village of lemont...they have computers available for lemont residents’ use. visit, , to complete...
TRANSCRIPT
I. Pledge of Allegiance
II. Roll Call
III. Consent Agenda
III.A Approval of Minutes
III.B Approval of Disbursements
IV. Mayor's Report
V. Clerk's Report
V.A A Resolution Authorizing Approval of an Emergency Water ConnectionAgreement with Franciscan Sisters of Chicago
V.B A Resolution Authorizing Approval of a Phase I Engineering AgreementProposal with Knight Engineering and Architects, Inc. for the Walker RoadExtension Project
V.C A Resolution Authorizing Approval of a Consulting Agreement with TaiGinsberg & Associates, LLC for Federal Advocacy Services
V.D Resolution of the Village of Lemont, Cook, Will and DuPage Counties,
Village of Lemont
VILLAGE BOARD MEETINGJuly 27, 2020 – 6:30 PM
Village Hall - Village Board Room418 Main Street, Lemont, IL 60439
AGENDA
Please view the agenda under "Upcoming Events" for directions for public comment,registering for the meeting, and how to view the meeting.
1
Illinois, Inducing Certain Expenditures of Redevelopment Project Costs inConnection with the Redevelopment of the Proposed Walker RoadRedevelopment Project Area to be Reimbursed from Proceeds of theWalker Road Special Tax Allocation Fund
V.E A Resolution Creating An Intergovernmental Agreement Between theVillage of Lemont and DuPage County for Reimbursement of EligibleCOVID-19 Expenses
VI. Village Attorney Report
VII. Village Administrator Report
VIII. Board Reports
IX. Staff Reports
X. Unfinished Business
XI. New Business
XII. Audience Participation
Please use "Raise Your Hand" feature in Zoom to speak and the host willunmute you when it is your turn to speak.
1. Mention your first and last name clearly for meeting minutes purposes. 2. Each person gets maximum 3 minutes to speak.
XIII. Executive Session Discussion Under Chapter 5 ILCS
Section 2(c)6 - Real Estate: Setting Price for Sale/Lease
XIV. Action on Closed Session Item(s)
XV. Motion to Adjourn
2
418 Main Street | Lemont, IL 60439
TO: Village Board MeetingFROM: Shaeera Salauddin, AdministrationTHROUGH:SUBJECT: Approval of Minutes DATE: July 27, 2020 SUMMARY/BACKGROUND
ANALYSIS
Consistency with Village Policy
STAFF RECOMMENDATIONApproval of Minutes
BOARD ACTION REQUESTEDApproval of Minutes
ATTACHMENTSVB_7_13_20_Minutes.pdf
3
Page 1 of 5
Minutes
VILLAGE BOARD MEETING Village Hall – 418 Main Street
July 13, 2020 6:30 PM
The regular meeting of the Lemont Village Board was held on Monday, July 13, 2020 at 6:30 p.m. with Mayor John Egofske presiding.
I) Pledge of Allegiance
II) Roll Call – Kittridge, Kwasneski, Maher, McClafferty, Sniegowski, Stapleton; present.
III) Consent Agenda
III.A) Approval of Minutes
Cover Page
6-29-2020 Village Board Meeting Minutes.pdf
III.B) Approval of Disbursements
Cover Page
6-23 to 7-13.pdf
III.C) Ordinance O-41-20 Amending Lemont Municipal Code Chapter 5.04, Section 5.04.060: Alcoholic Beverages (Increasing Number of Class A-4 Liquor Licenses)
Cover Page
Class_A-4_Liquor_License_to_Mama D's.pdf
III.D) Ordinance O-42-20 Approving an Agreement for the Formation of Village of Lemont Special Service Area 2.
Cover Page
Ordinance SSA Agreement.pdf
III.E) Ordinance O-43-20 Proposing the Establishment of Special Service Area 2 and Providing for a Public Hearing
Cover Page
4
Village of Lemont, Illinois July 13, 2020
Ordinance proposing SSA and public hearing.pdf Motion by McClafferty, seconded by Sniegowski to approve the items on the consent agenda by omnibus vote. Roll call: Kittridge, Kwasneski, Maher, McClafferty, Sniegowski, Stapleton; 6 ayes. Motion passed.
IV) Mayor's Report
Mayor’s Message-
1. As you all most likely know, we entered Phase 4 of the Restore Illinois plan on June 26. Details of this plan, along with an enormous amount of information on COVID-19, can be found on the Illinois Department of Public Health website, www.dph.illinois.gov We are very excited that our Lemont businesses are open, and restaurants can have indoor seating. Again, there are guidelines that businesses, as well as patrons, need to follow and we encourage everyone to follow the CDC guidelines. While we cannot speculate when we will move into Phase 5, it could be quite some time. Phase 5 is post-pandemic when there is a vaccine or highly effective and widely available treatment, or the elimination of new cases over a sustained period of time. The economy would fully reopen with safety precautions continuing. Please continue to wear cloth face coverings when less than 6 feet away from others and when indoors, and continue to maintain social distancing.
2. The Lemont Public Library is back to their regular open hours starting today. They are adhering to CDC guidelines with social distancing measures. Masks are required, there is a limited capacity of two in a study room, and computer usage is limited to one hour. Visit, www.LemontLibrary.org , for further information.
3. Lemont Park District is having Drive-In Movie nights. Advanced registration is required. Please visit their website for dates, times and registration. The Centennial Outdoor Aquatic Center is open and adhering to guidelines. Advanced registration is required. Please visit, www.LemontParkDistrict.org , for specific information.
4. Lemont Legions Cruise Nights takes place each Wednesday from 6-9 p.m. in downtown Lemont and continues through August 26. Visit, www.myhcba.com , for more information.
5. Census takers began visiting homes this month of those that have not yet responded to the 2020 Census. They will be wearing face coverings, following local public health guidelines and have a Census ID Badge when they visit your home. Their goal is to help you and everyone in your home be counted in the 2020 Census.
5
Village of Lemont, Illinois July 13, 2020
There are three ways you can complete your 2020 Census; respond online, by phone or by mail. If you respond online or by phone, a census taker is less likely to have to visit your home to collect your responses. Everyone should have previously received a post card in the mail from the Census with a code on it for the online form. With the library being open, they have computers available for Lemont residents’ use. Visit, www.2020Census.gov , to complete the online form. Please be sure to complete your 2020 Census and help bring Lemont to a 100% count so we receive our share of federal and state funds.
V) Clerk's Report
V.A An Ordinance Approving an Amendment to the Annexation Agreement for 13389 McCarthy Road
Cover Page
Ordinance Authorizing Execution of an Amended Annexation Agreement - 13389 McCarthy Road Motion by Stapleton, seconded by Sniegowski to adopt said ordinance. Roll call: Kittridge, Kwasneski, Maher, McClafferty, Sniegowski, Stapleton; 6 ayes. Motion passed.
V.B An Ordinance Approving a Variation to Section 17.28.020 of the Village UDO for 13389 McCarthy Road to Allow for an Onsite Septic System Rather than Connect to Village Sewer
Cover Page
Ordinance Granting A Variation for 13389 McCarthy Rd Sewer Connection Motion by Stapleton, seconded by Sniegowski to adopt said ordinance. Roll call: Kittridge, Kwasneski, Maher, McClafferty, Sniegowski, Stapleton; 6 ayes. Motion passed.
V.C Resolution Authorizing Award of Contract for Holmes Street Corridor Brick Paver Sidewalk Project
Cover Page
Resolution Authorizing Award of Contract Holmes Street Corridor Brick Paver Sidewalk Project.pdf Motion by McClafferty, seconded by Maher to adopt said resolution. Roll call: Kittridge, Kwasneski, Maher, McClafferty, Sniegowski, Stapleton; 6 ayes. Motion passed.
6
Village of Lemont, Illinois July 13, 2020
V.D A Resolution Authorizing Approval of a Tri-Party Agreement with Lemont Township & Lemont Quarries Holdings, LLC
Cover Page
RES - Tri-Party Agreement - Township and Forge.pdf
Draft Three party parking agreement - VoL and Township - 7-10-20- Pending Legal final changes.pdf
Draft Maintenance Plan_road and lots #2 - pending final legal changes.pdf Motion by Sniegowski, seconded by Maher to table this resolution until the next voting Board Meeting. Roll call: Kittridge, Kwasneski, Maher, McClafferty, Sniegowski, Stapleton; 6 ayes. Motion passed.
VI) Village Attorney Report
VII) Village Administrator Report
Village Administrator spoke about various openings in the Village including the Village Hall as well as restaurants and bars.
VIII) Board Reports
IX) Staff Reports
Public Works-
1. Route 83 bridgework will be done on the north of 107th street until end of October.
2. Even and odd watering is in effect. No watering between 10 a.m. & 6 p.m. Police-
1. Any individual over 2 years shall be required to wear a face mask covering the nose and mouth even outdoors if social distancing isn’t possible.
2. Bars and restaurants can have any number of customers as long as they are 6 feet apart. Masks must be worn in and out of the establishment.
X) Unfinished Business
XI) New Business
XII) Audience Participation
XIII) Executive Session Discussion Under Chapter 5 ILCS
Motion by Maher, seconded by Sniegowski to open the executive session. Roll call: Kittridge, Kwasneski, Maher, McClafferty, Sniegowski, Stapleton; 6 ayes. Motion passed.
7
Village of Lemont, Illinois July 13, 2020
XIV) Action on Closed Session Item(s)
XV) Motion to Adjourn
There being no further business, a motion was made by Maher, seconded by Kittridge, to adjourn the meeting at 8:34 p.m. Roll call: Kittridge, Kwasneski, Maher, McClafferty, Sniegowski, Stapleton; 6 ayes. Motion passed.
8
418 Main Street | Lemont, IL 60439
TO: Village Board MeetingFROM: Chris Smith, FinanceTHROUGH:SUBJECT: Approval of Disbursements DATE: July 27, 2020 SUMMARY/BACKGROUND
ANALYSIS
Consistency with Village Policy
STAFF RECOMMENDATIONStaff recommends approval
BOARD ACTION REQUESTEDStaff recommends approval
ATTACHMENTS7-14 to 7-27.pdf
9
Number Date Status Void ReasonReconciled/ Voided Date Source Payee Name
Transaction Amount
Reconciled Amount Difference
FM-Clearing - Accounts PayableCheck21239 07/27/2020 Open Accounts Payable AVALON PETROLEUM COMPANY $7,189.81
Invoice Date Description Amount465566 07/09/2020 1500 gallons regular $3,383.55465554 06/29/2020 1766 gallons regular $3,806.26
21240 07/27/2020 Open Accounts Payable BURNS PLUMBING $1,200.00Invoice Date Description Amount13994 07/17/2020 pd faucet replacements $1,200.00
21241 07/27/2020 Open Accounts Payable CAR REFLECTIONS $850.00Invoice Date Description Amount20-123 07/07/2020 vehicle lettering $850.00
21242 07/27/2020 Open Accounts Payable CHICAGO STREET CCDD, LLC $665.00Invoice Date Description Amount19249 06/30/2020 dump fees $665.00
21243 07/27/2020 Open Accounts Payable CHICAGO TRIBUNE MEDIA GROUP $61.50Invoice Date Description Amount021983991000 06/30/2020 classified ad $61.50
21244 07/27/2020 Open Accounts Payable COMED $505.12Invoice Date Description Amount20-07-4054 07/14/2020 4161134054 - street lights - 0 12701 TRE, 171
LEMONT$23.54
20-07-3016 07/02/2020 9338003016 - street lights - houston 1N schultz $21.0920-07-7033 07/01/2020 2213017033 - Main St lift station - bell rd, main st $101.2720-07-2063 07/01/2020 1443022063 - street lights - KA Steel path $25.2420-07-0155 07/02/2020 1515080155 - street lights - 451 Talcott $6.6920-07-3015 07/01/2020 0432203015 - street lights - 44 Stephen St $175.1520-06-9011 (2) 06/30/2020 6534089011 - street lights - 411 Singer Ave Rear $118.3020-07-4009 07/02/2020 0348764009 - street lights - 47 Stevens St $39.9920-06-0155 06/03/2020 1515080155 - street lights - 451 Talcott ($1.37)20-06-4009 06/03/2020 0348764009 - street lights - 47 Stevens St ($4.78)
21245 07/27/2020 Open Accounts Payable EARTHWERKS LAND IMPROVEMENT & DEVELOPMENT CORP
$328,064.04
Invoice Date Description Amount19377-PE1 07/07/2020 2020 water main replacement project $328,064.04
21246 07/27/2020 Open Accounts Payable ECOLOGY + VISION LLC $1,462.50Invoice Date Description Amount1163 07/01/2020 Plan Review $112.501165 07/01/2020 Plan Review $337.501166 07/01/2020 Plan Review $112.501164 07/01/2020 Plan Review $450.001162 07/01/2020 Plan Review $450.00
21247 07/27/2020 Open Accounts Payable GCS SUPPLY, LLC $802.90Invoice Date Description AmountIVC0141667 07/09/2020 cones $802.90
Thursday, July 23, 2020Pages: 1 of 7user: Meg Machacek
Payment RegisterVillage of Lemont
From Payment Date: 7/14/2020 - To Payment Date: 7/27/2020
10
Number Date Status Void ReasonReconciled/ Voided Date Source Payee Name
Transaction Amount
Reconciled Amount Difference
21248 07/27/2020 Open Accounts Payable GUARANTEED TECHNICAL SERVICES AND CONSULTING INC
$1,041.44
Invoice Date Description Amount2020-00264 07/10/2020 I.T. Support $1,041.44
21249 07/27/2020 Open Accounts Payable HERITAGE CORRIDOR CONVENTION & VISITORS BUREAU
$3,000.00
Invoice Date Description Amount9759 05/01/2020 Annual Membership $3,000.00
21250 07/27/2020 Open Accounts Payable ILLINOIS LAW ENFORCEMENT ALARM SYSTEM
$120.00
Invoice Date Description AmountDUES9693 07/01/2020 Annual Membership Dues 7/1/20-6/30/21 $120.00
21251 07/27/2020 Open Accounts Payable Illinois State Police $141.25Invoice Date Description Amount20-05-31 ISP BOI 05/31/2020 Cost Center: 01600 ORI: IL016600L $141.25
21252 07/27/2020 Open Accounts Payable ILLINOIS STATE TOLL HIGHWAY AUTHORITY
$47.60
Invoice Date Description AmountG125000005274 07/17/2020 tolls#183045332 4/1-6/30 $47.60
21253 07/27/2020 Open Accounts Payable IRMA $234.08Invoice Date Description AmountSALES0018497 06/30/2020 Jun 2020 Closed Claims $234.08
21254 07/27/2020 Open Accounts Payable JOHNSON CONTROLS SECURITY SOLUTIONS
$1,290.00
Invoice Date Description Amount34551085 07/11/2020 pw alarm monitoring $161.2534551083 07/11/2020 Main St l/s alarm monitoring $161.2534551079 07/11/2020 pd alarm monitoring $161.2534551081 07/11/2020 garage alarm monitoring $161.2534551082 07/11/2020 old pd alarm monitoring $161.2534551084 07/11/2020 well 6 alarm monitoring $161.2534551080 07/11/2020 vh alarm monitoring $161.2534551078 07/11/2020 metra station alarm monitoring $161.25
21255 07/27/2020 Open Accounts Payable KANE MCKENNA AND ASSOCIATES INC
$175.00
Invoice Date Description Amount17218 06/30/2020 1846 - Jun 2020 Services $175.00
21256 07/27/2020 Open Accounts Payable LAUTERBACH & AMEN, LLP $450.00Invoice Date Description Amount44142 03/15/2020 Projections - Cost of New Hire $450.00
21257 07/27/2020 Open Accounts Payable LEMONT EXPRESS CAR WASH, LLC
$600.00
Invoice Date Description Amount146 07/01/2020 pd car washes 4/1-6/30 $590.00147 07/17/2020 Lema car washes 4/1-6/30 $10.00
Thursday, July 23, 2020Pages: 2 of 7user: Meg Machacek
Payment RegisterVillage of Lemont
From Payment Date: 7/14/2020 - To Payment Date: 7/27/2020
11
Number Date Status Void ReasonReconciled/ Voided Date Source Payee Name
Transaction Amount
Reconciled Amount Difference
21258 07/27/2020 Open Accounts Payable LIVING WATERS CONSULTANTS INC
$1,500.00
Invoice Date Description Amount2567 07/15/2020 Grant Consulting $1,500.00
21259 07/27/2020 Open Accounts Payable LOOK NU, LLC $20.00Invoice Date Description Amount609 07/01/2020 pd car washes June 2020 $20.00
21260 07/27/2020 Open Accounts Payable MEADE INC $1,116.18Invoice Date Description Amount693005 07/01/2020 EVP Repair @ 127th & State $1,116.18
21261 07/27/2020 Open Accounts Payable MENARDS $164.55Invoice Date Description Amount72188 07/01/2020 supplies $12.3572569 07/07/2020 pump $89.9972973 07/14/2020 supplies $24.7373042 07/17/2020 supplies $37.48
21262 07/27/2020 Open Accounts Payable METROPOLITAN WATER RECLAMATION DISTRICT
$2,150.19
Invoice Date Description Amount26603-2019-B-000 07/14/2020 well 6 mwrd user fee $2,150.19
21263 07/27/2020 Open Accounts Payable METROPOLITAN WATER RECLAMATION DISTRICT
$1,820.10
Invoice Date Description Amount25596-2019-B-000 07/14/2020 well 5 mwrd user fee $586.7514496-2019-B-000 07/14/2020 well 3 mwrd user fee $889.9414485-2019-B-000 07/14/2020 well 4 mwrd user fee $343.41
21264 07/27/2020 Open Accounts Payable MONROE TRUCK EQUIPMENT $738.00Invoice Date Description Amount329719 07/08/2020 chemical tanks $738.00
21265 07/27/2020 Open Accounts Payable NICHOLSON, MYRON $531.91Invoice Date Description Amount20-08-01 MN 07/14/2020 2019 Tax Rebate $531.91
21266 07/27/2020 Open Accounts Payable NICOR GAS $235.08Invoice Date Description Amount20/07-9378 5 07/06/2020 25-59-90-9378 5 well #6 $38.8520/07-2000 4 07/06/2020 04-46-52-2000 4 well #4 $39.3520/07-2382 4 07/06/2020 88-84-93-2382 4 glens of connemara l/s $40.3020/07-2000 6 07/06/2020 69-98-10-2000 6 oak tree ln l/s $38.8620/07-4722 3 07/07/2020 91-25-56-4722 3 eagle ridge l/s $38.8620/07-2000 8 07/07/2020 37-54-52-2000 8 well #3 $38.86
21267 07/27/2020 Open Accounts Payable OCCUPATIONAL HEALTH CENTERS OF ILLINOIS, P.C.
