Page 1: Van Ness Avenue Bus Rapid Transit (BRT) · Bus Rapid Transit (BRT) Urban Forestry Council 12.14.12 . 2 Project Purpose and Need Enhance urban design and identity of Van Ness Avenue

Van Ness Avenue Bus Rapid Transit (BRT)

Urban Forestry Council

12.14.12

Page 2: Van Ness Avenue Bus Rapid Transit (BRT) · Bus Rapid Transit (BRT) Urban Forestry Council 12.14.12 . 2 Project Purpose and Need Enhance urban design and identity of Van Ness Avenue

2

Project Purpose and Need

Enhance urban design and identity

of Van Ness Avenue

Accommodate safe multimodal

circulation and access within the

corridor

Improve transit reliability, speed, connectivity and comfort

Separate autos from transit

Reduce delays associated with loading and unloading, and traffic

signals

Improve pedestrian comfort, amenities, and safety

Page 3: Van Ness Avenue Bus Rapid Transit (BRT) · Bus Rapid Transit (BRT) Urban Forestry Council 12.14.12 . 2 Project Purpose and Need Enhance urban design and identity of Van Ness Avenue

3

BRT Network Context

Rail does not

go to north side

of city

BRT network

proposed to fill

in rail gap…

…and support

local “rapid” +

regional bus

service

Page 4: Van Ness Avenue Bus Rapid Transit (BRT) · Bus Rapid Transit (BRT) Urban Forestry Council 12.14.12 . 2 Project Purpose and Need Enhance urban design and identity of Van Ness Avenue

4

Features of BRT

Dedicated transit lane

Transit signal priority

Traffic signal optimization

1

2

3

All-door boarding and

low-floor vehicles

Pedestrian safety

enhancements

High-quality shelters

4

5

6

1

2

3

4

5

6

Page 5: Van Ness Avenue Bus Rapid Transit (BRT) · Bus Rapid Transit (BRT) Urban Forestry Council 12.14.12 . 2 Project Purpose and Need Enhance urban design and identity of Van Ness Avenue

Alternatives Assessed in Draft EIS/EIR

Alternative 1 -- No Build

Alternative 2 – Side Lane

Alternative 3 – Center Lane with Right Side Boarding/Dual Medians

Alternative 4 – Center Lane with Left Side Loading/Center Median

Design Option B for Alternatives 3 and 4– Limited Left Turns

Page 6: Van Ness Avenue Bus Rapid Transit (BRT) · Bus Rapid Transit (BRT) Urban Forestry Council 12.14.12 . 2 Project Purpose and Need Enhance urban design and identity of Van Ness Avenue

6

Alternative 2 – Side BRT Lanes

Side Dedicated

Lanes

High Quality

Station

Platforms in

Sidewalk

Extension

Page 7: Van Ness Avenue Bus Rapid Transit (BRT) · Bus Rapid Transit (BRT) Urban Forestry Council 12.14.12 . 2 Project Purpose and Need Enhance urban design and identity of Van Ness Avenue

7

Alternative 3 – Center BRT Lanes with Right Side Loading / Dual Medians

Median

Reconfigured

Fully

Separated Bus

Lanes

Page 8: Van Ness Avenue Bus Rapid Transit (BRT) · Bus Rapid Transit (BRT) Urban Forestry Council 12.14.12 . 2 Project Purpose and Need Enhance urban design and identity of Van Ness Avenue

8

Alternative 4 – Center BRT Lanes with Left Side Loading / Center Median

Vehicles Have

Doors on Both

Sides

Page 9: Van Ness Avenue Bus Rapid Transit (BRT) · Bus Rapid Transit (BRT) Urban Forestry Council 12.14.12 . 2 Project Purpose and Need Enhance urban design and identity of Van Ness Avenue

Findings: Van Ness Avenue BRT Benefits

Improve transit travel times by up to 32%

Improve transit reliability by up to 50%

Increase transit boardings by up to 35%

Maintain corridor person-throughput while

increasing transit mode share

Save up to 30% of daily route operating costs

Improve multimodal safety, including for

pedestrians

9

17.516.8

12.9

8.8 9.38.6

0

2

4

6

8

10

12

14

16

18

20

2007 Existing Alt. 1(No Build)

VN BRT Alts 3 and 4 (with DesignOption B)

Trav

el T

ime

Bet

wee

n M

issi

on

/Du

bo

ce

Off

ram

p a

nd

Cla

y St

reet

(M

in)

Bus (Route 49)

