value stream mapping
TRANSCRIPT
1
VSM001
Value Stream Mapping
Value Stream Mapping
Day 1
Value
Stream
Mapping
2
VSM001
Value Stream Mapping
Jan Vlasak
Introductions
3
VSM001
Value Stream Mapping
Agenda
• Current State Map
• Future State Map
• Value Stream Plan
4
VSM001
Value Stream Mapping
AgendaDay 1:Topic/Activity TimeOpening 8:00 AMIntroduction 8:15 AMGoals of Workshop 8:30 AMReview of Lean Principles 8:35 AMBreak 9:00 AMIntroduction to Value Stream 9:20 AMCurrent State Map 10:05 AMExercise 1 – Customer Loop 11:00 AMLunch 12:00 AMReport-outs 12:45 PMExercise 2 – Internal Loop 1:00 PMReport-outs 2:25 PMBreak 2:40 PMExercise 3 – Supplier Loop 2:55 PMCurrent State Report-outs 3:45 PMOpportunities In Future State 4:05 PMExample Future State Map 5:00 PMAdjourn 5:45 PM
5
VSM001
Value Stream Mapping
AgendaDay 2:
Topic/Activity Time
Introduction Day 2 8:00 AM
Exercise 4 – Customer Loop 8:15 AM
Break 9:30 AM
Report-outs 9:45 AM
Exercise 5 – Internal Loop 10:00 AM
Report-outs 11:45 AM
Lunch 12:00 AM
Exercise 6 – Supplier Loop 12:45 PM
Obstacles 1:30 PM
Value Stream Plan 2:00 PM
Exercise 7 - VSP 2:15 PM
Final Report-outs 3:00 PM
Break 3:45 PM
The Value Stream Team 4:00 PM
Closing Comments 4:15 PM
6
VSM001
Value Stream Mapping
Company Strategy
• Growth
• Competitive Position
7
VSM001
Value Stream Mapping
Cost Reductions
• Customer Price
• Labor Inflation
• Increase Earnings
8
VSM001
Value Stream Mapping
Keys to Lean Production
• Work Place Organization
• JIT Production
• Six Sigma Quality
• Empowered Teams
• Visual Management
• Pursuit of Perfection
9
VSM001
Value Stream Mapping
Key Factors for Lean Success
• Strategic Vision
• Strong Line Management Leadership
• Expert Training and Support
• Aggressive Performance Targets and Tracking
• Impatience
10
VSM001
Value Stream Mapping
“Becoming the Best”
• The Answer;• Develop a Deep Understanding of Our Processes at
their Broadest Levels and Not Just Continue to Improve Individual Work Units
• Working Together to Add Value to our Company
11
VSM001
Value Stream Mapping
Our Needs
• Tools to Support Linkages Between Processes
• Emphasis on Processes and Systems
• Horizontal Organization Based on Teamwork
• Leadership and Followership
• Commitment and Involvement
12
VSM001
Value Stream Mapping
Performance
• Operational Performance Determines Financial Results
• Lean Enterprise Is the Key to Successful Operational Performance
13
VSM001
Value Stream Mapping
The AM of Tomorrow
• Complete Understanding of Lean Principles
• Commitment and Discipline to Live by these Principles
• Sense of Urgency to Exceed the Targets and Deadlines
• Commitment to Strive for Perfection
14
VSM001
Value Stream Mapping
Potential Benefits
• Inventory Reduction
• Quality Improvement
• Productivity Improvement
• 12% Reduction in Overall Cost
15
VSM001
Value Stream Mapping
Why are we Here?
16
VSM001
Value Stream Mapping
Goals of the Workshop
• L
• E
• A
• D
• E
• R
earn to See
stablish a Plan
ct on Opportunities
rive Change
nable Teams
educe Lead Time
17
VSM001
Value Stream Mapping
Think Lean
18
VSM001
Value Stream Mapping
Waste
• Waste is Only the Symptom of a Deeper Problem
• Focus on the Source Rather than the Symptom
19
VSM001
Value Stream Mapping
OverproductionOverproduction
• Definition:
• Producing More than Needed
• Producing Faster than Needed
Parts
Parts
Parts
Parts Parts
Parts
Parts
Parts
20
VSM001
Value Stream Mapping
Takt TimeTakt Time
Available Work Time
Customer Demand
21
VSM001
Value Stream Mapping
One Piece Flow
Make One, Move One!!!
