virginia initiative treatment plant service
TRANSCRIPT
0 5,500 11,000 16,500 22,0002,750Feet
VP019000VP018500
VP018500
VP018400
VP018304
VP018302
VP018200
VP018000
VP015400VP015320
VP014800 VP014700
VP014010
VP014020
VP017120VP016500
VP018305
VP016700
VP018200
VP010920 VP017110
VP018900
ÜCIP Location
Service Area
Legend
Treatment Plant Projects
Virginia Initiative Treatment Plant ServiceArea CIP Projects
GN016390GN016391GN016392VP018800
VP019100VP019200
_ CIP PumpStation Point
±
± CIP Interceptor LineCIP Abandonment
CIP Interceptor Point_̂
HRSD Interceptor Force MainHRSD Interceptor Gravity Main
3Q HRSD Treatment Plant
3SRP HRSD Pressure Reducing Station
3PS HRSD Pump Station
Treatment Plant Service Area
Virginia InitiativeTreatment Plant3Q±
VP01
0920
VP016500
CHES
APEA
KE BLV
D
CROMWELL DR
CROMWELL RDCHESAPEAKE BLVD
LYON
S AV
E
KANSAS AVE
ILLINOIS AVE
UPSHUR ST
MONTANA AVE
HENRICO ST
ARIZONA AVE
NOTTAWAY ST
COUNTY ST
FLAN
DERS
AVE
LAFAYETTE BLVD
MARN
E AV
E
VP010920Norview Estabrook Division I 18-Inch Force Main ReplacementPhase II, Section 2
CIP Location
Norfolk
Legend
HRSD Interceptor Force MainHRSD Interceptor Gravity Main
3Q HRSD Treatment Plant
3SRP HRSD Pressure Reducing Station
3PS HRSD Pump Station
VP010920
/0 180 360 540 72090
Feet
Project Area
±
± Project Interceptor Line!]̂ Project Interceptor Point!]̂ Project Pump Station Point
CIP Project Area
_̂ CIP Interceptor Point_ CIP Pump Station Point
CIP Abandonment
±
± CIP Interceptor Line
Norview Estabrook Division I 18-Inch Force Main Replacement Phase II, Section 2
PR_VP010920
System: VIPType: Pipelines
Driver Category: I&I Abatement-Rehabilitation PlanProject Phase: PERRegulatory: Rehab Plan Phase Two
PROGRAM CASH FLOW PROJECTION ($,000)
Prog CostExp to
Previous Year FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31
$3,153 $110 $165 $974 $1,428 $476 $0 $0 $0 $0 $0 $0
PROJECT DESCRIPTION
This project is to rehabilitate and/or replace a portion of SF-066 Norview-Estabrook Division I 18-Inch Force Main. The project extents are approximately 900 linear feet (LF) of 18-inch force main that stretches between Cromwell Drive and Robin Hood Road along Chesapeake Boulevard. One railroad crossing, under multiple Norfolk Southern tracks, is required.
PROJECT JUSTIFICATION
The pipe material and age are similar to other portions of the interceptor system in which HRSD has experienced multiple failures due to the tendency of cast iron to lose integrity with age. Construction activity for the new City lines also presents a significant risk to HRSD pipe lead joints, which are very sensitive to vibration. HART analysis has been completed for this system. This project must be completed before upgrades to the Chesapeake Boulevard Pump Station are completed (VP015400).
FUNDING TYPE CONTACTS
Funding Type: Revenue Bond Contacts-Requesting Dept: Operations-InterceptorsContacts-Dept Contacts: Tim MarshContacts-Managing Dept: Engineering
PROPOSED SCHEDULE START DATE COST ESTIMATE
PrePlanning 01/01/2020PER 11/02/2020Design Delay 05/04/2021Design 05/05/2021Bid Delay 08/02/2022PreConstruction 08/03/2022Construction 11/03/2022Closeout 11/05/2024
Cost Estimate Class: Class 5 PrePlanning $0PER $82,237Design $206,257PreConstruction $7,735Construction $2,856,656Closeout $0 Est. Program Cost $3,152,885Contingency Budget $571,331
Est. Project Costs $3,724,216
VP014010
VP01
4020
FEREBEE AVE
FEREBEE AVE
BAIN
BRID
GE B
LVD
EDGEWOOD AVE
ROWLAND AVE
YALE CT
FEREBEE AVE
ARLIE ST
VIRGINIA AVE
ANNE AVE
MORR
ISON
PL
VP014010Ferebee Avenue Pump StationReplacement
CIP Location
Chesapeake
Legend
HRSD Interceptor Force MainHRSD Interceptor Gravity Main
3Q HRSD Treatment Plant
3SRP HRSD Pressure Reducing Station
3PS HRSD Pump Station
VP014010
/0 110 220 330 44055
Feet
Project Area
±
± Project Interceptor Line!]̂ Project Interceptor Point!]̂ Project Pump Station Point
CIP Project Area
_̂ CIP Interceptor Point_ CIP Pump Station Point
CIP Abandonment
±
± CIP Interceptor Line
Ferebee Avenue Pump Station Replacement PR_VP014010
System: VIPType: Pump Stations
Driver Category: I&I Abatement-Rehabilitation PlanProject Phase: DesignRegulatory: Rehab Plan Phase Two
PROGRAM CASH FLOW PROJECTION ($,000)
Prog CostExp to
Previous Year FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31
$8,616 $1,051 $0 $2,775 $4,106 $684 $0 $0 $0 $0 $0 $0
PROJECT DESCRIPTION
This project is to design and construct a replacement pump station for the 1951 Ferebee Pump Station.
