  • 7/31/2019 Vessel Inspection Procedure

    1/16

    Trust International for Industrial and

    Petroleum Services- Limited -

    :002 03 4256262-:002 03 4256162

    Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd

    Floor, Smouha, Alexandria, Egypt

    Tel: 002 03 4265252 - Fax: 002 03 4265152 - www.trusteg.com - Email: [email protected]

    ONSHORE

    REGENERATION GAS SUBCOOLER

    E-2521

    DATEREF NO

    S/N SUBJECT 0 1 2 3

    1

    SCOPE

    2

    REFERENCES

    3 DEFINITIONS

  • 7/31/2019 Vessel Inspection Procedure

    2/16

    Trust International for Industrial and

    Petroleum Services- Limited -

    :002 03 4256262-:002 03 4256162

    Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd

    Floor, Smouha, Alexandria, Egypt

    Tel: 002 03 4265252 - Fax: 002 03 4265152 - www.trusteg.com - Email: [email protected]

    4

    ITEM

    DESCRIPTION

    5

    PREINSPECTION

    REQUIREMENTS

    6

    TYPES OF

    INSPECTION

    7

    INSPECTION

    PROCEDURE

    8

    REPORTING

    9

    ATTACHMENTS

    1- SCOPE

    This procedure delineates the internal inspection of the onshore regeration gas sub cooler E -2521

    during the scheduled shutdown to determine the status of internal surfaces of the vessel, and the

    need for repair or re rating according to the code requirements.

    2- REFERENCES;

  • 7/31/2019 Vessel Inspection Procedure

    3/16

    Trust International for Industrial and

    Petroleum Services- Limited -

    :002 03 4256262-:002 03 4256162

    Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd

    Floor, Smouha, Alexandria, Egypt

    Tel: 002 03 4265252 - Fax: 002 03 4265152 - www.trusteg.com - Email: [email protected]

    2.1 API STD 510 Pressure vessel inspection code : maintenance inspection, re

    rating , repair and alteration.

    2.2 API RP 572 Inspection of pressure vessels

    2.3 ANSI/NB-23 National board inspection code

    2-4 R7126 guidance notes and supporting information for rashpetco

    (Egypt) written schemes of examination managed by the

    pressure system data base.2-5 vessel drawings and

    data sheets

    3. DEFINITIONS:

    3.1 API The American Petroleum Institute

    3.2 ANSI The American National Standards institute

    3.3 ASME The American Society for Mechanical Engineers

    3.4 MAWP Maximum allowance working pressure

    3.5 MDMT minimum design metal temperature

    3.6 NB ASME national board

    3.7 WSOE Written scheme of examination

    4. ITEM DESCRIPTION:

    The onshore regeration gas subcooler E-2521, located horizontally at roseta gas field,

    was fabricated by JOY INDUSTRIES , under manufacturer's number 1101 at 1999 from

    stainless steel in accordance with ASME code sec. VIII Div. 1,1998 edition, and stamped by "U"

    stamp. The medium inside the vessel is HS gas shell side / HC gas tube side.

  • 7/31/2019 Vessel Inspection Procedure

    4/16

    Trust International for Industrial and

    Petroleum Services- Limited -

    :002 03 4256262-:002 03 4256162

    Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd

    Floor, Smouha, Alexandria, Egypt

    Tel: 002 03 4265252 - Fax: 002 03 4265152 - www.trusteg.com - Email: [email protected]

    SHELL:

    The shell is constructed from two courses of "SA-240-316. with dimensions of 660.4 ID * 25.4

    mm thick and length of shell is 5870 mm, the corrosion allowance is 0.0 mm.

    HAEDS :

    The heads are constructed from one piece of SA-240-316 formed to be elliptical 2:1 with

    dimensions of 660.4 ID * 25.4 mm thick, the corrosion allowance is 0.0 mm.

    NOZZELS :

    The nozzles are fabricated from SA-213-316, total number of tubes are 321 in one pass, tube

    outside diameter is 25.4 with 2.1 mm thickness and 6096 mm length.

    BOLTS :

    Stud bolts / nuts are constructed from SA -193-B7/SA-194-2H

    COATING :

    No cating exists on internal or external surfaces.