ProcessA
Process B
ProcessC
ProcessD
22
VSM001
Value Stream Mapping
Pull System
Supplying Process
Customer Process
Supermarket
ProductProduct
“Withdrawal” KANBAN“Production” KANBAN
23
VSM001
Value Stream Mapping
Selecting the Point of Pull
ProcessA
ProcessB
ProcessC
ProcessD
FLOW
POP
24
VSM001
Value Stream Mapping
Why Small Lots?
• Drive C/O Time Reduction
• Flexibility
• Reduce Inventory
• Reduce Lead Time
25
VSM001
Value Stream Mapping
Leveling
26
VSM001
Value Stream Mapping
A Brief Introduction to
ValueStream
Mapping
27
VSM001
Value Stream Mapping
The Improvement Process• Employee Involvement
• Training and Development
• Model Work Unit
• 20 Keys Assessment
• Traditional
• Learning
• Leading
• World Class
• Best in Class
28
VSM001
Value Stream Mapping
Factor ImprovementPPM .…………………………….. 91.3 %Scrap ……………………………. 57.6 %Training hrs./Employee ………...182.2 %Suggestions/employee ……..…. 347.5 %Labor cost % of sales ……….… 36.4 %WIP hours ………………………. 91.6 %Changeover time …………….… 72.5 %Lead time ……………………….. 87.0 %
ResultsImprovement on all work units since introduction of
the AM Performance System
29
VSM001
Value Stream Mapping
Operator 1
Operator 2
EntranceR Cut Draw Draw
F/A Spin SpinExit
Production Space = 30%
30
VSM001
Value Stream Mapping
Opportunities = 70%
31
VSM001
Value Stream Mapping
Why???
•Opportunities in Work Units
Vs.
•Opportunities between Work Units
32
VSM001
Value Stream Mapping
FLOW
StampingC/T = 4 Sec.
Sub-AssemblyC/T = 60 Sec.
Final AssemblyC/T = 60 Sec.
33
VSM001
Value Stream Mapping
The Next Chapter in AM’s Success Story
Value Stream Mapping
34
VSM001
Value Stream Mapping
What is a Value Stream?
All the Actions Involved in Making a Part
35
VSM001
Value Stream Mapping
Establishing Flow
Production Flow
Information
Material
36
VSM001
Value Stream Mapping
Elimination of Waste
A Broadened Perspective
• Identify and Target the Source of Waste in the Entire Value Stream, rather than Just the Work Unit
37
VSM001
Value Stream Mapping
Adding Value
• Establishing the Vision
• Reducing the Lead Time
38
VSM001
Value Stream Mapping
• Big Picture Approach
• Links Material/ Information Flow
• Team Growth
Benefits of Value Stream MappingBenefits of Value Stream Mapping
39
VSM001
Value Stream Mapping
Visionary Tool
• Planning
• Communication
• Implementation
40
VSM001
Value Stream Mapping
The Current State Map
41
VSM001
Value Stream Mapping
Customer
Stamping
Sub-Assembly
Assembly
Finished GoodsInventory
C/O Time
Down TimeTakt Time
Supplier
42
VSM001
Value Stream Mapping
The Future State Map
43
VSM001
Value Stream Mapping
Down Time
Cycle TimeC/O Time
Stamping
Sub-Assembly
Final Assembly
A Lean Stream!!!
Finished GoodsInventory
44
VSM001
Value Stream Mapping
Annual Value Stream Plan
• This Plan Visually Displays:• Step-by-Step Implementation Plan
• Measurable Goals
• Clear Checkpoints with Listed Deadlines, Ownership, and Named Reviewers
• The Value Stream Plan will Play a Fundamental Role in the Optimization of your Value Stream
45
VSM001
Value Stream Mapping
Management’s Role
• See Overall Flow
• Develop the Vision
• Lead Implementation
• Support EI Teams
• Make Sure Everyone Understands!