$397.00
Invoice Date Description Amount1012483065 07/07/2020 Random Testing $125.001012494736 07/14/2020 Random Testing $272.00
Thursday, July 23, 2020Pages: 3 of 7user: Meg Machacek
Payment RegisterVillage of Lemont
From Payment Date: 7/14/2020 - To Payment Date: 7/27/2020
12
Number Date Status Void ReasonReconciled/ Voided Date Source Payee Name
Transaction Amount
Reconciled Amount Difference
21268 07/27/2020 Open Accounts Payable OFFICE 8 $236.61Invoice Date Description Amount2061586 07/20/2020 Gloves, Wipes $236.61
21269 07/27/2020 Open Accounts Payable OTIS ELEVATOR CO $1,680.00Invoice Date Description AmountCYS19769001 03/18/2020 garage elevator test witness $1,680.00
21270 07/27/2020 Open Accounts Payable PRESTIGE PRESSURE WASHING INC
$500.00
Invoice Date Description AmountP6730 07/15/2020 graffiti removal $500.00
21271 07/27/2020 Open Accounts Payable PROVEN BUSINESS SYSTEMS, LLC $1,008.28Invoice Date Description Amount716460 07/01/2020 pw copier maintenance $28.47717294 07/08/2020 pw copier 7/4/20-1/3/21 $585.48717120 07/07/2020 V.H. Canon copier usage - 4/8/20-7/7/20 $394.33
21272 07/27/2020 Open Accounts Payable QUENCH USA INC $126.28Invoice Date Description Amount301154421 07/07/2020 146998 - coffee service supplies $126.28
21273 07/27/2020 Open Accounts Payable RAGAN COMMUNICATIONS INC $154.65Invoice Date Description Amount24069 06/23/2020 Programming Cable $154.65
21274 07/27/2020 Open Accounts Payable RAINBOW PRINTING $335.95Invoice Date Description Amount414255 07/14/2020 2500 ea Window & Blank Envelopes w return address
imprint$335.95
21275 07/27/2020 Open Accounts Payable RAY O'HERRON CO, INC. $1,942.69Invoice Date Description Amount2037701-IN 07/09/2020 Uniforms LA $958.702037702-IN 07/09/2020 Uniforms DT $983.99
21276 07/27/2020 Open Accounts Payable RCM DATA CORPORATION $172.48Invoice Date Description AmountIN74551 06/05/2020 toner $172.48
21277 07/27/2020 Open Accounts Payable SOSIN, ARNOLD & SCHOENBECK LTD
$1,000.00
Invoice Date Description Amount113541 06/30/2020 Jun 2020 Adjudication $1,000.00
21278 07/27/2020 Open Accounts Payable SOUTHWEST CONFERENCE OF MAYORS
$5,500.00
Invoice Date Description Amount20-06-158 SCM 06/15/2020 Annual Membership 7/1/20-6/30/21 $5,500.00
21279 07/27/2020 Open Accounts Payable SZYDLO, LENORE $641.84Invoice Date Description Amount20-08-03 LS 07/20/2020 2019 Property Tax Rebate $641.84
Thursday, July 23, 2020Pages: 4 of 7user: Meg Machacek
Payment RegisterVillage of Lemont
From Payment Date: 7/14/2020 - To Payment Date: 7/27/2020
13
Number Date Status Void ReasonReconciled/ Voided Date Source Payee Name
Transaction Amount
Reconciled Amount Difference
21280 07/27/2020 Open Accounts Payable TOTAL GREEN LAWN MAINTENANCE INC
$375.00
Invoice Date Description Amount1231 Acorn 06/01/2020 5/28/20 Mowing of Property $125.001355 Overton 06/01/2020 5/28/20 Mowing of Property $125.00801 Houston 07/01/2020 6/24/20 Mowing of Property $125.00
21281 07/27/2020 Open Accounts Payable UNDERGROUND PIPE & VALVE CO INC
$4,174.00
Invoice Date Description Amount043548 07/10/2020 water main repair parts $4,174.00
21282 07/27/2020 Open Accounts Payable WILLOWBROOK FORD INC $406.97Invoice Date Description Amount6327788 07/02/2020 warranty repair PD17-2 $100.006328082 07/09/2020 repair pw1891 $290.005146409 07/09/2020 parts $16.97
21283 07/27/2020 Open Accounts Payable ECONOMOS, ANDREW $30.00Invoice Date Description Amount20-07-15 AE 07/15/2020 refund amount overpaid for senior vehicle sticker $30.00
21284 07/27/2020 Open Accounts Payable FRISCH, DIANE $105.00Invoice Date Description Amount20-07-15 DF 07/15/2020 refund for returned Metra Pass #0051 $105.00
21285 07/27/2020 Open Accounts Payable GARGANO, PAULA $60.00Invoice Date Description Amount20-07-17 PG 07/17/2020 refund for vehicle sticker purchased in error $60.00
21286 07/27/2020 Open Accounts Payable KELLIHER, DANIEL, J $60.00Invoice Date Description Amount20-07-10 DJK 07/10/2020 refund amount overpaid for senior vehicle sticker $60.00
21287 07/27/2020 Open Accounts Payable KENDZORA, JEFFREY $60.00Invoice Date Description Amount20-07-17 JK 07/17/2020 refund amount overpaid for senior vehicle stickers $60.00
21288 07/27/2020 Open Accounts Payable MORAND, JOSEPH $105.00Invoice Date Description Amount20-07-15 JM 07/15/2020 refund for returned Metra Pass #0098 $105.00
21289 07/27/2020 Open Accounts Payable NAKIS, GEORGE $30.00Invoice Date Description Amount20-07-09 GN 07/09/2020 refund amount overpaid for senior vehicle sticker $30.00
21290 07/27/2020 Open Accounts Payable PALUCH, KEVIN $60.00Invoice Date Description Amount20-07-10 KP 07/10/2020 refund for vehicle sticker not needed $60.00
21291 07/27/2020 Open Accounts Payable PARKER, ROBIN $125.00Invoice Date Description Amount20-07-10 RP 07/10/2020 refund for returned Metra Pass #0106 $125.00
21292 07/27/2020 Open Accounts Payable PETRO, CHRISTINE OR DANIEL $125.00Invoice Date Description Amount20-07-08 CDP 07/08/2020 refund for returned Metra Pass #0112 $125.00
Thursday, July 23, 2020Pages: 5 of 7user: Meg Machacek
Payment RegisterVillage of Lemont
From Payment Date: 7/14/2020 - To Payment Date: 7/27/2020
14
Number Date Status Void ReasonReconciled/ Voided Date Source Payee Name
Transaction Amount
Reconciled Amount Difference
21293 07/27/2020 Open Accounts Payable VOLZ, JOHN, E $60.00Invoice Date Description Amount20-07-14 JV 07/14/2020 refund for vehicle sticker not needed $60.00
21294 07/27/2020 Open Accounts Payable SOUTHWEST CENTRAL DISPATCH $22,315.72Invoice Date Description Amount20-07-16 SCD 07/16/2020 Aug 20 assessment $22,315.72
Type Check Totals: 56 Transactions $397,963.72EFT664 07/27/2020 Open Accounts Payable ANDRYSIAK, EDWARD OR
PATRICIA$1,147.49
Invoice Date Description Amount20-07-15 EA 07/15/2020 Aug 2020 payment $1,147.49
665 07/27/2020 Open Accounts Payable CDW GOVERNMENT $57.06Invoice Date Description AmountZLB2360 07/16/2020 computer $57.06
666 07/27/2020 Open Accounts Payable EJ USA, INC $6,908.62Invoice Date Description Amount110200051161 07/15/2020 replacement hydrants and parts $6,330.80110200051859 07/16/2020 parts $577.82
667 07/27/2020 Open Accounts Payable GRANICUS LLC $12,430.00Invoice Date Description Amount128648 06/30/2020 7/1/2020-6/30/2021 $6,000.00123824 03/02/2020 govAccess $3,215.00124648 03/27/2020 govAccess $3,215.00
668 07/27/2020 Open Accounts Payable INFINISOURCE INC $27.45Invoice Date Description AmountI104777731 07/15/2020 COBRA Admin Fee $27.45
669 07/27/2020 Open Accounts Payable INSIGHT DIRECT USA INC $546.16Invoice Date Description Amount917133991 07/02/2020 toner cartridge $546.16
670 07/27/2020 Open Accounts Payable Neopost #6083457 $2,000.00Invoice Date Description Amount20-07-27 PW 07/27/2020 via ACH - POC # 6083457 $2,000.00
671 07/27/2020 Open Accounts Payable SHI INTERNATIONAL CORP $1,785.98Invoice Date Description AmountB11984802 07/13/2020 Switches $1,785.98
672 07/27/2020 Open Accounts Payable SHRED-IT USA, LLC $782.66Invoice Date Description Amount8180115280 07/17/2020 10465451 - document purge $782.66
Type EFT Totals: 9 Transactions $25,685.42FM-Clearing - Accounts Payable Totals
Checks Status Count Transaction Amount Reconciled AmountOpen 56 $397,963.72 $0.00Reconciled 0 $0.00 $0.00Voided 0 $0.00 $0.00
Thursday, July 23, 2020Pages: 6 of 7user: Meg Machacek
Payment RegisterVillage of Lemont
From Payment Date: 7/14/2020 - To Payment Date: 7/27/2020
15
Number Date Status Void ReasonReconciled/ Voided Date Source Payee Name
Transaction Amount
Reconciled Amount Difference
Stopped 0 $0.00 $0.00Total 56 $397,963.72 $0.00
EFTs Status Count Transaction Amount Reconciled AmountOpen 9 $25,685.42 $0.00Reconciled 0 $0.00 $0.00Voided 0 $0.00 $0.00Total 9 $25,685.42 $0.00
All Status Count Transaction Amount Reconciled AmountOpen 65 $423,649.14 $0.00Reconciled 0 $0.00 $0.00Voided 0 $0.00 $0.00Stopped 0 $0.00 $0.00Total 65 $423,649.14 $0.00
Grand Totals:Checks Status Count Transaction Amount Reconciled Amount
Open 56 $397,963.72 $0.00Reconciled 0 $0.00 $0.00Voided 0 $0.00 $0.00Stopped 0 $0.00 $0.00Total 56 $397,963.72 $0.00
EFTs Status Count Transaction Amount Reconciled AmountOpen 9 $25,685.42 $0.00Reconciled 0 $0.00 $0.00Voided 0 $0.00 $0.00Total 9 $25,685.42 $0.00
All Status Count Transaction Amount Reconciled AmountOpen 65 $423,649.14 $0.00Reconciled 0 $0.00 $0.00Voided 0 $0.00 $0.00Stopped 0 $0.00 $0.00Total 65 $423,649.14 $0.00
Thursday, July 23, 2020Pages: 7 of 7user: Meg Machacek
Payment RegisterVillage of Lemont
From Payment Date: 7/14/2020 - To Payment Date: 7/27/2020
16
418 Main Street | Lemont, IL 60439
TO: Village Board MeetingFROM: George Schafer, AdministrationTHROUGH:SUBJECT: A Resolution Authorizing Approval of an Emergency Water Connection
Agreement with Franciscan Sisters of Chicago DATE: July 27, 2020 SUMMARY/BACKGROUNDThe Village was recently awarded a federal grant to install a new water main on Main Streetthat will extend generally from the Fordham Subdivision to Walker Road. The project willprovide potable water service to the under served area for future and existing users. Due tonot having utilities currently on Main Street, the Franciscan Village is served with Village waterbut only from one location - from the south of their property via an older line. The attachedagreement is necessary so that the Village may also connect to it from this new water main, toprovide emergency water service in the event there are problems with their existingconnection. Timing of the agreement is important so the details of the connection can beincluded with the bid. The overall project will be bid in September and constructed in 2021.
ANALYSIS
Consistency with Village Policy2018 Strategic Plan
STAFF RECOMMENDATIONStaff recommends approval of the agreement
BOARD ACTION REQUESTEDMotion to Approve Resolution
ATTACHMENTSRES- EWC Agreement w. Franciscan Sisters.pdfEmergency Water Connection Agreement Signed FV.pdf
17
VILLAGE OF LEMONT
RESOLUTION NUMBER R-___-20
A RESOLUTION AUTHORIZING APPROVAL OF AN EMERGENCY WATER CONNECTION AGREEMENT WITH FRANCISCAN SISTERS OF CHICAGO
JOHN EGOFSKE, Village President CHARLENE M. SMOLLEN, Clerk
JANELLE KITTRIDGE
RYAN KWASNESKI DAVE MAHER
KEN MCCLAFFERTY RICK SNIEGOWSKI RON STAPLETON
Trustees
Published in pamphlet form by authority of the Village President and Board of Trustees of the Village of Lemont on __-__-2020
18
RESOLUTION NO. R-______-20
A RESOLUTION AUTHORIZING APPROVAL OF AN EMERGENCY WATER CONNECTION AGREEMENT WITH FRANCISCAN SISTERS OF CHICAGO
WHEREAS the Village of Lemont, Counties of Cook, Will and DuPage, Illinois, (“the Village”) is a municipality in the state of Illinois with full powers to enact ordinances and adopt resolutions for the benefit of the residents of the Village; and
WHEREAS the Village is desirous to enter into an Emergency Water Connection Agreement with Franciscan Sisters of Chicago; and
WHEREAS the President and the Board of Trustees of the Village find that it is in the best interests of the Village to authorize the Emergency Water Connection Agreement as further described in the attached Exhibit A (“Agreement”) with Franciscan Sisters of Chicago;
NOW, THEREFORE, BE IT RESOLVED by the President and Board of Trustees of the Village of Lemont, Counties of Cook, Will and DuPage, Illinois, as follows:
SECTION 1: RECITALS.
That the above recitals and legislative findings are found to be true and correct and are hereby incorporated herein and made a part hereof as if fully set forth in their entirety.
SECTION 2:
Subject to attorney review, the Emergency Water Connection Agreement with Franciscan Sisters of Chicago is hereby approved and authorized in substantially the same form as Exhibit A attached hereto.
SECTION 3:
The Village President or his designee is hereby authorized to execute the Agreement in substantially the form attached hereto as Exhibit “A.”
SECTION 4: EFFECTIVE DATE.
This Resolution shall be in full force and effect from and after its passage, approval and publication in pamphlet form as provided by law.
19
ADOPTED this ____ day of _________, 2020.
PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT, COUNTIES OF COOK, WILL, AND DUPAGE, ILLINOIS, ON THIS ______ DAY OF ___________________ 2020.
PRESIDENT AND VILLAGE BOARD MEMBERS:
AYES: NAYS: ABSENT: ABSTAIN: Janelle Kittridge
_________
_________
_________
_________
Ryan Kwasneski
_________
_________
_________
_________
Dave Maher
_________
_________
_________
_________
Ken McClafferty
_________
_________
_________
_________
Rick Sniegowski
_________
_________
_________
_________
Ron Stapleton
_________
_________
_________
_________
John Egofske, Village President Attest: Charlene M. Smollen, Village Clerk
20
EXHIBIT A Emergency Water Connection Agreement with Franciscan Sisters of Chicago
21
22
23
24
25
26
27
418 Main Street | Lemont, IL 60439
TO: Village Board MeetingFROM: George Schafer, AdministrationTHROUGH:SUBJECT: A Resolution Authorizing Approval of a Phase I Engineering Agreement
Proposal with Knight Engineering and Architects, Inc. for the Walker RoadExtension Project
DATE: July 27, 2020 SUMMARY/BACKGROUNDThe Village is desirous of creating a new railroad crossing and related extension of roadway ator near Walker Road and Main Street. The project began several years ago with the Forgetaking the lead as the Main/Walker site was originally going to be the main entrance to theoutdoor recreation park. Due to delays and inability to make progress on the crossing, theentrance to the park was moved to the north side of the I&M Canal in order for the park toopen this summer. It is still desirable by all parties that Main street become the main entranceto the park eventually, which also opens up other opportunities for the Village in this area. Asa result, over the last few months, the Village of Lemont has taken the lead on the project andhas begun coordinating and planning for the potential Walker Rd Extension and GradeCrossing Project. Based on initial guidance and funding commitments from the ICC, the project may end upbeing a grade separated overpass over the Canadian National railroad tracks at or nearWalker Rd. Those and other details, along with the location of the proposed overpass/crossingwill be worked out during the Phase I Engineering process. The overall improvement willextend Walker Road beginning at Main Street and ending north of the Illinois Central Railroad.The goal of the overall project will be to provide safe access to current and future developmentnorth of the Illinois Central Railroad (CN Rail). Most importantly, this project will also addressgrave safety concerns surrounding the Boyer Street and McGuire Parkway at-grade railcrossings that serve commercial developments immediately east of the proposed Walker Roadextension. The Village at this time has no jurisdiction on these two roadways/crossings butsees a need to address safety issues and improve the overall area. As a result of the project,the Walker Road extension project has the potential to remove the two at-grade crossings andprovide alternative access as part of the overall improvement to the area. While the Village has already applied for several funding opportunities and has manypromising leads on funding for the overall project, the Village will be required to fund Phase IEngineering for the project. During the Phase I Engineering project, the Village will be workingthrough details of the project which will include the evaluation of several alternatives. Duringthe Phase I process, the Village will continue to apply for and secure funding commitments forthe potential project. Phase I Engineering costs for the project are expected to be a not toexceed amount of $491,900. While the Village will have to fund the Phase I project initially,there are opportunities for reimbursement if the Village is desirous of creating a tax incrementfinance district for the area, or through other opportunities. The Village Board discussed thepotential for tax increment financing in this area about a year ago and completed some initial
28
studying of the area, but decided to wait for future discussion on the topic.
ANALYSISThe Walker Road extension and grade crossing and/or overpass is a comprehensive projectthat has great potential for economic development activity for the area. It will allow for thedevelopment of key areas north of the tracks, provide for the ability for future phases of theForge and allow the north side of the I&M Canal to return to a less traveled passive area forthe public (with parking and entrance for the Forge project being re-routed to Main Street).Importantly for the area is that the project will allow for 2 private and dangerous crossings tobe eliminated. The project also serves as a starting point to address other issues along theline including train noise. Due to all these benefits and more, the Village has been activemeeting with key players including Canadian National, the ICC, Metra, IDOT and propertyowners in the area. A project of this nature takes several seasons to engineer and construct. If all goes well,construction could begin as early as the Fall of 2023 – which would be around the same timeas IDOT’s reconstruction of Main Street from Fordham to 83 & Main (currently undergoingPhase II engineering). Potential for completion of both projects in 2024 would substantiallyimprove the area and bring potential for significant economic development to the community.The Walker Road extension and crossing project is a complex and expensive project. Webelieve we have commitments for at least half of this project and strategies are being put intoplace to secure more funding. The project details along with funding plans will be developedas we proceed through Phase I Engineering. Once the project is better understood by allparties, the Village will also reach out to players that will benefit off the improvement forcontribution as well. In order to move the project forward, the Village must fund Phase IEngineering, of which we have received a proposal to complete, which is attached. TotalEngineering Costs for Phase I is $491,900. A copy of the proposal is included as anattachment to this memo. In summary, the proposal identifies over 1200 hours of staff workand sub-consulting work to complete the analysis including: Coordination with differentagencies – (ICC, CN, Metra, IDOT, FHWA): Grant writing for Phase II and III engineering andconstruction opportunities; Surveying; Environmental Data Collection, Inventory andCoordination: Geotechnical analysis; Site design. The item was discussed at the July 20thCommittee of the Whole and the Board was receptive to moving forward for formal approval.
Consistency with Village Policy2018 Strategic Plan
STAFF RECOMMENDATIONStaff recommends approval of the attached resolution and agreement
BOARD ACTION REQUESTEDMotion to Approve Resolution
ATTACHMENTSResolution Authorizing Agreement with Knight.pdfProposal, Walker Road Ext (rev1).pdf
29
VILLAGE OF LEMONT
RESOLUTION NUMBER R-___-20
A RESOLUTION AUTHORIZING APPROVAL OF A PHASE I ENGINEERING PROPOSAL WITH KNIGHT ENGINEERING AND ARCHITECTS, INC. FOR THE
WALKER ROAD EXTENSION PROJECT
JOHN EGOFSKE, Village President CHARLENE M. SMOLLEN, Clerk
JANELLE KITTRIDGE
RYAN KWASNESKI DAVE MAHER
KEN MCCLAFFERTY RICK SNIEGOWSKI RON STAPLETON
Trustees
Published in pamphlet form by authority of the Village President and Board of Trustees of the Village of Lemont on __-__-2020
30
RESOLUTION NO. R-______-20
A RESOLUTION AUTHORIZING APPROVAL OF A PHASE I ENGINEERING PROPOSAL WITH KNIGHT ENGINEERING AND ARCHITECTS, INC. FOR THE
WALKER ROAD EXTENSION PROJECT
WHEREAS the Village of Lemont, Counties of Cook, Will and DuPage, Illinois, (“the Village”) is a municipality in the state of Illinois with full powers to enact ordinances and adopt resolutions for the benefit of the residents of the Village; and
WHEREAS the Village is desirous to enter into a Phase I Engineering proposal with Knight Engineering and Architects, Inc. for the Walker Road extension project; and
WHEREAS the President and the Board of Trustees of the Village find that it is in the best interests of the Village to authorize the Phase I Engineering proposal as further described in the attached Exhibit A (“Agreement”) with Knight Engineering and Architects, Inc.;
NOW, THEREFORE, BE IT RESOLVED by the President and Board of Trustees of the Village of Lemont, Counties of Cook, Will and DuPage, Illinois, as follows:
SECTION 1: RECITALS.
That the above recitals and legislative findings are found to be true and correct and are hereby incorporated herein and made a part hereof as if fully set forth in their entirety.
SECTION 2:
Subject to attorney review, the Phase I Engineering proposal with Knight Engineering and Architects, Inc. is hereby approved and authorized in substantially the same form as Exhibit A attached hereto.
SECTION 3:
The Village President or his designee is hereby authorized to execute the Agreement in substantially the form attached hereto as Exhibit “A.”
SECTION 4: EFFECTIVE DATE.
This Resolution shall be in full force and effect from and after its passage, approval and publication in pamphlet form as provided by law.
31
ADOPTED this ____ day of _________, 2020.
PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT, COUNTIES OF COOK, WILL, AND DUPAGE, ILLINOIS, ON THIS ______ DAY OF ___________________ 2020.
PRESIDENT AND VILLAGE BOARD MEMBERS:
AYES: NAYS: ABSENT: ABSTAIN: Janelle Kittridge
_________
_________
_________
_________
Ryan Kwasneski
_________
_________
_________
_________
Dave Maher
_________
_________
_________
_________
Ken McClafferty
_________
_________
_________
_________
Rick Sniegowski
_________
_________
_________
_________
Ron Stapleton
_________
_________
_________
_________
John Egofske, Village President Attest: Charlene M. Smollen, Village Clerk
32
EXHIBIT A
33
Knight E/A, Inc. 631 East Boughton Road Telephone (708) 342‐1250 Suite 205 Fax (708) 342‐1240 Bolingbrook, IL 60440‐2992 www.knightea.com
May 27, 2020
George J. Schafer Village Administrator Village of Lemont 418 Main Street Lemont, IL 60439 Re: Proposal for Professional Services Phase I Engineering Walker Road Extension Project Village of Lemont Dear George, Knight E/A, Inc. is pleased to submit this proposal for professional services related to Phase I engineering for the Walker Road Extension Project. If you find this proposal to be acceptable, the fully executed copies of this letter, together with the General Terms and Conditions attached hereto as Attachment A, which set forth the contractual elements of this agreement, will constitute an agreement between Village of Lemont (“Client”), and Knight E/A, Inc. (“Knight”) for services on this project. Project Understanding Knight understands that the Client would like to begin Phase I preliminary engineering and environmental studies for the evaluation of potential railroad grade separation and access alternatives along a new alignment that would extend Walker Road at Main Street in the Village of Lemont. The Phase I work will include all that is necessary to complete a Phase I Project Development Report (PDR) in conformance with IDOT and FHWA guidelines. Scope of Services See Attachment B. Workhour Estimate See Attachment C. Compensation Knight proposes to perform the above scope of services for a fee not to exceed $491,900 as detail in the Cost Estimate of Consultant Services attached hereto as Attachment D. Schedule Knight will provide and maintain a working schedule under separate cover.
34
Village of Lemont Proposal for Professional Services
May 27, 2020 Page 2 of 2
Terms and Conditions This proposal, together with Attachment A - General Terms and Conditions, represents the entire understanding between the Client and Knight. If the terms of this agreement are found to be satisfactory, please sign this agreement in the space provided and return one fully executed original to our office. We appreciate the opportunity to present this proposal and look forward to working with you on this project. Respectfully Submitted, KNIGHT E/A, INC. VILLAGE OF LEMONT Kevin E. Lentz, P.E. President
Date: Attachments: A – General Terms and Conditions B – Scope of Services C – Workhour Estimate D – Cost Estimate of Consultant Services
35
Village of Lemont Proposal for Professional Services
May 27, 2020
Attachment A
General Terms and Conditions 1. General Conditions. The Terms and Conditions set forth herein and in the attached cover letter constitute an offer by Knight E/A, Inc. (“Knight”) to perform for the Company to whom this letter is addressed (“Client”), all of the professional design services described in said cover letter as Scope of Services (“Services”) for Client’s project as defined therein (“Project”). Knight’s offer becomes a contract on these same terms and conditions when accepted by Client. This contract supersedes all previous understandings, if any, and constitutes the entire agreement between Knight and Client relating to the Services. Pre-printed terms and conditions on Client purchase orders are not accepted regardless of when issued. Knight shall have the right, at its sole option, to rescind its offer if the Services have not commenced within ninety (90) days of the date of Knight’s offer. 2. Knight’s Obligations. Knight will endeavor to perform its Services using that degree of care and skill ordinarily exercised by reputable members of its profession under similar circumstances. No other warranty, express or implied, is made or intended. 3. Client’s Obligations. Client shall provide the following: (i) all criteria and full information as to Client's requirements for the Project, including design objectives and constraints, borings, probing and subsurface explorations, hydrographic surveys, laboratory tests, environmental assessment and impact statements, property, boundary, easement, right-of-way, topographic and utility surveys, property descriptions, zoning, deed and other land use restrictions; all of which Knight may use and rely upon in performing services under this Agreement; (ii) arrange for access to and make all provisions for Knight to enter upon public and private property as required for Knight to perform services under this Agreement; and (iii) give prompt written notice to Knight whenever Client observes or otherwise becomes aware of any development that affects the scope or timing of Knight's services, or any defect or non-conformance in the work of any Contractor. 4. Consultant Services. When Knight procures consultant services required for the Project on behalf of Client, Knight does so as an administrative/invoicing convenience to Client and such consultants shall be considered Client’s independent Consultants. Knight makes no representation of, and does not assume responsibility or liability for, the work or services of Client’s Independent Consultants. Knight shall be entitled to rely upon the accuracy of services, including reports or surveys, provided by Client’s Independent Consultants. 5. Additional Services. Changes in scope or extent of Services may be made from time to time by mutual written agreement. Any additional Services required because of such changes will be charged at Knight’s customary rates in effect at that time. Unless otherwise agreed in writing all Terms and Conditions of this contract shall apply. Changes in these Terms and Conditions can only be made by written consent of Knight. Projects suspended for more than thirty (30) days through no fault of Knight shall be subject to a re-mobilization fee compensated as Additional Services. 6. Opinions of Probable Cost. Knight’s opinions of probable construction cost represent its best judgment as a design professional familiar with the construction industry and are not guarantees by Knight of actual construction cost. Knight has no control over material cost, labor, and methods of construction or bid procedures. Accordingly, Knight does not warrant or represent that contractor bids will not vary from the Project budget or Knight’s opinion of probable construction cost. If Client desires greater assurance of cost, Client shall engage the services of an independent construction cost estimator. 7. Payment. Knight shall be entitled to payment for Services rendered on the basis of Knight’s invoices submitted monthly. Invoices shall be due and payable within thirty (30) days after receipt. Past due invoices shall accrue interest at the rate of one and one-half percent (1.5%) per month. No retention shall be withheld. All accounts receivable must be current before Knight shall seal drawings, issue drawings to contractors for bidding, or issue drawings for permit application. Knight reserves the right to stop Services and/or withhold documents for reasons of non-payment and Knight shall not be liable for delays which may result from such stoppage. Knight shall be compensated for reimbursable expenses such as travel, duplication, plotting, prints, messenger services, additional insured provisions or increased limits of insurance, and other reasonably identifiable costs incurred in connection with the Services. Such reimbursable expenses shall be invoiced at cost or Knight’s customary rate, plus five percent (5%) handling and, unless specifically stated otherwise in the cover letter, are in addition to any amounts stated as maximum compensation.
