· web viewfor the better performance in all the dimension and for strict adherence to the kvs...
TRANSCRIPT
VIDYALAYA PROFILE
1.Name of the K.V. :KENDRIYA VIDYALAYA STC BSF CHAKUR
2.Sector : CIVIL
3.Vidyalaya Building : Temporary Building
4.Establishment In : 2010-11
5. Classes up to : X
6.No. of Sections : 10
7.Streams Available : --
8.Total Enrolment of Students : 378
9.No. of Sanctioned Posts
(a)Principal : 01
(b)Teaching Staff : 13
(c)Non-Teaching Staff : 09
10.Vacancies : 5(Teaching-03 & Non-Teaching:-2)
11.
TARGETS AND ACHIEVEMENT
SESSION 2014-15 SESSION 2015-16III A* A B C A* A B C
ENGLISH 14 15 11 1 40 35 25 0HINDI 14 14 10 3 35 35 30 0EVS 07 18 11 5 35 35 30 0
MATHEMATICS 04 18 15 4 40 45 15 0SESSION 2014-15 SESSION 2015-16I
V A* A B C A* A B CENGLISH 09 22 06 3 40 30 30 0
HINDI 05 16 18 1 30 30 30 0EVS 14 18 06 2 45 35 20 0
MATHEMATICS 08 25 05 2 35 45 20 0SESSION 2014-15 SESSION 2015-16V A* A B C A* A B C
ENGLISH 15 17 4 6 55 35 10 0HINDI 12 17 08 5 45 40 15 0EVS 12 18 6 6 45 40 15 0
MATHEMATICS 10 18 09 5 40 45 15 02014 -15 2015 -16VI % A1 A2 B1 B2 C1 C2 D PI % A1 A2 B1 B2 C1 C2 D PI
OVERALL 100 0 3 8 10 10 13 0 43.69 100 20 30 30 15 05 0 0 70ENGLISH 100 0 4 5 13 7 10 5 40.46 100 20 30 15 15 20 0 0 75
HINDI 100 0 5 9 11 12 6 1 50.74 100 30 35 30 05 0 0 0 80MATHS 100 1 1 4 8 11 14 5 42.97 100 25 30 25 15 05 0 0 70SCIENCE 100 1 4 9 7 7 12 4 44.37 100 25 35 20 10 10 0 0 70
SOCIAL SC 100 01 1 0 8 9 19 7 39.26 100 25 35 35 05 0 0 0 75SANSKRIT 100 1 11 15 11 04 02 0 44.48 100 30 35 30 05 0 0 0 75
2014-15 2015-16VII% A1 A2 B1 B2 C1 C2 D PI % A1 A2 B1 B2 C1 C2 D PI
OVERALL 100 2 5 5 11 9 4 2 44.76 100 25 35 30 20 00 00 00 75ENGLISH 100 01 06 12 6 5 5 3 46.35 100 25 25 15 15 20 0 0 75
HINDI 100 4 7 12 9 3 2 1 51.55 100 35 30 25 10 0 0 0 80
MATHS 100 1 4 2 7 1 14 9 41.21 100 30 25 25 15 05 0 0 70SCIENCE 100 4 2 4 5 10 6 7 47.60 100 25 35 20 10 10 0 0 70
SOCIAL SC 100 2 5 2 4 13 6 6 43.71 100 25 35 35 05 0 0 0 75
SANSKRIT 100 6 9 12 5 4 2 0 44.29 100 30 35 30 05 0 0 0 75
2014-15 2015-16VIII
% A1 A2 B1 B2 C1 C2 D PI % A1 A2 B1 B2 C1 C2 D PIOVERALL 100 1 5 9 7 12 8 2 45.68 100 25 35 20 10 10 0 0 70ENGLISH 100 1 3 9 6 5 10 10 47.91 100 25 35 35 05 0 0 0 75
HINDI 100 4 9 9 15 5 0 0 52.64 100 30 35 30 05 0 0 0 75
MATHS 100 1 2 5 4 11 15 6 45.02 100 25 35 30 20 00 00 00 75
SCIENCE 100 6 8 4 6 3 11 11 45.20 100 25 25 15 15 20 0 0 75SOCIAL SC 100 0 4 4 7 8 14 7 43.29 100 35 30 25 10 0 0 0 80SANSKRIT 100 5 8 10 13 6 0 2 2 46.81 100 30 25 25 15 05 0 0 70
2014-15 2015-16IX