46
VSM001
Value Stream Mapping
Management’s Commitment
• Eliminate Overproduction
• Support Lean Principles
• Willingness to Take Risks
47
VSM001
Value Stream Mapping
“Whenever there is a product for a customer there is a value stream
The challenge lies in seeing it”
AM
48
VSM001
Value Stream Mapping
The Current State Map
Practice Makes Perfect
49
VSM001
Value Stream Mapping
It’s Time to Practice
• At this Time Please Read through the Example Data Set for General Exhaust
• We will Begin Drawing the Example Current State Map in Just a Few Minutes
50
VSM001
Value Stream Mapping
Data Set for General Exhaust
• Customer
• General Auto
• Customer Information
• 20,000 pieces per month
• Container size = 300 pieces
• Customer operates on two shifts
• Two deliveries to customer per week
• General Auto
51
VSM001
Value Stream Mapping
Data Set for General Exhaust(continued)
• General Exhaust Production Control Department
• Electronically receives General Auto’s 13 week forecast and enters into MRP
• Electronically issues 13 week forecast to General Components
• Receives daily firm order fax from General Auto
• Secures components through daily fax to General Components
• Generates daily departmental schedule based on MRP
52
VSM001
Value Stream Mapping
Data Set for General Exhaust(continued)
• Production Process:
• Sub-Assembly 1 Sub-Assembly 2 Final Assembly
• Work Time:
• 20 Days per months
• 2 shifts in all production departments
• 8 hours per shift
• 2 ten minute breaks per shift and unpaid lunch
53
VSM001
Value Stream Mapping
Data Set for General Exhaust
(continued)
• Final Assembly• 3 operators• Takt Time = 55.2 seconds• Cycle Time = 55 seconds• Total Work Content = 146 seconds• Changeover Time = N/A• Uptime = 85%• Observed Inventory
• .75 Days work in progress
• 3.5 Days finished goods• Shipped to truck from final assembly finished goods
54
VSM001
Value Stream Mapping
Data Set for General Exhaust(continued)
• Sub-Assembly 2
• 3 operators
• Takt Time = 55.2 seconds
• Cycle Time = 55 seconds
• Total Work Content = 130 seconds
• Changeover Time = N/A
• Uptime = 90%
• Observed Inventory
• .5 Days work in progress
• 1 Day finished goods
55
VSM001
Value Stream Mapping
Data Set for General Exhaust
(continued)
• Sub-Assembly 1
• 1 Operator
• Takt Time = 27.6 seconds
• Cycle Time = 24 seconds
• Total Work Content = 24 seconds
• Changeover Time = 30 minutes
• Uptime = 97%
• Observed Inventory
• 2 days raw material
• .25 days work in progress
• 1 day finished goods
56
VSM001
Value Stream Mapping
Data Set for General Exhaust(continued)
• Supplier
• General Components
• Supplier Information
• Stampings
• Delivery to General Exhaust
• (1) time per day• Container size = 300 pcs
• Two shift operation
57
VSM001
Value Stream Mapping
Always Start With the Customer!!!
Work Upstream from There
58
VSM001
Value Stream Mapping
What to Look For...
• Information Flow from the Customer
• Forecasts
• Firm Order
• Instruction to Produce
• Movement of Material
• Inventory
• Future Opportunities!
59
VSM001
Value Stream Mapping
Exercise 1: Customer Loop
• Walk through the Entire Process (Upstream)
• Sketch Value Streams for the Customer Loop
• Gather Data for the Customer Loop Worksheet
• Capture Information Flow
• Return to Room
60
VSM001
Value Stream Mapping
Worksheet
Exercise 1: Customer Loop
1. Who are the customers and where are they located?
2. How many pieces does the customer require per month?
3. What is our delivery frequency?
4. What is the container size (pieces per container)?
61
VSM001
Value Stream Mapping
WorksheetExercise 1: Customer Loop
5. How many shifts does the customer run?
6. In detail, describe how customer orders are placed (Kanban, MRP, forecasts, firm orders, etc.)
7. Where is the point of pull?
8. How much finished goods inventory did you find (count it!)?
62
VSM001
Value Stream Mapping
WorksheetExercise 1: Customer Loop
9. Does any safety or buffer stock exist?
10. How is buffer and safety stock distinguished from finished goods inventory?
63
VSM001
Value Stream Mapping
11. Map the Material and Information Flow Customer Loop
64
VSM001
Value Stream Mapping
Report Outs
Customer Loop
65
VSM001
Value Stream Mapping
What We’ve Accomplished
• Understanding Customer Requirements
• Established Current State of Information and Material Flow
• Have Started to Think About Future Opportunities
66
VSM001
Value Stream Mapping
Internal Loop
• Tie the Customer Loop to Internal Processes
• Establish the Relationship between Internal Processes
67
VSM001
Value Stream Mapping
What to Look For...
