uw campus hotel - madison, wisconsinreet existing ramp to remain primary vehicle access ... level...

25
UW CAMPUS HOTEL MADISON, WISCONSIN LAND USE APPLICATION GRAPHICS | 03-06-2019

Upload: others

Post on 13-Mar-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: UW CAMPUS HOTEL - Madison, Wisconsinreet existing ramp to remain primary vehicle access ... level ventilation-coord location and size with mep req'ts laundry carts at linen chute

UW CAMPUS HOTELMADISON, WISCONSIN

L A N D U S E A P P L I C A T I O N G R A P H I C S | 0 3 - 0 6 - 2 0 1 9

Page 2: UW CAMPUS HOTEL - Madison, Wisconsinreet existing ramp to remain primary vehicle access ... level ventilation-coord location and size with mep req'ts laundry carts at linen chute

COPYRIGHT © 2019 KAHLER SLATER, INC. ALL RIGHTS RESERVED

CITY OF MADISON LUA SUBMITTAL | 03-06-2019 | PAGE 02

UW CAMPUS HOTELMADISON, WISCONSIN

LOCATION PLAN

THE KOHL CENTER

REGENT STREET

NORT

H PA

RK S

TREE

T

WEST W

ASHINGTO

N AVENUE

780

740700

PROJECT SITE

NOT TO SCALE

EAST

CAM

PUS

MAL

L

BIKE TRAIL

Page 3: UW CAMPUS HOTEL - Madison, Wisconsinreet existing ramp to remain primary vehicle access ... level ventilation-coord location and size with mep req'ts laundry carts at linen chute

COPYRIGHT © 2019 KAHLER SLATER, INC. ALL RIGHTS RESERVED

CITY OF MADISON LUA SUBMITTAL | 03-06-2019 | PAGE 03

UW CAMPUS HOTELMADISON, WISCONSIN

SITE & CONTEXT VIEWS

VIEW NORTH AT EAST CAMPUS MALL

VIEW WEST TO THE DEVELOPMENT

VIEW SOUTH ON EAST CAMPUS MALL AT BIKE TRAIL

VIEW NORTH FROM REGENT STREET

VIEW WEST ON BIKE TRAIL

VIEW WEST FROM KOHL CENTER

Page 4: UW CAMPUS HOTEL - Madison, Wisconsinreet existing ramp to remain primary vehicle access ... level ventilation-coord location and size with mep req'ts laundry carts at linen chute

COPYRIGHT © 2019 KAHLER SLATER, INC. ALL RIGHTS RESERVED

CITY OF MADISON LUA SUBMITTAL | 03-06-2019 | PAGE 04

UW CAMPUS HOTELMADISON, WISCONSIN

SITE PLAN

E

E

E

E

E

E

E

E

MH

UVUV

E

E

MH

NEW PARKING AND RECONFIGURED SITE AND LANDSCAPING

DROP-OFF LANE AT MAIN ENTRYPROVIDE DECORATIVE CONCRETE

TRANSFORMER

AREA WELL

RECONFIGURED PARKINGRETAINING WALL WITH RAILING

EXISTING BUILDING

EXISTING BUILDING

PROPOSED HOTEL TOWER (PARKING AND HOTEL PODIUM BELOW)

EXISTING BIKE TRAIL

EXISTING PARKING

PROPERTY LINE

PROPOSED PARKING STRUCTURE PROPOSED HOTEL

FIRE HYDRANTEXISTING TRASH ENCLOSURE

FIRE HYDRANT

REGENT STREET

EAST CAMPUS MALL

STAIR CONNECTION TO PEDESTRIAN MALL

ACCESS FROM W WASHINGTON TBD

EXISTING ADA RAMP

PROPERTY LINE

RESTRIPED PARKING

Copyright © 2019 Kahler Slater, Inc. All rights reserved.

UW CAMPUS HOTELMortenson DD000 | 01/21/19

ARCHITECTURAL SITE PLAN

0 2512.5 50 100SCALE: 1" = 50' - 0"

Page 5: UW CAMPUS HOTEL - Madison, Wisconsinreet existing ramp to remain primary vehicle access ... level ventilation-coord location and size with mep req'ts laundry carts at linen chute

COPYRIGHT © 2019 KAHLER SLATER, INC. ALL RIGHTS RESERVED

CITY OF MADISON LUA SUBMITTAL | 03-06-2019 | PAGE 05

UW CAMPUS HOTELMADISON, WISCONSIN

BAR

DINING

BUFFET

LOUNGE

RECEPTION

MARKET

ELEVATORLOBBY

WORKAREA

BREAKROOM

STAFFTLT

PLUMBINGMAINELEC.ENGINEERING

OFF

STAIR 1

BOHCORRIDOR

TRASH /RCVG

OPENSTAIR

LOBBYSEATING/ FUTURE

THIRDPARTYRETAIL

RECEPTIONLOBBY

KITCHENOFFICE

STORAGE

OFFICE

MDF

PARKING

STAIR 2

MEN'S

VESTIBULELOUNGE

WOMEN'S

HKPGOFFICE

LAUNDRY

LINENSTO

119' - 8"

RAMP DOWN

RAMP UP (CONTINUES UP THROUGH P3.5)

P0.5 PARKING

P1 PARKING

126'

- 9"

Copyright © 2019 Kahler Slater, Inc. All rights reserved.

UW CAMPUS HOTELMortenson DD101 | 01/21/19

FLOOR PLAN - LEVEL 1

0 157.5 30 60SCALE: 1" = 30' - 0"

1ST FLOOR PLAN

Page 6: UW CAMPUS HOTEL - Madison, Wisconsinreet existing ramp to remain primary vehicle access ... level ventilation-coord location and size with mep req'ts laundry carts at linen chute

COPYRIGHT © 2019 KAHLER SLATER, INC. ALL RIGHTS RESERVED

CITY OF MADISON LUA SUBMITTAL | 03-06-2019 | PAGE 06

UW CAMPUS HOTELMADISON, WISCONSIN

ROOFMECHANICAL

PARKING (3.5 LEVELS

FITNESS

BOHCORRIDOR

MALE FEMALE

MEETINGSALON A

SALON ASTORAGE

STAIR 1

OUTDOORTERRACE

COATS

ELEV.LOBBY

STAIR 3

STAIR 2

MEETINGSALON B

PREFUNCTION

SALON BSTORAGE

120' - 4"

128'

- 10"

Copyright © 2019 Kahler Slater, Inc. All rights reserved.

