  • Tanjung Jati B TrainingVERTICAL BALL MILL

  • REAGENT PREPARATIONVERTICAL BALL MILL

    Tanjung Jati B Training

  • Tanjung Jati B Training

    PT Central Java PowerTanjung Jati B Units 1 & 2Flue Gas Desulfurization (FGD) System

    Absorber Area DewateringArea

    Reagent PreparationArea

    Limestone JettyAnd Conveyor

  • Tanjung Jati B Training

    THE INTENT OF THIS SECTION IS TO DISCUSS BASICPROCEDURES FOR STARTING UP THE VERTICAL BALLSYSTEM.

    THIS SECTION, BY NO MEANS ESTABLISHES OPERATINGPROCEDURES, THEREFORE IT IS THE RESPONSIBILITYOF THE OPERATORS TO FULLY UNDERSTAND THEOPERATING PROCEDURES PROVIDED IN THEOPERATION & MAINTENANCE MANUALS.

    Reagent PreparationVertical Ball Mill

  • Prior to starting the Vertical Ball Mill section, letsfirst review the Reagent Preparation flow paths andrelated components.

    Tanjung Jati B Training

    Reagent PreparationVertical Ball Mill

  • Tanjung Jati B Training

    LimestoneSilo

    Bin Activator

    LimestoneFeeder Limestone

    Pre-Crusher

    VerticalBall Mill

    MillHydroclone

    MillRecirculation

    Sump

    Limestone SlurryStorage Tank

    Mill OutletSump

    Mill RecyclePump

    Seawater

    Reagent PreparationVertical Ball Mill

  • The function of Reagent Preparation is toprocess raw limestone stored in the LimestoneSilos into a limestone slurry which is ultimatelystored in the Limestone Slurry Storage Tank.

    Limestone Slurry, produced by the Vertical Ball Millsand classified by the Hydroclones, will have a solidscontent of 30%.

    95% of those solids will pass through a 325 meshscreen.

    Tanjung Jati B Training

    Reagent PreparationVertical Ball Mill

  • Tanjung Jati B Training

    LimestoneSilo

    Bin Activator

    LimestoneFeeder Limestone

    Pre-Crusher

    VerticalBall Mill

    MillHydroclone

    MillRecirculation

    Sump

    Limestone SlurryStorage Tank

    Mill OutletSump

    Mill RecyclePump

    Seawater30%

    SOLIDS

    95% of solidsthrough a 325 mesh screen

    Reagent PreparationVertical Ball Mill

  • The Limestone Slurry produced by the ReagentPreparation System, by design, will have asolids content of 30%.

    Control of the Reagent Preparation Systemis from the main control room. The system isoperated most efficiently as a batch processwith a constant design feed rate of limestoneto the vertical ball mills.

    Tanjung Jati B Training

    Reagent PreparationVertical Ball Mill

  • Tanjung Jati B Training

    Reagent PreparationVertical Ball Mill

    The Hydroclone is an integral part of the ReagentPreparation system as well as being integral to theoperation of the Vertical Ball Mill.

    Lets first take a look at the Vertical Ball Millcomponents.

  • Tanjung Jati B Training

    Reagent PreparationVertical Ball Mill

    BALL FILL

    DRIVEMOTOR

    MILLRECIRCULATION

    SUMP

    GEARREDUCER

    RAWMATERIAL

    INLET

    SCREW

    TO MILLOUTLET SUMP

    TO MILLRECIRCULATION

    PUMP

  • Tanjung Jati B Training

    Reagent PreparationVertical Ball Mill

    DRAIN

    WASH CONNECTION

    SLURRY FEED

    BALLDISCHARGE

    LOW LEVELSWITCH

  • Tanjung Jati B Training

    Reagent PreparationVertical Ball Mill

    AGITATOR

    AGITATOR(300 RPM)

    MILL RECYCLE SUMP(PLAN VIEW)

    AGITATORMOTOR

    SLURRYOUTLET

    AIRVENT

    CLAMPASSY

    BLADES

  • Tanjung Jati B Training

    Reagent PreparationVertical Ball Mill

    RAWMATERIAL

    INLET SLURRY OUTLETTO RECIRC SUMP

    RECYCLE SLURRYFROM RECIRC PUMP

    VERTICAL BALLMILL FLOW PATH

  • Tanjung Jati B Training

    VERTICAL BALL MILL INTERNALS @ TJ-B

    Reagent PreparationVertical Ball Mill

  • Tanjung Jati B Training

    Reagent PreparationVertical Ball Mill

    An Oil Lubrication Unit is required for the operationBall Mills Gear Reducer. This Lube Oil Unit requiresa cooling water source and has instrumentation formeasuring oil flow, temperature and differentialpressure.