    NAMEPLATE :

    The name plate is fabricated from stinless steel material and includes the following information:

    Manufacturer :

    Manufacturer's S/N :

    Tag number :

    Year built :

    MAWP shell side :

    MDMT shell side :

  • 7/31/2019 Vessel Inspection Procedure

    5/16

    Trust International for Industrial and

    Petroleum Services- Limited -

    :002 03 4256262-:002 03 4256162

    Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd

    Floor, Smouha, Alexandria, Egypt

    Tel: 002 03 4265252 - Fax: 002 03 4265152 - www.trusteg.com - Email: [email protected]

    MAWP shell side :

    MDMT shell side :

    MAWP tube side :

    MDMT tube side :

    Test pressure :

    Construction code :

    Code stamp :

    ACCESS :

    No access is available to inside the vessel, however inspector shall use 8"N3,N4 and other

    available nozzles to inspect the internal surface of the shell.

    5. PREINSPECTION REQUIREMENTS:

    5.1 Operation and inspection history of the tank shall be available for review by the

    inspector. For example: operating conditions, including process upsets that may affect

    mechanical integrity, inspection reports, and data for each type of inspectionconducted (for example, internal, external, thickness measurements), and inspection

    recommendations for repair.

    5.2 For an internal inspection, the tank shall be isolated by blinds or other positive

    methods from all sources of liquids, gases, and / or vapors. The vessel shall be drained,

    purged, cleaned, ventilated, and gas tested. Where required , protective equipment

    shall be worn that will protect the eyes, lungs, and other parts of the body from

    specific hazards that may exists in the vessel.

    5.3 No access is available to inside the vessel , however inspector shall use 8" N3,N4 and

    other available nozzles to inspect the internal surfaces of the shell using fiberscope

  • 7/31/2019 Vessel Inspection Procedure

    6/16

    Trust International for Industrial and

    Petroleum Services- Limited -

    :002 03 4256262-:002 03 4256162

    Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd

    Floor, Smouha, Alexandria, Egypt

    Tel: 002 03 4265252 - Fax: 002 03 4265152 - www.trusteg.com - Email: [email protected]

    and/or the inspection mirror as access permits.

    5.4 Nozzles shall be opened as required by inspector, isolation kits ( if required ),shall be

    available at site during the S/D to enable of the nozzles.

    5.5 Electrical line source terminal of 220 V shall be available near to vessel.

    5.6 Powerful light source shall be available to inspect the inside surface of the vessel.

    5.7 The vessel shall be prepared for hydraulic pressure testing of both the shell and the

    tube side at 127 barg using tap water as a test medium and hold for 1 hour. The

    required pump, calibrated pressure gauges and blind flanges/ spades shall be available

    for hydraulic pressure testing . the inspector shall witness the hydraulic pressure

    testing. ( use guidelines for hydraulic pressure testing PT/01)5.8 NDT and other inspection equipment shall be available for inspector to conduct the

    internal inspection (required inspection equipment are attached).

    6. TYPES OF INSPECTION:

    The internal inspection of the tank included, visual inspection, dye penetration and UT wall

    thickness measurements and supplements with NDT as required per examination specification

    RPCO-05, issue 1 ( WSOE ), and hydrostatic testing for both the shell and tube side at 127 barg for1 hour hold.

    7. INSPECTION PROCEDURE:

    7.1 Check the tank tag number and name plate.

    7.2 Obtain the safe entry permit from the appropriate HSE personnel.

  • 7/31/2019 Vessel Inspection Procedure

    7/16

    Trust International for Industrial and

    Petroleum Services- Limited -

    :002 03 4256262-:002 03 4256162

    Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd

    Floor, Smouha, Alexandria, Egypt

    Tel: 002 03 4265252 - Fax: 002 03 4265152 - www.trusteg.com - Email: [email protected]

    7.3 Check that cleaning of the vessel is adequate and the internal surface of the shell,

    heads, and nozzles are clearly visible.

    7.4 Check that inspection and NDT equipment that shall be used during the inspection are

    available and valid.

    7.5 Check that the light source that shall be used is operating and powerful and check for

    the availability of electrical line source terminal that be used to operate the NDT

    equipment.

    7.6

    If the vessel is not properly prepared for internal inspection, the inspector shall

    decline to make the inspection until the tank is ready for that inspection. inspection.

    7.7 Examine the internal surfaces of shell and heads carefully, as access permits, for

    possible cracks, general corrosion , pitting , and other signs of deterioration. If there is a

    suspect indication, use Dye penetrates according to approved NDT procedures; to

    verify the indication. Ultrasonic testing may be used for determining the depth ofindication. Pit depth shall be measured by depth gauge or venire caliber

    7.8 If evidence of distortion is found, it may be necessary to make a detailed check of the

    actual contours or principal dimensions of the vessel and to compare those contours

    and dimensions with the original design details.