UW CAMPUS HOTELMortenson DD102 | 01/22/19

FLOOR PLAN - LEVEL 2

0 157.5 30 60SCALE: 1" = 30' - 0"

HKPGELEV

LOBBY

E ELEC

ICE

IDF/MDF

KING KING KING

KING DOUBLEQUEEN-TUB

KING -ADA

PREMIUMKING -ADA

PREMIUMKING KINGKINGKINGKINGKINGKING KING

KING DOUBLEQUEEN

DOUBLEQUEEN

DOUBLEQUEEN

DOUBLEQUEEN

DOUBLEQUEEN

DOUBLEQUEEN

DOUBLEQUEEN

DOUBLEQUEEN

DOUBLEQUEEN

DOUBLEQUEEN

DOUBLEQUEEN-TUB

DOUBLEQUEEN-TUB

DOUBLEQUEEN

DOUBLEQUEEN-TUB

DOUBLEQUEEN

DOUBLEQUEEN

PREMIUMKINGQUEEN

STAIR 2STAIR 2

74' -

5"

322' - 9"

KING

KINGKING KING KING KING KING KING KING KING

W ELEC

Copyright © 2019 Kahler Slater, Inc. All rights reserved.

UW CAMPUS HOTELMortenson DD103 | 01/22/19

FLOOR PLANS - LEVELS 3 - 6

0 157.5 30 60SCALE: 1" = 30' - 0"

2ND FLOOR PLAN

3RD-6TH FLOOR PLAN

ROOFMECHANICAL

PARKING (3.5 LEVELS

FITNESS

BOHCORRIDOR

MALE FEMALE

MEETINGSALON A

SALON ASTORAGE

STAIR 1

OUTDOORTERRACE

COATS

ELEV.LOBBY

STAIR 3

STAIR 2

MEETINGSALON B

PREFUNCTION

SALON BSTORAGE

120' - 4"

128'

- 10"

Copyright © 2019 Kahler Slater, Inc. All rights reserved.

UW CAMPUS HOTELMortenson DD102 | 01/22/19

FLOOR PLAN - LEVEL 2

0 157.5 30 60SCALE: 1" = 30' - 0"

Page 7: UW CAMPUS HOTEL - Madison, Wisconsinreet existing ramp to remain primary vehicle access ... level ventilation-coord location and size with mep req'ts laundry carts at linen chute

COPYRIGHT © 2019 KAHLER SLATER, INC. ALL RIGHTS RESERVED

CITY OF MADISON LUA SUBMITTAL | 03-06-2019 | PAGE 07

UW CAMPUS HOTELMADISON, WISCONSIN

ENTRY VIEW

Page 8: UW CAMPUS HOTEL - Madison, Wisconsinreet existing ramp to remain primary vehicle access ... level ventilation-coord location and size with mep req'ts laundry carts at linen chute

COPYRIGHT © 2019 KAHLER SLATER, INC. ALL RIGHTS RESERVED

CITY OF MADISON LUA SUBMITTAL | 03-06-2019 | PAGE 08

UW CAMPUS HOTELMADISON, WISCONSIN

AERIAL VIEWS

VIEW TO NORTHEAST VIEW TO SOUTHWEST

Page 9: UW CAMPUS HOTEL - Madison, Wisconsinreet existing ramp to remain primary vehicle access ... level ventilation-coord location and size with mep req'ts laundry carts at linen chute

COPYRIGHT © 2019 KAHLER SLATER, INC. ALL RIGHTS RESERVED

CITY OF MADISON LUA SUBMITTAL | 03-06-2019 | PAGE 09

UW CAMPUS HOTELMADISON, WISCONSIN

APPROACH VIEW FROM REGEN STREET

Page 10: UW CAMPUS HOTEL - Madison, Wisconsinreet existing ramp to remain primary vehicle access ... level ventilation-coord location and size with mep req'ts laundry carts at linen chute

COPYRIGHT © 2019 KAHLER SLATER, INC. ALL RIGHTS RESERVED

CITY OF MADISON LUA SUBMITTAL | 03-06-2019 | PAGE 10

UW CAMPUS HOTELMADISON, WISCONSIN

APPROACH FROM EAST CAMPUS MALL

Page 11: UW CAMPUS HOTEL - Madison, Wisconsinreet existing ramp to remain primary vehicle access ... level ventilation-coord location and size with mep req'ts laundry carts at linen chute

COPYRIGHT © 2019 KAHLER SLATER, INC. ALL RIGHTS RESERVED

CITY OF MADISON LUA SUBMITTAL | 03-06-2019 | PAGE 11

UW CAMPUS HOTELMADISON, WISCONSIN

BIKE PATH VIEW TO EAST

Page 12: UW CAMPUS HOTEL - Madison, Wisconsinreet existing ramp to remain primary vehicle access ... level ventilation-coord location and size with mep req'ts laundry carts at linen chute

COPYRIGHT © 2019 KAHLER SLATER, INC. ALL RIGHTS RESERVED

CITY OF MADISON LUA SUBMITTAL | 03-06-2019 | PAGE 12

UW CAMPUS HOTELMADISON, WISCONSIN

BIKE PATH VIEW TO WEST

Page 13: UW CAMPUS HOTEL - Madison, Wisconsinreet existing ramp to remain primary vehicle access ... level ventilation-coord location and size with mep req'ts laundry carts at linen chute

COPYRIGHT © 2019 KAHLER SLATER, INC. ALL RIGHTS RESERVED

CITY OF MADISON LUA SUBMITTAL | 03-06-2019 | PAGE 13

UW CAMPUS HOTELMADISON, WISCONSIN

BUILDING ELEVATION AND MATERIALS

FLEX FACADES SCREENING DARK METAL (FLAT & CORRUGATED) METAL - WHITE SIDING - WOOD-LOOK FORMLINER PATTERN ON PRECASTEIFS - GRAY

SOUTH ELEVATION

Page 14: UW CAMPUS HOTEL - Madison, Wisconsinreet existing ramp to remain primary vehicle access ... level ventilation-coord location and size with mep req'ts laundry carts at linen chute

COPYRIGHT © 2019 KAHLER SLATER, INC. ALL RIGHTS RESERVED

CITY OF MADISON LUA SUBMITTAL | 03-06-2019 | PAGE 14

UW CAMPUS HOTELMADISON, WISCONSIN

BUILDING ELEVATIONSNORTH ELEVATION

WEST ELEVATION EAST ELEVATION

Page 15: UW CAMPUS HOTEL - Madison, Wisconsinreet existing ramp to remain primary vehicle access ... level ventilation-coord location and size with mep req'ts laundry carts at linen chute
Page 16: UW CAMPUS HOTEL - Madison, Wisconsinreet existing ramp to remain primary vehicle access ... level ventilation-coord location and size with mep req'ts laundry carts at linen chute

1 /8" = 1'-0"

E

E

E

E

E

E

E

E

MH

MH

E

UVUV

MHE

E

UV

E

E

E

MH

1 /8" = 1'-0"

NEW STAFF PARKING, RECONFIGURED PLAZA AND LANDSCAPING

COVERED DROP-OFF LANE AT MAIN ENTRY W/ DECORATIVE PAVING

TRANSFORMER / SWITCHGEAR

AREA WELL

RETAINING WALL & GUARDRAIL

EXISTING 780 REGENT BUILDING

EXISTING BUILDING

PROPOSED HOTEL TOWER (PARKING AND HOTEL PODIUM BELOW)

