valve symbol equipments symbol actuators pump …
TRANSCRIPT
12
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
1110987654321
121110987654321
© S
iem
en
s A
G 2014
We
re
se
rve
all
rig
hts
in
th
is d
oc
um
en
t a
nd
in
th
e i
nfo
rma
tio
n
co
nta
ine
d t
he
rein
. R
ep
rod
uc
tio
n,
us
e o
r d
isc
los
ure
to
th
ird
pa
rtie
s w
ith
ou
t e
xp
res
s a
uth
ori
ty i
s s
tric
tly
fo
rbid
de
n.
Latest rev. Revision text Rev. date Prepared by / Created by:
Docum
ent N
oS
heet
12913329
9100
HG
SGT-300 en
Lang.
2
No. of sh.
Title
Order no
BD000220
P&ID Legend Sheet
Document No
12913329
Plant Name
Sheet
Resp. dept.
/
/DCC
Based on doc No / Revision
Checked by
Appr. by
Latest revision
Designation
Prepared by
Original Date
OESMFB103 Petrobaltic Rig Conversion
S
(ET)
M
M
M
I
PDT
PT
G
ZZ
AM
TT
C S
M
ZY
ZS
ZS
HHH
LLL
LLL
HHH
GENERIC VALVE
NON RETURN VALVE
THREE WAY GENERIC VALVE
QUICK RELEASE COUPLING
BURST DISC
ISOLATION VALVE ASSEMBLY
FOR INSTRUMENT CALIBRATION
INSTRUMENT AIR ACTUATOR
SOLENOID ACTUATOR
ELECTRIC MOTOR
MANUAL HANDLE
VALVE SYMBOL ACTUATORSEQUIPMENTS SYMBOL
HEAT EXCHANGER
(GENERATOR COOLER)
OIL MIST ELIMINATOR
PROTECTION/BIRD SCREEN
GAS CYLINDER
SILENCER DUCTING
FLEXIBLE BELLOWS
FLAME ARRESTOR
FILTER/STRAINER
FLOW ORIFICE
FILTER SYMBOLS
ELECTRIC MOTOR DRIVEN FAN
GAS TURBINE DRIVEN
ROTARY GEAR PUMP
VARIABLE DISPLACEMENT
PISTON PUMP
PUMP SYMBOLS MISCELLANEOUS
FIRE EXTINGUISHANT NOZZLE
CLUTCH
VENT
PLUG/BLANK
PIPE REDUCER
FLEXIBLE PIPE
LINE SYMBOLS AND MISCELLANEOUS
PIPING COMPONENTS
PROCESS PIPE
INSTRUMENT AIR LINE
SECONDARY PROCESS
LINE/UTILITY LINE
ELECTRIC TRACE HEATED
PIPING
FIELD MOUNTED INSTRUMENT
LOCAL PANEL MOUNTED
CENTRAL/MAIN PANEL
OR CONSOLE MOUNTED
FUNCTION SYMBOLS
ABBREVIATIONS
FO FAIL OPEN
FC FAIL CLOSED
FF FAIL FIXED
NO NORMALLY OPEN
NC NORMALLY CLOSED
LO LOCKED OPEN
LC LOCKED CLOSED
ISOLATION VALVE ASSEMBLY
FOR INSTRUMENT CALIBRATION
(DIFFERENTIAL PRESSURE)
ELECTRIC MOTOR DRIVEN
ROTARY GEAR PUMP
OD OUTSIDE DIAMETER
Sch SCHEDULE
SWG STANDARD WIRE GAUGE
NB NOMINAL BORE
2 WAY BALL VALVE
BUTTERFLY VALVE
THREE WAY BALL VALVE
FOUR WAY GENERIC VALVE
PRESSURE REGULATOR
(INTERNAL SENSING)
BACK-PRESSURE REGULATOR
(INTERNAL SENSING)
PRESSURE RELIEF/CONTROL VALVE
VACUUM RELIEF VALVE
ACTUATED DAMPER
'Y' TYPE STRAINER
IMMERSION HEATER
INTERNAL HEATER
FINNED HEAT EXCHANGER
AIR BLAST HEAT EXCHANGER
MIST ELIMINATOR
INTERLOCK
INDICATING LAMP
INSTRUMENT AIR ACTUATOR
SPRING RETURN
GAS TURBINE ACTUATOR
POSITION DRIVE ACTUATOR
ELECTRIC MOTOR DRIVEN
RECIPROCATING PUMP
VARIABLE DISPLACEMENT
PISTON MOTOR
AIR DRIVEN DIAPHRAGM PUMP
ELECTRIC MOTOR DRIVEN
CENTRIFUGAL FAN
GAS TURBINE
UNIT CONTROL PANEL
MECHANICAL LINK
ELECTRICAL SIGNAL
GAS TURBINE PACKAGE
/ ENCLOSURE LIMIT
INDICATES A PROPRIETORY
ASSEMBLY OR LIMIT OF A
BOUGHT-IN ASSEMBLED UNIT
TEMPERATURE SENSOR IN
THERMOWELL
SILENCER PNEUMATIC
COUPLING SHEAR PIN DEVICE
NC
NO
NO
NO
NC
NC
NC
EXTERNAL CONNECTION REFERENCE POINT
(REFERENCED)
INTERNAL/ON-SKID CONNECTION REFERENCE
POINT (NON-REFERENCED)
NPS NOMINAL PIPE SIZE
PLATE HEAT EXCHANGER
GAS FUEL COALESCING FILTER
C (CUSTOMER)S (SIEMENS)
INSTRUMENT AIR POSITIONER
Valve Open or Valve
Energised Position Switch
Valve Open Fault - Shut Down
POSITION MONITORED
INSTRUMENT AIR ACTUATOR
Valve Closed or Valve
De-Energised Position Switch
Instrument Setting High Shut DownInstrument Setting High Alarm.
Instrument Setting Low Shut Down.Instrument Setting Low Alarm.
INSTRUMENT ALARM INDICATORS
VALVE POSITION ALARM INDICATORS
Valve Open Fault - Warning
Valve Closed Fault - Shut DownValve Closed Fault - Warning
FIELD MOUNTED CONTROLLER
PANEL MOUNTED (REAR) CONTROLLER
PRESSURE REGULATOR
(REMOTE SENSING)
PRESSURE RELIEF/CONTROL VALVE
A. C. OlofssonP. J. Gustavsson
K. Dahlroth
C
2014-06-27
C - 2014-09-11 A. C. Olofsson
12
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
1110987654321
121110987654321
© S
iem
en
s A
G 2014
We
re
se
rve
all
rig
hts
in
th
is d
oc
um
en
t a
nd
in
th
e i
nfo
rma
tio
n
co
nta
ine
d t
he
rein
. R
ep
rod
uc
tio
n,
us
e o
r d
isc
los
ure
to
th
ird
pa
rtie
s w
ith
ou
t e
xp
res
s a
uth
ori
ty i
s s
tric
tly
fo
rbid
de
n.
Latest rev. Revision text Rev. date Prepared by / Created by:
Docum
ent N
oS
heet
22913329
9100
HG
SGT-300 en
Lang.
2
No. of sh.
Title
Order no
BD000220
P&ID Legend Sheet
Document No
22913329
Plant Name
Sheet
Resp. dept.
/
/DCC
Based on doc No / Revision
Checked by
Appr. by
Latest revision
Designation
Prepared by
Original Date
OESMFB103 Petrobaltic Rig Conversion
CH MANUAL INPUT AS MANUALLY OPERATED SENSOR
QUALITY, VARIABLES (ANALYSIS)
VELOCITY, SPEED, FREQUENCY, ACCELERATION
COMBINED AND OTHER VARIBLES
COMBINED ANALOGUE AND BINARY SIGNAL CONDITIONING
ANALOGUE AND BINARY SIGNAL CONDITIONING
EA-EE
EG-EK
EM-EQ
EW-EZ
EU
ER
E
OPEN LOOP CONTROL
ALARM, ANNUNICATION
PROCESS COMPUTER
PROTECTION
REACTOR PROTECTION
*T
*Y
*X
*V
*W
*U
*P
*R
*S
*Q
*L
*M
*K
TEMPERATURE
NEUTRON FLUX
VIBRATION, EXPANSION
WEIGHT, MASS
VISCOSITY
MOISTURE, HUMIDITY
RADIATION VARIABLES
PRESSURE
TIME
LEVEL
GAS TURBINE PLANT
SYSTEMS
AN COMPRESSOR UNITS, FANS
DIRECT MEASURING CIRCUITS
INDIRECT MEASURING CIRCUITS
CLEANING, DRYING, FILTERING AND SEPARATING EQUIPMENT
GEARBOX AND COUPLING EQUIPMENT
STORAGE EQUIPMENT (TANKS)
JET PUMPS, EJECTORS, INJECTORS
FLOW RESTRICTORS, LIMITERS, ORIFICES
PIPING, DUCT WORK, CHUTES
FLUE GAS CATALYTIC CONVERTER MODULES
DISTANCE, LENGHT, POSITION, DIRECTION OF ROTATION
CLOSED-LOOP CONTROL CIRCUITS
ADJUSTING AND TENSIONING EQUIPMENT FOR NON-ELECTRICAL VARIABLES
COMBUSTION EQUIPMENT
STATIONARY TOOLING, TREATMENT EQUIPMENT
TEST AND MONITORING EQUIPMENT FOR PLANT MAINTENANCE
SHAFTS (FOR ERECTION AND MAINTENANCE ONLY)
HANGERS, SUPPORTS, RACKS, PIPING PENETRATIONS
BP
C*
*D
*F
*G
*E
F*
D*
BT
BU
BR
BS
BQ
ELECTRICAL VARIABLES
FLOW, RATE
DENSITY
INSULATION, SHEATING
SILENCERS
BF
BN
BE
B
BB
AU
AW
AX
AV
AS
AT
AP
APPARATUS
FOUNDATIONS
PUMP UNITS
ISOLATING ELEMENTS, AIR LOCKS
HEAT EXCHANGERS, HEAT TRANSFER SURFACES
TURNING, DRIVING, LIFTING AND SLEWING GEAR
HEATING, COOLING AND AIR CONDITIONING UNITS
CONTINUOUS CONVEYORS, FEEDERS
COMPACTING AND PACKAGING EQUIPMENT, ONLY AS PART OF PROCESS
SIZE REDUCITON EQUIPMENT, ONLY AS PART OF PROCESS
EQUIPMENT
AK
AM
AJ
AH
AG
AF
AE
A
AC
AB
AA
GENERATOR UNITS
MIXERS, AGIATORS
AGGREGATE
VALVES, DAMPERS
KP PUMPS
CLEANING MACHINES, DRYERS, SEPARATORS, FILTERS
STATIONARY TOOLING AND TREATMENT MACHINES
PIPING COMPONENTS, DUCTWORK COMPONENTS
BOOSTERS OTHER THAN COUPLINGS AND GEARBOXES
TRANSMISSION GEAR, NON ELECTRICAL, CONVERTERS AND
CONDENSATION CHAMBER IN MEASURING CIRCUITS
MEASURING INTRUMENTS, TESTING EQUIPMENT
SENSORS IF NOT STRUCTURALLY INTEGRAL WITH *QP*,
INSTRUMENTATION AND CONTROL COMPONENTS
THERMOWELLS AND POCKETS FOR PROTECTION OF SENSORS
TURBINESMT