36
Village of Lemont Proposal for Professional Services
May 27, 2020
Attachment A (continued) The amount of any excise, Value Added Tax (VAT) or gross receipts tax may be imposed by any Authority having jurisdiction shall be added to compensation due hereunder and shall be in addition to any amounts agreed to as maximum compensation. In the case of lump-sum fee arrangements, invoices shall reflect the percentage of work completed as estimated by Knight to the date indicated on the invoice. For all other fee arrangements, invoices shall indicate the fees earned on the basis of effort expended. A service charge of five percent (5%) of the invoice amount shall be added to all invoices prepared on special Client forms or requiring back-up such as time sheets, copies of receipts, and the like. Waivers of Lien will be provided, upon request, after receipt by Knight of monies due. 8. Documents. Any and all documents and plans (including Knight's independent professional associates and consultants) in whatever form, including electronic media (disks, tapes, telecommunication, etc.) prepared pursuant to or otherwise resulting from this contract are instruments of professional service and shall be and at all times remain the sole property of Knight. Client shall be entitled to retain hard copy of such documents and plans for informational use and references in connection with Client’s use and occupancy of this specific property only. Computer diskettes of project documents will not be released by Knight without agreement in writing stipulating the terms and restriction of usage. Knight will not be responsible for any consequence of re-use, other use, or adaptation of such documents without Knight’s express written approval. 9. Facsimile Transmissions. The parties agree that each may rely, without investigation, upon the genuineness and authenticity of any document, including any signature or purported signature, transmitted by facsimile machine, without reviewing or requiring receipt of the original document. Each document or signature so transmitted shall be deemed an enforceable original. Upon request, the transmitting party agrees to provide the receiving party with the original document transmitted by facsimile machine; however, the parties agree that the failure of either party to comply with such a request shall in no way affect the genuineness, authenticity or enforceability of the document. Each party waives and relinquishes as a defense to the formation or enforceability of any contract between the parties, or provisions thereof the fact that a facsimile transmission was used. 10. Certifications, Guarantees and Warranties. Knight shall not be required to sign any documents that would result in Knight having to certify, guarantee or warrant the existence of conditions whose existence Knight cannot ascertain. Client also agrees not to make resolution of any dispute with Knight or payment of any amount due to Knight in any way contingent upon Knight signing any such certification. 11. Insurance. Knight is protected by Professional Liability Insurance, Worker’s Compensation Insurance and Comprehensive General Liability Insurance and will furnish certificates upon request. Any additional insurance or limits or “additional insured endorsement” shall be provided as a reimbursable expense at actual cost or Knight’s scheduled charge. Client agrees to cause the Contractor to (i) provide Comprehensive General Liability Insurance for the Project naming Knight E/A, Inc. and Client as Additional insureds; and (ii) to defend, indemnify, and hold harmless Knight E/A, Inc. and Client from any and all loses, cost, damages, and expenses resulting from the Contractors Work on the Project, including without limitation claims arising out of or in connection with construction worker injuries. Client agrees to notify Knight of the existence of any Project-Specific Professional Liability Policy applicable to the Project which includes Knight as an Insured by name or reference so that Knight may, in a timely and effective manner coordinate its own insurance program. Should such a Project-Specific Professional Liability Policy be purchased by Client or Client’s contractors, Client agrees to make available to Knight a certified copy of the Policy and to cooperate with Knight in obtaining data with respect to possible claims against that Policy. 12. Indemnification. Knight agrees to the fullest extent permitted by law, to indemnify and hold Client harmless from any loss, cost (including reasonable attorney's fees and costs of defense) or expense for property damage and bodily injury, including death, caused by Knight, or its employees’ negligent acts, errors or omissions in the performance of professional services under this Agreement. Client agrees to the fullest extent permitted by law, to indemnify and hold Knight harmless from any loss, cost (including reasonable attorney's fees and costs of defense) or expense for property damage and bodily injury, including death, caused solely by Client, its agents or employees, negligent acts, errors or omissions in the performance of professional services under this Agreement.
37
Village of Lemont Proposal for Professional Services
May 27, 2020
Attachment A (continued) In no event shall Client be entitled to obtain from Knight, its agents, representatives, officers, employees, or independent contractors, ‘damages’ arising from Knight’s breach of this Agreement, or for its failure to perform its services in accordance with the standard of care provided for herein, in excess of fifty thousand dollars ($50,000) or the total fee amount paid by client, whichever is less. “Damages” as used herein, shall include tort damages, contract damages, strict liability damages, liquidated damages, economic losses, penalties, fines, and attorney’s fees. No Claims shall be made more than two (2) years after substantial completion of the Project. 13. Waiver of Contract Breach. The waiver of one party of any breach of this Agreement or the failure of one party to enforce at any time, or for any period of time, any of the provisions hereof, shall be limited to the particular instance, shall not operate or be deemed to waive any future breaches of this Agreement and shall not be construed to be a waiver of any provision, except for the particular instance. 14. Suspension of Services. Client may, at any time, by written order to Knight require Knight to stop all, or any part, of the services required by this Agreement. Upon receipt of such an order Knight shall immediately comply with its terms and take all reasonable steps to minimize the occurrence of costs allocable to the services covered by the order. Client, however, shall pay all costs associated with the suspension. 15. Termination. This Agreement may be terminated by either party upon thirty (30) days written notice in the event of substantial failure by the other party to perform in accordance with the terms hereof through no fault of the terminating party. This Agreement may be terminated by Client, under the same terms, whenever Client shall determine that termination is in its best interests. In the event of termination, Knight shall be compensated by Client for all Services performed up to and including the termination date, including reimbursable expenses, and/or the completion of such Services and records as are necessary to place Knight’s files in order and/or protect its professional reputation. In the event of bankruptcy or insolvency of Client or if the financial condition of Client at any times does not, in the judgment of Knight, justify continuance of the work, Knight shall be entitled to cancel this contract and receive reimbursement for its reasonable and proper cancellation charges. 16. Force Majeure. Neither party to this agreement will be liable to the other party for delays in performing the services, or for direct or indirect cost resulting from such delays, that may result from Acts of God, acts of governmental authorities, extraordinary weather conditions or other natural catastrophes, or any other cause beyond the reasonable control or contemplation of either party. Each party will take reasonable steps to mitigate the impact of any force majeure. 17. Asbestos/Hazardous Materials Disclaimer. Client is hereby notified that asbestos is prevalent in building constructed prior to 1978. Client agrees to defend, indemnify and hold harmless Knight from any and all asbestos, pollution, and/or hazardous waste-related claims arising against Knight relative to the presence, detection, removal or disposal of asbestos and or other hazardous wastes at the Project site. 18. “ADA” Compliance. For Projects of new construction, Knight shall endeavor to design the Project in conformity with the Americans with Disabilities Act (“ADA”) Accessibility Guidelines, 28 CFR Part 36 (July 26, 1991) (hereinafter the “Act”) and advise Client if any accommodation is structurally impractical. For modifications to an existing facility of any type, Knight shall endeavor to identify existing barriers and needed accommodations as those terms are used in the Act, and inform Client of the existence of these barriers and needed accommodations. It is the Client’s sole responsibility to determine whether to exclude a specific accommodation because the accommodation is not readily achievable or unduly burdensome. Knight shall not be responsible to determine whether it is necessary to remove all barriers identified in order to comply with the Act. Such determination shall be made by Client. 19. Compliance with Codes. Knight’s design shall conform to local applicable codes in effect, and as interpreted by building official, at the time the design is prepared; however, Knight shall not be responsible for changes to the Project resulting from changes in local or applicable codes or changes in interpretation thereof by authorities having jurisdiction. 20. Applicable Law. The rights and obligations of the parties under this contract shall be interpreted in accordance with and governed in all respects by the State of Illinois.
38
Blank
39
Scope of Work Walker Road Extension Project
Village of Lemont May 27, 2020
Page 1 of 9
SCOPE OF WORK Services will include all work associated with the preparation of Phase I preliminary engineering and environmental studies for the evaluation of potential railroad grade separation and access alternatives along a new alignment that would extend Walker Road at Main Street in the Village of Lemont. Key planning tools are anticipated to include extensive stakeholder outreach. The Phase I work will include all that is necessary to complete a Phase I Project Development Report (PDR) in conformance with IDOT and FHWA guidelines. This improvement will extend Walker Road beginning at Main Street and ending north of the Illinois Central Railroad (ICR). Note that Canadian National (CN) operates on this rail line as well as Metra as part of the Heritage Corridor. The overall project limits will extend from south of Main Street to north of ICR, approximately 1,400 feet. With access improvements, the project will measure approximately 2,400 feet. Improvements will include pavement reconstruction south of Main Street and new pavement alignment north of Main Street that will accommodate one through lane in each direction and channelization for left turn lanes. Phase I studies will evaluate grade separation of Walker Road over the railroad. Improvements may include traffic signals at the intersection with Main Street. Other improvements will include concrete curb and gutter, closed drainage improvements, multi-use path accommodations, commercial access improvements, lighting, landscaping, striping, and signing. Proposed improvements will require right-of-way acquisition. The following background/notes are provided for information. Knight E/A, Inc. (Knight) will utilize the following sub-consultants:
o Environmental Protection Industries, Inc. (EPI) – Geotechnical Studies (Borings) o GSG Consultants, Inc. – Structure Geotechnical Report (SGR)
It is important to note that IDOT has a state improvement programmed for Main Street (FAU 3587)
through Walker Road in FY 2021-2025. IDOT published Phase II engineering for the Main Street project on Professional Transportation Bulletin (PTB) 196, Item 6. Knight will coordinate planning for the Walker Road extension project with the improvements being proposed under PTB 196, Item 6.
Safety is of primary importance and continues to drive this project along with the need for access related
to economic development. Multiple fatalities, injuries and several recently reported near-miss incidents at the Boyer Street and McGuire Parkway at-grade crossings has heightened the awareness and urgency for this project to move forward. The Walker Road extension improvements will propose to replace the Boyer Street and McGuire Parkway at-grade crossings. See attached Project Area Map.
Knight proposes to perform the following Phase I engineering services. Scope of work tasks are identified and numbered to be consistent with the detail workhour estimate. 1) IDOT and FHWA Coordination
This work will include an initial IDOT Phase I kick-off meeting and two (2) IDOT BDE/FHWA coordination meetings at IDOT District 1. Each meeting will require preparation of an agenda, exhibits and follow-up coordination of meeting minutes.
Attachment B-1 40
Scope of Work Walker Road Extension Project
Village of Lemont May 27, 2020
Page 2 of 9
2) Data Collection and Review
Data collection and associated efforts will be undertaken for the following project related elements:
Miscellaneous data collection items include: o Land use, zoning, school districts, park districts, police districts and fire districts. o Bicycle, pedestrian, and bus route accommodations. Bicycle and pedestrian facility
coordination will be undertaken. Both existing and future “planned” routing are to be investigated.
o Railroad crossing data (available on-line and from ICC and CN). o CN schedules and coordination. o Metra schedules and coordination information. o FRA inventory of rail crossings (accident info, crossing data, interconnect, signal types).
Obtain, review, and analyze data available from the Department (IDOT). Data around the Main Street corridor may be available, such as traffic data, soils data, geological, information, ROW, property lines, utility atlases, and record plans.
Obtain and review of studies/reports prepared by others. Traffic data collection will be required at Main Street and Walker Road utilizing MioVision
cameras and processing. Train operations data collections will be required through the project limits. Manual data
collection will be needed as MioVision will not perform counts. The number of trains including type of train will be collected. This data will be used in grant/funding applications and provide needed general insight into the project study area existing conditions.
Prepare maps, charts, and exhibits of data collected, as well as analyze data. Obtain, review, and incorporate utility plan data (Utility Coordination). Field site visits to the study area (3 assumed over Phase I duration). This work will include a
project photo log to provide additional visual aid and documentation of existing features and conditions.
3) Geotechnical Studies
Geotechnical studies (borings) will be completed by Environmental Protection Industries, Inc (EPI). See attached EPI Proposal and scope of services. Knight will coordinate geotechnical activities with EPI and disseminate information to the project team as needed.
4) Surveys
Knight will complete needed route, rail, boundary, utility, and hydraulic surveys. Knight has collected some survey data from The Forge development that will be used. Knight will continue to coordinate with the Client, The Forge, and developer consultants for all available data. As such, it is expected that only minor pickup survey west of Walker Road extended will be required. Full survey effort will be required east of Walker Road extended and behind commercial properties. Hydraulic survey will also be required through mapped floodway areas as shown on the attached Environmental Resources Map. Given various ongoing Client and developer activities, sufficient land boundary data exists within the project study area to accurately depict property limits on Phase I engineering documents.
Attachment B-2 41
Scope of Work Walker Road Extension Project
Village of Lemont May 27, 2020
Page 3 of 9
Survey of Boyer Street and McGuire Parkway (including rail crossing will be completed using Total Station Scanner equipment. The Total Station Scanner will also be used in completing a study area photo log. Note that survey on railroad right-of-way will be required. As such, direct cost for right-of-entry (ROE), flagger, liability insurance has been estimated. Refer to the detail workhour estimate for additional information.
5) Environmental Data Collection, Inventory and Coordination
Knight will research collect and document existing and future land use and developments within the project study area. Results will likely be documented in plan/exhibit format.
Knight will review environmental justice and socioeconomic impacts potentially resulting from the alternatives analyzed. Given the project location, it is expected that this will be a cursory review and result in limited documentation. The potential for full take (displacement) and partial take acquisitions will be reviewed as part of environmental justice and socio-economic considerations. Census data and demographics will be understood when making an assessment. Access to adjacent properties in areas of profile change may require additional review for right-of-way takes, alternative access, and associated damages.
Knight will prepare exhibits and forms for the Environmental Survey Request (ESR). The exhibits will include a project location map, USGS topographic map with NWI wetland overlays, ground level photos of environmental concerns, aerial photos with the existing ROW, centerline, and ESR limits. ESR limits are expected to be something similar to the limits shown on Exhibit B. The ESR submittal package will be submitted online and in hard copy per current IDOT guidelines. IDOT Central Office will perform the necessary coordination with the following agencies and provide the appropriate results for inclusion in the CDR:
Archaeological/Historic/Architectural (IHPA) Prime Farmland (USDA/NRCS, IDA) Wetlands (IDNR, USACE) Stream Crossings (IDNR, USACE) Biological Survey (INHS, IDNR, USDOI/F&WS) Special Waste Survey (ISGS)
Knight will perform planning level tree tabulation (station, offset, diameter, type, health, and structure). Mature significant individual trees or stands of mature significant trees will be identified and tabulated by species.
Knight will perform a special waste review and assessment within the project study area (non-State right-of-way). Work will include complete site reconnaissance, database screening and associated documentation. If no recognized environmental concerns (RECs) are identified, an IDOT LPA Level II sign-off could be documented. However, it is expected that a full Preliminary Environmental Site Assessment (PESA) will be required. Knight will coordinate with IDOT for PESA work along Main Street and special waste documentation prepared by others as part of adjacent development.
Attachment B-3 42
Scope of Work Walker Road Extension Project
Village of Lemont May 27, 2020
Page 4 of 9
Bicycle and pedestrian facility coordination will be performed. Both existing and future “planned” routing will be investigated through on-line review, as well as coordination with state and local agencies. This coordination is expected to require minimal effort.
Knight will perform wetland delineations that consist of field survey procedures, required formwork, research, and preparation of report. The delineations will be the basis for preparation of the Wetland Impact Evaluation (WIE). See scope of work under Task 17.
Water quality issues and Best Management Practices (BMP’s) will be evaluated under the task Location Drainage Study.
6) Develop Project Purpose & Need and Feasible Alternatives
The project Purpose and Need will be documented in the Project Development Report (PDR) under scope of work Task 15. The project alternatives will also be documented in the PDR. See scope of work Task 10 for Alternative Geometric Studies.
7) Location Drainage Study
Preliminary drainage investigations and analyses will be performed for various alternatives as required. Final concept plans will be prepared for the Location Drainage Study and Hydraulic Reports for the preferred alternative. The study document will contain all calculations, supporting documentation, and mitigation plans, as required. The stormwater best management practices to be implemented during construction will be investigated in this phase. The need for Water Quality considerations will be coordinated with the District, if necessary. Preliminary Drainage Investigation Knight will collect existing project data as it pertains to the existing drainage condition. Anticipated items to be collected would include utility maps, as-built development plans, FEMA flood maps, NRCS Soils Maps, Wetlands Inventory, and documentation regarding any known drainage/flooding issues. Drainage Site Visits Project team members will perform site visits to investigate the existing study areas for major drainage features, storm sewer systems, outfalls, and other utilities. Manhole inspection will be performed where necessary to determine the condition of each structure. Drainage Calculations Existing drainage calculations shall be performed to determine the existing impervious area, time of concentration, curve number, runoff volumes, tributary areas, etc. Based on the proposed recommended geometric alternatives, proposed drainage calculations will be performed to determine impervious coverage, curve number, runoff volumes, tributary area, and time of concentration in order to be able to design proposed sewers, culverts, ditches, detention, BMP’s etc. The intent of the proposed system will be to collect and convey storm water runoff from the design year storm event without exceeding IDOT encroachment standards.
Attachment B-4 43
Scope of Work Walker Road Extension Project
Village of Lemont May 27, 2020
Page 5 of 9
Detention Analysis Knight will evaluate each outlet for sensitivity and whether it is suitable for continued use. For sensitive outlets, Knight will design detention according to the pertinent criteria and storm water ordinances to mitigate the increases in flow. Knight will prepare a hydrological model of the stormwater system within the study area and the tributary areas and determine the capacities of any existing detention facilities. Knight will provide recommendations and determine how additional volume will need to be provided. New detention facilities, expansion of existing detention facilities, oversized pipes, or ditch storage may be utilized to mitigate increased release rates due to the addition of new roadway facilities. The locations of facilities will be identified on the plans and included detail regarding control structures. Existing Drainage Plans (EDP) Utilizing the preferred alternative, Knight will identify all outlets within the study area and determine whether they are sensitive and/or suitable for continued use. Any drainage investigation areas that were previously identified will be investigated as well. Floodplains will be identified utilizing Flood Boundary and Floodway Maps or Flood Insurance Rate Maps for the study area. Existing flooding problems will be identified within the study limits. Major drainage features will be evaluated, and a waterway information table and other appropriate data will be prepared. A narrative summary will be prepared for drainage feature where characteristics such as overtopping frequency, clearance, freeboard, and flooding elevation will be defined. Proposed Drainage Plans (PDP) Knight will prepare a PDP to fully describe the proposed drainage concept for the preferred alternative. The PDP will reflect the drainage calculations and detention analysis and will include proposed routings, profiles, pipe sizes, detention locations with sizing, ditch sizes, and BMPs. Knight will prepare drainage plans to accommodate the proposed roadway improvements. These efforts will also include right-of-way analysis for all improvements including detention facilities. An analysis and appropriate mitigation/compensation of fill within floodway and floodplain boundaries will also be performed. Note that the PDP will be coordinated with the IDOT drainage design along Main Street through Walker Road. All information will be compiled into a report with information such as calculations, documents, exhibits, agency correspondence and documentation, and a completed checklist along with a narrative of the objectives and recommendations. See attached Location Drainage Worksheet.
8) Noise Analysis – FHWA Traffic Noise Model (TNM)
It is not expected that noise analysis will be required due to the lack of sensitive receptors in the project study area.
9) Air Quality Analysis
This project is exempt from CO analysis as discussed in Article 26-14.03(a) of the BDE Manual.
Attachment B-5 44
Scope of Work Walker Road Extension Project
Village of Lemont May 27, 2020
Page 6 of 9
10) Alternative Geometric Studies
Initial project study meetings have included alternative discussions. Phase I studies will assess up to three (3) alternatives for grade separating the Walker Road extension over the Illinois Central Railroad. Phase I studies will also review an at-grade crossing scenario. However, grade separation is preferred in order to most effectively address current safety issues at the Boyer Street and McGuire Parkway crossing, as well as provide safe access for The Forge development and commercial/industrial businesses utilizing the extension once the adjacent at-grade crossings are closed.
Alternative horizontal and vertical geometric studies including proposed cross-sections will be evaluated and prepared for the various alternatives. The cross-sectional evaluation will consider traffic volume, lane configurations, bicycle accommodations, ADA accommodations, and right of way impacts. Alternatives investigated will include roadway over railroad scenarios on multiple alignments.
Knight will evaluate grade separation warrants with respect to the USDOT FHWA “Railroad-Highway Grade Crossing Handbook” and IDOT Bureau of Design and Environment (BDE) Manual Chapter 7 “Railroad Coordination”, sub-section 7-3.03 “Grade Separation Studies”.
Knight will coordinate the alternative geometric studies with the Location Drainage Studies.
Intersection geometrics will be studied at Main Street. A full Intersection Design Study (IDS) and traffic signal warrant analysis will be required at Main Street. See scope of work under Task 13. Knight will coordinate these studies with the improvements being proposed along Main Street under IDOT PTB 196, Item 6.
Cross sections for study and evaluation of multiple alternatives will be done at approximate 100’ intervals and at critical locations as required. Cross sections for further study and evaluation of the preferred alternative(s) will be done at approximate 50’ intervals and at critical locations as required. Locations identified as critical may be done so as a result of right-of-way proximity, existing access impacts, new access considerations, drainage impacts, utility impacts, or impact to other structures.
The following studies/documentation will also be undertaken for the preferred alternative:
Typical cross-section design Cross-section detail/design Design exception development Barrier warrant analysis Complete Streets ADA ramp analysis Pavement design, I-last checklists V2.02, and tech memo(s) Preliminary construction cost estimate
Refer to the detail workhour estimate for additional information.
Attachment B-6 45
Scope of Work Walker Road Extension Project
Village of Lemont May 27, 2020
Page 7 of 9
11) Crash Analysis
Crash data for the most recent five (5) years will be requested from IDOT, reviewed and tabulated. A crash analysis technical memorandum will be completed and included in the PDR. There have been multiple fatalities, injuries and several recently reported near-miss incidents at the Boyer Street and McGuire Parkway at-grade crossings. Knight will coordinate with ICC and Client in documenting the issues at the private at-grade crossing and implement important data that can be documented outside of the data provided by IDOT.
12) Traffic Maintenance Plan
A Traffic Maintenance Plan (TMP) will be required for impacts to Main Street (FAU 3587), which is a non-significant route. Walker Road extension is on new alignment that will likely create limited impacts to Main Street during construction. It will be important to coordinate design modifications and construction impacts with the improvements being proposed along Main Street under IDOT PTB 196, Item 6. It is expected that a basic Traffic Control Plan (TCP) will be prepared and accompanied by a technical memorandum. The technical memorandum will be submitted and reviewed by IDOT District 1 Bureau of Traffic for "conceptual concurrence".
13) Intersection Design Studies (IDS)
IDS work will be required in accordance with IDOT District 1 requirements at the Main Street intersection with Walker Road. Knight will provide the following IDS activities:
Existing traffic counts via MioVision (see Task 2). Coordination with CMAP for 2050 traffic projections. Trip generation, distribution and assignments will be required that reflect expected site
development build-out. Capacity analysis consisting of Synchro/HCS modeling for existing AM+PM, projected AM+PM
(no improvements), and projected AM+PM (with improvements) Capacity analysis report. Traffic signal warrant studies. Prepare IDS plan(s). Coordinate IDS work with the improvements being proposed along Main Street under IDOT PTB
196, Item 6. 14) Public Involvement
It is expected that one (1) public informational meeting will be required. Initial coordination with IDOT and FHWA will provide final determination. Knight will work with Client to prepare for and facilitate the meeting. Refer to the detailed workhour estimate under Task 14 for specific scope items.
Attachment B-7 46
Scope of Work Walker Road Extension Project
Village of Lemont May 27, 2020
Page 8 of 9
15) Project Development Report (PDR)
Knight will prepare a PDR in accordance with the Section 22-2.11 of the BLR Manual using the appropriate BLR 22210 formwork. The PDR is prepared to ensure environmental issues and design features are consistent with Federal, State, and local goals and objectives. All research, studies, findings, design variances, public coordination and commitments developed during Phase I Engineering activities will be identified and discussed. The PDR will contain a preliminary cost estimate for the preliminary proposed improvements.
16) Bridges/ Structures
Bridge Type Studies will be required for the rail grade separation of Walker Road extended as well as study of structure type for new commercial access across the floodway. Bridge Type Studies will consider the feasibility and cost for various alternative structure type. A structure type will be selected based coordination with ICC, CN, and a synthesis of economic, aesthetic and site evaluations.
A bridge Type, Size and Location (TS&L) plan will be required for the rail grade separation of Walker Road extended. The RS&L will be prepared for the preferred bridge type and alignment alternative. A Structure Geotechnical Report (SGR) will be completed by GSG Consultants, Inc (GSG). See attached GSG Proposal and scope of services. Knight will coordinate SGR activities with GSG and disseminate information to the project team as needed. A Preliminary Bridge Design and Hydraulic Report (PBDHR) will be required. The PBDHR (BLR 10210) is the primary submittal package to IDOT District 1 and Bureau of Bridges and Structures that incorporated all structure, hydraulic and floodplain/floodway studies.
17) Wetland Impact Evaluation (WIE) Form/Process
Knight will prepare WIE forms, exhibits, and narrative discussing analysis and mitigation of wetlands. The WIE will be submitted online to IDOT District 1 and in hard copy format.