• Define Plant Level Processes
• Data Box Information• Takt Time, # of Operators, C/O Time, Work Unit Cycle
Time, Total Work Content, Uptime %, # of Shifts, Available Operating Time
• Capture All Inventory
• What Initiates Production?
• Future Opportunities!
68
VSM001
Value Stream Mapping
Exercise 2: Internal Loop
• If Needed, Walk through the Entire Process (Upstream)
• Sketch Value Streams for the Internal Loop
• Gather Data for the Internal Loop Worksheet
• Capture Information Flow
• Return to room
69
VSM001
Value Stream Mapping
WorksheetExercise 2: Internal Loop
1. Define the processes involved in the production of the part from a plant level (bird’s eye) perspective. Ex. Stamping Work Unit Sub-Assembly Final Assembly
2. For each of the plant level processes find the Takt Time, # of Operators, Work Unit Cycle Time, Total Work Content, Changeover Time, Uptime %, Number of Shifts, Available Operating Time (in seconds).
70
VSM001
Value Stream Mapping
WorksheetExercise 2: Internal Loop
3. For each of the plant level processes count and calculate the finished goods, work in progress, and raw materials inventory.
4. How do the production work units know when and what to produce? (Be very specific about this process)
71
VSM001
Value Stream Mapping
5. Map the Material and Information Flow Internal Loop
72
VSM001
Value Stream Mapping
Report Outs
Internal Loop
73
VSM001
Value Stream Mapping
What We’ve Accomplished
• Understand Relationship between Internal Processes
• Current State of Information and Material Flow
• Identified Future Improvement Opportunities
74
VSM001
Value Stream Mapping
Supplier Loop
• Tie Internal Loop to Supplier
• Understand Flow of Information and Material
75
VSM001
Value Stream Mapping
What to Look For...
• Capture All Inventory
• Establish Current Information and Material Flow
• From Storage to the Work Unit
• From Supplier to Storage
• Understand Raw Material and Component Requirements
• Future Opportunities!
76
VSM001
Value Stream Mapping
Exercise 3: Supplier Loop
• If Needed, Walk through the Entire Process (Upstream)
• Sketch Value Streams for the Supplier Loop
• Gather Data for the Supplier Loop Worksheet
• Capture Information Flow
• Return to Room
77
VSM001
Value Stream Mapping
Worksheet
Exercise 3: Supplier Loop
1. Supplier Info?
Supplier Part # # ofShifts
DeliveryFrequency
Amount ofSupplier Inventory
Quantity perContainer
Additional Comments:
78
VSM001
Value Stream Mapping
Worksheet
Exercise 3: Supplier Loop
2. Describe in detail how we decide we need more material and how we inform our supplier of our needs (MRP, Kanban, Forecasts, Firm Orders).
3. How do we decide how much raw material inventory we need?
79
VSM001
Value Stream Mapping
4. Map the Material and Information Flow Supplier Loop
80
VSM001
Value Stream Mapping
Report-Outs
Current State Map
(Putting It All Together)
81
VSM001
Value Stream Mapping
The Future State Map
Practice Makes Perfect
82
VSM001
Value Stream Mapping
It’s Time to Practice
• Please Review the Example Current State Map
• We will Begin Drawing the Future State Map Shortly
83
VSM001
Value Stream Mapping
Opportunities in Containerization
• Small Container Quantity• Increases Flexibility
• Reduces Customer Fluctuation
• Overall Benefit• Reduces Inventory Dollars
84
VSM001
Value Stream Mapping
Takt Time
Available Operating TimePieces
Takt Time =
28,800” - 1,200”500 pcs
=
55.2” per piece=
Sets Pace of Production to Match Customer Demand
85
VSM001
Value Stream Mapping
Effects of Container Size
• Current State Example
(takt time * container size) = min per container
60 seconds
(55.2” * 300 pieces) 276 minutes (4 hrs 36 m)
60 seconds 60 minutes
86
VSM001
Value Stream Mapping
Effects of Container Size
• Future State Example
(takt time * container size) = min per container
60 seconds