METERING ORIFICES
INSTRUMENT PIPING
CONTROLLERS, FLYBOLT GOVERNOR
SIGNALLING DEVICES
QR
QS
QT
QH
QP
QN
QB
Q
MU
BURNERS, GRATES
FOR MAINTENANCE
POSITIONERS, NOT ELECTRICAL
MECHANICAL COMPONENTS
CLUTCHES, COUPLINGS
ENGINES, NOT ELECTRICAL
BRAKERS
FOUNDATIONS
GEARBOXES
MK
MS
MR
MM
MG
MF
MB
M
KT
KW
KV
-L INDUCTORS
MEASURING INSTRUMENTS, TESTING EQUIPMENT
TRANSMISSION PATHS, WAVEGUIDES, AERIALS
MODULATORS, CONVERTORS FROM ELECTRICAL TO
TERMINATIONS, BALANCING EQUIPMENT, FILTERS,
TURNING, DRIVING, LIFTING AND SLEWING GEAR
GATE VALVES, GLOBE VALVES, DAMPERS, COCKS,
LIMITERS, CABLE TERMINATIONS
MECHANICAL COMPONENTS
VESSLES/TANKS, POOLS, SURGE TANKS
CONTINUOUS CONVEYORS, FEEDERS
COMPACTING, PACKAGING MACHINES
SIZE REDUCTION MACHINES
COMPRESSORS, BLOWERS, FANS
MIXERS, AGITATORS
HEAT EXCHANGERS, COOLERS
RUPTURE DISKS, ORIFICES
GATES, DOORS, DAM BOARDS
KJ
KK
KN
KM
KE
KF
KD
KA
KC
KB
K
AMPLIFIERS, CONTROLLERS
POWER SWITCHGEAR
TERMINALS, PLUGS, SOCKETS
SWITCHES, SELECTORS
TUBES, SEMICONDUCTORS
OTHER ELECTRICAL VARIABLES
ELECTRICAL POSITIONERS, E.G. SOLENOIDS
-W
-X
-Z
-Y
-U
-V
MOTORS
TRANSFORMERS
RESISTORS
-S
-T
-R
-Q
-M
-P
-N
BINARY ELEMENTS, DELAY DEVICES, MEMORY DEVICES
TRANSDUCERS FOR NON-ELECTRICAL TO ELECTRICAL
ELECTRICAL COMPONENTS
PROTECTIVE DEVICES
SIGNALLING DEVICES
SPECIAL COMPONENTS
GENERATORS, POWER SUPPLIES
VARIABLES AND VICE-VERSA
ASSEMBLIES AND SUBASSEMBLIES
RELAYS, CONTACTORS
CAPACITORS
-F
-H
-G
-K
-D
-C
-E
-B
-A
COMPONENTS
-
FIRE EXTINGUISHING SYSTEM, CO2,SGJ
TAG DEFINITIONS
DIFFERENT SECTION OF THE SYSTEM
GENERAL INSTRUMENT AIR SYSTEM
HEATING AND FUEL GAS SYSTEM
STATIONARY FIRE EXTINGUISHING SYSTEM
HEATING, AIR CONDITION, VENTILATION
ANCILLARY SYSTEMS
STATIONARY CLEANING SYSTEM
GAS FUEL SYSTEM, AREA 10
SUBSYSTEM DESIGNATION
EXAMPLE
MBP10
S
SA_
SF_
SG_
SD_
MAIN MACHINE SETS
GAS TURBINE PLANT
ADDITIONAL LETTER FOR
GENERATOR (ALTERNATOR)
COOLING WATER SYSTEMS
AUXILIARY SYSTEMS
MK_
P
Q
QF_
PG_ -
M
MB_
MB
MAIN SYSTEM GROUPS
GAS TURBINE: GAS GENERATOR SYSTEM
COOLING / SEALING AIR SYSTEM
GAS TURBINE: STARTING SYSTEM
GAS TURBINE: POWER TURBINE
MBH
MBK GEAR SYSTEM
MBJ
MBB
MBT
EXHAUST SYSTEMMBR
AIR INTAKE FILTER SYSTEMMBL
COMBUSTION CHAMBER SYSTEMMBM
IGNITION GAS SYSTEM
GAS FUEL SYSTEM
LIQUID FUEL SYSTEM
MBQ
MBP
MBN
ELECTRICAL GENERATOR SYSTEM
LUBE OIL SYSTEM
MK
MBV
WATER INJECTION SYSTEMMBU
TURBINE DRYING SYSTEMMPS
COOLING WATER SYSTEMPGA
INSTRUMENT AIR SYSTEMQFA
VENTILATION SYSTEM AUXILIARY ENCLOSURESAA
COOLING SYSTEM ELECTRICAL GENERATORSAE
VENTILATION SYSTEM GAS TURBINE ENCLOSURESAG
COMPRESSOR WASHING SYSTEMSDB
FIRE AND GAS CONTROL AND PROTECTION EQUIPMENTSGY
VENTILATION SYSTEM CONTROL ROOMSAC
EXTERNAL LIQUID FUEL SYSTEMEG
SYSTEM DESIGNATION
FCV - FLOW CONTROL VALVE
YD - FIRE DETECTOR
FI - FLOW INDICATION
FLX - FLEXIBLE PIPE
FO - FLOW ORIFICE
FT - FLOW TRANSMITTER
GCP - GENERATOR CONTROL PANEL
GD - GAS DETECTOR
HV - HAND OPERATED VALVE
IH - IMMERSION HEATER
LG - LEVEL GAUGE
LI - LEVEL INDICATION
LT - LEVEL TRANSMITTER
MAC - MANUAL ALARM/RELEASE CONTACT
MCC - MOTOR CONTROL CENTRE
MOV - MOTOR OPERATED VALVE
ND -KEY PHASOR
PCV - PRESSURE CONTROL VALVE
PDG PRESSURE DIFFERENTIAL GAUGE
PDI - PRESSURE DIFFERENTIAL INDICATION
PDT - PRESSURE DIFFERENTIAL TRANSMITTER
PG - PRESSURE GAUGE
PI - PRESSURE INDICATION
PS - PRESSURE SWITCH
PSE - PRESSURE SAFETY ELEMENT
PSV - PRESSURE SAFETY VALVE
PT - PRESSURE TRANSMITTER
QL - STATUS LAMP
RTD - RESISTANCE TEMPERATURE DETECTOR
SI - SPEED INDICATION
SOL - SOLENOID
ST - SPEED TRANSMITTER
TC - THERMO COUPLE
TD - TEMPERATURE DETECTOR
TH - HEAT EXCHANGER/COOLER
TI - TEMPERATURE INDICATION
TS - TEMPERATURE SWITCH
TT - TEMPERATURE TRANSMITTER
UD - VIBRATION DETECTOR
UI - VIBRATION INDICATION
UT - VIBRATION TRANSMITTER
VXI - RADIAL VIBRATION INDICATION (X AXIS)
VXT - RADIAL VIBRATIONTRANSMITTER (X AXIS)
VYI - RADIAL VIBRATION ELEMENT (Y AXIS)
VYT - RADIAL VIBRATION TRANSMITTER (Y AXIS)
XA - UNCLASSIFIED ALARM
XF - UNCLASSIFIED FILTER
XI - UNCLASSIFIED INDICATION
XL - UNCLASSIFIED LAMP
XM - UNCLASSIFIED MOTOR
XP - UNCLASSIFIED PUMP
XV - UNCLASSIFIED VALVE
XX - UNCLASSIFIED PART
YV - FIRE DAMPER
ZC - POSITION CONTROLLER
ZD - AXIAL VIBRATION
ZI - POSITION INDICATION
DCC - DC CONTROLLER
HS - HAND OPERATED SWITCH
HD - HEAT DETECTOR
ZS - POSITION SWITCH
ZSC - POSITION SWITCH (CLOSED)
ZSO - POSITION SWITCH (OPEN)
ZT - POSITION TRANSMITTER
ZY - POSITION CONVERTER
ZZ - LINEAR/ROTARY ACTUATOR
SD - SPEED PROBE
A. C. OlofssonP. J. Gustavsson
K. Dahlroth
C
2014-06-27
C - 2014-09-11 A. C. Olofsson
12
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
1110987654321
121110987654321
© S
iem
en
s A
G 2014
We
re
se
rve
all
rig
hts
in
th
is d
oc
um
en
t a
nd
in
th
e i
nfo
rma
tio
n
co
nta
ine
d t
he
rein
. R
ep
rod
uc
tio
n,
us
e o
r d
isc
los
ure
to
th
ird
pa
rtie
s w
ith
ou
t e
xp
res
s a
uth
ori
ty i
s s
tric
tly
fo
rbid
de
n.
Latest rev. Revision text Rev. date Prepared by / Created by:
Docum
ent N
oS
heet
2913341
HG
SGT-300 en
Lang.
No. of sh.
Title
Order no
BD000220
Core Auxiliary Module P&ID
Document No
2913341
Plant Name
Sheet
Resp. dept.
/
/DCC
Based on doc No / Revision
Checked by
Appr. by
Latest revision
Designation
Prepared by
Original Date
OESMFB103 Petrobaltic Rig Conversion
1 1/2" NPS SCH 10s
1" OD 16 SWG
3/4" OD 16 SWG
2" NPS SCH 10s
1" OD 16 SWG
1/2" OD 16 SWG
3/8" OD 16 SWG
1/4" OD 16 SWG
3/8" OD 16 SWG
3/8
" O
D 1
6 S
WG
1/2
" O
D 1
6 S
WG
3/4" OD 16 SWG
1/2" OD 16 SWG
3/4
" O
D 1
6 S
WG
1" OD 16 SWG
1"
NP
S S
CH
10s
3/4
" O
D 1
6 S
WG
1 1
/2"
NP
S S
CH
10s
3/4" OD 16 SWG
1 1/2" NPS SCH 10s
1 1/2" NPS SCH 10s
A
A
2913331-5
P2 Air
P2 Cooler
2913340-31
Instrument Air
Interstage Pilot Solenoid
XV60NO
NC
XV59
XV59
NC
FLX
165
2913331-59
Instrument Air
Air Assist
2913331-58
Liquid Fuel
Pilot Supply
2913331-57
Liquid Fuel
Main SupplyDual Fuel DLE Burner
BURNER No.3 SHOWNTYPICAL BURNERARRANGEMENT IN 5LOCATIONS ARE THE SAME
2913331-60
P2 Air / Propane
Liquid Fuel Module
TO BURNERS 1 & 2
TO BURNERS 4, 5 & 6
Gas M
ain
Manifold
Gas P
ilot M
anifold
Air
Assis
t M
anifold
Liq
uid
Main
Manifold
Liq
uid
Pilo
t M
anifold
DLE DUAL FUEL MANIFOLD
(ET
)(E
T)
(ET
)(E
T)
(ET
)(ET)
(ET)(ET)
(ET
)(E
T)
(ET
)
(ET)
(ET)(ET)
XF27B8-47-CK-115
2913340-28
Water Wash Fluid
Engine Auxiliary Module
FLX73
A. NO OR NC NOTATION ASSOCIATEDWITH AUTOMATIC VALVES RELATES TOTHE VALVE IN ITS DE-ENERGISEDSTATE.
B.WITH RESPECT TO CLIENT PIPING TOTHE PACKAGE, THIS P&ID MUST BE READIN CONJUNCTION WITH THE 'PIPINGDESIGN SPECIFICATION AND TIE INSCHEDULE' .
C.FLUID TO BE SUPPLIED IN ACCORDANCEWITH COMPANY FLUIDS SPECIFICATION65/0027.
D. THE CONTROL SYSTEM ISREPRESENTED IN A SIMPLIFIED FORMAT.THE CONTROL FUNCTIONS INDICATED AREDEPENDENT ON ENGINE STATUS. VALVEPOSITION ERROR MAY RESULT INSHUTDOWN OR START INHIBIT.
