Clock-Driven Scheduling&
Weighed Round Robin Scheduling
Vikas Kurdia
(Asst. Professor C.S. Department)
(M.Tech Coordinator C.S. & I.T. Department)
-
8/8/2019 Vikas Clock Driven FINAL
2/41
2
Jobs & Tasks job : a unit of workthat is carried out by the
system (Ji )
task: a set of related jobs that provide somesystem function ( Xi = { Ji,1, Ji,2 , , Ji,N } )
task a generalization of a class of jobs
tasks are specified at design-timejob Ji,k k
th instance of task i
jobs occur at run-time
-
8/8/2019 Vikas Clock Driven FINAL
3/41
Oct 19/09 3
Job & Task Parameters temporal: timing constraints and behaviour
interconnec
tion
:
dependencies among jobs(or among tasks)
functional: intrinsic parameters of work
resource: active (processor) and passive
(resource) components required
-
8/8/2019 Vikas Clock Driven FINAL
4/41
4
Temporal Parameters of
Jobs includes ri , di and Di
feasible interval: (ri, d
i)
It does not include ri
but includes di
also includes execution time (ei)
-
8/8/2019 Vikas Clock Driven FINAL
5/41
5
Scheduling T
heory
ideal goal : alljobs are always allocated requiredresources to complete execution within their feasibleregions ( r, d )
scheduling algorithm : decides the order in whichjobs are allocated resources
scheduler : a module that implements a schedulingalgorithm
scheduling decision point: point in time whenscheduler decides which job to execute next
-
8/8/2019 Vikas Clock Driven FINAL
6/41
6
Schedule
schedule : assignment of jobs to available
processors
feasible schedule : every job starts at or after
its release time and completes by its deadline
optimal scheduling algorithm : always
produces a feasible schedule if at least onefeasible schedule exists
-
8/8/2019 Vikas Clock Driven FINAL
7/41
-
8/8/2019 Vikas Clock Driven FINAL
8/41
8
Clock-Driven
Scheduling
job parameters are known a priori
job scheduleprecomputed off-line and
stored as a table for use at run-time table-driven scheduler
scheduling decision times in clock-drivensystem is defined a priori;
scheduler periodically wakes up and generatesnext portion of the schedule
-
8/8/2019 Vikas Clock Driven FINAL
9/41
9
Clock-Driven
Scheduling
Applicable when system is deterministic
only a few aperiodic and sporadic jobs
Some assumptions
Require periodic tasks in the system
task parameters known a priori
each job is ready for execution as soon as it is
released
-
8/8/2019 Vikas Clock Driven FINAL
10/41
10
Simplifying Assumptions
Each task denoted by the tuple
(i, p
i, e
i, D
i)
Sometimes only the period and execution
time is provided
relative deadline = period
phase = 0 critical instant at time = 0 !
denote tasks as pair(pi, ei)
all tasks have a
job ready at time 0
-
8/8/2019 Vikas Clock Driven FINAL
11/41
11
T1 T1 T1 T1 T1T3 T2T4 T2T2T2
schedule was designed arbitrarily!
Lets take an example we have four independent periodic task.
T1=(4,1) T2=(5,1.8) T3=(20,1) T4=(20,2)
-
8/8/2019 Vikas Clock Driven FINAL
12/41
12
0 4 6 8 10 122 14 16 18 20
cycles every
hyperperiodH =20
slack time
T1 T1 T1 T1 T1T3 T2T4
criticalinstant
T2
T2
T2
critical
instant
schedule was designed arbitrarily!
Lets take an example we have four independent periodic task.
T1=(4,1) T2=(5,1.8) T3=(20,1) T4=(20,2)
-
8/8/2019 Vikas Clock Driven FINAL
13/41
Clock-Driven approach
Consider four independent periodic task.
T1=(4,1) T2=(5,1.8) T3=(20,1) T4=(20,2)
HERE hyper periodic is L.C.M of p1,p2,p3,p4, mean L.C.M. of4,5,20,20then 20.