18) Section 4(f)/6(f) Evaluation (Separate Report)
The Illinois and Michigan Canal State Trail is likely a 4(f) resource that will require coordination. It is expected that impacts will be minimal. As such, Knight will complete an evaluation and prepare a report for a deminimis finding per Section 20-3 BLRS Manual. No Section 6(f) properties exist within the project study area.
19) Section 106 Evaluation
Section 106 coordination is not expected due to the lack of historic structures in the project study area.
Attachment B-8 47
Scope of Work Walker Road Extension Project
Village of Lemont May 27, 2020
Page 9 of 9
20) ICC and Railroad Coordination
Coordination required with ICC, CN and Metra will be a part of regular team meetings. It is expected that the team will meet at least once per month for the duration of Phase I studies. Knight will also attend ICC hearings as required.
21) Lighting and Landscape Planning
Knight will perform initial planning level studies along the study corridor for lighting the roadway, intersections, and grade separation. Knight will also address preliminary landscaping development and associated plan work. The following items define the general scope of this work:
Lighting Warrant Studies Preliminary Illumination/Photometric Calculations Lighting Layout (Preliminary Light Standard Spacing and Bridge Lighting) Landscaping Evaluation and Concept Development Preliminary Landscape Plans and Associated Renderings
22) Financial Planning and Funding Strategies
Early grant coordination and financial planning will be important to future funding opportunities. Knight will work closely with Client advocates to increase project awareness, strategize, and prepare and apply for grant funding opportunities.
23) Administration and Management
Knight will prepare and submit progress reports and invoices to the Client on a monthly basis. The progress reports will summarize work performed during the past month, anticipated activities for the upcoming month, the identification of open/critical issues, and the overall status of the project with regard to schedule and budget. Invoices will be prepared per IDOT standard format with appropriate support documentation and include subconsultant invoices.
24) Quality Assurance/ Quality Control
Knight QA/QC tasks include thorough review and documentation of milestone deliverables prior to formal submittal to the Client, IDOT and other agencies.
ATTACHMENTS
Project Area Map Environmental Resources Map Location Drainage Worksheet EPI Proposal GSG Proposal
Attachment B-9 48
Servi
ce La
yer C
redits
: Sou
rces:
Esri,
HERE
, Garm
in, U
SGS,
Inter
map,
INCR
EMEN
T P,
NRCa
n, Es
ri Jap
an, M
ETI, E
sri C
hina (
Hong
Kon
g), E
sri K
orea,
Esri (
Thail
and),
NGC
C,(c)
Ope
nStre
etMap
contr
ibutor
s, an
d the
GIS
Use
r Com
munit
yCo
ok C
ounty
GIS
Dep
t.
MCGUIRE PARKWAY
ILLINO
IS AN
D MI
CHIGA
N CA
NAL
DUPA
GECO
OK
McGu
ire P
arkw
ay C
ross
ing
Boye
r Stre
et C
ross
ing
Walke
r Roa
d Pro
ject A
lignm
ent
MAIN
ST
WALKER RD
BOYER ST
BEAT
RICE
LN
FRAN
CISCA
N DR
Lege
nd Projec
t Are
aWa
lker R
oad
Align
ment
Railro
ad C
ross
ing L
ocat
ions
Railro
adCo
untie
sPa
rcels
PROJ
ECT
LOCA
TION
MAP
Walke
r Roa
d Ex
tens
ionVil
lage
of Le
mont
Cook
Cou
nty,
Illino
is
1 inc
h =
300
feet
060
030
0Fe
et
April
2020
Serv
ice L
ayer
Cre
dits:
Sour
ces:
Esri,
HER
E, Ga
rmin,
USG
S, Int
erma
p,IN
CREM
ENT
P, NR
Can,
Esri
Japa
n, ME
TI, E
sri C
hina
(Hon
g Ko
ng),
Esri
Kore
a,Es
ri (Th
ailan
d), N
GCC,
(c) O
penS
treet
Map
cont
ribut
ors,
and
the
GIS
User
Comm
unity
Attachment B-10
49
Servi
ce La
yer C
redits
: Sou
rces:
Esri,
HERE
, Garm
in, U
SGS,
Inter
map,
INCR
EMEN
T P,
NRCa
n, Es
ri Jap
an, M
ETI, E
sri C
hina (
Hong
Kon
g), E
sri K
orea,
Esri (
Thail
and),
NGC
C,(c)
Ope
nStre
etMap
contr
ibutor
s, an
d the
GIS
Use
r Com
munit
yCo
ok C
ounty
GIS
Dep
t.
MCGUIRE PARKWAY
ILLINO
IS AN
D MI
CHIGA
N CA
NAL
DUPA
GECO
OK
McGu
ire P
arkw
ay C
ross
ingBo
yer S
treet
Cro
ssing
Walke
r Roa
d Pro
ject A
lignm
ent
ZONE
AE
ZONE
AE
ZONE
X
ZONE
X
ZONE
X
ZONE
AE
ZONE
AE
ZONE
X
ZONE
X
ZONE
AE
ZONE
A
ZONE
AE
ZONE
X
ZONE
AE
ZONE
AE
ZONE
AE
L1UB
HX
PEM1
C
PFO1
C
PFO1
C
PEM1
FPE
M1F
R2UB
HX
PEM1
A
R2UB
3HX
R4SB
C
PUBH
XPU
BHX
PFO1
C
PEM1
A
PUBG
X
PFO1
C
PUBH
X
MAIN
ST
WALKER RD
BOYER ST
BEAT
RICE
LN
FRAN
CISCA
N DR
Lege
nd Projec
t Are
aWa
lker R
oad
Align
ment
Railro
ad C
ross
ing L
ocat
ions
Railro
adCo
untie
sPa
rcels
ENVIR
ONME
NTAL
RE
SOUR
CES
MAP
Walke
r Roa
d Ex
tens
ionVil
lage
of Le
mont
Cook
Cou
nty,
Illino
is
1 inc
h =
300
feet
060
030
0Fe
et
April
2020
Serv
ice L
ayer
Cre
dits:
Sour
ces:
Esri,
HER
E, Ga
rmin,
USG
S, Int
erma
p,IN
CREM
ENT
P, NR
Can,
Esri
Japa
n, ME
TI, E
sri C
hina
(Hon
g Ko
ng),
Esri
Kore
a,Es
ri (Th
ailan
d), N
GCC,
(c) O
penS
treet
Map
cont
ribut
ors,
and
the
GIS
User
Comm
unity
Flood
Insu
ranc
e Ra
teMa
p Flood
way
1% A
nnua
l Cha
nce
Flood
Haz
ard
0.2%
Annu
al Ch
ance
Flood
Haz
ard
Area
of M
inima
lFlo
oding
Haz
ard
Natio
nal W
etlan
dsInv
ento
ryFre
shwa
ter E
merg
ent
Wetla
ndFre
shwa
ter
Fore
sted/S
hrub
Wetla
ndFre
shwa
ter P
ond
River
ineLa
keOt
her
Attachment B-11
50
Printed 5/28/2020 Page 1 of 2 D1 PD0021 (11/24/14)
Location Drainage Study Drainage Engineering Work Hour Summary
Project Route: Walker Road (CH W13) Extension Project
Project Limits: South of Main Street (FAU 3587) to North of Illinois Central Railroad (*)
County: Cook
Section Number: TBD
Local Agencies: Cook County DOT, MWRD, Will/South Cook Soil & Water Conservation District, Village of Lemont, Lemont Township, IDNR-OWR, Chicago ACOE
Number of Agencies: 4 Identified Drainage Problems: 2 (estimated) Number of Outlets: 1 (estimated) Drainage Districts: 1
Number of FPE’s 1 Total 1 Transverse ---- Longitudinal Number of Floodways 1 Total 1 Transverse ---- Longitudinal Major Drainage Features: TBD Bridges TBD Major Culvert Crossings ---- Pump Stations
2 (est.) Reservoirs/Detention Facilities: 0 Subway 0 Channels
Length:
Mainline 0 miles
Interchanges 0 miles
State Roads 0 miles
Local Roads 0.45 mile (2,400 feet)
Total Length (All of Above) 0.45 mile (2,400 feet)
NOTES:
(*) See attached project study area exhibit.
Attachment B-12 51
Printed 5/28/2020 Page 2 of 2 D1 PD0021 (11/24/14)
ITEM
WORK HOURS EXISTING DRAINAGE SYSTEM
General Location Drainage Map 8 Existing Drainage Plan 36 (3shts x 12hrs/sht; includes field visit) Transfer of Existing PDP to EDP 0 Identified Drainage Problems 16 (2 loc x 8hrs/loc)
Identified Base Floodplains 4 Major Drainage Features 0 (Excluded; supplemented if required) SUB-TOTAL EXISTING
64
PROPOSED DRAINAGE SYSTEM
Design Criteria 4 Outlet Evaluation 12 (1 loc x 16hrs/loc)
Storm Water Detention Analysis 48 (study detention controls under various alts) Right of Way Analysis 0 Drainage Alternatives 90 (3 alts x 30hrs/alt)
Local and Other Agency Coordination 24 (primarily MWRD; pre-app mtg; establish design
criteria; coordinate; WMO permit in Phase II)
Proposed Drainage Plan 60 (3shts x 20hrs/sht for pref alt) Pump Station Design N/A IDNR-OWR Permit 80 (H&H model prefer alt; IDOT hydr review; floodway
permit in Phase II)
Water Quality/BMP 8 Study Assembly 32 Field Visits/Investigations 0 (included above)
Quality Control/Quality Assurance ---- (4% - see total workhour estimate) Contract Administration and Billing ---- (2% - see total workhour estimate)
SUB-TOTAL PROPOSED 358
TOTAL WORK HOURS 422
Attachment B-13 52
•. ~;:,~"~-- - ~··
liM ENVIRONMENTAL PROTECTION INDUSTRIES
May 27, 2020
Mr. Clay Shipley, PE Knight E/ A, Inc. 631 E. Boughton Road, Suite 205 Bolingbrook, IL 60440
RE: Geotechnical Investigation Proposal- Walker Road Extension Lemont, IL EPI Proposal No. 20-299
Dear Mr. Shipley:
Thank you for the opportunity to work with you on the above-referenced project. EPI respectfully submits this proposal to perform a Geotechnical Investigation for the above referenced property. The intent of the proposed investigation is to provide geotechnical data and recommendations pertinent to construction considerations and foundation design.
Thank you for the opportunity to submit this proposal. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact us.
Sincerely, Environmental Protection Industries
Sergio Meilman, P .E. Director of Operations
Enclosure
Environmental Engineering • Assessment • Remediation • Brownfield Redevelopment • Construction Management
Corporate Office 16650 South Canal • South Holland, IL 60473 • tx 1.800.526.1788 • fax 1.708.225.1117 • office 1.708.225.1115 website: www.environmental-epi.com
Attachment B-14 53
Introduction
Geotechnical Investigation Proposal Walker Road Extension
Lemont, IL EPI Proposal No. 20-299
May 27,2020
Environmental Protection Industries (EPI) is pleased to provide this proposal to Knight E/ A, Inc. (Client).-This proposal has been prepared in response to a request by the Client and is based upon the Site Layout Plan provided to EPI for review. The intent of the proposed investigation is to provide geotechnical data and recommendations pertinent to construction considerations and foundation design.
Scope of Work
1.0 Drilling and Sampling
EPI proposes to mobilize the appropriate equipment and personnel to the site to drill a total of nine (9) soil borings. Five of the borings will be advanced to depths of 10 feet below grade in the future paved/path areas, whereas the remaining borings, drilled in the future bridge area, will be extended to depths of 65 feet below the existing grade. The soil borings will be advanced by utilizing a truck-mounted rotary drill rig at the selected locations to collect representative soil samples for geotechnical testing. Groundwater levels will be measured during and immediately after the performance of the drilling operations. Soil samples will be collected at 2.5-foot intervals up to 10 feet and 5 foot intervals thereafter, to the terminus of each boring.
Representative soil samples will be obtained using split-barrel sampling procedures in accordance with ASTM Standard D 1586, "Method for Penetration Test and Split-Barrel Sampling of Soils." A 140-pound hammer is used to drive a two-inch O.D. split-barrel sampler into the soil 18 inches. The hammer blows over the final twelve inches of driving yields the Standard Penetration Resistance (SPT N-value). This test result indicates the relative density and comparative consistency of the soil, which provides a basis for estimating the relative strength and compressibility of soils.
A Geotechnical Engineer will record a field log of the soils encountered in each of the borings. Each soil sample will be visually classified on the basis of texture and color in accordance with the Unified Soil Classification System (USCS). The estimated unconfined compressive strength of the cohesive soil samples (clays and clayey silts) will be obtained in the field based upon the calibrated spring-loaded penetrometer readings.
Geotechnical Proposal, EPI Proposal No. 20-299 May 27, 2020
Attachment B-15 54
Soil samples obtained from the drilling activities will be identified by the boring number and depth, immediately sealed in a glass container, and delivered to EPI's laboratory for further analysis and testing.
Soil cuttings will be placed back into the borings to seal the boreholes. Please note that due to the dead weight of the soil, some degree of borehole fill settlement may take place. All borings will be properly closed and capped with concrete, asphalt or soil, as site conditions dictate. Permission to drill on the subject property will be obtained by the Client.
2.0 Laboratory Testing and Analysis
Laboratory testing, performed in accordance with applicable ASTM Standards, will consist of unconfined compression, dry soil density and moisture content determinations. Other laboratory soil tests, such as sieve analysis, Atterberg Limits, CBR, consolidation etc. may be required in order to present geotechnical engineering recommendations pertaining to the most economical design. Please reference Section 6.0 - Cost Estimate of this proposal for the analytical testing recommendations.
3.0 Report
EPI will prepare a report with recommendations pertinent to construction considerations. This report will include the description of soil and groundwater conditions, soil classifications, geotechnical testing data, soil boring logs, site plan with approximate soil boring locations and structural design recommendations.
The report will be signed and sealed by a Licensed Professional Engineer.
4.0 Other Considerations
Should the field results identify conditions which require additional investigation, beyond the proposed soil borings, EPI will contact the Client immediately. A verbal request or Change Order for any additional drilling, sampling or testing that may be performed, while equipment and personnel are on-site, will be discussed. No additional drilling or testing will be performed without the authorization of the Client.
5.0 Schedule
The drilling and sampling is expected to be completed in three to four days. Laboratory testing and evaluation will be completed within three business days of sample collection. The laboratory data evaluation and report preparation will be completed within one week of the field acti viti es.
Geotechnical Proposal, EPI Proposal No. 20-299 May 27, 2020
Attachment B-16 55
6.0 Cost Estimate
The cost estimate, not to exceed, for the work proposed herein is$ 16,060.00
ACTIVITY UNIT UNIT PRICE ($) EXTENSION ($) Field Work Mobilization of Equipment Lump Sum 1,475 .00 1,475.00 and Site Layout (heavy A TV Req'd) Soil Drilling and Sampling Linear Foot - 150 total 16.00 2,400.00 0 ' -25' Soil Drilling and Sampling Linear Foot - 80 total 22.00 1,760.00 25 ' -45 ' Soil Drilling and Sampling Linear Foot - 80 total 26.00 2,080.00 45'- 65 ' Calibrated Penetrometer Test Each - 90 total N/C N/C Borehole Backfilling Linear Foot - 310 total N/C N/C Bentonite fill Bag - 1 0 total 25.00 250.00 Private Utility Locator Lump Sum 1,250.00 1,250.00 Equipment Access Delays Hour - 6 total (estimated) 225.00 1,350.00
Laboratory Testing Moisture Content Each - 1 00 total 10.00 1,000.00 Unconfined Compression Each - 60 total 14.00 840.00 Dry Soil Density Each - 9 total 25.00 225.00 USCS Soil Classification Each - 70 total N/C N/C Sieve Analysis Each - 2 total 475.00 950.00 Atterberg Limits Test Each - 2 total 275.00 550.00
Re12ort Pre12aration Drafting Hour - 6 total 65.00 390.00 Engineering Analysis Hour - 7 total 120.00 840.00 PE Review and Site Work Hour- 4 total 175.00 700.00
Total $ 16,060.00
Notes: 1. It is assumed that the PIQ is accessible to an ATV-mounted drill rig. EPI will require an access through the operating construction site and locked gates. 2. EPI will not be liable for any crop damage or surficial soil tire rutting resulting from the drilling operations. 3. EPI will not be liable for any damage to the buried utilities not marked by local onecall center (JULIE, DIGGER etc.). Private Utility Locator cost is included in the above estimate. 4. Any village/county/Forest Preserve permits, if required, are not a part of this proposal. 5. Flag-men, if required, are not a part of this proposal.
Project costs will be invoiced in accordance with the general Terms and Conditions of this proposal (See below).
7.0 Terms and Conditions See Attached general Terms and Conditions.
Geotechnical Proposal, EPI Proposal No . 20-299 May 27, 2020
Attachment B-17 56
8.0 Agreement
Geotechnical Investigation Proposal- Walker Road Extension Lemont, IL EPI Proposal No. 20-299
The undersigned authorizes EPI to perform the Scope of Work. The undersigned represents and warrants that he/she is fully authorized to execute this Agreement on behalf of the company, corporation, partnership, or legal entity or themselves, as the case may be; that they have read and understood this document, all attached documents, and all documents incorporated by reference; and that he/she intend the company, corporation, partnership, legal entity, or themselves, as the case may be, to be legally bound by the same.
Date:
Signature:
Name:
Title:
Company:
Geotechnical Proposal, EPI Proposal No . 20-299 May 27, 2020
Attachment B-18 57
TERMS AND CONDITIONS
The Client authorizes EPI to perform the Scope of Work described herein (Contract/Proposal No. 20-299).
The Client agrees that "Proposal" means this document and the Terms and Conditions described herein, together with all documents attached hereto and all documents incorporated by reference, and that such documents constitute the entire Proposal. The documents are intended to be construed consistently and as a whole, and anything that is required by one document shall be deemed to be required by all.
All changes in the Scope of Work, including increases and decreases thereto, must be set forth in written Change Orders accepted by both the Client and EPI. The Client shall approve or disapprove any Change Order proposed by EPI within three (3) business days of receipt of same. EPI' s tender of the Change Order and the Client ' s response may be made by telefax.
Force Majeure - Costs and schedule commitments shall be subject to negotiation for delays caused by Client's failure to provide information or access to the site as required, the Client's failure to timely respond to a Change Order request, or for delays caused by changes in the waste stream, unforeseen conditions at the site, unpredictable occurrences of force majeure events, such as fire, floods, strikes, riots, unavailability of labor or materials or services, bad weather, or action, inaction, or regulations of any governmental agency. Work stoppage or interruption caused by any of the above that result in additional cost and time to complete the Scope of Work, beyond that set forth in the Proposal, entitles EPI to an adjustment, by Change Order, to the cost and work schedule.
For performance of the services provided for herein, EPI shall be compensated by the Client as follows:
The Client understands that the fee is not contingent upon the closing of a transaction or the ability to receive financing for the property. Unpaid balances shall be subject to interest at the rate of 1.5% per month, or the maximum permissible under state law, whichever is less, commencing thirty (30) days from the invoice date. The Client shall reimburse EPI for any administrative and legal expenses that EPI may incur in collecting its fees and expenses, including reasonable attorney fees.
Client agrees to indemnify and hold harmless EPI, its agents, officers, employees, and its subcontractors, and assigns, from any and all claims, suits and causes of action relating in any way to loss, damage, injury and/or death to persons and property on or about the job site caused in whole, or in part, by the negligent, willful or intentional acts of the Client, its representatives, agents and employees or the property owner. EPI agrees to indemnify and hold harmless Client from all claims as described above where the claim arises out of the negligent, willful or intentional acts of EPI.
Should the Proposal be accepted and the project canceled after it is initiated, the project will be billed on a percentage completed basis, and the information collected will be submitted to the Client, upon request.
Geoteclmical Proposal, EPI Proposal No . 20-299 May 27, 2020
Attachment B-19 58
Stru
ctura
l Bor
ing #2
Stru
ctura
l Bor
ing #1
Stru
ctura
l Bor
ing #3
Stru
ctura
l Bor
ing #4
Road
way B
oring
#1
Road
way B
oring
#2
Road
way B
oring
#3Road
way B
oring
#4
Road
way B
oring
#5
Attachment B-20 59
May 27, 2020 Clay Shipley, PE Vice President Knight E/A, Inc. 631 Boughton Road, Suite 205 Bolingbrook, IL 60440 Re: Proposal for Geotechnical Engineering Services
Lemont Walker Road Extension – Phase 1 Engineering Lemont, Illinois
Dear Mr. Shipley: As per your request, GSG Consultants, Inc. (GSG) is pleased to provide this proposal for providing Geotechnical Engineering Services for the Phase I Engineering services for Walker Road Extension in Lemont, Illinois. GSG understands that the project includes the Phase I Engineering for a proposed bridge for Walker Road over the existing railroad tracks. GSG understands the bridge is proposed to be a single span bridge, with new embankments on either side of the tracks and retaining walls along the embankment. Walker Road will then be extended to meet the Illinois and Michigan Canal. Plans for the bridge and retaining walls are not available at this time, and the final road alignment is still undecided. The proposed structural borings for the bridge will be completed by EPI – currently under contract by the Village of Lemont. The services will include reviewing the soil borings completed in order to provide preliminary geotechnical recommendations and recommendations for additional field investigations for future Phase II design. The Scope of Services section provides a detailed description of GSG’s project approach.
Attachment B-21 60
Proposal for Geotechnical Services Walker Road Extension Lemont, Illinois Page 2 of 4
SCOPE OF SERVICES
1. Review Preliminary TSL plans for proposed bridge 2. Review all previous documents for this project, including geotechnical soil borings
completed by EPI. 3. Prepare a preliminary Structural Geotechnical Report that will review the existing site
conditions, and provide preliminary foundation recommendations for the proposed bridge based on the concept plans and soil borings completed to date by others.
4. GSG will provide recommendations for additional investigations and design steps to provide final foundation recommendations, and for adjacent retaining wall structures.
FEE ESTIMATE
GSG’s budget to complete the work outlined in this proposal for the lump sum fee of $8,000.
GSG appreciates the opportunity to submit this proposal for your consideration. We are looking forward to working with you on this project. Should you have any questions regarding our proposal, please call us at (312) 733-6262. Sincerely, GSG CONSULTANTS, INC.
Dawn Edgell, P.E. Ala E. Sassila, Ph.D. P.E. Sr. Project Engineer Principal
Attachment B-22 61
Proposal for Geotechnical Services Walker Road Extension Lemont, Illinois Page 3 of 4
GENERAL CONDITIONS
1. The professional services will be conducted after the attached Letter of Acceptance has been signed by Knight E/A, hereinafter referred to as Client, and returned to GSG Consultants, Inc. (GSG).
2. The Lump Sum Fee in this proposal shall be based on the scope of services outlined in the proposal. Should there be any unforeseen conditions encountered during the project, GSG will provide information as to the nature of the unforeseen conditions, as expeditiously as possible, and agree with the Client as to the any adjustment in the scope of services and fee.
3. Payment is due upon receipt of invoice. For all unpaid amounts, after thirty days from
the invoice date, Client agrees to pay the finance charge of one and one-half percent (1½%) per month, 18% annually, provided, however, that if this percentage exceeds that permitted by law, the charge will be the maximum permitted by law.
4. GSG will perform the services under this agreement at a level consistent with that level of care and skill ordinarily exercised by members of GSG's profession practicing under similar conditions at the same time in the same or similar locality. GSG CONSULTANTS, INC. DOES NOT MAKE ANY EXPRESS OR IMPLIED WARRANTIES UNDER THIS AGREEMENT.
5. Client agrees that the liability of GSG shall not exceed GSG’s insurance coverage and as allowed by applicable law.
6. The prices for these services are honored for ninety (90) days from the date of this proposal and are subject to modification after that time.
7. This agreement represents the entire understanding and agreement between Client and GSG and supersedes all prior negotiations, representations or agreements, either written or oral. This agreement may be amended only by written instrument signed by both Client and GSG.