% A1 A2 B1 B2 C1 C2 D PI % A1 A2 B1 B2 C1 C2 D PIOVERALL 86.47 0 0 2 4 7 8 4 58.65 100 15 25 25 25 10 0 0 70ENGLISH 100 0 5 4 10 6 0 0 44.51 100 20 35 35 10 0 0 0 75
HINDI 100 0 7 5 8 2 4 0 45.11 100 25 40 25 10 0 0 0 75
MATHS 89.47 0 0 0 2 4 14 5 40.06 100 15 25 25 25 10 0 0 70
SCIENCE 90.98 0 0 5 4 5 7 4 42.18 100 20 25 25 20 10 0 0 70
CLASS X
2014-15 2015-16X
%10 9 TO 8-8.9 7-7.9 6-6.9
5-5.94-4.9
PI %10 9 TO 8-8.9 7-7.9 6-6.9
5-5.94-4.9
PICGPA 9.9 CGPA CGPA CGPA CGPA CGPA 9.9 CGPA CGPA CGPA CGPAOVERALL 100 15 35 35 15 0 0 0 85
2014-15 2015-16X % A1 A2 B1 B2 C1 C2 D PI % A1 A2 B1 B2 C1 C2 D PIENGLISH 100 40 30 25 05 0 0 0 85
HINDI 100 40 35 20 05 0 0 0 85MATHS 100 35 30 25 05 05 0 0 80SCIENCE 100 35 30 25 05 05 0 0 80
SOCIAL SC 100 35 30 25 05 05 0 0 80SANSKRIT NOT APPLICABLE
CLASS XI (SCIENCE)
XI (SC) 2014-15 2015-16
%33- 45- 60— 75- 90&
PI %33- 45- 60— 75-
90- 9595
PI45% 60% 74% 90% ABOVE 45% 60% 74% 90% Above
OVERALLENGLISH
HINDIMATHS
CHEMISTRYPHYSICSBIOLOGY
CSIP
CLASS XI (COMMERCE)
XI (COMM)2014-15 2015-16
%33- 45- 60— 75- 90&
PI %33- 45- 60— 75-
90-9595
PI45% 60% 75% 90% ABOVE 45% 60% 74% 90% Above
OVERALLENGLISH
HINDIACCOUNTANCY
BUS STUDIESECONOMICS
IP
CLASS XII SCIENCE
XII (SC)2014-15 2015-16
% 33- 45- 60— 75- 90-95 95 PI % 33- 45- 60— 75- 90- 95 PI44.9% 59.9% 74.9% 89.9% Above 44.9% 59.9% 74.9% 89.9% 95 Above
OVERALL
XII SC2014 -15 2015 -16
% A1 A2 B1 B2 C1 C2 D PI % A1 A2 B1 B2 C1 C2 D PIOVERALLENGLISH
HINDIMATHSPHYSICS
CHEMISTRYBIOLOGY
CSIP
CLASS XII(COM)
XII COM 2014-15 2015-16
%A1 A2 B1 B2
C1 C2 D PI % A1 A2 B1 B2 C1 C2 D PI
OVERALL
ENGLISHHINDI
MATHSACCOUNTANCY
IPECONOMICS
BUS. STD
CLASS XII COMMERCE
XII (C0M)2014-15 2015-16
%33- 45- 60— 75- 90&
PI %33- 45- 60— 75- 90&
PI44.9% 59.9% 74.9% 89.9% ABOVE 44.9% 59.9% 74.9% 89.9% ABOVE
OVERALLOVERALL PERFORMANCE OF CLASS XII
XII2014-15 2015-16
%33- 45- 60— 75- 90&
PI %33- 45- 60— 75- 90&
PI44.9% 59.9% 74.9% 89.9% ABOVE 44.9% 59.9% 74.9% 89.9% ABOVEOVERALL
CLASS I & II(CYCLE TEST)
ISESSION 2014-15 SESSION 2015-16
A* A B C A* A B COVERALL 26 15 0 0 50 35 15 0ENGLISH 20 17 4 0 50 35 15 0
HINDI 21 19 1 0 50 35 15 0EVS 7 25 7 2 50 35 15 0
MATHEMATICS 32 8 1 0 50 35 15 0
IISESSION 2014-15 SESSION 2015-16
A* A B C A* A B COVERALL 10 31 4 0 50 35 15 0ENGLISH 16 22 7 0 50 35 15 0
HINDI 7 32 6 0 50 35 15 0EVS 13 26 6 0 50 35 15 0
MATHEMATICS 10 27 8 0 50 35 15 0
· NOTE: All the target results for Session 2015-16 are mentioned in terms of % of students, as the enrolment on date is not specific and defined.
