Date: 29-11-2012Doc. No. HM - LE - PRWIDE M0101 - DOC - MA -PMC -
00 - 002
Revision. 3
Project: Hyderabad Metro Rail
Page 1o 2!"#ec$ed by : "%NagarajaPre&ared by: D %rinat#
'itle: (nterace Manage)ent Plan
Table of Contents
1 (ntrod*ction..........................................................................................................
1.1 +vervie,..............................................................................................................1.2 +bjective..............................................................................................................!
2 Reso*rce Manage)ent........................................................................................
2.1 +rganisation and Roles Res&onsibilities...........................................................!2.2 Reso*rce Re/*ire)ent......................................................................................10
3 (nterace Re/*ire)ents......................................................................................
3.1 llocation o (nterace re/*ire)ents...................................................................113.2 (nterace descri&tion bet,een contractors..........................................................11
3.3 reas o concern................................................................................................13
Process Manage)ent........................................................................................
.1 "#ange o interacing re/*ire)ent.....................................................................1.2 eriication and alidation o (nteracing Re/*ire)ents......................................1.3 'esting and "o))issioning on (nteraces..........................................................1. 4*ality Proced*res.............................................................................................1
Doc*)ent Manage)ent.....................................................................................
.1 Reerence Doc*)ents.......................................................................................15.2 %tr*ct*re o Reerence Doc*)ents....................................................................1.3 ersion "ontrol o (nterace Doc*)ents.............................................................1
5 "o))*nication..................................................................................................
5.1 'er)s o Reerence o (nterace Meetings..........................................................195.2 67c#ange o (nor)ation bet,een "ontractors..................................................205.3 %*b)ission to 6)&loyer8s Re&resentative.........................................................205. Re/*est or 6)&loyer 6)&loyer8s Re&resentative ttention.............................20
(nterace Haard Manage)ent...........................................................................
! Progra))e........................................................................................................
!.1 ;ey ctivities......................................................................................................22!.2 ;ey Dates..........................................................................................................2
!.3 "ritical (te)s "ritical Pat#................................................................................29 Records.............................................................................................................
List of Figures
Figure 1 : Viaduct InterfaceOrganisation. 10Figure 2 : Project Life Cycle.13
Figure 3 : Flo c!art for Interface "anage#ent PlanProcess.. 1$
DSGN
CHKD
APPD
DOC. No.
RELEASED FOR PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTION
- 3
D%
CODE REV.
HM - M001 - D+" - M -PM" - 00 - 002
NAME SIGN DATE (N'6R?"6 MN@6M6N' P
-
8/10/2019 VIA -REV 4
2/28
Date: 2-12-2012Doc. No. HM - LE - PRWIDE M0101 - DOC - MA
-PMC - 00 - 002
Revision.
Project: Hyderabad Metro Rail
Page o 2!"#ec$ed by : "%NagarajaPre&ared by: D %rinat#
'itle: (nterace Manage)ent Plan
List of Appendices
%&&endi' %.........................................................................................................................
%&&endi' (: Interface )&eci*cation For#.....................................................................
%&&endi' C: Interface C!ange +e,uest For# -IC+F..................................................
Acronyms & Denitions/!e folloing de*nitions a&&ly t!roug!out t!is &rocedure and ill e used ininter&reting t!e #eaning of ter#s used in t!is docu#ent
Term Denition
%FC %uto#atic Fair Collection
%)) %u'iliary sustation
CO" Co##unication
C) Co#ined )erices raings.
C4 Ciil 4or5s
() e&ot uilding serices
CIV e&ot ciil
"6 e&ot "aintenance e,uient
"P esign "anage#ent &lan
6+ 6#&loyer7s +e&resentatie
8) 8eneral )&eci*cation
9V%C 9eating entilation air conditioning
I" Interface "anager
I"P Interface "anage#ent Plan
I"P8 Interface "anage#ent Progra##e
"I" "aster interface #atri'
")) "anual of )&eci*cation and )tandards
O6/) Oer!ead 6lectrical traction syste#P)) Poer su&&ly and )u&erisory Control %nd ata %c,uisitionsyste#
"P uality "anage#ent &lan
+); +olling stoc5
+)) +eceiing sustation
)
-
8/10/2019 VIA -REV 4
3/28
Date: 2-12-2012Doc. No. HM - LE - PRWIDE M0101 - DOC - MA
-PMC - 00 - 002
Revision.