Attachment B-23 62
Proposal for Geotechnical Services Walker Road Extension Lemont, Illinois Page 4 of 4
LETTER OF AGREEMENT Mr. Clayton Shipley, on behalf of Knight E/A accepts GSG Consultants, Inc. (GSG’s) attached Proposal, dated May 27, 2020, for a Geotechnical Investigation for the proposed Walker Road Extension Phase I in Lemont, Illinois. This Letter of Agreement, when signed by the Client constitutes a binding contract between GSG Consultants, Inc. and the Client. The terms and conditions of this contract are set out in the attached proposal and constitute the entire agreement between the GSG Consultant, Inc. and Client. Accepted by/: Amount: _____________ Signature Name: Title: Company: _________________ Address: _________________ City, State, Zip Code: Date:
Attachment B-24 63
Blank
64
Kni
ght
E/A
, In
c.M
ay 2
7, 2
020
Wor
khou
r an
d D
irect
Cos
t E
stim
ate
Wal
ker
Roa
d E
xten
sion
Pro
ject
Vill
age
of L
emon
tP
age
1 of
6
Kni
ght
Sub
1)ID
OT
and
FH
WA
Coo
rdin
atio
nK
nigh
tS
ubW
orkh
our C
alcula
tions
& A
ssum
ption
sDC
DC C
alcula
tion
ID
OT
Pha
se I
Kic
koff
Mee
ting
242 p
eople
x 1 m
tg x 4
hrs +
(16h
rs pr
ep an
d mtg
minu
tes)
milea
ge12
1.80
$
BD
E/F
HW
A M
eeti
ng A
tten
danc
e an
d M
inut
es (
esti
mat
e 2m
tgs
tota
l)32
2 peo
ple x
2mtgs
x 4h
rs +
(16h
rs pr
ep an
d mtg
minu
tes)
TO
TA
L W
OR
KH
OU
RS
=56
----
ES
TIM
AT
ED
DIR
EC
T C
OS
TS
=12
1.80
$
-
$
2)D
ata
Col
lect
ion
and
Rev
iew
K
nigh
tS
ubW
orkh
our C
alcula
tions
& A
ssum
ption
sDC
DC C
alcula
tion
M
isc
Dat
a C
olle
ctio
n/R
esea
rch
(stu
dy a
rea
due
dili
genc
e; m
ajor
ity
alre
ady
com
plet
e)16
estim
ate 16
hrs
O
btai
n an
d R
evie
w D
ata
from
the
Dep
artm
ent (
rela
ted
to M
ain
Str
eet I
DO
T im
prov
emen
ts)
20es
timate
20hr
s(T
raff
ic D
ata,
Soi
ls, G
eolo
gica
l Inf
o, R
OW
, Pro
pert
y L
ines
, Uti
lity
Atl
ases
, Oth
er)
R
evie
w o
f S
tudi
es/R
epor
ts/E
ngin
eeri
ng p
repa
red
by o
ther
s (m
ajor
ity
alre
ady
com
plet
e)16
2 peo
ple x
2 item
s x 8h
rs/ite
m
Tra
ffic
Dat
a C
olle
ctio
n C
oord
inat
ion
at M
ain
Str
eet a
nd W
alke
r R
oad
(Mio
Vis
ion)
16(1
perso
n x 2
setup
/tkdw
n x 4h
rs) +
8hrs
coor
dinati
on
Tra
in O
pera
tion
s D
ata
Col
lect
ion
(man
ual d
ata
redu
ctio
n; M
ioV
isio
n w
ill n
ot p
erfo
rm c
ount
s)32
(2 pe
ople
x 1 se
tup x
8hrs)
+ 16
hrs m
anua
l data
redu
ction
Miov
ision
480.0
0$
24hr
coun
t x $2
0/hr x
1 int
erse
ct
Pre
pare
Map
s, C
hart
s, E
xhib
its
of D
ata
Col
lect
ed a
nd A
naly
ze D
ata
12as
sume
12hr
s
Obt
ain,
Rev
iew
and
Inco
rpor
ate
Uti
lity
Pla
n D
ata
(Uti
lity
Coo
rdin
atio
n)36
1 per
son x
12hr
s (ini
tially
) + 4h
rs pe
r mon
th for
6mo p
eriod
as da
ta is
rece
ived
F
ield
Sit
e V
isit
s to
the
Stu
dy A
rea
(3 v
isit
s as
sum
ed o
ver
Pha
se I
dura
tion
)18
3 trip
s x 1.
5 peo
ple av
e x 4h
rs/trip
milea
ge34
.80$
TO
TA
L W
OR
KH
OU
RS
=16
6--
--E
ST
IMA
TE
D D
IRE
CT
CO
ST
S =
514.
80$
-$
3)G
eote
chni
cal S
tudi
esK
nigh
tS
ubW
orkh
our C
alcula
tions
& A
ssum
ption
sDC
DC C
alcula
tion
G
eote
chni
cal S
tudi
es (
see
Pro
posa
l fro
m E
PI)
----
see P
ropo
sal fr
om E
PI (a
ssum
e 4 st
ructu
ral a
nd 5
road
way b
oring
s in P
hase
I - al
l off o
f RR
ROW
)su
b fee
16,06
0.00
$
S
truc
ture
Geo
tech
nica
l Rep
ort (
SG
R)
(see
Sco
pe It
em 1
6)--
--se
e Sco
pe Ite
m 16
(**)s
ub-co
nsult
ant c
ost id
entifi
ed as
"ser
vice b
y othe
rs"
Coo
rdin
atio
n (K
nigh
t)6
Knigh
t will
coor
dinate
activ
ities w
ith E
PI; d
issem
inate
infor
matio
n and
coor
dinate
with
team
; esti
mate
6hrs
on C
ECS
works
heet
TO
TA
L W
OR
KH
OU
RS
=6
----
ES
TIM
AT
ED
DIR
EC
T C
OS
TS
=-
$
16
,060
.00
$
4)S
urve
ysK
nigh
tS
ubW
orkh
our C
alcula
tions
& A
ssum
ption
sDC
DC C
alcula
tion
S
urve
ysSe
e BDE
436
R
oute
, Rai
l, B
ound
ary
and
Uti
lity
Sur
veys
124
assu
me pi
ckup
only
west
of W
alker
Roa
d exte
nded
; full s
urve
y effo
rt ea
st up
to/be
hind c
omme
rc pr
oper
ties
ROE
perm
it1,0
00.00
$
may n
eed R
OE pe
rmit;
estim
ate $1
,000
(ass
ume
surv
eys
from
For
ge a
nd c
onsu
ltan
ts a
re g
ood
and
can
be u
sed)
surve
y cro
ssing
at B
oyer
/McG
uire w
ith T
otal S
tation
Sca
nner
- [(2
perso
n cre
w x 1
0hrs
x 5da
ys) +
24hr
s]RR
flagg
ers
500.0
0$
assu
me R
R fla
gger
s for
1 da
y at $
500
H
ydra
ulic
Sur
veys
(se
e E
nvir
onm
enta
l Res
ourc
es M
ap f
or lo
cati
on o
f fl
oodw
ay/f
lood
plai
n)46
surve
y cro
ss-se
ct thr
u floo
dway
betw
een M
ain S
treet
and I
&M C
anal
- [(2
crew
x 10
hrs x
2day
s) +
6hrs]
RR pr
ot lia
b ins
ur4,0
00.00
$
estim
ate $4
,000 f
or R
R pr
ot lia
bility
insu
ranc
e
Pho
to L
og (
use
Tot
al S
tati
on S
cann
er)
use T
otal S
tation
Sca
nner
vehic
le45
5.00
$
fie
ld ve
hicle
($65
/day x
7day
s)
Coo
rdin
atio
n w
/ For
ge, E
RA
and
Oth
ers
(to
com
pile
and
mer
ge .T
IN d
ata
from
oth
er s
urve
ys)
12es
timate
12hr
stitl
es co
mm50
0.00
$
titl
e com
mitm
ents
(allo
wanc
e $50
0)
TO
TA
L W
OR
KH
OU
RS
=18
2--
--E
ST
IMA
TE
D D
IRE
CT
CO
ST
S =
6,45
5.00
$
-$
WO
RK
HO
UR
S A
ND
DIR
EC
T C
OS
T E
ST
IMA
TE
Attachment C-1 65
Kni
ght
E/A
, In
c.M
ay 2
7, 2
020
Wor
khou
r an
d D
irect
Cos
t E
stim
ate
Wal
ker
Roa
d E
xten
sion
Pro
ject
Vill
age
of L
emon
tP
age
2 of
6
Kni
ght
Sub
WO
RK
HO
UR
S A
ND
DIR
EC
T C
OS
T E
ST
IMA
TE
5)E
nvir
onm
enta
l Dat
a C
olle
ctio
n, In
vent
ory,
and
Coo
rdin
atio
nK
nigh
tS
ubW
orkh
our C
alcula
tions
& A
ssum
ption
sDC
DC C
alcula
tion
(see
Env
iron
men
tal R
esou
rces
Map
)
Exi
stin
g an
d F
utur
e L
and
Use
, Agr
icul
ture
, Dev
elop
men
ts8
estim
ate 8h
rs for
coor
dinati
on of
futur
e lan
d use
and d
evelo
pmen
t plan
s with
The
For
ge et
al
Def
ine
Soc
ial a
nd E
cono
mic
Fac
tors
and
Doc
umen
t (li
mit
ed)
20cu
rsory
revie
w an
d doc
umen
tation
E
nvir
onm
enta
l Sur
vey
Req
uest
(E
SR
) C
oord
inat
ion:
32es
timate
32hr
s for
ESR
, aer
ials,
exhib
its, G
IS da
ta an
d foll
ow-u
p coo
rdina
tion.
T
his
wor
k ef
fort
is to
incl
ude
com
plet
ion
of th
e E
SR
and
exh
ibit
s (a
eria
ls a
ndC
AD
D d
raw
ings
wit
h an
tici
pate
d pr
opos
ed R
OW
) an
d so
me
foll
ow-u
p. T
heID
OT
Cen
tral
Off
ice
wil
l per
form
the
nece
ssar
y co
ordi
nati
on w
ith
the
foll
owin
gag
enci
es a
nd p
rovi
de th
e ap
prop
riat
e re
sult
s fo
r in
clus
ion
in th
e P
DR
:–
Arc
haeo
logi
cal/
His
tori
c/A
rchi
tect
ural
(IH
PA
)–
Pri
me
Far
mla
nd (
US
DA
/NR
CS
, ID
A)
–W
etla
nds
(ID
NR
, US
AC
E)
–S
trea
m C
ross
ings
(ID
NR
, US
AC
E)
–B
iolo
gica
l Sur
vey
(IN
HS
, ID
NR
, US
DO
I/F
&W
S)
–S
peci
al W
aste
Sur
vey
(IS
GS
) -
Sta
te R
OW
onl
y
Veg
etat
ion
and
Tre
e T
abul
atio
n (S
tati
on, O
ffse
t, D
iam
eter
, Typ
e, H
ealt
h an
d S
truc
ture
)40
estim
ate 40
hrs t
o coo
rdina
te wi
th su
rveys
in as
sess
ing tr
ee po
pulat
ion w
ithin
study
area
V
eget
atio
n T
ree
Eva
luat
ion
(Rem
ove,
Rem
ain,
Pro
tect
)--
--N/
A ide
ntify
in Ph
ase I
I
Pre
lim
inar
y E
nvir
on S
ite
Ass
essm
ent/
Inve
stig
atio
n (P
ES
A)
- no
n-S
tate
RO
W o
nly
90co
mplet
e site
reco
n, da
tabas
e scre
en an
d doc
umen
tation
(full
PES
A ex
pecte
d) [P
SI P
hase
II if
requ
ired]
B
icyc
le a
nd P
edes
tria
n F
acil
ity
Coo
rdin
atio
n 8
estim
ate 8h
rs for
vario
us ef
forts
relat
ed to
the I
&M C
anal
trail
W
etla
nd D
elin
eati
ons
and
Rep
ort
54co
mplet
e fiel
d sur
vey p
roce
dure
s for
delin
eatio
n of w
etlan
ds, r
equir
ed fo
rmwo
rk/re
sear
ch, a
nd pr
epar
e rep
ort
W
etla
nd Im
pact
Eva
luat
ion
(WIE
) (s
ee S
cope
Item
17)
----
see S
cope
Item
17
Eva
luat
ion
of W
ater
Qua
lity
Issu
es a
nd B
est M
anag
emen
t Pra
ctic
es--
--co
vere
d und
er S
cope
Item
7
Fie
ld T
rips
to A
rea
(cov
ered
und
er S
cope
Item
1)
----
cove
red u
nder
Sco
pe Ite
m 1
M
eeti
ngs
(1 m
tg f
or th
is s
cope
item
onl
y)8
1 mtg
x 2 pe
ople
x 4hr
s/mtg
milea
ge11
.60$
TO
TA
L W
OR
KH
OU
RS
=26
0--
--E
ST
IMA
TE
D D
IRE
CT
CO
ST
S =
11.6
0$
-
$
6)D
evel
op P
roje
ct P
urpo
se &
Nee
d an
d F
easi
ble
Alt
erna
tive
sK
nigh
tS
ubW
orkh
our C
alcula
tions
& A
ssum
ption
sDC
DC C
alcula
tion
P
repa
re “
Pur
pose
& N
eed”
Sec
tion
----
N/A
docu
ment
in PD
R; se
e Sco
pe Ite
m 15
, PDR
N/A
N/A
P
repa
re “
Pro
ject
Alt
erna
tive
s” S
ecti
on--
--N/
A do
cume
nt in
PDR;
see S
cope
Item
10, A
ltern
ative
Geo
metric
Stud
ies(I
nclu
ding
Bui
ld, N
o-B
uild
, and
oth
er A
lter
nati
ves)
TO
TA
L W
OR
KH
OU
RS
=0
----
ES
TIM
AT
ED
DIR
EC
T C
OS
TS
=-
$
-
$
7)L
ocat
ion
Dra
inag
e S
tudy
(L
DS
)K
nigh
tS
ubW
orkh
our C
alcula
tions
& A
ssum
ption
sDC
DC C
alcula
tion
S
ee L
ocat
ion
Dra
inag
e W
orks
heet
(D
1 P
D00
21)
422
see L
ocat
ion
Drain
age W
orks
heet
(D1 P
D002
1) fo
r calc
ulatio
n of w
orkh
ours
C
oord
inat
e w
ith
IDO
T f
or M
ain
Str
eet I
mpr
ovem
ents
(P
TB
196
, Ite
m 6
)12
PDP
will n
eed t
o coo
rdina
te an
d con
sider
drain
age d
esign
alon
g Main
Stre
et thr
ough
Walk
er R
oad
TO
TA
L W
OR
KH
OU
RS
=43
4--
--E
ST
IMA
TE
D D
IRE
CT
CO
ST
S =
-$
-$
8)
Noi
se A
naly
sis
– F
HW
A T
raff
ic N
oise
Mod
el (
TN
M)
Kni
ght
Sub
Wor
khou
r Calc
ulatio
ns &
Ass
umpti
ons
DCDC
Calc
ulatio
n
N
/A--
----
--N/
A do
cume
nt in
PDR
as re
quire
d; lac
k of s
ensit
ive re
cepr
otrs
TO
TA
L W
OR
KH
OU
RS
=0
----
ES
TIM
AT
ED
DIR
EC
T C
OS
TS
=-
$
-
$
Attachment C-2 66
Kni
ght
E/A
, In
c.M
ay 2
7, 2
020
Wor
khou
r an
d D
irect
Cos
t E
stim
ate
Wal
ker
Roa
d E
xten
sion
Pro
ject
Vill
age
of L
emon
tP
age
3 of
6
Kni
ght
Sub
WO
RK
HO
UR
S A
ND
DIR
EC
T C
OS
T E
ST
IMA
TE
9)A
ir Q
uali
ty A
naly
sis
K
nigh
tS
ubW
orkh
our C
alcula
tions
& A
ssum
ption
sDC
DC C
alcula
tion
N
/A--
----
--N/
A do
cume
nt in
PDR
as re
quire
d; ex
empt
from
analy
sis as
disc
usse
d in A
rticle
26-1
4.03(
a) of
the B
DE M
anua
l
TO
TA
L W
OR
KH
OU
RS
=0
----
ES
TIM
AT
ED
DIR
EC
T C
OS
TS
=-
$
-
$
10)
Alt
erna
tive
Geo
met
ric
Stu
dies
Kni
ght
Sub
Wor
khou
r Calc
ulatio
ns &
Ass
umpti
ons
DCDC
Calc
ulatio
n
A
lter
nati
ve G
eom
etri
c S
tudi
es, G
rade
Sep
arat
ion
150
assu
me 3
alts x
50hr
s eac
h
Pro
pert
y A
cces
s Im
pact
Stu
dies
and
Eva
luat
ion
70im
prov
emen
ts wi
ll imp
act tw
o (2)
exist
ing co
mmer
cial a
cces
s loc
ation
s; es
timate
35hr
s eac
h
Rai
lroa
d G
rade
Sep
arat
ion
War
rant
s, B
DE
Cha
pter
9 a
nd U
SD
OT
/FH
WA
Han
dboo
k70
estim
ate 70
hrs
P
rofi
le S
tudi
es, M
ulti
ple
Alt
erna
tive
s50
assu
me 3
alts w
/ var
ious p
rofile
chan
ges;
estim
ate 5
prof
x 10h
rs ea
ch
Cro
ss-S
ecti
on S
tudi
es, M
ulti
ple
Alt
erna
tive
s80
assu
me 5
profi
les ac
ross
alts
w/ xs
ectio
n stud
ies x
16hr
s/pro
f
Alt
erna
tive
Geo
met
ric
Stu
dies
, Adv
ance
d G
rade
Sep
arat
ion
Stu
dy o
f T
wo
(2)
Alt
erna
tive
s14
42 a
lts x
72hr
s eac
h
Pre
lim
inar
y C
onst
ruct
ion
Cos
t Est
imat
e (2
alt
s)12
2 alts
x 6h
rs ea
ch
Doc
umen
tati
on o
f P
refe
rred
Alt
erna
tive
Sel
ecti
on6
estim
ate 8h
rs
Alt
erna
te G
eom
etri
c S
tudi
es, P
refe
rred
Alt
erna
tive
120
4shts
x 30
hrs/s
ht [no
te: co
ordin
ate w
ith ID
OT D
1 PD
to tie
in to
impr
ovem
ents
at Ma
in St
reet]
P
rope
rty
Acc
ess
Impa
ct, A
void
ance
or
Min
imiz
ed Im
pact
, Pre
ferr
ed A
lter
nati
ve24
estim
ate 24
hrs
U
tili
ty C
onfl
ict I
dent
ific
atio
n, A
void
ance
and
/or
Res
olut
ion,
Pre
ferr
ed A
lter
nati
ve12
estim
ate 12
hrs
color
ing24
0.00
$
40
color
page
s/exh
ibits
x 6 co
pies x
$1 ea
ch
Typ
ical
Cro
ss-S
ecti
ons,
Pre
ferr
ed A
lter
nati
ve30
estim
ate 5
road
way t
yp se
ction
s x 6h
rs ea
ch
Cro
ss-S
ecti
on D
etai
l/D
esig
n, P
refe
rred
Alt
erna
tive
642,4
00'/5
0' pe
r sec
t = 48
sects
x 1 p
rof x
1.33
hr/se
ct
Pla
n S
tudi
es (
Des
ign
Exc
epti
ons)
, Pre
ferr
ed A
lter
nati
ve40
estim
ate 30
hrs t
o IDO
T D1
varia
nce f
orms
and d
etail v
arian
ce re
ques
ts
Pla
n S
tudi
es (
Bar
rier
War
rant
Ana
lysi
s), P
refe
rred
Alt
erna
tive
24es
timate
24hr
s
Pla
n S
tudi
es (
Com
plet
e S
tree
ts),
Pre
ferr
ed A
lter
nati
ve32
addr
ess c
omple
te str
eets
need
s in c
ompli
ance
with
IDOT
crite
ria an
d Villa
ge or
dinan
ce; d
ocum
ent in
PDR
P
lan
Stu
dies
(A
DA
Ram
p A
naly
sis)
, Pre
ferr
ed A
lter
nati
ve30
vario
us lo
catio
ns th
roug
hout
study
area
; esti
mate
30hr
s
Pla
n S
tudi
es (
Mis
c) [
pvt d
esig
n, I-
last
chc
klis
ts V
2.02
, tec
h m
emos
]24
estim
ate 24
hrs
D
evel
op P
reli
min
ary
Con
stru
ctio
n C
ost E
stim
ate,
Pre
ferr
ed A
lter
nati
ve16
estim
ate 16
hrs
M
eeti
ngs
242m
tgs x
2 peo
ple x
6hrs
(inclu
des p
rep a
nd do
cume
ntatio
n)mi
leage
52.20
$
1 I
DOT
+ 1 V
illage
C
oord
inat
e w
ith
IDO
T f
or M
ain
Str
eet I
mpr
ovem
ents
(P
TB
196
, Ite
m 6
)10
coor
dinate
with
IDOT
for im
prov
emen
ts tha
t will
need
to be
cons
ider in
desig
n of M
ain S
treet
at W
alker
Roa
d
TO
TA
L W
OR
KH
OU
RS
=1,
032
----
ES
TIM
AT
ED
DIR
EC
T C
OS
TS
=29
2.20
$
-
$
11)
Cra
sh A
naly
sis
(Tec
h M
emo
to b
e in
clud
ed in
PD
R)
Kni
ght
Sub
Wor
khou
r Calc
ulatio
ns &
Ass
umpti
ons
DCDC
Calc
ulatio
n
R
evie
w C
rash
Dat
a an
d T
abul
atio
n (5
yea
rs)
20so
me of
this
work
alrea
dy st
arted
; inclu
de IC
C his
torica
l data
; esti
mate
20hr
sN/
AN/
A
Ana
lysi
s of
Cra
sh D
ata
(5 y
ears
)24
some
of th
is wo
rk alr
eady
star
ted; in
clude
ICC
histor
ical d
ata; e
stima
te 24
hrs
D
raft
Tec
h M
emo
24es
timate
24hr
s
Yea
rly
Acc
iden
t Dat
a U
pdat
es--
--N/
A
TO
TA
L W
OR
KH
OU
RS
=68
----
ES
TIM
AT
ED
DIR
EC
T C
OS
TS
=-
$
-
$
Init
ial p
roje
ct s
tudy
mee
ting
s ha
ve in
clud
ed a
lter
nati
ve d
iscu
ssio
ns. P
hase
I st
udie
s w
ill a
sses
s up
to th
ree
(3)
alte
rnat
ives
for
gra
de
sepa
rati
ng th
e W
alke
r R
oad
exte
nsio
n ov
er th
e Il
lino
is C
entr
al R
ailr
oad.
Pha
se I
stud
ies
wil
l als
o re
view
an
at-g
rade
cro
ssin
g sc
enar
io. H
owev
er, g
rade
sep
arat
ion
is p
refe
rred
in o
rder
to m
ost e
ffec
tive
ly a
ddre
ss c
urre
nt s
afet
y is
sues
at t
he B
oyer
Str
eet a
nd
McG
uire
Par
kway
cro
ssin
g, a
s w
ell a
s pr
ovid
e sa
fe a
cces
s fo
r T
he F
orge
dev
elop
men
t and
com
mer
cial
/ind
ustr
ial b
usin
esse
s ut
iliz
ing
the
exte
nsio
n on
ce th
e ad
jace
nt a
t-gr
ade
cros
sing
s ar
e cl
osed
.
