Ronald B. Clary Vice President New Nuclear Deployment A SCANA COMPANY August 25, 2010 NND-10-0317 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 ATTN: Document Control Desk Subject: Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 Combined License Application (COLA) - Docket Numbers 52-027 and 52-028 Endorsement of Vogtle R-COLA Standard Content Submittals Reference: Letter from Southern Nuclear Company (SNC) to the Nuclear Regulatory Commission (NRC) Summary Identification of Reference Combined License Application Standard Content Submittals, dated August 23, 2010. The enclosed table (Attachment 1) provides the South Carolina Electric & Gas Company (SCE&G) response to the SNC's table of standard content provided to the NRC in a letter dated August 23, 2010. Under the column "S-COLA Endorsement", each open item response provided by SNC is classified as applicable or not applicable to the Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 COLA. Should you have any questions, please contact Mr. Alfred M. Paglia by telephone at (803) 345-4191, or by email at [email protected]. I declare under penalty of perjury that the foregoing is true and correct. Executed on this 25 day of -'t-'" ,2010. Sincerely, Ronald B. Clary Vice President New Nuclear Deployment JMG/RBC/jg Enclosure SCE&G I New Nuclear Deployment Post Office Box 88 MC P-40 Jenkinsville, South Carolina * 29065 www.sceg.com

Upload: others

Post on 13-Jan-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Virgil C. Summer, Units 2 and 3 Combined License Application - … · 2012-12-03 · Ronald B. Clary Vice President New Nuclear Deployment A SCANA COMPANY August 25, 2010 NND-10-0317

Ronald B. ClaryVice President

New Nuclear Deployment

A SCANA COMPANY August 25, 2010NND-10-0317

U.S. Nuclear Regulatory CommissionDocument Control DeskWashington, DC 20555

ATTN: Document Control Desk

Subject: Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 CombinedLicense Application (COLA) - Docket Numbers 52-027 and 52-028Endorsement of Vogtle R-COLA Standard Content Submittals

Reference: Letter from Southern Nuclear Company (SNC) to the Nuclear RegulatoryCommission (NRC) Summary Identification of Reference CombinedLicense Application Standard Content Submittals, dated August 23,2010.

The enclosed table (Attachment 1) provides the South Carolina Electric & GasCompany (SCE&G) response to the SNC's table of standard content provided to theNRC in a letter dated August 23, 2010. Under the column "S-COLA Endorsement",each open item response provided by SNC is classified as applicable or not applicableto the Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3 COLA.

Should you have any questions, please contact Mr. Alfred M. Paglia by telephone at(803) 345-4191, or by email at [email protected].

I declare under penalty of perjury that the foregoing is true and correct.

Executed on this 25 day of -'t-'" ,2010.

Sincerely,

Ronald B. ClaryVice PresidentNew Nuclear Deployment

JMG/RBC/jg

Enclosure

SCE&G I New Nuclear Deployment Post Office Box 88 MC P-40 • Jenkinsville, South Carolina * 29065 • www.sceg.com

Page 2: Virgil C. Summer, Units 2 and 3 Combined License Application - … · 2012-12-03 · Ronald B. Clary Vice President New Nuclear Deployment A SCANA COMPANY August 25, 2010 NND-10-0317

Document Control DeskPage 2 of 2NND-10-0317

c (with attachment):Luis A. ReyesJoseph M. SebroskyJohn ZeilerStephen A. ByrneJeffrey B. ArchieRonald B. ClaryBill McCallWilliam M. CherryAlvis J. BynumKathryn M. SuttonAmy M. MonroeDaniel PattonJoel HjelsethFrederick P. HughesWilliam E. HutchinsWilliam A. Fox, IIIGrayson YoungVCSummer2&3ProiectMail @ Shawqrp.comvcsummer2&3proiect @ westinqhouse.comDCRM-EDMS @ SCANA.COM

Page 3: Virgil C. Summer, Units 2 and 3 Combined License Application - … · 2012-12-03 · Ronald B. Clary Vice President New Nuclear Deployment A SCANA COMPANY August 25, 2010 NND-10-0317

Attachment 1

AP1000 S-COLA (SCE&G) Endorsement

of

SNC R-COLA Standard Content Submittals

Note: The attached document is 5 pages in length

Page 4: Virgil C. Summer, Units 2 and 3 Combined License Application - … · 2012-12-03 · Ronald B. Clary Vice President New Nuclear Deployment A SCANA COMPANY August 25, 2010 NND-10-0317

8/24/2010 AP1000 R-COLA (VEGP) SUPPLEMENTAL EVALUATION of SUBMITTALS for STANDARD APPLICABILITY Page 1 of 5

RAI/OI ID# ERAI/OI # RAI/Ol Topic/Subject Date Submitted RAI/DI Ltr # Utility Specific Official NRC RAI/Ol # S-COLA Endorsement3602 3381 Maximum Differential Settlement Between the NI and Other Structures 3/2/2010 045 Southern 02.05.04-5 N/A4132 4645 CIB1- Squib valve surveillances 5/27/2010 056 Standard 03.09.06-01 Yes3601 3380 Maximum Differential Settlement Between Buildings " . 3/2/2010 046 Southern 03.12-01 N/A4131 4642 EMB1- Surge line monitoring test abstract 7/2/2010 057 Standard 03.12-02 Yes4038 4281 Control Room Habitability System - Confirmatory Analysis 3/5/2010 048 Southern 06.04-02 . N/A4039 4281 Control Room Habitability System - ALOHA and TOXDISP Methodologies 3/5/2010 048 Southern 06.04-03 N/A

Requirements of 10 CFR 50.65 with respect to maintenance of onsite and offsite power2705 1596 system components, 4/28/2010 0251 S- Southern 08.02-02 VR N/A

Section 8.2.1.4 of the FSAR discusses maintenance, testing, and calibration practices that4135 1596 SCT follows 4/28/2010 025 S1 Southern 08.02-07 VR N/A3992 4067 . Offsite Power ,,, 1/7/2010 044 . Southern.. 08.02-13 . N/A4093 4525 EEB- Offsite Power 5/6/2010 053 Standard 08.02-14 Yes