Project: Hyderabad Metro Rail
Page 0o 2!"#ec$ed by : "%NagarajaPre&ared by: D %rinat#
'itle: (nterace Manage)ent Plan
1 Introduction
/!e 9yderaad "etro is a &ro&osed ra&id transit syste# for t!e city of9yderaad= %nd!ra Prades!= India. /!e &resent sco&e of &roject includes t!reecorridors along !ig!density tra>c corridors= s&anning a&&ro'i#ately ?15#s.
Corridor1 ill run fro# nort! to sout! and ill e 2@.@? 5# long= connecting 2?stations fro# "iya&ur to L. (. Aagar. Corridor2 ill e 1B.?@ 5# long= connecting1B stations fro# Parade 8rounds to Fala5nu#a. /!e Corridor3 ill run fro# nort!to sout! and ill e 2?.1 5# long= connecting 23 stations fro# Aagole to)!il&ara#a#.
/!e 9yderaad "etro ill e an eleated syste# it! a D#ide iaductstructure. /!e iaduct ill run fro# t!e central #edian of t!e road and ill !ae
to trac5s. /!e trac5s ill e 1B3 ## standard gauge. /!e syste#Es electricaltraction ill e %C and &oer ill e su&&lied t!roug! t!e oer!ead electricsyste#.
1.1 Purpose of Document/!is &lan is !olly ased on re,uire#ents ca&tured in 8eneral )&eci*cation foreac! interface= !erein t!e Contractor s!all deelo&= an I"P !ic! is #utuallyacce&tale to ot!er interfacing Contractors. /!e &ur&ose of t!is &lan s!allidentify t!e syste# and t!e susyste#s as ell as t!e ciil or5s and facilitiesit! interfacing re,uire#ents. It s!all de*ne t!e aut!ority and res&onsiility oft!e ContractorEs and Ot!er ContractorsE staG inoled in interface #anage#ent
and deeloent.
/!is Plan descries t!e #et!odology for #anaging interfaces to ac!iee aco#&re!ensie design coering all foreseen as&ects s&eci*c to t!e VI% syste#. Its!all identify t!e infor#ation to e e'c!anged= &recise diision of res&onsiilityeteen t!e Contractors and integrated tests to e &erfor#ed at eac! stage oft!e ContractorEs or5s. It addresses t!e or5s &rogra##e of t!e Contract to#eet t!e 5ey dates of eac! Contractor and !ig!lig!t &rogra##e ris5s if any to6#&loyer +e&resentatie. It s!all also indicate dates for t!e co##ence#ent andco#&letion of eac! &rinci&al actiity and t!e 5ey dates for e'c!anging syste#data and interface design infor#ation y t!e Contractor and t!e InterfacingOt!er Contractor.
/!is Interface "anage#ent Plan -I"P outlines t!e actiities to de#onstrate !ot!e Contractor &ro&oses to ac!iee a coordinated VI% )yste#= co#&atile it!design and construction carried out y ot!er interfacing contractors. /!e &landescries t!e #et!ods and strategies for #anaging interfaces. It also &roidescontrol of associated interfaces as t!e &roject gros t!roug! engineering=construction= installation and closeout.
1. !"er"ie#/!e &lan outlines t!e &rocess for eGectie e'c!ange of infor#ation for a safe cient to #eet t!e &ac5agere,uire#ents in order to successfully delier t!e 9yderaad "etro Project.
-
8/10/2019 VIA -REV 4
8/28
Date: 2-12-2012Doc. No. HM - LE - PRWIDE M0101 - DOC - MA
-PMC - 00 - 002
Revision.
Project: Hyderabad Metro Rail
Page 5o 2!"#ec$ed by : "%NagarajaPre&ared by: D %rinat#
'itle: (nterace Manage)ent Plan
/!e interface re,uire#ents s!all e identi*ed &rior to t!e esign < 6'ecutionstages y all interfacing &arties and entities so t!at redesign= reor5 andassociated costs and sc!edule i#&acts are #ini#iHed. /!is s!all eco##unicated to all aGected entities.