F. UNLESS OTHERWISE INDICATED, ALLINSTRUMENT AIR PIPEWORK IS 3/8" OD 16SWG.
H. N/A
GENERAL NOTES
1. MANIFOLD ARRANGEMENT WITH 10PIGTAILS.
NOTES REFERENCED ON P&ID
2913330-3
Gas Fuel
Pilot Supply
2913330-2
Gas Fuel
Main SupplyFLX1
FLX2
(ET)(ET)
(ET)(ET)
G. P&ID SHALL BE READ IN CONJUNCTIONWITH P&ID LEGEND SHEET. 2913329 /113A20-1766-PR-PID-24022
ZZ8
9
ZT
B8-47-ZT-008
44
TD
8
ZZ
B8-47-ZZ-008
42
XX
4
ZC ZI
ZI
ZI HHH
ELECTRIC VGV ACTUATOR
INTERSTAGE BLEED VALVE
VIEW A-A
1
2
34
5
6
113A20-1766-PR-PID-24017
113A20-1766-PR-PID-24023
113A20-1766-PR-PID-24017
113A20-1766-PR-PID-24023
113A20-1766-PR-PID-24020
113A20-1766-PR-PID-24023
113A20-1766-PR-PID-24023
113A20-1766-PR-PID-24020
113A20-1766-PR-PID-24023
A. C. OlofssonP. J. Gustavsson
K. Dahlroth
F
2014-06-30
F - 2014-11-20 A. C. Olofsson
12
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
1110987654321
121110987654321
© S
iem
en
s A
G 2014-2
015
We
re
se
rve
all
rig
hts
in
th
is d
oc
um
en
t a
nd
in
th
e i
nfo
rma
tio
n
co
nta
ine
d t
he
rein
. R
ep
rod
uc
tio
n,
us
e o
r d
isc
los
ure
to
th
ird
pa
rtie
s w
ith
ou
t e
xp
res
s a
uth
ori
ty i
s s
tric
tly
fo
rbid
de
n.
Latest rev. Revision text Rev. date Prepared by / Created by:
Docum
ent N
oS
heet
2913331
9100
HG
SGT-300 en
Lang.
No. of sh.
Title
Order no
BD000220
Liquid Fuel System P&ID
Document No
2913331
Plant Name
Sheet
Resp. dept.
/
/DCC
Based on doc No / Revision
Checked by
Appr. by
Latest revision
Designation
Prepared by
Original Date
OESMFB103 Petrobaltic Rig Conversion
CustomerSuppliedIsolationValve
1/2" OD 16 SWG
1" OD 16 SWG
1/2" OD 16 SWG
1 1/2" NPS SCH10s
3/4" OD 16 SWG
1" OD 16 SWG
1" OD 16 SWG
3/4" OD 16 SWG
3/4" OD 16 SWG
3/4
" O
D 1
6 S
WG
1" OD 16 SWG
1/2
" O
D 1
6 S
WG
3/8" OD 16 SWG
3/8" OD 16 SWG
3/8" OD 16 SWG
3/4" OD 16 SWG
1" OD 16 SWG
3/4
" O
D 1
6 S
WG
3/4" OD 16 SWG
1/2" OD 16 SWG
2" NPS SCH 10s
1 1
/2"
NP
S S
CH
10s
3/4" OD 16 SWG
1"
OD
16 S
WG
3/8
" O
D 1
6 S
WG 1
/2"
OD
16 S
WG
1/2
" O
D 1
6 S
WG
1/2" OD 16 SWG
1" OD 16 SWG
1 1
/2"
NP
S S
CH
10s
1" OD 16 SWG
1/2" OD 16 SWG
1/2" OD 16 SWG
3/4" OD 16 SWG
3/4" OD 16 SWG
1" OD 16 SWG
3/4" OD 16 SWG
Liquid Fuel
Client
HV39
NO
2913332 - 44
Instrument Air C S
NDc
C
ATRc
C
AHSc
C S
GJc
S C
GKc
ZI HHH
ZI
L
15
ZS
10
ZS
B8-47-ZSL-075
S SOL15B8-47-XY-075
XV75
B8-47-XV-075
FC
FO136
B8-47-FO-136
XP36
13
ZT
B8
-47
-ZT
-21
3
XP36B8-47-XP-036A
XP37B8-47-XP-036B
FO121
B8-47-FO-121
FO123
B8-47-FO-123
XV456
B8-47-VB-101
NC
NO
PSV171
B8-47-PSV-171
PSV169
B8-47-PSV-169
PSV172B8-47-PSV-172
PSV170B8-47-PSV-170
XI
DDV
XV214
B8-47-XV-214
DDV
XV213B8-47-XV-213
XV455
B8-47-VB-102
NO
NC
27
HS
B8-47-HS-036
ZI HHH
20
ZC
2
ZC
2
MCCM
XM5
B8-4
7-X
M-0
36
108
ZT
B8-47-ZT-214
ZI HHH A. NO OR NC NOTATION ASSOCIATED WITH AUTOMATIC VALVES
RELATES TO THE VALVE IN ITS DE-ENERGISED STATE.
B.WITH RESPECT TO CLIENT PIPING TO THE PACKAGE, THIS P&IDMUST BE READ IN CONJUNCTION WITH THE 'PIPING DESIGNSPECIFICATION AND TIE IN SCHEDULE' .
C.FLUID TO BE SUPPLIED IN ACCORDANCE WITH COMPANY FLUIDSSPECIFICATION 65/0027.
D. THE CONTROL SYSTEM IS REPRESENTED IN A SIMPLIFIEDFORMAT. THE CONTROL FUNCTIONS INDICATED AREDEPENDENT ON ENGINE STATUS. VALVE POSITION ERROR MAYRESULT IN SHUTDOWN OR START INHIBIT.
F. UNLESS OTHERWISE INDICATED, ALL INSTRUMENT AIRPIPEWORK IS 3/8" OD 16 SWG.
GENERAL NOTES
NOTES REFERENCED ON P&ID
1. LIQUID FUEL SUPPLY OPERATING PRESSURES AT SKID EDGECONNECTION Bc ;- MINIMUM - 1 BARG. MAXIMUM - 3 BARG.
2. DRAIN CONNECTION PIPE MUST NOT TRAVEL ABOVE XV424EXIT AT ANY POINT BETWEEN VALVE AND TANK.
3. BALANCE VENT PIPE MUST BE TAKEN FROM AS NEAR TO XV424OUTLET AS POSSIBLE AND TRAVEL AT ALL TIMES ABOVE XV424TO DRAIN TANK VENT PIPE.
4. AHc PROVIDED TO ENABLE CUSTOMER TO RETURN FUELPRIMING LINE BACK TO SUPPLY TANK IF REQUIRED. HV1000 TOBE SET AND LOCKED TO THE ON-SKID DRAIN TANK POSIITON ANDAHc PLUGGED.
5. PUMP MUST BE PRIMED/FILLED PRIOR TO USE.
6. OFF-SKID ISOLATION HAND VALVE AND BLOCK VALVE TO BELOCATED OUTSIDE THE PACKAGE PLANE OF ROTATION.
7. CUSTOMER SUPPLY OFF-SKID HAND VALVE IS A SAFETYREQUIREMENT FOR MANUAL ISOLATION AND MUST ALWAYS BEFITTED.
Note 7
Note 6
Note 4
Note 2
Note 3
Note 5
Note 5
Note 1
6
PDT
B8-4
7-P
DT
-006
XV586
XV587
FO96 FO95
XV457
28
FI
B8-47-FI-028
98
4
ZS
B8-4
7-Z
SH
-425
S
SOL620
B8-47-XY-425
NC NO
XV
459
2913331 - E
HV
555
NC
HV
558
NC
HV554
NC
HV557
NC
HV559
NC
XV423AB8-47-XV-423B
NC
NO
980
ZS
B8-47-ZSH-423
979
ZS
B8-47-ZSL-423
351
PTB8-47-PT-351
279
PTB8-47-PT-279
10
PT B8-47-PT-010
PI HHH
LLL
HV43HV560
PI HHH
LLL
HV231
PI HHH
LLL
2913331 - B
Liquid Fuel
HV42
PDI H
XV
425B
B8-4
7-X
V-4
25B
NO
XV424
B8-47-XV-424
NO NC
S SOL619
B8-47-XY-424
NC
NO
982
ZS
B8-47-ZSH-424
981
ZS
B8-47-ZSL-424
2913331 - A
XF179B8-47-CY-103
FO105B8-47-FO-105
133
TT
B8-47-TT-133
2913331 - A
Liquid Fuel
2913331 - B
2913331 - D
2913331 - E
2913331 - F
FO41
FO141B8-47-FO-141
238
PT
B8-47-PT-238
XV373
XV501G
XV501H
XV501J
XV152B8-47-XV-152
FC
SSOL172
B8-47-XY-152
NCNO
XV148B8-47-XV-148
FC
SSOL351
B8-47-XY-148
NCNO
XV147B8-47-XV-147
NC
NO
SSOL350
B8-47-XY-147
NCNO
990
ZS
B8-47-ZSH-147
989
ZS
B8-47-ZSL-147
2913331 - D
XV427B8-47-XV-427
NC
NO
SSOL622
B8-47-XY-427
NCNO
2913331 - F
TI HHH
L
PI H
L
HV224
XV501F
XV501E
XV501D
XV501C
XV501B
XV501A
ZI HHH
XV388B8-47-XV-388
FC
SSOL1
B8-47-XY-388
NCNO
ZI H
ZI
LLL
ZI
LLL
ZIHH
2913331 - C
2913331 - C
ZI HHH
ZI
LLL
ZI HHH
ZI
LLL
ZI HHH
ZI
LLL
ZI
LLL
ZI HHH
ZI
L LL
ZI H
ZI
LLL
XV585B8-47-XV-585
XV425A
165
ZT
B8-47-ZT-585
32
ZY
B8-47-ZY-585
XV638SSOL618
B8-47-XY-423
NCNO
XF19
XF19
B8-4
7-C
Y-1
01
XF98
B8-4
7-C
Y-1
02
HV225
ZI
HHH
98
3
ZS
B8-4
7-Z
SL-4
25
PSV168
B8-4
7-P
SV
-168
PSV167
B8-4
7-P
SV
-167
927
ZS
B8-47-ZSH-388
926
ZS
B8-47-ZSL-388
382
ZS
B8-47-ZSH-152
383
ZS
B8-47-ZSL-152
992
ZS
B8-47-ZSH-148
991
ZS
B8-47-ZSL-148
987
ZS
B8-47-ZSL-427
988
ZS
B8-47-ZSH-427
2
PDI
B8
-47
-PD
I-0
02
46
ZC
XV423BB8-47-XV-423A
NC
NO
FLX111 FLX112
FLX
113
14
PI
B8-47-PI-014
HV152
LIQUID FUEL MODULE BOUNDARY
C S
Bc
2913340 - 7
To Drain Tank Vent
2913340 - 8
To On-Skid Drain Tank
HV1000
LO
LC
SC
AHc
2913340 - 45
To On-Skid Drain Tank
TH8
B8-47-HZ-101
S
S ALGc
S S
ALHc
S S
ALJc
XF103B8-47-CY-104
2913332 - 41
Instrument Air
From Air Distribution
S
S
AJEc
2913341 - 57
Liquid Fuel
To Main Manifold
2913341 - 58
Liquid Fuel
To Pilot Manifold
2913341 - 59
P2 / Instrument Air
To Air Assist Manifold
2913341 - 60
P2 / Instrument Air
To Pilot Manifold
2913341 - 5
P2 Air
From Centre Casing
G. P&ID SHALL READ IN CONJUNCTION WITH P&ID LEGENT SHEET2913324/113A20-1766-PR-PID-24022
NC
113A20-1766-PR-PID-24012
113A20-1766-PR-PID-24014
113A20-1766-PR-PID-24014
113A20-1766-PR-PID-24014
113A20-1766-PR-PID-24014
113A20-1766-PR-PID-24023
113A20-1766-PR-PID-24017
113A20-1766-PR-PID-24017
113A20-1766-PR-PID-24017
113A20-1766-PR-PID-24012
113A20-1766-PR-PID-24014
113A20-1766-PR-PID-24023
19-025
IP
113A20-PR-PID--02514
113A20-PR-PID-05214
To Client Tank
19-047
IP
8.VALVE XV75 SUPPLIED LOOS FOR CLIENT INSTALLATION
Note 8
Test Point
TPM1P
Test Point
TPP1P
TPA
Test Point
TPMB
Test Point
TPPB
T1
MAIN FUEL CONTROL UNIT
PILOT FUEL CONTROL UNIT
TU
RB
INE
SK
ID E
DG
E
ENCLOSURE ROOF
M. KarlssonM. Mattfolk
B. Kazmierski
F
2014-07-09
F Revised with All Customer Tag Number 2015-01-22 K. Nejadian
12
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
1110987654321
121110987654321
© S
iem
en
s A
G 2014
We
re
se
rve
all
rig
hts
in
th
is d
oc
um
en
t a
nd
in
th
e i
nfo
rma
tio
n
co
nta
ine
d t
he
rein
. R
ep
rod
uc
tio
n,
us
e o
r d
isc
los
ure
to
th
ird
pa
rtie
s w
ith
ou
t e
xp
res
s a
uth
ori
ty i
s s
tric
tly
fo
rbid
de
n.
