Initial Environmental Examination April 2018 VIE: Productive Rural Infrastructure Sector Project in The Central Highlands Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province Prepared by Central Project Management Unit – Agriculture Project Management Board - Ministry of Agriculture & Rural Development for the Asian Development Bank

Upload: others

Post on 30-Nov-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Initial Environmental Examination

April 2018

VIE: Productive Rural Infrastructure Sector Project in The

Central Highlands

Subproject: Reinforcing Da Don irrigation works, Lam Ha

district, Lam Dong province

Prepared by Central Project Management Unit – Agriculture Project Management Board -

Ministry of Agriculture & Rural Development for the Asian Development Bank

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

Page 1

CURRENCY EQUIVALENTS

(As of November 01, 2017)

Currency unit – Vietnamese Dong (VND)

VND 1.00 = $0.0000441

$1.00 = VND 22,675

ABBREVIATIONS

ADB Asian Development Bank

AP Affected persons

CC Construction contractor

CEP Commitment on Environmental Protection

CPC Communal People’s committee

CPMU Central Project Management Unit

CSC Construction supervisor consultant

DARD Department of Agriculture and Rural Development

DONRE Department of Natural Resources and Environment

DPC District People’s Committee

EIAR Environmental Impact Assessment Report

EMDF Ethnic Minority Development Framework

EMP Environmental Management Plan

DARD Department of Agriculture and Rural Development

HH Household

IMA Independent monitoring agency

IEE Initial Environmental Examination

IPM Integrated Pest Management

LIC Loan Implementation Consultant

MONRE Ministry of Natural Resources and Environment

PC People’s Committee

PPC Provincial People’s Committee

PPMU Provincial Project Management Unit

RF Resettlement Framework

SIR Subproject Investment Report

TPC Town People’s Committee

UXO Unexploded Ordnance

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

Page 2

WEIGHTS AND MEASURES

km – kilometer

kg – kilogram

ha – hectare

m – meter

NOTE

In this report, "$" refers to US dollars.

This initial environmental examination is a document of the borrower. The views expressed herein

do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be

preliminary in nature. Your attention is directed to the “terms of use” section of this website.

In preparing any country program or strategy, financing any project, or by making any designation

of or reference to a particular territory or geographic area in this document, the Asian Development

Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

Page 3

TABLE OF CONTENTS

I. INTRODUCTION ..................................................................................................................... 5

II. POLICY FRAMEWORK, LEGISLATION AND MANAGEMENT ............................................. 7

2.1 ADB policy ........................................................................................................................... 7

2.2 Environment regulations of Vietnam government ................................................................. 7

III. SUBPROJECT DESCRIPTION ............................................................................................... 9

IV. DESCRIPTION OF BASELINE ENVIRONMENT .................................................................. 17

V. ENVIRONMENTAL IMPACT SCREENING ........................................................................... 22

5.1 Positive impacts ................................................................................................................. 22

5.2 Negative impacts ............................................................................................................... 23

VI. ENVIRONMENTAL MANAGEMENT PLAN .......................................................................... 41

6.1 Environmental impacts and mitigation measures ............................................................... 41

6.2 Environmental monitoring .................................................................................................. 58

6.3 Capacity Building for EMP implementation ........................................................................ 63

6.4 Budget for EMP implementation......................................................................................... 65

VII. IMPLEMENTATION RESPONSIBILITY AND REPORTING .............................................. 65

7.1 Implementation responsibility ............................................................................................. 65

7.2 Report system .................................................................................................................... 67

VIII. PUBLIC CONSULTATION AND INFORMATION DISCLOSURE ...................................... 67

8.1 Public consultation in the subproject preparation phase ..................................................... 68

8.2 Public consultation in the future ......................................................................................... 69

8.3 Public information disclosure ............................................................................................. 69

IX. GRIEVANCE REDRESS MECHANISM ................................................................................ 70

9.1 Purpose of the mechanism ................................................................................................ 70

9.2 Grievance redress mechanism .......................................................................................... 70

X. CONCLUSION, COMMITMENTS AND RECOMMENDATIONS ........................................... 71

10.1 Conclusion ......................................................................................................................... 71

10.2 Commitments ..................................................................................................................... 71

10.3 Recommendations ............................................................................................................. 71

XI. ANNEXES ............................................................................................................................. 72

Annex 1: Images of public consultation & at the sub-project site ................................................... 72

Annex 2: Minutes of public consultation ......................................................................................... 74

Annex 3: Minutes of agreed borrow pit and disposal site ............................................................... 86

Annex 4: Monitored results of environmental parameters .............................................................. 89

Annex 5: Acceptance minutes on UXO completion ........................................................................ 91

Annex 6: Environmental requirement in the bidding document ...................................................... 92

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

Page 4

LIST OF TABLES

Table 1: General information of the subproject ................................................................................ 9

Table 2: Baseline Environment Data ............................................................................................. 17

Table 3: Environmental impact screening ...................................................................................... 24

Table 4: Environmental mitigation plan .......................................................................................... 41

Table 5: Environmental effect monitoring ....................................................................................... 58

Table 6: Environmental compliance monitoring ............................................................................. 59

Table 7: Schedule of training on capacity building ......................................................................... 63

Table 8: Budget for EMP implementation ...................................................................................... 65

Table 9: Responsibility of stakeholders.......................................................................................... 65

Table 10: Monitoring and reporting system .................................................................................... 67

Table 11: Public consultation description ....................................................................................... 68

Table 12: Results of public consultation ......................................................................................... 68

Table 13: Expected public consultation activities ........................................................................... 69

LIST OF FIGURE

Figure 1: Locations of the sub-project ............................................................................................ 15

Figure 2: Locations of the SP components and residential area .................................................... 16

Figure 3: Grievance redresses mechanism ................................................................................... 70

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

Page 5

I. INTRODUCTION

The Productive Rural Infrastructure Development Project in the Central Highlands (hereafter

referred to as “The project”) is funded by loan from the Asian Development Bank (ADB), and

Ministry of Agriculture and Rural Development (MARD) is the project owner. The project will be

implemented within 05 years (2014 – 2019) and taken place in the 05 provinces of the Central

Highlands (Lam Dong, Dak Nong, Lam Dong, Gia Lai and Kon Tum).

The long-term purpose of the project is to contribute to hungry alleviation and poverty

reduction programs of the Government through sustainable development of the society, ecology,

and environment at community levels by developing infrastructures for production, improving socio-

economic conditions and living standards of people in the area.

The short-term objectives of the project are (i) to rehabilitate and upgrade deteriorated or

damaged irrigation systems and rural infrastructures, which are serving for production in 05

provinces of Highlands; (ii) To strengthen management capacity and implementation of ODA

projects; strengthen infrastructure management at community, province, district, and commune

levels to gradually improve living standards and conditions of the poor in the project area in the

Central Highlands; (iii) To build models, institutional policies on "water saving irrigation technology

for strategic and economic valuable plants" and "management and exploitation of irrigation

schemes sustainably with the participation of all economic sectors”.

One sub-project of The Project is “Reinforcing Da Don irrigation works, Lam Ha district, Lam

Dong province”, which is taken place in Da Don, Tan Van communes, Dinh Van town - Lam Ha

district, and Binh Thanh commune – Duc Trong district, Lam Dong province. The sub-project area

is about 45 km from Da Lat City. The objectives of this sub-project are: to improve livelihood and

life quality of people within the area, promote socio-economic development by investing and

promoting the effectiveness of rural infrastructure; to facilitate people to have access to and apply

scientific and technical advances in agricultural production, increase productivity and diversification

in agriculture; to bring job opportunities; alleviate poverty, actively contribute to the New rural

program and socio-economic development strategy of the locality through investment in subproject.

The objectives and scope of this Initial Environmental Examination (IEE) are to (i) assess

the existing environmental conditions along and in the vicinity of the sub-project; (ii) identify

potential environmental impacts from the proposed components; (iii) evaluate and determine the

significance of the impacts; (iv) develop an environmental management plan (EMP) detailing

mitigation measures, monitoring activities, reporting requirements, institutional responsibilities and

cost estimates to address adverse environmental impacts; and (v) carry-out public consultations to

documentary issues/concerns that stakeholders may have on the sub-project and to ensure that

such concerns are addressed in the sub-project design and mitigation measures.

This IEE of the sub-project is prepared to meet the requirements of environmental safety of

ADB and the environmental regulations of Government of Vietnam. Its structure includes 11 parts

as following:

(i) Introduction

(ii) Policy framework, legislation and management

(iii) Sub-project description

(iv) Description of the baseline environment

(v) Environmental impacts screening

(vi) Environmental Management Plan

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

Page 6

(vii) Implementation arrangement, monitoring and reporting

(viii) Public consultation and information disclosure

(ix) Grievance Redress Mechanism

(x) Conclusion, commitment and Recommendations

(xi) Annexes

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

Page 7

II. POLICY FRAMEWORK, LEGISLATION AND MANAGEMENT

2.1 ADB policy

The ADB Safeguard Policy Statement (SPS) 2009 imposes safeguard requirements for all

its funded projects. The SPS 2009 clarifies reasons, scope, and contents of the environmental

assessment. The SPS guides in identifying type of environmental report that will be implemented

through Rapid Environment Assessment (REA), type of project, and preparing appropriate

environmental report. The SPS emphasizes the need of effective implementation of mitigation

measures to:

i. Avoid adverse impacts of projects on the environment and affected people, where possible;

ii. Minimize/mitigate and/or compensate for adverse impacts on the environment and affected

people when avoidance is not possible; and

iii. Help borrowers/clients to strengthen their safeguard systems and develop the capacity to

manage environmental and social risks.

The SPS 2009 requires preparing environmental assessment report in the process of

preparing a project including environmental management plan (EMP). The borrower/client needs to

monitor EMP implementation. The monitoring will identify outstanding issues of EMP

implementation and propose appropriate mitigation measures. Periodic monitoring reports on EMP

activities will be submitted to ADB every semi-annual during construction phase of the project.

Moreover, all subprojects under the loan 3032-VIE need to follow the specific guidance on

environmental assessments as stated in the Environmental Assessment Review Framework

(EARF) of the project, prepared by the project owner and approved by ADB. The subprojects under

loan 3032-VIE only categorized as Category B or C will be included in the list of eligible sub-

projects for possible funding under the proposed Project. It is anticipated that all eligible sub-

projects will fall into Category B, whereby some adverse environmental impacts are expected, but

of a lesser.

The subproject “Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province” is

selected based on the project’s EARF that may cause some adverse impacts on the environment

that could be mitigated and ranked as categorized B. Therefore, an IEE needs to be prepared with

an EMP enclosed.

2.2 Environment regulations of Vietnam government

The project must also comply with the environmental regulations. The Vietnamese related-

environmental legal framework comprises of the following issues:

- The Law on Environmental Protection 55/2014/QH13 adopted by the National Assembly of

the Socialist Republic of Vietnam dated June 23, 2014, regulating general environmental

protection requirements, policies and resources for protecting the environment.

- The Law on Labor adopted by the National Assembly of the Socialist Republic of Vietnam

dated June 18, 2012, regulating general requirement on safety and occupational health.

- The Law on Water Resources 17/2012/QH13 adopted by the National Assembly of the

Socialist Republic of Vietnam dated June 21, 2012, regulating general water resources

protection requirements, policies.

- Decree No. 18/2015/ND-CP dated February 14, 2015 of the Government, regulating on

environmental protection planning, strategic environmental assessment, environmental

impact assessment (EIA) and environmental protection plan (EPPs).

- Decree No. 38/2015/ND-CP dated June 15, 2015 of the Government, stipulating on waste

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

Page 8

and disposal management.

- Decree No. 201/2013/ND-CP dated November 27, 2013 of the Government, detailing the

Law on water resources.

- Circular No. 27/2015/TT-BTNMT dated May 29, 2015 of the Ministry of Natural Resources

and Environment on strategic environmental assessment, environmental impact

assessment and environmental protection plans.

- Circular No. 36/2015/TT-BTNMT on June 30, 2015 of the Ministry of Natural Resources and

Environment on management of hazardous wastes.

- Circular No. 27/2013/TT-BLDTBXH dated October 18, 2013 of the Ministry of Labor,

Invalids, and Social Affairs on providing for occupational safety and hygiene training.

- Decision No. 3733/2002 /QD-BYT on October 10, 2002 of the Ministry of Health

promulgating 21 labor hygiene standards, 5 principles and 7 labor hygiene measurements.

- TCVN 6707:2009: National technical standard Hazardous waste – Warning signs.

- QCVN 05:2013/BTNMT: National technical regulation on ambient air quality.

- QCVN 26:2010/BTNMT: National technical regulation on noise.

- QCVN 27:2010/BTNMT: National technical regulation on vibration.

- QCVN 01:2009/BYT: National technical regulations on drinking water.

- QCVN 07:2009/BTNMT: National technical regulation on hazardous waste thresholds.

- QCVN 08-MT:2015/BTNMT: National technical regulation on surface water quality.

- QCVN 14-MT:2015/BTNMT: National technical regulation on domestic wastewater.

- QCVN 04 – 05:2012/ BNNPTNT: National technical regulations on irrigation works – main

regulations on design.

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

Page 9

III. SUBPROJECT DESCRIPTION

The general information of Sub-project has been described as following table:

Table 1: General information of the subproject

DESCRIPTION SUB-PROJECT DATA

III.1. GENERAL INFORMATION

Sub-Project Name

Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

Sub-Project type Repairing, upgrading productive rural infrastructures

Sub-Project Owner

Department of Agricultures and Rural Development (DARD) Lam Dong

Sub-Project owner’s representative

Production Rural Infrastructure of Central Highlands Project (PRI CHP), Lam Dong province

Address of Sub-Project Owner’s representative

14 Hung Vuong street, Ward 10, Da Lat city, Lam Dong province

Name and title of head of sub-project owner’s representative

Hoang Si Bich, Director

Telephone, fax and email details of sub-project owner’s representative

Phone: (0263) 3822049; Fax: 0263.3828630

Email: [email protected]

Full name of the PPMU’s environmental officer

Ninh Tri Vien

Phone: 0918399277; Fax: 0263.3828630

Email: [email protected]

III.2. SUBPROJECT DESCRIPTION

1. New or innovating or upgrading project

Repairing and upgrading rural infrastructures

2. Components of the subproject

The sub-project includes 02 components:

- Irrigation component: Ensuring irrigation for 2,200 ha of agriculture land including: (i) upgrading head-works; (ii) water intake crossing dam on the left shoulder of dam; (iii) constructing 1,692.4 m of main canal, dredging 3,649 m of drainage canal T1, reinforcing 13,188.16 m of 22 canals of interior field and (iv) constructing 296.7 m of road adjacent to main canal section leading to head-works.

- Traffic component: Upgrading, repairing 4,281.27 m of road on canal bank according to rural road type B.

Details of components are as follow:

No. Construction Total irrigated area before project (ha)

Total irrigated area after project

(ha)

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

Page 10

DESCRIPTION SUB-PROJECT DATA

Rice Coffee Rice Coffee

I Main canal 25 75 53 75

II Canal N1 485 275 570 359

1 Irrigated area on canal 200 260 30

2 Canal N1-9 60 30 60 254

3 Canal N1-10 75 170 90 75

4 Canal N1-11 150 75 160

III Canal N2 428 100 473 90

1 Irrigated area of canal 30 30

2 Canal N2-1 230 30 230 30

3 Canal N2-2 168 70 213 60

IV Canal N3 420 50 430 140

Da Don weir

1358 500 1526 674

1858 2200

(Source: Subproject Investment Report)

2.1. Irrigation component

a. Construction grade: Grade III

b. Head-works:

- Replacing 03 old gate valves with the new ones with size (BxH) = (1.36 x 2.60) m;

- Replacing 03 hand-controlled on-off valve machines with on-off valve machine operated by electric motor with capacity 3Kw – 380V;

- Newly constructing grade IV operational house, the area is 64 m2 including 03 rooms;

- 3-phase transformer station with capacity 150 KVA + 400m.

- Reinforcing 296.7 m of road by reinforced concrete M250 18 cm thick, which is adjacent to main canal section leading to head-works.

c. Canals and works on canals:

c1. Main canal:

- Reinforcing 296.2 m of canal from the section of current box culvert to culvert crossing national road QL27, the size is (BxH) = (2.0 x 1.8) m, the precast slab 20 cm thick made of reinforced concrete M250 is on the top.

- Reinforcing 1,396.2 m of canal from Da Nung head-work to Da Bon head-work by reinforced concrete M250 20 cm thick, which supplies water for N1 and N2 canals, the size is (BxH) = (1.5 x 1.6) m;

- Works on canals: Newly constructing 03 slab bridges made of reinforced concrete crossing canal with aperture from Lo = 4.7 m to Lo = 6.0 m at Km0+314.00, Km0+418.72, Km0+520.86; 01 work is continuous with Da Nung water division unit; 01 work is continuous with pipe culvert 2D1500 crossing road to Yen Thanh village.

c2. Drainage canals

- Dredging T1 canal with the total length of 3,649 m, in trapezium shape, the slope is m = 1:1; canal size is from (BxH) = (1.5x1.6) to (3.0x1.8) m.