/!e #ain sources of interface re,uire#ents to e i#&orted and traced originatefro#:
8eneral )&eci*cationJ
/ec!nical s&eci*cation
Interface s&eci*cation %&&endi' %1 to %@MJ
/!e Interface +e,uire#ents s!all e taulated in /as5 %llocation /ale -/%/ forall t!e interfaces listed in t!e VI% I+) and additional= if any.
*.1 Allocation of Interface re/uirements
/!e interface re,uire#ents are generally classi*ed in to esign < 6'ecutionInterfaces and t!e co##unication s!all e estalis!ed it! eac! of t!e Ot!erContractor. /!e infor#ation s!all e regularly u&dated and &eriodically re&ortedto 6#&loyer as &er t!e te#&late in )ection 3.2 elo.
*. Interface description bet#een contractors
In continuation to t!e allocation of interface re,uire#ent6rror: +eference sourcenot found t!e folloing /as5 %llocation tale -/%/ sections identify t!edescri&tion eteen t!e contractors.
Interface I InterfaceCategory
Interfaceescri&tion
+es&onsiility
Of VI%
+es&onsiilityof Ot!er
Contractor
+e#ar5s
/!is tale -/%/ indicates t!e res&onsiility and status in re#ar5s colu#n of allt!e interfaces identi*ed and eoled in t!e design and e'ecution &rocess.)u&&orting docu#ents for t!is tale s!all e t!e Interface )&eci*cation For#s
-refer %&&endi' ( and Is.
VI% Contractor !as res&onsiility for t!e design= installation= coordination= testingand co##issioning of t!e Viaduct syste#s. eal it! &role#s occurring duringt!e i#&le#entation of interfaces and ensure t!e integrity of t!e interfaceseteen t!e VI% and interfacing &artners.
/!e interfacing &artners it! Viaduct are listed elo:1 Interface it! Co##unications -CO"2 Interface it! e&ot Ciil 4or5s -CIV3 Interface it! Oer!ead 6lectric /raction )yste# -O6/)
-
8/10/2019 VIA -REV 4
9/28
Date: 2-12-2012Doc. No. HM - LE - PRWIDE M0101 - DOC - MA
-PMC - 00 - 002
Revision.
Project: Hyderabad Metro Rail
Page 6o 2!"#ec$ed by : "%NagarajaPre&ared by: D %rinat#
'itle: (nterace Manage)ent Plan
B Interface it! )ignaling < /rain Control -)
-
8/10/2019 VIA -REV 4
10/28
Date: 2-12-2012Doc. No. HM - LE - PRWIDE M0101 - DOC - MA
-PMC - 00 - 002
Revision.
Project: Hyderabad Metro Rail
Page 18o 2!"#ec$ed by : "%NagarajaPre&ared by: D %rinat#
'itle: (nterace Manage)ent Plan
ole & esponsibility L*7+ M7#-ocu#ents - I= #et!od state#ents= interface
test s&eci*cations and re&orts Initiation for &re&aration of t!e jointly &re&ared
docu#ent.
Pre&aration of docu#ent it! res&ect to LeadContractor7s sco&e of or5 and res&onsiility
Pre&aration of docu#ent it! res&ect to "atc!Contractor7s sco&e of or5 and res&onsiility
)igning of t!e jointly &re&ared docu#ent andsu#ission indiidually to t!e 6#&loyer7s+e&resentatie for infor#ation co##entsa&&roal
*.* Areas of concern%ny to Contractors of an interface ill !ae an e,ual degree of res&onsiility forac!ieing interface settle#ent according to t!e ti#e sc!edule= under t!ecoordination and su&erision of t!e Interface "anager it! su&&ort fro# t!eProject "anager.