Latest rev. Revision text Rev. date Prepared by / Created by:
Docum
ent N
oS
heet
2913332
9100
HG
SGT-300 en
Lang.
No. of sh.
Title
Order no
BD000220
Air Distribution P&ID
Document No
2913332
Plant Name
Sheet
Resp. dept.
/
/DCC
Based on doc No / Revision
Checked by
Appr. by
Latest revision
Designation
Prepared by
Original Date
OESMFB103 Petrobaltic Rig Conversion
3/8" OD 16 SWG
1" OD 16 SWG
1/2" NPS SCH 10s
1 1/2" NPS SCH 10s
3/4
" O
D 1
6 S
WG
1/2
" O
D 1
6 S
WG
1/2" NPS SCH 10s
1"
OD
16 S
WG
1"
OD
16 S
WG
3/8" OD 16 SWG
1" OD 16 SWG
1/2" OD 16 SWG
113A20-PR-PID-05214
Instrument Air
Client
2913340 - 30
Instrument Air
Auxiliary Module
C S
BWc
Gas T
urb
ine S
kid
Edge
2913340 - 11
Instrument Air
Seals
XF102
XF102
B8-47-CK-102
PDI
HV220
NO
NC
2913330 - 42
Instrument Air
Off-Skid Gas Fuel Block & Vent
2913336 - 48
Instrument Air
Ventilation Dampers
Note 1
Note 2
PDI
2913331 - 44
Instrument Air
Off-Skid Liquid Fuel block
Note 2
2913331 - 41
Instrument Air
Liquid Fuel Module
2913333 - 56
Instrument Air
Lube Oil Module
XV467
A. NO OR NC NOTATION ASSOCIATEDWITH AUTOMATIC VALVES RELATES TOTHE VALVE IN ITS DE-ENERGISEDSTATE.
B.WITH RESPECT TO CLIENT PIPING TOTHE PACKAGE, THIS P&ID MUST BE READIN CONJUNCTION WITH THE 'PIPINGDESIGN SPECIFICATION AND TIE INSCHEDULE' .
C.FLUID TO BE SUPPLIED IN ACCORDANCEWITH COMPANY FLUIDS SPECIFICATION65/0027.
D. THE CONTROL SYSTEM ISREPRESENTED IN A SIMPLIFIED FORMAT.THE CONTROL FUNCTIONS INDICATED AREDEPENDENT ON ENGINE STATUS. VALVEPOSITION ERROR MAY RESULT INSHUTDOWN OR START INHIBIT.
F. UNLESS OTHERWISE INDICATED, ALLINSTRUMENT AIR PIPEWORK IS 3/8" OD 16SWG.
GENERAL NOTES
NOTES REFERENCED ON P&ID
1. AIR SUPPLY MIN. - 5.5 BARG, MAX. - 8.0 BARG
2. IT IS RECOMMENDED THAT THE CUSTOMERFITS A FILTER AND ISOLATION VALVE TO ALLOFF-SKID PNEUMATIC EQUIPMENT.
2913340 - 12
Instrument Air
Auxiliary Module
2913330 - 12
Instrument Air
Gas Fuel Module
PCV45
PS
V92
C S
QFA/05
S C
QFA/010
CS
QF
A/0
15
SC
QF
A/0
20
3. ALL INSTRUMENT AIR PIPING 3/8" UNLESSOTHERWISE STATED.
4. OPTIONAL SIEMENS SUPPLY PRESSUREREGULATOR AND PRESSURE RELIEF VALVEARE SUPPLIED LOOSE FOR INCORPORATIONINTO THE CUSTOMERS AIR SUPPLY PIPING.
Note 4
G. P&ID SHALL BE READ IN CONJUNCTIONWITH P&ID LEGEND SHEET2913329/113A20-1766-PR-PID-24022
113A20-1766-PR-PID-24023
113A20-1766-PR-PID-24020
113A20-1766-PR-PID-24019
113A20-1766-PR-PID-24024
113A20-1766-PR-PID-24017
113A20-1766-PR-PID-24017
113A20-1766-PR-PID-24017
113A20-1766-PR-PID-24020
113A20-1766-PR-PID-24023
S S
ATHc
19-033IP
19-034IP
19-035IP
19-036IP
19-037IP
5. AIR SUPPLY MIN - 5.5 BARG, MAX 6.9 BARG
Note 5
M. KarlssonM. Mattfolk
R. Dahlbom
D
2014-07-03
D Revised accroding to revision notice 2014-12-05 M. Karlsson
12
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
1110987654321
121110987654321
© S
iem
en
s A
G 2014-2
015
We
re
se
rve
all
rig
hts
in
th
is d
oc
um
en
t a
nd
in
th
e i
nfo
rma
tio
n
co
nta
ine
d t
he
rein
. R
ep
rod
uc
tio
n,
us
e o
r d
isc
los
ure
to
th
ird
pa
rtie
s w
ith
ou
t e
xp
res
s a
uth
ori
ty i
s s
tric
tly
fo
rbid
de
n.
Latest rev. Revision text Rev. date Prepared by / Created by:
Docum
ent N
oS
heet
2913333
9100
HG
SGT-300 en
Lang.
No. of sh.
Title
Order no
BD000220
Lube Oil System P&ID
Document No
2913333
Plant Name
Sheet
Resp. dept.
/
/DCC
Based on doc No / Revision
Checked by
Appr. by
Latest revision
Designation
Prepared by
Original Date
OESMFB103 Petrobaltic Rig Conversion
3"
NP
S S
CH
10s
3"
NP
S S
CH
10s
2"
NP
S S
CH
10s
1" OD 16 SWG
3/4" OD 16 SWG
1"
OD
16 S
WG
2"
NP
S S
CH
10s
4"
NP
S S
CH
10s
4"
NP
S S
CH
10s
1"
OD
16 S
WG
4"
NP
S S
CH
10s
1/4
" O
D 1
6 S
WG
2"
NP
S S
CH
10s
2"
NP
S S
CH
10s
1"
OD
16 S
WG
3" NPS SCH 10s3" NPS SCH 10s
1"
OD
16 S
WG
1"
OD
16 S
WG
3/4" OD 16 SWG
1"
OD
16 S
WG
1"
OD
16 S
WG
2" NPS SCH 10s
3"
NP
S S
CH
10s
1"
NP
S S
CH
10s
2"
NP
S S
CH
10s
2"
NP
S S
CH
10s
2" NPS SCH 10s
1"
OD
16 S
WG
3"
NP
S S
CH
10s
3" NPS SCH 10s
3" NPS SCH 10s
3/8" OD 16 SWG
3/8
" O
D 1
6 S
WG
Generator
FLX
107
FLX
108
FLX123
FLX
30
FLX
83
S
S CPc
SS AGXc
SS
AJKc
XV52
2
TIB8-47-TT-002
S
S
Fc
S
S Gc
XV
26
XV
27
HV
562
LO
XF
186
FLX
89
HV
1002
LC
FLX
88
HV
1001
LC
XF1B8-47-CK-103
XV
5
HV
60
NO
HV305
HV306HV351
LC
XF133
S
CBAc
19
LG
B8-47-LG-019
HV
615B
SS
ATTcSS
ATWc
SS
ATVc
SS
ATXc
S
S Mc
S
S GCc
S
S GDc
S DBcSADRc
1
LG
B8-47-LG-001
XF5
S
CNc
LUBE OIL FILL POINT
LUBE OIL FILL POINT
TEST
MAIN LUBE OIL PUMP
ENCLOSURE ROOF
LUBRICATING OIL TANK
HV605
LC
IH1
B8-47-HN-101
IH2
B8-47-HN-102
IH3
B8-47-HN-103
EN
CLO
SU
RE
EN
D P
AN
EL
FO
91
S C
CNc
S C
CMc
SC
Hc
VENT (NOTE B)
XP1B8-47-XP-001
PS
V7
B8-4
7-P
SV
-007
38A
TS
B8-47-TSH-038A
38B
TS
B8-47-TSH-038B
39A
TS
B8-47-TSH-039A
39B
TS
B8-47-TSH-039B
40A
TS
B8-47-TSH-040A
40B
TS
B8-47-TSH-040B
CT BEARING BREATHER
VENT (NOTE B)
2
FIB8-47-FI-002
XF4
FLX
20B
XF7B8-47-CY-105
8
MCC
8A
MCC
8B
MCC
XF
4
B8
-47
-CL
-10
3
90
PDI
B8
-47
-PD
I-0
90
FLX
20A
HV
59
NO
1
FIB8-47-FI-001
XF6
B8-47-LZ-101
XF15
B8-47-LZ-102
2913337 -
21
Lube O
il
Fro
m H
ydra
ulic
Sta
rt.
5
PI
B8-47-PI-005
HV29
2913337 - 23
Lube Oil
To Hydraulic Start
2913332 -
56
Instr
um
ent A
ir
Fro
m A
ir D
istr
ibution.
FO119
Tank
PCV1B8-47-PV-001
POINTS
HV184
HV184
XF
2B
8-4
7-C
L-1
01
XF3
B8-47-CL-102
8
PDT
B8-47-PDT-008
HV566LO LC
31
FI
B8-47-FI-031
30
FI
B8-47-FI-030
66A
TT
B8-47-TT-066A
66B
TT
B8-47-TT-066B
XF2
6B
PT
B8-47-PT-006B
6A
PT
B8-47-PT-006A
XV
2
7
TT
B8-47-TT-007
1
LT
B8-47-LT-001
TEST POINTS
EMERGENCY PUMP
AUXILIARY PUMP
FO110
HV57
HV28A
TI
L
LI H
L
PI HHH
LLL
PI HHH
LLL
HV28B
TI HHH
LLL
TI HHH
LLL
ZI
ZI
PDI H
XV
428
B8-4
7-X
V-4
28
MODULE BOUNDARY
XP2B8-47-XP-002
PSV8B8-47-PSV-008
XF16B8-47-CK-104
XI
XP3B8-47-XP-003
PSV9
B8-47-PSV-009
XF17B8-47-CK-108
XI
FLUSHING HAND VALVE
Tank
Tank
26
HS
B8-47-HS-002
29
HS
B8-47-HS-003
FO111
48
ZC
4
MCC
42
ZC
3
DCC
202
PI
B8-47-PI-001
M XM2B8-47-XM-002
M XM1B8-47-XM-001
31
ZY
B8-47-ZY-428
1
PDI
B8
-47
-PD
I-0
01
HV561
NC
HV
1B
NC
HV
1A
NC
14
IY
B8-47-PY-001
MXM11
B8-47-XM-011
24
HS
B8-47-HS-011
3
MCC XI
TH1B8-47-HC-101
MXM33
B8-47-XM-033
56
HS
B8-47-HS-033
17
MCC XI
SS
DEc
SS
DDc
A. NO OR NC NOTATION ASSOCIATEDWITH AUTOMATIC VALVES RELATES TOTHE VALVE IN ITS DE-ENERGISEDSTATE.
B.WITH RESPECT TO CLIENT PIPING TOTHE PACKAGE, THIS P&ID MUST BE READIN CONJUNCTION WITH THE 'PIPINGDESIGN SPECIFICATION AND TIE INSCHEDULE' .
C.FLUID TO BE SUPPLIED IN ACCORDANCEWITH COMPANY FLUIDS SPECIFICATION65/0027.