EXISTING BIKE TRAIL

EXISTING PARKING

RESTRIPED PARKING

PROPERTY LINE

PROPERTY LINE

PROPERTY LINE

PROPOSED PARKING STRUCTURE PROPOSED HOTEL

FLAG(S) - COORD RELOCATION WITH 780 REGENT OWNER

FIRE HYDRANT - COORD LOCATIONS WITH FIRE DEPARTMENT TYP

REGENT STREET

EXISTING RAMP TO REMAIN

PRIMARY VEHICLE ACCESS

STAIR ENTRY W/ TRELLIS & DECORATIVE PAVING

SECONDARY VEHICLE ACCESS

TRASH / LOADING AREA

EA

ST C

AM

PU

S M

ALL

STAFF ENTRANCE

STAFF PARKING

BIKE PATH ACCESS

OUTDOOR PATIO W/ TRELLIS & DECORATIVE PAVING

LOADING ZONE

PEDESTRIAN WALKWAY

SHORT TERM HOTEL PARKING

US FLAG LOCATION

BIKE RACKS

ONE WAY TURN LANE

MONUMENT SIGNAGE TO BE RECONFIGURED

PARKING KIOSK

111 West Wisconsin Avenue, Milwaukee, Wisconsin 53203Telephone 414.272.2000 Fax 414.272.2001

44 East Mifflin Street, Suite 700, Madison, Wisconsin 53703Telephone 608.283.6300 Fax 608.283.6317

Sheet No.

Project No.

Sheet Title

Drawing Date

Revisions

NO

T F

OR

C

ON

ST

RU

CT

ION

SCOPE DOCUMENTS

3/5

/2019 9

:55:0

9 P

M

A000

ARCHITECTURAL SITEPLAN

Mortenson

MARCH 6, 2019

218051

780 Regent StreetMadison, WI 53715

UW CAMPUS HOTEL

LAND USE SUBMITTAL

Copyright © 2019 Kahler Slater, Inc. All rights reserved.

1/32" = 1'-0"1

ARCHITECTURAL SITE PLAN0 168 32 64

Page 17: UW CAMPUS HOTEL - Madison, Wisconsinreet existing ramp to remain primary vehicle access ... level ventilation-coord location and size with mep req'ts laundry carts at linen chute

UP

UP

E

COPIER

UP

2321

HK

P1 26

JA200

2

A201

A2011

2

150 SF

MDF

381 SF

PLUMBING 134 SF

MAIN ELEC. 256 SF

TRASH / RCVG

533 SF

BUFFET

40 SF

STAFF TLT

1004 SF

BOH CORRIDOR

728 SF

BAR

1432 SF

DINING

87 SF

STORAGE

155 SF

STAIR 1

106 SF

OFFICE

258 SF

WORK AREA

150 SF

ENGINEERING OFF

154 SF

MARKET

142 SF

RECEPTION

323 SF

ELEVATOR LOBBY

400 SF

LOUNGE

711 SF

RECEPTION LOBBY

319 SF

OPEN STAIR

499 SF

LOBBY SEATING / FUTURE THIRD PARTY RETAIL

7'-0" OVHD DOOR

NOTE: KITCHEN LAYOUT TBD BY FUTURE FOOD SERVICE VENDOR. COORDINATE RECESSED SLAB LOCATIONS FOR COOLERS.

276 SF

STAIR 2

AREAWELL FOR LOWER LEVEL VENTILATION-COORD LOCATION AND SIZE WITH MEP REQ'TS

LAUNDRY CARTS AT LINEN CHUTE

TRASH AND RECYCLING BINS

76 SF

KITCHEN OFFICE

OPENING IN PRECAST FOR VEHICULAR ACCESS

320' - 8"

HAHA

PC

PD

18' -

0 1

/8"

34' -

0"

8' -

5 7

/8"

60' -

6"

9' - 8"

P8P7P6P5P4P2 P3 P9

202 SF

MEN'S

10' - 0" 16' - 4 1/2" 26' - 4 1/2" 26' - 4 1/2" 26' - 4 1/2" 26' - 4 1/2" 26' - 4 1/2" 26' - 4 1/2" 16' - 0 1/2" 1' - 4" 18' - 8" 9' - 4" 17' - 4" 13' - 4" 25' - 4" 24' - 8" 10' - 0"

RAMP DOWN (SLAB ON GRADE)24 SPACES

RAMP UP (SLAB ON GRADE + PRECAST)24 SPACES

P0.5 PARKING(SLAB ON GRADE)

18 SPACES

P1 PARKING(SLAB ON GRADE)

11 SPACES

OPENING IN PRECAST FOR VEHICULAR ACCESS

184 SF

VESTIBULE

218 SF

LOUNGE

CC

C

ON

E W

AY

11' - 0" 3' - 0"

C

80' C

OM

MO

N P

AT

H

OVERHANG ABOVE (DASHED)

FOUNDATION WALL

195 SF

WOMEN'S

FD

FD

73 SF

HKPG OFFICE

280 SF

BREAK ROOM

862 SF

LAUNDRY

96 SF

LINEN STO

FD

176' - 0" 62' - 9"

A2015

123'

- 6

3/4

"

60' -

1"

TURNAROUND158 SF

ELEC RM

PRECAST STITCH / SHEAR WALL

PRECAST SHEAR WALL

C C CC

C

EXIT

EXIT

ENTRANCE

152 SF

STAIR 36' -

8 1

/8"

CONC STOOP W/ TRELLIS ABOVE - SEE STRUCT

GENERATOR

H4 H7

HG

HE

HD

HH

H2P10

5' -

0"

25' -

4"

22' -

0"

6' -

4"

6' -

0"

31' -

0"

8' -

8"

16' -

8"

3' -

4"

3"1'

- 1

"

HC

HB

H3

HF

H1

PARKING KIOSKS

135 SF

EMER. ELEC.

104 SF

WATER SOFT.

5' - 4"

PATIO AREA W/ TRELLIS ABOVE

8' - 0" 8' - 0"

STAFF ENTRANCE

CLERESTORY WINDOW

8' -

9"

LOUVER

66 SF

OFFICE

70 SF

OFFICE

8' -

4"

15' - 4"

11' -

11

7/8"

PARKING KIOSK

1502 SF

KITCHEN

SCREEN ASSEMBLY 01WALL ASSEMBLY 01

SCREEN ASSEMBLY 01

WALL ASSEMBLY 01

WALL ASSEMBLY 01

WALL ASSEMBLY 01

WALL ASSEMBLY 01 SCREEN ASSEMBLY 01 WALL ASSEMBLY 01GLAZING ASSEMBLY 02

WALL ASSEMBLY 01GLAZING ASSEMBLY 02

WALL ASSEMBLY 01

GLAZING ASSEMBLY 01

WALL ASSEMBLY 01WALL ASSEMBLY 01

WALL ASSEMBLY 01

DECORATIVE PAVING

507 SF

EXT ELEV LOBBY

DECORATIVE PAVING

A200

1

PARKING

REGULAR

COMPACT

ADA

VAN ADA

COUNT

175

60

02

02

TOTAL: 239

PERCENT

73%

25 %

1 %

1 %

100 %

BIKE PARKING AREAS: 2,015 SF AVAILABLE

111 West Wisconsin Avenue, Milwaukee, Wisconsin 53203Telephone 414.272.2000 Fax 414.272.2001

44 East Mifflin Street, Suite 700, Madison, Wisconsin 53703Telephone 608.283.6300 Fax 608.283.6317

Sheet No.