-- N/A.4061* 4497 Waste water retention basin request to update the FSAR . 4/15/2010 050 Standard* 09.03.03-1.> - See SCE&G Letter NND-10-01474057 1211 Offsite communications - verbal request to update the FSAR/EP 3/15/2010 005S2 Southern 09.05.02-3 N/A4033 1748 Construction worker dose . 1/29/2010 021S2 Southern 12.03-12.04-1 VR . N/A4214 1748 Construction worker dose 11/20/2009 02151 Southern 12.03-12.04-1 VR N/A4034 1751 Construction worker dose 1/29/2010 021S2 Southern 12.03-12.04-2 VR N/A4215 1751 Construction worker dose 11/20/2009 021 Si Southern 12.03-12.04-2 VR N/A4114 2087 Emergency Action Levels (EALs) " 4/28/2010 029 S2 Southern 13.03-03 VR N/A4147 3384 Vehicle Search Process 5/21/2010 041S2 Southern 13.06-06 S1 VR N/A4134 3403 S1 Vital Area Locations - . . 5/21/2010 041S1 . Southern 13.06-19 S1 VR- N/A3710 3682 Describe Cyber Security Team Qualifications 11/20/2009 043 Standard 13.06-21 See SCE&G Letter NND-10-02233712 3682 Describe how Critical Digital Assets are identified .. 1. 11/20/2009 043 - Standard 13.06-22 See SCE&G Letter NND-10-0223

Describe how all cyber security controls in RG 5.71, Appendices B & C are addressed and3713 3682 applied 11/20/2009 043 Standard 13.06-23 See SCE&G Letter NND-10-0223

Document commitment to having sufficient documentation available for review upon. .3714 3682 inspection " . :.- - 11/20/2009. 043 . Standard 13.06-24 .-. . - See SCE&G Letter NND-10-02233715 3682 Describe how Cyber Security Program will be maintained 11/20/2009 043 Standard 13.06-25 See SCE&G Letter NND-10-02233717 3682. Security Controls ' . .. . 11/20/2009 043 . Standard. 13.06-26 , . ' See SCE&G Letter NND-10-02234043 4140 PESB Diesel and Associated Secondary Power Supply Equipment Rooms 3/5/2010 047 Southern 13.06-27 N/A4044 4140 Level of Detail for PSP figures . . . - . 3/5/2010 047 Southern 13.06-28' N/A4045 4140 Security measures for ground level doors 3/5/2010 047 Southern 13.06-29 N/A4046 4140 'Involvementofoffsite agencies with drills and exercises conducted - . 3/5/2010 047 Southern 13.06-30 N/A4047 4140 Incorporation of 1994 VBS for Units 3 & 4 Protected Area 3/5/2010 047 Southern 13.06-31 N/A4148 4140 Incorporation of 1994 VBS for Units 3 & 4 Protected Area . . 5/28/2010 04751 , Southern 13.06-31 Si N/A4048 4140 Use of Delay Fence 3/5/2010 047 Southern 13.06-32 N/A4053 4213 FFD Program during Construction to comply with NEI 06-06 3/5/2010 049 Southern 13.06-33 N/A4054 4214 FFD During Construction Program - site-specific information 3/5/2010 049 Standard 13.06-34 See SCE&G Letter NND-10-0082

FFD Program for Construction - Conformance between FSAR T13.4-201 and License4055 4216 Conditions - " 3/5/2010 049 " Standard 13.06-35 . See SCE&G Letter NND-10-0082

FFD Program for Construction - Conformance between FSAR T13.4-201 and License4157 4216 Conditions 6/22/2010 049 S1 Standard 13.06-35 S1 See SCE&G Letter NND-10-02404103 4587 Describe how requirements of 10 CFR 73.58, Safety Security Interface will be met . , .5/14/2010 055 Standard 13.06-36 See SCE&G Letter NND-10-01804078 4466 Defensive Model - Location of CDAs 4/16/2010 051 Standard 13.06.06-01 See SCE&G Letter NND-10-02234079 4466 ., Defensive Model - bidirectional communications between Level 2 and Level 3 . 4/16/2010 0 051 • _ _ _____ ___-._ _"_ Standard !13.06.06-02 See SCE&G Letter NND-10-02234080 4466 Implementation of security controls - use of "commensurate" 4/16/2010 051 Standard 13.06.06-03 See SCE&G Letter NND-10-02234151 4466 Cyber Security Controls - Mitigation vice elimination . . 6/14/2010 051S1I Standard 13.06.06-03, - See SCE&G Letter NND-10-02234081 4466 Defensive model criteria 4/16/2010 051 Standard 13.06.06-04 See SCE&G Letter NND-10-02234082 4466 - Accesscontrols - . . . - 4/16/2010 051 'Standard ' 13.06.06-05 S See SCE&G Letter NND-10-02234083 4466 Clarification ["address" vs. "apply"] 4/16/2010 051 Standard 13.06.06-06 See SCE&G Letter NND-10-02234084 4466 Program review . " . 4/16/2010 051 Standard 13.06.06-07 See SCE&G Letter NND-10-02234085 4466 Definition of CDA 4/16/2010 051 Standard 13.06.06-08 See SCE&G Letter NND-10-02234086 4466 Definition of CS " - " 4/16/2010 051 _._ o , - __ • Standard . 13.06.06-09 See SCE&G Letter NND-10-02234153 4466 Cyber Security Plan - Licensing Basis use for Scoping 6/14/2010 051 S1 Standard 13.06.06-09 See SCE&G Letter NND-10-02234087 4466 Consistency . , . , . 4/16/2010 051 Standard 13.06.06-10 - See SCE&G Letter NND-10-02234088 4466 Support systems 4/16/2010 051 Standard 13.06.06-11 See SCE&G Letter NND-10-0223