(55.2” * 25 pieces) = 23 min
60 seconds
87
VSM001
Value Stream Mapping
Con
tain
er S
ize
Delivery Frequency
Small Containers = Improved Flexibility
88
VSM001
Value Stream Mapping
Fluctuation Caused by Container Size
800850900950
1000105011001150120012501300
0 1 2 3 4 5 6 7 8 9 10 11 12 13
ProduceOrder
89
VSM001
Value Stream Mapping
Fluctuation Caused by Container Size
800
850
900
950
1000
1050
1100
1150
1200
1250
1300
0 1 2 3 4 5 6 7 8 9 10 11 12 13
Produce
Order
90
VSM001
Value Stream Mapping
Opportunities in Delivery Pitch
• Even Delivery Pitch• Drives Constant Takt Time
• Reduces Fluctuation
• Overall Benefit• Reduction in Inventory
91
VSM001
Value Stream Mapping
Pick-Up (2,500 pcs/truck) 7:00 am Wednesday 7:00 am Friday
Truck 1 = 2,760’
= 165,600”
Takt = 66.24”
Truck 2 = 1,840’
= 110,400”
Takt = 44.16”
460 min 460 min
460 min460 min
400 min60min
460 min
460 min
460 min
460 min
60min 400 min
M
T
W
Th
F
Time between shifts
92
VSM001
Value Stream Mapping
Opportunities in Kanban
• Pull System• Links Production to Customer Demand
• Aids in Visual Control
• Identifies Opportunities for Improvement
• Overall Benefit• Improves Material Control
• Prevents Overproduction
• Reduces Inventory
93
VSM001
Value Stream Mapping
Pull System
Supplying Process
Customer Process
Supermarket
ProductProduct
“Withdrawal” KANBAN“Production” KANBAN
94
VSM001
Value Stream Mapping
Selecting the Point of Pull
ProcessA
ProcessB
ProcessC
ProcessD
FLOW
POP
95
VSM001
Value Stream Mapping
Opportunities in Leveling
• Leveling Post• Reduces Customer Demand Fluctuation
• Reduces Delivery Pitch Fluctuation
• Pulls Product Based on Takt Time
• Overall Benefits• Eliminates Scheduling
• Levels Customer Demand
96
VSM001
Value Stream Mapping
Week 1 2 3 4 Average
Part A 5300 4700 5200 4800 5000Average 5000 5000 5000 5000
Difference 300 -300 200 -200
Forecast
97
VSM001
Value Stream Mapping
Customer Fluctuation
4600
4800
5000
5200
5400
0 1 2 3 4 5
week
Part A
Average
98
VSM001
Value Stream Mapping
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Buffer
Part A
Average Avail. Sec Takt Time Container Size # Containers1000 55,200 55.2 25 40
Leveling Post
99
VSM001
Value Stream Mapping
Opportunities in Takt Time Production
• Takt Time Post• Produce to Takt Time
• Enables Visual Management
• Prevent Overproduction
• Overall Benefits• Identifies Labor Opportunities
• Lowers Inventory
• Eliminates Scheduling
100
VSM001
Value Stream Mapping
Takt Time Post
1st Shift606
612
618
624
630
636
642
648
654
730
724
706
700
718
712
600
Part A
101
VSM001
Value Stream Mapping
Opportunities in the Work Units
• Uptime • TPM
• BOS Charting
• Team Problem Solving
• Overall Benefits• More Capable Processes
• Employee Involvement
102
VSM001
Value Stream Mapping
Track Downtime and Improvement Activities on BOS Chart
Key Measurable– Target– Trend Line
ImprovementActivities
Data Analysis– Pareto
ImprovementTracking
103
VSM001
Value Stream Mapping
Opportunities in and between Work Units
• Continuous Improvement Tools• Standardized Work
• Work Balance
• Bottleneck Improvements
• Overall Benefits• Adding Value/ Removing Waste
• Improving Flexibility
104
VSM001
Value Stream Mapping
Work BalanceCurrent State
0
10
20
30
40
50
60
1 2 3
Walk
Manual
0
10
20
30
40
50
60
1 2 3
wait
Walk
Manual
Sub-Assembly 2 Final Assembly
105
VSM001
Value Stream Mapping
Work BalanceFuture State
0102030405060
1 2 3 4 5
Walk
Manual
Final Assembly
106
VSM001
Value Stream Mapping
Opportunities in and between Work Units
• Pull System• Withdraw Only What you Need
• Replenish What is Taken
• Overall Benefits• Flexibility in Production
• Prevents Overproduction
• Reduces Inventory
107
VSM001
Value Stream Mapping
Pull System
Assumptions:
• Production Schedules Will Always Change
• Production Will Never Go According to Schedule
