vievs user workshop 14 – 16 september, 2011 vienna vie_sched jing sun

19
VieVS User Workshop 14 – 16 September, 2011 Vienna VIE_SCHED Jing SUN

Post on 21-Dec-2015

217 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: VieVS User Workshop 14 – 16 September, 2011 Vienna VIE_SCHED Jing SUN

VieVS User Workshop

14 – 16 September, 2011

Vienna

VIE_SCHED

Jing SUN

Page 2: VieVS User Workshop 14 – 16 September, 2011 Vienna VIE_SCHED Jing SUN

VieVS User Workshop 2011 2

What’s the purpose of a scheduling program ?

Scheduling Program

Station

prc file, snp file

DRUDG

FS

Correlator

skd fileskd file

log file

Current scheduling

programs :

sked (Goddard)

sched (NRAO)

...

Page 3: VieVS User Workshop 14 – 16 September, 2011 Vienna VIE_SCHED Jing SUN

VieVS User Workshop 2011 3

Why is a new scheduling program needed?

VLBI2010 Goals1 mm measurement accuracy on global baselines

continuous measurements for time series of station positions and EOP

turnaround time to initial geodetic results of less than 24 hrs.

VLBI2010 Specificationssmall fast-moving antennas

broadband frequency (2–14 GHz)

two or more antennas at a site

Page 4: VieVS User Workshop 14 – 16 September, 2011 Vienna VIE_SCHED Jing SUN

VieVS User Workshop 2011 4

'source.cat'; % source positions 'flux.cat'; % source fluxes

'antenna.cat'; % antenna information 'position.cat'; % station x,y,z locations 'equip.cat'; % equipment IDs 'mask.cat' ; % horizon and coordinate masks

'freq.cat'; % frequency sequences 'rx.cat'; % receiver setups'loif.cat'; % station Lo and IF setups'rec.cat'; % recording modes'hdpos.cat'; % head offsets'tracks.cat'; % standard recorded tracks

'modes.cat'; % observing modes SKD file

NGS file

SKD-sum file

Input filesOutput files

Page 5: VieVS User Workshop 14 – 16 September, 2011 Vienna VIE_SCHED Jing SUN

VieVS User Workshop 2011 5

Source dependent scheduling strategy

0 50 100 150 200 250 300 350

-80

-60

-40

-20

0

20

40

60

80

right ascension [deg]

decl

inat

ion

[de

g]

Page 6: VieVS User Workshop 14 – 16 September, 2011 Vienna VIE_SCHED Jing SUN

VieVS User Workshop 2011 6

Source dependent scheduling strategy

0 50 100 150 200 250 300 350

-80

-60

-40

-20

0

20

40

60

80

right ascension [deg]

decl

inat

ion

[de

g]

Page 7: VieVS User Workshop 14 – 16 September, 2011 Vienna VIE_SCHED Jing SUN

VieVS User Workshop 2011 7

Base on a more global station distribution

Simple and effective

Source dependent scheduling strategy

Page 8: VieVS User Workshop 14 – 16 September, 2011 Vienna VIE_SCHED Jing SUN

VieVS User Workshop 2011 8

Station dependent scheduling strategy

divide the sky above the station in 13 segments;

count the segments which contain at least one observed source in a certain time interval.

the best possible sky coverage: 13

Page 9: VieVS User Workshop 14 – 16 September, 2011 Vienna VIE_SCHED Jing SUN

VieVS User Workshop 2011 9

VLBI2010 simulations

Longitude [deg]

Lat

itude

[de

g]