4154 4466 Cyber Security Plan - Use of Licensing Basis for systems "associated with" SSEP functions 6/14/2010 051"51 Standard 13.06.06-11 - See SCE&G Letter NND-10-02234089 4466 Hardening 4/16/2010 051 Standard 13.06.06-12 See SCE&G Letter NND-10-02234090 4466 Mitigation versus Prevention - 4/16/2010 051 Standard 13.06.06-13 See SCE&G Letter NND-10-02234155 4466 Cyber Security Plan - "Mitigation" 6/14/2010 051 S1 Standard 13.06.06-13 See SCE&G Letter NND-10-02234091 4466 Known vulnerability 4/16/2010 051 . Standard 13.06.06-14 . See SCE&G Letter NND-10-02234141 4716 CQVP - 1&3 plant only testing LC 6/181/2010 058 Standard 14.02-01 Yes4140 4717 CQVP- SUTLicense Conditions 6/18/2010 1 059 1Standard 14.02-02 Yes

Page 5: Virgil C. Summer, Units 2 and 3 Combined License Application - … · 2012-12-03 · Ronald B. Clary Vice President New Nuclear Deployment A SCANA COMPANY August 25, 2010 NND-10-0317

8/24/2010 AP1000 R-COLA (VEGP) SUPPLEMENTAL EVALUATION of SUBMITTALS for STANDARD APPLICABILITY Page 2 of 5

RAI/Ol D EAI/O RAI/OI Topic/Subject Date Submitted RAI/OI Ltr # Utility Specific Official NRC RAI/Ol # S-COLA Endorsement4050 4141 Physical Security ITAAC - Cross-reference with SRP 14.3.12 App. A and AP1000 DCD 3/5/2010 047 Standard 14.03.12-01 See SCE&G Letter NND-10-0106

-4133 4141S1i : Physical Securitly TAACc-Confoirmace with SRP 14 3 12 Draft Revision - - . 6/11/2010 - 047S2. - -Starndard .. 14.0312-01S1 .. See SCE&G Letter NND- 1O-02364051 4141 Physical Security ITAAC - Cross-reference between SRP 14.3.12 App. A and DCD 3/5/2010 047 Standard 14.03.12-02 See SCE&G Letter NND-10-0106

.4052 , . 4141 PhysicalsecurityiTAAC Cross-reference between SRP 14.3.12 and DCD ITAAC - 3/5/2010 047 S - , . standard* . 14.03.12-03 See SCE&G Letter NND-10-01063765 3409 General - Site drawing/map showing areas referenced in response 10/29/2009 042 Southern 19-010 N/A3855 3512 . DemonstrateAdceq~ateSeisn--iMargin , .. 10/30/2009 040 . Standard - 19010 : SeeSCE&G LetteroNND-09-0318,3766 3409 General - Descriptions of staging areas and equipment locations in procedures 10/29/2009 042 Standard 19-011 See SCE&G Letter NND-09-03183767 - 3409 - General -- Cool tower basin functi-n. -.-- - .- 1 - -. 10/29/2009 1 042; 1 -Southern .. -"19-012 - - N/A.4002 3409 General - Cooling tower basin functions 12/23/2009 042 S2 Southern 19-012 N/A

- 3768 j- " 3409 _ General- Identify Alternate WaterSources - ---. 10/29/2009. 042 .' - . - :. - - -Standard 1 19-013 - . See SCE&G Letter NNPD09-0318,3769 3409 General - Capability of FPS to Meet Competing Demands 10/29/2009 042 Standard 19-014 See SCE&G Letter NND-09-0318

ý3770 .-. 3409 - General - Evaluation of strategies and procedures in relation to safety and security .- 10/29/2009 J0-42 - .-. . . .Standard 1-~19-015 - ; -See SCE& G Letter NND-09-03 18

4003 3409 General - Evaluation of strategies and procedures in relation to safety and security 12/23/2009 042 52 Standard 19-015 See SCE&G Letter NND-10-00733771 '.. " 3409 -. Shutdown Mode Considerations . - , - , . - . 11/13/2009 - -. 042SI 51- - ,- I Standard i9'016S see SCE&G LetterNND-09-03184026 3409 Shutdown Mode Considerations 2/5/2010 042 S3 Standard 19-016 VR See SCE&G Letter NND-10-00733772, .- 3409- . Labeling/Tagging LDLAEquipment- . ,o - • 10/29/2009- 042 . .Standard . 19-017 . See'SCE&G Letter NND-09-0318;•4004 3409 Labeling/Tagging LOLA Equipment 12/23/2009 042S2 Standard 19-017 ISee SCE&G Letter NND-10-0073

.3773 3409 C•iscussion ofiSimple Modifications to Implement/ai LDLAStrategies -11/3/2009 042 S2i - ' <'Standard 1. i9-018. . . See'SCE&G Letter NND-09-03183774 3409 COLA Markup to Depict Design Features of Mitigation Strategies 11/13/2009 042 51 Standard 19-019 See SCE&G Letter NND-09-0318- :3775t. " 3409 - Commitment to Walk ThiroughRProcedures andcTrain Responsible Individuals ; - - 10/29/2009 - 042- . . . . . . .Standard - 19-020- . See SCE&G Letter NND,09-0318 -3776 3409 Assurance that Critical SSCs will Survive LOLA Event 10/29/2009 042 Standard 19-021 See SCE&G Letter NND-09-03184005 . _ 3409 Assurance that Critical SSCs will Survive LOLA Event 12/23/2009 042S2 2., Standard, . 19-021 .- ' See SCE&G Letter NND-10-00733777 3409 Differentiate Between "Commitments" and "Strategies" in the MST 10/29/2009 042 Standard 19-022 See SCE&G Letter NND-09-03183778 3409 ! Fire ProtfectionRing1Header Feeds 11/13/2009 042-S1. aubn S d _023- See SCE&G Letter NND09-03183779 3409 Communication Enhancements for Robust Buildings 10/29/2009 042 Standard 19-024 See SCE&G Letter NND-09-03183780 -, , 3409 !Seoaratio6 of.Fire Water Pumps . , i . . - . .. i 11/13/2009 04251" - ' -2 Standard. 1 19-025 S___ ,_ ee SCE&G LetterNND=09:0318,'4006 3409 ISeparation of Fire Water Pumps 12/23/2009 042 52 Standard 19-025 See SCE&G Letter NND-10-0073