/!e concerned Contractor s!all ensure t!at all resolutions ill e docu#entedt!roug! tec!nical s&eci*cations= draings and detailed sc!edules agreed y t!eaGected Contractors. /!e Project "anager ill a&&roe t!e *nal resolution.6nsure t!at t!e resoled or unresoled Interface is roug!t to t!e notice of6#&loyer or 6#&loyer7s +e&resentatie
+ Process %anagement
Various ele#ents in association it! t!e I"P t!at enco#&ass t!e entire &rocessin identi*ed in t!esection
-
8/10/2019 VIA -REV 4
11/28
Date: 2-12-2012Doc. No. HM - LE - PRWIDE M0101 - DOC - MA
-PMC - 00 - 002
Revision.
Project: Hyderabad Metro Rail
Page 11o 2!"#ec$ed by : "%NagarajaPre&ared by: D %rinat#
'itle: (nterace Manage)ent Plan
Figure 1' Illustrated Flo# c)art for (IA Interface
%anagement
+.1 C)ange of interfacing re/uirement
/!e c!ange s!all e initiated for#ally t!roug! an Interface C!ange +e,uest For#-IC+F. /!is s!ould e circulated to all t!e sta5e!olders for t!eir reies andco##ents. 4!en an IC+F is initiated to &ro&ose a c!ange in interface
-
8/10/2019 VIA -REV 4
12/28
Date: 2-12-2012Doc. No. HM - LE - PRWIDE M0101 - DOC - MA
-PMC - 00 - 002
Revision.
Project: Hyderabad Metro Rail
Page 1o 2!"#ec$ed by : "%NagarajaPre&ared by: D %rinat#
'itle: (nterace Manage)ent Plan
re,uire#ents it s!all e ca&tured in t!e interface action log. If one of t!einterfacing contractors re,uests for a c!ange= t!is ill e #anaged t!roug! an
IC+F= &lease referAnne-ure C
for t!e te#&late. /!e for# s!all e used only ifan interfacing contractor re,uests a c!ange to so#e as&ect !ic! !as een&reiously agreed in t!e Interface #eeting. /!e originator !as to declare t!ecloseout of t!e IC+F in t!e suse,uent Interface #eeting= and accordinglyreect in t!e action log.9oeer= during t!e &rocess if any conict clari*cation arise= t!e decision y t!e6#&loyer7s re&resentatie s!all e *nal and inding on &artners. /!e sa#e ille dealt under res&ectie contract conditions and oligations.
+. (erication and (alidation of Interfacing
e/uirements
/esting actiities s!all e ased on t!e re,uire#ents ca&ture and referred inetailed Interface ocu#ent. /!is s!all ensure co#&atiility eteen syste#sand t!at eery co#&onent functions and &erfor#s in tande#. /as5 %llocation
/ale s!all e #ade to ensure t!at t!e identi*ed interface re,uire#ents areeri*ed and alidated. /!is ill e deelo&ed syste#atically and s!all t!oroug!lyealuate all indiidual syste# co#&onents and t!eir integrated &erfor#ance.
/!e V
-
8/10/2019 VIA -REV 4
13/28
-
8/10/2019 VIA -REV 4
14/28
Date: 2-12-2012Doc. No. HM - LE - PRWIDE M0101 - DOC - MA
-PMC - 00 - 002
Revision.
Project: Hyderabad Metro Rail
Page 1o 2!"#ec$ed by : "%NagarajaPre&ared by: D %rinat#
'itle: (nterace Manage)ent Plan
uality %ssurance "anage#ent Plan 9"LIP+4I6 "0101OC"%")00001
)yste# %ssurance -+%") "anage#ent
Planesign "anage#ent Plan
6niron#ental Plan 9"L6P+4I6 "0101OC"%P"C0000$
Installation Plan
/esting and Co##issioning "anage#ent
Planefects Liaility "anage#ent Plan 9"L6P+4I6 "0101OC"%P"C
0000@
"aintenance Plan
. tructure of eference Documents
%&art fro# t!e &lans= t!e reference Interface docu#ents= na#ely t!e folloing I for eac! contractor
I for eac! Contractor
o /!e te#&late and structure of t!e docu#ent s!all e as &er t!edetailed docu#ent deelo&ed and #utually agreed u&on it! eac!
of t!e ot!er Contractors and 6#&loyer 4ee5ly Interface %ction Log s!all !ae t!e folloing taular structure
Ao. )yste# ated Interface Issue+aised
Fro# /o +e#ar5s )tatus
Interface C!ange +e,uest For# s!all e as detailed in %&&endi' C Interface )&eci*cation For# detailed in %&&endi' ( s!all for# a &art of t!e
I= #ade for eac! of t!e Interface actiity.
