utility infrastructure briefing - wood issues briefing... · pipelines: determine type and purpose...

14
OFBF Self-Help Energy Programs Utility Infrastructure Briefing

Upload: others

Post on 11-Mar-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Utility Infrastructure Briefing - Wood Issues Briefing... · Pipelines: Determine type and purpose of the pipeline system proposed for the area. Infrastructure Development Ohio Utility

OFBF Self-Help Energy Programs

Utility Infrastructure

Briefing

Page 2: Utility Infrastructure Briefing - Wood Issues Briefing... · Pipelines: Determine type and purpose of the pipeline system proposed for the area. Infrastructure Development Ohio Utility

Crude Oil

Natural Gas

Electric Generation

Energy Market Trends

Page 3: Utility Infrastructure Briefing - Wood Issues Briefing... · Pipelines: Determine type and purpose of the pipeline system proposed for the area. Infrastructure Development Ohio Utility

Strategies to Control Energy Costs

Diversified Energy Portfolio – A teamwork approach utilizing several different fuel

sources.

Movement from a centralized to a decentralized electric generation, transmission and distribution system.

Energy Market Trends

Page 4: Utility Infrastructure Briefing - Wood Issues Briefing... · Pipelines: Determine type and purpose of the pipeline system proposed for the area. Infrastructure Development Ohio Utility

Infrastructure Development

Page 5: Utility Infrastructure Briefing - Wood Issues Briefing... · Pipelines: Determine type and purpose of the pipeline system proposed for the area. Infrastructure Development Ohio Utility

Pipelines: Determine type and purpose of the pipeline system proposed for the area.

Infrastructure Development

Interstate Service Lines

Page 6: Utility Infrastructure Briefing - Wood Issues Briefing... · Pipelines: Determine type and purpose of the pipeline system proposed for the area. Infrastructure Development Ohio Utility

Pipelines: Determine type and purpose of the pipeline system proposed for the area.

Infrastructure Development

SB 315 – Intrastate NG Service Lines

14-2322-EL-BGN: Clean Energy Future-Lordstown 14-1717-GA-BLN: NRG Ohio Avon Lake Gas Project 14-1754-GA-BLN: North Coast Lateral Pipeline 14-0534-EL-BGN: Middletown Energy Center 13-1752-EL-BGN: Carroll County Energy Generation 12-1669-EL-BGA: Rolling Hills Generating Conversion

Page 7: Utility Infrastructure Briefing - Wood Issues Briefing... · Pipelines: Determine type and purpose of the pipeline system proposed for the area. Infrastructure Development Ohio Utility

Pipelines: Determine type and purpose of the pipeline system proposed for the area.

Infrastructure Development

Intrastate Liquids Lines

Page 8: Utility Infrastructure Briefing - Wood Issues Briefing... · Pipelines: Determine type and purpose of the pipeline system proposed for the area. Infrastructure Development Ohio Utility

Pipelines: Determine type and purpose of the pipeline system proposed for the area.

Infrastructure Development

Ohio Utility IRP - Main Replacement Programs

Company Duke Energy Columbia Gas Dominion East

Ohio Vectren

Program Term 15 years 25 years 25 years 20 years

Current Year 13 6 6 6

Total Mileage 1,200 4,153 5,572 708

Miles Replaced

to Date 1,061 910 805 157

Utility Service Lines

Page 9: Utility Infrastructure Briefing - Wood Issues Briefing... · Pipelines: Determine type and purpose of the pipeline system proposed for the area. Infrastructure Development Ohio Utility

Infrastructure Development

Material, Distance, Diameter and Pressure

Interstate – Governed by Federal Energy Regulatory Commission (FERC).

Intrastate – Governed by PUCO and OPSB.

Collection Lines – Governed by ODNR – Oil and Gas.

Were Does Eminent Domain Apply?

Pipelines: Determine type and purpose of the pipeline system proposed for the area.

Page 10: Utility Infrastructure Briefing - Wood Issues Briefing... · Pipelines: Determine type and purpose of the pipeline system proposed for the area. Infrastructure Development Ohio Utility

General Concepts

Make adjustments to fit the farm…

Financial Settlement – Think beyond the “snapshot” offer.

Full Work Order - Specific construction specifications and logistics for your property.

Page 11: Utility Infrastructure Briefing - Wood Issues Briefing... · Pipelines: Determine type and purpose of the pipeline system proposed for the area. Infrastructure Development Ohio Utility

Remediation Process

OPSB Rules provide standards for repair and remediation after construction. Additional resources are available.

ODNR – Division of Soil & Water Conservation Pipeline Standard & Construction Specifications

• Planning Phases

• Construction Specs

• Monitoring and Remediation

Page 12: Utility Infrastructure Briefing - Wood Issues Briefing... · Pipelines: Determine type and purpose of the pipeline system proposed for the area. Infrastructure Development Ohio Utility

Establishing Payment

Factors to Consider

• Length – Pipeline running across property; price per linear foot or rod (16.5 foot surveying measurement.)

• Width – Total acreage taken temporarily (or permanently) out of production; coupled by impact on all future use.

Page 13: Utility Infrastructure Briefing - Wood Issues Briefing... · Pipelines: Determine type and purpose of the pipeline system proposed for the area. Infrastructure Development Ohio Utility

Establishing Payment

Factors to Consider

• Fair market value/loss of value.

• Current land rental rates in area.

• Loss of marketable timber/nursery stock.

• Loss of crop production/compaction.

• Value of guardianship

• Cost for personal attorney fees, consultants, survey work, filing fees, etc.

Page 14: Utility Infrastructure Briefing - Wood Issues Briefing... · Pipelines: Determine type and purpose of the pipeline system proposed for the area. Infrastructure Development Ohio Utility

OFBF Self-Help Energy Programs

Dale Arnold, Director, Energy Services Ohio Farm Bureau Federation

280 North High Street Columbus, OH 43218

Phone: 614.246.8294

E-Mail: [email protected]