,3781 3409 Clarif if FPS Isolation Valves are External PIVs 11/13/2009 04251 Standard . , 19-026 . See SCE&G Letter NNO-09-0318,4007 3409 Clarify if FPS Isolation Valves are External PIVs 12/23/2009 042 S2 Standard 19-026 See SCE&G Letter NND-10-0073

3782 3409 . Pump redundancy clarifications re:blackout conditions and physical hookups to FPS ,[ 11/13/2009 042S1 Standard 19-027 Se SCE&G Letter NND-09-0318,3783 3409 Fire Water Storage Tank Refill Capabilities 11/13/2009 042 Si Standard 19-028 See SCE&G Letter NND-09-03184008" ' - 3409 . Fire Water Storage Tank Refi Capabilities 12/23/2009- 012S2 'Standard 19-028. --,----- I See SCE&G Lette•r NND-•10-00733784 3409 Fire Protection System Management 10/29/2009 042 Southern 19-029 N/A3785 . 3409 SFP Mitigation Strategies Using a Portable Pump -. ' . - . 10/29/2009 , 042 119.Standard 19-030 '• . See SCE&G Letter NND-09-03183786 3409 SFP Makeup from Cask Washdown Pit 11/13/2009 042 51 Standard 19-031 See SCE&G Letter NND-09-03183787 - ,,-3409 - SFP Makeup from PCCWST- 11/13/2009 042S1 Standard 19-032 See SCE&G Letter NND-09-03183788 3409 SFP Makeup Through the PCCS 11/13/2009 042 S1 Standard 19-033 See SCE&G Letter NND-09-03184009 -340 SFP MakeupThrou-gh thePCCS -12/23/2009 042 S2 -, Standard 19-033 I See SC•& Lsetter NND-09-0318,3789 3409 SFP Makeup from Fire Ring Header or Yard Hydrants 11/13/2009 042 S1 Standard 19-034 See SCE&G Letter NND-09-03183790 3409,. Locations of SFPPenetrations for Make-Up and Spray 11/13/09 1042 Si1 StandardseesCE&GetteNND09-03183792 3409 PWR Design Considerations for Site Response Strategies 10/29/2009 042 Standard 19-037 See SCE&G Letter NND-09-03183793 3409 Clarificati0ns Regarding Phase 3 Mitigative Strategies :1 - - 10/29/2009 !042 . - Standard 19-038 !- , 5e SCE&G Letter NND-09-0318'4010 3409 Clarifications Regarding Phase 3 Mitigative Strategies 12/23/2009 042 S2 Standard 19-038 See SCE&G Letter NND-10-00733794, 3409 Portable Spray Clarifcatins 1/3/2009 042 S1 Standard 19-039 CE&GLtter NND- 09-03184011 3409 Portable Spray Clarifications 12/23/2009 i042 S2 Standard 19-039 See SCE&G Letter NND-10-00733795 : 3409-:- Additional Details Re' RCS Make-Up - K ,. '.- 11/13/2009 .042 Si - - - Standard- 19-040 S1 See SCE&G Letter NND-09-03183796 3409 Additional Details Re: Safety Injection 11/13/2009 042 S1 Standard 19-041 See SCE&G Letter NND-09-03183797 , 3409 -Additional Details Re: DecayHeat Removal .11/13/2009 i042 S1, . - Standard - 19-042- ' . seeSCE&GeLetterNND09.03183798 3409 Additional Details Re: Containment Cooling 11/13/2009 042 S1 Standard 19-043 See SCE&G Letter NND-09-0318

,3799 - 3409 Additional Details Re: Containment Isolation , - - -. 11/13/2009; -042 S1 Standard 1 19-044 ' See SCE&G Letter NNDi09-03184027 3409 Additional Details Re: Containment Isolation 2/5/2010 042 S3 Standard 19-044 Vt See SCE&G Letter NND-10-0073

.- -. : : . ,- MST, Phase 1, Item I -Fire Fighting Response Strategy -Fire Brigade Target and Staging - -. . . , -" , - . .3800 : 3409 !Areas .0-- 142 N ' ..'Southern ' - 19-045- --- N -

MST, Phase 1, Item 1 - Fire Fighting Response Strategy - Fire Brigade Target and Staging4012 3409 Areas 12/23/2009 042 52 Southern 19-045 N/A

. ' .P -F -". B Report L t 1 04 Sou.er 19-04l

4013 3409 MST, Phase 1, Item 1 - Fire Fighting Response Strategy - Fire Brigade Report Locations 12/23/2009 042S2 Southern 19-046 N/A

4013802 . 3409 MT PhaseItem1FireFightingResponseStrategy-FireBrigade ReportL12/ 2009-" 042'-s S2 - PSouthernr-cdural 19-046-e n fN/A Fire

382 - 3409 trgdDipra - - ----- Strteg -~Poeua~Rqieet o Fire 10/29/2009 -- 042 '--. - - - Southern - - 19047 --- N/

Page 6: Virgil C. Summer, Units 2 and 3 Combined License Application - … · 2012-12-03 · Ronald B. Clary Vice President New Nuclear Deployment A SCANA COMPANY August 25, 2010 NND-10-0317

8/24/2010 AP1000 R-COLA (VEGP) SUPPLEMENTAL EVALUATION of SUBMITT'ALS for STANDARD APPLICABILITY Page 3 of 5

RAI/Ol ID# ERAI/Ol # RAI/Ol Topic/Subject Date Submitted RAI/Ol Ltr I Utility Specific Official NRC RAI/Ol # S-COLA EndorsementMST, Phase 1, Item 2 - Fire Fighting Response Strategy - Procedural Requirements for Fire

4014 3409 Brigade Dispersal 12/23/2009 042 S2 Southern 19-047 N/A3803 3409 MST, Phase 1, Item 3 - Fire Fighting Response Strategy- Airlifted Resources 10/29/2009 042 'Southern 19-048 N/A

MST, Phase 1, Item 4 - Fire Fighting Response Strategy - Technical Direction to Offsite3804 3409 Responders 10/29/2009 042 Southern 19-G49 N/A

