veishea float
DESCRIPTION
VEISHEA Float. Parade Day Schedule. 5:45 am Build Leaders and volunteers meet UDCC Dumpsters Outside Maple Towers 6:00 am Meet at Build site and connect hitch 6:15 am Move float to Staging Lot 6:45-8:45 Breakfast. Parade Day Schedule. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: VEISHEA Float](https://reader035.vdocuments.net/reader035/viewer/2022081512/568161b1550346895dd173d3/html5/thumbnails/1.jpg)
VEISHEA FLOAT
![Page 2: VEISHEA Float](https://reader035.vdocuments.net/reader035/viewer/2022081512/568161b1550346895dd173d3/html5/thumbnails/2.jpg)
Parade Day Schedule 5:45 am Build Leaders and volunteers
meet UDCC Dumpsters Outside Maple Towers
6:00 am Meet at Build site and connect hitch
6:15 am Move float to Staging Lot 6:45-8:45 Breakfast
![Page 3: VEISHEA Float](https://reader035.vdocuments.net/reader035/viewer/2022081512/568161b1550346895dd173d3/html5/thumbnails/3.jpg)
Parade Day Schedule 8:45 AM Everyone meets in Staging lot
between Howe and Beyer (#3 on map)
Wear FLiE Shirt and Jeans (be prepared for weather
10:30 Parade Begins Represent FLiE and College of Engineering
84th Entry in Parade
![Page 4: VEISHEA Float](https://reader035.vdocuments.net/reader035/viewer/2022081512/568161b1550346895dd173d3/html5/thumbnails/4.jpg)
MEET HERE 8:45
Parade Route
![Page 5: VEISHEA Float](https://reader035.vdocuments.net/reader035/viewer/2022081512/568161b1550346895dd173d3/html5/thumbnails/5.jpg)
Parade Day Schedule After Parade tractor drops off float at
Jack Trice parking lot Move trailer to Applied Science with
truck Disassemble and drop off materials Rides back to dorms Celebrate remainder of VEISHEA
Safely and Responsibly
![Page 6: VEISHEA Float](https://reader035.vdocuments.net/reader035/viewer/2022081512/568161b1550346895dd173d3/html5/thumbnails/6.jpg)
Molecule (Materials)
![Page 7: VEISHEA Float](https://reader035.vdocuments.net/reader035/viewer/2022081512/568161b1550346895dd173d3/html5/thumbnails/7.jpg)
Tractor (Agriculture)
![Page 8: VEISHEA Float](https://reader035.vdocuments.net/reader035/viewer/2022081512/568161b1550346895dd173d3/html5/thumbnails/8.jpg)
Bridge (Civil/Construction)
![Page 9: VEISHEA Float](https://reader035.vdocuments.net/reader035/viewer/2022081512/568161b1550346895dd173d3/html5/thumbnails/9.jpg)
Building Blocks of Life (Chemistry)
![Page 10: VEISHEA Float](https://reader035.vdocuments.net/reader035/viewer/2022081512/568161b1550346895dd173d3/html5/thumbnails/10.jpg)
Gear (Mechanical)
![Page 11: VEISHEA Float](https://reader035.vdocuments.net/reader035/viewer/2022081512/568161b1550346895dd173d3/html5/thumbnails/11.jpg)
cyHome (Computer/Software)
![Page 12: VEISHEA Float](https://reader035.vdocuments.net/reader035/viewer/2022081512/568161b1550346895dd173d3/html5/thumbnails/12.jpg)
Cereal Box
![Page 13: VEISHEA Float](https://reader035.vdocuments.net/reader035/viewer/2022081512/568161b1550346895dd173d3/html5/thumbnails/13.jpg)
Float and Building Statistics 844 Hours Worked 7 Build Weekends 1200+ Dollars on Materials and Food 35 Members Participated Avg. Participation was 24.11 Hours
= 3.44 hours a build weekend a person SUCCESS!!!!