- Works on canals: Reinforcing 05 serial positions by reinforced concrete M200 with stone sized (1x2); newly constructing 03 slab bridges by reinforced

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

Page 11

DESCRIPTION SUB-PROJECT DATA

concrete crossing canal with aperture from Lo = 4.7 m to Lo = 6.0 m; newly constructing 03 serial works and 02 stilling basins made of reinforced concrete.

c3. Interior-field canal

- Reinforcing 21 interior-field canals by reinforced concrete M200 with stones sized (1x2), the total length is 13,188.16 m.

- Works on canals include 18 crossing road culverts, 14 bridges crossing canal, 124 water intakes, 18 water slopes, 2 water drops

2.2 Traffic component

Rural road: Reinforcing 4,281.27 m of road along the canal bank according to rural road standard type B, the road base width is 4m, road surface width is 3m, road is made of concrete M250 18 cm thick.

Works on road:

- Vehicles-avoiding points: Installing 10 points to avoid vehicles on the route, a distance of each point is from 300 m to 500 m.

- Traffic safety: Installing 30 road signs, signposts according to road signal standard QCVN 41:2016/BGTVT.

- Drainage system: Installing 11 pipe culverts crossing the road made of spun concrete, the diameter of culverts is 40cm. They are to drain water from field to drainage canals.

Quantity and size of drainage culvert

There are 07 road culverts with aperture D = 30 cm and 01 drainage sluice. The SP will newly construct 11 new pipe culverts with aperture D = 40 cm

Quantity of bridges

The road along the canal bank within the Subproject (SP) area is available, it is only needed to upgrade. On the road, there are 2 slab bridges and 01 aqueduct bridge, these bridges are in use so it is not necessary to upgrade these one.

Irrigation and drainage structures

- 01 main canal: The canal is 1,692.4 m long, in trapezium shape. The slope is m = 1.0. The size is BxH = (1.5 x 1.6) m;

- Dredging drainage canal T1 3,649 m in length.

- Reinforcing 21 interior-field canals by reinforced concrete M200 with stone (1x2), the total length is 13,188.16 m.

- Constructing 18 road culverts, 14 bridges crossing drainage canals, 124 water intakes, 18 water slopes and 2 water drops.

Drainage ditches along the road are side ditches on slope and road culverts. There are 11 pipe culverts crossing road made of spun concrete with diameter D = 40 cm. They are to drainage water from field surface drainage canals.

Area of site clearance

Permanent land:

Canals and roads within the SP are constructed on the existing ones. There is no upgrading as well as expanding. Thus, compensation of site clearance is not necessary.

Temporary land:

- 01 material yard is of the construction companies which is being exploited, thus there is no land acquisition.

- The area of storage area, yards, yards to gather materials are taken from locations along the route. The acquired land area is about 10,000 m2.

Other roads that intersect with subproject’s roads

Highway No.27 linking highway No.20 to Lam Dong Province through the district center is an important road axle to link the districts, facilitates trading activities. In addition, provincial road DT625 and inter-commune roads are invested to construct asphalt road, the inter-village roads are cement roads.

The main streams across

There is 01 river flowing through the SP area: Da Dang river from the high mountain of Lac Duong district to the southeast with the length of more than 90

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

Page 12

DESCRIPTION SUB-PROJECT DATA

the road

- Rivers

- Reservoirs

- Other streams

km.

- Cam Ly, Da Me, Da SeDang, Da K’Nang streams flow in the south-north direction;

- There are Da Sa, Ri Hin, Da Dung, Phuc Tho lakes closing to SP area.

Number of hills and mountains

The subproject area is relatively flat, the elevation is from 800 ÷ 850 m with two types of terrain: hills and rivers along the irrigation area. All the irrigation area is in the valley area. The terrain is sloping towards the Da Dang River, the slope of the irrigation area in the same direction of the flow of Da Bon stream is about 0.02% ÷ 0.04%.

III.3. Construction activities

Commencement (month/year)

- Planned Quarter III of 2018

Finish (month/year)

- Planned Quarter II of 2019

Number of construction worker

- Estimated around 50 workers

Are there any camps for workers? Yes/no

- Yes, there will be 02 camps located near the weir and roads for 50 workers.

Will the construction take place in rainy seasons?

- Upgrading head-works and irrigation canals system: In rainy season, there could be some activities such as site and materials storage preparation, gathering materials, building camps, dam slopes, planting grasses on the slopes, constructing internal roads and canals. The main construction activities will be implemented in dry season.

- Upgrading rural roads: Yes, it will be implemented in good weather condition.

Number of concrete mixers

- The sub-project will mobilize 20 concrete mixers with the capacity 250 – 500L each.

Construction methods

Construction method for canals system:

- Flow diversion method: Almost existing canals to be upgraded have been constructed but are soil ones as well as in small sizes, therefore the construction will only close the valves in upstream and downstream of canal section to implement construction activities when they are dried out., flow diversion dyke will be no need to build. The construction activities will be planned and taken place between 02 irrigation periods and/or 02 crops. (2 months from April 01 to June 01, between the Winter - Spring crop and the Summer - Autumn crop). So upgrading of canal will still ensure water for irrigation.

- Completing preparation (camps, internal roads, site clearance, and materials storage) until the end of March 2018.

- From April to June 2018, shutting the water off will be implemented for construction, then supplying water in July 2018, and completing remaining items.

- All construction activities are expected to complete in December 2018.

- Construction activities will be implemented both by machines and handworks.

Construction method for roads

- Road can be constructed from 2 directions at the same time: one is from the beginning point of the road downwards the middle point of road and another is

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

Page 13

DESCRIPTION SUB-PROJECT DATA

from the ending point upwards the middle point of road. And road construction will be implemented section by section to avoid traffic jam.

- Works on road: Culverts will be cast in-place by both machines and handworks.

Temporary location and area occupation and material sources

Sources of materials: Materials for sub-project construction are provided as following

- Embankment soil is exploited at Yen Thanh village, Da Don commune. This material yard is allocated for Nguyen Hong Cong Private Enterprise by the PPC to implement concentrated cattle slaughter center project and Nguyen Hong Cong Private Enterprise agreed for exploitation (please see annex 3 for more details), distances about 2.0 km to the site

- Stones will be bought at licensed stone pit in Duc Trong district.

- Cement, sand, steel will be purchased at Dinh Van town., Lam Ha District

Supplying electricity, water and services:

- Electricity: Currently, in construction sites, there is power line go through, thus it could be used for domestic and construction purposes. Electric generator will be installed to avoid stagnation due to power cut.

- Water: Using available water sources such as streams or wells of local people.

- Other services will be supplied from center of Lam Ha district.

Gathering materials: The temporary area to gather materials will be selected by the construction contractor during construction phase agreed by households (for rent) and/or CPC.

Measures to manage and balance excavation/ embankment spoil/stone

As estimated, the total amount of excavated soil is 10,314 m3 while soil for embankment is 5712 m3.( from SIR December 2017) , therefore the balance is about 4602 m3 of soil will be discarded The excavated soil will be used to embank roads along the canals, redundant soils will be disposed at Tan Tien residential group area , Dinh Van town, distances about 5.0 km to the site (Please see annex 3 for details).

In addition, if there is redundant land, it will be used by local households as mentioned in public consultation.

Approximate volume of construction materials

The construction materials used for this sub-project is showed as below:

Stone is 3,000 m3; sand is 25,000 m2; steel is 260 tons; cement is 30,850 tons.

Number and condition of vehicles and construction equipment

The sub-project will use 20 concrete mixers with capacity 250÷500L; 42 reedle vibrators; 10 jumping jack compactors, 10 roller compactors 9T; 5 bulldozers 110CV; 10 excavators 1.25 m3; 36 trucks 7T; 10 tank trucks; 06 electric generators. All equipment will be in good conditions and will be subject to periodical verifications.

Source: from SIR

III.4. Operation and maintenance activities

Maximum speed 10 - 15 km/h

Designed load Load < 6 tons

Designed vehicles density

50 vehicles/day-night

Maintenance activities

After completion, the DPC of Lam Ha district will be responsible for operation and maintenance.

For irrigation system:

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

Page 14

DESCRIPTION SUB-PROJECT DATA

(i) For regular operation and maintenance: Regular maintenance will be implemented to mitigate the deterioration of the components, including cleaning drainage pipes, repairing temporary damaged parts, cleaning and forming drainage system.

(ii) For periodic operation and maintenance: Repairing cracked and deteriorated sections to maintain their function. Replacing or repairing mechanical items. Dredging the canals and keeping their design shapes.

(iii) For frequency maintenance: Once/seven years or when an emergency occurs. Operation and maintenance in case of emergency including repairing, replacing damaged and downgraded sections; checking damages and proposing technical measures and estimated costs for repairing based on current regulations of the State.

For the rural road component: (frequency: once/5 years)

� Clearing road surface;

� Dredging drainage ditches;

� Repairing broken parts on concrete road surface;

� Regularly painting traffic signs;

� Additional rock to protect the slope.

V. Resettlement There is no relocated HHs in this sub-project

Affected households

0

Severely affected households

0

Relocated households

0

Total acquired area (m2)

Temporarily = 10,000 Permanently = 0

Acquired agricultural land area (m2)

Temporarily = 10,000 Permanently = 0

Acquired forestry land area (m2)

Temporarily = 0 Permanently = 0

Acquired aquaculture land area (m2)

Temporarily = 0 Permanently = 0

Acquired residential land area (m2)

Temporarily = 0 Permanently = 0

Acquired garden land area (m2)

Temporarily = 0 Permanently = 0

Other acquired lands (m2)

Temporarily = 0 Permanently = 0

III.5. The sub-project cost

Total subproject cost (VND)

Estimated VND 64,857,000,000, equivalent to 2,860,286 USD (1USD = 22,675 VND).

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

15

Figure 1: Locations of the sub-project

Location of subproject

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

16

Figure 2: Locations of the SP components and residential area

Gia Hanh village

Village 5

Village No.3

N1-11

N1-8

N3-17

N3-17a

My Hoa village

Duc Hoa village

Ha village Trung

Quang Duc village

Van Tam village

Tien Phong village

Soan village

Tan Tien village

Doan Ket village

Weir of head-

work

Management

house

Main canal connection

Da Nung head-works

Da Nung head-works

Main canal

Da Bon bridge

N3-4 N3-5

N3-5a

N2

N3

N1

N1-3

N1-4

N2-2

N2-2-1

N2-2-3

N2-2-1-1

Tan Tien village

Da Don bridge

An Phuoc village

An Phuoc village

Tan Lin village

Village No.1

Village No.4

Da Don CPC

Canal bank road

Spillway at the end

of drainage canal

Drainage canal

N1-11-2

N1-10-1

N1-10-2-1

N1-10-2

N1-10

N1-10-3-1

N1-10-3

Tan Duc village

Tan Loi village

Tan Loc village

Tan Thanh village Tan Hoa village

Tan Tien village Tan Tien village

Tan Lap village

Tan Van CPC

Son Ha

village

Co Gia village

Yen Binh village

Ha village Trung

Con Tach Dang

village Pang Pung village

Da Ro Nang village

Dong Tam village

PC of Dinh Van town

Tan An village

Tan Thuan village

GENERAL LAYOUT

SUBPROJECT: REINFORCING DA DON

IRRIGATION WORKS, LAM HA DISTRICT,

LAM DONG PROVINCE

SCALE: 1/10,000

RIVER, STREAM, LAKE

DRAINAGE CANAL

EXISTING CANAL

UPGRADED CANAL

CANAL BANK ROAD

WEIR

AQUEDUCT BRIDGE

SPILLWAY

DISTRIBUTOR

IRRIGATION AREA

NOTE

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

17

IV. DESCRIPTION OF BASELINE ENVIRONMENT

Results of survey and baseline environment data of the subproject area could be

summarized as following:

Table 2: Baseline Environment Data

DATA ITEM SUBPROJECT DATA

4.1 PROJECT LOCATION

Commune/Town The sub-project locates in Da Don, Tan Van communes and Dinh Van town

District Lam Ha

Province Lam Dong

Geographical position

The sub-project is located in the center of Lam Ha district. It borders on the Da Lat in the North, Da Don commune in the West, Duc Trong district in the South and the East. General geographical coordination of sub-project as following:

Latitude: From 11040’ N to 12005‘ N

Longitude: From 107057’ E to 108028’ E

4.2 NATURAL ENVIRONMENTAL CONDITIONS

Air quality1 The sub-project is located in the mountainous area, where there are neither industrial nor mining activities. Therefore, there is no air pollution within the sub-project areas.

Analysis Centers and Environmental Geodesic Phuong Nam had collected 02 samples of ambient air quality within sub-project area in November 2017. The analyzed results of 07 parameters (TSP = 0.15 ÷ 0.19 mg/m3, SO2 = 0.04 ÷ 0.05 mg/m3, NO2 = 0.03 mg/m3, CO = 3.8 ÷ 4.1 mg/m3) indicate that air quality of sub-project met the requirement at the National Technical Regulation on Ambient air quality QCVN 05:2013/BTNMT.

(Please see more details in Annex 4).

Noise and vibration2

The sub-project is located in the mountainous area, where there are neither industrial nor mining activities with low traffic density.

Analysis Centers and Environmental Geodesic Phuong Nam had sampled at 02 positions within sub-project area in November 2017. The measured results showed that all values (from 54.2 dBA – 68.4 dBA) are lower than the threshold of National Technical Regulation on Noise. Noise and vibration mostly generate from means of transport.

(Please see more details in Annex 4)

Climate and natural disasters

The subproject area is influenced by the monsoon climate and tropical monsoon climate. The year is divided into two distinct seasons:

- The rainy season is from June to November, accounts for approximate 80-85% of average annual rainfall; average annual rainfall is about 1,593.98 mm.

- The dry season is from December to May of the next year, accounts for approximate 15-20% of average annual rainfall.

The temperature of this area:

- Average annual temperature: 20.970C

- The highest average month temperature: 22.30C

- The lowest average month temperature: 19.10C

Air humidity:

1 The analyzed results are from Environmental Impact Assessment approved by DONRE of Lam Dong province 2 The analyzed results are from Environmental Impact Assessment approved by DONRE of Lam Dong province

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

18

DATA ITEM SUBPROJECT DATA

- Annual average humidity: 77.18%

- The highest humidity: 93.2% (in May)

- The lowest humidity: 38% (in September)

Wind:

According to the meteorological data at Lien Khuong station, the wind speed corresponding to its frequency and direction is determined as follows:

- Average wind speed is 1.3 m/s.

- Maximum wind speed is 20 m/s.

- Major wind direction is Northeast (NE), West - Southwest (W-SW).

Evaporation:

According to the meteorological data at Lien Khuong station, the evaporation is as follows:

- Average annual evaporation: 988.20 mm

- Highest month: March (150 mm)

- Lowest month: September (41.70 mm).

(Source: Subproject Investment Report)

Natural Disasters:

The main natural disasters in Central Highlands and in Lam Dong province could include drought in dry season and flood in rainy season. There are also other disasters, which have been occurred recently, such as landslide, whirlwind, hail, extreme rainfalls and extreme hot days. According to analysis of the National Centre for Hydrometeorology about the flood prevention plan in 2015, Lam Dong is not directly affected by tropical storms. However, heavy rains due to storms’ influence are significant. The highest rainfall of a day in storms landed from Da Nang to Tuy Hoa usually exceeded 100 mm. The highest rainfall on September 29, 2009 was reached 150 – 250 mm. Heavy rains due to storms influence usually happen from middle of September to the beginning of December causing floods, flash floods, erosions. In November 2017, storm No.12 had caused heavy rain and strong winds, 70 houses of local people in Lam Dong were blown away and collapsed, hundreds hectares of crops were destroyed, industrial trees were submerged, landslide happened at many traffic works, bridges, culverts, they were swept away and submerged, causing some production areas and residents to be divided. In particular, Phu Son commune of Lam Ha district was completely isolated. 03 people had died due to flash floods and being swept away.

(Source: Center for Hydro meteorological of Lam Dong province)

Topography and soil

Topography:

The subproject area is relatively flat, the elevation is from 800 ÷ 850 m with two types of terrain: hills and rivers along the irrigation area. The irrigation area topography is divided into two parts:

- Head part: The irrigation area is located just on the right bank of Da Dang River, is alluvial slope terrain, not separated. The slope is relatively high, and slope direction is from the East to the West.

- The rest part: From Da Bung distributor to the border of Da Bon stream, the terrain is plain, flat, it slopes gently towards to the southeast.

Soil:

The subproject area has 04 main type of soils:

- Alluvial soil: the area is 3,547 ha, accounting for 6.78% of natural land area of district;

- Exhausted alluvial soil: the area is 618 ha, accounting for 1.18% of natural land area;

- Yellow-Red alluvial soil: the area is 45,989 ha, accounting for 87.86% of natural

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

19

DATA ITEM SUBPROJECT DATA

land area

- The rest is other groups of soil.

Surface water resource

The network of rivers and streams in subproject area is widespread and dense. Some main rivers, streams are Da Dang river flowing from Lang Biang mountain in southeast direction; Cam Ly, Da Me, Da SeDang streams flowing to the south-north direction; Da Sa lake, Ri Hin lake, Da Dung lake, Phuc Tho lake.

Surface water resources are being used for agriculture activities and domestic purposes of the local people.