MST, Phase 1, Item 5 - Fire Fighting Response Strategy . Agreement for use of.Outside3805 3409 Organizations with Specific Knowledge or Abilities for LOLA Response - - . 10/29/2009 042 Southern 19-050 N/A

MST, Phase 1, Item 6 - Fire Fighting Response Strategy - Identification and Acquisition of3806 3409 Equipment Needed to Fight Large Fires 10/29/2009 042 Southern 19-051 N/A

MST, Phase 1, Item 7 - Fire Fighting Response Strategy - Appropriate Locations for Pre-3807 3409 Staging On-Site Fire Fighting Equipment 10/29/2009 042 Southern 19-052 N/A

MST, Phase 1, Item 8 - Fire Fighting Response Strategy - Coordination with Local Fire3808 3409 Departments and Other Regional Fire Fighting Aid 10/29/2009 042 Southern 19-053 N/A

MST, Phase 1, Item 9 - Fire Fighting Response Strategy - Staging Areas fornEmergency3809 3409 Response Vehicles 10/29/2009 042 .Southern 19-054 - N/A

MST, Phase 1, Item 10 - Fire Fighting Response Strategy - Communication Enhancements3810 3409 Related to Radios 10/29/2009 042 Southern 19-055 N/A

MST, Phase 1, Item 11 - Fire Fighting Response Strategy - Triage Areas for-Treatment of3811 3409 Mass Casualties 10/29/2009 042 Southern 19-056 N/A "

MST, Phase 1, Item 11 - Fire Fighting Response Strategy - Triage Areas for Treatment of4015 3409 Mass Casualties 12/23/2009 042 12 Southern 19-056 N/A3812 3R 10/29/2009 042 Southern 19-057 -.i N/A4016 3409 MST, Phase 1, Item 12 - Fire Fighting Response Strategy - Plant Personnel Assembly Areas 12/23/2009 042

4016 3409 MST, Phase 1, Item 12 - Fire Fighting Response Strategy - Plant Personnel Assembly Areas 12/23/2009 _042 S2 Southern 19-057 N/A

-3813 3409 MST, Phase 1, Item 13 - Fire Fighting Response Strategy -,Fire Brigade Training .10/29/2009 042 Southern 19-058 - " N/A3814 3409 Protocols and Procedures to Mobilize Additional Organizations 10/29/2009 042 Southern 19-059 N/A'3815 3409 Requirements for N~cessary Equipment in MOUs - 10/29/2009' 042 Southern - 19-060- K N/A o .3816 3409 Anti-Radiation Shields/Blankets for Fire Fighters 10/29/2009 042 Southern 19-061 N/A

Actions to Minimize Releases, Phase 1, Item 3- Dose Rates inPRA Used in Prolection r --- -: •3817 3409 Models X. -11/13/2009 - 042S1 Standard .. 19-062 'See SCE&G Letter NND-09-0318

MST, Phase 1, Item 1 - Plant Operations to Mitigate Fuel Damage - Pre-Defined Positioning3818 3409 and Dispersal of Personnel 10/29/2009 042 Southern 19-063 N/A

MST, Phase 1, Item 1 - Plant Operations~to Mitigate Fuel Damage - Pre-Defined Positioning -4017 3409 and Dispersal of Personnel ' , 12/23/2009 042S2 Southern 19-063 ,- 1 ,N/A

MST, Phase 1, Item 2 - Plant Operations to Mitigate Fuel Damage - Communications3819 3409 Capabilities 10/29/2009 042 Southern 19-064 N/A

MST, Phase 1, Item 2 - Plant Operations to Mitigate Fuel Damage - Communications-4018 3409 Capabilities .. "-K- 12/23/2009 042 12 Southern 19-064 N N/A

MST, Phase 1, Item 8 - Plant Operations to Mitigate Fuel Damage - Plant Area3820 3409 Compartmentalization 11/13/2009 042 S1 Standard 19-065 See SCE&G Letter NND-09-0318

MST, Phase 1, Item 8- Plant Operations to Mitigate Fuel Damage- Plant Area- - -

4028 3409 Compartmentaization 2/5/2010 042 S3 Standard 19-065 VR See SCE&G Letter NND-10-0073MST, Phase 1, Item 6 - Plant Operations to Mitigate Fuel Damage - Equipment

3821 3409 Requirements Related to LOLA Compensatory Functions 11/13/2009 042 S1 Standard 19-066 See SCE&G Letter NND-09-0318MST, Phase 1, Item 7 - Plant Operations to Mitigate Fuel Damage -Mitigation Equipment " I

3822 3409 Requirements Related to Loss of Both AC and DC Power - - - - - 11/13/2009 042 S1 Standard- 19-067.- " - See SCE&G Letter NND-09-0318MST, Phase 1, Item 9 - Plant Operations to Mitigate Fuel Damage - Equipment Survivability

3823 3409 in Plant Areas Affected by Fire or Explosion 11/13/2009 042 S1 Standard 19-068 See SCE&G Letter NND-09-0318MST, Phase 1, Item 13 - Plant Operations to Mitigate Fuel Damage.- SFP Loss of Inventory - - -

3824 3409 and Spent Fuel Loading Patterns. - - - - 11/13/2009 "042S1 SStandard 19-069 See SCE&G Letter NND-09-0318MST, Phase 1, Item 13 - Plant Operations to Mitigate Fuel Damage - SFP Loss of Inventory

4029 3409 and Spent Fuel Loading Patterns 2/5/2010 042 13 Standard 19-069 VR See SCE&G Letter NND-10-0073MST, Phase 1, Item 14 - Plant Operations to Mitigate Fuel Damage' Training of Emergency , - .--