PROJECT JUSTIFICATION
This project will evaluate and implement the replacement of Ferebee Avenue Pump Station, as it is nearing the end of its useful life. This facility was inspected in 2008, 2011, and August 2013, as part of a Condition Assessment Program administered by Brown and Caldwell. Ferebee Avenue Pump Station was recommended for replacement and/or upgrades under Level 2 in the Rehabilitation program. An in-house hydraulic evaluation in 2014 identified several alternatives for maintaining this station as a lift station or revising its hydraulic capacity and connectivity to function as a terminal station. Final alignment and connectivity (to gravity or to the forcemain system) will significantly impact the design of both the Ferebee Avenue and Park Avenue pump stations. Preliminary engineering evaluations of these two stations will be conducted jointly.
FUNDING TYPE CONTACTS
Funding Type: Revenue Bond Contacts-Requesting Dept: Operations-InterceptorsContacts-Dept Contacts: Jeff LayneContacts-Managing Dept: Engineering
PROPOSED SCHEDULE START DATE COST ESTIMATE
PrePlanning 07/01/2015PER 06/01/2017Design Delay 10/31/2019Design 11/01/2019Bid Delay 07/01/2021PreConstruction 07/01/2022Construction 11/01/2022Closeout 09/01/2024
Cost Estimate Class: Class 4 PrePlanning $0PER $240,158Design $808,607PreConstruction $40,000Construction $7,527,000Closeout $0 Est. Program Cost $8,615,765Contingency Budget $1,353,000
Est. Project Costs $9,968,765
VP014020
VP018000
VP014010
PARK AVEPARK AVE
FEREBEE AVEFEREBEE AVE
I-464
I-464
4A
BAINBRIDGE BLVD
POINDEXTER ST
RODGERS ST
PARK AVE
CHESAPEAKE AVE
BARNES RD
ANNE AVE
VIRGINIA AVE
HAYWOOD AVE
HOLLY AVE
EDGEWOOD AVEBANKS ST
SEABOARD AVE
THUR
MAN
ST
HOOVER AVE
ARDMORE AVE
JACKSON AVE
CHES
APEA
KE DR
POST AVE
WILBUR AVE
NARROW ST
STUBEN ST
DECATUR ST
SWAIN AVE
ROSEMONT AVE
WILTON ST
YALE
CT
MYERS RD
AVALON AVE
BASSETT ST
CORA
ST
PAXSON AVE
WIL
KINS
LN
KRES
LER
PL
JEFFERSON ST
VP014020Sanitary Sewer Project 1950 12Inch Force Main and 24 and 18 InchGravity Replacement
CIP Location
Chesapeake
Legend
HRSD Interceptor Force MainHRSD Interceptor Gravity Main
3Q HRSD Treatment Plant
3SRP HRSD Pressure Reducing Station
3PS HRSD Pump Station
VP014020
/0 675 1,350 2,025 2,700337.5
Feet
Project Area
±
± Project Interceptor Line!]̂ Project Interceptor Point!]̂ Project Pump Station Point
CIP Project Area
_̂ CIP Interceptor Point_ CIP Pump Station Point
CIP Abandonment
±
± CIP Interceptor Line
Sanitary Sewer Project 1950 12 Inch FM and 24 and 18 Inch Gravity Replacement
PR_VP014020
System: VIPType: Pipelines
Driver Category: I&I Abatement-Rehabilitation PlanProject Phase: DesignRegulatory: Rehab Plan Phase Two
PROGRAM CASH FLOW PROJECTION ($,000)
Prog CostExp to
Previous Year FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31
$11,280 $1,030 $2,317 $4,533 $3,400 $0 $0 $0 $0 $0 $0 $0
PROJECT DESCRIPTION
This project is to design and construct a force main to replace the 850 feet cast iron discharge force main SF-155 Sanitary Sewer Project 1950 12-inch Force Main. This project will also replace 2,900 feet 18-inch gravity line 1960 SG-153 and replace 3,500 feet 24-inch 1960 SG-149.
PROJECT JUSTIFICATION
This project will evaluate and implement the replacement of HRSD force main and gravity sewer between Ferebee Avenue Pump Station and Park Avenue Pump Station. Both pump stations are being evaluated for replacement and preliminary engineering evaluations of these two stations will be conducted jointly. The sewers designated for replacement under this project will also be evaluated under the same preliminary engineering effort. Final alignment, size, and connectivity of these sewers will significantly impact the design of both the Ferebee Avenue and Park Avenue pump stations.
FUNDING TYPE CONTACTS
Funding Type: Cash Contacts-Requesting Dept: Operations-InterceptorsContacts-Dept Contacts: Jeff LayneContacts-Managing Dept: Engineering
PROPOSED SCHEDULE START DATE COST ESTIMATE
PrePlanning 07/01/2015PER 06/01/2017Design Delay 10/31/2019Design 11/01/2019Bid Delay 07/01/2021PreConstruction 09/01/2021Construction 01/01/2022Closeout 04/01/2024
Cost Estimate Class: Class 4 PrePlanning $0PER $183,507Design $846,000PreConstruction $50,000Construction $10,200,000Closeout $0 Est. Program Cost $11,279,507Contingency Budget $1,367,000
Est. Project Costs $12,646,507
VP014700INGLESIDE RD
UTAH ST
INGL
ESID
E RD
WESTMINSTER AVE
COM
STOC
K ST
VP014700Ingleside Road Pump StationReplacement
CIP Location
Norfolk
Legend
HRSD Interceptor Force MainHRSD Interceptor Gravity Main
3Q HRSD Treatment Plant
3SRP HRSD Pressure Reducing Station
3PS HRSD Pump Station
VP014700
/0 110 220 330 44055
Feet
Project Area
±
± Project Interceptor Line!]̂ Project Interceptor Point!]̂ Project Pump Station Point
CIP Project Area
_̂ CIP Interceptor Point_ CIP Pump Station Point
CIP Abandonment
±
± CIP Interceptor Line
Ingleside Road Pump Station Replacement PR_VP014700
System: VIPType: Pump Stations
Driver Category: I&I Abatement-Rehabilitation PlanProject Phase: PERRegulatory: Rehab Plan Phase Two
PROGRAM CASH FLOW PROJECTION ($,000)
Prog CostExp to
Previous Year FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31
$3,375 $406 $2,969 $0 $0 $0 $0 $0 $0 $0 $0 $0
PROJECT DESCRIPTION
This project is to rehabilitate and/or replace Ingleside Road Pump Station. This project also includes the design and installation of a new emergency generator/pump.