D. THE CONTROL SYSTEM ISREPRESENTED IN A SIMPLIFIED FORMAT.THE CONTROL FUNCTIONS INDICATED AREDEPENDENT ON ENGINE STATUS. VALVEPOSITION ERROR MAY RESULT INSHUTDOWN OR START INHIBIT.
F. UNLESS OTHERWISE INDICATED, ALLINSTRUMENT AIR PIPEWORK IS 3/8" OD 16SWG.
GENERAL NOTES
1. LUBRICATING OIL TANK
5. N/A
2. DRAIN TO BE SUBMERGED TO WITHIN100MM OF THE TANK BASE.
3. PRIMARY BREATHER 2"NPS SCH10S.
4. ON SITE FLUSHING TO BE CARRIED OUTIN ACCORDANCE WITH TSP05008. REMOVESTRAINER ELEMENT AFTER FLUSHING.
6. OIL MIST ELIMINATOR PRIMINGCONNECTION (ATXc).
8. SIPHON-BREAKER HOLE AT TOP OF PIPELOOP. MAXIMUM DIAMETER 1/4".
10. CT BEARING TELL-TALE DRAIN PIPEDTO UNDERBASE.
NOTES REFERENCED ON P&ID
Note 3
Note 1
Note 8
Note
2
Note 7
Note 5
Note 4
Note 6
Note
10
RUNDOWN LEVEL CHARGE CAPACITY -5041 LITRES
MAX OPERATING LEVEL - 4537 LITRES
MAX OPERATING LEVEL (RUNNING) -4321 LITRES
MIN OPERATING LEVEL (RETENTIONCAPACITY) - 3802 LITRES
WORKING CAPACITY - 2268 LITRES
TERMINOLGY AS API614
67
HS
B8-47-HS-070
XI
200
MCCM
XM70
B8-47-XM-070
HV1423PDI H
7. CONNECTION OPTION FOR OILCONDITIONING.
11. HV57, (SOCIAL VALVE TO PDT8), CANBE USED AS A LUB OIL SAMPLE POINT.
Note 11
G. P&ID SHALL BE READ INCONJUNCTION WITH P&ID LEGENDSHEET2913329/113A20-1766-PR-PID-24022
11
3A
20
-17
66
-PR
-PID
-24
01
2
113A20-1766-PR-PID-24021
11
3A
20
-17
66
-PR
-PID
-24
02
1
135
TS
B8-47-TSH-135
134
TS
B8-47-TSH-134
380A
MCC
380B
MCC
12. HV305 & HV306 CUSTOMER SUPPLIEDISOLATION VALVES FOR LUBE OILCONDITIONER OUTLET-RETURN MUST BEFITTED.
Note 12
44
PDT
S S
19-028
IP
19-029
IP
IH36B8-47-HM-101
IH37B8-47-HM-102
9. HEATER XXX (1 x 3.0 kW ON RETURNHEADER) LOCATED INSIDE OF HEADER.
IH38
B8-47-HM-103
G
Gas Turbine
M. KarlssonE. Åström
B. Kazmierski
E
2014-07-07
E Revised with All Customers Tag Numbers 2015-01-23 K. Nejadian
12
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
1110987654321
121110987654321
© S
iem
en
s A
G 2014
We
re
se
rve
all
rig
hts
in
th
is d
oc
um
en
t a
nd
in
th
e i
nfo
rma
tio
n
co
nta
ine
d t
he
rein
. R
ep
rod
uc
tio
n,
us
e o
r d
isc
los
ure
to
th
ird
pa
rtie
s w
ith
ou
t e
xp
res
s a
uth
ori
ty i
s s
tric
tly
fo
rbid
de
n.
Latest rev. Revision text Rev. date Prepared by / Created by:
Docum
ent N
oS
heet
2913342
4430
HG
SGT-300 en
Lang.
No. of sh.
Title
Order no
BD000220
Driven Unit Package (Generator) P&ID
Document No
2913342
Plant Name
Sheet
Resp. dept.
/
/DCC
Based on doc No / Revision
Checked by
Appr. by
Latest revision
Designation
Prepared by
Original Date
OESEFB103 Petrobaltic Rig Conversion
XX59
GEARBOX
39
UD
B8-47-VE-113
UI HHH
29
RTD
B8-47-RTD-02927
RTD
B8-47-RTD-02725
RTD
B8-47-RTD-025
24
RTD
B8-47-RTD-024
23
RTD
B8-47-RTD-023
40
RTD
B8-47-RTD-040
39
RTD
B8-47-RTD-039
44
RTD
B8-47-RTD-044
IH10
IH11
W V U
W V U
EXCITER
Manual drainManual drain
GENERATOR
(plug)(plug)
23R
RTDB8-47-RTD-023R
TI HHH
39R
RTDB8-47-RTD-039R
44R
RTD
B8-47-RTD-044R
TI HHH
24R
RTD
B8-47-RTD-024R
TI HHH
TI HHH
TI HHH
TI HHH
40R
RTDB8-47-RTD-040R
26
RTD
B8-47-RTD-026
Redundant
28
RTD
B8-47-RTD-028
Redundant
30
RTD
B8-47-RTD-030
TI HHH
Redundant
GCP
GCP
51X1
UD
B8-47-VE-114
51Y1
UD
B8-47-VE-11552X1
UD
B8-47-VE-116
52Y1
UD
B8-47-VE-117
UI HHH
UI HHH
UI HHH
UI HHH
52Y
UD
52X
UD
51Y
UD
51X
UD
COOLINGAIR OUT
TH9
XX47
M
XM53B8-47-XM-053
PDI H
11
PDSB8-47-PDSH-011
XI
XI
107
MCC
55
HS
M
XM52B8-47-XM-052
108
MCC
58
HS
COOLING AIR IN
A. NO OR NC NOTATION ASSOCIATEDWITH AUTOMATIC VALVES RELATES TOTHE VALVE IN ITS DE-ENERGISEDSTATE.
B.WITH RESPECT TO CLIENT PIPING TOTHE PACKAGE, THIS P&ID MUST BE READIN CONJUNCTION WITH THE 'PIPINGDESIGN SPECIFICATION AND TIE INSCHEDULE' DOCUMENT NUMBER.113A20-1766-PP-SP-24007
C.FLUID TO BE SUPPLIED IN ACCORDANCEWITH COMPANY FLUIDS SPECIFICATION65/0027.
D. THE CONTROL SYSTEM ISREPRESENTED IN A SIMPLIFIED FORMAT.THE CONTROL FUNCTIONS INDICATED AREDEPENDENT ON ENGINE STATUS. VALVEPOSITION ERROR MAY RESULT INSHUTDOWN OR START INHIBIT.
E. FOR INFORMATION RELATING TOINSTRUMENT ALARMS AND SHUTDOWNSETC, REFER TO THE INSTRUMENTSETTINGS LIST :113A20-1766-IN-LIS-24048
F. UNLESS OTHERWISE INDICATED, ALLINSTRUMENT AIR PIPEWORK IS 3/8" OD 16SWG.
G. THIS P&ID SHULD BE READ INCONJUCTION WITH P&ID LEGEND SHEET2913329 / 113A20-1766-PR-PID-24022
GENERAL NOTES
TI HHH
J. SvenssonM. Lundén
R. Dahlbom
C
2014-06-27
C Customer tags added 2014-10-23 J. Svensson
12
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
1110987654321
121110987654321
© S
iem
en
s A
G 2014
We
re
se
rve
all
rig
hts
in
th
is d
oc
um
en
t a
nd
in
th
e i
nfo
rma
tio
n
co
nta
ine
d t
he
rein
. R
ep
rod
uc
tio
n,
us
e o
r d
isc
los
ure
to
th
ird
pa
rtie
s w
ith
ou
t e
xp
res
s a
uth
ori
ty i
s s
tric
tly
fo
rbid
de
n.
Latest rev. Revision text Rev. date Prepared by / Created by:
Docum
ent N
oS
heet
2913334
HG
SGT-300 en
Lang.
No. of sh.
Title
Order no
BD000220
Core Instrumentation P&ID
Document No
2913334
Plant Name
Sheet
Resp. dept.
/
/DCC
Based on doc No / Revision
Checked by
Appr. by
Latest revision
Designation
Prepared by
Original Date
OESMFB103 Petrobaltic Rig Conversion
6
SD
B8-47-SD-006
1
SD
B8-47-SD-001
3
SD
B8-47-SD-003
5
SD
B8-47-SD-005
259
PT
B8-47-PT-259
262
TC
B8-47-TK-262
21R
TC
B8-47-TK-021R
22R
TC
B8-47-TK-022R
92R
TC
B8-47-TK-092R
261R
TC
B8-47-TK-261R
262R
TC
B8-47-TK-262R
23R
TC
B8-47-TK-023R
91R
TC
B8-47-TK-091R
PI
SIHH
LL
SIHH
LL
HHTI H
HHTI H
HH
24R
TC
B8-47-TK-024R
HV187
10K1
ND
B8-47-ND-101A
10K2
ND
B8-47-ND-101B
11X1
UD
B8-47-VE-109A
11X2
UD
B8-47-VE-109B
11Y2
UD
B8-47-VE-111B
11Y1
UD
B8-47-VE-111A
UI HHH
UI HHH
21
TC
B8-47-TK-021
22
TC
B8-47-TK-022
23
TC
B8-47-TK-023
91
TC
B8-47-TK-09124
TC
B8-47-TK-024
92
TC
B8-47-TK-092
TI HHH
TI HHH
TI HHH
TI HHH TI H
HH
1
TC
B8-47-TK-001
2
TC
B8-47-TK-002
3
TC
B8-47-TK-003
4
TC
B8-47-TK-004
5
TC
B8-47-TK-005
6
TC
B8-47-TK-006
7
TC
B8-47-TK-007
13
TC
B8-47-TK-013
12
TC
B8-47-TK-012
11
TC
B8-47-TK-011
10
TC
B8-47-TK-010
9
TC
B8-47-TK-009
8
TC
B8-47-TK-008
TI HHH
TI HHH
TI HHH
TI HHH
TI HHH
TI HHH
TI HHH
TI HHH
TI HHH
TI HHH
TI HHH
TI HHH
TI HHH
8
PT
B8-47-PT-008
PI
HV67
10Y2
UD
B8-47-VE-107B
10Y1
UD
B8-47-VE-107A
UI HHH
10X1
UD
B8-47-VE-105A
10X2
UD
B8-47-VE-105B
UI HHH
1
RTD
B8-47-RTD-001
48
RTD
B8-47-RTD-048
TI HHH
LLL
TI HHH
LLL
VIEW ACROSS EXHAUST: B-BVIEW ON AIR INTAKE: A-A
261
TC
B8-47-TK-261
ZI HHH
LLL
Option (GED04)DLE Engines Only
10T1
ZD
B8-47-VE-102
10T2
ZD
B8-47-VE-104
TI HHH
255
TC
B8-47-TK-255
256
TC
B8-47-TK-256
TI HHH
1
IG
B8-47-FH-101
2
IGB8-47-FH-102
257
TC
B8-47-TK-257
258
TC
B8-47-TK-258
259
TC
B8-47-TK-259
260
TC
B8-47-TK-260
TI HHH
TI HHH
TI HHH
TI HHH
3
IG
B8-47-FH-103
4
IG
B8-47-FH-104
5
IG
B8-47-FH-105
6
IGB8-47-FH-106
200
PT
B8-47-PT-200
PI HHH
VIEW ACROSS COMBUSTION CHAMBERS: C-C
See Note 2
A. NO OR NC NOTATION ASSOCIATEDWITH AUTOMATIC VALVES RELATES TOTHE VALVE IN ITS DE-ENERGISEDSTATE.
B.WITH RESPECT TO CLIENT PIPING TOTHE PACKAGE, THIS P&ID MUST BE READIN CONJUNCTION WITH THE 'PIPINGDESIGN SPECIFICATION AND TIE INSCHEDULE' .