It mean after t=20 the entire schedule consist of replicated segment of length xhere
N is 20/4 + 20/5 + 20/20 + 20/20 =5+4+1+1=11
Here hyper periodic is 20 and number of jobs that is scheduled under hyperperiod is 11
-
8/8/2019 Vikas Clock Driven FINAL
14/41
14
Simple Table Driven
Scheduler Implementationfor Example:
organize blocks of activities in hyperperiod
0 4 6 8 10 122 14 16 18 20
T1 T1 T1 T1 T1T3 T2T4 T2T2T2
B1 B2 B3 B4 B5
B1
:
call T1
call T3
call T2
B2:
call T1
B3
:
call T4
call T2
call T1
etc.
0 4 6.5 12 16 18
burst start times:
B6
-
8/8/2019 Vikas Clock Driven FINAL
15/41
15
Organize Blo
cks in HTable
Block StartTime
B1 4
B2 2.5
B3 5.5
B4 4
B5 2
B6 2
time until start
of next burst
-
8/8/2019 Vikas Clock Driven FINAL
16/41
16
FrameSch
edulingpartition hyperperiod H into equal-sized frames
each frame has constant length f=frame size
H is an integral multiple off
scheduling decision for a frame made at the start
of the frame
no preemption within frame
phase of each task is an integer multiple off
-
8/8/2019 Vikas Clock Driven FINAL
17/41
17
Frame Monitoring at start of each frame, scheduler must
ensure:
1. jobs scheduled for execution in frame
have been released and are ready
2. overrun does not occur
i.e. jobs in previous frames completed
-
8/8/2019 Vikas Clock Driven FINAL
18/41
18
-
8/8/2019 Vikas Clock Driven FINAL
19/41
19
FrameS
izeC
onstraints every job must be able to start and complete
within a frame:
fu max (ei)
for at least one task Ti: - pi/f pi / f = 0
-floor function
(round down,
integer result)
Why?
frame divides into
hyperperiod
-
8/8/2019 Vikas Clock Driven FINAL
20/41
20
FrameS
izeC
onstraints (2) to ensure that every job completes by itsdeadline: want fsmall enough that there is
at least one frame between the release time
and deadline of each job
Liu concludes constraint met when:
2f gcd( pi , f ) Di
r d D
frame
ensures that job
has a frame in
which to execute
gcd = greatest
common divisor
-
8/8/2019 Vikas Clock Driven FINAL
21/41
21
CyclicSchedule Creation
for Previous ExampleT = {(4, 1), (5, 1.8), (20, 1), (20, 2)}
Constraints on possible values off
f max (1, 1.8, 1, 2) 2
f=
a divisor of one pi one of 2, 4, 5, 10, 20
2f gcd (pi,f) Di ????
all satisfy first
constraint
-
8/8/2019 Vikas Clock Driven FINAL
22/41
22
Determining fconsider2f gcd (pi,f) Di for 2, 4, 5, 10, 20
pi Di 2f gcd(pi, f=2 f=4 f=5 f=10 f=20 )
4 4 4-2 8-4 10-1 20-2 40-2
5 5 4-1 8-1 10-5 20-5
20 20 4-2 8-4 10-5 20-10 therefore, f=2only case to satisfy!
-
8/8/2019 Vikas Clock Driven FINAL
23/41
23
Problems with Frame
Constraints? what if tasks wont all satisfy constraints?
e.g. cant meet both:
minimum f to ensure a frame between release
and deadline, and
f greater than execution time
cant ensure that a job will be able tocomplete in one frame! ???
-
8/8/2019 Vikas Clock Driven FINAL
24/41
24
JobS
lic
es solution: partition jobs of a task into slices
with smaller execution times
schedule slices in different frames
planned preemption!
ei
execution time
before
execution time
after
ei1 ei2
-
8/8/2019 Vikas Clock Driven FINAL
25/41
25
Design Decisions:
1. choose frame size f
2. partition jobs into slices
3. places slices in frames
choices are not independent !
algorithm for choices in Liu 5.8
-
8/8/2019 Vikas Clock Driven FINAL
26/41
26
Cyclic
Executives
modify clock-driven scheduler to makescheduling decisions on frame boundaries
dont need to adjust timerjob slices are organized into blocks
use slack time to execute aperiodic/sporadicjobs
special servers ?
run in background ?
-
8/8/2019 Vikas Clock Driven FINAL
27/41
27
Overrun
if current block not completed by time next
block starts frame overrun !
options:
abort the offending block
let block complete in background
finish the job and force others to be late
exception handling! (gnarly)
-
8/8/2019 Vikas Clock Driven FINAL
28/41
28
Improving Response of
Aperiodic Jobs can use knowledge of deadlines to
advantage!
all slices in a block must complete withintheir frame
no advantage to completing earlier vs. later inthe frame
instead of allocating slack at end of frame,could use it at beginning!