OTHER EXAMINATIONS
IAPT
2014-15 2015-16EXAM
APPEARED QUALIFIED I QUALIFIED II APPEARED QUALIFIED I QUALIFIED IICHEMISTRY
PHYSICSBIOLOGY
JUNIOR SC.ASTRONOMY
NFLAT
2014-15 2015-16EXAM
APPEARED MERIT CERTIFICATE SCHOOL RANK APPEARED MERIT CERTIFICATE SCHOOL RANKNFLAT
MORH (FILM COMPETITION)
EXAM 2014-15 2015-16
ENTRY POSITION RESULT ENTRY POSITION RESULTMORH
IIT JEE
EXAM 2014-15 2015-16
MAINS ADVANCE POSITION MAINS ADVANCE POSITION
SPORTS
EVENT 2014-15 2015-16ACHIEVEMENT ACHIEVEMENT
KVS REGIONAL 04 07
KVS NATIONAL 01 05
SGFI 00 00
TEACHERS ACHIEVEMENT
EVENT 2014-15 2015-16ACHIEVEMENT ACHIEVEMENT
NATIONAL 00 00
REGIONAL 00 00
INNOVATION 00 01
ICT 00 00
ACADEMIC EVENTS
CAMP CAMPCLAS
S REMEDIAL COVERAGE OF SYLLABUS TEST(SLOW BLOOMERS) (BRIGHT ACHIEVERS)
15 DAYS BEFORE SAI & 05 DAYS BEFORE SAI & SA 15 DAYS BEFORE SAI & SAI: 04 WEEK AUG 15 PRE SA I: 03 WEEK AUG
X 2015SAII (AFTER PRE SA’s) II (AFTER PRE SA’s) SAII (AFTER PRE SA’s) SAII: 10THFEB 201611-16 FEB S016
15 DAYS BEFORE SAI & 05 DAYS BEFORE SAI & SA 15 DAYS BEFORE SAI & SAI: 04 WEEK AUG 15 PRE SA I: 03 WEEK AUG
IX 2015SAII (AFTER PRE SA’s) II (AFTER PRE SA’s) SAII (AFTER PRE SA’s) SAII: 10THFEB 201611-16 FEB S016
15 DAYS BEFORE SAI & 05 DAYS BEFORE SAI & SA 15 DAYS BEFORE SAI & SAI: 04 WEEK AUG 15 PRE SA I: 03 WEEK AUG
VI-VIII 2015SAII) II SAII SAII: 10THFEB 201611-16 FEB S016
I-V EVERY DAY/ SATURDAY SATURDAYEVERY DAY
AS PER PLANFORTNIGHT PIECE MEAL
TEST
REVIEW MEETINGS/ PTM MEETING
MEETING WITH CHILD WITH MEETING WITH PARENTS OFCLASS REVIEW MEETING PARENT TEACHER MEETING
LEARNING DIFFICULTIES HIGH ACHIEVERS
XIMMEDIATELY AFTER TEST AND TERM IMMEDIATELY AFTER TEST AND LAST WORKING DAY OF EVERY AS PER THE AVAILAIBILITY AND
TEST TERM TEST MONTH COMFORT OF PARENTS
IXIMMEDIATELY AFTER TEST AND TERM IMMEDIATELY AFTER TEST AND LAST WORKING DAY OF EVERY AS PER THE AVAILAIBILITY AND
TEST TERM TEST MONTH COMFORT OF PARENTS
VI-VIIIIMMEDIATELY AFTER TEST AND TERM IMMEDIATELY AFTER TEST AND LAST WORKING DAY OF EVERY AS PER THE AVAILAIBILITY AND
TEST TERM TEST MONTH COMFORT OF PARENTS
I-VIMMEDIATELY AFTER TEST AND TERM IMMEDIATELY AFTER TEST AND LAST WORKING DAY OF EVERY AS PER THE AVAILAIBILITY AND
TEST TERM TEST MONTH COMFORT OF PARENTS
12. (A) No. of Internal Audit Paras pending as on 31 March 2015 : 00
(b)No. of A.G Audit Paras pending as on 31 March,2015 : 00
(C )No of Internal Audit Paras settled during 2014-15 : 27
(d)No of AG Audit paras settled during 2014-15 : Nil
13. (a) VVN Balance as on 31 March, 2015 : Rs 470721
(b)Approx. Estimation of Collection of VVN per quarter. : Rs 450000
(i) Development and maintenance of Infrastructural facilities : Rs
(ii)Academic and related Activities. : Rs
(iii)Financial Administration : Rs
(iv)Other Administrative Works. : Rs
MAINTENANCE AND DEVELOPMENT OF INFRASTRUCTURAL AND OTHER FACILITIES
SHE
ADExpected Programme of Action / Action
Activity/ Programme Status Planned Achievement Target Date/Time of Key Result Areas RemarksN Plan (Wherever Required)completion
To make the -----------
------- --------Vidyalaya is running in
temporary building --------movement of
students and staffcomfortable
CON
STRU
CTIO
N
Request need to Chairman VMC
Play Ground and Play Infrastructure is The students will ----------- be benefited with
1 Infrastructure& Stage presently temporary ---- sports activities.
More Drinking ---------Two separate Drinking water water points shallRenovation of Drinking Existing Nov 2015 be available for
activities also.