C.FLUID TO BE SUPPLIED IN ACCORDANCEWITH COMPANY FLUIDS SPECIFICATION65/0027.
D. THE CONTROL SYSTEM ISREPRESENTED IN A SIMPLIFIED FORMAT.THE CONTROL FUNCTIONS INDICATED AREDEPENDENT ON ENGINE STATUS. VALVEPOSITION ERROR MAY RESULT INSHUTDOWN OR START INHIBIT.
F. UNLESS OTHERWISE INDICATED, ALLINSTRUMENT AIR PIPEWORK IS 3/8" OD 16SWG.
GENERAL NOTES
A. NO OR NC NOTATION ASSOCIATEDWITH AUTOMATIC VALVES RELATES TOTHE VALVE IN ITS DE-ENERGISEDSTATE.
C.FLUID TO BE SUPPLIED IN ACCORDANCEWITH COMPANY FLUIDS SPECIFICATION65/0027.
D. THE CONTROL SYSTEM ISREPRESENTED IN A SIMPLIFIED FORMAT.THE CONTROL FUNCTIONS INDICATED AREDEPENDENT ON ENGINE STATUS. VALVEPOSITION ERROR MAY RESULT INSHUTDOWN OR START INHIBIT.
F. UNLESS OTHERWISE INDICATED, ALLINSTRUMENT AIR PIPEWORK IS 3/8" OD 16SWG.
H. N/A
GENERAL NOTES
NOTES REFERENCED ON P&ID
1. REDUNDANT SENSING ELEMENTS AREISOLATED IN THE LOCAL JUNCTION BOX
2. COMBUSTER T/C's ONLY PRESENT ONDLE ENGINES
Redundant Note 1Redundant Note 1 Redundant Note 1 Redundant Note 1
Redundant Note 1 Redundant Note 1Redundant Note 1Redundant Note 1
Redundant Note 1Redundant Note 1 Redundant Note 1 Redundant Note 1Fitted But Not Monitored
Redundant Note 1Redundant Note 1
See Note 2
G. P&ID SHALL BE READ IN CONJUNCTIONWITH P&ID LEGEND SHEET. 2913329 /113A20-1766-PR-PID-24022
10X
UT
B8-47-VE-106
10Y
UT
B8-47-VE-108
11X
UT
B8-47-VE-110
11Y
UT
B8-47-VE-112
10K
UT
B8-47-VE-101
10T
ZT
B8-47-VE-103
B
B
A
A
1
2
3
4
5
6
C
C
A. C. OlofssonP. J. Gustavsson
K. Dahlroth
D
2014-06-30
D - 2014-10-24 A. C. Olofsson
12
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
1110987654321
121110987654321
© S
iem
en
s A
G 2014
We
re
se
rve
all
rig
hts
in
th
is d
oc
um
en
t a
nd
in
th
e i
nfo
rma
tio
n
co
nta
ine
d t
he
rein
. R
ep
rod
uc
tio
n,
us
e o
r d
isc
los
ure
to
th
ird
pa
rtie
s w
ith
ou
t e
xp
res
s a
uth
ori
ty i
s s
tric
tly
fo
rbid
de
n.
Latest rev. Revision text Rev. date Prepared by / Created by:
Docum
ent N
oS
heet
2913336
9100
HG
SGT-300 en
Lang.
No. of sh.
Title
Order no
BD000220
Fire and Gas System P&ID
Document No
2913336
Plant Name
Sheet
Resp. dept.
/
/DCC
Based on doc No / Revision
Checked by
Appr. by
Latest revision
Designation
Prepared by
Original Date
OESMFB103 Petrobaltic Rig Conversion
3/8" OD 16 SWG
SSOL162B8-47-YY-001
NC
NO
XV498
11
XL
16
ZS
B8-47-ZSH-001
99
ZS
B8-47-ZSL-001
YV1B8-47-YV-001
FC
1
XA
ZI H
ZI
L
S
SOL161B8-47-YY-002
NC
NO
XV499
17
ZS
B8-47-ZSH-002
76
ZS
B8-47-ZSL-002
YV2B8-47-YV-002
FC
ZI H
ZI
L
EXHAUST
2913332 - 48
Instrument Air
1
GD
B8-4
7-G
D-0
01
2
GD
B8-4
7-G
D-0
02
HHH
HHH
A. NO OR NC NOTATION ASSOCIATEDWITH AUTOMATIC VALVES RELATES TOTHE VALVE IN ITS DE-ENERGISEDSTATE.
B.WITH RESPECT TO CLIENT PIPING TOTHE PACKAGE, THIS P&ID MUST BE READIN CONJUNCTION WITH THE 'PIPINGDESIGN SPECIFICATION AND TIE INSCHEDULE' .
C.FLUID TO BE SUPPLIED IN ACCORDANCEWITH COMPANY FLUIDS SPECIFICATION65/0027.
D. THE CONTROL SYSTEM ISREPRESENTED IN A SIMPLIFIED FORMAT.THE CONTROL FUNCTIONS INDICATED AREDEPENDENT ON ENGINE STATUS. VALVEPOSITION ERROR MAY RESULT INSHUTDOWN OR START INHIBIT.
E. UNLESS OTHERWISE INDICATED, ALLINSTRUMENT AIR PIPEWORK IS 3/8" OD 16SWG.
GENERAL NOTES
2A
TD
2B
TD
TI HHH
TI HHH
2913339 - 22
Extinguishant
From Bottle Rack
S S
EC5
YD
7
YD
8
YD
HHH
HHH
HHH
7A
QL
7B
QL
7C
QL
7D
QL
5
MAC
On-Skid Control Panel
NOTES REFERENCED ON P&ID
1. DEAD LEG AT END OF EXTINGUISHANTPIPEWORK TO COLLECT DEBRIS.
Note 1
11
GD
B8-47-GD-011
3
GD
B8-47-GD-003
4
GD
B8-47-GD-004
1A
QL
1B
QL
1C
QL
1D
QL
2A
QL
2B
QL
2C
QL
2D
QL
6
GD
B8-47-GD-006
HHH
HHH
HHH
HHH
1
MAC
B8-47-MAC-001
2
MAC
B8-47-MAC-002
G. P&ID SHALL BE READ IN CONJUNCTIONWITH P&ID LEGEND SHEET. 2913329 /113A20-1766-PR-PID-24022
COMBUSTION AIR INLET
VENTILATION AIR INLET
VENTILATION OUTLET
PORT
STARBOARD
113A20-1766-PR-PID-24012
113A20-1766-PR-PID-24018
C. ErikssonK. Sijercic
R. Dahlbom
C
2014-07-02
C Customer tags added. 2014-10-20 C. Eriksson
12
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
1110987654321
121110987654321
© S
iem
en
s A
G 2014
We
re
se
rve
all
rig
hts
in
th
is d
oc
um
en
t a
nd
in
th
e i
nfo
rma
tio
n
co
nta
ine
d t
he
rein
. R
ep
rod
uc
tio
n,
us
e o
r d
isc
los
ure
to
th
ird
pa
rtie
s w
ith
ou
t e
xp
res
s a
uth
ori
ty i
s s
tric
tly
fo
rbid
de
n.
Latest rev. Revision text Rev. date Prepared by / Created by:
Docum
ent N
oS
heet
2913337
9100
HG
SGT-300 en
Lang.
No. of sh.
Title
Order no
BD000220
Hydraulic Start P&ID
Document No
2913337
Plant Name
Sheet
Resp. dept.
/
/DCC
Based on doc No / Revision
Checked by
Appr. by
Latest revision
Designation
Prepared by
Original Date
OESMFB103 Petrobaltic Rig Conversion
1"
OD
16 S
WG
3/4
" O
D 1
6 S
WG
1"
OD
16 S
WG
XP
9
B8-4
7-X
P-0
09
XP5B8-47-XP-005
2913333 - 23
Lube Oil
Lube Oil Filter Discharge
2913333 - 21
Lube Oil
Lube Oil Tank
SSOL47
B8-47-XY-005NO
NC
XV202
XV
185
14
PDI
B8
-47
-PD
I-0
14
XV
470
XV
469
B8-4
7-P
RV
-469
XV
471
XV472
NC
XV474
NCNO
XV475
XV
473
FO
135
B8-4
7-F
O-1
35
M
XM
3
43
TD
B8-47-TD-043
8
TD
B8-47-TD-008
6
TD
B8-47-TD-006
10
TD
B8-47-TD-010
XI
25
HS
B8-47-HS-009
XF14
B8-4
7-C
Y-1
09
1
MCC
45
ZC
PC
V170
B8-4
7-P
CV
-170
FO
153
B8-4
7-F
O-1
53
XM91
B8-47-MJ-101XI
HH
S T1 T
B B
A A
Fa1
Fe
XV468
XV
584
XX45
A. NO OR NC NOTATION ASSOCIATEDWITH AUTOMATIC VALVES RELATES TOTHE VALVE IN ITS DE-ENERGISEDSTATE.
B.WITH RESPECT TO CLIENT PIPING TOTHE PACKAGE, THIS P&ID MUST BE READIN CONJUNCTION WITH THE 'PIPINGDESIGN SPECIFICATION AND TIE INSCHEDULE' .
C.FLUID TO BE SUPPLIED IN ACCORDANCEWITH COMPANY FLUIDS SPECIFICATION65/0027.
D. THE CONTROL SYSTEM ISREPRESENTED IN A SIMPLIFIED FORMAT.THE CONTROL FUNCTIONS INDICATED AREDEPENDENT ON ENGINE STATUS. VALVEPOSITION ERROR MAY RESULT INSHUTDOWN OR START INHIBIT.
F. UNLESS OTHERWISE INDICATED, ALLINSTRUMENT AIR PIPEWORK IS 3/8" OD 16SWG.
GENERAL NOTES
NOTES REFERENCED ON P&ID
1. NOTE THAT COMPONENTS OF THEHYROSTART SYSTEM SHOWN WITHIN THEBOUNDARY LINES ARE PART OF TWOMACHINED ASSEMBLIES. THEREFORE NOTALL ARE SHOWN, REFER TO OPERATINGMANUAL.
2. SYSTEM TO BE PRIMED PRIOR TO FIRSTSTART AND AFTER MAINTENANCE ON THEHYRAULIC CIRCUIT COMPONENTS.
Note 1 Note 1
Note 2
3. FITTED ON ZONE 2 MOTOR ONLY.
Note 3
15
IY
B8-47-IY-005
ZI
G. P&ID SHALL BE READ IN CONJUNCTIONWITH P&ID LEGEND SHEET: 2913329 /113A20-1766-PR-PID-24022
113A20-1766-PR-PID-24024
113A20-1766-PR-PID-24024
FILTER ASSEMBLY
HYDROSTATIC PUMP ASSEMBLY HYDROSTATIC START MOTOR ASSEMBLY
TEST
POINT
GEAR BOX ASSEMBLY
M. KarlssonE. Åström
R. Dahlbom
B
2014-07-07
B - 2014-10-20 K. Nejadian
12
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
1110987654321
121110987654321
© S
iem
en
s A
G 2014-2
015
We
re
se
rve
all
rig
hts
in
th
is d
oc
um
en
t a
nd
in
th
e i
nfo
rma
tio
n
co
nta
ine
d t
he
rein
. R
ep
rod
uc
tio
n,
us
e o
r d
isc
los
ure
to
th
ird
pa
rtie
s w
ith
ou
t e
xp
res
s a
uth
ori
ty i
s s
tric
tly
fo
rbid
de
n.
Latest rev. Revision text Rev. date Prepared by / Created by:
Docum
ent N
oS
heet
2913338
9100
HG
SGT-300 en
Lang.
No. of sh.
Title
Order no
BD000220
Water Wash Module P&ID
Document No
2913338
Plant Name
Sheet
Resp. dept.