.* (ersion Control of Interface Documents
+es&ectie uality #anage#ent syste# for VI% infor#s on t!e ersion control ofall docu#ents for t!e &roject= t!is includes t!e interface docu#entation.Con*guration #anage#ent addressed as &art of uality "anage#ent )yste# fort!e &roject is e,ually a&&licale to t!e Interface "anage#ent. /!e sa#eguidelines are a&&licale and folloed t!roug! t!e Interface ocu#entationincluded in t!is &lan.
-
8/10/2019 VIA -REV 4
15/28
Date: 2-12-2012Doc. No. HM - LE - PRWIDE M0101 - DOC - MA
-PMC - 00 - 002
Revision.
Project: Hyderabad Metro Rail
Page 12o 2!"#ec$ed by : "%NagarajaPre&ared by: D %rinat#
'itle: (nterace Manage)ent Plan
2 Communication
-
8/10/2019 VIA -REV 4
16/28
Date: 2-12-2012Doc. No. HM - LE - PRWIDE M0101 - DOC - MA
-PMC - 00 - 002
Revision.
Project: Hyderabad Metro Rail
Page 13o 2!"#ec$ed by : "%NagarajaPre&ared by: D %rinat#
'itle: (nterace Manage)ent Plan
2.1 Terms of eference of Interface %eetings/!e ter#s of reference of interface #eetings is dran out as &er elo e'a#&le.
/!e docu#ent reference is &roided in t!e +eference docu#ent
2. ,-c)ange of Information bet#een Contractors
-
8/10/2019 VIA -REV 4
17/28
Date: 2-12-2012Doc. No. HM - LE - PRWIDE M0101 - DOC - MA
-PMC - 00 - 002
Revision.
Project: Hyderabad Metro Rail
Page 14o 2!"#ec$ed by : "%NagarajaPre&ared by: D %rinat#
'itle: (nterace Manage)ent Plan
/!e &rocess for t!e e'c!ange of infor#ation eteen t!e contractors !as eenidenti*ed in t!e Interface "anage#ent o c!art= &lease refer section B.1on a#ore s&eci*c note t!at e'c!ange of infor#ation s!all e ca&tured in interfaceregister and s!all e aailale for engineering traceaility
/!e registers of t!e interface infor#ation and Interface Logs s!on elo are t!ecore tools t!at s!all e used for co##unication on interface issue.
a +FI For# +e,uest for Infor#ation-+efer %&&endi' F J Interface %ction LogJc +FI )tatus +egisterJd Interface C!ange +e,uest For# -IC+FJ
2.* ubmission to ,mployer3s epresentati"e/!e a&&roac! to e ado&ted y t!e contractors on t!e su#ission of t!e
Interface "anage#ent Plan to 6#&loyer7s +e&resentatie s!all e t!roug!6lectronic ocu#ent "anage#ent )yste# -6").
2.+ e/uest for ,mployer4 ,mployer3s epresentati"eAttention
/!e #ain criteria in re,uesting for 6#&loyer 6#&loyer7s +e&resentatieattention is to re,uest interention if an issue is not resoled eteen tointerfacing contractors%ny #ajor reor5 or delay arising due to ful*l#ent of interface re,uire#entsdue to i#&ro&erinade,uateasence of infor#ation= sa#e s!all also e roug!tto t!e attention of 6#&loyer 6#&loyer7s +e&resentatie.
/!e clari*cations and conicts s!all e dealt under res&ectie contract conditionsand oligations.