Surface water quality3

Analysis Centers and Environmental Geodesic Phuong Nam had collected 02 samples of surface water within sub-project area in November 2017. The analyzed results of 16 parameters (pH from 7.2– 7.3, Turbidity from 22.7 – 24.3 NTU, TSS from 19.2 – 24.5 mg/l, DO from 4.2 – 4.8 mg/l, TDS from 37 – 41 mg/l, COD from 14 – 18.2 mg/l, BOD5 from 8 – 12 mg/l, Total N from 4.1 – 6.2 mg/l, Total P from 0.4 – 0.5 mg/l, NO3

- from 0.2 – 0.3 mg/l, NH4+ from 0.1 – 0.3 mg/l, PO4

3- from 0.1 – 0.2 mg/l, Fe from 0.2 – 0.3 mg/l, Total oil from 0.03 – 0.08 mg/l, E.coli from 5 – 24 MPN/100ml, Coliform from 2,200 – 5,600 MPN/100ml) indicate that all analyzed parameters were under allowed limits established by National technical regulation on surface water quality QCVN 08-MT:2015/BTNMT.

(Please see more details in Annex 4)

Ground water Groundwater within the subproject area has no pressure and is available at the depth of 7 – 15 m which is near surface water sources and 25 – 30 m towards the hill.

The ground water resources are being used for domestic purpose of the local people.

Ground water quality

Although there is no available groundwater data, the site survey has evaluated groundwater exploited by local people for domestic purposes without visible pollution.

Flooding Flooding occurs only at cultivation area in valleys or adjacent to streams where altitudes are lower than residential areas and roads. Floods appear when rain occurs continuously for several days.

Lam Dong is not directly affected by tropical storms. However, heavy rains due to storms’ influence are significant. The highest rainfall of a day in storms landed from Da Nang to Tuy Hoa usually exceeded 100 mm. The highest rainfall on September 29, 2009 was reached 150 – 250 mm. Heavy rains due to storms influence usually happen from middle of September to the beginning of December causing floods, flash floods, erosions. In November 2017, storm No.12 had caused heavy rain and strong winds, 70 houses of local people in Lam Dong were blown away and collapsed, hundreds ha of crops were destroyed, industrial trees were submerged, landslide happened at many traffic works, bridges, culverts, they were swept away and submerged, causing some production areas and residents to be divided. In particular, Phu Son commune of Lam Ha district was completely isolated. 03 people had died due to flash floods and being swept away.

(Source: Hydro-meteorological center in Lam Dong province)

Terrestrial fauna and flora

The main flora in the subproject area includes agricultural crops (rice, cassava, maize, beans, coffee, pepper, rubber trees, etc.).

Terrestrial fauna in the sub-project area includes cattle, pigs, chickens, small animals, birds, reptile species such as frogs, snakes, etc.

No protected wild animal has been found within the subproject area.

3 The analyzed results are from Environmental Impact Assessment approved by DONRE of Lam Dong province

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

20

DATA ITEM SUBPROJECT DATA

Aquatic fauna and flora

Aquatic fauna and flora within the subproject area are mostly common species presented in Da Dang river, and branches of rivers, small streams.

Specific data on the aquatic flora and fauna of these water bodies is not available. Through site survey, aquatic fauna species in rivers, streams, reservoirs, canals had been found including freshwater fish, shrimps and others, while aquatic flora include water hyacinth, algae and various other grass.

No specially protected aquatic fauna & flora species are listed in the Red Data Book of Vietnam.

Protected areas No reserve is within the subproject area.

There are 01 National Park and 01 Nature Reserve in Lam Dong province, Chu Yang Sin national park and Kalon Song Mao nature reserve. However, they are not located within the subproject area, about 35 – 75 km from the subproject area.

4.3 ENVIRONMENTAL AND SOCIAL CONDITIONS

Unexploded ordnance

Checking unexploded ordnance (UXO) to ensure safety during construction of the sub-project was completed in December 2017. Moreover, most of the activities of the sub-project will take place in existing foundation, which are subject to regular maintenance and do not present hazard from unexploded devices. (Please see annex 5 for details)

Land use The details of land use in Da Don, Tan Van communes, and Dinh Van town are presented as follows:

Content Da Don Tan Van Dinh Van

Total land area (ha) 7,362.45 3,706.62 3,510.93

Agricultural land (ha) 6,141.1 3,225.4 2,871.73

Forest land (ha) 603.65 23.9 184.61

Land used for other purpose (ha) 283.56 158.24 183.5

Residential land (ha) 63.45 91.89 141.45

(Source: Annual Statistics Report of Lam Ha district in 2017)

Residential area near the sub-project

Residential areas surrounding the subproject area located in center of commune, town or along the road. The distance from road to the nearest residential area is 1.5 m. Dinh Van town has 22 civil groups, Da Don commune has 11 villages, Tan Van commune has 16 villages.

Rural infrastructures

- Transportation: Highway No.27 linking highway No.20 to Lam Dong Province through the district center is an important road axle to link the districts, facilitates trading activities. In addition, inter-commune roads are invested to construct asphalt road, the inter-village roads are cement-concrete road.

- Irrigation system: The irrigation system in Da Don commune was built by MARD to supply water for Da Don and Tan Van communes and Dinh Van town in Lam Ha district and a part of Binh Thanh commune in Duc Trong district. This irrigation system supplies water for 1432 ha of 2-crop rice, 686 ha of coffee, 82 ha of crops and about 45,000 people for daily life. The system consists of 01 reservoir and main canal, grade-I canals (N1, N2, N3) and other canals. Main canal is 6,450 m long, grade-I canals are 14,192 m long, and lower-grade canals are about 85 km.

- Electrical power and telecommunication: Each commune / town has connected with the national grid and has its own post office.

- Education: The number of schools of each commune/town is as follow:

Type of school Da Don Tan Van Dinh Van

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

21

DATA ITEM SUBPROJECT DATA

Pre-school 2 1 4

Primary school 3 2 5

Secondary school 3 1 2

High school 0 0 2

(Source: Annual Statistics Report of Lam Ha district in 2017)

- Health care: Each commune has its own medical station, there is one hospital at district level in the center of Lam Ha district.

Agriculture and aquaculture

- Lam Ha district: The total agricultural land area in Lam Ha district in 2016 is 62,011.35 ha, of which 5,040 ha are annual crops and 56,971.35 ha are perennial crops. The output in 2016 is 239,215 tons. The main agricultural products are rice, maize, sweet potato, cassava, peanuts, mango, coffee, etc.

The breeding in 2016 was reached 825,269 animals (including buffalo, cow, pig, goat, and poultry) and produced 21,167.9 tons of products, while the aquaculture area was 1,139.4 ha (mainly raising fish) and produced 2,072.6 tons of aquaculture product.

- Da Don commune: The total agricultural land area in Da Don commune in 2016 is 6,141.1 ha, of which 527 ha is annual crops and 5,614.1 ha are perennial crops. The output in 2016 is 15,525.6 tons. The main agricultural products are rice, maize, sweet potato, cassava, peanuts, mango, coffee, etc.

The breeding in 2016 was reached 38,636 animals (including buffaloes, cows, pigs, goats, and poultry), while the aquaculture area was 34.3 ha and produced 62.39 tons of aquaculture product.

- Tan Van commune: The total agricultural land area in Tan Van commune in 2016 is 3,225.4 ha, of which 567 ha is annual crops and 2,658.4 ha are perennial crops. The output in 2016 is 11,993.3 tons. The main agricultural products are rice, maize, sweet potato, cassava, peanuts, mango, coffee, etc.

The breeding in 2016 was reached 45,016 animals (including buffaloes, cows, pigs, goats, and poultry), while the aquaculture area was 31 ha and produced 55.8 tons of aquaculture product.

- Dinh Van town: The total agricultural land area in Dinh Van commune in 2016 is 2,871.73 ha, of which 1,199 ha is annual crops and 1,672.73 ha are perennial crops. The output in 2016 is 9,899.2 tons. The main agricultural products are rice, maize, sweet potato, cassava, peanuts, mango, coffee, etc.

The breeding in 2016 was reached 161,102 animals (including buffaloes, cows, pigs, goats, and poultry), while the aquaculture area was 34.3 ha and produced 61.74 tons of aquaculture product

(Source: Annual Statistics Report of Lam Ha district in 2017)

Population Statistics by the end of 2016 of Lam Ha district:

Lam Ha district

Tan Van commune

Da Don commune

Dinh Van commune

Population 141,349 10,390 12,539 20,425

Number of households

36,212 2,772 3,030 4,742

Population density

152 280 170 582

Poverty rate 6.67 5.95 5.71 5.29

(Source: Annual Statistics Report of Lam Ha district in 2017)

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

22

DATA ITEM SUBPROJECT DATA

Ethnic minority groups

- Tan Van commune has 16 villages, including 2,772 households with 10,390 people, of which ethnic minority households account for 25% (Ko Ho, Nung, ChuRu);

- Da Don commune has 11 villages, including 3,030 households with 12,539 people, of which ethnic minority households account for 37.5%. (K'Ho, Cil, Ma);

- Dinh Van town has 22 residential groups, including 4,742 households with 20,425 people, of which ethnic minority households account for 37% (Ko Ho, Ning, ChuRu, Cil, Ma).

Livelihood - Agriculture & forestry are main economic sectors of Lam Ha district as well as communes/town. The economic structure of Lam Ha district by the end of 2016: Agriculture, forestry and fishery: 55.15%, industry and construction: 11.91%, trading and services: 32.94%; Economic structure of Tan Van Commune: Agriculture, forestry and fishery: 70.5%, industry and construction: 9.2%, trading and services: 20.3%; Economic structure of Da Don commune: Agriculture, forestry and fishery 63%, industry and construction 15%, trading and services: 22%. Economic structure of Dinh Van town: Agriculture, forestry and fishery: 24.5%, industry and construction: 27.1%, trading and services: 48.4%;

- The total income of Lam Ha district by the end of 2016 is VND 97.874 billion and total expenditure is also VND 1,358.505 billion. Such numbers were VND 3,912,000,000 and VND 3,897,000,000 for Da Don commune, were VND 5,904,000,000 and VND 5,193,000,000 for Tan Van commune and were VND 32,454,000,000 and VND 6,100,000,000 for Dinh Van town.

- The average annual income per capital in 2016 of Tan Van commune, Da Don commune and Dinh Van town was VND 40 million, VND 49.2 million and VND 48.4 million respectively.

(Source: Annual Statistics Report of Lam Ha district in 2016)

Cultural and natural heritages

No cultural and/or natural heritage has been recorded within the subproject area.

Public health Each commune / town has one communal health care center, which can diagnose and treat simple and most common diseases such as diarrhea, red eye, respiration and skin diseases. District hospital in Lam Ha district could diagnose and treat more diseases.

Traffic and transportation

- Within the sub-project area, there is only road with very low traffic density which just serves for domestic purpose of local people in Tan Van and Da Don communes and Dinh Van town;

- The main means of transportation includes bicycles and motorbikes.

- The areas with highest traffic density are in provincial road DT725 and highway QL27

V. ENVIRONMENTAL IMPACT SCREENING

5.1 Positive impacts

The subproject "Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province"

will bring positive impacts on environment and society as follows:

- It will ensure safety for works; reduce the loss of water in canals due to penetration; save

water for irrigation; take the maximum advantageous of water resources from the reservoirs

to increase the area of irrigated plants, especially during dry season; ensure growing of

plants and trees as well as domestic water supply, aquaculture activities of the local people.

It will also contribute to stabilization of groundwater resources;

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

23

- The development of rural road infrastructure improves traffic and links residential areas to

production areas reducing burden and cost in transporting materials, fertilizers and

agricultural products, transport of people will be more favorable during rainy and flood days.

It also creates favorable conditions for mechanizing agricultural production, brings scientific

advances into the producing areas that will increase crop yields. The sub-project also

reduces cultivation and labor costs and improves income of local people in the sub-project

area.

- The sub-project will also contribute to improvement of living conditions, livelihoods, and

environment in the sub-project areas and therefore could potentially reduce poverty. The

sub-project is expected to bring long-term benefit for 1,432 ha of 2-crop rice, 686 ha of

coffee, 82 ha of crops of Da Don irrigation system.

5.2 Negative impacts

Besides positive impacts, the implementation of sub-project could also create several

negative impacts, especially during construction phase, which need to be managed through

appropriate mitigation measures. The negative impacts from sub-project could be summarized in

the following table:

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

24

Table 3: Environmental impact screening

No Impacts/ Issues

Potential Impact

Brief description Yes/ no

Minor or significant

Positive or

negative

Temporary or

permanent

I Pre-construction phase

1 Risk when detecting unexploded ordnance (UXO)

UXO removal activities were completed in December 2017.

UXO can be remained in the subproject areas where had been suffered from war. Unexploded items may create risks for local people and workers during construction phase. However, UXO removal activities were carried out by 319 Corporation Ministry of National Defense & completed in September 2017. (please see details in annex 6)

2 Impacts on HHs due to site clearance (land acquisition)

Yes Minor Negative Temporary Description:

Roads and canals will be constructed on existing ones without extension. Thus site clearance is not implemented

- 1 material yard is of Construction Company and being exploited, so there is no acquisition of local people’s land.

- Land for storage area, camp, gathering materials is taken from land along the road, the area is about 10,000 m2.

(Source: Statistics on affected land from preliminary survey of Lam Dong PPMU, Subproject Investment Report)

Affected object(s): Local people whose productive land is near material yard, camps, storage area.

Affected level: This impact is minor due to there is no permanently land acquisition.

Location: Production fields of HHs along the upgraded road, canals and irrigation works

Time: Temporary.

3 Reducing crop productive due to inappropriate construction plan in term of time

Yes Moderate Negative Temporary Description: Wet-rice is main crop, which is irrigated by irrigation system of Da Don reservoir. There are 02 main seasons including Winter-Spring and Summer- Autumn. The construction period will be in 6 months, which could stop temporarily irrigation flows on upgraded canals and cause reduction of water availability for agricultural crops. The possible consequences will be negative impacts on agricultural productive and livelihood of local people. Thus,

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

25

No Impacts/ Issues

Potential Impact

Brief description Yes/ no

Minor or significant

Positive or

negative

Temporary or

permanent

construction methods need to be considered alternative water supply for irrigation activities in the area.

Affected object(s):

� Crops irrigated by 01 main canal, 03 grade-I canals, grade 2 & interior canals (lower-grade canals) of upgraded canals of Da Don irrigation system.

� Local people in Da Don and Tan Van communes and Dinh Van town.

Affected level: The impact is moderate due to i) the construction of canals has to be mainly implemented in the dry season – at the same period of agricultural activities and plants needed to irrigate water during dry season; ii) the construction of each canal will be 10-15 days, thus impact on water availability for agricultural crops will be insignificant; iii) construction of canals and road will be implemented section by section which could help reduce interruption period.

Location: Construction sites on canals, roads, downstream area of Da Don weir, where irrigated by main canal, 03 grade-I canals and other lower-grade canals in Da Don and Tan Van communes and Dinh Van town.

Time: Temporary during preparation and construction phases.

II Construction phase

1 Landslide, soil erosion or sedimentation flow into irrigation canals, drains

Yes Minor Negative Temporary Description: The constructions activities, especially excavation, embankment and storing materials in head-works of Da Don weir as well as upgraded canals, and upgraded roads could create debris and/or cause materials falling into water sources. Soil erosion and landslide could cause increasing in sediments and turbidity of surface water as well as obstructing water flows. The consequence could cause negative impacts on the rice fields located near by the construction sites in Da Don and Tan Van communes and Dinh Van town. The highest risks location of landslide and soil erosion could be listed as below:

� Soil erosion caused by the excavation of canal bed and slopes along upgraded canals and upgraded roads.

� Landslide at slope of Da Don weir ;

� Landslides at bank of main canal, irrigation canal, slope of upgraded

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

26

No Impacts/ Issues

Potential Impact

Brief description Yes/ no

Minor or significant

Positive or

negative

Temporary or

permanent

road.

� Landslides at 01 borrow pit.

Affected object(s):

� Water quality of Da Dang River, Cam Ly, Da Me, Da SeDang, Da K’Nang streams and other small streams.

� Fields/crops irrigated by canals of the subproject;

� Cultivated areas, which located close to the 01 borrow pit.( Yen Thanh Village-Da Don Commune)

� Beneficiaries on the closed proposed canals and roads areas.

Affected level: This impact is moderate due to (i) the material sources are mainly taken from agreed borrow pit of Da Don commune; (ii) volumes of excavation and embankment are not much (total excavated soil: 10,314 m3; total embanked soil: 5712 m3); (iii) the excavated soil will be reused to fill up banks of upgraded main canal and roads in Da Don and Tan Van communes and Dinh Van town; (iv) excavation activities will be mainly taken during dry season and (v) borrow pit is located in the vacant land. However, this impact still needs to be managed and controlled to reduce surface water pollution.

Location: Sloping area of Da Don weir, slope and road within the subproject area in Da Don and Tan Van communes and Dinh Van town.

Time: This impact is temporary during the constructing phase.

2 Surface water pollution

Yes Moderate Negative Temporary Description: Surface water sources including Da Dang river, Cam Ly stream, Da Me stream, Da SeDang, Da K’Nang streams and other small streams as well as ditches, irrigation canals within subproject area could be polluted due to construction activities. The main sources of pollution include (i) domestic wastewater of workers in 02 camps; (ii) grease and oil from machinery maintenance and (iii) rainwater runoff passing through constructional areas/activities during rainy days; (iv) spoils and/or sediment from excavation, embankment as well as materials. Such pollutants could fall into water resources causing water pollution, reducing quality of irrigation water, domestic water as well as causing impacts on aqua-ecosystem with the subproject area.