/
/DCC
Based on doc No / Revision
Checked by
Appr. by
Latest revision
Designation
Prepared by
Original Date
OESMFB103 Petrobaltic Rig Conversion
JVc
DKc
HV
117
NC
XF109
B8-47-CK-109
XP6
B8-47-XP-006
PSV57B8-47-PSV-057
2913340 - 19
Wash Fluid
Skid Edge
56
PI
B8-47-PI-056
IH7ALG
7
01 SDB10AA025-A
B8-47-LG-007
XF85
B8-47-CY-110
78D
LS
B8-47-LSLL-78D
I
56
XL
78B
LS
B8-47-LSL-78B
I
78A
LS
B8-47-LSH-78A
I
I
23
TI
B8-47-TI-023
I
55
XL
I
77
HS
97
HS
98
HS
78
TS
B8-47-TSH-078
FLX146A
FLX146B
FLX146C
80
TS
B8-47-TSH-080
MXM15
B8-47-XM-006
Note 1
Note 2
High Pressure Compressor Wash Module.
FLX63
A. NO OR NC NOTATION ASSOCIATED WITHAUTOMATIC VALVES RELATES TO THE VALVE INITS DE-ENERGISED STATE.
B.WITH RESPECT TO CLIENT PIPING TO THE PACKAGE,THIS P&ID MUST BE READ IN CONJUNCTION WITH THE'PIPING DESIGN SPECIFICATION AND TIE IN SCHEDULE' .
C.FLUID TO BE SUPPLIED IN ACCORDANCE WITHCOMPANY FLUIDS SPECIFICATION 65/0027,
D. THE CONTROL SYSTEM IS REPRESENTED IN ASIMPLIFIED FORMAT. THE CONTROL FUNCTIONSINDICATED ARE DEPENDENT ON ENGINE STATUS. VALVEPOSITION ERROR MAY RESULT IN SHUTDOWN OR STARTINHIBIT.
F. UNLESS OTHERWISE INDICATED, ALL INSTRUMENTAIR PIPEWORK IS 3/8" OD 16 SWG.
GENERAL NOTES
NOTES REFERENCED ON P&ID
1. WASH MODULE IS A FIXED UNIT.
2. TANK IS VENTED.
3. TO PREVENT FREEZING, ANTI FREEZE SHOULDBE USED IN COLD AMBIENTS AND THE MODULEDRAINED AND STORED IN A HEATED LOCATION.
Note 3
G. THIS P&ID SHULD BE READ IN CONJUCTION WITHP&ID LEGEND SHEET 2913329 /113A20-1766-PR-PID-24022
C S
C S
113A20-1766-PR-PID-24017PCV34
B8-47-PCV-034
S C
FNc
4. THE FLEXIBLE PIPE FLX63 IS RECOMMENDED ANDSUPPLIED BY THE CLIENT.
Note 4
19-072IP
19-068IP
19-027IP
113A20-PR-PID-05214
Water by client
FILL POINT
FILL POINT
M. KarlssonE. Åström
R. Dahlbom
F
2014-07-07
F Revised with All Customers Tag Numbers 2015-01-26 K. Nejadian
12
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
1110987654321
121110987654321
© S
iem
en
s A
G 2014
We
re
se
rve
all
rig
hts
in
th
is d
oc
um
en
t a
nd
in
th
e i
nfo
rma
tio
n
co
nta
ine
d t
he
rein
. R
ep
rod
uc
tio
n,
us
e o
r d
isc
los
ure
to
th
ird
pa
rtie
s w
ith
ou
t e
xp
res
s a
uth
ori
ty i
s s
tric
tly
fo
rbid
de
n.
Latest rev. Revision text Rev. date Prepared by / Created by:
Docum
ent N
oS
heet
2913339
9100
HG
SGT-300 en
Lang.
No. of sh.
Title
Order no
BD000220
Extinguishant Bottle Rack System P&ID
Document No
2913339
Plant Name
Sheet
Resp. dept.
/
/DCC
Based on doc No / Revision
Checked by
Appr. by
Latest revision
Designation
Prepared by
Original Date
OESMFB103 Petrobaltic Rig Conversion
3/4" NB Sch 80
XX17 XX16 XX20 XX19
XV200
PSE5
B8-47-PSE-005
749
ZSB8-4
7-Z
SH
-017
748
ZSB8-4
7-Z
SH
-016
XV137 XV1368
PS
B8-47-PSH-008
751
ZSB8-4
7-Z
SH
-020
750
ZSB8-4
7-Z
SH
-019
XV201
PSE6
B8-47-PSE-006
PSE7
B8-47-PSE-007
XV139 XV13873
PS
B8-47-PSH-073
XV199
PSE3B8-47-PSE-003
384
ZS
B8-47-ZSH-142
235
ZS
B8-47-ZSL-142
SS
FZc
INITIAL CYLINDERS RESERVE CYLINDERS
PSE4
B8-47-PSE-004
SOL18B8-47-XY-018
NC
S S
SOL19B8-47-XY-019
NC
ZI
LLL
ZI
LLL
ZIHH
ZIHH
ZI
LLL
ZI
LLL
HV142
B8-47-HV-142
ZI H
ZI H
2913336 - 22
Extinguishant
Package Nozzles
FLX55
FLX53
FLX57 FLX56
FLX54
FLX58
A. NO OR NC NOTATION ASSOCIATEDWITH AUTOMATIC VALVES RELATES TOTHE VALVE IN ITS DE-ENERGISEDSTATE.
B.WITH RESPECT TO CLIENT PIPING TOTHE PACKAGE, THIS P&ID MUST BE READIN CONJUNCTION WITH THE 'PIPINGDESIGN SPECIFICATION AND TIE INSCHEDULE' .
C.FLUID TO BE SUPPLIED IN ACCORDANCEWITH COMPANY FLUIDS SPECIFICATION65/0027.
D. THE CONTROL SYSTEM ISREPRESENTED IN A SIMPLIFIED FORMAT.THE CONTROL FUNCTIONS INDICATED AREDEPENDENT ON ENGINE STATUS. VALVEPOSITION ERROR MAY RESULT INSHUTDOWN OR START INHIBIT.
E. UNLESS OTHERWISE INDICATED, ALLINSTRUMENT AIR PIPEWORK IS 3/8" OD 16SWG.
GENERAL NOTES
G. P&ID SHALL BE READ IN CONJUNCTIONWITH P&ID LEGEND SHEET. 2913329 /113A20-1766-PR-PID-24022
113A20-1766-PR-PID-24019
C. ErikssonK. Sijercic
R. Dahlbom
D
2014-07-02
D Customer tags added. 2014-10-17 C. Eriksson
12
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
1110987654321
121110987654321
© Siemens AG 2014-2015
We reserve all rights in this document and in the inform
ation
contained therein. Reproduction, use or disclosure to third
parties without express authority is strictly forbidden.
Latest rev. Revision text Rev. date Prepared by / Created by:
Document N
oSheet
2913335
9100
HG
SGT-300 en
Lang.
No. of sh.
Title
Order no
BD000220
Turbine Package P&ID
Document No
2913335
Plant Name
Sheet
Resp. dept.
/
/DCC
Based on doc No / Revision
Checked by
Appr. by
Latest revision
Designation
Prepared by
Original Date
OESMFB103 Petrobaltic Rig Conversion
XX58
XX49
FLX126
S
C
ALc1
XF213C
B8-47-CY-107
XF213A
B8-47-CY-108
COMBUSTION AIRINLET
XF34A XF189XX53 XX54
HV540A
NO
HV540B
NC
HV466A
NO
HV466B
NC
Note 3Note 3
Note 4Note 4
EXHAUST
FLX127
FLX155 FLX134FLX152
XM6
XV476 XV477
M
XM6
XM7
M
XM7
XI
XI
42
HS
35
HS
7A
MCC
7B
MCCXX56XX55 XF33 XX50
S
C ANc1
PDI H
XF213B
B8-47-CY-108
HV570A
NO
HV570B
NC
VENTILATION AIRINLET
Note 3Note 4
A. NO OR NC NOTATION ASSOCIATEDWITH AUTOMATIC VALVES RELATES TOTHE VALVE IN ITS DE-ENERGISEDSTATE.
B.WITH RESPECT TO CLIENT PIPING TOTHE PACKAGE, THIS P&ID MUST BE READIN CONJUNCTION WITH THE 'PIPINGDESIGN SPECIFICATION AND TIE INSCHEDULE'. -
C.FLUID TO BE SUPPLIED IN ACCORDANCEWITH COMPANY FLUIDS SPECIFICATION65/0027.
D. THE CONTROL SYSTEM ISREPRESENTED IN A SIMPLIFIED FORMAT.THE CONTROL FUNCTIONS INDICATED AREDEPENDENT ON ENGINE STATUS. VALVEPOSITION ERROR MAY RESULT INSHUTDOWN OR START INHIBIT.
F. UNLESS OTHERWISE INDICATED, ALLINSTRUMENT AIR PIPEWORK IS 3/8" OD 16SWG.
GENERAL NOTES
NOTES REFERENCED ON P&ID
1. N/A
2. N/A
3. IMPULSE PIPING MUST BE INSTALLEDWITH NO MORE THAN ONE HIGH POINT INTHE SYSTEM (MUST FALL TO THE SENSINGPOINT AND/OR FALL TO THE DRAINPOINT).
4. THE DRAIN VALVES FITTED TO THEDIFFERENTIAL PRESSUREINSTRUMENTATION SHOULD BE OPENEDON A PERIODIC BASIS, TO PREVENTTHE BUILD UP ON CONDENSATE INTHESE LINES.
5. N/A
6. N/A
PDI HHH
XF213DB8-47-CY-106
HV572A
NO
HV572B
NC
PDI HHH
L
LL
XF213E
HV571A
NO
HV571B
NC
Note 3Note 4
XF34B
XX57B8-47-GZ-110
XX51B8-47-LN-104
G. P&ID SHALL BE READ IN CONJUNCTIONWITH P&ID LEGEND SHEET 2913329 /113A20-1766-PR-PID-24022
XX52
B8-47-LN-102
1CS148424
TEG
HRSG
PDI H
HH
PDI H
HH
Revisions according to revision notice.
1
PDT
B8-47-PDT-001
97
PDTB8-47-PDT-097
27
PDT
B8-47-PDT-027
138
PDT
B8-47-PDT-138
133
PDT
B8-47-PDT-133
S
C
ALc2
S
C ANc2
-
+
-
+
+
-
-
+
+
-
113A20-1766-PR-PID
-24013
B8-47-GZ-106
B8-47-LN-103B8-47-GZ-109B8-47-GZ-107 B8-47-GZ-108
B8-47-GI-101 B8-47-GI-102
B8-47-LN-101
B8-47-GZ-103 B8-47-GZ-104B8-47-GZ-105B8-47-GZ-101 B8-47-GZ-102
H. GustafssonV. Kirstilä
B. Kazmierski
E
2014-07-09
E - 2015-04-13 H. Gustafsson
12
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
1110987654321
121110987654321
© Siemens AG 2014-2015
We reserve all rights in this document and in the inform
ation
contained therein. Reproduction, use or disclosure to third
parties without express authority is strictly forbidden.
Latest rev. Revision text Rev. date Prepared by / Created by:
Document N
oSheet
12913330
9100
HG
SGT-300 en
Lang.
2
No. of sh.
Title
Order no
BD000220
Gas Fuel System P&ID
Document No
12913330
Plant Name
Sheet
Resp. dept.