The students will
CON
STRU
CTIO
N
Primary Section LawnVidyalaya is running temporary building ------ get opportunity for------- play time -----
------------
2 LibraryVidyalaya is running temporary building ------
Better reading
place
SPEC
IAL
Development of flower bed The area round themonitoring committee.
The area will installed with September Beautification ofround the approach road approach road isflower bed. 2015 Vidyalaya Premisesempty
Two Security guards The Services of the security To provide theguards will be engaged inSECURITY GUARD round the clock duty safety to the The process of Registration,
CON
SERV
ANCY
AN
D accordance to the previousare functioning campus
OU
TSO
URC
ING
session calling of Tenders and Preparation
Three safaiwala (one To maintain the of comparatives are completed. A
4.01.04.2015 special committee of 05 members
Safaiwala exclusively for wash The same will be continued. clean and hygienic is engaged to monitor the entireroom area) environment event and submit the feedback
report periodically to the Office ofthe Principal
Vidyalaya is running in temporary building and upto
class x
AMC
Registered firm will ask to repair For better service Registered firm will ask to repair
AMC of computersWhenever
needednot planned
5
Pare
nt
Area
Development of Parent No seating area for Sofa and showcase almirah For proper----------enclosing the Vidyalaya 2015 hospitality of the
Area visiting parents documentary visitors
Plan
tati
o
Development of Green Campus is holding The school is celebrating Vidyalaya shall The joint efforts of students, staff
n
more than 50 Swacha Bharat Abhiyan 30.04.2015 present a beautiful and parents will make theCampus seasonal plants. look celebration of the year a success.
Committee to monitor Committee will expand their The committee of five members
supervision dimension by To provide hygienicheaded by Roopendra Singh (TGT
LIB)Monitoring of Cleanliness the Cleanliness is April 2015providing more hygienic environment has been framed for theexisting facilities same.
To cater to the--------------
CHILDREN PARK
Children Park is available of sponsoring agency to
near the school ---------- --------- needs of Primary
CORN
ER Students.
7 BS & G CornerTemporary BS & G The structured corner with
October 2015To meet the Scout and Guide I/c is directed to
ACTI
VITY Corner is existing logos will be framed guidelines of KVS arrange the proper plan of action.
Existence of Social Expansion of the Lab with December Providing The Social Science I/c areSocial Science Lab 2015 Opportunity forScience Lab Corner viewing of Space Object implementing the event.
Corn
er better learning
Resource room Resource Room will be To meet the better
Room
/Aca
dem
ic Resource Room April 2015 learning LCD Projector to be installedexisting equipped with LCD Projector environment
8 Providing TGT Maths is Maths corner with minimum opportunity toMaths corner not going to prepare plan of actionMaths Corner basic learning and application October 2015 learn withexisting and it will be executed
Activ
ity
of Maths to be developed application and accordingly.understandingTo provide the Science Teacher of Upper PrimaryJunior Science lab In absence of Rooms a mobile learningJunior Science Lab April 2015 and Primary are trained tocorner is existing Junior Science with NCERT Kit environment with
perform the event.skill development
----------
COMPUTERS / ACCESSORIES30 No of Computers 08 more computers to be
Dec 2015Better learning
are existing placed in different location environment
For students and ----------Wi Fi Routers and Boosters Teachers for usingLeaseLine Under Process OCT 2015are planned to install the optimumInternet facility
01 Rooms is December For better learning ---------Audio Visual Aids established with use of 01 more rooms are planned
2015 EnvironmentLCD
No Gymnasium is A mini Gymnasium with DecemberThe firms are called for2015SPORTS minimum 02 equips in initial
existing registration for further process.is planned
A better learning DecemberSkill development ---------2015SUPW No lab is ill equipped environment with all the
programinitial equipments
Less number of ------------ To excel in the The I/c Music Department hasMusic Department Musical Instruments October 2015 stage performance been directed for further plan of
are available of students action
PURC
HAS
E
Yoga event will be in To follow thepractices in Morning Sports Teacher and Sports CoachApril/May guidelines of KVS9 YOGA No event is in practice Assembly and the are directed to implement the2015 and better physicalequipments for the students same.environment
to be availed
Less no of Hindi The frequency of Hindi To meet theLiterature will more October 2015 guidelines of Raj Librarian has been directed toLiterature is available
empowered BhashaLIBRARY SEVICES
work with the Library Committee
Less no of Journals, More no. of Journals and To provide learningMembers for the event
Magazines are October 2015Magazines will be equipped environmentavailable
Less number of Additional Almirah and Table To facilitate thefurniture are available will be equipped for library October 201 proper functioningin Library& staff , class and benches for class – rooms 5 The firms are registered and theof Libraryrooms issue will be forwarded to