PROJECT JUSTIFICATION
This project will replace the submersible pump station experiencing pump failures, as well as, deteriorating structural and electrical systems.
FUNDING TYPE CONTACTS
Funding Type: Cash Contacts-Requesting Dept: Operations-InterceptorsContacts-Dept Contacts: Tim MarshContacts-Managing Dept: Engineering
PROPOSED SCHEDULE START DATE COST ESTIMATE
PrePlanning 07/01/2019PER 04/01/2020Design Delay 11/02/2020Design 11/03/2020Bid Delay 05/04/2021PreConstruction 05/05/2021Construction 07/03/2021Closeout 04/02/2022
Cost Estimate Class: Class 5 PrePlanning $0PER $82,401Design $323,862PreConstruction $0Construction $2,968,736Closeout $0 Est. Program Cost $3,374,999Contingency Budget $593,748
Est. Project Costs $3,968,747
VP014800
VP018500
VA-164
VA-1
64
MARTIN LUTHER KING FWY
CHAUTAUQUA AVE
ADRIATIC ST
INDUSTRIAL AVE
HILL AVE
VP014800Lee Avenue-Wesley StreetHorizontal Valve Replacement
CIP Location
Norfolk
Legend
HRSD Interceptor Force MainHRSD Interceptor Gravity Main
3Q HRSD Treatment Plant
3SRP HRSD Pressure Reducing Station
3PS HRSD Pump Station
VP014800
/0 110 220 330 44055
Feet
Project Area
±
± Project Interceptor Line!]̂ Project Interceptor Point!]̂ Project Pump Station Point
CIP Project Area
_̂ CIP Interceptor Point_ CIP Pump Station Point
CIP Abandonment
±
± CIP Interceptor Line
Lee Avenue/Wesley Street Horizontal Valve Replacement
PR_VP014800
System: VIPType: Pipelines
Driver Category: I&I Abatement-Rehabilitation PlanProject Phase: ProposedRegulatory: Rehab Plan Phase Two
PROGRAM CASH FLOW PROJECTION ($,000)
Prog CostExp to
Previous Year FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31
$3,267 $0 $381 $2,886 $0 $0 $0 $0 $0 $0 $0 $0
PROJECT DESCRIPTION
This project will replace the inoperable 36-inch horizontal gate valve and install a new 48-inch valve at the intersection of Lee Avenue and Wesley Street in the City of Portsmouth. A Preliminary Engineering Report was completed in November 2007 making these recommendations.
PROJECT JUSTIFICATION
The 36-inch horizontal gate valve is currently stuck in the open position and, due to the configuration of the valve, will not close to allow flow isolation of SF-220 in case of a failure. SF-220 is a 36-inch reinforced clay pipe (RCP) force main that was constructed in 1946. The installation of a new 48-inch valve on SF-221 where SF-221 intersects with SF-220 will allow flow isolation of SF-221 to the north and south of the intersection. SF-221 is a 48-inch RCP force main approximately 15,000 linear feet (LF) constructed in 1946 with isolation valves only located at each end. The valves will insure proper operation in the event of a failure on these aged force mains.
FUNDING TYPE CONTACTS
Funding Type: Revenue Bond Contacts-Requesting Dept: Operations-InterceptorsContacts-Dept Contacts: Keegan AnkofskiContacts-Managing Dept: Operations-Interceptors
PROPOSED SCHEDULE START DATE COST ESTIMATE
PrePlanning 06/01/2010PER 09/01/2010Design Delay 03/01/2011Design 03/01/2011Bid Delay 12/01/2011PreConstruction 03/01/2022Construction 06/01/2022Closeout 04/01/2023
Cost Estimate Class: Class 3 PrePlanning $0PER $0Design $0PreConstruction $60,000Construction $3,207,183Closeout $0 Est. Program Cost $3,267,183Contingency Budget $814,287
Est. Project Costs $4,081,470
VP015320
VP015320
VP015320
VP015320
VP015320
MONROE PLACE
POWHATAN AVE
RICHMOND CRESCENT
HAMP
TON
BLVD
BOLLING AVE
MONROE PL
POW
HATA
N AV
E MAGNOLIA AVE
CEDAR LN
STUD
ELEY
AVE
CARI
LLO
AVE
ROCKBRIDGE AVE
ROLFE AVE
MANCHESTER AVE
WESTM
ORELAND AVEARGA
LL A
VE
LEXAN AVE
MONTEREY AVE
HANOVER AVE
SUSSEX PL
WYT
HE P
L
LARCHMONT CRESWES
TWOO
D TE
R
ELEANOR CT
ALSON DR
ESCADRILLE PT
S FAIRWATER DR
MCLEAN AVE
WALNUT HILL ST
CATALPA ST
S ELEANOR CTRO
LFE
AVE
VP015320Larchmont Area Sanitary SewerImprovements
CIP Location
Norfolk
Legend
HRSD Interceptor Force MainHRSD Interceptor Gravity Main
3Q HRSD Treatment Plant
3SRP HRSD Pressure Reducing Station
3PS HRSD Pump Station
VP015320
/0 460 920 1,380 1,840230
Feet
Project Area
±
± Project Interceptor Line!]̂ Project Interceptor Point!]̂ Project Pump Station Point
CIP Project Area
_̂ CIP Interceptor Point_ CIP Pump Station Point
CIP Abandonment
±
± CIP Interceptor Line
Larchmont Area Sanitary Sewer Improvements PR_VP015320
System: VIPType: Pump Stations
Driver Category: I&I Abatement-Rehabilitation PlanProject Phase: ProposedRegulatory: Rehab Plan Phase Two
PROGRAM CASH FLOW PROJECTION ($,000)
Prog CostExp to
Previous Year FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31
$36,443 $1,519 $1,463 $8,923 $10,410 $8,922 $5,205 $0 $0 $0 $0 $0
PROJECT DESCRIPTION
This project involves design and construction of five new sanitary sewer pump stations, approximately 3,700 linear feet of 6-inch, 8-inch, and 10-inch force mains, and approximately 10,000 linear feet of 8-inch and 10-inch gravity mains and appurtenances. The new infrastructure will replace (a) five existing HRSD pump stations: Monroe Place PS # 114, Powhatan Avenue PS #122, Richmond Crescent #124, Hanover Avenue PS #141, and Jamestown Crescent PS #142, (b) City of Norfolk (City) pump stations: Larchmont Eleanor Court PS #112; Larchmont Walnut Hill Street PS #113; and Larchmont Westwood Terrace PS #114, and (c) install new gravity trunk lines to divert the flow to the new pump station locations. The two new pump stations replacing Powhatan Avenue and Monroe Place will be terminal stations and will remain under HRSD ownership while the other three new pump stations will be non-terminal and ownership will be transferred to the City at the completion of the project.