3825 3409 Response Organization (ERO) Personnel and Potential Responders 10/29/2009 - 042 Southern 19-070-- - -- N/A,3826 3409 MST, Phase 2, Item 4 - Onsite Resources to Reduce or Stop SFP Leakage 10/29/2009 042 Southern 19-071 N/A3827 3409 SFP Fuel Rack Design Improvements - - - - - 11/13/2009 0 042 S1 - Standard 19-072 - See SCE&G Letter NND-09-03184030 3409 SFP Fuel Rack Design Improvements 2/5/2010 042 13 Standard 19-072 VR See SCE&G Letter NND-10-00733829 3409 Plans for Post-LOLA Restoration of Communications - - 10/29/2009 042 Standard 19-074'- - - See SCE&G Letter NND-09-03183830 3409 Command and Control Structure if Control Staff is Substantially Affected 10/29/2009 042 Standard 19-075 See SCE&G Letter NND-09-03184019 3409 Command and Control Structure if Control Staff is Substantially Affected - - - 12/23/2009 04212 .Standard 19-075 " - - - "- See SCE&GLetter NND-O-00733831 3409 Offsite Notifications and ERO Callout if Control Room is Lost 10/29/2009 042 Standard 19-076 See SCE&G Letter NND-09-03183832 3409 Initial Damage Assessment by ERO 0- - - - 10/29/2009 -)42 Standard 19-077 .. K - See SCE&G Letter NND-09-03184020 3409 Initial Damage Assessment by ERO 12/23/2009 042 12 Standard 19-077 See SCE&G Letter NND-10-0073

3833 - 3409 -MST, Phase 3, Item 1 - Boundary Conditions for Development of EDMGS: - - .0/29/2009, -- 42 ..... Standard - -- 19-078 ] - - See SCE&G Letter NND-09-0318

Page 7: Virgil C. Summer, Units 2 and 3 Combined License Application - … · 2012-12-03 · Ronald B. Clary Vice President New Nuclear Deployment A SCANA COMPANY August 25, 2010 NND-10-0317

8/24/2010 AP100O R-COLA (VEGP) SUPPLEMENTAL EVALUATION of SUBMITTALS for STANDARD APPLICABILITY Page 4 of 5

RAI/Ol ID# ERAI/Ol # RAI/Ol Topic/Subject Date Submitted RAI/Ol Ltr 8 Utility Specific Official NRC RAI/Ol I S-COLA EndorsementMST, Phase 3, Item 8 - Use of Portable Sprays to Provide Additional Capabilities to Scrub

3834 3409 Fission Product Release and Charge the FPS Fire Header 11/13/2009 042 $1 Standard 19-079 See SCE&G Letter NND-09-0318MST, Phase 3, Item 8 - Use of Portable Sprays to Provide Additional Capabilities to Scrub

4021 3409 Fission Product Release and Charge the FPS Fire Header , ,12/23/2009 042 S2 Standard 19-079 See SCE&G Letter NND-10-007319-81: Clearly define Phase 2 pathways for Internal makeup, external makeup, and

4062 4459 external spray strategies 5/5/2010 052 Standard 19-081 See SCE&G Letter NND-10-0275Clarify the response to RAI 19-81iren Defining the Phase 2 pathways for Internal Makeup, - " -. '

4142 4459 External Makeup, and External Spray strategies 5 .•/28/2010. - 05251 -- Standard 1 1 V SCE& Letter NND-10-0275'4063 4459 19-82: Assure that power supplies for equipment needed for Phase 2 are "diverse" 5/5/2010 052 Standard 19-082 See SCE&G Letter NND-10-0275

19-83: Describe personnel actions needed to makeup to or spray the Spent Fuel Pool . ' - , .4064 4459 under Phase 2 - -' ' -, 5/5/2010 052 . . , . Standard 19-083 See SCE&G Letter NND052-02754065 4459 19-84: Provide Phase 2 injection and spray flow path flow rates 5/5/2010 052 Standard 19-084 See SCE&G Letter NND-10-02754066 4459 19-85: Explain how an effective spray pattern for the Spent Fuel Poolwill be assured5 "/5/2010 052 ,. , Standard 19-085 See SCE&G Letter NND-10-0275

4067 4459 19-86: State the applicant will have a means to secure flexible hoses 5/5/2010 052 Standard 19-086 See SCE&G Letter NND-10-027519-87: Address how the aircraft impact assessment affected mitigation of loss of large . " ",,

4068 4459 areas of the plant - . 5/5/2010 052 - Standard 19-087 See SCE&G Letter NND-10-02754069 4459 19-88: List additional site-specific Spent Fuel Pool strategies 5/5/2010 052 Standard 19-088 See SCE&G Letter NND-10-0275

19-89: Address how engineering basis for 10 CFR 50.54(hh)(2) is to be documented and.4070 4459 available for audit . - . 5/5/2010 052 Southern 19-089 See SCE&G Letter NND-10-0275

19-90: Confirm that plant will have adequate length and diameter hose to perform certain4071 4459 strategies 5/5/2010 052 Standard 19-090 See SCE&G Letter NND-10-0275

19-91: Update Mitigative Strategies Tableto differentiate between commitments and4072 4459 strategies 5/5/2010 052 Southern 19-091 See SCE&G Letter NND-10-0275

Clarifications re: Updated Mitigative Strategies Table to differentiate between4144 4459 commitments and strategies 5/28/2010 052 51 Southern 19-091 51 VR See SCE&G Letter NND-10-0275

4073 4459 19-92: Address guidance on how to choose which of the Phase 2 external strategies to use 5/5/2010 052 Standard 19-092 See SCE&G Letter NND-10-0275

4074 4459 19-93: Spatial separation of Spent Fuel Pool headers 5/5/2010 052 Standard 19-093 See SCE&G Letter NND-10-02754145 4459 Clarification re: Spatial Separation of Spent Fuel Pool Spray Headers 5/28/2010 05251 - Standard 19-093 S1 VR4077 4459 19-96: Describe the normal makeup flow path to the Spent Fuel Pool 5/5/2010 052 Standard 19-094 See SCE&G Letter NND-10-0275