Furniture Computer Lab, All the Labs will be equipped Regional Office for the dueChemistry Lab, Physics To facilitate the approval as the expenses arewith minimum furniture.Lab, Department, One proper functioning beyond the limit of the Office ofComputer Lab will be OCT 2015Class Room are of labs and the Principal.established as per thewithout proper departments
guidelines of KVSfurniture
STO
CK The process of stock The personal verification for The committee to assist thefinding the deficit and surplus Proper functioning Principal is framed and the
Stock Verification verification is 02.05.2015will be performed by the of department program will be executed
AND completed. Office of the Principal accordingly
1
DEPA
RTM
ENT
0 Teachers are directed to prepared the list of unserviceable / broken
articles -------------Proper functioning
Condemnation 30.01.2016
ACADEMIC PLANNING
DUTI
ES
AcademicMonitoring for the The duties of the For better The teachers during the staff
Primary, Upper committee are expanded learning and skillACADEMIC MONITORING 01.04.2015 meeting to narrate with the
OF
Primary, Secondary with inter disciplinary class development events with comments.1
observation environment
ALLO
TMEN
T
As per the guidelines of KVS For better The senior PRT has been issued withPrimary Planner - a exhaustive Saturday Plan 01.04.2015 performance in guidelines according to the KVS HQ
to be implemented by PRT primary wingThe committees to For proper The committee I/c are instructed
TEES
AND monitor the entire The duties of the
2 COMMITTEES 01.04.2015 functioning of with direction to follow theplan of action and committees are expanded
CLUB--------
7 CLUBS ARE FRAMED 01.11..2015
ACADEMIC TIME TABLE ExistingFramed as per the revised
01.04.2015guidelines of KVSTA
BLE For proper
workshop system is To achieve proficiency in development of The I/c and concerned teachers areWORKSHOP SCHEDULE 01.04.2015 various
TIM
E in practice teaching learning issued with a direction for strictcompetencies and compliance of the same. The DO
moral values.
AND3
Structured Film Film shows shownreport by the concerned will besubmitted to the Office of the
CALE
NDA
R FILM SHOW SCHEDULE 01.04.2015Show Program Fortnightly to each class. Principal on the end day of everyMonth
Mass participationWell defined Calendar with Throughout the of students in
SPORTS/ CCA CALENDAR Structured Program periodical submission of different activitiescalendar yearreports and exploration of
hidden talent
SPLIT OF SYLLABUS PlannedCompletion of syllabus as
As per scheduleper schedule For better
SYLL
ABU
S learning The teachers will issue the DOWell planned with timely environment toPlanned but not As per calendar letter to the Office of the Principal4 Planning of Activities implementation in parallel the students andexhaustive year reflecting all the events performedto syllabus excel in their by themperformance asPlanned but not Well planned with As per schedule good citizens
Skill Development Activities implemented with involvement of skilled Throughout thetrue spirit teachers calendar year
TARG
ETFIX
ATIO
N
All the teachers are system has been
5 ACADEMICdirected to submit the
15.11.2015For best generated to collect the set targets
academic targets for the achievement from the concerned Teachers/2015-16 session Department I/c
The co scholastic teachers For bestCO SCHOLASTIC TARGET will submit the target for 15.04.2015achievementthe session 2015-16
SUPE
RVIS
ION
PRINCIPAL Once/Twice a day
Once/Twice a day with To bring The Academic I/c and the teachersregular Class Meeting to6 Academic In charge Twice a day 13.10.2015 excellence in are issued with guidelines and
ROO
M
evaluate the situation and Teaching-Learning reflect in the DO letterbring better teaching-environmentlearning environment
CLA
SS
ACADEMICExhaustive Plan of action
- for fortnight/ Formative/
SYST
EM Unit Test
Alround Examination I/c has been specified7
EVAL
UATI
ON
01.04.2015 development with the instruction
A well defined Plan A well defined with specificCO SCHOLASTIC with division of period and division of
labour duties is planned
8
Well defined calendar ofactivity with distribution of
duties
CCA
BS & GWell defined with inclusionof Rallies and celebration
30.0
3.20
16)
EQUIPAs per the plan of Regional
Office for 15 days
ACTI
VITY
AN
D EV
ENTS Weekend exhaustive Plan
(to
be
com
plet
ed b
y th
e
CMP with Professionaldevelopment tools
Visiting to Sai nandanwanADVENTURE Visited to water park
Investiture Well defined House system
01.0
1.20
16with awards and incentiveCeremony/Distribution of for the best performingHouse
House
ANNUAL DAY To be CelebratedProposed for celebration in
the month of January
Well planned In HouseIn house Exhibition exhibition for all the areas,
separately for Primary
Twice in the In the month of August andHealth Check-up December as per KVS
Academic Year Calendar
For t
he b
etter
per
form
ance
in a
ll th
e di
men
sion
and
for s
trict
adh
eren
ce to
the
KVS
guid
elin
es a
nd C
BSEN
orm
s
The
conc
erne
d de
partm
ents
and
I/c h
ave
plac
ed th
e pl
an o
f exe
cutio
n fo
r the
bett
er p
erfo
rman
ce
and
with
trues
pirit
The
repo
rts o
f the
eve
nt w
ill b
e tim
ely
forw
arde
d to
the
Regi
onal
Offi
ce fo
r the
eva
luati
ve o
f pe
rfor
man
ce.