Attachment C-3 67
Kni
ght
E/A
, In
c.M
ay 2
7, 2
020
Wor
khou
r an
d D
irect
Cos
t E
stim
ate
Wal
ker
Roa
d E
xten
sion
Pro
ject
Vill
age
of L
emon
tP
age
4 of
6
Kni
ght
Sub
WO
RK
HO
UR
S A
ND
DIR
EC
T C
OS
T E
ST
IMA
TE
12)
Tra
ffic
Mai
nten
ance
Pla
nK
nigh
tS
ubW
orkh
our C
alcula
tions
& A
ssum
ption
sDC
DC C
alcula
tion
C
oord
inat
e w
ith
IDO
T f
or M
ain
Str
eet I
mpr
ovem
ents
(P
TB
196
, Ite
m 6
)6
coor
dinate
with
IDOT
for t
iming
of th
is pr
oject
and t
he M
ain S
treet
proje
ct; do
cume
nt in
tech m
emo
N/A
N/A
P
repa
re T
raff
ic C
ontr
ol P
lan
(TC
P)
12as
sume
1sht
with
notes
at 12
hrs
P
repa
re T
ech
Mem
o w
ith
Att
achm
ents
6tec
h mem
o will
revie
wed b
y IDO
T Di
strict
1 Bu
reau
of T
raffic
for "
conc
eptua
l con
curre
nce"
P
rese
nt a
t ID
OT
Dis
tric
t 1 D
etou
r C
omm
itte
e M
eeti
ng--
--no
t anti
cipate
d
TO
TA
L W
OR
KH
OU
RS
=24
----
ES
TIM
AT
ED
DIR
EC
T C
OS
TS
=-
$
-
$
13)
Inte
rsec
tion
Des
ign
Stu
dies
(ID
S)
Kni
ght
Sub
Wor
khou
r Calc
ulatio
ns &
Ass
umpti
ons
DCDC
Calc
ulatio
n
E
xist
ing
traf
fic
coun
ts v
ia M
ioV
isio
n --
--se
e Tas
k 2N/
AN/
A
Coo
rdin
atio
n w
ith
CM
AP
for
205
0 T
raff
ic P
roje
ctio
ns4
estim
ate 4h
rs
Tri
p G
ener
atio
n, D
istr
ibut
ion
and
Ass
ignm
ents
(to
acc
ount
for
The
For
ge b
uild
-out
)24
estim
ate 24
hrs
1C
apac
ity
Ana
lyse
s at
30hr
s/L
ocat
ion
30Ex
isting
vs. P
ropo
sed w
/ Pro
jected
Tra
ffic
Cap
acit
y A
naly
sis
Rep
ort
(es
tim
ate
8hr
s)8
1T
raff
ic S
igna
l War
rant
Stu
dies
at
24hr
s/L
ocat
ion
24no
te tha
t war
rants
will
be ad
dres
sed p
rior t
o any
IDS
relat
ed w
ork b
eing p
erfor
med
1ID
S a
t80
hrs/
Inte
rsec
tion
80
Coo
rdin
ate
wit
h ID
OT
for
Mai
n S
tree
t Im
prov
emen
ts (
PT
B 1
96, I
tem
6)
10co
ordin
ate w
ith ID
OT fo
r impr
ovem
ents
that w
ill ne
ed to
be co
nside
r in de
sign o
f Main
Stre
et at
Walk
er R
oad
TO
TA
L W
OR
KH
OU
RS
=18
0--
--E
ST
IMA
TE
D D
IRE
CT
CO
ST
S =
-$
-$
14)
Pub
lic
Invo
lvem
ent
Kni
ght
Sub
Wor
khou
r Calc
ulatio
ns &
Ass
umpti
ons
DCDC
Calc
ulatio
n
Ass
ume
a pu
blic
info
rmat
iona
l mee
ting
wil
l be
requ
ired
. Ass
ume
also
that
indi
vidu
al la
ndow
ner
mee
ting
s w
ill b
e re
quir
ed.
P
ubli
c In
form
atio
n M
eeti
ng (
esti
mat
e 1m
tg to
tal)
C
oord
inat
e an
d C
ompi
le M
aili
ng L
ists
(in
clud
ing
all a
djac
ent p
rope
rty
owne
rs)
10es
timate
10hr
s
Cre
ate
invi
tati
on p
ostc
ard,
pri
nt a
nd m
ail/
deli
ver
12es
timate
12hr
spo
stage
55.00
$
1m
tg x 1
00 po
stcar
ds x
$0.55
each
P
repa
rati
on o
f P
ubli
c M
eeti
ng H
ando
uts/
Com
men
t Car
ds (
Bro
chur
es)
16es
timate
16hr
sco
lor pr
inting
100.0
0$
1mtg
x 100
hand
outs
x $1 e
ach
P
repa
rati
on o
f P
ubli
c M
eeti
ng D
ispl
ay E
xhib
its
(est
imat
e 6
boar
d)72
6 boa
rds x
12hr
s/boa
rdex
hibits
150.0
0$
1mtg
x 6 co
lor ex
hibit b
oard
s x $2
5 eac
h
Pre
para
tion
of
Pub
lic
Mee
ting
Aud
io-V
isua
l Pre
sent
atio
n--
--no
t nee
ded
S
ecur
e L
ocat
ion
of P
ubli
c M
eeti
ng/H
eari
ng S
ites
6es
timate
6hrs
(coor
dinate
with
Villa
ge fo
r loca
tion a
nd pa
ss th
roug
h cos
t)sit
e ren
tal75
0.00
$
1m
tg x $
750
M
edia
(ad
s pr
omot
ing
mee
ting
)6
estim
ate 6h
rs (co
ordin
ate w
ith V
illage
)me
dia/ad
s70
0.00
$
2 m
edia
relea
ses x
$350
each
M
eeti
ng D
ry-R
un20
2 peo
ple x
1mtg
x 10h
rs tot
al (if
need
ed, a
nticip
ate dr
y-run
at V
illage
Hall
)mi
leage
11.60
$
2m
tgs (d
ry+pu
blic)
P
repa
re D
ay a
fter
Sum
mar
y an
d M
eeti
ng M
inut
es12
estim
ate 12
hrs
P
repa
rati
on o
f D
raft
Res
pons
e L
ette
rs to
Pub
lic
Mee
ting
Com
men
ts
24es
timate
24hr
s (as
sume
Knig
ht wi
ll dra
ft res
pons
es fo
r Villa
ge)
posta
ge27
.50$
1mtg
x 50 r
espo
nse l
etter
s x $0
.55 ea
ch
Indi
vidu
al L
ando
wne
r M
eeti
ng (
for
two
com
mer
cial
pro
pert
ies
only
)24
estim
ate 4m
tgs x
6hrs/
mtg
TO
TA
L W
OR
KH
OU
RS
=20
2--
--E
ST
IMA
TE
D D
IRE
CT
CO
ST
S =
1,79
4.10
$
-$
For
impa
cts
to M
ain
Str
eet (
FA
U 3
587)
, whi
ch is
a n
on-s
igni
fica
nt r
oute
. Wal
ker
Roa
d ex
tens
ion
is o
n ne
w a
lign
men
t tha
t wil
l li
kely
cre
ate
lim
ited
impa
cts
to M
ain
Str
eet d
urin
g co
nstr
ucti
on. I
t wil
l be
impo
rtan
t to
coor
dina
te d
esig
n m
odif
icat
ions
and
co
nstr
ucti
on im
pact
s w
ith
the
Mai
n S
tree
t pro
ject
cur
rent
ly o
n ID
OT
PT
B 1
96, I
tem
6.
Attachment C-4 68
Kni
ght
E/A
, In
c.M
ay 2
7, 2
020
Wor
khou
r an
d D
irect
Cos
t E
stim
ate
Wal
ker
Roa
d E
xten
sion
Pro
ject
Vill
age
of L
emon
tP
age
5 of
6
Kni
ght
Sub
WO
RK
HO
UR
S A
ND
DIR
EC
T C
OS
T E
ST
IMA
TE
15)
Pro
ject
Dev
elop
men
t Rep
ort (
PD
R)
Kni
ght
Sub
Wor
khou
r Calc
ulatio
ns &
Ass
umpti
ons
DCDC
Calc
ulatio
n
D
raft
PD
R N
arra
tive
(B
LR
222
10)
120
assu
me G
roup
II CE
and D
A; es
timate
120h
rs
Pre
pare
Com
pile
d P
DR
wit
h E
xhib
its/
App
endi
ces
20es
timate
20hr
sco
lor pr
inting
480.0
0$
60 co
lor pa
ges/e
xhibi
ts x 8
copie
s x $1
each
R
evis
ions
to A
ddre
ss a
nd In
corp
orat
e P
DR
Rev
iew
Com
men
ts60
addr
ess c
omme
nts, r
evise
appe
ndice
s, re
-ass
emble
, dra
ft disp
ositio
n (ex
pect
at lea
st 2 f
ull re
views
x 30
hrs e
ach)
TO
TA
L W
OR
KH
OU
RS
=20
0--
--E
ST
IMA
TE
D D
IRE
CT
CO
ST
S =
480.
00$
-$
16)
Bri
dges
/ Str
uctu
res
Kni
ght
Sub
Wor
khou
r Calc
ulatio
ns &
Ass
umpti
ons
DCDC
Calc
ulatio
n
F
ield
Mee
ting
s w
ith
IDO
T A
rea
Bri
dge
Eng
inee
r--
--N/
AN/
AN/
A
Bri
dge
Insp
ecti
ons
----
N/A
B
ridg
e C
ondi
tion
Rep
ort
----
N/A
B
ridg
e T
ype
Stu
dies
(br
idge
/wal
ls o
ver
RR
and
str
uctu
re a
cros
s fl
oodw
ay)
74stu
dy op
tions
on pr
eferre
d alig
nmen
t that
satis
fy IC
C an
d CN
requ
ireme
nts //
deter
mine
stru
cture
for c
ross
ing flo
odwa
y for
new
comm
ercia
l acc
ess
B
ridg
e T
ype,
Siz
e an
d L
ocat
ion
(TS
&L
) P
lan
(bri
dge/
wal
ls o
ver
RR
)22
0pr
eferre
d alig
nmen
t; inc
ludes
pre-
final
subm
ittal, a
ddre
ssing
revie
w co
mmen
ts an
d fina
l sub
mitta
l
Str
uctu
re G
eote
chni
cal R
epor
t (S
GR
) (s
ee p
ropo
sal f
rom
GS
G)
----
see P
ropo
sal fr
om G
SG -
comp
lete S
GR pe
r IDO
T re
quire
ments
sub f
ee8,0
00.00
$
Pre
lim
inar
y B
ridg
e D
esig
n an
d H
ydra
ulic
Rep
ort (
PB
DH
R)
16co
mplet
e BLR
1021
0 w/ a
ttach
ments
that
includ
e LDS
(sco
pe Ite
m 7)
, TS&
L Plan
s, an
d SGR
.(**
)sub
-cons
ultan
t cos
t iden
tified
as "s
ervic
e by o
thers"
on C
ECS
works
heet
TO
TA
L W
OR
KH
OU
RS
=31
0--
--E
ST
IMA
TE
D D
IRE
CT
CO
ST
S =
-$
8,00
0.00
$
17)
Wet
land
Impa
ct E
valu
atio
n F
orm
/Pro
cess
Kni
ght
Sub
Wor
khou
r Calc
ulatio
ns &
Ass
umpti
ons
DCDC
Calc
ulatio
n
C
ompi
le Im
pact
Eva
luat
ion
For
ms
12es
timate
12hr
sN/
AN/
A
Pre
pare
Exh
ibit
s12
estim
ate 12
hrs
A
naly
sis
and
Mit
igat
ion/
Avo
idan
ce O
ptio
ns6
estim
ate 6h
rs
TO
TA
L W
OR
KH
OU
RS
=30
----
ES
TIM
AT
ED
DIR
EC
T C
OS
TS
=-
$
-
$
18)
Sec
tion
4(f
)/6(
f) E
valu
atio
n (S
epar
ate
Rep
ort)
Kni
ght
Sub
Wor
khou
r Calc
ulatio
ns &
Ass
umpti
ons
DCDC
Calc
ulatio
n
Illi
nois
& M
ichi
gan
Can
al S
tate
Tra
il is
like
ly a
4(f
) re
sour
ce th
at w
ill r
equi
re c
oord
inat
ion
http
s://
ww
w.tr
aill
ink.
com
/tra
il-m
aps/
illi
nois
--m
ichi
gan-
cana
l-st
ate-
trai
l/
S
ecti
on 4
(f)
Eva
luat
ion
Doc
umen
tati
on &
Coo
rdin
atio
n60
----
prep
are a
repo
rt for
a de
minim
is fin
ding p
er S
ectio
n 20-
3 BLR
S Ma
nual;
estim
ate 60
hrs n
eede
dN/
AN/
A
TO
TA
L W
OR
KH
OU
RS
=60
----
ES
TIM
AT
ED
DIR
EC
T C
OS
TS
=-
$
-
$
19)
Sec
tion
106
Eva
luat
ion
Kni
ght
Sub
Wor
khou
r Calc
ulatio
ns &
Ass
umpti
ons
DCDC
Calc
ulatio
n
N
/A--
----
--N/
A do
cume
nt in
PDR
as re
quire
dN/
AN/
A
TO
TA
L W
OR
KH
OU
RS
=0
----
ES
TIM
AT
ED
DIR
EC
T C
OS
TS
=-
$
-
$
Attachment C-5 69
Kni
ght
E/A
, In
c.M
ay 2
7, 2
020
Wor
khou
r an
d D
irect
Cos
t E
stim
ate
Wal
ker
Roa
d E
xten
sion
Pro
ject
Vill
age
of L
emon
tP
age
6 of
6
Kni
ght
Sub
WO
RK
HO
UR
S A
ND
DIR
EC
T C
OS
T E
ST
IMA
TE
20)
ICC
and
Rai
lroa
d C
oord
inat
ion
Kni
ght
Sub
Wor
khou
r Calc
ulatio
ns &
Ass
umpti
ons
DCDC
Calc
ulatio
n
C
oord
inat
ion
wit
h IC
C, C
N a
nd M
etra
60es
timate
# of
mtgs
: avg
1mtg/
mo x
12mo
s x 5h
rs/mt
g (inc
ludes
prep
and m
tg mi
nutes
)mi
leage
-$
N/
AN
ote:
The
team
has
alr
eady
hel
d tw
o m
eeti
ng w
ith
ICC
, rai
lroa
d an
d ID
OT
att
ende
es.
assu
me al
l mee
ting w
ill be
via v
ideo c
onfer
ence
Ant
icip
ate
that
reg
ular
team
mee
ting
s w
ith
ICC
, rai
lroa
d an
d ID
OT
rep
rese
ntat
ion
wil
l con
tinu
e.
Att
end
ICC
Hea
ring
s (p
repa
re f
or a
nd a
tten
d as
req
uire
d)60
assu
me 3
ICC
mtgs
x 20
hrs/m
tg (m
odify
/upda
te ex
hibits
from
othe
r tas
ks an
d re-
use;
agen
da; m
tg mi
nutes
milea
ge17
4.00
$
3m
tgs x
2 trip
s x 50
mile
s
TO
TA
L W
OR
KH
OU
RS
=12
0--
--E
ST
IMA
TE
D D
IRE
CT
CO
ST
S =
174.
00$
-$
21)
Lig
htin
g an
d L
ands
capi
ng P
lann
ing
Kni
ght
Sub
Wor
khou
r Calc
ulatio
ns &
Ass
umpti
ons
DCDC
Calc
ulatio
n
L
ight
ing
War
rant
Stu
dies
40es
timate
40hr
s
Pre
lim
inar
y Il
lum
inat
ion/
Pho
tom
etri
c C
alcu
lati
ons
30es
timate
30hr
s
Lig
htin
g L
ayou
t (P
reli
min
ary
Lig
ht S
tand
ard
Spa
cing
and
Bri
dge
Lig
htin
g)60
estim
ate 60
hrs
L
ands
capi
ng E
valu
atio
n an
d C
once
pt D
evel
opm
ent
40es
timate
40hr
s
Pre
lim
inar
y L
ands
cape
Pla
ns a
nd A
ssoc
iate
d R
ende
ring
s80
estim
ate 50
hrs f
or pl
an(s)
+ 30
hrs f
or re
nder
ing(s)
color
ing12
0.00
$
30
color
page
s/exh
ibits
x 4 co
pies x
$1 ea
ch
TO
TA
L W
OR
KH
OU
RS
=25
0--
--E
ST
IMA
TE
D D
IRE
CT
CO
ST
S =
120.
00$
-$
22)
Fin
anci
al P
lann
ing
and
Fun
ding
Str
ateg
ies
Kni
ght
Sub
Wor
khou
r Calc
ulatio
ns &
Ass
umpti
ons
DCDC
Calc
ulatio
n
F
inan
cial
Pla
nnin
g an
d F
undi
ng S
trat
egie
s (p
rovi
ded
By
Oth
ers)
----
early
gran
t coo
rdina
tion a
nd fin
ancia
l plan
ning w
ill be
impo
rtant
to fut
ure f
undin
g opp
ortun
ities
N/A
N/A
C
oord
inat
ion
(Kni
ght)
30Kn
ight w
ill co
ordin
ate w
ith V
illage
advo
cates
thro
ugh v
ariou
s mee
tings
and o
ffline
activ
ities
estim
ate 30
hrs
TO
TA
L W
OR
KH
OU
RS
=30
----
ES
TIM
AT
ED
DIR
EC
T C
OS
TS
=-
$
-
$
23)
Adm
inis
trat
ion
and
Man
agem
ent
Kni
ght
Sub
Wor
khou
r Calc
ulatio
ns &
Ass
umpti
ons
DCDC
Calc
ulatio
n
A
dmin
istr
atio
n an
d M
anag
emen
t (4%
of
prio
r sc
ope
item
s)14
4Us
e 4%
of pr
ior sc
ope i
tems.
N/A
N/A
TO
TA
L W
OR
KH
OU
RS
=14
4--
--E
ST
IMA
TE
D D
IRE
CT
CO
ST
S =
----
-$
24)
Qua
lity
Ass
uran
ce/ Q
uali
ty C
ontr
olK
nigh
tS
ubW
orkh
our C
alcula
tions
& A
ssum
ption
sDC
DC C
alcula
tion
Q
A/Q
C (
2% o
f pr
ior
scop
e it
ems
excl
udin
g A
dmin
/Man
agem
ent)
72Us
e 2%
of pr
ior sc
ope i
tems e
xclud
ing "A
dmin/
Mana
geme
nt"N/
AN/
A
TO
TA
L W
OR
KH
OU
RS
=72
----
ES
TIM
AT
ED
DIR
EC
T C
OS
TS
=--
---
$
WO
RK
HO
UR
S T
AS
K 1
TH
RU
22
=3,
610
----
WO
RK
HO
UR
S T
AS
K 2
3 A
ND
24
=21
6--
--
TO
TA
L W
OR
KH
OU
RS
AL
L T
AS
KS
=3,
826
----
TO
TA
L D
IRE
CT
CO
ST
S A
LL
TA
SK
S =
9,96
3.50
$
----
TO
TA
L S
UB
-CO
NS
UL
TA
NT
FE
ES
=--
--24
,060
.00
$
Kni
ght
Sub
Attachment C-6 70
Blank
71
FIR
M N
AM
E:
Kn
igh
t E
/A,
Inc.
DA
TE
:05
/27/
20P
RIM
E/S
UP
PL
:P
rim
eP
TB
NO
.N
/AR
OU
TE
:W
alke
r R
oad
SE
CT
ION
:T
BD
CO
NT
RA
CT
TE
RM
15M
ON
TH
SO
VE
RH
EA
D R
AT
E12
3.63
%S
TA
RT
DA
TE
6/1/
2020
CO
MP
LE
XIT
Y F
AC
TO
R0
RA
ISE
DA
TE
7/1/
2020
% O
F R
AIS
E3.
00%
6/1/
2020
-7/
1/20
207/
2/20
207/
1/20
217/
2/20
21
9/1/
2021
039
814
112
215
1515
Th
e to
tal e
scal
atio
n f
or
this
pro
ject
wo
uld
be:
3.21
%
6.67
%82
.40%
14.1
5%
PA
YR
OL
L E
SC
AL
AT
ION
TA
BL
EF
IXE
D R
AIS
ES
Bur
eau
of D
esig
n an
d E
nviro
nmen
t
Attachment D-1 72
FIRM NAME: Knight E/A, Inc. DATE 05/27/20PRIME/SUPPLEMENT: PrimePTB NO: N/AROUTE: Walker RoadSECTION: TBD
ESCALATION FACTOR = 3.21%
Vice President $75.00 $70.00 ($5.00)Principal Engineer $72.70 $70.00 ($2.70)Senior Engineer II, Planner II $69.74 $70.00 $0.26Senior Engineer I, Planner I $62.50 $64.51 $2.01Project Engineer II, Planner II $58.59 $60.47 $1.88Project Engineer I, Planner I $50.88 $52.51 $1.63
Engineer IV, Planner IV $46.05 $47.53 $1.48
Engineer III, Planner III $41.66 $43.00 $1.34
Engineer II, Planner II, Designer III $37.58 $38.79 $1.21
Engineer I, Planner I, Designer II $29.75 $30.71 $0.96Senior Environmental Specialist $60.10 $62.03 $1.93
Environmental Specialist II $36.54 $37.71 $1.17
Environmental Specialist I $33.65 $34.73 $1.08
Land Acquisition Specialist $40.82 $42.13 $1.31Survey Manager $46.15 $47.63 $1.48Survey Party Chief $30.41 $31.39 $0.98Surveyor II $33.17 $34.24 $1.07Surveyor I $28.00 $28.90 $0.90Survey Technician II $24.04 $24.81 $0.77Survey Technician I $22.12 $22.83 $0.71Office Administration $32.33 $33.37 $1.04Graphic Designer $26.56 $27.41 $0.85Admin Assistant, Secretary $23.92 $24.69 $0.77
DIFF
PAYROLL RATES
CALCULATED RATECLASSIFICATION CURRENT RATE
Attachment D-2 73
CO
ST
ES
TIM
AT
E O
F C
ON
SU
LT
AN
T S
ER
VIC
ES
FIR
M:
Kn
igh
t E
/A, I
nc.
DA
TE
:05
/27/
20P
TB
:N
/AO
VE
RH
EA
D R
AT
E12
3.63
%P
RIM
E/S
UP
PL
EM
EN
T:
Pri
me
CO
MP
LE
XIT
Y F
AC
TO
R0
RO
UT
E:
Wa
lker
Ro
adS
EC
TIO
N:
TB
D
OV
ER
HE
AD
IN-H
OU
SE
OU
TS
IDE
SE
RV
ICE
S%
OF
ITE
MW
OR
KH
OU
RS
PA
YR
OL
L&
DIR
EC
TF
IXE
DD
IRE
CT
BY
TO
TA
LG
RA
ND
FR
ING
E B
EN
FC
OS
TS
FE
EC
OS
TS
OT
HE
RS
TO
TA
L
(A)
(B)
( C
)(D
)(E
)(F
)(G
)(B
-G)
IDO
T/F
HW
A C
oord
inat
ion
563,
162.
083,
909.
281,
169.
978,
241.
331.
68%
Dat
a C
olle
ctio
n/ R
evie
w16
67,
245.
428,
957.
512,
680.
8118
,883
.74
3.84
%
Geo
tech
nica
l Stu
dies
631
2.00
385.
7311
5.44
813.
170.
17%
Sur
veys
182
6,07
2.10
7,50
6.94
2,24
6.68
15,8
25.7
13.
22%
Env
iron
Dat
a C
olle
ct/In
v/R
ev26
012
,287
.56
15,1
91.1
14,
546.
4032
,025
.07
6.51
%
Loca
tion
Dra
inag
e S
tudy
434
18,6
78.3
823
,092
.08
6,91
1.00
48,6
81.4
69.
90%
Alt
Geo
met
ric S
tudi
es1,
032
46,9
27.1
658
,016
.05
17,3
63.0
512
2,30
6.26
24.8
6%
Cra
sh A
naly
sis
682,
902.
963,
588.
931,
074.
107,
565.
981.
54%
Tra
ffic
Mai
nten
ance
Pla
n24
1,08
2.92
1,33
8.81
400.
682,
822.
410.
57%
Inte
rsec
t Des
ign
Stu
dies
180
8,46
7.98
10,4
68.9
63,
133.
1522
,070
.10
4.49
%
Pub
lic In
volv
emen
t20
29,
220.
5811
,399
.40
3,41
1.61
24,0
31.6
04.
88%
Pro
ject
Dev
Rep
ort (
PD
R)
200
9,15
9.16
11,3
23.4
73,
388.
8923
,871
.52
4.85
%
Brid
ges/
Str
uctu
res
310
16,4
84.2
020
,379
.42
6,09
9.15
42,9
62.7
78.
73%
Wet
land
Impa
ct E
valu
atio
n30
1,34
4.00
1,66
1.59
497.
283,
502.
870.
71%
Sec
tion
4(f)
/ 6(f
) E
valu
atio
n60
2,93
1.22
3,62
3.87
1,08
4.55
7,63
9.64
1.55
%
ICC
and
Rai
lroad
Coo
rd12
06,
489.
008,
022.
352,
400.
9316
,912
.28
3.44
%
Ligh
ting/
Lan
dsc
Pla
nnin
g25
010
,972
.40
13,5
65.1
84,
059.