However, the number of workers is not much (about 50 people) and they are

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

27

No Impacts/ Issues

Potential Impact

Brief description Yes/ no

Minor or significant

Positive or

negative

Temporary or

permanent

scattered in 2 camps (about 5m3/day within subproject area), wastewater generated from machines is less, machines generates less wastewater, less oil and grease, number of materials falling into water sources on rainy days is minor. Moreover, construction of head-works will be implemented in dry season, thus impacts are minor and controllable.

Affected object(s): Surface water sources including Da Dang river, Cam Ly stream, Da Me stream, Da SeDang, Da K’Nang streams and other small streams as well as ditches, irrigation canals within the subproject area.

Affected level: The impact level is moderate due to (i) the construction activities will be scattered in the large areas, 02 camps will be located at difference places, few workers will be mobilized on the sites (estimated 50 at maximum); (ii) excavation will be taken section by section and (iii) generations of domestic wastewater (less than 5 m3/day), grease and engines oil are limited. However, appropriate mitigations need to be implemented and monitored to minimize the impacts.

Location: Da Dang river, Cam Ly stream, Da Me stream, Da SeDang, Da K’Nang streams and other small streams as well as ditches, irrigation canals within subproject area.

Time: This impact is temporary during the construction period.

3 Noise and vibration from construction machines and trucks

Yes Minor Negative Temporary Description: Upgrading dams, roads, canals of the sub-project will cause noise and vibration from construction machines (concrete mixers, bulldozers, stream rollers, trucks, etc.) that may affect residential areas along the upgraded roads/works. In addition, the exploitation of soil & disposal of soil as well as construction waste in borrow pit and disposal site will create noise and vibrations.

Affected object(s):

- Residential areas closed to Da Don weir, upgraded roads and canals in Tan Van, Da Don communes, Dinh Van town;

- Residential areas along main transportation roads of the sub-project in Tan Van, Da Don communes, Dinh Van town;

- Residential areas closed to borrow pit and disposal site.

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

28

No Impacts/ Issues

Potential Impact

Brief description Yes/ no

Minor or significant

Positive or

negative

Temporary or

permanent

Affected level: This impact is minor, due to: (i) very few equipment will be mobilized on the site; (ii) borrow pit and disposal site are located in vacant land and there is no HH located close to disposal site/borrow pit; (iii) density of households around construction sites is low.

Location: Residential areas near construction site, and along transportation roads & borrow pit and disposal site in Tan Van, Da Don communes, Dinh Van town.

Time: This impact is temporary during the construction period.

4 Air pollution (dust and exhaust)

Yes Minor Negative Temporary Description: Dust, air pollutants will be generated from excavation activities, waste disposal activities, electrical generators, mobile concrete mixers or operation of trucks, material storage areas, especially on sunny days. However, the main air pollutants such as NOx, CO, SO2, etc. will be minor since the number of construction equipment mobilized on the site will be minor and scattered in the large areas of construction sites. In addition, construction area is far from residential area. People travelling on this route are not much. A small part of soil will be utilized by local people, which could generate dust when transporting, however, each HH just uses a small volume of soil so the dust is not significant.

Affected object(s):

- Residential areas closed to Da Don weir, upgraded roads and canals in Tan Van, Da Don communes, Dinh Van town;

- Residential areas along main transportation roads of the sub-project in Tan Van, Da Don communes, Dinh Van town;

- Residential area closed to 01 borrow pit and 01 disposal site;

- Workers at 02 camps.

Affected level: This impact is minor, due to (i) the excavation activities schedule to be implemented during dry season; (ii) very few equipment will be mobilized, (iii) no HH is located along the borrow pit and disposal site (iv) very few households are located along the updated canals and roads; (v) subproject areas are located in rural areas where have many opened space for pollutants to dilute.

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

29

No Impacts/ Issues

Potential Impact

Brief description Yes/ no

Minor or significant

Positive or

negative

Temporary or

permanent

Location: Residential areas in communes along constructed area and transportation routes in Tan Van, Da Don communes, Dinh Van town

Time: Temporary during the construction period.

5 Solid waste and hazardous waste generation

Yes Moderate Negative Temporary Description: Solid wastes, which are generated in the construction phase, include: (i) domestic waste from daily activities of workers, which is mainly organic maters. It is estimated that approximate 5.5 tons of domestic waste will be generated during the whole construction period (12 months); (ii) Construction wastes including abundant discarded soil, sand, stone, debris, steel etc. could be utilized to embank road base, canal, dam. The generation of solid wastes could potentially pollute soil, surface water and even cause diseases (by rubbish) for construction workers if they are not properly handled and disposed; (iii) The hazardous waste: lubricating oil, chemicals mops/duster cloth, fuel and chemical’s containers is generated by maintenance activities or use of hazardous material. If these wastes will not be properly managed this could cause impact on water and soil quality.

Affected object(s):

� Air quality in and around construction sites and worker camps;

� Water quality of surface water bodies nearby worker camps as well as local productive fields nearby construction sites;

� Workers living at 02 camps;

� Local people living along upgraded roads.

Affected level: The impact is moderate due to: (i) waste will be generated for the whole of construction phase; (ii) worker camps will be separated in subproject area (only 50 people in 02 camps); (iii) disposal site is far from residential areas; (iv) subproject in Tan Van, Da Don communes, Dinh Van town; (v) demand of hazardous material used on the site is also very limited.

Location: All sub-project construction sites, 01 borrow pit, 01 disposal site and 02 worker camps.

Time: This impact is temporary during construction periods.

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

30

No Impacts/ Issues

Potential Impact

Brief description Yes/ no

Minor or significant

Positive or

negative

Temporary or

permanent

6 Soil pollution Yes Minor Negative Temporary Description: Soil quality within the subproject area could be affected by (i) domestic wastewater from 02 worker camps; (ii) grease drops from construction machinery maintenance and (iii) domestic and construction wastes. If those wastes are not collected and treated in proper manners, these can contaminate the soil, especially waste water with high grease and other pollutions.

Affected object(s):

- Soil quality of cultivated land along upgraded roads;

- Local people in the beneficiary areas in Tan Van and Da Don communes, and Dinh Van town.

Affected level: This impact is minor due to (i) the total of workers is limited to 50 scattered in 02 worker camps and amount of wastewater generated is estimated at approximately 5 m3 per day; (ii) the hazardous substance usage and waste are very minor since the demand of these substances is quite low. However, still need to be managed appropriately as requested in the waste management section.

Location: The construction areas & 02 worker camps, 01 disposal site and 01 borrow pit in Tan Van, Da Don communes, Dinh Van town.

Time: Temporary during the construction phase.

7 Local flooding Yes Minor Negative Temporary /Permanent

Description: Constructing culverts, roads may locally block water flows and cause flooding, especially in rainy seasons. 11 drainage culverts on the route will be constructed, which design may be inappropriate or contractor will not fully follow the technical specifications which could lead to inadequate discharged aperture of these culverts or temporary lock. Temporary blocking of drainage culverts and intakes may cause temporary and locally flooding, if it will be happened for long period which may cause damage on crops, access roads in the surrounding areas and create many insanitation issue and disease release.

Affected object(s):

- Crops irrigated by canals of the subproject.

- Local people in sub-project areas or construction sites in Tan Van, Da Don communes, Dinh Van town.

Affected level: This impact is minor due to (i) the upgrading of rural roads is on

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

31

No Impacts/ Issues

Potential Impact

Brief description Yes/ no

Minor or significant

Positive or

negative

Temporary or

permanent

existing ones; (ii) excavation activities will be planned to implement during dry period; (iii) construction works will be conducted section by section; (iv) a very small adjustment will be implemented in the existing drainage system and almost functions will be remained that ensure its functions during estimated construction period; (v) finally, design of upgrading irrigation canal systems will be contributed in drainage function.

Location: Residential area in downstream of Da Don weir, canals as well as culverts, water intakes of sub-project in Tan Van, Da Don communes, Dinh Van town.

Time: Temporary during the construction period but it could become permanent since there are several inappropriate technical specification during designing or contractors may not strictly followed the design specifications

8 Unsafe for travelling and business during the road construction (Traffic safety)

Yes Moderate Negative Temporary Description: The upgrading of 4,281.27 m of road, which is connecting local residential areas (canal bank road) with productive fields, may cause blocking of existing road surface; operation of equipment and trucks, storage of material may cause disturbance for local travel and unsafe condition for local people.

The upgraded road will connect with national road No.27 and provincial road DT725 and connect with communal & village roads.

The unsafe condition could be listed as (i) traffic accidents, especially the elderly and children and cattle; (ii) the difficulties of transportation of goods through the upgraded roads.

In addition, it is observed that the transport routes from construction sites to borrow pit and disposal site are very narrow and low grade, thus operation of trucks on the rural roads could cause potentially impact on local traffic and/or cause traffic accidents in Tan Van, Da Don commune and Dinh Van town.

Affected object(s): Local people in the sub-project area and people traveling through upgraded road during construction period.

Affected level: This impact is moderate due to: (i) upgrading of road and canals will only occupy existing road which may cause temporary block of access routes; (ii) route from construction sites to 01 borrow pit and 01 disposal site is very narrow and low quality; (iii) the road construction will be completed section by section with warning signs and informed schedule for residents, the

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

32

No Impacts/ Issues

Potential Impact

Brief description Yes/ no

Minor or significant

Positive or

negative

Temporary or

permanent

construction will be implemented on one side and the another side will be used for travelling of local residents; (iv) the traffic density on those roads are quite small. However, adequate traffic management and temporary bridges over canals in the residential needs to be implemented to ensure traffic movement and safety for local people.

Location: Along the constructed road, at intersections and materials transportation routes of sub-project in Tan Van, Da Don communes, Dinh Van town.

Time: This impact is temporary during construction period.

9 Affect local environmental landscape and ecology system

Yes Minor Negative Temporary Description: The sub-project does not locate near natural reserves, national parks, and ecosystem with high value in terms of science and reservation, which need to be protected. Therefore, it does not significantly affect the ecosystem/ biodiversity.

The area of 1 borrow pit is vacant land in which only small shrubs of no commercial or scientific value are growing. Therefore, the exploitation of soil from such borrow pit and disposal site will not have any noticeable negative impact on those lands or on the nearby plantations.

The construction activities of subproject could cause impacts on aqua ecosystem in existing irrigation canal; however, species in such canals are insignificant, while sub-project activities are quite far from surface water resources such as Da Dang river, Cam Ly, Da Me, Da SeDang, Da K’Nang streams and other small streams. However, constructions of roads and canals can create impact on ground surfaces and make it more weathered.

Affected object(s):

- Flora in construction site of Da Don weir, newly constructed road, canals, and field.

- Aquatic flora & fauna in Da Dang river, Cam Ly stream, Da Me stream, Da SeDang, Da K’Nang streams and other small streams.

Affected level: This impact is minor, according to site observation in December 2017, the areas along upgraded road and canals, and 01 borrow pit are covered with grass and sub-project does not acquire those lands. While the aqua

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

33

No Impacts/ Issues

Potential Impact

Brief description Yes/ no

Minor or significant

Positive or

negative

Temporary or

permanent

species almost small fresh fish in canals without or less economic value as well as reserved. Furthermore, the impact is temporary as constructed places and ecological environments will be recovered soon after completion of construction.

In addition, the construction work will generate concrete on ground surface (including road surface and canals). However, roads and canals are upgraded on existing ones, therefore, the further concreted areas are quite small.

Location: Along the upgraded road and canals, Da Dang river, Cam Ly, Da Me, Da SeDang, Da K’Nang streams and other small streams, 01 borrow pit and 01 disposal site.

Time: This impact is temporary during construction periods.

10 Deteriorate / damage on local infrastructures

Yes Minor Negative Temporary Description: According to site survey in April 2018, along the upgraded roads, there is only a low voltage grid located far from the route (at least 4 m). No water supply and drainage system was detected within the subproject area. Currently, roads/culverts or bridges around the subproject area are very weak which are soil roads, in which most of them were deteriorated, damaged and difficult for travelling. These roads are narrow and there is no warning sign of loading capacity. So, unless the weight of loaded vehicles transporting material to and from work-sites are scrupulously checked and appropriately limited to specifications, these existing roads and bridges may be damaged.

Affected object(s):

- Bridges/ roads used for materials/wastes transportation for sub-project construction.

- Local people in the sub-project area within Tan Van, Da Don communes, Dinh Van town.

- People traveling along roads used for subproject’s construction.

Affected level: This impact is minor due to the extent of transportation that needs for subproject is small and scattered in Tan Van, Da Don communes, Dinh Van town. In addition, there is no domestic water supply system and/or drainage system in the subproject area, therefore, these impacts will minor. Moreover, construction contractor needs to prepare construction and transportation plan well to minimize possible negative impacts, the contractor

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

34

No Impacts/ Issues

Potential Impact

Brief description Yes/ no

Minor or significant

Positive or

negative

Temporary or

permanent

should also be bound to repair damaged infrastructure to their original condition if this situation will occur.

Location: All roads/culverts or bridges used for the sub-project materials transportation in Tan Van, Da Don communes, Dinh Van town.

Time: This impact is temporary during construction period.

11 Social disturbance by worker gathering

Yes Minor Positive & Negative

Temporary Description:

Negative impacts includes: (i) diseases such as sore eyes, cholera, flu and other respiratory diseases from workers and spread to local people in the subproject area; (ii) social problems can appear such as gambling, drug addiction, prostitution, violence, conflict amongst workers, or among workers and local people. There is also a risk of sexually transmitted diseases (STD) from 50 workers including HIV/AIDS that needs to be considered.

Positive impacts: The increase of labor force in communes could temporary induce some positive economic support for local trading market.

Affected object(s):

- Workers on the sites & in 02 camps.

- Local people in Tan Van, Da Don communes, Dinh Van town.

- Businesses in Tan Van, Da Don communes, Dinh Van town.

Affected level: Both positive and negative impacts are minor due to (i) the workers will be split in 02 worker camps; (ii) local workers will be encouraged to mobilize on the site; (iii) construction time will be taken within 12 months; and (iv) workers need to be managed and controlled to eliminate negative impacts.

Location: In 02 camps and community in Da Don, Tan Van communes, Dinh Van town.

Time: This impact is temporary during construction period.

12 Risk to health of local people and construction workers

Yes Moderate Negative Temporary Description: Dust and noise generated from construction activities, transport vehicles and operation of equipment (such as concrete mixers, bulldozers) may cause directly affect health of the workers and the local communities, especially in case of safety regulations not being properly complied with.

The high risks of health problem and safety for workers may also come from

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

35

No Impacts/ Issues

Potential Impact

Brief description Yes/ no

Minor or significant

Positive or

negative

Temporary or

permanent

unsafe living conditions, unsafe food and water supply and inappropriate personal protection equipment and conflict between workers and traffic accidents involving people passing through construction places.

Moreover, construction activities may need to occupy road surface or add a number of vehicles on the narrow rural roads which could lead to unsafety for local people who use the roads. The construction of road connecting production area may also cause temporary blocking access of local people.

Affected object(s):

- Workers at construction sites.

- Residential areas along upgrade roads and roads used for transport of materials and near the construction areas of in Tan Van, Da Don communes, Dinh Van town.

Affected level: This impact is at moderate level due to number of construction workers (50 at maximum) as well as machine or equipment being mobilized on the sites is not significant. However, because the importance of preserving human health and lives of locals and construction workers, adequate management measures need to be implemented and supervised as regulated by legal requirements for labor safety and hygiene.

Location: 02 worker camps and residential area closed to Tan Van, Da Don communes and Tan Dinh town.

Time: This impact is temporary during construction period.

13 Impacts around the mines of soil, stone and sand

Yes Minor Negative Temporary Description: According to preliminary assessment of borrow pit’s characteristics and location of materials sources, the embankment soil of the sub-project will be taken from the 1 borrow pit in Da Don commune, where ensure the available of embankment soils for construction sites. Those areas are agricultural and vacant land. However, during the clearance and excavation period, the HHs closing to this borrow pit could be disturbed by transportation activities, dust as well as redundant soil on the roads.

Stone will purchased and transported from stone pit in Duc Trong district, and sand pit will be purchased in Dinh Van town.

The excavation will generate dust & air pollutants during mining, transportation,

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

36

No Impacts/ Issues

Potential Impact

Brief description Yes/ no

Minor or significant

Positive or

negative

Temporary or

permanent

and probably landslide during mining. While transportation of materials (including soils and construction materials) will potential generate air pollution and cause impacts on local infrastructures as well as traffic attention.

Affected object(s):

- Local people along transportation routes.

- Workers of sub-project working in & people living, working nearby 1 borrow pit in Da Don commune.

Affected level: This impact is minor due to (i) borrow pit is located in vacant areas, no HHs living close to these areas; (ii) total demand of embankment soil will be very few (about 1,699.5 m3 of soil for the whole sub-project); and (iii) other materials will be purchased from licensed and controlled mines by authorities via environmental permission / certification.

Location: 01 Borrow pit in Da Don commune, stone pit in Duc Trong district, sand pit in Dinh Van town.

Time: This impact is temporary during construction period.

14 Affect existing irrigation systems

Yes Moderate Negative Temporary Description:

The constructions are taken place on existing foundations of Da Don irrigation system serving 1,358 ha of rice and 500 ha of coffee. Specifically, the construction of canals will require blocking constructed sections. Therefore, during construction, the irrigation functions could be temporarily affected which could have potential impacts on crops if mitigation measures are not implemented properly.