Four times in the Academic For the better The committee is framed dulyTwice/thrice in the execution of planVMC Session, preferably in the December 15 approved by the Regional Officeacademic session of action beforeVidyalaya Campus with information of to ChairmanVMC
Monthly with discussion of For the better The committee is duly framed andVEC Bi Monthly every minute issues and 15.04.2015 execution and informed about the policy of the
note sheet approvals plan of work KVS
Separate Monitoring The committee is separatelyCommittee for Monthly meeting for theMonitoring Committee 01.04.2015 framed for the same and isAcademic and Staff execution of plan of actionimplemented accordingly
Infrastructure
Quarterly meeting to The members are elected during
DISC
USSI
ON PTA To be Framed discuss the important November 15
the open house meetingissues of the vidyalaya
Month end/Staff Meeting will be
The staff members are narratedSTAFF MEETING conducted at the end of 01 hr9
AND Important event each month. with the issues of Regional Office
MEE
TIN
GS
Skill development issuewith interdisciplinarydiscussion and video For betterconferencing will be inMeeting Being development ofdiscussion. The model The teachers have been discussedSUBJECT COMMITTEE Conducted with 01 hour skills andlessons and innovative and directed to plan accordinglyformal discussion improvement inideas will be in discussion in
performancethe concern departmentwith involvement of
experts
1
STUD
ENT
Distribution is planed For well The orders of the same has beenSTUDENT DIARY Under print including all the events and June 15 articulated placed and the plan will be
0 reports execution of plan executed in due time
Distribution is planed in the For identificationDistributed in the of student and The process of collectingSTUDENT IDENTITY CARD month of April including 15.7.2015month of September facilitating Library information is in process
Library Bar Code work
No planed repository Program on E CTLT, Khan For facilitating the The issue has been discussed withDEVELOPMENT OF REPOSITORY Academy, NROER, and self 30.12.2015 teaching-learning teachers and directed to plan of
was available developed Portal environment action accordingly
Well planed PSA Exhaustive plan under the For making The issue has been narrated to theable guidance ofASL/OTBA/PSA program was September end students Examination I/c and the Academicexamination I/c forlaunched comfortable I/c for best performance
PSA/OTBA/ASLOnline News Letter for
Magazine under every club, VidylayaVIDYALAYA MAGAZINE/NEWS magazine in the month of The I/c have been issued withprint for the system January 16LETTER July/August, and periodical guidelines for the same
2014-15 submission of CMPNewsletter
PARTICIPATION OF EXTERNAL The event will be extended To open theGreen Olympiad, with participation December 2015 career
EXAMS The concern teacher and the, NTSE opportunitiescareer counseling department
Career Counseling The event will be continued To open the have been issued with guidelinesCAREER COUSELLING SESSION Session with involvement of local 31.12.2015 career
experts opportunities
Well identification with To scaffold the The teachers are guided withSLOW AND BRIGHT STUDENTS Well identified 30.04.2015 studentsproper plan for enrichment policy matter of KVSaccordingly
ANDI
NCEN
TI
Appreciation in the Appreciation of To encourage and The CCA I/c and Exam I/c are1 Academic, Sports performance in academics, uplift theSTUDENT July 2015 directed to prepare plan for1 and Co scholastic sports and co scholastic performance execution
performance performance index
Appreciation for theperformance in Appreciation for the To encourage andAcademics and performance in Academics The CCA I/c and Exam I/c areuplift theTEACHER assisting the school and assisting the school May 2015 directed to prepare the plan forperformanceadministration for administration for excelling execution
indexexcelling in in performanceperformance
The log of performance of To encourage the The team of teachers is set for theNON TEACHING STAFF - duty is maintained to 30.03.2015performance evaluation of workevaluate the performance
-- Teaching/Sub Staff for theINCENTIVE AWARD achievement of said award - - -
is encouraged
Morning Teacher/Principal To inculcate the The teachers are guided and
MORAL VALUESMorning Teacher / Talk, Narrating Moral
01.04.2015moral values and directed to use their arrangement
Principal Talk stories during arrangement put exemplar hours judiciously with moral