Automobile

8.7 Min Difference

4.3 Min Difference

Page 10: Van Ness Avenue Bus Rapid Transit (BRT) · Bus Rapid Transit (BRT) Urban Forestry Council 12.14.12 . 2 Project Purpose and Need Enhance urban design and identity of Van Ness Avenue

10

Key issues/areas of interest

Wish for identifying a high-performing alternative that “works”

Concerns regarding:

Traffic diversions

Left turn removals

Transit stop consolidation

Visual effects, including trees and

landscaping

Page 11: Van Ness Avenue Bus Rapid Transit (BRT) · Bus Rapid Transit (BRT) Urban Forestry Council 12.14.12 . 2 Project Purpose and Need Enhance urban design and identity of Van Ness Avenue

11

Alternatives Analysis in the EIS/EIR

Alternatives performance outlined in Chapter 10 of EIS/EIR

36 indicators grouped into categories based on Project Purpose

and Need as well as issues of importance to stakeholders and

decision-makers

Transit Performance

Passenger Experience

Access and Pedestrian Safety

Urban Design/Landscape

System Performance

Environmental and Social Effects (includes tree presevation)

Operations and Maintenance

Construction and Capital Costs

Page 12: Van Ness Avenue Bus Rapid Transit (BRT) · Bus Rapid Transit (BRT) Urban Forestry Council 12.14.12 . 2 Project Purpose and Need Enhance urban design and identity of Van Ness Avenue

12

Tree Analysis – Existing Conditions

102 Median Trees

28 are mature and in good/excellent health

50 are young, healthy trees (<13’ in height, <10 years old)

24 trees are in moderate/poor health

314 Sidewalk Trees

Health and height assessed only for trees that could be

impacted by BRT (38 trees)

Total = 416 Trees

Page 13: Van Ness Avenue Bus Rapid Transit (BRT) · Bus Rapid Transit (BRT) Urban Forestry Council 12.14.12 . 2 Project Purpose and Need Enhance urban design and identity of Van Ness Avenue

13

Tree Analysis – BRT Alternatives*

All build alternatives result in net increase in trees on corridor

Build Alternative 2

Removes 6 mature/healthy trees

Build Alternative 3

Removes 28 mature/healthy trees

Build Alternative 4

Removes 11 mature/healthy trees

Median

Trees

Removed

Sidewalk

Trees

Removed

New

Median

Trees

New

Sidewalk

Trees

Net

Total

Trees

Alt 2 20 38 103 68 529

Alt 3 102 0 163 48 525

Alt 4 64 0 113 48 513

*Note: Results represent

preliminary likely tree

preservation and new

plantings based on

current information.

Ability to preserve and

plant individual trees may

change with final design,

including a more detailed

root assessment, and

construction.

Page 14: Van Ness Avenue Bus Rapid Transit (BRT) · Bus Rapid Transit (BRT) Urban Forestry Council 12.14.12 . 2 Project Purpose and Need Enhance urban design and identity of Van Ness Avenue

14

Center BRT Best Meets Project Purpose and Need

Design Option B has nearly twice the travel time savings and

reliability benefits as Side BRT (Alternative 2)

Public comment on Draft EIS/EIR indicated preference for center

running BRT (nearly 3:1 versus Side BRT)

17.5

16.8

12.9

8.8 9.38.6

0

2

4

6

8

10

12

14

16

18

20

2007 Existing Alt. 1(No Build)

VN BRT Alts 3 and 4 (with DesignOption B)

Trav

el T

ime

Bet

wee

n M

issi

on

/Du

bo

ce

Off

ram

p a

nd

Cla

y St

reet

(M

in)

Bus (Route 49)

Automobile

8.7 Min Difference

4.3 Min Difference

Page 15: Van Ness Avenue Bus Rapid Transit (BRT) · Bus Rapid Transit (BRT) Urban Forestry Council 12.14.12 . 2 Project Purpose and Need Enhance urban design and identity of Van Ness Avenue