Affected object(s):

- Crops irrigated by Da Don irrigation system within the subproject area;

- Local people in the beneficiary areas in Tan Van, Da Don communes, Dinh Van town.

Affected level:

The impact is minor due to (i) the construction will be implemented in shutting the water off period section by section to ensure irrigation water supply for cultivation activities; (ii) the total affected period on irrigation system is 12

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

37

No Impacts/ Issues

Potential Impact

Brief description Yes/ no

Minor or significant

Positive or

negative

Temporary or

permanent

months. However, mitigation measures during construction need to be strictly implemented to reduce impacts on crops of local people.

Location: Da Don irrigation works.

Time: This impact is temporary during construction period.

15 Impact on surrounding agricultural land and cultivation activities

Yes Minor Negative Temporary Description: The construction activities of sub-project could cause impacts on surrounding agricultural activities of local people such as temporarily blocking irrigation water towards downstream and feeder canals of the Da Don irrigation system. In addition, construction road could also temporarily challenging local people in transferring materials and/or products to productive areas vice versa, and cause falling of material in the canals of the surrounding areas.

Affected object(s):

- Local people whose cultivation depends on water supply by Da Don irrigation system;

- Local people using upgraded road to connect to productive areas in Tan Van, Da Don communes, Dinh Van town.

Affected level: This impact on surrounding areas is minor due to the extent of construction activities is small and scattered all over Tan Van, Da Don communes, Dinh Van town, and the main travelling time to productive areas of local people are in early morning or late afternoon, which are different from construction time. This will reduce difficulties in travelling and transferring materials and/or goods. While the construction of canals will be completed section by sections to ensure/ minimize impact on the function of irrigation canals.

Location: Areas irrigated by upgraded canals, Da Don irrigation system, and upgraded road in Tan Van, Da Don communes, Dinh Van town.

Time: This impact is temporary during construction period.

16 Cultural objects or graves found

No - - - Description: Currently, neither object of cultural significance nor grave in the areas of construction of the sub-project is recorded. However, if any cultural objects and/or graves are found during excavation work, the contractor is compelled to immediately suspend works in that area and notify the State agency responsible for culture, sports, and tourism for prompt action/measures.

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

38

No Impacts/ Issues

Potential Impact

Brief description Yes/ no

Minor or significant

Positive or

negative

Temporary or

permanent

Affected object(s): Potential cultural objects/graves found within construction areas.

Affected level: Currently, there is no impact but if occurs, the impact is estimated as minor.

Location: Construction area in Tan Van, Da Don communes, Dinh Van town, and 01 borrow pit.

Time: This impact is temporary during construction period.

17 Environmental recovery activities

Yes Minor Negative & Positive

Temporary & Permanent

Description: The construction contractor needs to restore damaged environment to its original condition as well as local infrastructures. If environmental recovery activities are not be properly implemented, natural environment of the subproject area may suffer from: (i) loss of trees along upgrading roads and loss of vegetation cover around the upgraded canals and 01 borrow pit; (ii) changing environmental landscape at 01 borrow pit; and (iii) downgrade of existing public infrastructures. Moreover, restoring the original environmental conditions of damaged features may also have some positive impacts. These activities may include strengthening road surface, which could result in their longer use and become better in terms of safety for local people as well as increasing green space in recovered areas.

Affected object(s):

- Local infrastructures used by the sub-project;

- Local people in the sub-project area & people traveling through the roads need to be restored.

- Landscape of construction areas and borrow pit.

Affected level: This impact is minor due to: (i) subproject will upgrade existing canal and road; (ii) very few number of trees are needed to be cut out, and they are not listed in rare species needing special preservation; (iii) there will be not many local infrastructures that need to be restored.

Location: Da Don weir, upgraded canal, along upgraded road, 01 borrow pit.

Time: This impact is temporary during construction periods.

III Operational phase

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

39

No Impacts/ Issues

Potential Impact

Brief description Yes/ no

Minor or significant

Positive or

negative

Temporary or

permanent

1 Canals, drains & culverts obstructing or flooding because of not dredging on time

Yes Minor Negative Temporary Description: Culverts, drains, canals are likely to be obstructed by rainwater runoff that sweeps soil, sand and stones if dredged untimely. This will cause waterlogging, reduce water runoff and temporary inundation in several low-lying places.

Affected object(s): Productive fields along road, canals, and local people.

Affected level: This impact is minor due to maintenance activities include culverts dredging that will be implemented by The Lam Dong Irrigational Exploitation Co., Ltd. (Lam Ha Branch) and Road Management Units of Division of Infrastructure - Economy of Lam Ha district

Location: Along culverts, drains, canal, and upgraded road in Tan Van, Da Don communes, Dinh Van town.

Time: This impact occurs only during the operational phase.

2 Erosion or landslide Yes Minor Negative Temporary Description: High intensity rain can cause landslide, erosion, deposit sedimentation in nearby canals, culverts, and obstruct them especially in heavy rain days. The impact will be reduced when soil of the road is stabilized and vegetation is fully grown on both sides of the road, canals.

Affected object(s):

- Local people in subproject area near the canals and roads;

- Water quality and aqua-species living in canals.

Affected level: This impact is minor and stabilized soon after when vegetation grow in bank of the road, canals.

Location: Along culverts, drains, canal, and upgraded road in Tan Van, Da Don communes, Dinh Van town.

Time: This impact occurs during the operational phase, and impact will be less after soil is compressed and vegetation is fully grown.

3 More traffic accidents Yes Minor Negative Permanent Description: After upgrading roads and road surface, the traffic density and driving speed are increasing (particularly among young drivers). This is likely to cause traffic accidents if road users do not abide by traffic regulations.

Affected object(s): Local people in the sub-project area & people traveling through the upgraded roads in Tan Van, Da Don communes, Dinh Van town.

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

40

No Impacts/ Issues

Potential Impact

Brief description Yes/ no

Minor or significant

Positive or

negative

Temporary or

permanent

Affected level: This impact is minor due to the density of transportation in areas is still at low level.

Location: Upgraded roads in Da Don, Tan Van communes, Dinh Van town.

Time: Long term in operational phase

4 Water quality could be pollution due to increase of fertilizer or pesticide volume

Yes Minor Negative Permanent Description: The increasing irrigation capacity from upgraded canals will boost production. However, the use of fertilizers and/or pesticides will potentially normally increase. This will have an impact on both surface and ground water in the sub-project area as well as in the water of downstream areas.

Affected object(s): Water quality of canals within the sub-project area & water bodies closed to the cultivated area irrigated by the canals.

Affected level: The impact is minor because an increase of fertilizers and pesticides is relatively low; moreover, it is also expected that the increasing trend of using environmental-friendly products will prevail in the coming future.

Location: Irrigation canals of canals system and beneficiary areas in Tan Van, Da Don communes, Dinh Van town.

Time: This impact is long-term in operational phase.

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

41

VI. ENVIRONMENTAL MANAGEMENT PLAN

From the analysis and evaluation of environmental impacts in section V, this section outlines the environmental management plan (EMP),

including (i) Environmental mitigation measures; (ii) Environmental monitoring; (iii) Capacity strengthening program.

6.1 Environmental impacts and mitigation measures

Table 4: Environmental mitigation plan

No. Impacts Objectives Mitigation Measures

Mitigation measures Responsibility Location Time Cost

Pre-construction phase

1 Risk when detecting unexploded ordnance (UXO)

Detecting UXO is implemented by Corporation 319 of Ministry of Defense

2 Impacts on HHs due to site clearance (land acquisition)

To minimize social impacts on HHs along the sub-project sites

Roads and canals will be constructed on existing ones without extension. Thus site clearance is not implemented

Thus, no impacts on HHs due to site clearance ( Report on no land acquisition )

-

-

-

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

42

No. Impacts Objectives Mitigation Measures

Mitigation measures Responsibility Location Time Cost

3 Reducing crop production due to inappropriate construction plan

To ensure that the sub-project does not interrupt, or negatively affect farming activities

- Construction plan needs to be discussed with and agreed by DARD, local authority/people and the results are posted up on notice boards of Tan Van, Da Don communes, Dinh Van town.

- Constructing canals:

+ Canals within the subproject area being constructed are soil ones with small sizes which do not go through big river, streams, therefore, it is only needed to close the valves in upstream of branches to implement construction activities when they are dried out so that flow diversion method will not be needed. Canals could be constructed at the same time to shorten construction duration.

+ From April to June 2018, shutting the water off will be implemented for construction (2 months from April 01 to June 01, between the Winter - Spring crop and the Summer - Autumn crop), then supplying water in July 2018, and completing remaining items.

+ The construction will be conducted from the bottom upwards and section by section.

+ Completing preparation (camps, internal roads, site clearance, and materials storage) until the end of March 2018.

+ All construction activities are expected to complete in September 2018.

+ Construction activities will be implemented both by machines and handworks

Construction contractor and Lam Dong PPMU

At construction sites, canals, roads, downstream areas of Da Don weir irrigated by main canal, 03 grade-I canals and lower-grade canals in Tan Van, Da Don communes, Dinh Van town.

Detailed design and construction phases

Cost of sub- project’s preparation by Lam Dong PPMU

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

43

No. Impacts Objectives Mitigation Measures

Mitigation measures Responsibility Location Time Cost

- Constructing roads: The activities will be site cleaning, constructing road foundation and drainage system, and road surface. All these construction activities will be completed by machines (bulldozers, excavators, trucks, air compressors, concrete mixers, etc.) and by handworks. The work items will be constructed section by section.

- The material supplying plan needs to be prepared and included the following requirements:

+ Required materials, potential sources and estimated quantities available;

+ Material supply manners: preferring to purchase from existing material quarries;

+ Agreement with the local authorities;

+ Checking environmental permission/ certification of the quarries to ensure that owners have considered environmental impacts and mitigation measures;

+ Preparing material transportation done following suitable plans and schedules.

Construction phase

1 Landslide, soil erosion or sedimentation flows into irrigation canals, drains.

To minimize soil erosion and the increase of sedimentation in flow caused by erosion or blocking flows

- Excavation works need to be scheduled to avoid rainy season (from the end of May or early of June to November) as much as possible;

- Splitting construction section by section to reduce the open storage of materials and extent of excavation and embankment;

- Material storage areas need to be

Contractors Sloping areas of Da Don weir, slope and roads within subproject area in Tan Van, Da Don communes,

During the construction phase

Included in the construction contract

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

44

No. Impacts Objectives Mitigation Measures

Mitigation measures Responsibility Location Time Cost

bounded and covered during rainy days;

- Stabilizing slopes, embanked area and other erosion-prone working areas while works are proceeding at 01 borrow pit;

- Re-planting vegetation covering in upstream slope sections of the dams and the road as soon as possible after excavation and embankment works are achieved;

- The exploitation of 01 borrow pit needs to avoid rainy days that may cause landslide;

- The exploitation of 01 borrow pit needs to be dug in subsequent sections to better control verticality of digging areas;

- Not allowing any heavy machines or other equipment to be located on the top of digging areas to avoid possible landslides.

Dinh Van town

2 Surface water pollution

To minimize water source contamination

- Discarded lubricant and other chemicals have to be kept in dry and covered carefully;

- Providing 4 dustbins and 02 mobility septic tanks at work sites to manage wastewater and domestic waste from workers at 02 worker camps;

- Contractors’ personnel in all sites shall prohibit disposal of solid wastes into Da Dang river, Cam Ly stream, Da Me stream, Da SeDang stream, Da K’Nang stream and other streams as well as ditches, canals, agricultural fields through notices on signboards at sites and daily

Contractors Water bodies closed to sub-project areas such as Da Dang river, Cam Ly stream, Da Me stream, Da SeDang stream, Da K’Nang stream and other streams as well as ditches,

During the construction phase.

Included in the construction contract

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

45

No. Impacts Objectives Mitigation Measures

Mitigation measures Responsibility Location Time Cost

patrols;

- Contractors must prepare a place to wash vehicles/means of transportation. Washing trucks/ vehicles next to the water bodies, existing rivers, streams, canals, and reservoirs such as Da Dang river, Cam Ly stream, Da Me stream, Da SeDang stream, Da K’Nang stream and other streams as well as ditches, canals within subproject area will not be permitted;

- Locations of 02 worker camps need to be apart from reservoirs & springs to avoid water contamination from domestic waste;

- Covering material storage areas if it rains. Temporary storage of construction and domestic waste on the sites will be no longer than 24 hours.

canals of the sub-project area

3 Noise and vibration caused by machines & vehicles

To ensure noise and vibration according to standard QCVN 26 & 27:2010/BTNMT

- Construction vehicles, machines, and equipment need to meet the standards related to noise, and vibration as regulated by the Government. The Contractor needs to submit the official documentation to prove that all construction vehicles, equipment, and machines are checked and meet requirements concerning noise and vibration generation of the current Vietnamese standard;

- Ensuring that all construction vehicles and equipment are well maintained. All activities generating noise and vibration shall be avoided during resting time of

CPMU, LIC, Lam Dong PPMU, contractors

Residential areas near construction site and along the transportation road, 01 borrow pit and 01 disposal site in Tan Van, Da Don communes, Dinh Van town

During the construction phase

Included in the construction contract

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

46

No. Impacts Objectives Mitigation Measures

Mitigation measures Responsibility Location Time Cost

local people (12 p.m. to 13 p.m. and 20 p.m. to 6 p.m.) along the upgraded roads in Tan Van, Da Don communes, Dinh Van town;

- Providing ears’ protective equipment for workers working in high noise conditions generated by machines and/or equipment, and allowing workers to have reasonable time-off from work when they are exposed to excessively long periods to noise and vibrations, as regulated in Decision No.3733/2002 of Ministry of Health;

- Detailed construction schedule needs to be publicly announced by the contractor to local people (on the notice boards of Tan Van, Da Don communes, Dinh Van town) so that these people could arrange their activities, avoid being close to the working sites and be affected by the impact of noise and vibrations.

4 Air pollution caused by machines and vehicles (dust and gas emissions)

To ensure that air pollution complies with QCVN 05-2013/BTNMT

- Covering trucks and transportation vehicles to minimize dust generated when transporting materials as well as waste.

- Equipment/vehicles have to be verified and licensed. Specifically, transporting vehicles need to meet the standards related of exhaust emissions as regulated by Government and according to Decision 249/2005/QD-TTg of the Prime Minister about emission standards to road motor vehicles;

- Watering to minimize dust generation needs to be implemented for roads and

CPMU, LIC, Lam Dong PPMU, contractors

Worker camps and residential areas along constructed road and transportation routes in Tan Van, Da Don communes, Dinh Van town.

During the construction phase

Included in the construction contract

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

47

No. Impacts Objectives Mitigation Measures

Mitigation measures Responsibility Location Time Cost

construction sites that are close to residential area in Tan Van, Da Don communes, Dinh Van town;

- The watering activities have been proposed at least once per day during the rainy season and twice a day during the dry season in construction area;

- The use of construction materials needs to be properly planned to limit as much as possible the volume of quantities stored at sites;

- Equipment and machines will not be allowed to move out of construction sites to ensure control of emission;

- Materials or soil falling from the vehicles on the road shall be removed immediately;

- All material/waste storages shall be located away from any HHs and sensitive areas.

5 Solid waste and hazardous waste generation

To minimize impacts on environment due to solid wastes & hazardous waste

- All excavated soil will be utilized to embank, thus there is no residual volume. In case that local people ask excavated soil for their house construction, the agreement between local households, contractors and local authorities need to be obtained.

- Hazardous waste will be collected and transferred to licensed collection company as required by Circular 36:2015/BTNMT of MONRE.

- Equipping 04 dustbins and 02 mobile septic tanks to work-sites for waste collection and treatment.

Contractors All sub-project construction sites, 01 borrow pit and 01 disposal site and 02 camps

During the construction phase

Included in the construction contract

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

48

No. Impacts Objectives Mitigation Measures

Mitigation measures Responsibility Location Time Cost

- Disposal of solid wastes into canals, springs, other water resources, agricultural field and public areas shall be prohibited.

- Burning of construction and domestic wastes shall be prohibited.

6 Soil contamination

To minimize soil contamination

- Covering material storage areas and handling chemicals and wastes to ensure that construction materials and/or wastes could not fall into agricultural land within the sub-project areas;

- Discarded lubricant, chemicals must be kept in dry area or covered when raining;

- Hazardous waste, if any, needs to be collected, transported and treated according to Circular No. 36:2015/BTNMT of MONRE;

- Providing 4 dustbins and 02 mobility septic tanks in all construction sites and 02 worker camps;

- Wastewater from 02 worker camps needs to be collected and treated by mobile septic tanks before discarded to environment.

CPMU, LIC, Lam Dong PPMU, contractors

Construction sites, 01 borrow pit, 01 disposal site, and 02 worker camps in Tan Van, Da Don communes, Dinh Van town.

During the construction phase

Included in the construction contract

7 Local flooding To ensure that the construction does not interrupt farming activities

- Setting up appropriate construction schedule/ plan to avoid rainy season, especially for excavation activities. This has been strictly applied for excavation, embankment and construction activities in upgraded irrigation canals;

- Managing storage of materials and/or wastes to avoid these wastes falling into water in irrigation canals that causes

Contractors Residential areas in downstream of Da Don weir, canals as well as water intakes of the subproject in Tan Van, Da

During the construction phase

Included in the construction contract

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

49

No. Impacts Objectives Mitigation Measures

Mitigation measures Responsibility Location Time Cost

blocking intakes and/or aqueducts.