PRO
GRA
M
hours. identities teachingsTo make the The I/c Career Counseling is Local student
----- directed to prepare a exhaustive1 CAREER COUNSELLING expert and separate career 01.04.2015 comfortable for2
AWAR
NE
SS
counseling desk career plan for the Class X Student forAcademic Session 2015-16
opportunityEnvironmental Awareness
To make theEnvironmental Program with WasteENVIRONMENTAL Awareness Program Management Technique, 31.12.2015 realization of Nature and Echo Club will enforcedegradingwas launched separation wet and dry the said program
environmentwaste, garbage enzyme
A special coaching program
COAC
HIN
G
for nurturing sports is To empower the The Sports Teacher and Sports
SPORTS -planed during 2:10-3:30 PM
01.04.2015performance of Coach are directed with guidelines
for the students under the the student in for the same and arrange the1 able guidance of Sports sports event experts for the same.3 Teacher and Sports Coach
SPEC
IAL
To make the The career counseling I/c is issuedSpecial Class for Olympiads student to excel inACADEMICS - 01.04.2015 with necessary guidelines for the
(IAPT) and Terra Green the performance planning of the same.for the said exams
Special classes or expert to The CCA I/c will make theCCA - improvise the CCA May-June 2015 - necessary arrangements by
performance organizing the session with experts
COMPUTER LITERACY-
CLP for the neighboringMay-June 2015
To make the ICT Computer Teacher will organizePROGRAM school awareness and plan for the same
The Primary wing will To make thePrimary Wing - enclose the pictures of the October 2015learning with funtext stories
1 BAL
A
Portraits of Great To make the Art Teacher is instructed for theSecondary Wing - Personality with brief October 2015 information event to get programmed and4
description available on wall planed for best execution.
SPORTS GROUND - Logo of Sports event January 2015To promote the
sports spirit
FINANCIAL ADMINISTRATION
APPR
OVA
LS
SCHOOL FUND Well plannedWell Planned budget with
01.04.2015quarterly distribution The office has been directed towork out with assistance of
Well Planned budget with For the better and concern department I/c1 VIDYALAYA VIKAS NIDHI Well Planned quarterly distribution of 01.04.2015 planned executionA N D
assignments of work
BUD
GET Prior approval for the The office has been directed to
Furniture, Construction andAPPROVAL ----- 01.05.2015 forward the issue to RegionalOutsourcing from Regional OfficeOffice
REQUIREMENT FROM The requirements with The department I/c have been- 15.04.2015 issued with the note to prepare
DEPARTMENT detailed configuration the same
A detailed plan with day The concern have been issued withwise execution of work and For the systematicUDC/LDC/Sub Staff - 10.04.2015 guidelines for preparation of themaintenance of Log of work performancesame duly countersigned
performed.Collection by UBI Finding the disturbance in The LDC has been issued with
PLA
N FEE COLLECTION 01.04.2015For avoid hassle guidelines to maintain the
2 situation decorum of the program andsubmit the compliance report
The periodical meeting of For betterPAC has been the PAC will be conducted The PAC is constituted and willperformance inPURCHASE PROCESS designed to meet the under the chairmanship of 01.04.2015 perform the work as per thethe purchasesame VMC Chairman to execute guidelines of Accounts Code of KVSprocessthe work an transparency
The note sheet system to
INTERNAL AUDIT No Para Standingavoid the discrepancies in
01.04.2015As per the guidelines of Accounts
Purchase Process will be Code of KVS
AUD
IT3 implemented
AG Audit
ALLO
WAN
CES
Pay and allowances UBI Portal UBI Portal
4
This vidyalaya is waiting for UDC, LDC, SUB STAFF And
regular teachers is still assignment is allowted to
teachersFor keeping The teacher has been issued withA N D
Pay Slip or Statement - 01.04.2015 record of the direction and guidelinesP A
employee accordingly
Published on Time for the
APPO
INTM
ENT O
F CON
TRAC
TUAL
TEAC
HER NOTIFICATION Published on time collection and preparation 28.02.2015 Posted on website
of data base
Postponed due to non As per the schedule given by theCall of Interview - scheduling of program by MARCH 2015ChairmanChairman
1Postponed due to non As the modal code of coduct ofPreparation of Panel On time scheduling of program by May-June
Election has been implemented.Chairman
Posting of Candidate On time -The teachers will be called after