station distribution

-180 -90 0 90 180-90

-40

0

40

90

--- legacy antennas --- fast slewing antennas

Interim network : 18 stations

Schedule parameters

Page 10: VieVS User Workshop 14 – 16 September, 2011 Vienna VIE_SCHED Jing SUN

VieVS User Workshop 2011 10

VLBI2010 simulations

From VIE_SCHED_1

2 sources in a subnetsouce-dependent

From VIE_SCHED_2

3 sources in a subnetsouce-dependent

From VIE_SCHED_3

station-dependent

Number of sources

197 190 225

number of scans

2102 3371 4138

number of observations

67633 53828 84398

number of observations

Page 11: VieVS User Workshop 14 – 16 September, 2011 Vienna VIE_SCHED Jing SUN

VieVS User Workshop 2011 11

distribution of observations

From VIE_SCHED_1 From VIE_SCHED_2 From VIE_SCHED_3

0 2 4 6 8 10 12 14 16 18 200

2000

4000

6000

8000

10000

12000

14000

station index

num

ber

of o

bser

vatio

ns

Page 12: VieVS User Workshop 14 – 16 September, 2011 Vienna VIE_SCHED Jing SUN

VieVS User Workshop 2011 12

spatial coverage of sources

0 5 10 15 20 25 30 35 40 45 5045

50

55

60

65

70

time index

spat

ial c

over

age

valu

e [%

]

From VIE_SCHED_1 From VIE_SCHED_2 From VIE_SCHED_3

Page 13: VieVS User Workshop 14 – 16 September, 2011 Vienna VIE_SCHED Jing SUN

VieVS User Workshop 2011 13

idling percentage

From VIE_SCHED_1 From VIE_SCHED_2 From VIE_SCHED_3

0 2 4 6 8 10 12 14 16 180

10

20

30

40

50

60

70

80

90

station index

perc

enta

ge v

alue

[%

]

obs

slew

idle

0 2 4 6 8 10 12 14 16 180

10

20

30

40

50

60

70

80

90

station index

perc

enta

ge v

alue

[%

]

obs

slew

idle

Page 14: VieVS User Workshop 14 – 16 September, 2011 Vienna VIE_SCHED Jing SUN

VieVS User Workshop 2011 14

mean sky coverage

From VIE_SCHED_1 From VIE_SCHED_2 From VIE_SCHED_3

0 2 4 6 8 10 12 14 16 187.5

8

8.5

9

9.5

10

10.5

11

11.5

station index

mea

n sk

y co

vera

ge v

alue

Page 15: VieVS User Workshop 14 – 16 September, 2011 Vienna VIE_SCHED Jing SUN

VieVS User Workshop 2011 15

Simulation parameters• the refractive index structure constant Cn :• the effective height of wet troposphere H : 2000 [m]• the wind velocity vector v (8.0 m/s) towards east• the Allan standard deviation (ASD) of 1e-14 @ 50 min• the white noise : 16 ps per baseline

Estimated parameters• NNR/NNT for all a priori station coordinates; source coordinates fixed to ICRF2.• EOP offsets for each 24-hour session.• Quadratic function plus 60 min piecewise linear function for clocks with relative

constraints of 42 ps.• 6 min piecewise linear function for zenith wet delays with relative constraints of 19

ps.• 10 min piecewise linear function for gradients with 1.4 mm relative constraints and 1

mm absolute constraints.

Page 16: VieVS User Workshop 14 – 16 September, 2011 Vienna VIE_SCHED Jing SUN

VieVS User Workshop 2011 16

station position repeatibilities

mean station position repeatibilities = 3.61

mean station position repeatibilities = 3.55

mean station position repeatibilities = 3.72

From VIE_SCHED_1 From VIE_SCHED_2 From VIE_SCHED_3

0 2 4 6 8 10 12 14 16 18 200

1

2

3

4

5

6

7

station index

3D r

ms

[mm

]

Page 17: VieVS User Workshop 14 – 16 September, 2011 Vienna VIE_SCHED Jing SUN

VieVS User Workshop 2011 17

baseline length repeatibilities

From VIE_SCHED_1 From VIE_SCHED_2 From VIE_SCHED_3

0 2000 4000 6000 8000 10000 12000 140000

1

2

3

4

5

6

7

8

9

baseline length [km]

rms

[mm

]

Page 18: VieVS User Workshop 14 – 16 September, 2011 Vienna VIE_SCHED Jing SUN

VieVS User Workshop 2011 18

Ongoing and planned developments of VIE_SCHED

Variance and covariance analysis and even a dynamic optimization process

Twin/multiple telescopes at a site

Spacecraft tracking

Interactive interface

More analyses and comparisons

----- with sked, sched and other scheduling package

Page 19: VieVS User Workshop 14 – 16 September, 2011 Vienna VIE_SCHED Jing SUN

VieVS User Workshop 2011 19

Thanks for your attention!

problems? questions? mail to [email protected]

Jing Sun would like to thank the FWF for funding project SCHED2010 (P21049-N14).