15

Stakeholders Prioritize Transit Performance

0

5

10

15

20

25

30

35

TR

AN

SIT

PE

RF

OR

MA

NC

E

PA

SS

EN

GE

R E

XP

ER

IEN

CE

AC

CE

SS

AN

DP

ED

ES

TR

IAN

SA

FE

TY

UR

BA

ND

ES

IGN

/LA

ND

SC

AP

E

SY

ST

EM

PE

RF

OR

MA

NC

E

EN

VIR

ON

ME

NT

AL

AN

DS

OC

IAL

EF

FE

CT

S

OP

ER

AT

ION

S A

ND

MA

INT

EN

AN

CE

CO

NS

TR

UC

TIO

N A

ND

CA

PIT

AL C

OS

TS

Weighting SFCTA/SFMTA Project Staff

TAC

CAC

Average

Page 16: Van Ness Avenue Bus Rapid Transit (BRT) · Bus Rapid Transit (BRT) Urban Forestry Council 12.14.12 . 2 Project Purpose and Need Enhance urban design and identity of Van Ness Avenue

16

Challenges with Center BRT alternatives

Alternative 3:

May require wider lanes throughout corridor due to “head-

on” configuration

Complete reconstruction of median

Removal of all existing trees

More significant utility considerations

Alternative 4

Requires left-right door vehicles

No 5-door trolleycoach in existence in North America

(procurement risk)

Higher spare ratio contributes to facilities challenges

Reduces operational flexibility

Page 17: Van Ness Avenue Bus Rapid Transit (BRT) · Bus Rapid Transit (BRT) Urban Forestry Council 12.14.12 . 2 Project Purpose and Need Enhance urban design and identity of Van Ness Avenue

LPA Recommendation: Center-Running BRT with Right Side Loading/Center Median and Limited Left Turns

For planning purposes only

Page 18: Van Ness Avenue Bus Rapid Transit (BRT) · Bus Rapid Transit (BRT) Urban Forestry Council 12.14.12 . 2 Project Purpose and Need Enhance urban design and identity of Van Ness Avenue

18

LPA Recommendation: Center-Running BRT with Right Side Loading/Center Median and Limited Left Turns

Existing Landscaping

Preserved Where

Possible Outside of

Station Locations

Standard, Right

Side Door

Vehicles

Page 19: Van Ness Avenue Bus Rapid Transit (BRT) · Bus Rapid Transit (BRT) Urban Forestry Council 12.14.12 . 2 Project Purpose and Need Enhance urban design and identity of Van Ness Avenue

19

Tree Analysis – LPA*

Net increase in trees

Removes 17 mature/healthy trees (between Alts 3 and 4)

Reflects latest SFMTA standards and proposal to Caltrans

City agencies negotiating with Caltrans over median width

Median

Trees

Removed

Sidewalk

Trees

Removed

New

Median

Trees

New

Sidewalk

Trees

Net

Total

Trees

Alt 2 20 38 103 68 529

Alt 3 102 0 163 48 525

Alt 4 64 0 113 48 513

LPA 80 0 85 48 469

*Note: Results represent

likely tree preservation

and new plantings based

on current information.

Ability to preserve and

plant individual trees may

change with final design,

including a more detailed

root assessment, and

construction.

Page 20: Van Ness Avenue Bus Rapid Transit (BRT) · Bus Rapid Transit (BRT) Urban Forestry Council 12.14.12 . 2 Project Purpose and Need Enhance urban design and identity of Van Ness Avenue

20

New Planting Species

11 ft. median

9 ft. median

Page 21: Van Ness Avenue Bus Rapid Transit (BRT) · Bus Rapid Transit (BRT) Urban Forestry Council 12.14.12 . 2 Project Purpose and Need Enhance urban design and identity of Van Ness Avenue

Cost and Funding

21

Cost: $125.6M (YOE)

$106M in already identified funding

$20M in Prop K; $75M in FTA Small

Starts funds; $11M in other

local/state sources

Only Small Starts project in the nation to

receive a “high” project justification

summary rating

FTA programmed $45M for project in

FY 11/12 and 12/13

$10M recommended for 13/14

Page 22: Van Ness Avenue Bus Rapid Transit (BRT) · Bus Rapid Transit (BRT) Urban Forestry Council 12.14.12 . 2 Project Purpose and Need Enhance urban design and identity of Van Ness Avenue

22

Project Schedule

Near Term

Certify Final EIS/EIR (March, 2013)

Begin preliminary design (January,

2013)

FTA Record of Decision (May, 2013)

Design/Implementation

Complete Preliminary Design (Spring

2014)

Final Design (Spring 2014 – Summer

2015)

Construction (Fall 2015 – Winter 2017)

Operations (Spring 2018)

Page 23: Van Ness Avenue Bus Rapid Transit (BRT) · Bus Rapid Transit (BRT) Urban Forestry Council 12.14.12 . 2 Project Purpose and Need Enhance urban design and identity of Van Ness Avenue

Thank You!