veneziano associates - granicus

4
VENEZIANO & ASSOCIATES John Delano, Chairman North Castle Planning Board IS Bedford Road Armonk, New York 10504 COUNSELLORS-AT-LAW 84 BUSINESS PARK DRIVE SUITE 200 ARMONK, NEW YORK 10504 TEL, (914) 273-1300 FAX, (914) 273-1303 October 21,2016 Re: 113 King Street Provision of Additional Parking Revised Phasing Plan Honorable Chairman and Members of the Planning Board: This firm represents Airport Campus I, LLC; Airport Campus II, LLC; Airport Campus III, LLC; Airport Campus N, LLC; and Airport Campus V, LLC (hereinafter "Airport Campus") the owners ofthe property located at 113 King Street.! As you know, by letter dated September 6, 2016, we applied for an amended Preliminary Development Concept Plan (PDCP) in order to provide additional parking on the site to meet current market demands. That submission provided for additional parking in the form of at- grade parking and, if necessary, a parking structure containing two levels. Our application was forwarded to your Board and we met with you at your meeting on September 26, 2016. At that meeting, we discussed, among other things, our client's goal of being able to provide the additional parking while still preserving the approvals granted to MBIA with respect to an additional office building, a parking structure, and a meeting house. Based on our discussions with your professional staff, we proposed to accomplish this by preserving the existing approvals as the final stage in our plan. The site plan approval granted by your Board to MBIA in 2004 provided for development of the project in 3 phases, as follows: I The project team also includes William Harrington, Esq. of Bleakley, Platt & Schmidt LLP as co-counsel and Anthony Guccione of JMC as project engineer.

Upload: others

Post on 05-May-2022

14 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: VENEZIANO ASSOCIATES - Granicus

VENEZIANO & ASSOCIATES

John Delano, Chairman North Castle Planning Board IS Bedford Road Armonk, New York 10504

COUNSELLORS-AT-LAW

84 BUSINESS PARK DRIVE

SUITE 200

ARMONK, NEW YORK 10504

TEL, (914) 273-1300

FAX, (914) 273-1303

October 21,2016

Re: 113 King Street Provision of Additional Parking Revised Phasing Plan

Honorable Chairman and Members of the Planning Board:

This firm represents Airport Campus I, LLC; Airport Campus II, LLC; Airport Campus III, LLC; Airport Campus N, LLC; and Airport Campus V, LLC (hereinafter "Airport Campus") the owners ofthe property located at 113 King Street.!

As you know, by letter dated September 6, 2016, we applied for an amended Preliminary Development Concept Plan (PDCP) in order to provide additional parking on the site to meet current market demands. That submission provided for additional parking in the form of at­grade parking and, if necessary, a parking structure containing two levels.

Our application was forwarded to your Board and we met with you at your meeting on September 26, 2016. At that meeting, we discussed, among other things, our client's goal of being able to provide the additional parking while still preserving the approvals granted to MBIA with respect to an additional office building, a parking structure, and a meeting house. Based on our discussions with your professional staff, we proposed to accomplish this by preserving the existing approvals as the final stage in our plan.

The site plan approval granted by your Board to MBIA in 2004 provided for development of the project in 3 phases, as follows:

I The project team also includes William Harrington, Esq. of Bleakley, Platt & Schmidt LLP as co-counsel and Anthony Guccione of JMC as project engineer.

Page 2: VENEZIANO ASSOCIATES - Granicus

VENEZIANO & ASSOCIATES

John Delano, Chairman North Castle Planning Board

October 21, 2016 Page 2

1. The first phase would consist of removal of underground residential fuel oil tanks, removal of dead trees and pruning of healthy trees, the reconstruction of existing stone walls and the demolition of the existing Cooney Hill homes, construction of a graded earth berm up to 6 feet in height along King Street to shield the Cooney Hill area, the construction of walking paths and a fitness center to provide recreational opportunities for MBIA employees, and the construction of new stone walls around the perimeter of the property;

2. The second phase would include the construction of the meeting house and the stormwater detention area located to the south of the meeting house; and,

3. The third phase would consist of the construction of the corporate headquarters expansion together with the new parking structure. The first phase described above was completed years ago but no action has been taken on the second or third phases.

Following our meeting with you on September 26, 2016, our team has explored various alternatives to provide the additional parking needed on the site. As a result of those discussions, we have determined that the simplest and most expeditious option is to forego our concept contained in our September 6, 2016 submission and, instead, move forward with the approved MBIA parking structure, albeit in a modified phasing arrangement.

Specifically, we are requesting a simple text modification to the prior site plan approval to provide that the previously approved parking structure can be constructed as Phase I, with the office building comprising Phase II, and the meeting house Phase III. Please note that we are not seeking any change to the approved plans, simply a re-arrangement of the order in which the components would be constructed. In addition, we are also seeking your permission to construct the parking structure, in its approved form, but with the ability to build only as many levels as necessary initially, with the right to add the additional approved levels as demand requires. Again, the net result would be the originally approved parking structure being constructed first, with the office building and meeting house to follow in subsequent phases.