Project No.

Sheet Title

Drawing Date

Revisions

NO

T F

OR

C

ON

ST

RU

CT

ION

SCOPE DOCUMENTS

3/5

/2019 9

:55:1

1 P

M

A101

LEVEL 1 PLAN

Mortenson

MARCH 6, 2019

218051

780 Regent StreetMadison, WI 53715

UW CAMPUS HOTEL

LAND USE SUBMITTAL

Copyright © 2019 Kahler Slater, Inc. All rights reserved.

1/16" = 1'-0"1

01 FIRST FLOOR PLAN

1/4" = 1'-0"

PARKING TOTALS

0 84 16 32

Page 18: UW CAMPUS HOTEL - Madison, Wisconsinreet existing ramp to remain primary vehicle access ... level ventilation-coord location and size with mep req'ts laundry carts at linen chute

UP

UP DN

2321

HK

P1 26

JA200

2

A201

A2011

2

HA

PC

PD

P8P7P6P5P4P2 P3 P9

C

C C CC

C C C

C C CC

C C C

P1.5 PARKING (PRECAST)15 SPACES

C

P2 PARKING (PRECAST)15 SPACES

PRECAST DOUBLE TEES - RAMP DOWN TO FOUNDATION WALL BELOW

C

RAMP UP (PRECAST)24 SPACES

RAMP DOWN (PRECAST)24 SPACES

A2015

OPEN TO BELOW

BIKE PARKING

300 SF

BIKE PARKING

345 SF

PRECAST SHEAR WALL

180 SFELEV. LOBBY

BIKE PARKING

302 SF

C

PRECAST STITCH / SHEAR WALL

EXIT

EXIT

C

ELEVATOR

H4 H7

HG

HE

HD

HH

H2P10

HC

HB

H3

HF

H1

10' - 0" 16' - 4 1/2" 26' - 4 1/2" 26' - 4 1/2" 26' - 4 1/2" 26' - 4 1/2" 26' - 4 1/2" 26' - 4 1/2" 16' - 0 1/2"

177' - 5"

PARKING

REGULAR

COMPACT

ADA

VAN ADA

COUNT

175

60

02

02

TOTAL: 239

PERCENT

73%

25 %

1 %

1 %

100 %

BIKE PARKING AREAS: 2,015 SF AVAILABLE

111 West Wisconsin Avenue, Milwaukee, Wisconsin 53203Telephone 414.272.2000 Fax 414.272.2001

44 East Mifflin Street, Suite 700, Madison, Wisconsin 53703Telephone 608.283.6300 Fax 608.283.6317

Sheet No.

Project No.

Sheet Title

Drawing Date

Revisions

NO

T F

OR

C

ON

ST

RU

CT

ION

SCOPE DOCUMENTS

3/5

/2019 9

:55:1

2 P

M

A102

LEVEL P2 PLAN -PARKING

Mortenson

MARCH 6, 2019

218051

780 Regent StreetMadison, WI 53715

UW CAMPUS HOTEL

LAND USE SUBMITTAL

Copyright © 2019 Kahler Slater, Inc. All rights reserved.

1/16" = 1'-0"1

P2 PARKING PLAN

1/4" = 1'-0"

PARKING TOTALS

0 84 16 32

Page 19: UW CAMPUS HOTEL - Madison, Wisconsinreet existing ramp to remain primary vehicle access ... level ventilation-coord location and size with mep req'ts laundry carts at linen chute

UP

E

DN

2321

HK

P1 26

JA200

2

A201

A2011

2

988 SF

FITNESS

632 SF

BOH CORRIDOR

175 SF

MALE

175 SF

FEMALE

907 SF

MEETING SALON A

155 SF

STAIR 1

33 SF

COATS

122 SF

SALON A STORAGE

TRAFFIC COATING / CUT PATTERN TBDGLASS GUARDRAIL SYSTEM AT PERIMETER OF TERRACE

ACM CLAD CANOPY

OPERABLE PARTITION

OPEN TO BELOW

ROOF MOUNTED SCREEN WALL

MECHANICAL YARD ON ROOFSEE MEP DWGS

MILLWORK FOR TOWELS, ETC.

906 SF

MEETING SALON B

HAHA

PC

PDPD

P8P7P6P5P4P2 P3 P9

OPEN STAIR WITH ORNAMENTAL RAILINGS

OPEN TO BELOW

727 SF

OUTDOOR TERRACE

4'-6

" M

IN

GLASS GUARDRAIL SYSTEM AT PERIMETER OF TERRACE

HIGH TOP TABLES

MILLWORK BUFFET

86 SF

SALON B STORAGE

PRESENTATION AREA

SMOKE GUARDS

LINEN CHUTE

DECORATIVE WALL / CEILING

TA

PE

RE

D

INS

ULA

TIO

N

ROOF DRAIN W/ BACKUP TYP

A2015

H4 H7

HG

HE

HD

5' -

6"17

' - 0

"

53 SF

JANITOR

HH

H2P10

HC

HB

H3

POCKET

HF

PRESENTATION AREA

MILLWORK BUFFET

DF

2084 SF

PREFUNCTION

H1

ROOF ACCESS

TA

PE

RE

D

INS

ULA

TIO

N

TA

PE

RE

D

INS

ULA

TIO

NT

AP

ER

ED

IN

SU

LAT

ION

TA

PE

RE

D

INS

ULA

TIO

NT

AP

ER

ED

IN

SU

LAT

ION

203

SF

EL

EV

AT

OR

LO

BB

Y

152 SF

STAIR 3

WALL ASSEMBLY 01 GLAZING ASSEMBLY 02 GLAZING ASSEMBLY 02

WALL ASSEMBLY 01

WALL ASSEMBLY 01

WALL ASSEMBLY 03

SCREEN ASSEMBLY 01WALL ASSEMBLY 01

WALL ASSEMBLY 01

WALL ASSEMBLY 01

GLAZING ASSEMBLY 01

SCREEN ASSEMBLY 01

WALL ASSEMBLY 01

SCREEN ASSEMBLY 01 WALL ASSEMBLY 01

5' -

0"

25' -

4"

22' -

0"

6' -

4"

6' -

0"

31' -

0"

8' -

8"

16' -

8"

3' -

4"

3"

1' -

4"

1' - 2"

3' -

11

7/8"

40' -

8"

16' - 0 1/2" 20' - 0" 9' - 4" 17' - 4" 13' - 4" 25' - 4" 24' - 8" 10' - 0"

72' - 6" 1' - 10"1' - 0"

111 West Wisconsin Avenue, Milwaukee, Wisconsin 53203Telephone 414.272.2000 Fax 414.272.2001

44 East Mifflin Street, Suite 700, Madison, Wisconsin 53703Telephone 608.283.6300 Fax 608.283.6317

Sheet No.