    The source of cooling water is Service Water. Thecooling water exiting the Lube Oil Unit goes tothe drain (trench).

  • Tanjung Jati B Training

    Reagent PreparationVertical Ball Mill

    DUPLEXFILTER

    MOTOR

    THERMOMETER(WITH SWITCH)

    OILPUMP

    FLOWMETER

    OILCOOLER

    DIFFERENTIALSWITCH

    OILINLET

    OILOUTLET

  • Tanjung Jati B Training

    Reagent PreparationVertical Ball Mill

    Prior to discussing the start-up of the Vertical BallMill, lets look at the Alarms Mill Trip Recycle Pump Trip Recirculation Sump Agitator Trip Mill Liquid Level Low Mill & Mill Motor Bearing & Winding Temperatures High Mill Motor Current (amps) High Gear Reducer Lube Oil Pump Trip Gear Reducer & Bearing Temperatures High Gear Reducer Lube Oil Flow Low Gear Reducer Lube Oil Temperature High

  • Tanjung Jati B Training

    Reagent PreparationVertical Ball Mill

    The Reagent Preparation System is started in thefollowing sequence. Note, the Limestone SlurryStorage Tank must be ready to receive slurry

    1. Mill Outlet Sump, Agitator & Pump

    2. Tower Mill System Lube Oil System Mill Main Drive Mill Recycle Pump & Recirc Sump Agitator Limestone Pre-Crusher Limestone Weigh Feeder & Silo Gate Valve Limestone Bin Activator

  • Tanjung Jati B Training

    Reagent PreparationVertical Ball Mill

    The Reagent Preparation System is started in thefollowing sequence

    3. Limestone Slurry Storage System

    Slurry Storage Tank (Level not Hi-Hi) Tank Agitator Limestone Slurry Feed Pumps

  • Tanjung Jati B Training

    Reagent PreparationVertical Ball Mill

    We have discussed system alarms and the start-upsequence, now lets look at the basic steps for startingthe Vertical Mill and related equipment

    Please consult the O&M Manuals for the details forstarting and stopping the Vertical Mill and relatedequipment.

  • Tanjung Jati B Training

    Reagent PreparationVertical Ball Mill

    Starting the Ball Mill System (Mill Outlet Sump)

    Open the Mill Outlet Sump Recycle Valve

    Close Sump Pump Common Discharge Valve

    Open manual Feed Valve to the Hydroclone

    Verify that the manual Flushing Valve to theHydroclone Overflow is closed

    Verify that the manual seawater Flushing Valve isclosed

  • Tanjung Jati B Training

    From Vertical MillRecirculating Sump

    (Flush Water)

    Seawater Flush

    MillHydroclone

    FLUSH

    FEED

    Pumps A & B

    To Vertical MillRecirculating Sump

    To LimestoneSlurry Tank C

    O

    CO

    C

    Reagent PreparationVertical Ball Mill

    Seawater Fill C*

    SUMP VALVEARRANGEMENT

    DURING START-UP

    * Open Valve if sumplevel is low

    C

  • Tanjung Jati B Training

    Reagent PreparationVertical Ball Mill

    Starting the Ball Mill System (Mill Outlet Sump)

    Place the Mill Outlet Sump Pump in Automatic

    Place the Mill Outlet Sump Agitator in Automatic

    Once Sump level is achieved, the Pump & Agitatorwill start.

    The Sump Pump discharge flow will remain in theRecycle Mode until the entire mill system is in operation.