Provide a draft license condition in Chapter 13" ofthe FSAR on schedules for4104 4543 implementation of programs related to 10 CFR S0.S4(hh)(2) and 10 CFR 52.80(d). 5/24/2010 054 . Standard 19-095 See SCE&G Letter NND-10-02754105 4543 Provide a draft commitment to follow NEI 99-04, Rev. 0. 5/24/2010 054 Standard 19-096 See SCE&G Letter NND-10-02754107 . 4543 Discuss maintenance program and controls for equipment credited under (hh)(2) - 5/24/2010 054 ' . Standard 19-098 See SCE&G Letter NND-10-0275

Supplement i to RAI 19-40 - Address spatial separation of CVS and CMTs inside or outside4109 4543 containment used to provide RCS makeup 5/24/2010 054 Standard 19-099 See SCE&G Letter NND-10-0275

Supplement I to RAI19-41 - Address common equipment and spatial separation issues for4110 4543 safety injection key safetyfunction - 5/24/2010 054 - Standard 19-100. See SCE&G Letter NND-10-0275-4149 4543 Identify spatial separation criteria for key safety functions 6/4/2010 05451 Standard 19-100 Si See SCE&G Letter NND-10-0275

Supplement 2 to'RAI 19-44 - Clarification of adequate spatial separation of dc power for,4111 4543 containment isolation S e °5/24/2010r054r- - --Standard; 19-101 . See SCE&G Letter NND-10-0275

Supplement i to RAI 19-67 - Develop procedures to start a DG without dc power and4112 4543 discuss capability of use of a pumper truck to inject to the core. 5/24/2010 054 Standard 19-102 See SCE&G Letter NND-10-0275

Supplement 1 to RAI 19-20 - Modify commitment to include an engineering evaluation or•- . N/A - SCE&G to provide plant4113 4543 demonstration that hoses and electrical equipment cars be hooked up as assumed. 5/24/2010 054 . . Standard 19-103 - specific response at a later date4097 4337 CIB1 - Coatings 6/17/2010 VEGP-VOL-ChO6 re BLN-170 Southern BLN 06.01.02-02 N/A4136 3590 SPCV - CR Habitability training " ' .' 6/17/2010 VEGP-VOL-Ch06 re BLN-168° Southern BLN 06.04-07 N/A4096 4184 SPCV - CR Habitability evaluations 6/17/2010 VEGP-VOL-ChO6 re BLN-169 Southern BLN 06.04-08 N/A4035 66 CQVP-0QAPD 1/29/2010 VEGP-VL-Ch7. . Standard BLN 17.05-09 VR N/A - previously incorporated4094 66 CQVP- QAPD 4/2/2010 VEGP-VOL-Chl7 Standard BLN 17.05-09 VR2 See SCE&G Letter NND-10-01434023 3849 FG 1.133 C.6 Exception Conf Item 1/8/2010 COL-SER-01-CH04 Conf - " - Standard" Cl 04.04-01 See SCE&G Letter NND-10-0132

Summarize NRC clarifications to Cyber Security Plan expectations from January 14, 20104213 n/a meeting. 1/22/2010 n/a Standard n/a See SCE&G Letter NND-10-02233910 2566 Parts 30/40/70 - . 7/9/2010 COL-SER-Ol-ChOl S2, Standard 010o.05-01 Yes3948 569 Pipe rupture analyses 3/18/2010 COL-SER-0I-ChO3 S4 Standard 0103.06-01 Yes4099 569 Pipe rupture analyses . 4/23/2010 COL-SER-OI-ChO3 S6 - " . Standard 0103.06-01 VR Yes3950 110 Valve testing 3/1/2010 COL-SER-0O-ChO3 S3 Standard 0103.09-02 Yes4115 110 Vlae testing 5/14/2010 COL-SER-01-ChO3 S7' Standard 0103.09-02 VR Yes3951 110 Valve testing 3/1/2010 COL-SER-0l-ChO3 53 Standard 0103.09-03 Yes4116 110 Valve testing 5/14/2010 COL-SER-OI-Ch03 S7, . Standard 0103.09-03 VR . Yes3952 110 Valve testing 12/14/2009 COL-SER-OI-ChO3 Southern 0103.09-04 N/A4058 110 Valve testing 3/1/2010 COL-SER-0-ChO3 S3 1 . Standard 0103.09-04 VR Yes3953 110 Valve testing 1/12/2010 COL-SER-0I-ChO3 S1 Standard 0103.09-05 Yes

Page 8: Virgil C. Summer, Units 2 and 3 Combined License Application - … · 2012-12-03 · Ronald B. Clary Vice President New Nuclear Deployment A SCANA COMPANY August 25, 2010 NND-10-0317

8/24/2010 AP1000 R-COLA (VEGP) SUPPLEMENTAL EVALUATION of SUBMITTALS for STANDARD APPLICABILITY Page 5 of 5

RAI/Ol ID# ERAI/Ol # RAI/Ol Topic/Subject Date Submitted RAI/Ol Ltr # Utility Specific Official NRC RAI/Ol # S-COLA Endorsement3954 110 ST related Tech Specs 12/14/2009 COL-SER-0-ChO3 Southern 0103.09-06 N/A3955 653 Seismic and dynamic qualification 2/5/2010 COL-SER-0O-ChO3 S2 Standard 0103.10-01 Yes4095 . 653 Seismic and dynamic qualification 4/2/2010 COL-SER-0O-ChO3 S5 Standard 0103.10-01 VR Yes3976 3829 Metamic monitoring program 12/30/2009 COL-SER-0O-Ch09 Standard 0109.01-01 Yes4102 3829 Metamic monitoring program 4/23/2010 COL-SER-0I-Ch09 51 Standard 0109.01-01, -Yes3977 290 LLHS inspection implementation 12/30/2009 COL-SER-0I-Ch09 Standard 0109.01-02 Yes3978 291 OHLHS program implementation ., 12/30/2009 COL-SER-0O-ChO9 Standard 0109.01-03 Yes3979 291 OHLHS inspection implementation 12/30/2009 COL-SER-Ol-ChO9 Standard 0109.01-04 Yes3981 4109 0112.03-01 completion - . . . 12/30/2009 COL-SER-01-Ch09 Standard 0109.02-02 Yes