Project No.

Sheet Title

Drawing Date

Revisions

NO

T F

OR

C

ON

ST

RU

CT

ION

SCOPE DOCUMENTS

3/5

/2019 9

:55:1

3 P

M

A103

LEVEL 2 PLAN - HOTEL

Mortenson

MARCH 6, 2019

218051

780 Regent StreetMadison, WI 53715

UW CAMPUS HOTEL

LAND USE SUBMITTAL

Copyright © 2019 Kahler Slater, Inc. All rights reserved.

1/16" = 1'-0"1

02 SECOND FLOOR PLAN - HOTEL0 84 16 32

Page 20: UW CAMPUS HOTEL - Madison, Wisconsinreet existing ramp to remain primary vehicle access ... level ventilation-coord location and size with mep req'ts laundry carts at linen chute

UP

DN

UP

2321

HK

P1 26

JA200

2

A201

A2011

2

152 SF

STAIR 3

181 SF

ELEV. LOBBY

UPPER PART OF 2.5 FLOOR

HA

PC

PD

P8P7P6P5P4P2 P3 P9

P2.5 PARKING (PRECAST)13 SPACES

P3 PARKING (PRECAST)15 SPACES

RAMP UP (PRECAST)24 SPACES

RAMP DOWN (PRECAST)24 SPACES

A2015

60' -

6"

60' -

6"

112 SF

MAINT SHED

161 SF

TRANSFER STAIR

C C CC

C C C

C CC

C C C

C

PRECAST DOUBLE TEES - RAMP DOWN TO FOUNDATION WALL BELOW

C

340 SF

BIKE PARKING

502 SF

PRECAST SHEAR WALL

BIKE PARKING

300 SF

C

PRECAST STITCH / SHEAR WALL

EXIT

EXIT

C

ELEVATOR

BIKE PARKING

H4 H7

HG

HE

HD

HH

H2P10

HC

HB

H3

HF

H1

MECHANICAL YARD / ROOF BELOW

C

276 SF

STAIR 2

10' - 0" 16' - 4 1/2" 26' - 4 1/2" 26' - 4 1/2" 26' - 4 1/2" 26' - 4 1/2" 26' - 4 1/2" 26' - 4 1/2" 16' - 0 1/2"

177' - 5"

PARKING

REGULAR

COMPACT

ADA

VAN ADA

COUNT

175

60

02

02

TOTAL: 239

PERCENT

73%

25 %

1 %

1 %

100 %

BIKE PARKING AREAS: 2,015 SF AVAILABLE

111 West Wisconsin Avenue, Milwaukee, Wisconsin 53203Telephone 414.272.2000 Fax 414.272.2001

44 East Mifflin Street, Suite 700, Madison, Wisconsin 53703Telephone 608.283.6300 Fax 608.283.6317

Sheet No.

Project No.

Sheet Title

Drawing Date

Revisions

NO

T F

OR

C

ON

ST

RU

CT

ION

SCOPE DOCUMENTS

3/5

/2019 9

:55:1

4 P

M

A104

LEVEL P3 PLAN -PARKING

Mortenson

MARCH 6, 2019

218051

780 Regent StreetMadison, WI 53715

UW CAMPUS HOTEL

LAND USE SUBMITTAL

Copyright © 2019 Kahler Slater, Inc. All rights reserved.

1/16" = 1'-0"1

P3 PARKING PLAN

1/4" = 1'-0"

PARKING TOTALS

0 84 16 32

Page 21: UW CAMPUS HOTEL - Madison, Wisconsinreet existing ramp to remain primary vehicle access ... level ventilation-coord location and size with mep req'ts laundry carts at linen chute

DN

P1

A200

1

HA

PC

P8P7P6P5P4P2 P3 P9

A2014 A201 3

CCCCTU

RN

AR

OU

ND

C

16' -

0"

25' -

0"

16' -

0"

C C

P3.5 PARKING (PRECAST)8 SPACES

C C C C CCC

161 SFTRANSFER STAIR

C C C

C

18' -

0"

24' -

0"

18' -

0"

P3 PARKING (SEE P3 PLAN)

RAMP UP (SEE P3 PLAN)

BIKE PARKING

120 SF

HE

HD

P10

HC

HB

HF

H1

TO INTERIOR PARKINGPROTECT EDGE OF BUILDING ABOVE CAR BUMPER

60' -

6"

10' - 0" 16' - 4 1/2" 26' - 4 1/2" 26' - 4 1/2" 26' - 4 1/2" 26' - 4 1/2" 26' - 4 1/2" 26' - 4 1/2" 16' - 0 1/2" 1' - 4"

64' - 9" 32' - 2" 4' - 6"

2' -

5 1

/8"

111 West Wisconsin Avenue, Milwaukee, Wisconsin 53203Telephone 414.272.2000 Fax 414.272.2001

44 East Mifflin Street, Suite 700, Madison, Wisconsin 53703Telephone 608.283.6300 Fax 608.283.6317

Sheet No.

Project No.

Sheet Title

Drawing Date

Revisions

NO

T F

OR

C

ON

ST

RU

CT

ION

SCOPE DOCUMENTS

3/5

/2019 9

:55:1

4 P

M

A105

LEVEL P3.5 PLAN -PARKING

Mortenson

MARCH 6, 2019

218051

780 Regent StreetMadison, WI 53715

UW CAMPUS HOTEL

LAND USE SUBMITTAL

Copyright © 2019 Kahler Slater, Inc. All rights reserved.

1/16" = 1'-0"1

P3.5 PARKING PLAN0 84 16 32

Page 22: UW CAMPUS HOTEL - Madison, Wisconsinreet existing ramp to remain primary vehicle access ... level ventilation-coord location and size with mep req'ts laundry carts at linen chute

UP DN

DN

2423222120192P1 25 263 4 5 6 7 8 9 10 11 12 13 15 16 17

J

A200

2

A201

A2011

2

357 SF

HKPG

265 SF

ELEV

LOBBY

115 SF

E ELEC

107 SF

ICE

158 SF

STAIR 232 SF

IDF/MDF

14

297 SF

KING

297 SF

KING

297 SF

KING

309 SF

KING

336 SF

DOUBLE

QUEEN-TUB490 SF

KING -

ADA

495 SF

PREMIUM

KING -

ADA

440 SF

PREMIUM

KING

155 SF

STAIR 2

PD15' - 0" 12' - 0"16' - 8"

11' -

4"

53' -

10"

240' - 0"