- Regularly checking water flow situation of canals, water intakes, and culverts and removing materials/wastes that block water flow.

- Placement of equipment for washing vehicles and tools next to the existing rivers, springs, and canals such as Da Dang river, Cam Ly, Da Me, Da SeDang, Da K’Nang streams and other small streams as well as ditches, canals within the subproject area will not be allowed.

Don communes, Dinh Van town

8 Unsafe condition for travelling and business during the road construction (Traffic safety)

To ensure traffic safety and minimize life disturbance of local people

- Installing signals at construction sites to regulate and minimize speed of vehicles or warning signs at construction sites, especially at the road’s intersections.

- Installing lamps at night at construction sites.

- Informing communities about construction schedule through public consultation or at any local people meetings and posting up related information on notice board of Tan Van, Da Don communes, Dinh Van town.

- Construction activities should be done section by section to minimize temporarily occupied land area along roads.

- Training for drivers of sub-project as well as worker on respecting safety rules and warning people passing nearby the sites.

- At least 01 worker, in peak hours, will be assigned to monitor the vehicles go in and out of construction sites as well as warning people in order to assure traffic

Contractors Along the constructed road, at intersections and transportation routes of sub-project in Tan Van, Da Don communes, Dinh Van town

During the construction phase

Included in the construction contract

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

50

No. Impacts Objectives Mitigation Measures

Mitigation measures Responsibility Location Time Cost

safety.

9 Impact on local environmental landscape and ecosystems

To minimize impacts on the local ecology

- Only cutting down private trees and agricultural plants that have been taken into account in compensation plans.

- Cutting plants and/or damaged fields, which are out of the ROW, will be compensated according to voluntary agreement.

- Re-planting vegetation cover section by section after construction work completed to return landscape in its original condition.

Lam Dong PPMU, contractors

Along the upgraded roads, canals, Da Dang river, Cam Ly, Da Me, Da SeDang, Da K’Nang streams and other small streams, 01 borrow pit and 01 disposal site

During the construction phase

Included in the construction contract

10 Deteriorate / damage to existing infrastructure

To minimize adverse impacts on existing infrastructure

- Working with existing infrastructure owners (electricity, water...) to identify locations of underground components if any;

- Obtaining the agreement with local authorities in using the transport routes;

- Any public facilities damaged during the sub-project activities should be fully repaired and recovered to their original conditions by the contractor;

- Load capacity of trucks should not exceed local bridges / roads (it is the best to use truck with capacity lower than 5-10 tons, paying special attention to roads that designed load is 5 tons only);

- After construction has completed, all public facilities must be re-checked to ensure that theirs functions have not been affected by sub-project activities, if any

Contractors All roads/culverts or bridges within the subproject area in Tan Van, Da Don communes, Dinh Van town

During the construction phase

Included in the construction contract

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

51

No. Impacts Objectives Mitigation Measures

Mitigation measures Responsibility Location Time Cost

damage has been identified except normal wear and tear, the contractor will be responsible for repairing the damaged structures to their original conditions and compensate for damages that cannot be recovered.

11 Disturbance to local people’s life due to presence of construction workers

To minimize disturbances to local people’s life due to workers

- Priority should be given to local labors by the contractor;

- Registering provisional residence for workers living in the worker camps;

- Contractor needs to regulate camp sanitation regulations.

- Carrying out HIV/AIDS and sex transmission infection prevention program, all workers should attend this training organized by the project.

- Propagating and raising awareness of the construction workers to maintain discipline, habits and customs and create good relationships with local people, reduce social evils.

- Contractors organize provision of meals for all workers at each site to ensure hygiene and food safety.

- Spraying insecticides in the 02 worker camps regularly;

- Training and guiding labor safety measures and prevention of common diseases for workers.

Contractors In 02 worker camps and local people in Tan Van, Da Don communes, Dinh Van town

During the construction phase

Included in the construction contract

12 Risk to health of local people and construction

To ensure good health and safety to local people and workers

- Construction contractors need to register number of labors working for sub-project to local authorities.

- Regularly testing health of workers

Construction contractors

In 02 worker camps and local people in Tan Van,

During construction phase

Included in the construction contract

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

52

No. Impacts Objectives Mitigation Measures

Mitigation measures Responsibility Location Time Cost

workers against infectious diseases as regulated by Ministry of Labor, War invalids and Social Affairs.

- Providing sufficient labor safety equipment for workers such as safety shoes, helmets, etc. Instructing workers how to use this equipment and monitoring regularly to ensure compliance.

- A first aid kit will be provided at each construction site to ensure that patients can receive first aid timely before transporting them to the medical station/ hospital;

- Collaborating with communal clinic center to receive additional support.

- Installing power network at construction sites in accordance with official safety regulations, ensuring that the power lines are safe and that power connection to grid or generators are located at dry and safe places.

- Installing fences and warning signs at receptacles.

- Displaying information panels on the labor regulations at sites.

- Installing fences, warning signs at the intersection between the canals and roads.

- Keeping the light switched on during nigh time on all construction sites.

- Constructing temporary drainage ditches to drain water from site, prevent any possible waterlogging.

Da Don communes, Dinh Van town

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

53

No. Impacts Objectives Mitigation Measures

Mitigation measures Responsibility Location Time Cost

- Preparing emergency alerts and remedy intervention for any occurrence that could occur during construction activities such as fire, flooding or other unforeseen event.

13 Impacts around the mines of soil, stone and sand

To minimize environmental impacts caused by mining raw materials for construction

- The soil will be utilized from 01 borrow pit in Da Don commune (about 3 km) belonging to private household, thus this is not long distance and it will reduce impacts due to dust. Therefore traffic safe will be ensured;

- Exploiting section by section to avoid excessive dust generation and landslides and prepare recovery plan for exploited areas;

- Nighttime transportation should be minimized to avoid traffic accident possibly due to poor nighttime visibility.

- The stone and sand will be purchased from stone pit in Duc Trong district, about 10 – 20 km to the construction site, where environmental issues are controlled and mitigated by local authorities and pit’s owners. Construction contractor needs to check license and environmental mitigation measures of such pits.

- Material transportation will be implemented continuously. Vehicles will be covered to reduce dust and falling.

CPCs of Tan Van, Da Don communes, Dinh Van town, pit’s owners; construction contractor

01 borrow pit in Da Don commune, stone pit in Duc Trong district and sand pit in Dinh Van town

In preparing materials for construction phase

Included in the construction contract

14 Affect existing irrigation systems

To avoid and minimize impacts on lacking of water for irrigation

- The construction of irrigation canal systems and their works must be scheduled and planned considering water availability for agriculture fields. Those plans need to be agreed with local

Construction contractor; Supervisors and Lam Dong PPMU

Da Don irrigation works

In preparing materials for construction phase

Included in the construction contract

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

54

No. Impacts Objectives Mitigation Measures

Mitigation measures Responsibility Location Time Cost

DARDs of Lam Dong province and Lam Ha district, and Tan Van, Da Don communes, Dinh Van town, then those plans will be posted up on notice boards for local people;

- Contractor needs to apply adequate measures to ensure that downstream of upgraded irrigation canals will not be deprived of needed water. It should be accelerated (2 months) according to the plan of shutting the water off to ensure timely irrigation for Summer-Autumn crop;

- The water for construction will be taken from existing canals. Construction needs to implemented section by section to minimize impacts.

15 Impact on surrounding agricultural land and cultivation activities

To avoid and minimize impacts on surrounding agricultural activities

- The construction plans must be scheduled and planned considering water availability for fields. Those plans need to be consulted with local DARDs of Lam Dong province and Lam Ha district, Tan Van, Da Don communes, Dinh Van town, and then these plans must be posted up at information board of Tan Van, Da Don communes, Dinh Van town.

- Constructing section by section to ensure traffic in upgraded road.

- For canals system: Canals within the subproject area are soil ones as with small sizes which do not go through river, springs, therefore, it is only needed to close the valves in upstream of branches to implement construction activities when they are dried out so that flow diversion

Construction contractor.

Areas irrigated by upgraded canals, Da Don irrigation system, upgraded roads in Tan Van, Da Don communes, Dinh Van town.

During construction phase

Included in the construction contract

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

55

No. Impacts Objectives Mitigation Measures

Mitigation measures Responsibility Location Time Cost

method will not be needed. Canals could be constructed at the same time to shorten construction time. Shutting the water off for construction will be implemented (2 months from April 1st to June 1st, between Winter-Spring crop and Summer-Autumn crop). In this period, construction of main work items will be focused. Then, supplying water and completing the remaining work items. The items will be constructed upwards and section by section.

- Any negative impact on irrigated fields (mainly insufficient or interrupted water supply causing losses to crops) occurring during construction period need to be adequately compensated.

16 Cultural objects or graves found

To avoid and minimize on cultures objects and graves

- If any cultural object and/or grave is found during construction phase, the construction activities at those places need to be temporarily stopped and local authorities should be immediately informed to deal with the issue;

- Proper forms of compensation need to be undertaken after consultation with households suffering the impact on their graves, and the construction contractor should provide the needed support to these HHs to resettle graves elsewhere or to communes for cultural objects found.

Construction contractor, Lam Dong PPMU, CPCs of Tan Van, Da Don communes, Dinh Van town

Construction areas and 01 borrow pit in Tan Van, Da Don communes, Dinh Van town

During construction phase

Included in the construction contract

17 Environmental recovery activities

To ensure damaged environment and related

- During construction, any damage to local infrastructures will be compensated and mitigated by construction contractor as mentioned above.

Construction contractor

Da Don weir, areas along the upgraded canals, roads

During and after construction phase

Included in the construction contract

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

56

No. Impacts Objectives Mitigation Measures

Mitigation measures Responsibility Location Time Cost

infrastructures will be recovered after completing construction

- The environmental issues emerged during recovery activities such as noise, dust, gases, solid waste, hazardous waste, water pollution etc. will be handled with similar measures indicated in related section above.

- Re-planting trees after completing construction activities.

- Repairing damaged infrastructures as soon as possible.

- Restoring water-flows into upgraded reservoirs and canals to recover aqua-ecosystem.

- Restoring the landscape in and around borrow pits to avoid landslides after exploitation completed;

and 01 borrow pit

Operational phase

1 Canals, drains & culverts obstructing or flooding because of untimely or inadequate dredging

To ensure drainage function of culverts, drains and canals

- Regularly checking and maintaining culverts, drains & canals.

- Periodically dredging culverts, drains and canals after each harvest or after heavy rainfalls that cause erosion to hillside.

Lam Dong Irrigation Works Management Co., Ltd. (Lam Ha branch) and communal officials

Along culverts, drains, canal, and upgraded roads in Tan Van, Da Don communes, Dinh Van town

During operational phase

Operational and maintenance cost

2 Erosion or landslide

To manage erosion and land slide

- Considering the need to reinforce canals, culverts & roads;

- Planting and maintaining regularly vegetation cover on dam slopes, canals, roads;

- Reinforcing, compacting and planting grass at the road slopes.

Lam Dong Irrigation Works Management Co., Ltd. (Lam Ha branch) and communal

Along culverts, drains, canal, and upgraded roads in Tan Van, Da Don communes,

During operational phase

Operational and maintenance cost

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

57

No. Impacts Objectives Mitigation Measures

Mitigation measures Responsibility Location Time Cost

- Regularly maintaining and repairing broken part of infrastructures (dam crest, irrigation systems, roads, etc.).

officials Dinh Van town

3 Traffic accident increase

To ensure traffic safety

- Installing signs of speed limit and load limit; ensuring traffic safety at residential areas and at road intersections.

- Propagandizing to enhance awareness of traffic safety for local people.

Road Management Units of Division of Infrastructure - Economy of Lam Ha district.

Upgraded roads in Tan Van, Da Don communes, Dinh Van town

During operational phase

Operational and maintenance cost

4 Impact on water quality due to use of fertilizer or pesticide

To mitigate impacts on surface water

- Cooperating with the extension service agencies to ensure that farmers receive training on sustainable farming methods, pest management;

- Pit to collect containers of pesticides, fertilizer must be constructed far from water reservoirs and flood areas; or recommend people collecting these wastes, do not scatter them on field, canals;

- Biological, environmental friendly pesticides must be introduced and be prioritized to use;

- Pesticides, which are less toxic, less durable in environment, must be applied.

- Schedule of pesticides spreading must be appropriate to reduce the volume to a minimum in order to reduce pollution to local environment.

DARD of Lam Dong province and Lam Ha district;

Lam Dong Irrigation Management Co., Ltd. (Lam Ha branch)

Irrigation canals of the subproject and beneficiary areas in Tan Van, Da Don communes, Dinh Van town.

During operational phase

Included in operational and maintenance cost

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

58

6.2 Environmental monitoring

Environmental monitoring consists of (i) Environmental effect monitoring and (ii) Environmental Compliance Monitoring.

6.2.1 Environmental effect monitoring

The environmental effect monitoring has been shown in the following table:

Table 5: Environmental effect monitoring

Mitigation

Measure Parameters Location Methods Frequency Responsibility Cost

Construction phase

Control of air

quality and noise

impact

Dust generated

from the sub-

project areas and

its equipment

Construction sites and

along the constructed

roads

Observation,

document review

and public

consultation

Weekly Contractor Included in the

civil work

contracts and

CSC contracts

Control of

water

quality

Sediment

loads,

rubbish, oil or

other visible

pollutants

Significant water bodies

through canals

Observation,

document review

and public

consultation,

workers’ interview

Weekly and

after heavy rain

occurrences

Contractor

Operational phase

Surface

water

quality

Turbidity, presence

of grease

Main streams flow into

irrigation canals

Observation,

document review

and public

consultation

2 times per

year for the first 2 years

(1 time in wet season

and 1 time in dry season)

PPMU Included in

operation cost

Soil quality Evidence of

salt or alum

contamination

At 03 representative

locations of irrigated areas

of the sub-project

Observation,

document review

and public

consultation

2 times per

year for the first 2 years

(1 time in wet season

and 1 time in dry season)

PPMU

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

59

6.2.2 Environmental compliance monitoring

The environmental effect monitoring is shown in the following table:

Table 6: Environmental compliance monitoring

Mitigation Measure

Parameters Location Methods Frequency Responsibility Cost

Construction phase

EMP implementation provisions in construction contracts, construction supervision contracts

Availability of EMP implementation provisions in contracts

N/a Checking contracts

The first monitoring

LIC, CPMU, Lam Dong PPMU

Included in the LIC Contract

Manpower to implement EMP

Environment staffs mobilized by PPMU, CC, CSC

N/a Discussion with stakeholders, document review

Every 6 months LIC, Lam Dong PPMU, CSC, CC

Included in the LIC Contract and CSC contract

Landslide, erosion and sedimentation controls

Condition and capacity of controls;

Performance of all mitigation measure

Throughout construction site

Observation, document review and public consultation

After heavy rains CSC / CC Included in the LIC Contract and CSC contract

Surface water pollution

Turbidity, grease;

Performance of all mitigation measure

Da Dang river, Cam Ly, Da Me, Da SeDang streams and others small streams

Observation, document review and public consultation

Random LIC, Lam Dong PPMU, CSC, CC

Soil contamination Solid waste, grease availability;

Performance of all mitigation measure

Throughout construction sites

Observation, document review and public consultation

Random LIC, Lam Dong PPMU, CSC, CC

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

60

Mitigation Measure

Parameters Location Methods Frequency Responsibility Cost

Materials storage

Condition of materials storage area

Throughout construction site

Observation, document review and public consultation and worker interview

Weekly LIC, Lam Dong PPMU, CSC, CC

Construction equipment and vehicles

Noise and exhaust generation; covering of trucks; oil/ fuel leaks

Throughout construction site

Observation, document review and public consultation and worker interview

Random LIC, Lam Dong PPMU, CSC, CC

Construction camp conditions

Cleanliness; waste disposal facilities; general condition.

