vaux le vicomte

14
Damien VUILLET Technical and sales meeting – April 2012 Technical and sales meeting Vaux le Vicomte Castle

Upload: bert-vanden-eynde

Post on 12-Jul-2015

892 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Vaux le vicomte

Damien VUILLET Technical and sales meeting – April 2012

Technical and sales meeting

Vaux le Vicomte Castle

Page 2: Vaux le vicomte

Damien VUILLET Technical and sales meeting – April 2012

Main specifications :-Renovation of the main dome with no support on it

-Castle opened to the visitors

-Access of the working site above the river

-Scaffold with canopy on each face

-Keder roof at the top

Page 3: Vaux le vicomte

Damien VUILLET Technical and sales meeting – April 2012

3D view

Page 4: Vaux le vicomte

Damien VUILLET Technical and sales meeting – April 2012

3D view with only steel deck

Page 5: Vaux le vicomte

Damien VUILLET Technical and sales meeting – April 2012

The footbridge access

-Length of 19m

-Assembled on ground then put in by crane

-7T500 of ballast for the stability

Page 6: Vaux le vicomte

Damien VUILLET Technical and sales meeting – April 2012

Principle of the scaffold

Creation of 4 scaffolds beams

Top view

Page 7: Vaux le vicomte

Damien VUILLET Technical and sales meeting – April 2012

Front view Middle view

No support on the dome

Page 8: Vaux le vicomte

Damien VUILLET Technical and sales meeting – April 2012

Rear view

Fixation on the wooden skeleton

Page 9: Vaux le vicomte

Damien VUILLET Technical and sales meeting – April 2012

Section in the middle of the dome

Fixation on the wooden skeleton Last level of anchoring (3 plugs)

Page 10: Vaux le vicomte

Damien VUILLET Technical and sales meeting – April 2012

Page 11: Vaux le vicomte

Damien VUILLET Technical and sales meeting – April 2012

Page 12: Vaux le vicomte

Damien VUILLET Technical and sales meeting – April 2012

Page 13: Vaux le vicomte

Damien VUILLET Technical and sales meeting – April 2012

Page 14: Vaux le vicomte

Damien VUILLET Technical and sales meeting – April 2012

-150t of LAYHER scaffold system

-760kg of wind force by plug

-1160kg on each wooden fixation

-Maximum load per standard : 3580kg