    7.9 Examine welded joints and the adjacent heat-affected zones for service-induced cracks

    or other defects.

  • 7/31/2019 Vessel Inspection Procedure

    8/16

    Trust International for Industrial and

    Petroleum Services- Limited -

    :002 03 4256262-:002 03 4256162

    Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd

    Floor, Smouha, Alexandria, Egypt

    Tel: 002 03 4265252 - Fax: 002 03 4265152 - www.trusteg.com - Email: [email protected]

    7.10 Carry out PT on 10% of all seam and girth welds on the shell, plus all "T" weld

    inspections, to distance of 300 mm from inspection of weld looking for signs of cracking

    and other weld defects ( including transverse cracking where appropriate ).

    7.11 Carry out PT on nozzles.

    7.12

    Examine the surfaces of. Nozzles and other openings for distortion, crack, and other

    defects, using a mirror as necessary, paying particular attention to the welding used toattach the parts and their reinforcements.

    7.13 Examine accessible flange faces for distortion and determine the condition of gasket-

    seating surfaces.

    7.14

    Examine the tubing and tube sheets externally for possible cracks and other signs of

    deterioration.

    7.15 Examine the earthing conditions, and describe the status in the final inspection report.

  • 7/31/2019 Vessel Inspection Procedure

    9/16

    Trust International for Industrial and

    Petroleum Services- Limited -

    :002 03 4256262-:002 03 4256162

    Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd

    Floor, Smouha, Alexandria, Egypt

    Tel: 002 03 4265252 - Fax: 002 03 4265152 - www.trusteg.com - Email: [email protected]

    7.16 Measure the wall thichness of the shell at 500 mm intervals ( as access permits ) from

    the datum points ( shell-to-front head weld seam ) till the shell-to-rear head weld

    seam. The readings will be taken in four directions (3,6,9,12 o'clock ). Readings also will

    be taken on heads and nozzles and shall be included in the report.

    7.17 Clearly mark all defects found with a permanent marker on place. Sketch the size and

    location of defects and document the findings on the final inspection report.

    81.7 Witness the hydraulic pressure test at 127 barg for both shell and tube side using tap

    water as a test medium and hold for 1 hour . ( use guidelines for hydraulic pressure

    testing ( PT/01)

    81. Sate areas not accessible and reasons why.

    8. REPORTING:

    8.1 All findings shall be reported in the attached final inspection report form.

    9. ATTACHEMENTS:

    9.1 Sketch for onshore registration gas subcooler E-25219.2 List of required inspection equipment.

    9.3 Inspection check list.

    9.4 final inspection report.

    9.1 LIST OF REQUIRED INSPECTION EQUIPMENT

    S/N DESCRIPTION QTY

    REQ.

    RECOMMENDED TYPE

  • 7/31/2019 Vessel Inspection Procedure

    10/16

    Trust International for Industrial and

    Petroleum Services- Limited -

    :002 03 4256262-:002 03 4256162

    Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd

    Floor, Smouha, Alexandria, Egypt

    Tel: 002 03 4265252 - Fax: 002 03 4265152 - www.trusteg.com - Email: [email protected]

    1

    Ultrasonic thickness meter.

    1 ANY

    2

    Inspection mirror with telescopic

    hand, the mirror size shall fit into 2"

    pipe at least. 1 Any

    3

    Pocket size flash light

    1 Any

    4

    Measuring tape 5 m.

    1 Any

    5Flexible fiberscope with light source

    and forward & side tip.1 Olympus or equivalent

    6Dye penetration material kit (

    penetrant-remover-developer ) 1From only one family product

    e.g. Ely , or magnaflux etc.

    7

    Ultrasonic instrument for crack

    detection with cables and 0, 45, 60, 70

    degree angle probes, with IIW-V2block.

    1KRAUTKRAMER OR

    EQUIVALENT

    8

    Still photos digital camera.

    1 Sony or equivalent

    9Depth gauge or vernier caliber.