7928
,597
.37
5.81
%
Fin
anci
al/F
undi
ng S
trat
egie
s30
2,01
7.65
2,49
4.42
746.
535,
258.
601.
07%
Adm
in a
nd M
anag
emen
t14
45,
811.
127,
184.
292,
150.
1115
,145
.52
3.08
%
QA
/QC
724,
140.
365,
118.
731,
531.
9310
,791
.02
2.19
%
Dire
ct C
osts
(B
DE
436
)9,
963.
509,
963.
502.
03%
EP
I (B
orin
gs)
16,0
60.0
016
,060
.00
3.26
%
GS
G (
SG
R)
8,00
0.00
8,00
0.00
1.63
%
Sub
cons
ulta
nt D
L0.
000.
000.
00%
TO
TA
LS
3,82
617
5,70
8.25
217,
228.
119,
963.
5065
,012
.05
0.00
24,0
60.0
049
1,97
1.91
100.
00%
CO
ST
PL
US
FIX
ED
FE
E
Attachment D-3 74
AV
ER
AG
E H
OU
RL
Y P
RO
JEC
T R
AT
ES
FIR
M:
Kn
igh
t E
/A, I
nc.
RO
UT
E:
Wal
ker
Ro
adD
AT
E:
PT
B:
N/A
SE
CT
ION
:T
BD
PR
IME
/SU
PP
LE
ME
NT
:P
rim
eS
HE
ET
1o
f4
Cla
ssif
icat
ion
Rat
eH
ou
rs%
Wg
tdH
ou
rs%
Wg
tdH
ou
rs%
Wg
tdH
ou
rs%
Wg
tdH
ou
rs%
Wg
tdH
ou
rs%
Wg
td
Par
t.A
vgP
art.
Avg
Par
t.A
vgP
art.
Avg
Par
t.A
vgP
art.
Avg
Vic
e P
resi
dent
70.0
00
Prin
cipa
l Eng
inee
r70
.00
223
5.83
%4.
0812
21.4
3%15
.00
42.
20%
1.54
41.
54%
1.08
Sen
ior
Eng
inee
r II,
Pla
nner
II70
.00
140.
37%
0.26
127.
23%
5.06
233
.33%
23.3
3
Sen
ior
Eng
inee
r I,
Pla
nner
I
64.5
171
518
.69%
12.0
616
28.5
7%18
.43
2213
.25%
8.55
42.
20%
1.42
166.
15%
3.97
Pro
ject
Eng
inee
r II,
Pla
nner
II
60.4
750
1.31
%0.
79
Pro
ject
Eng
inee
r I,
Pla
nner
I52
.51
128
3.35
%1.
76
14
8.43
%4.
43
Eng
inee
r IV
, Pla
nner
IV
47.5
335
89.
36%
4.45
1832
.14%
15.2
820
12.0
5%5.
73
24
9.23
%4.
39
Eng
inee
r III
, Pla
nner
III
43.0
044
611
.66%
5.01
466
.67%
28.6
7
Eng
inee
r II,
Pla
nner
II, D
esig
ner
III38
.79
738
19.2
9%7.
488
14.2
9%5.
5436
21.6
9%8.
41
4
2.20
%0.
85
Eng
inee
r I,
Pla
nner
I, D
esig
ner
II30
.71
694
18.1
4%5.
57
62
37.3
5%11
.47
Sen
ior
Env
ironm
enta
l Spe
cial
ist
62.0
382
2.14
%1.
332
3.57
%2.
22
80
30.7
7%19
.09
Env
ironm
enta
l Spe
cial
ist I
I37
.71
501.
31%
0.49
5019
.23%
7.25
Env
ironm
enta
l Spe
cial
ist I
34.7
386
2.25
%0.
78
86
33.0
8%11
.49
Land
Acq
uisi
tion
Spe
cial
ist
42.1
30
Sur
vey
Man
ager
47.6
330
0.78
%0.
37
30
16.4
8%7.
85
Sur
vey
Par
ty C
hief
31.3
960
1.57
%0.
49
60
32.9
7%10
.35
Sur
veyo
r II
34.2
40
Sur
veyo
r I
28.9
020
0.52
%0.
15
20
10.9
9%3.
18
Sur
vey
Tec
hnic
ian
II24
.81
601.
57%
0.39
6032
.97%
8.18
Sur
vey
Tec
hnic
ian
I22
.83
0
Offi
ce A
dmin
istr
atio
n33
.37
0
Gra
phic
Des
igne
r27
.41
0
Adm
in A
ssis
tant
, Sec
reta
ry24
.69
721.
88%
0.46
TO
TA
LS
3,82
610
0%$4
5.92
5610
0.00
%$5
6.47
166
100%
$43.
656
100%
$52.
0018
210
0%$3
3.36
260
100%
$47.
26
05/2
7/20
TO
TA
LS
En
viro
n D
ata
Co
llect
/Inv/
Rev
Su
rvey
sG
eote
chn
ical
Stu
die
sD
ata
Co
llect
ion
/ Rev
iew
IDO
T/F
HW
A C
oo
rdin
atio
n
Attachment D-4 75
'
AV
ER
AG
E H
OU
RL
Y P
RO
JEC
T R
AT
ES
FIR
M:
Kn
igh
t E
/A, I
nc.
RO
UT
E:
Wal
ker
Ro
adD
AT
E:
PT
B:
N/A
SE
CT
ION
:T
BD
PR
IME
/SU
PP
LE
ME
NT
:P
rim
eS
HE
ET
2o
f4
Cla
ssif
icat
ion
Rat
eH
ou
rs%
Wg
tdH
ou
rs%
Wg
tdH
ou
rs%
Wg
tdH
ou
rs%
Wg
tdH
ou
rs%
Wg
tdH
ou
rs%
Wg
td
Par
t.A
vgP
art.
Avg
Par
t.A
vgP
art.
Avg
Par
t.A
vgP
art.
Avg
Vic
e P
resi
dent
70.0
0
Prin
cipa
l Eng
inee
r70
.00
122.
76%
1.94
605.
81%
4.07
22.
94%
2.06
105.
56%
3.89
125.
94%
4.16
Sen
ior
Eng
inee
r II,
Pla
nner
II70
.00
Sen
ior
Eng
inee
r I,
Pla
nner
I
64.5
140
9.22
%5.
9522
021
.32%
13.7
56
8.82
%5.
692
8.33
%5.
38
40
19.8
0%12
.77
Pro
ject
Eng
inee
r II,
Pla
nner
II
60.4
7
50
27.7
8%16
.80
Pro
ject
Eng
inee
r I,
Pla
nner
I52
.51
605.
81%
3.05
45.
88%
3.09
625
.00%
13.1
38
4.44
%2.
3314
6.93
%3.
64
Eng
inee
r IV
, Pla
nner
IV
47.5
384
19.3
5%9.
2092
8.91
%4.
24
24
11.8
8%5.
65
Eng
inee
r III
, Pla
nner
III
43.0
017
239
.63%
17.0
4
10
14.7
1%6.
3212
50.0
0%21
.50
7240
.00%
17.2
0
Eng
inee
r II,
Pla
nner
II, D
esig
ner
III38
.79
320
31.0
1%12
.03
4058
.82%
22.8
2
60
29.7
0%11
.52
Eng
inee
r I,
Pla
nner
I, D
esig
ner
II30
.71
126
29.0
3%8.
9228
027
.13%
8.33
68.
82%
2.71
416
.67%
5.12
4022
.22%
6.82
5225
.74%
7.91
Sen
ior
Env
ironm
enta
l Spe
cial
ist
62.0
3
Env
ironm
enta
l Spe
cial
ist I
I37
.71
Env
ironm
enta
l Spe
cial
ist I
34.7
3
Land
Acq
uisi
tion
Spe
cial
ist
42.1
3
Sur
vey
Man
ager
47.6
3
Sur
vey
Par
ty C
hief
31.3
9
Sur
veyo
r II
34.2
4
Sur
veyo
r I
28.9
0
Sur
vey
Tec
hnic
ian
II24
.81
Sur
vey
Tec
hnic
ian
I22
.83
Offi
ce A
dmin
istr
atio
n33
.37
Gra
phic
Des
igne
r27
.41
Adm
in A
ssis
tant
, Sec
reta
ry24
.69
TO
TA
LS
434
100%
$43.
041,
032
100%
$45.
4768
100%
$42.
6924
100%
$45.
1218
010
0%$4
7.04
202
100%
$45.
65
05/2
7/20
Inte
rsec
t D
esig
n S
tud
ies
Pu
blic
Invo
lvem
ent
Lo
cati
on
Dra
inag
e S
tud
yA
lt G
eom
etri
c S
tud
ies
Cra
sh A
nal
ysis
Tra
ffic
Mai
nte
nan
ce P
lan
Attachment D-5 76
'
AV
ER
AG
E H
OU
RL
Y P
RO
JEC
T R
AT
ES
FIR
M:
Kn
igh
t E
/A, I
nc.
RO
UT
E:
Wal
ker
Ro
adD
AT
E:
PT
B:
N/A
SE
CT
ION
:T
BD
PR
IME
/SU
PP
LE
ME
NT
:P
rim
eS
HE
ET
3o
f4
Cla
ssif
icat
ion
Rat
eH
ou
rs%
Wg
tdH
ou
rs%
Wg
tdH
ou
rs%
Wg
tdH
ou
rs%
Wg
tdH
ou
rs%
Wg
tdH
ou
rs%
Wg
td
Par
t.A
vgP
art.
Avg
Par
t.A
vgP
art.
Avg
Par
t.A
vgP
art.
Avg
Vic
e P
resi
dent
70.0
0
Prin
cipa
l Eng
inee
r70
.00
126.
00%
4.20
247.
74%
5.42
26.
67%
4.67
813
.33%
9.33
3025
.00%
17.5
06
2.40
%1.
68
Sen
ior
Eng
inee
r II,
Pla
nner
II70
.00
Sen
ior
Eng
inee
r I,
Pla
nner
I
64.5
140
20.0
0%12
.90
140
45.1
6%29
.13
1220
.00%
12.9
030
25.0
0%16
.13
4016
.00%
10.3
2
Pro
ject
Eng
inee
r II,
Pla
nner
II
60.4
7
Pro
ject
Eng
inee
r I,
Pla
nner
I52
.51
147.
00%
3.68
83.
20%
1.68
Eng
inee
r IV
, Pla
nner
IV
47.5
324
12.0
0%5.
70
36
14.4
0%6.
84
Eng
inee
r III
, Pla
nner
III
43.0
0
26
8.39
%3.
6128
93.3
3%40
.13
3050
.00%
21.5
030
25.0
0%10
.75
3614
.40%
6.19
Eng
inee
r II,
Pla
nner
II, D
esig
ner
III38
.79
6030
.00%
11.6
412
038
.71%
15.0
2
30
25.0
0%9.
7060
24.0
0%9.
31
Eng
inee
r I,
Pla
nner
I, D
esig
ner
II30
.71
5025
.00%
7.68
1016
.67%
5.12
6425
.60%
7.86
Sen
ior
Env
ironm
enta
l Spe
cial
ist
62.0
3
Env
ironm
enta
l Spe
cial
ist I
I37
.71
Env
ironm
enta
l Spe
cial
ist I
34.7
3
Land
Acq
uisi
tion
Spe
cial
ist
42.1
3
Sur
vey
Man
ager
47.6
3
Sur
vey
Par
ty C
hief
31.3
9
Sur
veyo
r II
34.2
4
Sur
veyo
r I
28.9
0
Sur
vey
Tec
hnic
ian
II24
.81
Sur
vey
Tec
hnic
ian
I22
.83
Offi
ce A
dmin
istr
atio
n33
.37
Gra
phic
Des
igne
r27
.41
Adm
in A
ssis
tant
, Sec
reta
ry24
.69
TO
TA
LS
200
100%
$45.
8031
010
0%$5
3.17
3010
0%$4
4.80
6010
0%$4
8.85
120
100%
$54.
0825
010
0%$4
3.89
05/2
7/20
Pro
ject
Dev
Rep
ort
(P
DR
)B
rid
ges
/ Str
uct
ure
sW
etla
nd
Imp
act
Eva
luat
ion
Sec
tio
n 4
(f)/
6(f
) E
valu
atio
nIC
C a
nd
Rai
lro
ad C
oo
rdL
igh
tin
g/ L
and
sc P
lan
nin
g
Attachment D-6 77
'
AV
ER
AG
E H
OU
RL
Y P
RO
JEC
T R
AT
ES
FIR
M:
Kn
igh
t E
/A, I
nc.
RO
UT
E:
Wal
ker
Ro
adD
AT
E:
PT
B:
N/A
SE
CT
ION
:T
BD
PR
IME
/SU
PP
LE
ME
NT
:P
rim
eS
HE
ET
4o
f4
Cla
ssif
icat
ion
Rat
eH
ou
rs%
Wg
tdH
ou
rs%
Wg
tdH
ou
rs%
Wg
tdH
ou
rs%
Wg
tdH
ou
rs%
Wg
tdH
ou
rs%
Wg
td
Par
t.A
vgP
art.
Avg
Par
t.A
vgP
art.
Avg
Par
t.A
vgP
art.
Avg
Vic
e P
resi
dent
70.0
0
Prin
cipa
l Eng
inee
r70
.00
1550
.00%
35.0
0
10
13.8
9%9.
72
Sen
ior
Eng
inee
r II,
Pla
nner
II70
.00
Sen
ior
Eng
inee
r I,
Pla
nner
I
64.5
115
50.0
0%32
.26
3625
.00%
16.1
336
50.0
0%32
.26
Pro
ject
Eng
inee
r II,
Pla
nner
II
60.4
7
Pro
ject
Eng
inee
r I,
Pla
nner
I52
.51
Eng
inee
r IV
, Pla
nner
IV
47.5
3
36
25.0
0%11
.88
Eng
inee
r III
, Pla
nner
III
43.0
0
26
36.1
1%15
.53
Eng
inee
r II,
Pla
nner
II, D
esig
ner
III38
.79
Eng
inee
r I,
Pla
nner
I, D
esig
ner
II30
.71
Sen
ior
Env
ironm
enta
l Spe
cial
ist
62.0
3
Env
ironm
enta
l Spe
cial
ist I
I37
.71
Env
ironm
enta
l Spe
cial
ist I
34.7
3
Land
Acq
uisi
tion
Spe
cial
ist
42.1
3
Sur
vey
Man
ager
47.6
3
Sur
vey
Par
ty C
hief
31.3
9
Sur
veyo
r II
34.2
4
Sur
veyo
r I
28.9
0
Sur
vey
Tec
hnic
ian
II24
.81
Sur
vey
Tec
hnic
ian
I22
.83
Offi
ce A
dmin
istr
atio
n33
.37
Gra
phic
Des
igne
r27
.41
Adm
in A
ssis
tant
, Sec
reta
ry24
.69
7250
.00%
12.3
5
TO
TA
LS
3010
0%$6
7.26
144
100%
$40.
3672
100%
$57.
510
0%$0
.00
00%
$0.0
00
0%$0
.00
05/2
7/20
Fin
anci
al/F
un
din
g S
trat
egie
sA
dm
in a
nd
Man
agem
ent
QA
/QC
Attachment D-7 78
COMPANY NAME:
PROJECT:
TODAY'S DATE:
ITEM ALLOWABLE UTILIZEW.O. ONLY
QUANTITYJ.S. ONLY
CONTRACT RATE
TOTAL
Per Diem (per GOVERNOR’S TRAVEL CONTROL BOARD)
Up to state rate maximum $0.00 $0.00
Lodging (per GOVERNOR’S TRAVEL CONTROL BOARD)
Actual cost (Up to state rate maximum) $0.00 $0.00
Lodging Taxes and Fees(per GOVERNOR’S TRAVEL CONTROL BOARD)
Actual cost $0.00 $0.00
Air FareCoach rate, actual cost, requires minimum two weeks' notice, with prior IDOT approval
$0.00 $0.00
Vehicle Mileage (per GOVERNOR’S TRAVEL CONTROL BOARD)
Up to state rate maximum 700 $0.580 $406.00
Vehicle Owned or Leased $32.50/half day (4 hours or less) or $65/full day 7 $65.00 $455.00
Vehicle Rental Actual cost (Up to $55/day) $0.00 $0.00
Tolls Actual cost $0.00 $0.00
Parking Actual cost $0.00 $0.00
Overtime Premium portion (Submit supporting documentation) $0.00 $0.00
Shift Differential Actual cost (Based on firm's policy) $0.00 $0.00
Overnight Delivery/Postage/Courier Service Actual cost $30.00 $0.00
Copies of Deliverables/Mylars (In-house) Actual cost (Submit supporting documentation) $0.00 $0.00
Copies of Deliverables/Mylars (Outside) Actual cost (Submit supporting documentation) $0.00 $0.00
Report Printing & Binding (Outside) Actual cost 940 $1.00 $940.00
Postage (First Class Mail) Actual cost 150 $0.55 $82.50
Project Specific Insurance (RR Protective Liability Insurance)
Actual cost $10,000.00 $0.00
Monuments (Permanent) Actual cost $0.00 $0.00
Photo Processing Actual cost $0.00 $0.00
2-Way Radio (Survey or Phase III Only) Actual cost $0.00 $0.00
Telephone Usage (Traffic System Monitoring Only) Actual cost $0.00 $0.00
CADD Actual cost (Max $15/hour) $0.00 $0.00
Web Site Actual cost (Submit supporting documentation) $0.00 $0.00
Advertisements Actual cost (Submit supporting documentation) 2 $350.00 $700.00
Public Meeting Facility Rental / Noise Forum Actual cost 1 $750.00 $750.00
Public Meeting Exhibits/Renderings & Equipment Actual cost 6 $25.00 $150.00
Recording Fees Actual cost $0.00 $0.00
Transcriptions (specific to project) Actual cost $0.00 $0.00
Courthouse Fees Actual cost $0.00 $0.00
Storm Sewer Cleaning and Televising Actual cost (Requires 2-3 quotes with IDOT approval) $0.00 $0.00
Traffic Control and Protection Actual cost (Requires 2-3 quotes with IDOT approval) $0.00 $0.00
Aerial Photography and Mapping Actual cost (Requires 2-3 quotes with IDOT approval) $0.00 $0.00
Utility Exploratory Trenching Actual cost (Requires 2-3 quotes with IDOT approval) $0.00 $0.00
Testing of Soil Samples* Actual cost $0.00 $0.00
Lab Services* Actual cost (Provide breakdown of each cost) $0.00 $0.00
Specialized Equipment Rental* / Noise Monitoring Actual cost $0.00 $0.00
Miovision Equipment & Processing Fee (per hour) Actual cost (Submit supporting documentation) 24 $20.00 $480.00
Title Commitments Actual cost (Submit supporting documentation) 1 $500.00 $500.00
RR ROE Permit Actual cost (Submit supporting documentation) 1 $1,000.00 $1,000.00
RR Flaggers Actual cost (Submit supporting documentation) 1 $500.00 $500.00
RR Protective Liability Insurance Actual cost (Submit supporting documentation) 1 $4,000.00 $4,000.00
$0.00 $0.00
TOTAL DIRECT COST $9,963.50
*If other allowable costs are needed and not listed, please add in the above spaces provided.
LEGEND
W.O. = Work Order
J.S. = Job Specific
Knight E/A, Inc.
Walker Road Extension, Lemont
5/27/2020
Direct Costs Check Sheet
PRINTED 5/27/2020 BDE 436 (Rev. 02/02/17)
Attachment D-8 79
418 Main Street | Lemont, IL 60439
TO: Village Board MeetingFROM: George Schafer, AdministrationTHROUGH:SUBJECT: A Resolution Authorizing Approval of a Consulting Agreement with Tai
Ginsberg & Associates, LLC for Federal Advocacy Services DATE: July 27, 2020 SUMMARY/BACKGROUNDRelated to the Walker Road and other large scale projects, the Village may find itadvantageous to engage a federal advocacy consultant to implement strategies and advocacyfor federal funding for larger capital projects. Attached is a proposal from a consultant thatcomes highly recommended from the Will County Governmental League and otherneighboring towns and agencies doing work with the firm. The Village has worked with theconsultant in the past and has been successful in securing federal funding for the Village. Itshould be noted that while this project will be a priority for the Village and the consultant, theVillage has many other larger projects that will require federal funding if the projects were tocome to fruition. Five projects would be highlighted for the term of the agreement for potentialfunding: Walker Road Extension and Grade Crossing Project; Bike Bridge over ChicagoSanitary & Ship Canal (Village currently working through Phase I Engineering); Water & SewerInfrastructure; I&M Canal Restoration; Additional Commuter Rail Service. The item wasdiscussed at the July 20th Committee of the Whole Meeting and the board was in favor ofmoving forward with the engagement.
ANALYSIS
Consistency with Village Policy2018 Strategic Plan
STAFF RECOMMENDATIONStaff recommends approval of Resolution and agreement
BOARD ACTION REQUESTEDMotion to Approve Resolution
ATTACHMENTSRES- Consulting Services TG&A.pdfTG&A letter of engagement - Village of Lemont, IL - FINAL.pdf
80
VILLAGE OF LEMONT
RESOLUTION NUMBER R-___-20
A RESOLUTION AUTHORIZING APPROVAL OF A CONSULTING AGREEMENT WITH TAI GINSBERG & ASSOCIATES, LLC FOR FEDERAL ADVOCACY
SERVICES
JOHN EGOFSKE, Village President CHARLENE M. SMOLLEN, Clerk
JANELLE KITTRIDGE
RYAN KWASNESKI DAVE MAHER
KEN MCCLAFFERTY RICK SNIEGOWSKI RON STAPLETON
Trustees
Published in pamphlet form by authority of the Village President and Board of Trustees of the Village of Lemont on __-__-2020
81
RESOLUTION NO. R-______-20
A RESOLUTION AUTHORIZING APPROVAL OF A CONSULTING AGREEMENT WITH TAI GINSBERG & ASSOCIATES, LLC FOR FEDERAL ADVOCACY
SERVICES
WHEREAS the Village of Lemont, Counties of Cook, Will and DuPage, Illinois, (“the Village”) is a municipality in the state of Illinois with full powers to enact ordinances and adopt resolutions for the benefit of the residents of the Village; and
WHEREAS the Village is desirous to enter into a Consulting Agreement with Tai Ginsberg & Associates, LLC for Federal Advocacy Services; and
WHEREAS the President and the Board of Trustees of the Village find that it is in the best interests of the Village to authorize the Consulting Agreement as further described in the attached Exhibit A (“Agreement”) with Tai Ginsberg & Associates, LLC;
NOW, THEREFORE, BE IT RESOLVED by the President and Board of Trustees of the Village of Lemont, Counties of Cook, Will and DuPage, Illinois, as follows:
SECTION 1: RECITALS.
That the above recitals and legislative findings are found to be true and correct and are hereby incorporated herein and made a part hereof as if fully set forth in their entirety.
SECTION 2:
Subject to attorney review, the Consulting Agreement with Tai Ginsberg & Associates, LLC is hereby approved and authorized in substantially the same form as Exhibit A attached hereto.
SECTION 3:
The Village President or his designee is hereby authorized to execute the Agreement in substantially the form attached hereto as Exhibit “A.”
SECTION 4: EFFECTIVE DATE.
This Resolution shall be in full force and effect from and after its passage, approval and publication in pamphlet form as provided by law.
82
ADOPTED this ____ day of _________, 2020.
PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF LEMONT, COUNTIES OF COOK, WILL, AND DUPAGE, ILLINOIS, ON THIS ______ DAY OF ___________________ 2020.
PRESIDENT AND VILLAGE BOARD MEMBERS:
AYES: NAYS: ABSENT: ABSTAIN: Janelle Kittridge
_________
_________
_________
_________
Ryan Kwasneski
_________
_________
_________
_________
Dave Maher
_________
_________
_________
_________
Ken McClafferty
_________
_________
_________
_________
Rick Sniegowski
_________
_________
_________
_________
Ron Stapleton
_________
_________
_________
_________
John Egofske, Village President Attest: Charlene M. Smollen, Village Clerk
83
EXHIBIT A
84
July 21, 2020
George Schafer
Village Administrator
Village of Lemont
418 Main Street
Lemont, IL 60439
RE: Proposal for Strategic Federal Advocacy Services
Dear Mr. Schafer:
This letter serves as a proposal and outlines the terms of agreement between Tai Ginsberg & Associates,
LLC (TG&A) and the Village of Lemont, IL (Lemont) to provide strategic consulting and federal
advocacy services.