• It Is Human Nature to Overproduce
PrecedingProcess
StoreFollowing
Process
ProductionKanban
WithdrawalKanban
New Product Needed Product
108
VSM001
Value Stream Mapping
Opportunities in and between Work Units
• Changeover• Decrease Changeover Time
• Increase # of Changeovers
• Drive Small Lot Production
• Overall Benefits• Flexibility in Production
• Reduction in Inventory
• Better Inventory Turns
109
VSM001
Value Stream Mapping
1996 YTD LAST MO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
C/O #1C/O #2
C/O #3
C/O #4
C/O #5
C/O #6
C/O #7C/O #8
AVG. 16.3 14.7 13.2
GOAL 18.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
CHANGEOVER Work Unit__________ SHIFT_____
-
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
18.0
199
6
YT
D
LA
ST
MO 1 2 3 4 5 6 7 8 9 10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
DAY
MIN
UT
ES
AVG. GOAL
110
VSM001
Value Stream Mapping
Type of Activity
PLANT EXERCISE No. Description
VIDEO TAPE ANALYSIS 1 Can be made ext. immediately
2 Obvious waste - remove immediately3 Transfer to ext. after improvements4 Adjustment activity5 Remaining activity for Continuous Improvement
Elapsed Check Type of ResultingStart Time End Time Time for Activity Proposed Solution Elapsedof Activity of Activity Activity Described Activity TimeH / M / S H / M / S Seconds 1 2 3 4 5
111
VSM001
Value Stream Mapping
GameBoard
ToolStorage
PaperStorage
DieStorage
Supply Table
1
1
2
2
3
3
4
4
5
5
6
6
Dance Chart Example
112
VSM001
Value Stream Mapping
Opportunities in the Supplier Loop
• Supplier Development• Identify Key Suppliers
• Reduce Container Size
• Increase Delivery Frequency
• Kanban!!!
• Overall Benefit• Inventory Reduction
• Cost Reduction
113
VSM001
Value Stream Mapping
The Future State Map
It is Time To Draw
114
VSM001
Value Stream Mapping
Value Stream Mapping
Day 2
Value
Stream
Mapping
115
VSM001
Value Stream Mapping
Exercise 4: Customer Loop
• Step 1• Review Takt Time Calculation
• Step 2• Opportunities with Containerization
• Effect of Container Time
• Fluctuation due to Container Quantity
• Future State Proposal for Container Quantity
116
VSM001
Value Stream Mapping
Exercise 4: Continued
• Step 3• Opportunities with Customer Pull Timing
• Identify Delivery Pitch
• Calculate Inventory Held Due to Pitch
• Future State Delivery Frequency/Timing
• Step 4• Opportunities with Leveling
• Calculate Leveling Post
• Develop Point of Pull
• Future State Leveling System
117
VSM001
Value Stream Mapping
Exercise 4: Continued
• Step 5• Opportunities in Takt Time Production
• Determine Kanban Delivery Frequency to Cell
• Future State Takt Time Post
• Step 6• Map the Future State Customer Loop
118
VSM001
Value Stream Mapping
1. Formula:
Pieces
Available Operating TimeTakt Time
2. Takt Time Results:
Worksheet 1Takt Time Calculation
Worksheet 1Takt Time Calculation
119
VSM001
Value Stream Mapping
Worksheet 2Opportunities with Containerization
1. Effect of container time:
2. Fluctuation due to container quantity (Graph):
3. Future state proposal for container quantity
120
VSM001
Value Stream Mapping
Worksheet 3Opportunities with Customer Pull Timing
1. Identify delivery pitch:
2. Calculate inventory held due to pitch:
3. Future state delivery frequency and timing:
121
VSM001
Value Stream Mapping
Worksheet 4Opportunities with Leveling
1. Calculate leveling post:
2. Develop point of pull:
3. Future state leveling system:
122
VSM001
Value Stream Mapping
Worksheet 5Opportunities in Takt Time Production
1. Determine kanban delivery frequency to the work unit:
2. Future state takt time post:
123
VSM001
Value Stream Mapping
Worksheet 6
Map the Future State Customer Loop
124
VSM001
Value Stream Mapping
Report-Outs
Future State Map
Customer Loop
125
VSM001
Value Stream Mapping
Exercise 5: Internal Loop
• Step 1
• Are BOS Charts Being Used?
