venet website

15
VENet Website www.venet-eu.com Judith Riessner, 3. rd TCA Meeting in Werl, May 06 VENet Website Status Quo

Upload: hakan

Post on 15-Jan-2016

31 views

Category:

Documents


0 download

DESCRIPTION

VENet Website. Status Quo. Summary of Work done Open Questions Comments, suggestions, To dos. Contents. Summary. A lot of work, far more than expected No expert was hired, needed someone knowing the project Text checked by native speaker – to be used by all of us - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: VENet Website

VENet Website

www.venet-eu.comJudith Riessner, 3.rd TCA Meeting in Werl, May 06

VENet Website

Status Quo

Page 2: VENet Website

VENet Website

www.venet-eu.comJudith Riessner, 3.rd TCA Meeting in Werl, May 06

Contents

• Summary of Work done• Open Questions• Comments, suggestions, To dos

Page 3: VENet Website

VENet Website

www.venet-eu.comJudith Riessner, 3.rd TCA Meeting in Werl, May 06

Summary

Page 4: VENet Website

VENet Website

www.venet-eu.comJudith Riessner, 3.rd TCA Meeting in Werl, May 06

• A lot of work, far more than expected• No expert was hired, needed someone

knowing the project• Text checked by native speaker – to be

used by all of us• Good cooperation with Simos• Live on April 13th

Page 5: VENet Website

VENet Website

www.venet-eu.comJudith Riessner, 3.rd TCA Meeting in Werl, May 06

Open Questions

Page 6: VENet Website

VENet Website

www.venet-eu.comJudith Riessner, 3.rd TCA Meeting in Werl, May 06

• Info on changes • Statistics• Downloads• Newsletter subscription• Support • Regional models• GM on website• Hosting after March 07

Page 7: VENet Website

VENet Website

www.venet-eu.comJudith Riessner, 3.rd TCA Meeting in Werl, May 06

Info on changes, Statistics• As there is only one responsible person to make changes, it

does not seem to be necessary to inform by automatic mail about every change of a comma or a space

• If there is a major change, information by mail• Anytime check under

http://www.venet-eu.com/tools/updates

• For website statistics check

http://www.venet-eu.com/tools/webstat

Page 8: VENet Website

VENet Website

www.venet-eu.comJudith Riessner, 3.rd TCA Meeting in Werl, May 06

• Checked PPP?• Longer description of national DPs?• Status quo reports of DPs?• GM concept incl. subgoals?• Internal: All docs from meetings?• Other?• …

Downloads

Page 9: VENet Website

VENet Website

www.venet-eu.comJudith Riessner, 3.rd TCA Meeting in Werl, May 06

Newsletter Subscription

• We could add a button “Subscribe to our NL”; form with name, country and mail will be sent to [email protected]

Page 10: VENet Website

VENet Website

www.venet-eu.comJudith Riessner, 3.rd TCA Meeting in Werl, May 06

• FAQ section already there, but empty• Extra point on menu on the left?

Subsections?• Contents?• info@... address now comes to secretary

… topic Support System

Support

Page 11: VENet Website

VENet Website

www.venet-eu.comJudith Riessner, 3.rd TCA Meeting in Werl, May 06

• How to present the compact model?• Regional models in the same way?• Needs to be a format we can change

ourselves (download as table, PPP, jpg…)

… topic VENet regional models

Regional Models

Page 12: VENet Website

VENet Website

www.venet-eu.comJudith Riessner, 3.rd TCA Meeting in Werl, May 06

Page 13: VENet Website

VENet Website

www.venet-eu.comJudith Riessner, 3.rd TCA Meeting in Werl, May 06

• Use gender sensitive language• Select pictures by avoiding stereotypes• Equally represent and value qualities and

performances of women and men • Distinguish used statistics according to

gender• …Cyprus

GM Subgoals: Website

Page 14: VENet Website

VENet Website

www.venet-eu.comJudith Riessner, 3.rd TCA Meeting in Werl, May 06

Hosting of Website 03/07

• Meeting with CYTA end of March positive

• Takes 2-3 months for written confirmation

• Looks positive

Page 15: VENet Website

VENet Website

www.venet-eu.comJudith Riessner, 3.rd TCA Meeting in Werl, May 06

Thank you!