/!e Project identi*ed 6lectronic ocu#ent "anage#ent )yste# -6") asfor#al #et!od of trans#ission of infor#ation= s!all e used to ring 6#&loyer 6#&loyer7s +e&resentatie attention
5 Interface 6a7ard %anagement
5.1 trategy and Approac)
/!e foreseen interface !aHards s!all e rainstor#ed as &art of Interface#eeting and t!e outco#e ca&tured in t!e interface !aHard log. /!is s!all e#anaged y t!e Interface "anager and &eriodically reieed it! t!e Project"anager.Please refer tale t!e folloing foreseen Interface 9aHard tale t!at s!all efolloed as &art of t!e Interface #anage#ent. /!e interface !aHard log as &erelo s!all e u&dated continuously during t!e &roject life cycle.
ID ystem
6a7ard Cause Conse/uence %itigationplan
VI%Q9%
R001
O6/) Falling of O96#ast.
Inade,uatet!readed lengt! of
t!e K olt for *'ingt!e O96 #ast.
)yste# failurefolloed it!
ot!er losses.
1 6nsuresu>cient
t!readed lengt!indesigndraing.2 Ins&ect olts
-
8/10/2019 VIA -REV 4
18/28
Date: 2-12-2012Doc. No. HM - LE - PRWIDE M0101 - DOC - MA
-PMC - 00 - 002
Revision.
Project: Hyderabad Metro Rail
Page 15o 2!"#ec$ed by : "%NagarajaPre&ared by: D %rinat#
'itle: (nterace Manage)ent Plan
ID ystem
6a7ard Cause Conse/uence %itigationplan
during delier.3 Ins&ectaailale lengt!during casting.B +ejection of&ara&etseg#ent it!i#&ro&ert!readed lengt!.
e*nition of t!e ter#s used in Interface 9aHard log as follos:
ID' Kni,ue identi*er to distinguis! eery Interface 9aHard8ystem: /!e syste# fro# !ic! t!is !aHard is originating fro#J6a7ard' % &!ysical situation resulting in syste# failureJCause' reasons !o and !y a &articular !aHard #ay co#e into e'istenceJConse/uence' an unintended eent or series of eents t!at results in deat!=injury= loss of a syste# or serice= or eniron#ental da#age.
9 Programme
/!e interface actiities as detailed in t!e I+) of VI% /) and any ot!er as re,uiredfor t!e &roject s!all e ensured in a ti#ely #anner to #eet t!e ;ey dates of t!e
res&ectie VI% 4or5s &rogra# and also ensure t!at t!e ot!er Contractorsac!iee t!eir res&ectie #ilestone dates.
9.1 :ey Acti"ities
/!e folloing tale s!os t!e ;ey actiities enisaged for t!e estalis!#ent oft!e Interface and sign oG on t!e I it! eac! Contractor. 9oeer= t!e detailedinterface re,uire#ents along it! additional interfaces as re,uired it! eac!Contractor s!all e estalis!ed and #utually agreed it! ot!er Contractors.
S9no
VIA A#$)$ In*!;7#* Con!7#o!/s A!*7 o; $n*!;7#*
1"asting o PiersA %eg)entsand Para&ets
+6'%P%%'R=%B%%"(D"("+M%'"
Res&ect t#e %+Dclearances
2"asting o Para&et ,allsincl*ding design
+6'%
Provision o +H6Masts
Provisions or %M6
3Provide necessary o&eningsin iad*ct str*ct*res orcable crossing o&enings
+6'%%B%%"(
"oordination or e7actre/*ire)ent o o&enings or location
and sie PiersA seg)ents andPara&ets- Providing oeart#ling connectionsAeart#ling connection or
+6'%%B% Detailed dra,ing andinstallations o t#eeart#ling arrange)entA connections and
-
8/10/2019 VIA -REV 4
19/28
Date: 2-12-2012Doc. No. HM - LE - PRWIDE M0101 - DOC - MA
-PMC - 00 - 002
Revision.
Project: Hyderabad Metro Rail
Page 16o 2!"#ec$ed by : "%NagarajaPre&ared by: D %rinat#
'itle: (nterace Manage)ent Plan
Hand Rail contin*ity
-
8/10/2019 VIA -REV 4
20/28
Date: 2-12-2012Doc. No. HM - LE - PRWIDE M0101 - DOC - MA
-PMC - 00 - 002
Revision.
