Village Integrated Monitoring System(VIMS)
Mandip Singh Brar, I.A.S. Deputy Commissioner , Kurukshetra
Village Integrated Monitoring System(VIMS)
The idea ……………
Issues• New Policy of Govt. Direct transfer of funds to
G.P.• Monitoring of Physical & Financial progress of
the projects.• Slow progress of Dev. Projects due to non-
availability of actual status.• Compilation on various Parameters• Publicity of Govt. Works• Public Relation Department requirement of
complete list of works.• RTIs
Issues
• Different set of Figures each time• Utility tool like UC• Real time monitoring• Progress since last monitoring/fudged fig.• New technology tools• No. 1 Haryana
Earlier Experience to resolve these issues
Two approaches were tried
•Project wise entry – BDPOs office•Result: Failed because of lack of Staff/Busy in other Misc. Works
•Finalization of books – backlog entries•Result: Failed because there was no monitoring on this basis.
Target to Achieve
To Keep updated reports ready / instantly from Minor
Level to Micro Level i.e. Panchayat to District level.Using various parameters.
Project - VIMS
Only two system works•BDPO office – to enter the project initially & generate the work code.•Banks – to enter the detail of each & every transaction.
Who will be Benefited?
Local Administration viz. DC,Dev. Dept.
State GovernmentPolity viz. MP/MLA/member Zila parishad/Block Samiti etc.
Public Relation DepartmentSocial WorkersResearch Scholar
Salient feature of VIMSBy using the sub-report feature, it is only at a click away to get the Detailed Reports.Colored scheme to show the expenditure, images etc.Annual/Cumulative District /Block / Constituency /J.E/. …..Graphical PresentationComparison with the previous bookmarked pointTransaction’s Details
Monitoring
Earlier:As usual, simple monitoring:
•Have to rely on the Fig. produced.•Compilation on various parameters very difficult•No Comparison with the achievement made after last meetings.
Now:•Exact Figures•Compilation on various parameters very easy. Readily available.•Comparison available.
ResultsAfter adoption of this software, District Kurukshetra has seen a Dramatic improvement which seems not be possible without it
Record ManagementWhat to manage?
Sanction lettersEstimatesResolution of withdrawalImagesWork Completion CertificateUCsName of ConstituenciesName of the Block’sJ.E.’sSDO’sGram Sachiv’s
InvestigationsEarlier:
Because of lack of availability of Resolution, many a times not possible to investigate properly any anomalies in any project.
Now:•As it is made mandatory for banks before clearing any cheque for payment they have to upload the resolution, it is easy to investigate any complaint of anomalies in any project.•More over images of projects also helps a lot.
Project’s Directory
Instantly at any time complete directory of projects on the basis
of Panchayat under Blocks or Assembly Constituency can be generated. Very beneficial to
Govt. to show case their achievements.
Pendency level
As projects can be easily bifurcated on the basis of
years of sanction, priority can be assign to delayed projects & to find out the reasons of
delay.
Achievement due to this system
• Many works was at the stage of completion but because of non-issue of completion certificate status was pending.Action taken: Asked to issue completion Certificate
• Many works completion certificate was issued but Utilisation Certificate were not issued.Action taken: Asked to issue UC.
• In case of some projects, works were in progress or completed but their TECHNICAL APPROVAL & ASSESSMENT were not traceable.Action taken: Asked to trace & Upload.
• Projects were near to complete but lying ideal. Action: Projects were categorized as per their expenditure, those
near to complete, taken on priority basis.
Technical Points/How to implement
Nodal District for Software Updation: KurukshetraNodal Officer at State level:
------------Nodal Officer/Dev. Team
1. Mandip Singh Brar, I.A.S.2. Gagan Deep, DDPO3. Vinod Singla, DIO, NIC
System Requirement:Any configuration with any OSNetPlan: Broad Band or 3GPrinter: Any A4 size printer or colored inkjet
printer
Thank you
Reporting
EarlierMultiple level works i.e.Depending on the compilation by various official viz Sarpanch, Gram Sachiv, BDPOs, J.E., SDOs, DDPO, XEn etc.
Other factors:Work CultureWork capabilityCompilation Not EasyCompilation at different parameters e.g. District level, Block wise, Constituency wise, J.E., Exe. Agency, Scheme wise
NowThis System will overcome all the above factors.
Switch over to two level works1. BDPO office – Only once enter the project detail . System automatically
generate the work code.2. At each withdrawl of money banks update the Cheque No.,date, amount & Upload the resolution.