/
/DCC
Based on doc No / Revision
Checked by
Appr. by
Latest revision
Designation
Prepared by
Original Date
OESMFB103 Petrobaltic Rig Conversion
1/2" OD 16 SWG 1/2" OD 16 SWG
2" NPS SCH 10s
2" NPS SCH 10s
2" NPS SCH 10s
3/4" OD 16 SWG
2" NPS SCH 10s
2" NPS SCH 10s
CustomerSuppliedIsolationValve
2" NPS SCH 10s
1/2" OD 16 SWG
(ET)(ET)
(ET)
(ET)
(ET)
(ET)
(ET)
(ET)
(ET)
(ET)
(ET)(ET)
(ET)
(ET)
(ET)
(ET)
(ET)
(ET)
(ET)(E
T)
(ET)
(ET)
(ET)
(ET)
(ET)
(ET)
(ET)
(ET)
(ET)
(ET)
(ET)
(ET)(ET)(ET)(ET)(ET)(ET)
(ET) (ET)
(ET)
(ET)
(ET)
(ET)
(ET)
(ET)
(ET)
(ET)
(ET)
103
LD
B8-47-LT-103
140
PDT
B8-47-PDT-140
104
LD
B8-47-LT-104
C S
AUAc
S C
BZc
S C
AUCc
113A20-1766-PR-PID-24020-2
Gas Fuel
Sheet 2 - A
PDI H
LI H
LI H
113A20-PR-PID-05214
Hydrocarbon Condensate
To Drain Note B
113A20-PR-PID-05214
Gas Fuel Note B
Vent to Atmosphere
HV1014
HV1013
HV672
XX5B8-47-CQ-101
XX66
B8-47-CQ-102
FG
18
KA11
FG
19
KA16
FO109B8-47-FO-109
HV1017B
NO
HV1018NC
HV1017A
NO
HV1020NC
HV1019A
NO
HV1019B
NO
HV673
NO
HV674
NC
HV1023B
NC
HV1023A
NC
HV1024NO
HV1021A
NC
HV1022NO
HV1021B
NC
XF97
B8-4
7-C
Q-1
03
XF204
B8-4
7-C
Q-1
04
HV1025
NO
HV1026
NC
203
PI
B8-47-PI-203
204
PI
B8-47-PI-204
HV1015
HV1016
113A20-PR-PID-05214
Gas Fuel
Client
HV31Note 1
Note 3Note 2
Note 41. MAXIMUM OPERATING PRESSURE AT CONNECTIONsAUAc & CBc NOT TO EXCEED 28 Barg.
2. MINIMUM SUPPLY TEMPERATURE 2.5 DEG.C ORTHE GAS DEWPOINT PLUS 20 DEG.C WHICHEVER ISTHE GREATEST VALUE. MAXIMUM SUPPLYTEMPERATURE 120 DEG.C.
3. OFF-SKID PIPING TO BE STAINLESS STEEL.
4. CUSTOMER SUPPLY OFF-SKID HAND VALVE IS ASAFETY REQUIREMENT FOR MANUAL ISOLATION ANDMUST ALWAYS BE FITTED.
NOTES REFERENCED ON P&ID
5. TAPPING POINT ON HV1013 & HV1014 TO BE USEDFOR FORWARD AND REVERSE PURGE OF THE SYSTEMPRIOR TO MAINTENANCE.
6. DUPLEX COALESCER SHOWN WITH FLOW THROUGHXF97 and XF204
TEST POINTNote 5
TEST POINTNote 5
Note 6
A. NO OR NC NOTATION ASSOCIATED WITHAUTOMATIC VALVES RELATES TO THE VALVEIN ITS DE-ENERGISED STATE.
B.WITH RESPECT TO CLIENT PIPING TO THEPACKAGE, THIS P&ID MUST BE READ INCONJUNCTION WITH THE 'PIPING DESIGNSPECIFICATION AND TIE IN SCHEDULE' .
C.FLUID TO BE SUPPLIED IN ACCORDANCE WITHCOMPANY FLUIDS SPECIFICATION 65/0027.
D. THE CONTROL SYSTEM IS REPRESENTED IN ASIMPLIFIED FORMAT. THE CONTROL FUNCTIONSINDICATED ARE DEPENDENT ON ENGINE STATUS.VALVE POSITION ERROR MAY RESULT IN SHUTDOWNOR START INHIBIT.
GENERAL NOTES
Note 7
7. MINIMUM SUPPLY PRESSURE AT SKID EDGECONNECTION Dc FOR FULL LOAD RUNNING IS 20.3 Barg.THE MINIMUM RUNNING PRESSURE CAN BE REDUCEDDEPENDENT ON OPERATING LOAD REQUIRED.
IT COULD BE CALCULATED WITH HIGHER SUPPLYTEMPERATURE AND LARGER CHANGE-OVER VOLUME FORSPECIFIC GAS IN CUSTOMER´S INTEREST. INFORMATION ONGAS FUEL SUPPLY PRESSURE AND CHANGEOVER VOLUMEREQUIRED.
S C
CCc1
2913332 - 42
Instrument Air
From Customer Supply
S
SOL11
NC
NO
S
SOL12
NC NO
12
ZS
XV30
FC
ZI
ZI
LLL
ZI
H
ZI
L LL
45
ZS
44
ZS
11
ZS
XV31
FO
(ET)(ET)(ET) (ET)(ET)
(ET)
(ET)
(ET)
S C
CBc
Note 6
F. UNLESS OTHERWISE INDICATED, ALL INSTRUMENTAIR PIPEWORK IS 3/8" OD 16 SWG.
G. THIS P&ID SHULD BE READ IN CONJUCTION WITH P&IDLEGEND SHEET 2913329 / 113A20-1766-PR-PID-24022
ZI
H
113A20-1766-PR-PID-24012
19-019
IP
19-022
IP
19-020
IP
19-021
IP
19-023
IP
HV98
HV99
M. KarlssonM. Mattfolk
B. Kazmierski
F
2014-07-10
F Nitrogen purge valves added. See revision clouds 2015-05-19 M. Karlsson
12
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
1110987654321
121110987654321
© Siemens AG 2014-2015
We reserve all rights in this document and in the inform
ation
contained therein. Reproduction, use or disclosure to third
parties without express authority is strictly forbidden.
Latest rev. Revision text Rev. date Prepared by / Created by:
Document N
oSheet
22913330
9100
HG
SGT-300 en
Lang.
2
No. of sh.
Title
Order no
BD000220
Gas Fuel System P&ID
Document No
22913330
Plant Name
Sheet
Resp. dept.
/
/DCC
Based on doc No / Revision
Checked by
Appr. by
Latest revision
Designation
Prepared by
Original Date
OESMFB103 Petrobaltic Rig Conversion
2" NPS SCH 10s 2" NPS SCH 10s 1 1/2" NPS SCH 10s
1/2" NPS SCH 10s
3/8" OD 16 SWG
1 1/2" NPS SCH 10s
Sheet 1 - A
Gas Fuel
XV6
B8-47-XV-006
FC
207
ZS
B8-47-ZSH-006
XV464
208
ZS
B8-47-ZSL-006
XV7
B8-47-XV-007
FC
S
SOL5
B8-47-XY-007
NO NC
XV463
XV212B8-47-XV-212
FO
SSOL470B8-47-XY-212
NCNO
743
ZS
B8-47-ZSL-212
SC
ACc
C S
DcXF94
B8-47-CK-101
MXM26
B8-47-XM-150
181A
PT
B8-47-PT-181A
181B
PT
B8-47-PT-181B
ECU
6
TT
B8-47-TT-006
XI H
HH
LLL
16
PI
B8-47-PI-016
HV550
FO128B8-47-FO-128
FO127B8-47-FO-127
TI H
HH
L
LL
178
ZS
B8-47-ZSH-007
ZI
ZI
L
ZI
ZI
L
ZI H
ZI
LLL
2A
PT
B8-47-PT-002A
2B
PT
B8-47-PT-002B
5
ZS
B8-47-ZSL-007
742
ZS
B8-47-ZSH-212
XV150
B8-47-XV-150
12
ZT
B8-4
7-Z
T-1
50
SSOL110B8-47-XY-006
NC NO
12
ZC
220B
PT
B8-47-PT-220B
220A
PT
B8-47-PT-220A
182A
PT
B8-47-PT-182A
182B
PT
B8-47-PT-182B
XV149
B8-47-XV-149
103
ZT
B8-4
7-Z
T-1
49
13
ZCXI H
HH
LLL
ECU
(ET)(ET) (ET)(ET)
(ET)(ET)(ET)
(ET)(ET)
(ET)
(ET)
(ET)(ET) (ET)(ET)(ET)
(ET) (ET)(ET) (ET)(ET)(ET)(ET)(ET) (ET) (ET)(ET)
(ET)
(ET)
(ET)
(ET)
(ET)
(ET)
(ET)
(ET)
(ET)
(ET)
(ET)
(ET)
(ET)
(ET)
(ET)
(ET)
(ET)
(ET)
(ET)
(ET)(ET)(ET)(ET)(ET)(ET) 2913341 - 3
Gas Fuel
To Pilot Manifold
2913341 - 2
Gas Fuel
To Main Manifold
GAS TURBINE SKID EDGE
113A20-P
R-P
ID-05214
Gas Fuel Note B
Vent to Atm
osphere
NOTES REFERENCED ON P&IDNote 5Note 1
1. MINIMUM SUPPLY PRESSURE AT SKID EDGECONNECTION Dc FOR FULL LOAD RUNNING IS 20.3Barg. THE MINIMUM RUNNING PRESSURE CAN BEREDUCED DEPENDING ON OPERATING LOAD REQUIRED.
2. CONTROL VALVE DIFFERENTIAL PRESSURE TRIPSETTING = 1.38 Bar.
3. TAPPING POINT ON XF94 TO BE USED FORFORWARD AND REVERSE PURGE OF THE SYSTEMPRIOR TO MAINTENANCE.
4. OFF-PACKAGE FUEL GAS BLOCK VALVE AND ALLASSOCIATED UPSTREAM PIPING MUST BE INSTALLEDOUTSIDE OF THE GAS TURBINE PLANE OFROTATION.
5. VOLUME REQUIRED UPSTREAM OF SKID EDGECONNECTION DC FOR AUTOMATIC CHANGE-OVER FROM GASTO LIQUID FUEL RUNNING AT FULL LOAD SEE; GASTURBINE PACKAGE UTILITIES SCHEDULE 1CS147949
Note 2
Note 3
Note 2
A. NO OR NC NOTATION ASSOCIATED WITHAUTOMATIC VALVES RELATES TO THE VALVEIN ITS DE-ENERGISED STATE.
B.WITH RESPECT TO CLIENT PIPING TO THEPACKAGE, THIS P&ID MUST BE READ INCONJUNCTION WITH THE 'PIPING DESIGNSPECIFICATION AND TIE IN SCHEDULE' .
C.FLUID TO BE SUPPLIED IN ACCORDANCE WITHCOMPANY FLUIDS SPECIFICATION 65/0027.
D. THE CONTROL SYSTEM IS REPRESENTED IN ASIMPLIFIED FORMAT. THE CONTROL FUNCTIONSINDICATED ARE DEPENDENT ON ENGINE STATUS.VALVE POSITION ERROR MAY RESULT IN SHUTDOWNOR START INHIBIT.
GENERAL NOTES
F. UNLESS OTHERWISE INDICATED, ALL INSTRUMENTAIR PIPEWORK IS 3/8" OD 16 SWG.
291332 - 12
Instrument Air
Air Distribution Unit
S
S
C1
G. THIS P&ID SHULD BE READ IN CONJUCTION WITH P&IDLEGEND SHEET 2913329 / 113A20-1766-PR-PID-24022
IT COULD BE CALCULATED WITH HIGHER SUPPLYTEMPERATURE AND LARGER CHANGE-OVER VOLUME FORSPECIFIC GAS, IN CUSTOMER´S INTEREST.INFORMATION ON GAS FUEL TEMPERATURE AND CHAN--OVER VOLUIME SHOULED BE ADJUSTED.
113A20-1766-PR-PID-24020-1 113A20-1766-PR-PID-24014
113A20-1766-PR-PID-24014
113A20-1766-PR-PID
-24012
19-024
IP
19-026
IP
M
XM27
B8-47-XM-149
GAS FUEL MODULE
MAIN GAS FUEL
CONTROL VALVE
ASSEMBLY
FF
PILOT GAS FUEL
CONTROL VALVE
ASSEMBLY
FF
M. KarlssonM. Mattfolk
B. Kazmierski
F
2014-07-10
F Nitrogen purge valves added. See revision clouds 2015-05-19 M. Karlsson