using holographic 3d technology to enhance the ... - … 2017/using holographic … · presented...

33
Presented by: John Myers Senior Virtual Design & Construction Manager Eric Dodson Project Executive Using Holographic 3D Technology to Enhance the Design Process

Upload: duongdung

Post on 01-Jul-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

P r e s e n t e d b y :

John Myers – Sen io r V i r t ua l Des ign & Const ruc t ion Manager

E r i c D o d s o n– P r o j e c t E xe c u t i v e

Using Holographic 3D

Technology to Enhance the

Design Process

Educate User Groups on the Benefits of Holographic 3D Technology

Employing Holographic 3D Technology on Your Next Project

Facilitate Interactive Sessions with Designers, Builders, and User Groups

Use Holographic Technology on Projects to Reduce Costly and Time Consuming Changes.

LEARNING OUTCOMES

➢Planning and

Design Phases

➢Why is the Builder

at the Table?

BENEFITS OF 3D TECHNOLOGY

➢Design-Bid-Build

▪ Few Opportunities for Collaborative Interaction

▪ Fortunately, there IS a Better Way

FACILITATING INTERACTIVE DESIGN AND

CONSTRUCTION

➢Construction Management – Preconstruction Phase

▪ Cost Estimates

▪ Schedule Development

▪ Constructability Review

▪ Site Logistics Planning

▪ Greater Understanding of Design

FACILITATING INTERACTIVE DESIGN

AND CONSTRUCTION

➢Design-Assist▪ Engagement of Subcontractors

in Preconstruction to Finalize Design and Fabrication Details

➢Design Build ▪ Even More Collaborative:

▪ Schedule Driven

FACILITATING INTERACTIVE DESIGN

AND CONSTRUCTION

➢Design Tool - Revit

➢Marketing Tool - Fly Through

➢Design Coordination

▪ Constructability

▪ Clash Detection

▪ Fabrication Details for Complex Shapes

➢Collaborative Design Tool– Augmented Reality

▪ Layering Virtual Elements into Real World Views

▪ HoloLens Technology

HYPOTHESIS

HYPOTHESIS

Traditional Virtual Reality Mixed Reality

WE NEED A REASON

Why? How?

Why?

Are Today’s Contract Drawings Good Enough to Build From?

Is Redesign from Subcontractors Required to Put Work in Place?

BUILD IT RIGHT

INTENT vs M&M

Publ ic Bid Detai l in Massachusetts.

Took 4 months of redesign

(unreimbursed) once we had the

contractor on board.

We’re deceiving ourselves by claiming

that design today is intended for

fabr ication.

TACTICS

OBSERVE

INTERACT

IMMERSION

NEW WAY TO PROTOTYPE

NEW WAY TO PROTOTYPE

NEW WAY TO PROTOTYPE

NEW WAY TO PROTOTYPE

BOOM SAUCE

IMMERSION – AR VS VR

SCALE AND APPLICABILITY

THE HOW

THE HOW

EXECUTION – WHAT’S THE VALUE

POP THE HOOD

➢Enhance User Group Understanding and Design Input

➢For Complex Facilities Such as:

▪ Laboratories

▪ Vivarium

▪ Maker Space

▪ Studios

▪ Learning Spaces

FACILITATING INTERACTION WITH 3D

LEARNING OUTCOMES

▪ Educate User Groups on the Benefits of Holographic 3D Technology

▪ Employing Holographic 3D Technology on Your Next Project

▪ Facilitate Interactive Sessions with Designers, Builders, and User Groups

▪ Use Holographic Technology on Projects to Reduce Costly and Time Consuming Changes .

FINITO – QUESTIONS?