the preparation of panel.with Chairman approval
IN SERVICE COURSE OF Calendar of the In-service To skill teachers The teachers are guided for the- course for the teachers is 30.03.2015 for improvise inTEACHER sameformulated performance
ISSU
ESO
FFIC
IAL
AND
No proper time table Proper time table for To maintain the The teachers will execute the2 dispersing among theSERVICE RECORD was functional to Quarterly transparency of program as per the planar and
CORR
ESPO
NDA
NCE teacher and getting the
collect the data the work of Office guidelines of KVScountersign
CORRESPONDANCE TO THE Timely submission of the To facilitate the Regular teachers are trained byNo timely Correspondence to The Monthly work of Regional the Computer Instructor for the
REGIONAL OFFICE Regional Office Office use of technology accordingly
A well maintained Log of The program is monitored by theevery teacher is preparedAPARS AND REPORTS - Monthly - Principal for tabulating with exactproper planting of digits infigures for performance of staff
APAR
To be followed as per the The Proposals were timelyFollowed as per the guidelines of KVS and theTRANSFER PROPOSAL - - forwarded to the Regional Officeguidelines of KVS relevant documents arefor further actionissued in hard copy
Online Records for all theDaily -
The teacher has been trainedcorrespondence by Office for the same
Bills and Vouchers to be The teacher has been trainedMAINTAINANCE OF RECORDS supplemented with Note Quarterly -for the samesheet and Indexing
Uploading of the details onDaily -
The teacher has been trained for thewebsite same
Publishing the notification on Timely publishing the event As per the- on the website and school -the website schedulenotice board/ News paper
Online system toCollection of forms maintained to avoid The Admission has been directed
discrepancies to perform the event with
ADM
ISSI
ON
Lottery and Publishing the list With the due approval ofdiscussion and due approval of
3 -concern authority.
of selected candidate Chairman
Calling admission under Quota As per the guidelines of KVS
Performed as per the To be performed as per theThe admission I/c is directed to
ADMISSION UNDER RTE QUOTA enlist and perform lottery beforeguidelines guidelines the Chairman and team
4
R T E
Timely claims with conduct The I/c admissionis directed to scheduleDISTRIBUTION OF CLAIMS - of RTE meeting with the
for the same.parents concern
To facilitate the The teacher has directed theNon Quarterly Monthly submission of QuarterlyCollection of Income Tax Monthly salaried employee billing underSubmission Income Tax submission ofthe Income tax liabilities
TA X reportThe salaried staff billing
5IN
COM
E under the Income Tax
Issue of Form 16 and Online
I/C teacher Income Tax are directed to initiate
- April 2015 - the programFilling of Tax Return
ACKNOWLEDGEMENT
The entire Vidyalaya Plan 2015-16 has been prepared by the following team and will execute the work accordingly:
S NO NAME OF THE OFFICIAL AREA
Mr. S B GAWALI (senior most teacher)Academic Monitoring
01 Development of InfrastructureEstablishment of Labs and Corners
02 Mr. Roopendra Singh (TGT LIB)Installation of Inventories
Preparation of Sanitation and Hygiene event
03
Mr. S B Gawali(TGT ENG)Mr. M S Shinde (PRT)Mr. G V Ladke (PRT)
EQUIP Workshop and Program of House event Tabulation of
Official Finance
04Mr. M S Shinde (PRT)
Mr. Ravi Khandare (TGT Maths)Rajbhasha
Scout and GuideExamination
Mr. Ravi Khandare (TGT Maths) CCA05 Smt. Bharati V N (music ) Environmental Awareness
Mr. Roopendra Singh (TGT LIB) Personality Development Workshop and Interschoolevent
06Mr. M S Shinde (PRT)Mr. G V Ladke (PRT)
Primary Infrastructure
Activity Room
07Mr. M S Shinde (PRT)Mr. G V Ladke (PRT)
CMP
News letter and Online Resource for PrimaryVideo Conferencing
08Mr. G V Ladke (PRT)Mr. Khushal Singh Establishment of ICT Infrastructure
Time Schedule/ CalendarPlan for Sports Event
09 Mr. M S Shinde (PRT)Establishment of Discipline and Awareness
10 Smt. Bharati V N (music teacher )Music Department
CCA and Co Scholastic Activities
11Mr. Sanju Kumari (PRT) Art Corner
H D Deshmukh (PRT) BALA
News letter and Magazine Mr. S B Gawali(TGT ENG) Mr. M S Shinde (PRT)
Workshop
Monitoring Committee Mr. G V Ladke (PRT)
PAC12 Syllabus
AdmissionCareer Counseling
Library and Counseling Corner13 Mr. Roopendra Singh (TGT LIB) Workshop
Study CellICT Infrastructure
14
Mr. G V Ladke (PRT)CLP
Programming and Compilation
Website Maintenance
(KALIKA PRASAD)
I/C Principal