Project: Hyderabad Metro Rail
Page 8o 2!"#ec$ed by : "%NagarajaPre&ared by: D %rinat#
'itle: (nterace Manage)ent Plan
coordination
1
DesignA coordinateA s*&&lyand install t#e cablecontain)ent cable tro*g#etc. and &rovide o&enings int#e cable tro*g# as &er"+M contractor8sre/*ire)ents
"+M
"+M cablecontain)ent syste)along trac$side andstation &lator)
15
Design and coordinate t#ecable contain)entA cabletro*g# along ,it# anyo&enings re/*ired or cablecrossings to,ards t#e trac$
or signalling cables along'rac$ side
%'"
(nstallation o 'rac$side e/*i&)entand cabling
inrastr*ct*re orsignalling along t#eviad*ct or allcorridors
%#all also $ee& &rovisiono s&ace or line sidee/*i&)ents
1
"oordination and Provisiono ade/*ate s&ace or %B %ignaling &&arat*s Bo7 Ealong iad*ct
%'"
Mo*nting o %B trac$side bo7 andot#er line sidee/*i&)ents
1!"oordination and Provisiono ade/*ate s&ace or signal
)ast along iad*ct
%'"Mo*nting o signal&ost
19
llo, t#e side ,all oviad*ct or i7ing cablecontain)ent by P%%"ontractor.
P%%
rrange)ent orlaying &o,er andcontrol cables on t#eiad*ct
20
Provide necessary o&eningsin iad*ct str*ct*res orcable crossing ro) viad*ctto station and vice-versaAinside t#e station ro) oneside to ot#er on bot# endsAviad*ct to viad*ct and
trac$side to to& o langecable tro*g#&ara&et,allany &art o t#e iad*ct.
P%%Providing o&enings iniad*ct str*ct*res
21Develo& %6M dra,ingsbased on re/*ire)ent
P%% %6M Provisions
-
8/10/2019 VIA -REV 4
21/28
-
8/10/2019 VIA -REV 4
22/28
Date: 2-12-2012Doc. No. HM - LE - PRWIDE M0101 - DOC - MA
-PMC - 00 - 002
Revision.
Project: Hyderabad Metro Rail
Page o 2!"#ec$ed by : "%NagarajaPre&ared by: D %rinat#
'itle: (nterace Manage)ent Plan
2P6RMN6N'=+R;% ?+R
(DG"' =+R;%"+N'R"'+R 112 13201 11112 10131 12112 2131 9113 !131 3113 131 511 1213201
3 PRP6' ND+'H6R ?(N(%H6%
"+N'R"'+R 3113 513201 113 12131 5113 131 311 10131 10113 5131 311 2132015
9. :ey Dates
(ased on t!e contract sc!edule= 6#&loyer7s re,uire#ent and interface #eetingsagree#ents= t!e folloing tale ill e used for#onitoring t!e duration of t!e agreed u& on 5ey dates for t!e interfacing acties Issues
:ey Dates c)edule for (iaduct
-
8/10/2019 VIA -REV 4
23/28
Date: 29-11-2012Doc. No. HM - LE - PRWIDE M0101 - DOC - MA -PMC -
00 - 002
Revision. 3
Project: Hyderabad Metro Rail
Page 0o 2!"#ec$ed by : "%NagarajaPre&ared by: D %rinat#
'itle: (nterace Manage)ent Plan
1. %ccess to )ite N %ailaility of @# +O4 -it!in (arricading free fro#6ncu#rances and Ktilities to co##ence construction.
9.* Critical Items 4 Critical Pat)/!e critical Ite#sCritical Pat! s!all e as &er t!e Oerall #aster 4or5s Progra#to !ic! t!e VI% 4or5s Plan #eets t!e re,uire#ents.%ccordingly Interface actiities s!all e releantly lined u& it! t!e 4or5s Plan=as re,uired
; ecords
%ll records s!all e #aintained as &er t!e tale elo:
ocu#ent Au#er escri&tion +etention Period "ini#u#
APP,
-
8/10/2019 VIA -REV 4
24/28
Date: 2-12-2012Doc. No. HM - LE - PRWIDE M0101 - DOC - MA
-PMC - 00 - 002
Revision.