1. BACKGROUND. The Village of Lemont, IL is embarking on an ambitious effort to transform
the Village’s economic development initiatives into reality and enhance and expand its
transportation and infrastructure. Lemont will also be pursuing projects to further develop water
infrastructure projects through the U.S. Army Corps of Engineers.
2. COMPANY. Focused on consulting services within the transportation & infrastructure sector
Tai Ginsberg & Associates, LLC (TG&A) provides a strong depth of knowledge ranging from
traditional issues concerning air, water, rail and surface transportation all the way to innovative
new transportation technologies and services that are rapidly developing. TG&A works with a
diverse set of clients in the private sector and has a deep understanding of the funding challenges
posed at all levels of government through its work with many public agencies.
Our service includes extensive work with the U.S. House of Representatives and U.S. Senate,
developing or modifying policies and programs to meet client objectives while building
relationships for our clients to leverage. We also provide assistance to clients with matters before
the U.S. Department of Transportation (DOT) and its modal agencies, and other relevant federal
agencies, such as the U.S. Army Corps of Engineers’ Chicago District Office and at its
Washington, DC headquarters. The firm is active in both the annual federal Energy and Water
appropriations and the annual U.S. Army Corps of Engineers work plan processes and the bi-
annual Water Resources Development Act (WRDA) process. These efforts have led to numerous
funding awards for our clients to pursue flood mitigation, environmental, and general water
infrastructure projects and increased awareness by federal decision-makers of the water and
infrastructure priorities of our clients. Furthermore, TG&A maintains strong relationships with stakeholders in the transportation industry and can provide a continuous liaison with other Washington, DC-based trade associations and companies.
85
3. SERVICES/PROPOSED SCOPE OF WORK. During the term of the agreement, TG&A will
provide strategic consulting and advocacy services to Lemont that includes the following
activities:
a. Federal Advocacy Services: TG&A will implement federal government relations outreach
and advocacy services to help the Village on federal and state grant and loan programs,
legislative, and other infrastructure-related matters. These would include but not be limited to
the U.S. Army Corps of Engineers, U.S. EPA (and IEPA), FEMA, U.S. Department of
Transportation, and U.S. Department of Commerce programs. In addition, TG&A will assist
the Village with both advocating for its priorities in Washington and assisting with rebranding
efforts locally. Projects that the Village has identified and seeks assistance will include:
• Restoration of the I&M Canal;
• Walker Road extension;
• Construction of a new bike bridge;
• Enhancement of Amtrak service; and
• Water system and sewer improvements.
b. Strategic Counsel: In general, TG&A will provide strategic counsel on overall governmental
and political trends with potential impacts to the Village.
4. TERM. This agreement will be effective on August 1, 2020, and will continue through July 31,
2021, unless terminated earlier in accordance with Section 11 or renewed under Section 5 below.
5. RENEWAL. Lemont may renew this Agreement for one additional year by providing written
notice of its intent to renew at least 30 days prior to the scheduled termination date. If the term of
this Agreement is renewed, the terms and conditions of this Agreement shall be the same as the
terms and conditions in effect immediately prior to such renewal except that TG&A may increase
its standard monthly retainer rate upon written notice to Lemont.
6. FEES AND EXPENSES. In consideration of the services to be provided under this Agreement,
Lemont shall pay a retainer of $6,500 per month plus expenses. Necessary expenses for travel,
printing, deliveries, and other incidental expenses will be billed at cost. Consulting fees and
expenses shall be billed monthly and shall be paid within 30 days from receipt of invoice.
7. CONFIDENTIALITY. If either party provides information or materials indicated to be
confidential, the receiving party will maintain the confidentiality of such matters and not disclose
any such matters except in the proper performance of this Agreement. The receiving party agrees:
(a) not to disclose or otherwise make available Confidential Information of the disclosing party to
any third party without the prior written consent of the disclosing party; provided, however, that
the receiving party may disclose the Confidential Information of the disclosing party to its officers,
employees, consultants, and legal advisors who have a “need to know”, who have been apprised
of this restriction, and who are themselves bound by nondisclosure obligations at least as restrictive
as those set forth in this Section; (b) to use the Confidential Information of the disclosing party
only for the purposes of performing its obligations under the Agreement or, in the case of Lemont,
to make use of TG&A services or deliverables; and (c) to promptly notify the disclosing party in
the event it becomes aware of any loss or disclosure of any of the Confidential Information of the
86
disclosing party. For the purposes of this Agreement, Confidential Information is defined as
information that is treated as confidential by a party, including but not limited to all non-public
information about its business affairs, products or services, intellectual property rights, trade
secrets, third-party confidential information, and other sensitive or proprietary information.
Confidential Information shall not include information that: (a) is already known to the receiving
party without restriction on use or disclosure prior to receipt of such information from the
disclosing party; (b) is or becomes generally known by the public other than by breach of this
Agreement by, or other wrongful act of, the receiving party; (c) is developed by the receiving party
independently of, and without reference to, any Confidential Information of the disclosing party;
or (d) is received by the receiving party from a third party who is not under any obligation to the
disclosing party to maintain the confidentiality of such information.
8. INDEMNIFICATION. Lemont shall defend, indemnify, and hold harmless TG&A and its
officers, directors, employees, agents, successors, and permitted assigns from and against all losses
arising out of or resulting from: (1) bodily injury, death of any person, or damage to real or
tangible, personal property resulting from the negligent or willful acts or omissions of Lemont and
(2) Lemont’s breach of any representation, warranty, or obligation of Lemont in this Agreement.
TG&A shall defend, indemnify, and hold harmless Lemont and its officers, directors, employees,
agents, successors, and permitted assigns from and against all losses arising out of or resulting
from: (1) bodily injury, death of any person, or damage to real or tangible, personal property
resulting from the negligent or willful acts or omissions of TG&A and (2) TG&A’s breach of any
representation, warranty, or obligation of TG&A in this Agreement.
9. COOPERATION. Lemont shall: (a) cooperate with TG&A in all matters relating to the provision
of services under this Agreement and appoint a Lemont employee to serve as the primary contact
with respect to this Agreement and who will have the authority to act on behalf of Lemont with
respect to matters pertaining to this Agreement; (b) provide such access to its premises and such
office accommodation and other facilities as may reasonably be required by TG&A for the
purposes of performing services under this Agreement; (c) respond promptly to any TG&A request
to provide direction, information, approvals, authorizations, or decisions that are reasonably
necessary for TG&A to perform services in accordance with the requirements of this Agreement;
(d) provide such materials and information as TG&A may request in order to carry out the services
under this Agreement; (e) ensure that all Lemont equipment is in good working order and suitable
for the purposes for which it is used and conforms to all relevant legal or industry standards; and
(f) obtain and maintain all necessary licenses and consents and comply with all applicable laws in
relation to the services to be performed under this Agreement. If TG&A’s performance of its
obligations under this Agreement is prevented or delayed by any act or omission of Lemont or its
agents, subcontractors, consultants, or employees, TG&A shall not be deemed in breach of its
obligations under this Agreement or otherwise liable for any costs, charges, or losses sustained or
incurred by Lemont, in each case, to the extent arising directly or indirectly from such prevention
or delay.
10. CHANGE ORDERS. If either party wishes to change the scope or performance of the services
under this Agreement, it shall submit details of the requested change to the other party in writing.
TG&A shall, within a reasonable time after receiving a Lemont-initiated request, or at the same
time that TG&A initiates such a request, provide a written estimate to Lemont of: (a) the likely
87
time required to implement the change; (b) any necessary variations to the fees and other charges
for the services arising from the change; (c) the likely effect of the change on the services; (d) any
other impact the change might have on the performance of this Agreement; and (e) any other
information reasonably requested by Lemont. Promptly after receipt of the written estimate, the
parties shall negotiate and agree in writing on the terms of such change.
11. TERMINATION. Either party may terminate this agreement for any reason upon 30 days written
notice to the other party. The monthly retainer shall be billed pro rata for any fractional month
remaining after notice is provided and payable within 30 days. This agreement may be extended
or amended by mutual agreement signed by both parties as set forth herein.
This agreement sets forth the entirety of the agreement between TG&A and Lemont as to the services to
be provided and compensation to be made during the term thereof. If Lemont is agreeable to the terms and
conditions set out above, please sign below. A fully executed agreement will be transmitted to you for
your records.
Jason Tai
Principal
Tai Ginsberg & Associates, LLC (TG&A)
George Schafer
Village Administrator
Village of Lemont
Date Date
88
ABOUT TG&A
Focused on government relations within the transportation sector, Tai Ginsberg & Associates, LLC
(TG&A) provides a strong depth of knowledge ranging from traditional issues concerning rail, aviation,
highways and transit all the way to innovative new transportation technologies and services that are
rapidly developing. TG&A works with a diverse set of clients in the private sector and has a deep
understanding of the challenges posed by constrained budgets at all levels of government through its
work with many public agencies.
Our service includes extensive work with the U.S. House of Representatives and U.S. Senate,
developing or modifying policies and programs to meet client objectives while building relationships for
our clients to leverage. We also provide assistance to clients with matters before the U.S. Department of
Transportation (DOT) and its modal agencies, and other relevant federal agencies. TG&A maintains
strong relationships with stakeholders in the transportation industry and can provide a continuous liaison
with other Washington DC‐based trade associations and companies. With our vast network and
successful track record acquiring federal discretionary grant funding, Congressionally‐designated
discretionary spending, and statutory formula programs on behalf of clients TG&A is an efficient
specialized firm with very broad application potential. Specifically, our portfolio in autonomous,
connected vehicle, and other transportation technologies has quickly expanded. The intersection of
transportation and innovative technology has been an ideal opportunity for TG&A to apply its
relationships and long history of legislative experience to an industry that is quickly evolving the
modern transportation landscape.
FIRM BIOS
Jason Tai, Principal
Jason has over 15 years of broad and substantive experience in federal and state government with an
expertise in transportation and infrastructure issues. He has proven successful in negotiating and
securing significant federal and state funding for a variety of critical projects and managed complex
governmental and political processes to achieve results. Prior to joining the private sector government
relations field, Jason served as Chief of Staff for Congressman Dan Lipinski (Illinois‐3rd) where he
oversaw and managed all policy, projects, communications, intergovernmental, and political issues.
Jason also spent time as a Professional Staff Member on the U.S. House Transportation & Infrastructure
Committee. Previously, he served as an appointed senior executive at the Illinois Department of
Transportation (IDOT) serving dual appointed positions as Director of Public and Intermodal
Transportation (DPIT) and Senior Policy Advisor to the Secretary, where he was responsible for a $548
million budget, which funded statewide transit and rail operating and capital needs. DPIT administered
federal and state funding for 52 transit agencies across Illinois. Prior to his IDOT stint, Jason was Chief
of Staff to former U.S. Congressman William O. Lipinski (Illinois‐3rd).
Matt Ginsberg, Principal
Matt has over 10 years of private sector lobbying experience including drafting and passing legislation,
performing business development services, coordinating lobbying strategies, securing federal funding,
and representing clients before Congress, executive branch agencies, and industry associations. Over the
course of his private sector tenure, he has successfully secured over hundreds of millions of dollars in
federal discretionary grants for his clients through direct advocacy and strategic technical assistance.
Previously, Matt worked for U.S. Representative Jared Polis (Colorado‐2nd), member of the powerful
House Rules Committee. He has experience working in both the U.S. Senate and U.S. House of
89
Representatives. Prior to his time in Washington DC, Matt worked for a political consulting firm in
Denver, Colorado helping to manage the media strategy for a major Presidential campaign.
Sean Winkler, Director
Sean has served in a variety of public‐facing roles on behalf of trade and membership organizations and
private businesses throughout his career. Prior to joining TG&A, he previously served as the Director of
Advocacy at the Railway Engineering‐Maintenance Suppliers Association (REMSA), where he built an
ambitious grassroots advocacy program that hosted nearly 40 Members of Congress for district events
highlighting railroad manufacturers across the United States. Most recently, he served as the Director of
Public Affairs and Advocacy at the Biophysical Society. Earlier in his career he managed Maryland
Delegate Jon Cardin’s (D‐11) Attorney General’s bid in 2014 and served in his legislative office in
Annapolis.
Gus Maples, Director
Gus Maples joined TG&A after completing five federal budget cycles as Professional Staff Member on
the U.S. Senate Committee on Appropriations, overseeing more than $50 billion in budgetary resources
and programs at the U.S. Department of Transportation. In this capacity he advised Transportation
Subcommittee Chairman Susan Collins (R‐ME) on policy and funding issues, departmental
rulemakings, and grant programs administered by agencies including the Federal Highway
Administration, Federal Motor Carrier Safety Administration, and National Highway Traffic Safety
Administration. He gained broad experience working with many Senate offices, on both sides of the
aisle, as well as participating in conference negotiations with the House of Representatives to enact
Appropriations bills. Before Senator Thad Cochran (R‐MS) hired Maples to the Appropriations
Committee staff, he worked at the Student Veterans of America organization.
Jeff Bell, Sr. Policy Advisor
Jeffrey B. Bell is a Senior Policy Advisor for TG&A. Mr. Bell is a seasoned multi‐modal transportation
policy professional with nearly 33 years of experience accrued with the Illinois Department of
Transportation (IDOT). Mr. Bell completed his career at IDOT as Bureau Chief of Federal Affairs in the
Office of Legislative Affairs. During his career, Mr. Bell developed transportation policy for the
consideration of nine IDOT Secretaries across the modes of highways/highway safety, public
transportation, passenger/freight rail, aviation, and waterways.
90
418 Main Street | Lemont, IL 60439
TO: Village Board MeetingFROM: George Schafer, AdministrationTHROUGH:SUBJECT: Resolution of the Village of Lemont, Cook, Will and DuPage Counties,
Illinois, Inducing Certain Expenditures of Redevelopment Project Costs inConnection with the Redevelopment of the Proposed Walker RoadRedevelopment Project Area to be Reimbursed from Proceeds of theWalker Road Special Tax Allocation Fund
DATE: July 27, 2020 SUMMARY/BACKGROUNDRelated to the Walker Road extension project engineering agreement presented earlier on theagenda, the Village may in the future wish to reimburse those costs to itself in the event a taxincrement financing district is established in the future for the area. There were preliminarystudies conducted on the area around Walker Road last year and early results indicated a TIFDistrict could be appropriate for the area, if the Village chose to move forward with thatprocess at some point. The inducement ordinance would provide for an avenue to have thosecosts reimbursed as well as any other cost (construction, engineering, etc) associated with theproject.
ANALYSIS
Consistency with Village Policy2018 Strategic Plan
STAFF RECOMMENDATIONStaff recommends approval of resolution.
BOARD ACTION REQUESTEDMotion to approve Resolution
ATTACHMENTSResolution No. ___ Walker Road TIF Improvements.pdf
91
RESOLUTION NO. _______
RESOLUTION OF THE VILLAGE OF LEMONT, COOK, WILL
AND DUPAGE COUNTIES, ILLINOIS, INDUCING CERTAIN
EXPENDITURES OF REDEVELOPMENT PROJECT COSTS IN
CONNECTION WITH THE REDEVELOPMENT OF THE
PROPOSED WALKER ROAD REDEVELOPMENT PROJECT
AREA TO BE REIMBURSED FROM PROCEEDS OF THE
WALKER ROAD SPECIAL TAX ALLOCATION FUND
WHEREAS, the Village of Lemont, Cook, Will, and DuPage Counties, Illinois (the
“Village”), is reviewing the designation of an area located between the Illinois & Michigan
Canal and Main Street lying east and west of Walker Road as a “redevelopment project area”
pursuant to the Tax Increment Allocation Redevelopment Act (65 ILCS 5/11-74.4-1, et seq.) (the
“TIF Act”);
WHEREAS, the development of the Project Area is vital to the economic well-being of
the Village;
WHEREAS, the Village shall undertake the necessary actions mandated by the TIF Act
to determine if the Project Area qualifies for designation as a redevelopment project area, as
defined in the TIF Act;
WHEREAS, contingent upon the creation of the “Walker Road Redevelopment Project
Area” (the “Project Area”), the Village proposes to make capital expenditures involving the
acquisition of properties within the Project Area, the construction of public roadways and
utilities, including the Walker Road Extension and Grade Crossing Project, and the development
of commercial and industrial businesses therein (the “Project”);
WHEREAS, the Village shall proceed with the Project and incur costs and make
expenditures of approximately $10,000,000 (the “Expenditures”) that qualify as redevelopment
project costs under the TIF Act before the Village can formally create the Walker Road
Redevelopment Project Area, and the Village will proceed to do so in reliance upon the prospect
of reimbursement as provided herein;
WHEREAS, the Village has determined that it would not reasonably expect to proceed
with the Project unless the Village would reimburse itself for the Expenditures through tax
increment allocation financing under the TIF Act;
WHEREAS, the Village desires such Expenditures to qualify for consideration as
Redevelopment Project Costs so that they can be reimbursed from proceeds of the tax increment
generated within the Project Area;
WHEREAS, the Village reasonably expects to reimburse itself for the Expenditures by
issuing “pay-as-you-go” tax increment finance notes or other debt instruments secured by the tax
increment and other revenues generated within the Project Area (the “Obligations”); and
92
2
WHEREAS, this Resolution is intended to induce the Village to incur the Expenditures
so that they may be considered redevelopment project costs under the TIF Act, even though they
will be incurred before the Village passes those ordinances necessary under the TIF Act to create
the Walker Road Redevelopment Project Area and tax increment financing, subject to the
conditions as hereinafter set forth in the Resolution.
NOW, THEREFORE BE IT RESOLVED, by the President and Board of Trustees of the
Village of Lemont, Cook, Will, and DuPage Counties, Illinois, as follows:
Section 1. Recitals. The recitals set forth in the above prefatory clauses are hereby
adopted as the findings of the Village of Lemont and are expressly incorporated herein as a part
of this resolution.
Section 2. Reimbursement. The Village may be reimbursed from proceeds of the
tax increment generated within the Project Area, or Obligations issued in relation thereto, for
advanced funds related to Expenditures provided: (a) the Village creates the Walker Road
Redevelopment Project Area; (b) the Project is in compliance with and in furtherance of the
redevelopment plan and project for the Walker Road Redevelopment Project Area; and (c) such
expenditures are allowable under the TIF Act and Illinois law.
Section 3. Reliance. To the fullest extent permitted by law, the Village is entitled to
rely on this Resolution as a commitment of Village to: (a) diligently pursue the creation of the
Walker Road Redevelopment Project Area and to enact the necessary ordinances if the Project
Area qualifies for designation as such under the TIF Act, and (b) if the Walker Road
Redevelopment Project Area is created, to provide for the reimbursement of the Expenditures
from the Walker Road Special Tax Allocation Fund.
Section 4. Declaration of Official Intent. To the extent the Village issues tax
exempt obligations the proceeds of which are to be allocated to the Project, this Resolution shall
constitute the Village’s “official intent” pursuant to Section 1.150-2 of U.S. Treasury regulations
for the use of the proceeds for reimbursement of such expenses and costs.
Section 5. Authorization. All actions of the officers, agents and employees of the
Village that are in conformity with the purpose and intent of this Resolution, whether taken
before or after the adoption of this Resolution, are ratified, confirmed and approved.
Section 6. Severability. If any section, paragraph, clause, or provision of this
Resolution shall be held invalid, the invalidity thereof shall not affect any of the other provisions
of this Resolution.
Section 7. Repealer. All ordinances, resolutions, motions or orders in conflict with
this Resolution are hereby repealed to the extent of such conflict.
Section 8. Effective Date. This Resolution shall be in full force and effect following
its adoption and approval as provided by law.
93
3
ADOPTED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES
OF THE VILLAGE OF LEMONT, COUNTIES OF COOK, WILL, AND DUPAGE, ILLINOIS,
ON THIS 27th DAY OF JULY, 2020.
PRESIDENT AND VILLAGE BOARD MEMBERS:
AYES: NAYS: ABSENT: ABSTAIN:
Janelle Kittridge
_________
_________
_________
_________
Ryan Kwasneski
_________
_________
_________
_________
Dave Maher
_________
_________
_________
_________
Ken McClafferty
_________
_________
_________
_________
Rick Sniegowski
_________
_________
_________
_________
Ron Stapleton
_________
_________
_________
_________
Approved:
John Egofske, Village President
Attest:
Charlene M. Smollen, Village Clerk
94
418 Main Street | Lemont, IL 60439
TO: Village Board MeetingFROM: Chris Smith, FinanceTHROUGH: George Schafer, Village AdministratorSUBJECT: A Resolution Creating An Intergovernmental Agreement Between the
Village of Lemont and DuPage County for Reimbursement of EligibleCOVID-19 Expenses
DATE: July 27, 2020 SUMMARY/BACKGROUNDOn July 14th, The DuPage County Board approved an Intergovernmental Agreement to allowmunicipalities to submit for reimbursement of COVID 19 related expenses. The County isasking the Village Board to approve this agreement. Once this is approved the Village willreceive a per capita share for the Lemont residents living in DuPage County. In August, staff will present another agreement from Cook County pertaining to reimbursableexpenses.
ANALYSIS
Consistency with Village PolicyOther Subheadings, as applicable. Please Specify in Analysis Field.
STAFF RECOMMENDATIONPass the resolution authorizing the agreement to be executed
BOARD ACTION REQUESTEDPass the resolution authorizing the agreement to be executed
ATTACHMENTSdupage county agreement.pdfdupage county resolution and agreeement.pdf
95
VILLAGE OF LEMONT
RESOLUTION NUMBER R-___-20
A RESOLUTION CREATING AN INTERGOVERNMENTAL
AGREEMENT BETWEEN VILLAGE OF LEMONT AND
DUPAGECOUNTY FOR REIMBURSEMENT OF ELIGIBLE COVID-19
EXPENSES
JOHN EGOFSKE, Village President
CHARLENE M. SMOLLEN, Clerk
JANELLE KITTRIDGE
RYAN KWASNESKI
DAVE MAHER
KEN MCCLAFFERTY
RICK SNIEGOWSKI
RON STAPLETON
Trustees
Published in pamphlet form by authority of the Village President and Board of Trustees of the Village of Lemont on July -27-2020
96
97
RESOLUTION NO. ____________
A RESOLUTION CREATING AN INTERGOVERNMENTAL
AGREEMENT BETWEEN VILLAGE OF LEMONT AND
DUPAGECOUNTY FOR REIMBURSEMENT OF ELIGIBLE COVID-19
EXPENSES
WHEREAS, the Village of Lemont ("Village") is an Illinois Municipal Corporation
pursuant to the Illinois Constitution of 1970 and the Statutes of the State of Illinois; and
WHEREAS, Article 7, Section 10 of the Illinois Constitution of 1971 and Illinois
Intergovernmental Cooperation Act 5 ILCS 220/1 et seq. allow units of public entities to enter into
intergovernmental agreements in the furtherance of their governmental purposes; and
WHEREAS, DuPage County enacted Resolution F1-R-0420-20 to provide funding under
the CARES ACT to municipalities;
WHEREAS, the President and Village Board seek to sign the Intergovernmental
Agreement for Participation in DuPage County local government COVID-19 reimbursement
program;
BE IT RESOLVED by the Village President and Board of Trustees of the Village of
Lemont, Counties of Cook, Will and DuPage, Illinois, as follows:
SECTION ONE: The Village President is hereby directed and authorized to execute the
referenced Agreement with DuPage County.
SECTION TWO: This Resolution shall be in full force and effect from and after its
passage and approval as provided by law.
ADOPTED this 22ND day of July, 2020.
98
2
PASSED AND APPROVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF
THE VILLAGE OF LEMONT, COUNTIES OF COOK, WILL, AND DUPAGE, ILLINOIS, ON
THIS 22nd DAY OF JULY 2020.
PRESIDENT AND VILLAGE BOARD MEMBERS:
AYES: NAYS: ABSENT: ABSTAIN:
Janelle Kittridge
_________
_________
_________
_________
Ryan Kwasneski
_________
_________
_________
_________
Dave Maher
_________
_________
_________
_________
Ken McClafferty
_________
_________
_________
_________
Rick Sniegowski
_________
_________
_________
_________
Ron Stapleton
_________
_________
_________
_________
John Egofske, Village President
Attest:
Charlene M. Smollen, Village Clerk
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113