  • Tanjung Jati B Training

    From Vertical MillRecirculating Sump

    (Flush Water)

    Seawater Flush

    MillHydroclone

    FLUSH

    FEED

    Pumps A & B

    To Vertical MillRecirculating Sump

    To LimestoneSlurry Tank C

    O

    CO

    C

    Reagent PreparationVertical Ball Mill

    Seawater Fill C

    SUMP PUMP ANDAGITATOR TO AUTO(SHORT RECYCLE)

    C

  • Tanjung Jati B Training

    Reagent PreparationVertical Ball Mill

    Starting the Ball Mill System (Hydroclone)

    Verify that 4 of 5 Cyclone Isolation Valves are open

    Mill Hydroclone Recycle Valve to manual and open

    Open Sump Pump Common Discharge Valve

    Close Mill Outlet Sump Pump Recycle Valve

    Mill Hydroclone Recycle Valve to automatic

  • Tanjung Jati B Training

    From Vertical MillRecirculating Sump

    (Flush Water)

    Seawater Flush

    MillHydroclone

    FLUSH

    FEED

    Pumps A & B

    To Vertical MillRecirculating Sump

    To LimestoneSlurry Tank O

    O

    CO

    C

    Reagent PreparationVertical Ball Mill

    Seawater Fill C

    MILL HYDROCLONEIN THE

    RECYCLE MODE

    O

  • Tanjung Jati B Training

    Reagent PreparationVertical Ball Mill

    MILL HYDROCLONEMILL HYDROCLONE

    (PLAN VIEW)

    CYCLONES

    CYCLONE

    4 of 5 Cyclones openfor normal operation

  • Tanjung Jati B Training

    Reagent PreparationVertical Ball Mill

    INLET

    UNDERFLOW

    OVERFLOW

    MILL HYDROCLONE

  • Tanjung Jati B Training

    MILLHYDROCLONE

    orCLASSIFIER

    KREBS U.S.A.

    LOWERLAUNDER

    UPPERLAUNDER

    CYCLONESReagent PreparationVertical Ball Mill

  • Tanjung Jati B Training

    Reagent PreparationVertical Ball Mill

    Starting the Ball Mill System (Lube Oil Unit)

    Verify Lube Oil Shutoff Valves are Open

    Verify Cooling Water Shutoff Valve is Open(Observe cooling water discharging into trench)

    Start the Lube Oil Pump

    Verify Lube Oil Flow is above minimum, temperaturebelow maximum and differential pressure belowmaximum

  • Tanjung Jati B Training

    Reagent PreparationVertical Ball Mill

    DUPLEXFILTER

    MOTOR

    THERMOMETER(WITH SWITCH)

    OILPUMP

    FLOWMETER

    OILCOOLER

    DIFFERENTIALSWITCH

    OILINLET

    OILOUTLET

  • Tanjung Jati B Training

    Reagent PreparationVertical Ball Mill

    Starting the Ball Mill System (Vertical Mill)

    Verify Mill Flush & Drain Valves are closed

    Seawater Flow Control Valve to manual and open fully

    Open Seawater Make-Up Isolation Valve

    If Mill is empty, open seawater isolation valve.Fill Mill until water is seen overflowing into theMill Outlet Sump

    Verify Seawater Valve to Mill Hydroclone Underflowis open

  • Tanjung Jati B Training

    Reagent PreparationVertical Ball Mill

    MILL OUTLET SUMP

    SEAWATERMAKE-UP

    O

    O

    O

    O

    MILL HYDROCLONE

    VERTICAL MILL

  • Tanjung Jati B Training

    Reagent PreparationVertical Ball Mill

    Starting the Ball Mill System (Vertical Mill)

    Once water from the Mill Recirculating Sump is seendischarging into the Mill Outlet Sump, the Mill can bestarted (manually).

    If the Mill is in Automatic, the Mill will start when thelevel in the Mill Recirculating Sump is above the lowlevel (switch).

  • Tanjung Jati B Training

    Reagent PreparationVertical Ball Mill

    MILL OUTLET SUMP

    SEAWATERMAKE-UP

    O

    O

    O

    O

    MILL HYDROCLONE

    VERTICAL MILL

  • Tanjung Jati B Training

    Reagent PreparationVertical Ball Mill

    Starting the Ball Mill System (Recycle Pump & SumpAgitator)

    Verify Mill Flush and Drain Valves are closed.