Project: Hyderabad Metro Rail
Page o 2!"#ec$ed by : "%NagarajaPre&ared by: D %rinat#
'itle: (nterace Manage)ent Plan
List of +ole Players for Interface +e,uire#ents
+ole Aa#e Contactnu#er
6#ail +e#ar5s
Project "anager"r ; )es!a
reddy
SD1
DDD02230D
5QsrTlntecc.co#
VI% 6'ecution
"anager )tage
1=3=2
"r %9 ;!an SD1
D0200DDD0=
a!5!anTlntecc.co#
VI% 6'ecution
"anager )tage
2=B=1
"r ; "o!an SD1
D0000122$=
5#o!anTlntecc.co#
VI% 6'ecution
"anager +O(s
"r
)u5u#aran
SD1
DD121DDD10
dsu5u#aranTlntecc.co
#
VI% esign "anager "r + PandeyS 0B0
B023$@?1?3
rag!aendra&andeyTlnt
ecc.co#
C!ief Interface
"anager
"r )anjee
)!ar#a
SD1
DDBDD223??
sanjee.s!ar#aTlntec
c.co#
Interface "anager
VI%
"r C. ).
Aagaraja
SD1
D0002220B?
csnTlntecc.co#
Interface "anager
)CIV=)()
Interface "anager
CIV= ()
"r uuri
8angad!ara
)astry
SD1D@BDB?1
D3B
dgsastryTlntecc.co#
Interface "anager
O6/)
"r +ai
)ri!ari
SD1
D@?@1$$3$3
rsri!ariTlntecc.co#
Interface "anager
P))
"r PV) Paan
;u#ar
SD1
@@@$@$?1?
&s&5Tlntecc.co#
Interface "anager
/+4
"r +ajan
;u#ar
SD1DD@DDD3
$@
rajand.5u#arTlnties.c
o#
Interface "anager +) "r o!n
%lston
SD1
?@D3223D$B
Interface "anager
)
-
8/10/2019 VIA -REV 4
25/28
Date: 2-12-2012Doc. No. HM - LE - PRWIDE M0101 - DOC - MA
-PMC - 00 - 002
Revision.
Project: Hyderabad Metro Rail
Page 2o 2!"#ec$ed by : "%NagarajaPre&ared by: D %rinat#
'itle: (nterace Manage)ent Plan
ou&.co#
Interface "anager
%FC
/( /( /(
mailto:[email protected]:[email protected] -
8/10/2019 VIA -REV 4
26/28
Date: 2-12-2012Doc. No. HM - LE - PRWIDE M0101 - DOC - MA
-PMC - 00 - 002
Revision.
Project: Hyderabad Metro Rail
Page 3o 2!"#ec$ed by : "%NagarajaPre&ared by: D %rinat#
'itle: (nterace Manage)ent Plan
Appendi- >' Interface pecication Form
I
-
8/10/2019 VIA -REV 4
27/28
Date: 2-12-2012Doc. No. HM - LE - PRWIDE M0101 - DOC - MA
-PMC - 00 - 002
Revision.
Project: Hyderabad Metro Rail
Page 4o 2!"#ec$ed by : "%NagarajaPre&ared by: D %rinat#
'itle: (nterace Manage)ent Plan
Appendi- C' Interface C)ange e/uest FormICFB
isci&lineContract Pac5age:
Aa#e:
Kni,ue IC+ Ao:
ate:
+ef. %ttac!#ents
)uject %ttriute:
/itle:
escri&tion:
etailed +eco##endation:
+easons for C!angeusti*cation: -Prole#6rrorAon Confor#ance I#&roe#ent6n!ance#ent C!ange due to ot!er factors
I#&lications:
Cost:
/i#e:
I#&ortance toOriginator:
-Critical 9ig! "ediu#Lo
I#&lications +e#ar5s: %reas of I#&act:
ocu#ents and elierales re,uiring u&dates: +is5 inoled -if any:
+eco##ende
d for%&&roal
Interface"anager