PROJECT JUSTIFICATION
This project was initially identified by HRSD as part of a condition assessment program to address aging infrastructure concerns related to structural, electrical, and pump performance operation. It was also identified to mitigate the risks from tidal flooding during wet weather conditions and from sea level rise due to climate change. HRSD and City jointly funded a comprehensive sanitary sewer master plan for the Larchmont sanitary sewer service area that encompassed pump station facilities and gravity collection systems associated with these pumping facilities. Hazen was commissioned to perform the comprehensive study on behalf of HRSD and City. HRSD and City are entering into a cost sharing agreement with the intent to plan, design, and construct the recommended improvements. Elements of the Project identified under the VIP-R10 in HRSD's EPA Rehabilitation Action Plan Phase 2 will need to reach Substantial Completion by May 5, 2025.
FUNDING TYPE CONTACTS
Funding Type: Cash Contacts-Requesting Dept: Operations-InterceptorsContacts-Dept Contacts: Gary HartContacts-Managing Dept: Engineering
PROPOSED SCHEDULE START DATE COST ESTIMATE
PrePlanning 03/01/2019PER 06/01/2020Design Delay 06/01/2021Design 06/01/2021Bid Delay 07/01/2022PreConstruction 07/01/2022Construction 09/01/2022Closeout 04/01/2024
Cost Estimate Class: Class 5 PrePlanning $0PER $1,397,000Design $4,511,000PreConstruction $50,000Construction $30,485,000Closeout $0 Est. Program Cost $36,443,000Contingency Budget $5,466,000
Est. Project Costs $41,909,000
VP015400
VP015400
VP015400
VP015400
VP016500
VP01
0920
CITY PARK
NORVIEW AVE
ASHLAND CIRCLE
LUXEMBOURG AVE
CHESAPEAKE BLVDTI
DEW
ATER
DR
CROMWELL DR
NORVIEW AVE
LAFAYETTE BLVD
WILLOW WOOD DR
CROMWELL RD
LINDENWOOD AVE
SOM
ME A
VE
LENS
AVE
DUNK
IRK
AVE
TAIT TER
ARGO
NNE A
VE
NORWAY PL
VERD
UN A
VE
ST M
IHIE
L AV
E
KELLER AVE
LENO
IR C
IR
DAVIS ST
JERS
EY A
VE
GAZEL ST WYOMING AVE
ROLAND DR
AMHERST ST
DARE CIR
OKLAHOMA AVE
BAPA
UME
AVE
GLEN AVE
ASHLAND AVE
VILLA CIR
SEDG
EFIE
LD D
R
VISTA ST
QUAIL ST
SILBERT RD
ILLINOIS AVE
ZOO DR
LAKE
WOO
D DR
HOLLY AVE
HUGO ST
GARD
EN S
T
POM
ROY
AVE
FEARER AVE
E SEVERN RD
ROSSO CT
ARGONNE AVE
VP015400Lafayette Norview-Estabrook PumpStation Replacements
CIP Location
Norfolk
Legend
HRSD Interceptor Force MainHRSD Interceptor Gravity Main
3Q HRSD Treatment Plant
3SRP HRSD Pressure Reducing Station
3PS HRSD Pump Station
VP015400
/0 1,000 2,000 3,000 4,000500
Feet
Project Area
±
± Project Interceptor Line!]̂ Project Interceptor Point!]̂ Project Pump Station Point
CIP Project Area
_̂ CIP Interceptor Point_ CIP Pump Station Point
CIP Abandonment
±
± CIP Interceptor Line
Lafayette Norview-Estabrook Pump Station Replacements
PR_VP015400
System: VIPType: Pump Stations
Driver Category: I&I Abatement-Rehabilitation PlanProject Phase: DesignRegulatory: Rehab Plan Phase Two
PROGRAM CASH FLOW PROJECTION ($,000)
Prog CostExp to
Previous Year FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31
$20,791 $2,449 $3,963 $7,843 $6,536 $0 $0 $0 $0 $0 $0 $0
PROJECT DESCRIPTION
This project is to rehabilitate and/or replace four pump stations, and their associated force mains, in the Lafayette-Norview-Estabrook areas of the City of Norfolk (City Park Pump Station #106, Chesapeake Boulevard Pump Station #105, Luxembourg Avenue Pump Station #113, and Ashland Circle Pump Station #102).