8' - 8" 8" 12' - 8" 12' - 8" 12' - 8" 12' - 8" 12' - 8" 12' - 8" 12' - 8" 12' - 8" 12' - 8" 12' - 8" 12' - 8" 12' - 8" 12' - 8" 12' - 8" 12' - 8" 33' - 0" 15' - 8" 8" 12' - 0" 12' - 8" 12' - 8" 12' - 8" 12' - 8" 9' - 4"

64' - 8" 36' - 8" 91' - 4" 30' - 5" 80' - 3" 9' - 8"

2' - 0" 48' - 2" 62' - 8" 7' - 6"

103 103 103 103

103

303' - 4"

1' - 10"

76' -

1 3

/4"

2' -

10

5/8"

12' - 0"16' - 8"9' - 1 1/2"

65' -

2"

53' -

6"

11' -

8"

104

105

106

WALL ASSEMBLY 04

WALL ASSEMBLY 02WALL ASSEMBLY 01

WALL ASSEMBLY 02

WALL ASSEMBLY 03

WALL ASSEMBLY 01

WALL ASSEMBLY 03

WALL ASSEMBLY 01 297 SF

KING

297 SF

KING

297 SF

KING

297 SF

KING

297 SF

KING

297 SF

KING

297 SF

KING

309 SF

KING

336 SF

DOUBLE

QUEEN

336 SF

DOUBLE

QUEEN

336 SF

DOUBLE

QUEEN

336 SF

DOUBLE

QUEEN

336 SF

DOUBLE

QUEEN

336 SF

DOUBLE

QUEEN

336 SF

DOUBLE

QUEEN

336 SF

DOUBLE

QUEEN

336 SF

DOUBLE

QUEEN

336 SF

DOUBLE

QUEEN

336 SF

DOUBLE

QUEEN-TUB

336 SF

DOUBLE

QUEEN-TUB

336 SF

DOUBLE

QUEEN

336 SF

DOUBLE

QUEEN-TUB

336 SF

DOUBLE

QUEEN

336 SF

DOUBLE

QUEEN

440 SF

PREMIUM

KING

336 SF

QUEEN

SMOKE DOORS ON HOLD-OPENS

LINEN CHUTE

A2014 A201 3

A2015

15' -

8"

4' -

8"

20' -

4"

18

9' -

8"

3' -

8"

20' -

8"

63 SF

W ELEC

1888 SF

CORRIDOR

8' - 7"

297 SF

KING

297 SF

KING

297 SF

KING

297 SF

KING

297 SF

KING

297 SF

KING

297 SF

KING

297 SF

KING

297 SF

KING

309 SF

KING

WALL ASSEMBLY 02

WALL ASSEMBLY 03

WALL ASSEMBLY 03

WALL ASSEMBLY 04

WALL ASSEMBLY 02

WALL ASSEMBLY 04

WALL ASSEMBLY 02 WALL ASSEMBLY 01

WALL ASSEMBLY 01

WALL ASSEMBLY 03

WALL ASSEMBLY 03WALL ASSEMBLY 02 WALL ASSEMBLY 03

A200

1

34' -

0"

30' -

0"

2423222120192P1 25 263 4 5 6 7 8 9 10 11 12 13 15 16 17

JA200

2

A201

A2011

2

96 SFE ELEC

32 SFIDF / MDF

158 SFSTAIR 2

357 SFHOUSEKEEPING

155 SFSTAIR 1

112 SFICE

263 SFELEV. LOBBY

LINEN CHUTE

14

PD

489 SFDOUBLE QUEEN - ADA

A2014 A201 3

A2015

18

47 SF

W ELEC

407

1891 SFCORRIDOR

A200

1

UNIT TYPE

DQ

DQ-ADA

K

K-ADA

PK

PK-ADA

COUNT

72

02

88

04

08

02

TOTAL: 176

PRECENT

41 %

01 %

50 %

02 %

5 %

01 %

100 %

111 West Wisconsin Avenue, Milwaukee, Wisconsin 53203Telephone 414.272.2000 Fax 414.272.2001

44 East Mifflin Street, Suite 700, Madison, Wisconsin 53703Telephone 608.283.6300 Fax 608.283.6317

Sheet No.

Project No.

Sheet Title

Drawing Date

Revisions

NO

T F

OR

C

ON

ST

RU

CT

ION

SCOPE DOCUMENTS

3/5

/2019 9

:55:1

7 P

M

A106

LEVEL 3 & 4 PLAN

Mortenson

MARCH 6, 2019

218051

780 Regent StreetMadison, WI 53715

UW CAMPUS HOTEL

LAND USE SUBMITTAL

Copyright © 2019 Kahler Slater, Inc. All rights reserved.

REF TYP FLOOR PLAN (LEVEL 3)

1/16" = 1'-0"1

03 THIRD FLOOR PLAN (TYPICAL)

1/16" = 1'-0"2

FOURTH - SIXTH FLOOR PLAN

1/4" = 1'-0"

UNIT TOTALS

0 84 16 32

0 84 16 32

Page 23: UW CAMPUS HOTEL - Madison, Wisconsinreet existing ramp to remain primary vehicle access ... level ventilation-coord location and size with mep req'ts laundry carts at linen chute

24

23

22

21

20192

P1

25

26

3 4 5 6 7 8 9 10 11 12 13 15 16 17

J

A200

2

A201

A2011

2

ELEVATOR OVERRUN ROOF, WRAP MEMBRANE DOWN SIDES, PROVIDE SCREENING AS REQUIRED BY AHJ

HATCH FOR ROOF ACCESS

COORDINATE ROOFTOP PENETRATIONS FOR TOILET EXHAUST TO BE LOCATED IN CENTRAL AREA

SLOPED STRUCTURE TPO ROOF; ROOF DRAINS, CRICKETS AND SCUPPERS AS REQUIRED

14

PD PARAPET

PARAPET

PARAPET

PARAPETPARAPET EXTENSIONS TYP

SLO

PE

TO

DR

AIN

SLO

PE

RO

OF

DE

CK

TO

DR

AIN

SLO

PE

RO

OF

DE

CK

TO

DR

AIN

SLO

PE

RO

OF

DE

CK

TO

DR

AIN

SLO

PE

RO

OF

DE

CK

TO

DR

AIN

SLO

PE

RO

OF

DE

CK

TO

DR

AIN

SLO

PE

RO

OF

DE

CK

TO

DR

AIN

ACM WRAP ROOF CAP, SLOPE TO DRAIN

BALLASTED WRAP ROOF

SLOPED STRUCTURE TPO ROOF; ROOF DRAINS, CRICKETS AND SCUPPERS AS REQUIRED

TY

P

4' -

0"

1' - 4"TYP

1' - 3"

A2014 A201 3

A2015

18

TY

P S

UB

DU

CT

LO

CA

TIO

NS

EE

ME

CH

DW

GS

FO

R

EQ

UIP

ME

NT

DOAS

ROOF HATCH & SHIPS LADDER

DOAS

ROOF HATCH & SHIPS LADDER

12' - 0"

12' - 0"

MECH SHAFTS - SEE MECH DWGS FOR EQUIPMENT TYP

A200

1

111 West Wisconsin Avenue, Milwaukee, Wisconsin 53203Telephone 414.272.2000 Fax 414.272.2001

44 East Mifflin Street, Suite 700, Madison, Wisconsin 53703Telephone 608.283.6300 Fax 608.283.6317

Sheet No.