Inasmuch as there is no proposed change to the approved site plan itself, we respectfully submit that no amendment to the PDCP is required. The plan remains exactly as contemplated by the existing PDCP and your site plan approval, with the only change being in the phasing of the construction.

Page 3: VENEZIANO ASSOCIATES - Granicus

VENEZIANO & ASSOCIATES

John Delano, Chainnan North Castle Planning Board

October 21,2016 Page 3

Please place this matter on your agenda for November 7, 2016 and advise if any additional infonnation is required. Thank you for your courtesy and cooperation.

MPMikj

cc: Airport Campus William Harrington, Esq. Anthony Guccione

Very truly yours,

By~' ________________ ___ Mark P. Miller

Page 4: VENEZIANO ASSOCIATES - Granicus

DWELLINGFRAME

EXISTING

(EXISTING)

EXISTING PONDWATER ELEV. 405.5

(JULY, 2000)

STRUCTUREPARKINGMULTI-LEVEL

(EXISTING)

MBIAOFFICE BUILDING

(EXISTING)

MBIAOFFICE BUILDING

WETLAND SETBACK100'

N/F LANDS OF THE CITY OF NEW YORK

N/F

LA

ND

S O

F T

HE

CIT

Y O

F N

EW

YO

RK

12' WIDE STABILIZED TURF FOR FIRE ACCESS

WETLAND SETBACK

100'

TYPICAL

A

A

WEBERPLACE

CO

ON

EY

HIL

LR

OA

D

AM

ERIC

AN

LAN

E

KINGSTREET

(NYS R

OUTE 120)

W

W

W

W

W

W

W

W

W

W

++

++

+ +

+

+

+

++

+

PROPOSED WATER QUALITY FOREBAY

PROPOSED STORMWATER

PROPOSED WALKING TRAIL (TYPICAL)

PROPOSED

MANAGEMENT POND

PROPOSED STORMWATERMANAGEMENT AREA

PROPOSED MEADOW

SITE PLAN

PORTION OF WEBER PLACETO BE REMOVED

GATE HOUSE

WETLAND BOUNDARY

12" WIDE GRAVEL SURFACEFOR EMERGENCY ACCESS

PROPOSEDLAWN SCULPTURE GARDEN

STATION(TYPICAL)

PAVEMENTTO BE

EXISTING GARAGETO BE REMOVED

PROPOSED GATE HOUSE

PROPOSED GATE HOUSESECURITY PULL-OFF

STONE WALLSPROPOSED

WITH SIGNAGE

CONSTRUCT/REPAIR STONEWALLS ALONG KING STREET

CONSTRUCT/REPAIRSTONE WALLSALONG COONEYHILL ROAD

LAND FOR ROADWIDENING PURPOSES

EXISTING

REMOVED

PROPOSEDEXERCISE

RESERVED

PROPOSED STONE WALLSWITH SIGNAGE

12" WIDE GRAVEL SURFACEFOR EMERGENCY ACCESS

PROPOSEDLAWN SCULPTURE GARDEN LAND FOR ROAD

WIDENING PURPOSES

RESERVED

PROPOSED MULTI-LEVEL

PARKING STRUCTURE

PROPOSED MBIA OFFICE

BUILDING EXPANSION MECH.

BUILDINGSERVICE/

PROPOSED

HOUSEMEETING

SP-1

SIT

E P

LA

N

01/08/2004

2000014

PRESENTATION

TOW

N O

F N

OR

TH C

AS

TLE

, NE

W Y

OR

K11

3 K

ING

STR

EE

T

1"= 80'

JMKD

NE

W C

AN

AA

N, C

ON

NE

CTI

CU

T 06

840

9 R

IPP

OW

AM

RO

AD

84 B

US

INE

SS

PA

RK

DR

IVE

, SU

ITE

200

AR

MO

NK

, NE

W Y

OR

K 1

0504

113

KIN

G S

TRE

ET

AR

MO

NK

, NE

W Y

OR

K 1

0504

COPYRIGHT By John Meyer Consulting2004

ARCH

ITEC

T:

CLIE

NT:

ARCH

ITEC

T:

or alterations to this document without the written permission of

electronic, mechanical, photocopying, recording or otherwise, without the

John Meyer Consulting shall render them invalid and unusable.

prior written permission of John Meyer Consulting. Any modifications

stored in a retrieval system, or transmitted in any form or by means,All Rights Reserved. No part of this document may be reproduced,

DATE

DATE:

PROJ. NO.:

DOCUMENT ID.:

DRAWING NO.:

APPROVED:DRAWN:

SCALE:

Pre

viou

s E

ditio

ns O

bsol

ete

NO.

REVI

SIO

N

C

MB

IA O

FF

ICE

EX

PA

NS

ION

ST

UD

IO I

II A

RC

HIT

EC

TS

, P

.C.

VE

NE

ZIA

NO

& A

SS

OC

IAT

ES

MB

IA I

NS

UR

AN

CE

CO

RP

OR

AT

ION