    1 Any

    10

    Magnifier lens 2, 5, or 8X

    1 Any

  • 7/31/2019 Vessel Inspection Procedure

    11/16

    Trust International for Industrial and

    Petroleum Services- Limited -

    :002 03 4256262-:002 03 4256162

    Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd

    Floor, Smouha, Alexandria, Egypt

    Tel: 002 03 4265252 - Fax: 002 03 4265152 - www.trusteg.com - Email: [email protected]

    11Permanent markers (Yellow/red

    color).1 Any

    12

    9.2 INSPECTION CHECK LIST

    S/N ITEM CODITION ACCEPTANCE REMARKS

    1Shell internal / external

    surface

    2Head internal / external

    surface

    3Shell-to-shell circumferential

    weld seam

    4Shell-to shell longitudinal weld

    seam5

    Shell-to-head circumferential

    weld seam6 N1 16" -900# tube inlet7 N1 16" -900# tube outet

    8 N3 8"-900# shell inlet

    9 N4 8"-900# shell oulet

    10 N1A 2"-900#P1 connection

    11 N2A2"-900#P1 connection

    12 N3A2"-900#P1 connection

    13 N4A2"-900#P1 connection

  • 7/31/2019 Vessel Inspection Procedure

    12/16

  • 7/31/2019 Vessel Inspection Procedure

    13/16

    Trust International for Industrial and

    Petroleum Services- Limited -

    :002 03 4256262-:002 03 4256162

    Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd

    Floor, Smouha, Alexandria, Egypt

    Tel: 002 03 4265252 - Fax: 002 03 4265152 - www.trusteg.com - Email: [email protected]

    Data of examination Data of last examination Vessel Drawing Number

    Data of manufacture Manufacturer Design Code

    PART 2: VESSEL DATA

    Shell Tube side

    Contents

    Max/min design pressure (bar)

    Max/min design temperature

    (C degree)

    Material

    Thickness (mm)

    Corrosion allowance (mm)

    Material (lining)

    Insulation

    PART 3: EXETENT AND METHOD OF EXAMINATION

    Examination and/or tests carried out, plus no of attached sheets.

    Parts not examined with reasons

    PART 4: CONDITION OF VESSEL (SUMMARY)

    EXTELNAL

  • 7/31/2019 Vessel Inspection Procedure

    14/16

    Trust International for Industrial and

    Petroleum Services- Limited -

    :002 03 4256262-:002 03 4256162

    Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd

    Floor, Smouha, Alexandria, Egypt

    Tel: 002 03 4265252 - Fax: 002 03 4265152 - www.trusteg.com - Email: [email protected]

    Element Condition Comments

    Access ladders/platforms

    Man ways

    Heads

    Shell

    Nozzles

    Protective coatings

    insulation

    Bolted attachments

    Welded attachments

    Supports/ skirt/ mounts

    Ear thing

    Nameplate

    Internal

    Element Condition Comments

    Access ladders/platforms

    Man ways

    Heads

    Shell

    Nozzles

    Protective coatings

  • 7/31/2019 Vessel Inspection Procedure

    15/16

    Trust International for Industrial and

    Petroleum Services- Limited -

    :002 03 4256262-:002 03 4256162

    Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd

    Floor, Smouha, Alexandria, Egypt

    Tel: 002 03 4265252 - Fax: 002 03 4265152 - www.trusteg.com - Email: [email protected]

    Tubes

    Tube plates

    Welded attachments /

    supports

    Bolted attachments / trays

    Strainers /filters/demisters

    Definition of vessel Condition

    C-Nothing to report B-Less significant Fault A2-significant andfault

    A1-Imminent Danger

    Vessel in excellent

    condition no signs of

    damage or corrosion-

    nothing to report

    Surface rust, light

    scale or corrosion not

    exceeding 0.5mm and

    within the corrosion

    allowance-damage

    judged not to be

    dangerous

    Corrosion greater

    than 0.5mm possible

    cracking adjacent to

    welds-more

    significant damage

    than B but no

    immediate of failure

    Heavy corrosion

    and/or deep pitting or

    cracking of any

    description; vessel

    operating above SOL-

    significant damage

    with risk of imminent

    danger

    PART5: Anomalies and defects

    PART6: Statement by Inspector

    I declare that the above equipment has been inspected according to the examination described in part 3

    and that this document is a true report of the inspection carried out

    Inspectors name signature data

    PART 7: Statement by competent person

  • 7/31/2019 Vessel Inspection Procedure

    16/16

    Trust International for Industrial and

    Petroleum Services- Limited -

    :002 03 4256262-:002 03 4256162

    Al Saraya Towers, Ali Bin Abi-Talib Square, Alpansi Tower, 2nd

    Floor, Smouha, Alexandria, Egypt

    Tel: 002 03 4265252 - Fax: 002 03 4265152 - www.trusteg.com - Email: [email protected]

    The vessel is suitable for its design specified in part 2 subject to the relief system remaining in order:

    YES/NO

    The written scheme of examination require amending as result of this examination : yes / no

    Description of amendments required

    The above equipment may be used within the duty specified in part 2, subject to the following conditions

    Next thorough examination due before

    Name signature