PROJECT JUSTIFICATION
This project will address aging infrastructure pertaining to the condition of the wet wells, pumps, motors, controls, appurtenances, and emergency generator/pump for the facilities. The pumps, motors, and controls are nearing the end of their useful life and replacement parts are not available. The Luxembourg Pump Station buildingis experiencing differential settlement. Ashland Circle Pump Station is in a low-lying area and condition assessment activities gave evidence that tidal flooding likely occurs during severe wet weather events.
FUNDING TYPE CONTACTS
Funding Type: VCWRLF Contacts-Requesting Dept: Operations-InterceptorsContacts-Dept Contacts: Jeff LayneContacts-Managing Dept: Engineering
PROPOSED SCHEDULE START DATE COST ESTIMATE
PrePlanning 11/01/2017PER 08/01/2018Design Delay 01/01/2020Design 02/01/2020Bid Delay 06/01/2021PreConstruction 08/01/2021Construction 01/01/2022Closeout 05/01/2024
Cost Estimate Class: Class 4 PrePlanning $0PER $719,047Design $1,730,000PreConstruction $42,000Construction $18,300,000Closeout $0 Est. Program Cost $20,791,047Contingency Budget $2,000,000
Est. Project Costs $22,791,047
VP016500
VP01
0920
VP017120
CROMWELL RD
DAVIS ST
LARKIN ST
JERS
EY A
VE
BIRCH ST
ORANGE ST
AMHERST ST
HENRICO ST
OKLAHOMA AVE
KRICK ST
PETERSON ST
GLEN
AVE
HURLEY AVEATTERBURY ST
NOTTAWAY ST
BUCKINGHAM ST
LAFAYETTE BLVD
KANSAS AVE
KENNON AVE
ILLINOIS AVE
UPSHUR ST
OVERBROOK AVE
ARIZONA AVE
SPRUCE ST
COUNTY ST
E BONNER DR
KENNEBECK AVE
W BONNER DR
RADFORD ST
HANBURY ST
NEVADA AVE
TAIT TER
LITTLE JOHN DR
WYOMING AVE
BLACKWOOD AVE
PALMYRA ST
KENNEBECK CIR
OKLA
HOMA
AVE
VP016500Norview-Estabrook Division I 12-Inch Force Main Replacement
CIP Location
Norfolk
Legend
HRSD Interceptor Force MainHRSD Interceptor Gravity Main
3Q HRSD Treatment Plant
3SRP HRSD Pressure Reducing Station
3PS HRSD Pump Station
VP016500
/0 420 840 1,260 1,680210
Feet
Project Area
±
± Project Interceptor Line!]̂ Project Interceptor Point!]̂ Project Pump Station Point
CIP Project Area
_̂ CIP Interceptor Point_ CIP Pump Station Point
CIP Abandonment
±
± CIP Interceptor Line
Norview-Estabrook Division I 12-Inch Force Main Replacement
PR_VP016500
System: VIPType: Pipelines
Driver Category: I&I Abatement-Rehabilitation PlanProject Phase: PERRegulatory: Rehab Plan Phase Two
PROGRAM CASH FLOW PROJECTION ($,000)
Prog CostExp to
Previous Year FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31
$2,826 $106 $148 $870 $1,277 $426 $0 $0 $0 $0 $0 $0
PROJECT DESCRIPTION
This project is to rehabilitate and/or replace the SF-069 Norview-Estabrook Division I 12-inch Force Main consisting of approximately 2,800 linear feet (LF) of 12-inch pipe along Robin Hood Road.
PROJECT JUSTIFICATION
This project will replace a 1952 cast iron force main with lead joints that is nearing the end of its useful life (SF-69). Replacement of this force main will be needed prior to the completion of the upgrades to the Chesapeake Boulevard Pump Station (VP015400).
FUNDING TYPE CONTACTS
Funding Type: VCWRLF Contacts-Requesting Dept: Operations-InterceptorsContacts-Dept Contacts: Tim MarshContacts-Managing Dept: Engineering
PROPOSED SCHEDULE START DATE COST ESTIMATE
PrePlanning 01/01/2020PER 11/02/2020Design Delay 05/04/2021Design 05/05/2021Bid Delay 08/02/2022PreConstruction 08/03/2022Construction 11/03/2022Closeout 11/05/2024
Cost Estimate Class: Class 5 PrePlanning $0PER $81,358Design $184,378PreConstruction $6,914Construction $2,553,633Closeout $0 Est. Program Cost $2,826,283Contingency Budget $510,727
Est. Project Costs $3,337,010
VP016700TI
DEW
ATER
DR
LAFAYETTE BLVD
SOM
ME A
VE
VIM
Y RI
DGE
AVE
BELLEVUE AVE
NORW
AY P
L
DUNK
IRK
AVE
ASHLAND AVE
RACI
NE A
VE
COLUMBIA AVE
MORRIS AVE
LASALLE AVE
LORR
AINE
AVE
BAPA
UME
AVE
ST DENIS AVE
WILLARD PL
ST L
OUIS
AVE
CLARK CIR
RACI
NE A
VE
VP016700Norview-Estabrook Division I 18-Inch Force Main ReplacementPhase III
CIP Location
Norfolk
Legend
HRSD Interceptor Force MainHRSD Interceptor Gravity Main
3Q HRSD Treatment Plant
3SRP HRSD Pressure Reducing Station
3PS HRSD Pump Station
VP016700
/0 260 520 780 1,040130
Feet
Project Area
±
± Project Interceptor Line!]̂ Project Interceptor Point!]̂ Project Pump Station Point
CIP Project Area
_̂ CIP Interceptor Point_ CIP Pump Station Point
CIP Abandonment
±
± CIP Interceptor Line
Norview-Estabrook Division I 18-Inch Force Main Replacement Phase III
PR_VP016700
System: VIPType: Pipelines
Driver Category: I&I Abatement-Rehabilitation PlanProject Phase: PERRegulatory: Rehab Plan Phase Two
PROGRAM CASH FLOW PROJECTION ($,000)
Prog CostExp to
Previous Year FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31
$3,785 $118 $201 $1,172 $1,721 $574 $0 $0 $0 $0 $0 $0
PROJECT DESCRIPTION
This project is to rehabilitate and/or replace a portion of the SF-066 Norview-Estabrook Division I 18-inch Force Main for approximately 2,100 linear feet (LF) of 18-inch cast iron pipe starting at the existing force main near the Luxembourg Pump Station starting at Versailles Avenue and Norway Place extending east to the first valve on Pershing Avenue near Tidewater Drive. Project is through the Lafayette Residence Park neighborhood, listed on the National Historic Register.