3961 3951 Calorimetric uncertainty COL item 1/22/2010 COL-SER-0O-Ch15 Standard 01 15.00-01 Yes4036 3951 Calorimetric uncertainty COL item - followup to WtC Revised Response - - 5/21/2010 COL-SER-Ol-Ch15 S1 Standard 0115.00-01 Yes3963 3952 GL85-05 1/22/2010 COL-SER-0O-Ch15 Standard 0115.04-01 Yes3920 1450 TS- setpoint methodology and program . 3/1/2010 COL-SER-01-Ch16 S1 Standard 01 16.01-01 See SCE&G Letter NND-10-02964092 1450 TS- setpoint methodology and program 5/21/2010 COL-SER-0O-Ch16 S2 Standard 0116.01-01 See SCE&G Letter NND-10-02963921 1425 CIA- NEI 06-14 - RG 1.33L- 12/31/2009 COL-SER-Ol-Chl7 S1 Standard 0117.01-01 See SCE&G Letter NND-10-01433922 0066 17.5-05 QA- NEI 06-14 - Regulation citation 12/31/2009 COL-SER-0I-Ch17 S1 Standard 0117.05-01 See SCE&G Letter NND-10-01433923 0066 17.5-06 GA- NEI 06-14 - IRC per ANSI N18.7 12/31/2009 COL-SER-0O-Chl7 S1 Standard 0117.05-02 . iSee SCE&G Letter NND-10-01433924 0066 17.5-07 QA- NEI 06-14 - ID licensee 12/31/2009 COL-SER-0O-Chl7 S1 Standard 0117.05-03 See SCE&G Letter NND-10-01433925 0137 17.5-13 CA- NEI 06-14 - CG calibration services . 12/31/2009 COL-SER-0l-Chl7 S1 Standard 01"17.05-04 - See SCE&G Letter NND-10-01433926 0137 17.5-14 QA- NEI 06-14 - CG dedication 12/31/2009 COL-SER-0O-Ch17 S1 Standard 0117.05-05 See SCE&G Letter NND-10-01434169 4943 Site parameters 7/1/2010 VEGP-VOL-Ch02 re site parameters Standard ... VEGP02.00VR'. SEE SCE&G Letter NNDO10-02604168 4940 Waterproofing 7/1/2010 VEGP-VOL-ChO2 re waterproofing Standard VEGP 02.05 VR See SCE&G Letter NND-10-02614158 ASCE 7 . 6/18/2010 VEGP-VOL-ChO3 ASCE Southern-. VEGP 03.03 VR " N/A4137 Service Level II Coatings 5/24/2010 VEGP-VOL-ChO6 Coatings Standard VEGP 06.01 VR Yes4163 Service Level 11 Coatings . ". 7/2/2010 VEGP-VOL-Ch06 Coatings " Standard VEGP 06.01vR2 Yes

4101 4935 SPCV - Setpoint calculation 6/4/2010 VEGP-VOL-ChO7 Standard VEGP 07.01 VR See SCE&G Letter NND-10-03014100 SPCV - Systems Required for Safe Shutdown •- - 6/4/2010 VEGP-VOL-ChO7 . .•,Standard 'VEGP 07.05 VR . . SeeSCE&G Letter NND-10-03014160 SPCV - Systems Required for Safe Shutdown 7/6/2010 VEGP-VOL-ChO7 S1 Standard VEGP 07.05 VR See SCE&G Letter NND-10-03014138 IBR of EP 5/27/2010 VEGP-VOL-Chl3 Standard- '" VEGP13.03 VR , See SCE&G Letter NND-10-0306

Revise Table 13.04-201 to identify milestone for CSP as "Prior to receipt of fuel onsite4218 4466 (Protected Area)" 4/16/2010 051 Standard VEGP 13.04 Yes4037 Cyber Security Plan revision to RG 5.71 with deviations 2/19/2010`- VEGP-VOL-CSP-571. Southern VEGP 13.06yR - N/A "4139 IBR of PSP 5/27/2010 VEGP-VOL-Ch13 Standard VEGP 13.06 VR See SCE&G Letter NND-10-03064159 TSC Tier 2 ." . - . - 7/9/2010 VEGP-VOL-Ch18 TSC • Southern' VEGP 18.08 VR - N/A . -

Correct frequency for cyber security assessments from bi-annual to at least every 244219 4466 months 4/16/2010 051 Standard VEGP CSP1 See SCE&G Letter NND-10-0223

Editorial correction to CSP Att. A, Deviation Table, to correctly repeat the existing text from4220 4466 RG 5.71. . - . 4/16/2010 051 Standard VEGP CSP2 - - See SCE&G Letter NND-10-02234221 4466 Revise Proposed License Condition 5 to include the Cyber Security Plan 4/16/2010 051 Standard VEGP LC#5 See SCE&G Letter NND-10-0223

4222 4543 Clarify minimum thickness of concrete between spent fuel pool and outside wall" 5/24/2010 054 Standard VEGP LOLAI " See SCE&G Letter NND-10-0275

4223 4543 Clarify which spray headers are supplied by the independently-powered portable pump 5/24/2010 054 Standard VEGP LOLA2 See SCE&G Letter NND-10-0275Revise MST Section 7.0 to clarify the susceptibility to damage associated with passive plant

4224 4543 features " . 5/24/2010 054 Standard VEGP LOLA3 See4SCE&G Letter NND-10-0275Revise MST Section 7.8 to clarify the design basis refill capacity of the fire water storage

4225 4543 tanks 5/24/2010 054 Standard VEGP LOLA4 See SCE&G Letter NND-10-02754216 LWA Supporting ER info - • 2/5/2010 VEGP-VOL-PtO6 Southern VEGP LWA VR , N/A4217 LWA Supporting ER info 3/11/2010 VEGP-VOL-PtO6 Southern VEGP LWA VR N/A

Notes4061 This response contained both Standard and plant-specific content. The need to include line item 9.8 in the site interfaces table is STANDARD.

3625 / 3529 Correction to 2009-11-20 listing. The * Note attached to RAI/Ol ID# 3625 was actually a * Note for RAI/Ol ID# 3529. The two items should have read 3625 and 3529".