• Identify the Main Causes of Downtime
• What Steps Can We Take to Achieve Best-in-Class Levels of Uptime (97%)?
126
VSM001
Value Stream Mapping
Exercise 5: Continued
• Step 2
• Identify Manual and Walk Time
• Identify any Bottlenecks
• Calculate Labor Requirements
• Does this Labor Requirement Reflect what You Witnessed on the Line?
• Do Opportunities Exist to Combine Work Units in the Value Stream Based on Labor Requirements?
127
VSM001
Value Stream Mapping
Exercise 5: Continued
• Step 3
• Map the Future State Internal Loop
128
VSM001
Value Stream Mapping
Worksheet 1Uptime %
1. Are BOS charts being used?
2. Identify the main causes of downtime:
3. What steps can we take to achieve Best-in-Class levels of uptime (97%)?
129
VSM001
Value Stream Mapping
Worksheet 2Standardized Work
1. Identify manual and walk time:
2. Identify any bottlenecks:
3. Calculate the labor requirements:
4. Does this labor requirement reflect what you witnessed on the line?
5. Do opportunities exist to combine work units in the value stream based on labor requirements?
130
VSM001
Value Stream Mapping
Worksheet 3
Map the Future State Internal Loop
131
VSM001
Value Stream Mapping
Report-Outs
Future State Map
Internal Loop
132
VSM001
Value Stream Mapping
Exercise 6: Supplier Loop
• Step 1
• Opportunities with Kanban
• Are Parts Ordered Based on Usage?
• Are Supplier Kanbans Being Used to Order Parts?
• Are Move Cards Used to Deliver Raw Materials to the Work Units?
• Step 2
• Opportunities with Delivery Frequency
• Can Inventory be Reduced with an Increase in Delivery Frequency?
133
VSM001
Value Stream Mapping
Exercise 6: Continued
• Step 3
• Opportunities with Containerization
• Do Component Container Sizes Match Finished Goods Container Size?
• Step 4
• Map the Future State Supplier Loop
134
VSM001
Value Stream Mapping
Worksheet 1Kanban
1. Are parts ordered based on usage?
2. Are Supplier Kanbans being used to order parts?
3. Are move cards used to deliver raw materials to the work unit?
135
VSM001
Value Stream Mapping
Worksheet 2Delivery Frequency and Containerization
1. Can inventory be reduced with an increase in delivery frequency?
2. Do component container sizes match finished goods container sizes.
136
VSM001
Value Stream Mapping
Worksheet 3
Map the Future State Supplier Loop
137
VSM001
Value Stream Mapping
Report-Outs
Future State Map
Supplier Loop
138
VSM001
Value Stream Mapping
Understanding the Future StateDrawing the Map
• Put Pencil to Paper!!!
• Remember:
• Start with the Customer
• Include Material and Information Flows
• Data Boxes!!!
139
VSM001
Value Stream Mapping
Report-Outs
Future State Map
(Putting Opportunities Together)
140
VSM001
Value Stream Mapping
Implementation
Making the Future State a Reality
141
VSM001
Value Stream Mapping
Continuous Improvement Cycle
• Plan• Developing the Improvement Plan
• Do• Support the Implementation
• Check• Analyze the Results
• Act• Standardize the Process
142
VSM001
Value Stream Mapping
How Do We Implement?
• Break Implementation Into Steps
• Customer Loop
• Internal Loop
• Supplier Loop
143
VSM001
Value Stream Mapping
...How Do We Implement...
• Develop Implementation Packet
• Current State Map
• Future State Map
• Supporting Documentation (Standard Work Studies, etc.)