PROJECT JUSTIFICATION
This project will replace a 1952 cast iron force main with lead joints that is nearing the end of its useful life (SF-66). Replacement of this force main will need to be coordinated with the Lafayette Norview-Estabrook and Norview Pump Station Replacements (VP015400).
FUNDING TYPE CONTACTS
Funding Type: VCWRLF Contacts-Requesting Dept: Operations-InterceptorsContacts-Dept Contacts: Tim MarshContacts-Managing Dept: Engineering
PROPOSED SCHEDULE START DATE COST ESTIMATE
PrePlanning 01/01/2020PER 11/02/2020Design Delay 05/04/2021Design 05/05/2021Bid Delay 08/02/2022PreConstruction 08/03/2022Construction 11/03/2022Closeout 11/05/2024
Cost Estimate Class: Class 5 PrePlanning $0PER $84,589Design $250,897PreConstruction $7,841Construction $3,441,999Closeout $0 Est. Program Cost $3,785,326Contingency Budget $688,400
Est. Project Costs $4,473,726
VP017110
VP017120
E PRINCESS ANNE RD
E PRINCESS ANNE RD
MCNEAL AVE
HALSTEAD AVE
SILVE
Y DR
NELMS AVEHILLANDALE RD
FLEETWOOD AVE
SHELTON AVE
MARIUS RD
BEEKMAN ST
RIVER OAKS DR
JULIANNA DR
VP017110Central Norfolk Area Gravity SewerImprovements Phase I
CIP Location
Norfolk
Legend
HRSD Interceptor Force MainHRSD Interceptor Gravity Main
3Q HRSD Treatment Plant
3SRP HRSD Pressure Reducing Station
3PS HRSD Pump Station
VP017110
/0 140 280 420 56070
Feet
Project Area
±
± Project Interceptor Line!]̂ Project Interceptor Point!]̂ Project Pump Station Point
CIP Project Area
_̂ CIP Interceptor Point_ CIP Pump Station Point
CIP Abandonment
±
± CIP Interceptor Line
Central Norfolk Area Gravity Sewer Improvements Phase I
PR_VP017110
System: VIPType: Pipelines
Driver Category: I&I Abatement-Rehabilitation PlanProject Phase: Pre PlanningRegulatory: Rehab Plan Phase Two
PROGRAM CASH FLOW PROJECTION ($,000)
Prog CostExp to
Previous Year FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31
$101 $86 $15 $0 $0 $0 $0 $0 $0 $0 $0 $0
PROJECT DESCRIPTION
This project will rehabilitate 318 linear feet (LF) and replace 75 LF gravity sewer segments and three (3) manholes along McNeal Avenue in Central Norfolk. Ownership will be transferred to the City of Norfolk upon completion of construction. Refer to Rehabilitation Plan VIP-R-1 for a full listing of affected assets.
PROJECT JUSTIFICATION
Condition assessment activities indicate that these assets present a material risk of failure due to I/I and physical condition defects. This project is a portion of the EPA Rehabilitation Action Plan Project VIP-R-1 with a Substantial Completion requirement of May 5, 2025.