All 02 camps Observation, document review and worker interview

Weekly LIC, Lam Dong PPMU, CSC, CC

Vegetation clearance

Boundaries of vegetation clearance

Areas of sensitive vegetation

Observation, document review and public consultation

Weekly during phase of site clearance

LIC, Lam Dong PPMU, CSC, CC

Solid wastes management on the site

Dustbins and mobile septic tanks at work site

Check with waste generation, collected, transported and treated manners and documents

Performance of all mitigation measure

In all construction sites Observation, document review and worker interview

Weekly LIC, Lam Dong PPMU, CSC, CC

Waste disposal Site cleanliness and condition; temporary waste storage area

Throughout construction site

Observation, document review and public consultation

Weekly LIC, Lam Dong PPMU, CSC, CC

Local flooding Possibility of local flooding due to

Throughout construction site

Observation, document review

Random LIC, Lam Dong PPMU, CSC,

Included in the LIC Contract

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

61

Mitigation Measure

Parameters Location Methods Frequency Responsibility Cost

construction activities

Performance of all mitigation measure

and public consultation

CC and CSC contract

Traffic accident may increase and be difficulty for usual life of local people

Availability of signals or staffs to control/guide road users at site

Road component at all villages around the sub-project

Observation, document review and public consultation

Random LIC, Lam Dong PPMU, CSC, CC

Included in the LIC Contract and CSC contract

Deteriorate /damage to existing infrastructures

Agreement letters between contractors and local authorities in using public facilities;

Types of damages; level of compensation; satisfaction from local authorities as well as local residents

Throughout construction site

Observation, document review and worker interview

Weekly

LIC, Lam Dong PPMU, CSC, CC

Included in the LIC Contract and CSC contract

Impact on terrestrial ecosystems

Trees are cut outside of row; re-plant vegetation cover

Road components Observation, document review and public consultation

Random LIC, Lam Dong PPMU, CSC, CC

Included in the LIC Contract and CSC contract

Disturbance to local people’s life due to construction worker’s presence

Status of workers: registration to local authorities and conflicts in the areas between local residents and workers

Throughout construction site

Observation, document review and public consultation

Random LIC, Lam Dong PPMU, CSC, CC

Risks to health and safety to local people and workers

Equipment available; percent of workers equipped with;

Provision of any warning signals in the sites

Performance of all

Throughout construction site

Observation, document review and public consultation and worker interview

Weekly

LIC, Lam Dong PPMU, CSC, CC

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

62

Mitigation Measure

Parameters Location Methods Frequency Responsibility Cost

mitigation measure

Affect existing irrigation system

Availability of water for irrigation in crops;

Irrigation canals and production fields

Observation, document review and public consultation

Weekly, monthly in dry season

LIC, Lam Dong PPMU, CSC, CC

Included in the LIC Contract and CSC contract

Impact on surrounding agricultural land and cultivation activities

Availability of water for irrigation in crops;

Crops impacts of communes

Agricultural areas around and in downstream of Da Don weir

Observation, document review and public consultation

Weekly, monthly in dry season

LIC, Lam Dong PPMU, CSC, CC

Included in the LIC Contract and CSC contract

Cultural objects or graves found

Checking each case and performance of contractors

Throughout construction site

Observation and public consultation and document review

If any LIC, Lam Dong PPMU, CSC, CC

Environment recovery

Ensuring environment is restored in its original condition

Worksites, and disposal locations

Observation and public consultation

Once before handing over

LIC, Lam Dong PPMU, CSC, CC

Operational phase

Culverts & canals obstructing or flooding

Ensuring culverts and canals to be operated well

Irrigation component Observation and public consultation

6 months for the first 5 years of operation

Lam Dong PPMU

Included in operational stage budget

Risk of traffic accident increase due to better road surface

Controlling traffic accident Traffic component Observation and discussion with local authority

6 months for the first 5 years of operation

Lam Dong PPMU

Water quality could be pollution due to use of fertilizer or pesticide

Water usage safety Households closed to irrigation canals

Observation and discussion with local authority

6 months for the first 5 years of operation

Lam Dong PPMU

Erosion or land slide Ensure the canals/ roads In both components Observation and discussion with

6 months for the first 5 years of

Lam Dong

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

63

Mitigation Measure

Parameters Location Methods Frequency Responsibility Cost

to be operated well local authority operation PPMU

Environment recovery

Ensure environment is recovered to its original condition

In both components Observation and discussion with local authority

6 months for the first 5 years of operation

Lam Dong PPMU

6.3 Capacity Building for EMP implementation

The relevant stakeholders need to ensure the EMP implementation as their responsibilities. All CPMU, Lam Dong PPMU, CSC and CC need

to appoint officials/staffs to be in charge of environmental management. However, most of these officers/ staffs are also assigned for other works

and they are not specialized in environmental management. Thus, to ensure EMP is implemented in compliance with sponsor policies and

Vietnamese legislation, these officers/ staffs must be guided/ trained on EMP implementation capacity building. Training on EMP implementation

must be held for different groups with different requirements.

- Lam Dong PPMU and CSC: The staffs that are in charge of environment will be trained (at least once in the first 3 months of the project) on

monitoring and preparing environmental reports.

- Construction contractor (CC): will be trained (immediately after signing contract) on implementing mitigation measures and preparing reports.

Table 7: Schedule of training on capacity building

Agency Session Participant Frequency of training Duration and type Responsibility Cost

PPMU Environmental

monitoring and report

preparation

Environmental staffs,

engineers

1 time when starting the

project and then update

it, if any, depending on

implementation

1 day of training CPMU/ LIC Included in the

project management

cost and LIC

Contract

CSC Environmental

monitoring and report

preparation

People who are in

charge of environment

and people related to

environmental

management

1 time when starting the

project and then update

it, if any, depending on

implementation

1 day of training CPMU/ LIC Included in the

project management

cost and LIC

Contract

CC Implement mitigation

measures

Main contractors

report to Lam Dong

1 time when signing

contract then update it,

1 day of training CPMU/ LIC Included in the

project management

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

64

Agency Session Participant Frequency of training Duration and type Responsibility Cost

PPMU if any, depending on

implementation

cost and LIC

Contract

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

65

6.4 Budget for EMP implementation

The budget allocation for implementation of EMP of the sub-project has been described in following table:

Table 8: Budget for EMP implementation

Item Preparation

phase Construction phase Operation phase Total

CSC Included in the

contract with Lam

Dong PPMU

Internal monitoring

on EMP

implementation of

Lam Dong PPMU

Included in the

project

management

cost of Lam

Dong PPMU

Included in the

contract of CC, CSC

and Lam Dong PPMU

management cost.

Provincial and

local budget

Included in

contract and

operational

stage budget

Implementing

mitigation

measures

The sub-project

preparation cost

Included in the

construction contracts

Operation and

maintenance cost

Monitoring EMP

implementation

(undertaken by LIC)

Included in the

contract between

CPMU & LIC

Public consultation

and information

disclosure

VND 15,000,000 VND 15,000,000 VND 15,000,000 VND 45,000,000

VII. IMPLEMENTATION RESPONSIBILITY AND REPORTING

7.1 Implementation responsibility

Three agencies, which are related directly to EMP implementation, are Lam Dong PPMU,

CSC and CC. The responsibilities of relevant stakeholders in EMP implementation are presented

as table below:

Table 9: Responsibility of stakeholders

Agency Responsibilities

CPMU - Recruiting consultant for safeguard policies preparation;

- Reviewing, adopting, and submitting to ADB IEE reports;

- Assigning LIC to monitor EMP implementation;

- Guiding Lam Dong PPMU to integrate EMP into tender documents / CSC

contract;

- Reviewing monitoring reports of LIC and internal reports of Lam Dong PPMU;

- Reporting EMP implementation to ADB;

- Assigning experienced staff/s to follow up and monitor EMP implementation.

PPMU Lam Dong - Lam Dong PPMU is liable for any recommendations regarding improvement of

the project with the aim of protecting and maintaining environment. It includes

environmental grievances and grievances redress related to subproject

implementation;

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

66

Agency Responsibilities

- Appointing specialized personnel to monitor environment of the subproject;

- Posting up EMP information at CPC where the project goes through;

- Integrating environmental requirements including sanctions for failure to comply

EMP into bids / contracts with CC and CSC;

- Instructing and approving EMP package prepared by construction contractor;

- Supporting and coordinating with the agencies implementing EMP;

- Ensuring adequate fund for EMP implementation;

- Arranging and joining in capacity building training on EMP implementation

conducted by LIC;

- Periodically reporting EMP implementation to CPMU and Lam Dong DONRE.

Construction

supervision

consultant (CSC)

- Appointing staff/s to be in charge of environment and participating in training

courses conducted by LIC;

- Reviewing EMP prepared by contractors and submitting it to Lam Dong PPMU

to get approval;

- Besides monitoring construction quality, CSC also implement compliance

monitoring on environmental safeguard of construction contractors every day

as stipulated in EMP;

- Reporting monitoring results and findings to Lam Dong PPMU monthly.

Construction

contractor (CC)

- Appointing staff/s to monitor environmental issues of the construction. This staff

can be a concurrent staff/s if the workload of environmental is not heavy;

- Based on the EMP of sub-project, CC will prepare their own EMP;

- Implementing mitigation measures to minimize potential negative impacts as

instructed in the EMP;

- Closely coordinating with local communities to perform environmental mitigation

measures during construction process;

- Ensuring that all construction activities have complete documents from the

relevant authorities;

- Implementing all measures to minimize negative impacts and to protect

environment;

- Ensuring that staffs and employees understand the process and their duties in

the EMP;

- Reporting to Lam Dong PPMU the difficulties and problems, if any;

- Reporting to stakeholders the environmental issues and coordinating with them

to solve those issues.

Lam Dong PPC/

DONRE

- Monitoring any violation under policies on environmental management and

protection of Vietnam;

- Evaluating any change of the design that can cause environmental impacts.

Lam Ha

DPC/DONRE

- Approving Environmental Protection Plan (EPP) of the sub-project in

accordance with the provisions of Vietnamese law;

- Monitoring EMP implementation through internal monitoring system of the DPC.

Social

organizations,

Women’s Union

- Playing a key role as a link between local community and PCs;

- Community monitoring;

- Mobilizing community participation in subproject implementation;

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

67

Agency Responsibilities

and other

associations

- Coordinating with Lam Dong PPMU and contractors to perform mitigation

measures;

- Participating in resolving environmental problems.

Local community - In Vietnam, the communities have the right and responsibility to regularly

monitor environmental activities in the construction process to ensure that the

rights and their safety is protected fully and mitigation measures are

implemented effectively;

- In case of problems, they will report to community team, CC or PPMU.

7.2 Report system

Besides monitoring on EMP implementation, stakeholder is also responsible for periodic

report EMP implementation. Table below shows the system of monitoring and reporting.

Table 10: Monitoring and reporting system

Phase Report Frequency Responsibility Submit to

Co

nstr

uctio

n

Periodically report on implementation of

mitigation measures: Presented in details of

EMP activities of the subproject/packages and

monitoring results.

Monthly CC Lam Dong

PPMU and

CSC

Periodically report on EMP implementation

of construction contractor: Presented in

details of EMP activities of the subproject and

monitoring results.

Monthly CSC Lam Dong

PPMU

Periodically report on EMP implementation

of the subproject: Presented in details of

EMP activities of the subproject and monitoring

results.

Every 3

months

during

construction

phase

Lam Dong

PPMU

- CPMU

- DONRE

of Lam Ha

district

Environmental Monitoring Report -

Periodically monitoring report on EMP

implementation of the sub project:

Presented in details environmental activities of

the subproject and activities in compliance with

EMP of the subproject and monitoring results.

Every 6

months

during

construction

phase

CPMU/LIC ADB

Op

era

tio

n Periodically report on EMP implementation

at operation: Presented in details activities in

compliance with EMP of the subproject in

operational phase.

Every 6

months

Sub-project

operation

agency at

district level

CPMU

VIII. PUBLIC CONSULTATION AND INFORMATION DISCLOSURE

Public consultation and information disclosure of the subproject as well as EMP have to be

implemented continuously from the design phase to the construction phase. It consists of collecting

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

68

community ideas as well as encouraging local people’s participation and monitoring on EMP

preparation and implementation of the subproject. Public consultation is in preparing IEE of the

sub-project. The minutes and pictures of public consultation are in Annex 1 & Annex 2.

8.1 Public consultation in the subproject preparation phase

8.1.1 Description of activities to date

Table 11: Public consultation description

Consultation method Description of activities

By dispatches and meeting

with local officers

Date of

correspondence

Lam Dong PPMU contacted with local

authorities by telephone to agree on

public consultation

Dates of meetings (if

requested)

No

Minutes of meeting

attached (yes/ no)

No

Public meeting

Organization date April 3rd, 2018

Organization location PC of communes/town

Invitees Beneficiaries, headers of villages and

representative of local authorities.

Invitation method Per the public media of the commune

(header of villages announce every HH).

The Women’s Union also invites women

to attend the meetings.

Meeting schedule

attached (yes/ no)

Yes

Minutes of meeting

attached (yes/ no)

Yes

Number of participants - Da Don commune: 18 people (07

females)

- Dinh Van town: 24 people (02

females)

- Tan Van commune: 17 people (04

females)

8.1.2 Outcomes of the public consultation to date

All ideas/concerns from local people during the public consultation were reported by SPC to

Lam Dong PPMU and integrated into the IEE as stated in table 4 (EMP) of IEE and 100% of

participants agreed with sub-project development. The summary of the main ideas/concerns is in

the table below:

Table 12: Results of public consultation

Issues raised Required follow-up actions?

Description By Whom?

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

69

Issues raised Required follow-up actions?

Description By Whom?

Potential damage existing road Local people - Trucks with loading capacity less than 10

tons.

Abundant spoil (soil, stone etc.)

from constructional activities (if

any) to be used by local people

Local people - Contractors have to notify abundant spoils to

local people if it is available.

Original environmental recovery Local people Contractors have to recover environment at sites,

including:

- Inappropriate disposal site of the subproject.

- Mines, especially borrow pit;

- Temporarily occupy land around sites and on

roads.

- Checking survival of trees and plants

complementarily if any.

Bad quality of the proposed

works

Local people - Local people agree on taking part in

community monitoring team set up by Lam

Dong PPMU and local authority.

8.2 Public consultation in the future

There will be other public consultations in the future and their implementation plans have been shown as following:

Table 13: Expected public consultation activities

Activities Participants Expected results Schedule Cost

Community

meeting

before

construction

commence

Lam Dong PPMU,

CC, CSC,

representative of

local authorities and

local people

- Announcement of

construction items and

construction plan.

- Agreement on details of

mitigation measures

(especially water off

schedule).

1 week before

construction

commence.

Included in

EMP budget

Periodic

meeting

CC, CSC,

representatives of

local authority,

organization, and

community within the

sub-project area

- Periodically monitoring

mitigation measures

application, and

outstanding issues;

- Proposal of mitigation

measures and agree on

implementation.

Every 1

month from

the

construction

commence.

Included in

contract with

stakeholders

8.3 Public information disclosure

- After IEE is approved, Lam Dong PPMU is responsible for posting up IEE summary at CPC

of Tan Van, Da Don communes and Dinh Van town.

- IEE report will be posted on ADB website.

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

70

IX. GRIEVANCE REDRESS MECHANISM

9.1 Purpose of the mechanism

During the implementation of the subproject, local people are informed of environmental

protection activities described in EMP. Negative impacts on the environment may occur during the

construction and operational phases. Any comments / grievances of local people will be solved

quickly, transparently and in compliance of laws, particularly for affected people by the sub-project.

Grievance redress mechanism will be classified by level and responsibilities of involved parties.

9.2 Grievance redress mechanism

Per the environmental management frame, there are 03 steps to redress grievance as

below:

Stage 1: If a household has any grievance, he/she can submit it to the CPC-community

monitoring board. CPC will work with CSC and CC to solve it.

Stage 2: If the grievance is not redressed, it will be submitted to the Lam Ha DPC to

redress. Lam Ha DPC (through Lam Ha DONRE) will work with PPMU to solve it.

Stage 3: If more than 15 days pass without response from Lam Ha DPC, the complainant

may submit a grievance to the Lam Dong PPC (through Lam Dong DONRE). Lam Dong PPC will

require Lam Ha DPC to solve it. In case the grievance is still not redressed, Lam Dong PPC will

require environmental police to investigate and requested stakeholders to solve it. See the

mechanism in figure below:

Figure 3: Grievance redresses mechanism

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

71

X. CONCLUSION, COMMITMENTS AND RECOMMENDATIONS

10.1 Conclusion

The results of environmental screening and environmental impact assessment show that

the sub-project may cause some environmental impacts but most of such impacts are minor to

moderate. However, the appropriate mitigation measures have also proposed to manage the

negative impacts and maximize the benefit of the subproject. The responsibilities of implementation

and monitoring of the stakeholders have also identified in this IEE report to ensure environmental

compliance.

10.2 Commitments

Lam Dong PPMU of the subproject “Reinforcing Da Don irrigation works, Lam Ha district,

Lam Dong province” commits themselves to:

- Implement requirements of environmental safety as stated in IEE via information

dissemination, integrating environmental safety as stated in this IEE in bidding documents,

in construction and in the CSC contracts; mobilize human resources and monitor internally

the IEE compliance;

- Report environmental management plan implementation to Lam Dong DONRE and CPMU

periodically as specified in the IEE;

- Compensate and take measures against environmental pollution if there is any problem

during operational phase of the sub-project;

- Redress grievances if any.

10.3 Recommendations

Based on the IEE report, the Lam Dong PPMU would recommend that:

- No further environmental assessment is needed because the impacts on environment is

temporary, minor or insignificant, when application of mitigation measures during the

construction phase.

- Based on IEE, Lam Dong PPMU would like to request functional authorities to appraise and

approve the IEE for “Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong

province” sub-project to create the basic for next implementation steps, ensure the

implementation progress, effectiveness and benefits of the subproject.

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

72

XI. ANNEXES

Annex 1: Images of public consultation & at the sub-project site

Public consultation in Dinh Van town Public consultation in Tan Van commune

Public consultation in Da Don commune Head of main canal (box canal) in Da Don

weir

A section of N2 canal, canal bank road and

existing drainage canal

Head of N1 canal

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

73

Material yard area Route to the existing material yard

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

74

Annex 2: Minutes of public consultation

2.1 Minutes of public consultation in Dinh Van town

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

75

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

76

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

77

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

78

2.2 Minutes of public consultation in Da Don commune

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

79

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

80

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

81

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

82

2.3 Minutes of public consultation in Tan Van commune

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

83

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

84

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

85

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

86

Annex 3: Minutes of agreed borrow pit and disposal site

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

87

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

88

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

89

Annex 4: Monitored results of environmental parameters

Analyzed results of ambient air quality

No. Parameter Unit Result

QCVN 05:2013/BTNMT

KK1 KK2

Microclimate

1 Temperature 0C 27.3 26.4 -

2 Moisture % 80.3 81.6 -

3 Wind speed m/s 1.3 0.9 -

Air quality

4 SO2 mg/m3 0.04 0.05 0.35

5 NO2 mg/m3 0.03 0.03 0.2

6 CO mg/m3 3.8 4.1 30

7 TSP mg/m3 0.15 0.19 0.3

Source: Analysis Centers and Environmental Geodesic Phuong Nam

Analyzed results of noise

Sampling location Sound level (dBA)

Measurement range(40-110 dB)

KK1 54.2 – 61.7

KK2 57.8 – 68.4

QCVN 26:2010/BTNMT 70

Source: Analysis Centers and Environmental Geodesic Phuong Nam

Note:

- Samples were taken on January 15, 2016

- QCVN 05:2013/BTNMT: National technical regulation on ambient air quality.