Project No.

Sheet Title

Drawing Date

Revisions

NO

T F

OR

C

ON

ST

RU

CT

ION

SCOPE DOCUMENTS

3/5

/2019 9

:55:1

8 P

M

A108

LEVEL 7 - ROOF PLAN

Mortenson

MARCH 6, 2019

218051

780 Regent StreetMadison, WI 53715

UW CAMPUS HOTEL

LAND USE SUBMITTAL

Copyright © 2019 Kahler Slater, Inc. All rights reserved.

1/16" = 1'-0"1

07 ROOF PLAN0 84 16 32

Page 24: UW CAMPUS HOTEL - Madison, Wisconsinreet existing ramp to remain primary vehicle access ... level ventilation-coord location and size with mep req'ts laundry carts at linen chute

LEVEL 1100' - 0"

LEVEL P2111' - 2"

LEVEL P3121' - 2"

23 21 P126

LEVEL 2116' - 0"

LEVEL P1.5105' - 0"

LEVEL P3.5125' - 0"

LEVEL P0.595' - 0"

GRADE VARIES GRADE VARIES

NOTE: PENETRATIONS FOR LOUVERS AND EQUPMENT NOT SHOWN; REFER TO HVAC INFORMATION

LEVEL P2.5115' - 0"

EXHAUST WELL

P8 P7 P6 P5 P4 P2P3P9

METAL PANEL INFILL TYP

EIFS REVEAL TYP

GRAVEL STOP / COPING AT ROOF EDGES TYP

01 028

H4H7 H2 P10H3 H1

WALL ASSEMBLY 01WALL ASSEMBLY 02WALL ASSEMBLY 03WALL ASSEMBLY 02

WALL ASSEMBLY 01

WALL ASSEMBLY 01 WALL ASSEMBLY 04

WALL ASSEMBLY 02SCREEN ASSEMBLY 02

WALL ASSEMBLY 01

01 01

WALL ASSEMBLY 01SCREEN ASSEMBLY 01

GLAZING ASSEMBLY 01

GLAZING ASSEMBLY 02

10' - 0" 24' - 8" 25' - 4" 13' - 4" 17' - 4" 9' - 4" 18' - 8" 1' - 4" 16' - 0 1/2" 26' - 4 1/2" 26' - 4 1/2" 26' - 4 1/2" 26' - 4 1/2" 26' - 4 1/2" 26' - 4 1/2" 16' - 4 1/2" 10' - 0"

MECHANICAL UNITMECHANICAL UNIT

GLAZING ASSEMBLY 03

SIGN 1

PRECAST

SIGN 1

GLAZING ASSEMBLY 03

GLAZING ASSEMBLY 03

GLAZING ASSEMBLY 03

LEVEL 1100' - 0"

LEVEL 1100' - 0"

LEVEL P2111' - 2"

LEVEL P3121' - 2"

LEVEL 3133' - 6"

LEVEL 4142' - 10"

LEVEL 5152' - 2"

LEVEL 6161' - 6"

ROOF171' - 0"

24

23

2322

21

2120192

P1

P1 25

26

263 4 5 6 7 8 9 10 11 12 13 15 16 17

LEVEL 2116' - 0"

LEVEL P1.5105' - 0"

LEVEL P3.5125' - 0"

LEVEL P0.595' - 0"

LEVEL P2.5115' - 0"

14

ROOF EDGE - EIFS172' - 0"

ROOF - ELEVATOR CAP178' - 0"

PARAPET - MASONRY176' - 0"

P8P7P6P5P4P2 P3 P9

PROVIDE RECESSED LIGHTING IN SOFFITS

10' - 0"24' - 8"25' - 4"13' - 4"17' - 4"9' - 4"18' - 8"1' - 4"16' - 0 1/2"26' - 4 1/2"26' - 4 1/2"26' - 4 1/2"26' - 4 1/2"26' - 4 1/2"26' - 4 1/2"16' - 4 1/2"10' - 0"

18

9' - 4"12' - 8"12' - 8"12' - 8"12' - 8"12' - 8"15' - 8"17' - 4"15' - 8"12' - 8"12' - 8"12' - 8"12' - 8"12' - 8"12' - 8"12' - 8"12' - 8"12' - 8"12' - 8"12' - 8"12' - 8"12' - 8"12' - 8"12' - 8"9' - 4"

0201

H4 H7H2P10 H3H126

' - 8

"

010201 01

WALL ASSEMBLY 02WALL ASSEMBLY 01

WALL ASSEMBLY 01

WALL ASSEMBLY 02WALL ASSEMBLY 04WALL ASSEMBLY 03WALL ASSEMBLY 04WALL ASSEMBLY 02WALL ASSEMBLY 01

WALL ASSEMBLY 01 SCREEN ASSEMBLY 01 WALL ASSEMBLY 01

GLAZING ASSEMBLY 02

3' -

10"

6' -

2"

3' -

10"

6' -

2"

5' -

0"

5' -

0"

MECHANICAL UNIT

MECHANICAL UNIT

GLAZING ASSEMBLY 03

GLAZING ASSEMBLY 03

GLAZING ASSEMBLY 03GLAZING ASSEMBLY 03

GLAZING ASSEMBLY 03

SIGN 1

PRECAST RAIL 1

SIGN 1

SIGN 1

BU

ILD

ING

HE

IGH

T

78' -

0"

ARCHITECTURAL LIGHTINGARCHITECTURAL LIGHTING

111 West Wisconsin Avenue, Milwaukee, Wisconsin 53203Telephone 414.272.2000 Fax 414.272.2001

44 East Mifflin Street, Suite 700, Madison, Wisconsin 53703Telephone 608.283.6300 Fax 608.283.6317

Sheet No.

Project No.

Sheet Title

Drawing Date

Revisions

NO

T F

OR

C

ON

ST

RU

CT

ION

SCOPE DOCUMENTS

3/5

/2019 9

:55:2

6 P

M

A200

EXTERIOR ELEVATIONS

Mortenson

MARCH 6, 2019

218051

780 Regent StreetMadison, WI 53715

UW CAMPUS HOTEL

LAND USE SUBMITTAL

Copyright © 2019 Kahler Slater, Inc. All rights reserved.