FUNDING TYPE CONTACTS
Funding Type: Revenue Bond Contacts-Requesting Dept: EngineeringContacts-Dept Contacts: Holly Anne MatelContacts-Managing Dept: Engineering
PROPOSED SCHEDULE START DATE COST ESTIMATE
PrePlanning 04/15/2019PER 01/15/2020Design Delay 01/15/2020Design 05/12/2020Bid Delay 12/02/2020PreConstruction 12/02/2020Construction 02/02/2021Closeout 06/05/2021
Cost Estimate Class: Class 5 PrePlanning $0PER $0Design $11,659PreConstruction $0Construction $89,803Closeout $0 Est. Program Cost $101,462Contingency Budget $8,000
Est. Project Costs $109,462
VP017120
VP015400
VP015400
VP015400
VP016500
VP01
0920
NORVIEW AVE
ASHLAND CIRCLE
LUXEMBOURG AVE
CHESAPEAKE BLVD
I-64
TIDE
WATE
R DR
NORVIEW AVE
AZAL
EA G
ARDE
N RD
SEWELLS POINT RD
E PRINCESS ANNE RD
CHESAPEAKE BLVD
INGLESIDE RD
CROMWELL DR
LAFAYETTE BLVD
N MILITARY HWY
279
CROMWELL RD
WILLOW WOOD DR
VP017120Central Norfolk Area Gravity SewerImprovements Phase II
CIP Location
Norfolk
Legend
HRSD Interceptor Force MainHRSD Interceptor Gravity Main
3Q HRSD Treatment Plant
3SRP HRSD Pressure Reducing Station
3PS HRSD Pump Station
VP017120
/0 1,500 3,000 4,500 6,000750
Feet
Project Area
±
± Project Interceptor Line!]̂ Project Interceptor Point!]̂ Project Pump Station Point
CIP Project Area
_̂ CIP Interceptor Point_ CIP Pump Station Point
CIP Abandonment
±
± CIP Interceptor Line
Central Norfolk Area Gravity Sewer Improvements Phase II
PR_VP017120
System: VIPType: Pipelines
Driver Category: I&I Abatement-Rehabilitation PlanProject Phase: ProposedRegulatory: Rehab Plan Phase Two
PROGRAM CASH FLOW PROJECTION ($,000)
Prog CostExp to
Previous Year FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31
$6,350 $25 $630 $2,439 $3,193 $63 $0 $0 $0 $0 $0 $0
PROJECT DESCRIPTION
This project consists of 3 sections of improvements to the gravity sewer system:-Fox Hall/Norcova Drive/East Princess Avenue Interceptor Gravity Sewer-Rehabilitation of 3,650 linear feet (LF) of gravity sewer (ranging from 10 to 12-inches) with associated 19 manholes. Includes the 150 LF of 12-inch gravity sewer extending to the City of Norfolk Pump Station (PS) #44.-Luxembourg Avenue Gravity Sewer-Rehabilitation of 1,500 LF of 12-inch gravity sewer with associated 11 manholes and replacement or relocation of 1,300 LF of 8-inch gravity sewer with associated 6 manholes. Relocation of the referenced gravity sewer considers redirecting flows from the existing Lafayette River crossing.-Norview-Estabrook/Chesapeake Boulevard Gravity Sewer-Rehabilitation of gravity sewer not previously rehabilitated or replaced including 3,000 LF of gravity sewer (ranging from 12 to 18-inches) with 20 associated manholes. Additionally, manhole rehabilitation is to include 3 manholes on Chesapeake Boulevard.
PROJECT JUSTIFICATION
Condition assessment activities indicate that these assets present a material risk of failure due to I/I and physical condition defects. This project is a portion of the EPA Rehabilitation Action Plan Project VIP-R-1 with a Substantial Completion requirement of May 5, 2025. For further details, refer to page 3-18, Table 3-2 of the Rehabilitation Action Plan.
FUNDING TYPE CONTACTS
Funding Type: Revenue Bond Contacts-Requesting Dept: Operations-InterceptorsContacts-Dept Contacts: Holly Anne MatelContacts-Managing Dept: Engineering
PROPOSED SCHEDULE START DATE COST ESTIMATE
PrePlanning 03/01/2021PER 07/01/2021Design Delay 01/03/2022Design 01/03/2022Bid Delay 10/03/2022PreConstruction 10/03/2022Construction 02/01/2023Closeout 02/01/2024
Cost Estimate Class: Class 5 PrePlanning $25,000PER $270,000Design $540,000PreConstruction $10,000Construction $5,397,000Closeout $108,000 Est. Program Cost $6,350,000Contingency Budget $810,000
Est. Project Costs $7,160,000
VP018000
VP014020
PARK AVE
PARK AVE
I-464
I-464
4A
POIN
DEXT
ER ST
PERRY ST
PARK AVE
JEFFERSON ST
PORTER ST
VP018000Park Avenue Pump StationReplacement
CIP Location
Chesapeake
Legend
HRSD Interceptor Force MainHRSD Interceptor Gravity Main
3Q HRSD Treatment Plant
3SRP HRSD Pressure Reducing Station
3PS HRSD Pump Station
VP018000
/0 110 220 330 44055
Feet
Project Area
±
± Project Interceptor Line!]̂ Project Interceptor Point!]̂ Project Pump Station Point
CIP Project Area
_̂ CIP Interceptor Point_ CIP Pump Station Point
CIP Abandonment
±
± CIP Interceptor Line
Park Avenue Pump Station Replacement PR_VP018000
System: VIPType: Pump Stations
Driver Category: I&I Abatement-Rehabilitation PlanProject Phase: DesignRegulatory: Rehab Plan Phase Two
PROGRAM CASH FLOW PROJECTION ($,000)
Prog CostExp to
Previous Year FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31
$11,365 $984 $3,490 $5,168 $1,723 $0 $0 $0 $0 $0 $0 $0
PROJECT DESCRIPTION
This project is to design and construct a replacement pump station for the existing 1922 Park Avenue Pump Station (PS), based on the recommendations of the Park Avenue and Ferebee Avenue Pump Station Study (VP011010). This project is to include installation of an emergency generator/pump and address the replacement/rehabilitation of 50 linear feet (LF) of the 24-inch gravity influent line.
PROJECT JUSTIFICATION
This project will evaluate and implement the replacement of Park Avenue Pump Station. This facility was inspected in August 2013, as part of a Condition Assessment Program administered by Brown and Caldwell. Park Avenue Pump Station was recommended for replacement and/or upgrades under Level 2 in the Rehabilitation program. This facility experiences operational issues related to aging equipment and structure.Park Avenue Pump Station currently receives flows from HRSD's Ferebee Avenue Pump Station in addition to flow from several city pump stations. An in-house hydraulic evaluation in 2014 identified several alternatives for revising the alignment and connectivity (to gravity or to the force main system) of the Ferebee Avenue Pump Station effluent force main, which may significantly impact the future capacity needs and design of the Park Avenue Pump Station. Preliminary engineering evaluations of these two stations will be conducted jointly.