- QCVN 26:2010/BTNMT: National technical regulation on noise.

- Sampling locations:

+ KK1: Sample at head of road along main canal of head-works (VN 2000 coordinates: X=1311301;

Y=0550088).

+ KK2: Sample at road closed to head of drainage canal (VN 2000 coordinates: X=1305356;

Y=0552837).

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

90

Analyzed results of surface water quality within sub-project area

No. Parameter Unit Result QCVN 08-MT:2015-BTNMT

(B1 column) NM1 NM2

1 pH - 7.3 7.2 5.5 - 9

2 Turbidity NTU 22.7 24.3 -

3 Dissolved Oxygen (DO) mg/l 4.8 4.2 ≥ 4

4 Total dissolved solid (TDS) mg/l 37 41 -

5 Total suspended solid (TSS) mg/l 19.2 24.5 50

6 COD mg/l 14 18.2 30

7 BOD5 (20oC) mg/l 8 12 15

8 Total N mg/l 4.1 6.2 -

9 Total P mg/l 0.4 0.5 -

10 Nitrate (NO3-) mg/l 0.2 0.5 10

11 Ammonium (NH4+) mg/l 0.1 0.3 0.9

12 Phosphate (PO43-) mg/l 0.1 0.2 0.3

13 Total Fe mg/l 0.2 0.3 1.5

14 Total oil mg/l 0.03 0.08 1

15 E.coli MPN/100ml 5 24 100

16 Coliform MPN/100ml 2,200 5,600 7,500

Source: Analysis Centers and Environmental Geodesic Phuong Nam

Note:

- QCVN 08:2015/BTNMT: National technical regulation on surface water quality.

- Sampling locations:

+ NM1: Sample at water intake, VN 2000 coordinates: X=1311268; Y=0550093;

+ NM2: Sample at the end of main canal, VN 2000 coordinates: X=1307465; Y=0550756.

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

91

Annex 5: Acceptance minutes on UXO completion

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

92

Annex 6: Environmental requirement in the bidding document

No. Impacts Mitigation Measures Location

1 Landslide, soil erosion or sedimentation flows into irrigation canals, drains

- Excavation works need to be scheduled to avoid rainy season (from the end of May or early of June to November) as much as possible;

- Splitting construction section by section to reduce the open storage of materials and extent of excavation and embankment;

- Material storage areas need to be bounded and covered during rainy days;

- Stabilizing slopes, embanked area and other erosion-prone working areas while works are proceeding at 01 borrow pit;

- Re-planting vegetation covering in upstream slope sections of the dams and the road as soon as possible after excavation and embankment works are achieved;

- The exploitation of 01 borrow pit needs to avoid rainy days that may cause landslide;

- The exploitation of 01 borrow pit needs to be dug in subsequent sections to better control verticality of digging areas;

- Not allowing any heavy machines or other equipment to be located on the top of digging areas to avoid possible landslides.

Sloping areas of Da Don weir, slope and roads within subproject area in Tan Van, Da Don communes, Dinh Van town

2 Surface water pollution

- Discarded lubricant and other chemicals have to be kept in dry and covered carefully;

- Providing 4 dustbins and 02 mobility septic tanks at work sites to manage wastewater and domestic waste from workers at 02 worker camps;

- Contractors’ personnel in all sites shall prohibit disposal of solid wastes into Da Dang river, Cam Ly stream, Da Me stream, Da SeDang stream, Da K’Nang stream and other streams as well as ditches, canals, agricultural fields through notices on signboards at sites and daily patrols;

- Contractors must prepare a place to wash vehicles/means of transportation. Washing trucks/ vehicles next to the water bodies, existing rivers, streams, canals, and reservoirs such as Da Dang river, Cam Ly stream, Da Me stream, Da SeDang stream, Da K’Nang stream and other streams as well as ditches, canals within subproject area will not be permitted;

- Locations of 02 worker camps need to be apart from reservoirs & springs to avoid water contamination from domestic waste;

- Covering material storage areas if it rains. Temporary storage of construction and domestic waste on the sites will be no longer than 24 hours.

Water bodies closed to sub-project areas such as Da Dang river, Cam Ly stream, Da Me stream, Da SeDang stream, Da K’Nang stream and other streams as well as ditches, canals of the sub-project area

3 Noise and vibration

- Construction vehicles, machines, and equipment need to meet the standards related to noise, and vibration as regulated by the Government. The Contractor needs to submit the official documentation to prove that all construction vehicles, equipment, and machines are checked and meet requirements concerning noise and

Residential areas near construction site and along the transportation road, 01 borrow

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

93

No. Impacts Mitigation Measures Location

vibration generation of the current Vietnamese standard;

- Ensuring that all construction vehicles and equipment are well maintained. All activities generating noise and vibration shall be avoided during resting time of local people (12 p.m. to 13 p.m. and 20 p.m. to 6 p.m.) along the upgraded roads in Tan Van, Da Don communes, Dinh Van town;

- Providing ears’ protective equipment for workers working in high noise conditions generated by machines and/or equipment, and allowing workers to have reasonable time-off from work when they are exposed to excessively long periods to noise and vibrations, as regulated in Decision No.3733/2002 of Ministry of Health;

- Detailed construction schedule needs to be publicly announced by the contractor to local people (on the notice boards of Tan Van, Da Don communes, Dinh Van town) so that these people could arrange their activities, avoid being close to the working sites and be affected by the impact of noise and vibrations.

pit and 01 disposal site in Tan Van, Da Don communes, Dinh Van town

4 Air pollution - Covering trucks and transportation vehicles to minimize dust generated when transporting materials as well as waste.

- Equipment/vehicles have to be verified and licensed. Specifically, transporting vehicles need to meet the standards related of exhaust emissions as regulated by Government and according to Decision 249/2005/QD-TTg of the Prime Minister about emission standards to road motor vehicles;

- Watering to minimize dust generation needs to be implemented for roads and construction sites that are close to residential area in Tan Van, Da Don communes, Dinh Van town;

- The watering activities have been proposed at least once per day during the rainy season and twice a day during the dry season in construction area;

- The use of construction materials needs to be properly planned to limit as much as possible the volume of quantities stored at sites;

- Equipment and machines will not be allowed to move out of construction sites to ensure control of emission;

- Materials or soil falling from the vehicles on the road shall be removed immediately;

- All material/waste storages shall be located away from any HHs and sensitive areas.

Worker camps and residential areas along constructed road and transportation routes in Tan Van, Da Don communes, Dinh Van town.

5 Solid waste and hazardous waste generation

- All excavated soil will be utilized to embank, thus there is no residual volume. In case that local people ask excavated soil for their house construction, the agreement between local households, contractors and local authorities need to be obtained.

- Hazardous waste will be collected and transferred to licensed collection company as required by Circular 36:2015/BTNMT of MONRE.

- Equipping 04 dustbins and 02 mobile septic tanks to work-

All sub-project construction sites, 01 borrow pit and 01 disposal site and 02 camps

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

94

No. Impacts Mitigation Measures Location

sites for waste collection and treatment.

- Disposal of solid wastes into canals, springs, other water resources, agricultural field and public areas shall be prohibited.

- Burning of construction and domestic wastes shall be prohibited.

6 Soil contamination

- Covering material storage areas and handling chemicals and wastes to ensure that construction materials and/or wastes could not fall into agricultural land within the sub-project areas;

- Discarded lubricant, chemicals must be kept in dry area or covered when raining;

- Hazardous waste, if any, needs to be collected, transported and treated according to Circular No. 36:2015/BTNMT of MONRE;

- Providing 4 dustbins and 02 mobility septic tanks in all construction sites and 02 worker camps;

- Wastewater from 02 worker camps needs to be collected and treated by mobile septic tanks before discarded to environment.

Construction sites, 01 borrow pit, 01 disposal site, and 02 worker camps in Tan Van, Da Don communes, Dinh Van town.

7 Local flooding - Setting up appropriate construction schedule/ plan to avoid rainy season, especially for excavation activities. This has been strictly applied for excavation, embankment and construction activities in upgraded irrigation canals;

- Managing storage of materials and/or wastes to avoid these wastes falling into water in irrigation canals that causes blocking intakes and/or aqueducts.

- Regularly checking water flow situation of canals, water intakes, and culverts and removing materials/wastes that block water flow.

- Placement of equipment for washing vehicles and tools next to the existing rivers, springs, and canals such as Da Dang river, Cam Ly, Da Me, Da SeDang, Da K’Nang streams and other small streams as well as ditches, canals within the subproject area will not be allowed.

Residential areas in downstream of Da Don weir, canals as well as water intakes of the subproject in Tan Van, Da Don communes, Dinh Van town

8 Unsafe condition for travelling and business during the road construction (Traffic safety)

- Installing signals at construction sites to regulate and minimize speed of vehicles or warning signs at construction sites, especially at the road’s intersections.

- Installing lamps at night at construction sites.

- Informing communities about construction schedule through public consultation or at any local people meetings and posting up related information on notice board of Tan Van, Da Don communes, Dinh Van town.

- Construction activities should be done section by section to minimize temporarily occupied land area along roads.

- Training for drivers of sub-project as well as worker on respecting safety rules and warning people passing nearby the sites.

- At least 01 worker, in peak hours, will be assigned to monitor the vehicles go in and out of construction sites as well as warning people in order to assure traffic safety.

Along the constructed road, at intersections and transportation routes of sub-project in Tan Van, Da Don communes, Dinh Van town

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

95

No. Impacts Mitigation Measures Location

9 Impact on local environmental landscape and ecosystems

- Only cutting down private trees and agricultural plants that have been taken into account in compensation plans.

- Cutting plants and/or damaged fields, which are out of the ROW, will be compensated according to voluntary agreement.

- Re-planting vegetation cover section by section after construction work completed to return landscape in its original condition.

Along the upgraded roads, canals, Da Dang river, Cam Ly, Da Me, Da SeDang, Da K’Nang streams and other small streams, 01 borrow pit and 01 disposal site

10 Deteriorate / damage to existing infrastructure

- Working with existing infrastructure owners (electricity, water...) to identify locations of underground components if any;

- Obtaining the agreement with local authorities in using the transport routes;

- Any public facilities damaged during the sub-project activities should be fully repaired and recovered to their original conditions by the contractor;

- Load capacity of trucks should not exceed local bridges / roads (it is the best to use truck with capacity lower than 5-10 tons, paying special attention to roads that designed load is 5 tons only);

- After construction has completed, all public facilities must be re-checked to ensure that theirs functions have not been affected by sub-project activities, if any damage has been identified except normal wear and tear, the contractor will be responsible for repairing the damaged structures to their original conditions and compensate for damages that cannot be recovered.

All roads/culverts or bridges within the subproject area in Tan Van, Da Don communes, Dinh Van town

11 Disturbance to local people’s life due to presence of construction workers

- Priority should be given to local labors by the contractor;

- Registering provisional residence for workers living in the worker camps;

- Contractor needs to regulate camp sanitation regulations.

- Carrying out HIV/AIDS and sex transmission infection prevention program, all workers should attend this training organized by the project.

- Propagating and raising awareness of the construction workers to maintain discipline, habits and customs and create good relationships with local people, reduce social evils.

- Contractors organize provision of meals for all workers at each site to ensure hygiene and food safety.

- Spraying insecticides in the 02 worker camps regularly;

- Training and guiding labor safety measures and prevention of common diseases for workers.

In 02 worker camps and local people in Tan Van, Da Don communes, Dinh Van town

12 Risk to health of local people and construction workers

- Construction contractors need to register number of labors working for sub-project to local authorities.

- Regularly testing health of workers against infectious diseases as regulated by Ministry of Labor, War invalids

In 02 worker camps and local people in Tan Van, Da Don

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

96

No. Impacts Mitigation Measures Location

and Social Affairs.

- Providing sufficient labor safety equipment for workers such as safety shoes, helmets, etc. Instructing workers how to use this equipment and monitoring regularly to ensure compliance.

- A first aid kit will be provided at each construction site to ensure that patients can receive first aid timely before transporting them to the medical station/ hospital;

- Collaborating with communal clinic center to receive additional support.

- Installing power network at construction sites in accordance with official safety regulations, ensuring that the power lines are safe and that power connection to grid or generators are located at dry and safe places.

- Installing fences and warning signs at receptacles.

- Displaying information panels on the labor regulations at sites.

- Installing fences, warning signs at the intersection between the canals and roads.

- Keeping the light switched on during nigh time on all construction sites.

- Constructing temporary drainage ditches to drain water from site, prevent any possible waterlogging.

- Preparing emergency alerts and remedy intervention for any occurrence that could occur during construction activities such as fire, flooding or other unforeseen event.

communes, Dinh Van town

13 Impacts around the borrow pit, stone pit and sand pit.

- The soil will be utilized from 01 borrow pit in Da Don commune (about 3 km) belonging to private household, thus this is not long distance and it will reduce impacts due to dust. Therefore traffic safe will be ensured;

- Exploiting section by section to avoid excessive dust generation and landslides and prepare recovery plan for exploited areas;

- Nighttime transportation should be minimized to avoid traffic accident possibly due to poor nighttime visibility.

- The stone and sand will be purchased from stone pit in Duc Trong district, about 10 – 20 km to the construction site, where environmental issues are controlled and mitigated by local authorities and pits’ owners. Construction contractor needs to check license and environmental mitigation measures of such pits.

- Material transportation will be implemented continuously. Vehicles will be covered to reduce dust and falling.

01 borrow pit in Da Don commune, stone pit in Duc Trong district and sand pit in Dinh Van town

14 Affect existing irrigation systems

- The construction of irrigation canal systems and their works must be scheduled and planned considering water availability for agriculture fields. Those plans need to be agreed with local DARDs of Lam Dong province and Lam Ha district, and Tan Van, Da Don communes, Dinh Van town, then those plans will be posted up on notice boards for local people;

- Contractor needs to apply adequate measures to ensure that downstream of upgraded irrigation canals will not be deprived of needed water. It should be accelerated (2

Da Don irrigation works

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

97

No. Impacts Mitigation Measures Location

months) according to the plan of shutting the water off to ensure timely irrigation for Summer-Autumn crop;

- The water for construction will be taken from existing canals. Construction needs to implemented section by section to minimize impacts.

15 Impact on surrounding agricultural land and cultivation activities

- The construction plans must be scheduled and planned considering water availability for fields. Those plans need to be consulted with local DARDs of Lam Dong province and Lam Ha district, Tan Van, Da Don communes, Dinh Van town, and then these plans must be posted up at information board of Tan Van, Da Don communes, Dinh Van town.

- Constructing section by section to ensure traffic in upgraded road.

- For canals system: Canals within the subproject area are soil ones as with small sizes which do not go through river, springs, therefore, it is only needed to close the valves in upstream of branches to implement construction activities when they are dried out so that flow diversion method will not be needed. Canals could be constructed at the same time to shorten construction time. Shutting the water off for construction will be implemented (2 months from April 1st to June 1st, between Winter-Spring crop and Summer-Autumn crop). In this period, construction of main work items will be focused. Then, supplying water and completing the remaining work items. The items will be constructed upwards and section by section.

- Any negative impact on irrigated fields (mainly insufficient or interrupted water supply causing losses to crops) occurring during construction period need to be adequately compensated.

Areas irrigated by upgraded canals, Da Don irrigation system, upgraded roads in Tan Van, Da Don communes, Dinh Van town.

16 Cultural objects or graves found

- If any cultural object and/or grave is found during construction phase, the construction activities at those places need to be temporarily stopped and local authorities should be immediately informed to deal with the issue;

- Proper forms of compensation need to be undertaken after consultation with households suffering the impact on their graves, and the construction contractor should provide the needed support to these HHs to resettle graves elsewhere or to communes for cultural objects found.

Construction areas and 01 borrow pit in Tan Van, Da Don communes, Dinh Van town

17 Environmental recovery activities

- During construction, any damage to local infrastructures will be compensated and mitigated by construction contractor as mentioned above.

- The environmental issues emerged during recovery activities such as noise, dust, gases, solid waste, hazardous waste, water pollution etc. will be handled with similar measures indicated in related section above.

- Re-planting trees after completing construction activities.

- Repairing damaged infrastructures as soon as possible.

- Restoring water-flows into upgraded reservoirs and canals to recover aqua-ecosystem.

Da Don weir, areas along the upgraded canals, roads and 01 borrow pit

Initial Environmental Examination (IEE)

Subproject: Reinforcing Da Don irrigation works, Lam Ha district, Lam Dong province

98

No. Impacts Mitigation Measures Location

- Restoring the landscape in and around borrow pit to avoid landslides after exploitation completed.