• Value Stream Plan
144
VSM001
Value Stream Mapping
Value Stream Plan
• The Plan Visually Displays:
• Step-by-step Implementation plan
• Measurable Goals
• Clear Checkpoints with Listed Deadlines, Ownership, and Named Reviewers
145
VSM001
Value Stream Mapping
Key Points for Planning
• Produce to Takt Time
• Eliminate Overproduction
• Pull Product Based on Customer Demand
• Kanban
• Point of Pull
• Leveling
• Establish Continuous Flow
146
VSM001
Value Stream Mapping
Outline the Plan
• For Each Value Stream Loop
• Establish the Objectives
• Determine the Measurable Goal
147
VSM001
Value Stream Mapping
Plant Level Objective
Goal Measurable
Reduce lead-time 9 Days to 4 Days
148
VSM001
Value Stream Mapping
Customer Loop
Goal MeasurableDecrease Container Quantity 300 Pieces to 25 Pieces
Increase Delivery Frequency 2 per Week to 1 per Day
Finish Goods Pull System 1.75 Days of F/G Inventory
149
VSM001
Value Stream Mapping
Internal Loop
Goal MeasurableIncrease Uptime % Best in Class - 97%
Establish Continuous Flow (0) Inventory Between Work Units
Reduce Changeover Time (30) to (15) Minutes
Internal Pull System Production/Move Cards
150
VSM001
Value Stream Mapping
Supplier Loop
Goal MeasurableImplement Kanban Supplier Cards
Increase Delivery Frequency 4 times per Day
Decrease Container Quantity 300 Pieces to 25 Pieces
151
VSM001
Value Stream Mapping
Date: Yearly Value Stream PlanChampion:
Plant-LevelObjective
Value StreamLoop
Loop
Value StreamObjective
Goal(Measurable)
Specific Scheduling Deadlines(on Monthly Basis)
Owner Reviewer andReview Dates
1Customer
2Internal
3Supplier
Product Family:
1 2 3 4 5 6 7 8 9 10 11 12
152
VSM001
Value Stream Mapping
Date: 10/29/99
Yearly Value Stream PlanChampion: Bill Green
Plant-LevelObjective
Value StreamLoop
Loop
Value StreamObjective
Goal(Measurable)
Specific Scheduling Deadlines(on Monthly Basis)
Owner Reviewer andReview Dates
1Customer
2Internal
3Supplier
Product Family:Sub-Muffler
1 2 3 4 5 6 7 8 9 10 11 12
Dec Cont. Qty.
Inc. Del. Freq.
FG Pull System
ReduceFinished Goods
Inventory
300 to 25
2 /wk to 1/D
1.75 DaysFinishedGoods
GoldTeam
Joan Smith2/28/004/15/005/29/00
Inc. Uptime %
Cont. Flow (S/A2 to F/A)
Reduce C/OTime
Int. Pull Sys.
BIC 97%
0 Inv. Betweenwork units
15 minutes
Prod. MoveCards
Kanban
Inc. Del. Freq.
Dec. Cont. Qty.
Supp. Cards
4/Day
300 to 25
BlueTeam
RedTeam
John Doe5/30/007/30/008/30/00
Jim Smith9/30/0010/15/0012/30/00
153
VSM001
Value Stream Mapping
Exercise 7: Value Stream Plan
• Step 1• Develop Value Stream Plan
• Step 2• Discuss Roadblocks to Implementation
• How Do We Eliminate Roadblocks
154
VSM001
Value Stream Mapping
Date: Yearly Value Stream PlanChampion:
Plant-LevelObjective
Value StreamLoop
Loop
Value StreamObjective
Goal(Measurable)
Specific Scheduling Deadlines(on Monthly Basis)
Owner Reviewer andReview Dates
1Customer
2Internal
3Supplier
Product Family:
1 2 3 4 5 6 7 8 9 10 11 12
155
VSM001
Value Stream Mapping
Report-Outs
The Value Stream Plan(Putting Ideas Into Action)
156
VSM001
Value Stream Mapping
The Value Stream Team
Prepare the organization to see opportunities for improvement and turn
those opportunities into reality
157
VSM001
Value Stream Mapping
Identify the Value Streams
• End of the Chain• Completion of the final product
• Next move is to the Customer
• Move Upstream
• Identify the internal suppliers
• Final step is supplied parts
158
VSM001
Value Stream Mapping
Choose the Model
• Practice Makes Perfect!
• Begin with the less complicated
• Move to the more difficult
159
VSM001
Value Stream Mapping
Establishing the Team
• Selecting the Team
• Who are the people in the value stream
• What type of resources are required
• Function of the Team
• Analyze Value Stream Together
• Hold Frequent Meetings to Monitor Progress
• Eliminate Obstacles Together
160
VSM001
Value Stream Mapping
Transfer the Knowledge
• Start the Process
• Current State Map
• Future State Map
• Develop the Plan
• Check Understanding
• Clear Up Confusion
• Get Commitment
161
VSM001
Value Stream Mapping
Things to Remember
• Benchmark the Current Condition
• Dedicate the Resources
• Monitor the Progress
• Evaluate the Results
• Celebrate Success
• Continue the Pursuit of Perfection!!!