    Verify Mill Recycle Pump Isolation Valves are open

    Verify Mill Recycle Feed Valve is open

    Place Pump & Agitator in automatic. Both will startif the level within the Recirculating Sump is abovethe minimum (low level switch)

  • Tanjung Jati B Training

    Reagent PreparationVertical Ball Mill

    MILLRECYCLE PUMP

    TO MILLOUTLET SUMP

    MILLRECIRCULATING

    SUMP

    OOO

  • Tanjung Jati B Training

    Reagent PreparationVertical Ball Mill

    Starting the Ball Mill System (System Dust Collector)

    Verify Instrument Air Isolation Valve is open

    Verify Isolation Valves at the Mill and LimestoneFeeder are open

    Start the Dust Collector

    Verify Differential Pressure is not excessive

  • Tanjung Jati B Training

    LIMESTONE SLURRY TANK(UNDER CONSTRUCTION)

    REAGENT PREPARATIONAREA DUST COLLECTOR

    Reagent PreparationVertical Ball Mill

  • Tanjung Jati B Training

    Reagent PreparationVertical Ball Mill

    FROM TOWER MILL A

    FROM LIMESTONE FEEDER A

    FROM TOWER MILL B

    FROM LIMESTONE FEEDER B

    INSTRUMENTAIR

    REAGENT PREPARATION SYSTEM DUST COLLECTOR

    C

    C

    O

    O

    O

  • Tanjung Jati B Training

    Reagent PreparationVertical Ball Mill

    Starting the Ball Mill System (Crusher, Feeder andBin Activator)

    Pre-Crusher will start after a short time delay afterthe Mill is started (automatic)

    Verify Silo Discharge Gate Valve is open

    Limestone Feeder will start after a short time delayafter the Pre-Crusher is started (automatic)

    Bin Activator will start (if in automatic) when Feederis running and Gate Valve is open.

  • Tanjung Jati B Training

    LimestoneSilo

    Bin Activator

    LimestoneFeeder Limestone

    Pre-Crusher

    VerticalBall Mill

    MillHydroclone

    MillRecirculation

    Sump

    Limestone SlurryStorage Tank

    Mill OutletSump

    Mill RecyclePump

    Seawater

    Slide Gate

    Reagent PreparationVertical Ball Mill

  • Tanjung Jati B Training

    When the Limestone Slurry Storage Tank Levelreaches the high level set point, the Mill OutletSump Pump will stop.

    When the Sump Pump Stops, this will stop thefollowing equipment if in automatic mode

    Pre-Crusher Limestone Feeder Bin Activator

    The Vertical Mill will remain in service for flushingand proper shutdown (approximately 60 minutes).

    Reagent PreparationVertical Ball Mill

  • Tanjung Jati B Training

    LimestoneSilo

    Bin Activator (4)

    LimestoneFeeder

    (3)Limestone

    Pre-Crusher(2)

    VerticalBall Mill

    (5)

    MillHydroclone

    MillRecirculation

    Sump

    Limestone SlurryStorage Tank

    Mill OutletSump Pump (1)

    Mill RecyclePump

    Seawater

    SHUTDOWN ORDER

    High LevelSet Point

    Reagent PreparationVertical Ball Mill

  • Tanjung Jati B Training

    The Vertical Mill is required to operate or run for60 minutes after the Mill Outlet Sump Pump hasstopped.

    This is required so that the slurry within the Millwill become finer (smaller) and not settle rapidlyif the Mill were shutdown earlier.

    The Mill will shutdown automatically after 60 minutesif the Mill is in Automatic.

    Reagent PreparationVertical Ball Mill

  • Tanjung Jati B Training

    The Mill Recycle Pump and Mill Recirculating SumpAgitator will continue to operate and slurry will berecycled back to the Vertical Mill.

    It is recommended that the Vertical Mill be run for a5-minute period every 4 hours. This will prevent thecompacting of ground limestone within the Mill.

    Reagent PreparationVertical Ball Mill

  • Tanjung Jati B Training

    Reagent PreparationVertical Ball Mill

    MILLRECYCLE PUMP

    TO MILLOUTLET SUMP

    MILLRECIRCULATING

    SUMP

  • Tanjung Jati B Training

    Emergency Shutdown of the Vertical Ball Mill

    In case of emergency stop due to electrical failureor other cause, the Mill is to be drained and washedof all slurry to prevent the cementation of the hardparticles.

    For next start-up, the Vertical Mill must be filled withwater until the water is seen overflowing into the MillOutlet Sump.

    Reagent PreparationVertical Ball Mill

  • REAGENT PREPARATIONVERTICAL BALL MILL

    (END)