-
8/8/2019 Vikas Clock Driven FINAL
29/41
29
SlackS
tealing execute aperiodic jobs ahead of periodic
jobs in a frame whenever possible
required
for block
available for
aperiodic
frame
vs.
-
8/8/2019 Vikas Clock Driven FINAL
30/41
30
SlackS
tealing Furth
er scheduler can allow aperiodic jobs to
execute whenever there is slack in a frame
could interleave between slices in a block
increases aperiodic throughput
increases overhead !
s1 vs.s2 s1 s2
-
8/8/2019 Vikas Clock Driven FINAL
31/41
31
Sporadi
cJobs
hard deadlines!
assume minimum release, max execution
and deadline times are known
when sporadic job released perform an
acceptance test:
if jobs already scheduled + new job are feasible
then admit the job
-
8/8/2019 Vikas Clock Driven FINAL
32/41
32
Sporadi
cJob Deadline
sporadic job can use any slack available inany frame prior to its deadline
if enough slack exists to meet deadline, thenadmit and schedule the job
if insufficient slack reject the job
immediately if more than one sporadic job waiting
order them earliest deadline first
-
8/8/2019 Vikas Clock Driven FINAL
33/41
33
Implementation sporadic job queue EDF ordering
in each frame:
1. execute the periodic block first
2. then dynamically accept (or reject) from
sporadic job queue
3. then allow aperiodic jobs
Liu text has more details (5.6.3)
-
8/8/2019 Vikas Clock Driven FINAL
34/41
34
ModeCh
anges changes in operational mode can impact
schedule
mode change reconfigure system
possibly different set of jobs
possibly different job parameters
may need initialization phase to create/deletejobs
-
8/8/2019 Vikas Clock Driven FINAL
35/41
35
ModeCh
anges (c
ont) change scheduling table for periodic jobs
how to handle outstanding sporadic jobs
from old mode?
must still meet their deadlines (?)
may not be possible due to reduced amounts of
slack available (?) requires careful handling
-
8/8/2019 Vikas Clock Driven FINAL
36/41
36
Summary ofCyclic
Executiveloop forever : wake up and execute at tfintervals (frame boundaries)
retrieve the data structure which defines a frame
wake up the periodic task server
service the sporadic job queue
service the aperiodic job queue
perform general maintenance
manage slack time, perform error checking
-
8/8/2019 Vikas Clock Driven FINAL
37/41
37
Pros ofClock-Driven
Schedulingadvantages of clock-driven scheduling:
simple to understand
the validation problem is very easy
(deterministic)
precedence and dependency can be dealt
with off-line by choice of the schedule
-
8/8/2019 Vikas Clock Driven FINAL
38/41
38
Cons ofClock-Driven
Schedulingdisadvantages of clock-driven scheduling:
not well suited for applications with varying
temporal & resource requirements exact nature of the workload model is not known
a priori
not always easy to design, usually hard tochange !
sophisticated approaches overheads
-
8/8/2019 Vikas Clock Driven FINAL
39/41
Weighted Round-Robin
approach Weighted Round-robin (WRR) is a best-effort
connection scheduling discipline.
WRR serves a number of packets for eachnonempty connection.
Number= normalized ( weighted / mean packet size)
Drawbacks:
Mean packet size must be known;
In a scale of one round WRR doesnt provide fair link
sharing.
This
page
is
from WIKIPED
-
8/8/2019 Vikas Clock Driven FINAL
40/41
WRR Example
The mean packet sizes of class A, B, C are
2, 3, 4
The weights of A, B, C are 0.5, 0.3, 0.2
The normalized weights of A, B and C are:
A: 0.5/2= 0.25
B: 0.3/3 = 0.1
C: 0.2/4= 0.05
Minimal normalized weight is 0.05
-
8/8/2019 Vikas Clock Driven FINAL
41/41
WRR Example (
Cont)
The number of packets serviced for A, B
and C are:
NPC = (MNW / weighted)
A: 0.25/0.05=5
B: 0.1/0.05=2
C: 0.05/0.05= 1
A possible schedule is:
A A A A A BB C .