Date 20.02.2012 Sl. Project Name Status 1 Hai Phong 3-1 Commenced 2 3 Son my #3 Expected to finish by 2018 4 Vinh Tan II #2 5 Long Phu 6 Soc Trang 7 Expected to be complete in 2013 8 Kiew Giang To be completed in 2012 Thai Binh Coal Fired Power Plant Turbine of Thai Binh 2 thermo power plant will be put into commercial operation in 2013 and the second one in 2014 The deputy prime minister requires the investor to ensure the projects’ implementation pace for the other two projects of Vinh Tan 1 and Vinh Tan 3, together with putting the first turbine of Vinh Tan 2 thermo power plant into operation in Long Thermal Power Plant Phu 1 will put into operation of machine assembly No. 1 in 4 October 2014,assembly No. 2 on 10 May 2014, one year earlier than planned. The Soc Trang power complex is planned to have four power plants with a total installed capacity of 4,400 MW and will be constructed in phases. Soc Tra Vinh - Wind Project

Upload: skohli2000

Post on 27-Oct-2015

27 views

Category:

Documents


0 download

DESCRIPTION

Power Sector in Vietnam

TRANSCRIPT

Page 1: Vietnam Power Projects

Date 20.02.2012

Sl. Project Name Status

1 Hai Phong 3-1 Commenced

2

3 Son my #3 Expected to finish by 2018

4 Vinh Tan II #2

5 Long Phu

6 Soc Trang

7 Tra Vinh - Wind Project Expected to be complete in 2013

8 Kiew Giang To be completed in 2012

9

Thai Binh Coal Fired Power Plant

Turbine of Thai Binh 2 thermo power plant will be put into commercial operation in 2013 and the second one in 2014

The deputy prime minister requires the investor to ensure the projects’ implementation pace for the other two projects of Vinh Tan 1 and Vinh Tan 3, together with putting the first turbine of Vinh Tan 2 thermo power plant into operation in 2013

Long Thermal Power Plant Phu 1 will put into operation of machine assembly No. 1 in 4 October  2014,assembly No. 2 on 10 May 2014, one year earlier than planned.

The Soc Trang power complex is planned to have four power plants with a total installed capacity of 4,400 MW and will be constructed in phases. Soc Trang 1 (1,200 MW) power plant will be financed by the Japan Bank for

Nhon Trach 2 combined cycle power plant goes on line in Vietnam

After a construction period of only 28.5 months the Nhon Trach 2 combined cycle power plant started commercial operation in Vietnam on October 16, 2011

Page 2: Vietnam Power Projects

10

11

12 Cam Pha

13

14

Van ThongCoal Based power project

Under this BOT (build, operate, transfer) power project, a supercritical coal-fired power plant with a generation capacity of 1,320 megawatts (two 660-megawatt boiler turbine generator units) will be built to supply electricity to "Electricity of Vietnam" (EVN) over a period of 25 years, using coal imported from Australia and other countries as fuel. Sumitomo aims to complete plant construction and start commercial operations in 2015

Omon600 MW thermo electric power plant, the first project of the largest thermo-electric power centre in the Mekong Delta,

The first turbine group was scheduled to begin operation in late 2008 and the second, in 2010.

On Sep. 15, 2011 the two thermo power plants of Cam Pha 1 and Cam Pha 2 were handed over to Cam Pha Thermo Power Joint Stock Co, under Vietnam Coal and Mineral Industries Group (Vinacomin).

Son Dong220-megawatt (MW) Son Dong coal-fired thermal power plant

On November 8, Son Dong power station in Vietnam received the Provisional Acceptance Certificate (PAC). Its two units are running smoothly so far.

Quang Ninh 1,080MW thermo power plant

Its first turbine is expected to become operational in the first quarter of 2015, with the second to follow in the third quarter.

Page 3: Vietnam Power Projects

Concerned Organisation Info uploaded date Web site address

16.06.2009

26.06.2010

Son My Power Centre 24.02.2012

01.06.2010

ADB

06.07.2011

17.04.2007

10.11.2011

Dongfong Electric Corporation Marubenic Corporation

http://www.uni-bros.com/en/news.php?cid=3&id=12139

Electricity of VietnamPetroVietnam Power Corp

http://vietnambusiness.asia/work-on-thai-binh-2-thermo-power-plant-to-start-in-december-2010/

http://www.uni-bros.com/en/news.php?id=13490&cid=3

http://vietnambusiness.asia/first-turbine-of-vinh-tan-2-thermo-power-plant/

http://pid.adb.org/pid/TaView.htm?projNo=42083&seqNo=01&typeCd=2

Cong Ly Construction, Trading and Tourism Co Ltd

http://www.intellasia.net/news/articles/business/111331285.shtml

HANOI, Vietnam (AP) -- Australian coal mining company Ensham Resources Pty Ltd.

http://www.asiafinest.com/forum/index.php?showtopic=117021

http://www.siemens.com/press/en/pressrelease/?press=/en/pressrelease/2011/fossil_power_generation/efp201111010.htm

Page 4: Vietnam Power Projects

Posco Vinashin, Sumitomo 24.11.2009

16.09.2011

26.12.2011

24.10.2011

http://www.sumitomocorp.co.jp/english/news/2009/20091124_112559.html

Electricity of Viet Nam corporation

http://www.uni-bros.com/en/projects.php/omon_2_3_4_gas_fueled_power_plants/mode=target/id=17

The China-based Harbin International Power Engineering Co Ltd

http://vietnambusiness.asia/cam-pha-thermo-power-plant-no-12-officially-handed-over/

http://www.sfeco.net.cn/English/NewDetail.aspx?ID=76

http://vietnamnews.vnagency.com.vn/Industries/216839/construction-underway-on-17billion-power-station-.html