1/16" = 1'-0"1

North Elevation

1/16" = 1'-0"2

South Elevation

KEYNOTES - ASSEMBLIES &...GLAZING ASSEMBLY 01 STOREFRONT

GLAZING ASSEMBLY 02 CURTAINWALL

GLAZING ASSEMBLY 03 THERMALLY BROKEN ALUMINUM FRAMED UNITWINDOW SYSTEM

PRECAST STRUCTURAL PRECAST CONCRETE WITH ANARCHITECTURAL FINISH

RAIL 1 GLASS GUARDRAIL SYSTEM; BASIS OF DESIGNIS LIVERS BRONZE STRUCT-U-RAIL

SCREEN ASSEMBLY 01 PARKING SCREEN

SCREEN ASSEMBLY 02 ROOF SCREEN

SIGN 1 INTERNALLY ILLUMINATED EXTERIOR SIGN TOMATCH HOTEL BRAND

WALL ASSEMBLY 01 PRECAST INSULATED WALL PANEL 12 1/2"

WALL ASSEMBLY 02 EFIS W/ CFMF BACKUP WALL 11 1/2"

WALL ASSEMBLY 03 METAL PANEL W/ CFMF BACKUP WALL 12 1/4"

WALL ASSEMBLY 04 WOOD LOOK CLADDING W/ CFMF BACKUP WALL12"

0 84 16 32

0 84 16 32

Page 25: UW CAMPUS HOTEL - Madison, Wisconsinreet existing ramp to remain primary vehicle access ... level ventilation-coord location and size with mep req'ts laundry carts at linen chute

LEVEL 1100' - 0"

LEVEL 3133' - 6"

LEVEL 4142' - 10"

LEVEL 5152' - 2"

LEVEL 6161' - 6"

ROOF171' - 0"

HKJ

J

LEVEL 2116' - 0"

ROOF EDGE - EIFS172' - 0"

ROOF - ELEVATOR CAP178' - 0"

HAPD

PD

PARAPET - MASONRY176' - 0"

PRECAST PARKING BEYOND

08

HG HE HDHH HC HBHF

WALL ASSEMBLY 02

WALL ASSEMBLY 03

WALL ASSEMBLY 03

WALL ASSEMBLY 01

WALL ASSEMBLY 01WALL ASSEMBLY 01

WALL ASSEMBLY 01

WALL ASSEMBLY 01

WALL ASSEMBLY 02

WALL ASSEMBLY 04

GLAZING ASSEMBLY 01GLAZING ASSEMBLY 02GLAZING ASSEMBLY 02

GLAZING ASSEMBLY 02

3"3' - 4" 16' - 8" 8' - 8" 31' - 0" 6' - 0" 6' - 4" 22' - 0" 25' - 4" 5' - 0"

MECHANICAL UNIT

SIGN 1

SIGN 1

RAIL 1

SCREEN ASSEMBLY 02

BU

ILD

ING

HE

IGH

T

78' -

0"

LEVEL 1100' - 0"

LEVEL P2111' - 2"

LEVEL P3121' - 2"

LEVEL 3133' - 6"

LEVEL 4142' - 10"

LEVEL 5152' - 2"

LEVEL 6161' - 6"

ROOF171' - 0"

J

LEVEL P1.5105' - 0"

LEVEL P3.5125' - 0"

LEVEL P0.595' - 0"

GRADE VARIES

LEVEL P2.5115' - 0"

ROOF EDGE - EIFS172' - 0"

ROOF - ELEVATOR CAP178' - 0"

HA PC PD

PD

PARAPET - MASONRY176' - 0"

8

HCHB

WALL ASSEMBLY 01

WALL ASSEMBLY 02

WALL ASSEMBLY 01

GLAZING ASSEMBLY 02

WALL ASSEMBLY 01

SCREEN ASSEMBLY 01

WALL ASSEMBLY 01

WALL ASSEMBLY 02

5' - 0" 25' - 4" 30' - 2" 60' - 6"

MECHANICAL UNIT

SIGN 1

PRECAST

PRECAST

BU

ILD

ING

HE

IGH

T

78' -

0"

LEVEL 3133' - 6"

LEVEL 4142' - 10"

LEVEL 5152' - 2"

LEVEL 6161' - 6"

ROOF171' - 0"

LEVEL P3.5125' - 0"

ROOF EDGE - EIFS172' - 0"

ROOF - ELEVATOR CAP178' - 0"

PC

PARAPET - MASONRY176' - 0"

LEVEL 3133' - 6"

LEVEL 4142' - 10"

LEVEL 5152' - 2"

LEVEL 6161' - 6"

ROOF171' - 0"

LEVEL P3.5125' - 0"

ROOF EDGE - EIFS172' - 0"

ROOF - ELEVATOR CAP178' - 0"

PC

PARAPET - MASONRY176' - 0"

LEVEL 1100' - 0"

LEVEL 3133' - 6"

LEVEL 4142' - 10"

LEVEL 5152' - 2"

LEVEL 6161' - 6"

ROOF171' - 0"

HK

J

LEVEL 2116' - 0"

ROOF EDGE - EIFS172' - 0"

ROOF - ELEVATOR CAP178' - 0"

PD

PARAPET - MASONRY176' - 0"

111 West Wisconsin Avenue, Milwaukee, Wisconsin 53203Telephone 414.272.2000 Fax 414.272.2001

44 East Mifflin Street, Suite 700, Madison, Wisconsin 53703Telephone 608.283.6300 Fax 608.283.6317

Sheet No.

Project No.

Sheet Title

Drawing Date

Revisions

NO

T F

OR

C

ON

ST

RU

CT

ION

SCOPE DOCUMENTS

3/5

/2019 9

:55:3

2 P

M

A201

EXTERIOR ELEVATIONS

Mortenson

MARCH 6, 2019

218051

780 Regent StreetMadison, WI 53715

UW CAMPUS HOTEL

LAND USE SUBMITTAL

Copyright © 2019 Kahler Slater, Inc. All rights reserved.

1/16" = 1'-0"1

East Elevation

1/16" = 1'-0"2

West Elevation

1/16" = 1'-0"3

PARTIAL ELEVATION - EAST

1/16" = 1'-0"4

PARTIAL ELEVATION - WEST

1/16" = 1'-0"5

PARTIAL ELEVATION - SOUTH - WEST

KEYNOTES - ASSEMBLIES & COMPONENTSGLAZING ASSEMBLY 01 STOREFRONT

GLAZING ASSEMBLY 02 CURTAINWALL

PRECAST STRUCTURAL PRECAST CONCRETE WITH AN ARCHITECTURAL FINISH

RAIL 1 GLASS GUARDRAIL SYSTEM; BASIS OF DESIGN IS LIVERS BRONZE STRUCT-U-RAIL

SCREEN ASSEMBLY 01 PARKING SCREEN

SCREEN ASSEMBLY 02 ROOF SCREEN

SIGN 1 INTERNALLY ILLUMINATED EXTERIOR SIGN TO MATCH HOTEL BRAND

WALL ASSEMBLY 01 PRECAST INSULATED WALL PANEL 12 1/2"

WALL ASSEMBLY 02 EFIS W/ CFMF BACKUP WALL 11 1/2"

WALL ASSEMBLY 03 METAL PANEL W/ CFMF BACKUP WALL 12 1/4"

WALL ASSEMBLY 04 WOOD LOOK CLADDING W/ CFMF BACKUP WALL 12"

0 84 16 32

0 84 16 32