FUNDING TYPE CONTACTS
Funding Type: VCWRLF Contacts-Requesting Dept: Operations-InterceptorsContacts-Dept Contacts: Jeff LayneContacts-Managing Dept: Engineering
PROPOSED SCHEDULE START DATE COST ESTIMATE
PrePlanning 07/01/2006PER 06/02/2017Design Delay 11/01/2019Design 11/02/2019Bid Delay 06/01/2021PreConstruction 07/01/2021Construction 11/01/2021Closeout 11/01/2023
Cost Estimate Class: Class 4 PrePlanning $0PER $255,572Design $728,200PreConstruction $45,000Construction $10,336,000Closeout $0 Est. Program Cost $11,364,772Contingency Budget $1,943,000
Est. Project Costs $13,307,772
VP018200
VP018200
VP018301
I-264
I-264
7A
ELM AVE
HIGH ST
EFFINGHAM ST
BART ST
SOUTH ST
CRAWFORD ST S
KING ST
COUNTY ST
DUKE ST
SOUTH ST
QUEEN ST
GREEN ST
RUTTER ST
RACE ST
MAPLE AVE
CRABAPPLE ST
PRENTIS AVE
THOMAS CIR
ATLA
NTA
AVE
WALL ST
LASALLE AVE
BARBOUR DR COLUMBIA ST
CHISHOLM CIR
BRIGHTON ST
PHOEBUS ST
ARMSTRONG ST
COLUMBIA CT COLUMBIA ST
GREE
N ST
COLUMBIA ST
BRIGHTON ST
VP018200Effingham Interceptor Vault Removal
CIP Location
Portsmouth
Legend
HRSD Interceptor Force MainHRSD Interceptor Gravity Main
3Q HRSD Treatment Plant
3SRP HRSD Pressure Reducing Station
3PS HRSD Pump Station
VP018200
/0 320 640 960 1,280160
Feet
Project Area
±
± Project Interceptor Line!]̂ Project Interceptor Point!]̂ Project Pump Station Point
CIP Project Area
_̂ CIP Interceptor Point_ CIP Pump Station Point
CIP Abandonment
±
± CIP Interceptor Line
Effingham Vault Removal and Force Main Rehabilitation PR_VP018200
System: VIPType: Pipelines
Driver Category: Risk MitigationProject Phase: Pre PlanningRegulatory: None
PROGRAM CASH FLOW PROJECTION ($,000)
Prog CostExp to
Previous Year FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31
$2,351 $279 $1,624 $448 $0 $0 $0 $0 $0 $0 $0 $0
PROJECT DESCRIPTION
This project will rehabilitate 1,815 feet of existing 36-inch prestressed concrete cylinder pipe (PCCP) interceptor force main (IFM) with a structural cured-in-place pipe (CIPP) lining and removal of the vaults. The structural lining will extend from a new tee and valve near the Race Street Pump Station northerly toward the intersection of Effingham Street and County Street.
PROJECT JUSTIFICATION
This project will address an air vent originally included in GN013900, a Consent Decree required project that addressed air vents with galvanized riser pipes that are vulnerable to catastrophic failure due to severe corrosion. During field investigations, this air vent was discovered to be directly tapped into a reinforced concrete vaultlocated under both north-bound lanes of Effingham Street. Both the air vent and vault appear to have been installed as part of a Virginia Department of Transportation(VDOT) relocation project in 1956. The condition of the vault is unknown, but suspected to be compromised due to exposure to hydrogen sulfide (H2S) gas for over 60 years. Due to the location, unknown condition, and Consent Decree requirement to address the air vent, both assets will be removed from the force main system.
FUNDING TYPE CONTACTS
Funding Type: Cash Contacts-Requesting Dept: Operations-InterceptorsContacts-Dept Contacts: Harry HardyContacts-Managing Dept: Operations-Interceptors
PROPOSED SCHEDULE START DATE COST ESTIMATE
PrePlanning 07/01/2018PER 08/02/2018Design Delay 09/02/2018Design 09/03/2018Bid Delay 04/01/2021PreConstruction 04/01/2021Construction 08/02/2021Closeout 10/03/2022
Cost Estimate Class: Class 3 PrePlanning $0PER $0Design $275,521PreConstruction $5,300Construction $2,065,300Closeout $5,300 Est. Program Cost $2,351,421Contingency Budget $516,400
Est. Project Costs $2,867,821
VP018302
VP018200
VP018301
I-264I-264
HIGH ST
LONDON BLVD
ELM AVE
EFFI
NGHA
M ST CRAWFORD PKWY
LONDON BLVD
COUNTY ST
QUEEN ST
ELM AVE
COURT ST
KING ST
SOUTH ST
LECKIE ST
PENI
NSUL
A AV
E
ANN ST
HARPER AVE
SPRATLEY ST
CONS
TITU
TION
AVE
GREEN ST
GODWIN ST
A ST
GUTH
RIE
ST
NORTH STHOLLADAY ST
GENDREAU RD
RIXEY PL
PINNERS AVE
PAUL JONES CT
OWEN
S ST
GLASGOW ST
WARD TER
COLUMBIA ST
HARRELL ST
ALPINE ST
KING
ST
A ST
KING ST
VP018301VIP Service Area I-I ReductionPhase I (PORTS)
CIP Location
Portsmouth
Legend
HRSD Interceptor Force MainHRSD Interceptor Gravity Main
3Q HRSD Treatment Plant
3SRP HRSD Pressure Reducing Station
3PS HRSD Pump Station
VP018301
/0 800 1,600 2,400 3,200400
Feet
Project Area
±
± Project Interceptor Line!]̂ Project Interceptor Point!]̂ Project Pump Station Point
CIP Project Area
_̂ CIP Interceptor Point_ CIP Pump Station Point
CIP Abandonment
±
± CIP Interceptor Line
VIP Service Area I/I Reduction Phase I (PORTS) PR_VP018301
System: VIPType: Locality and Private Property
Driver Category: I&I Abatement-IP/RWWMPProject Phase: Pre PlanningRegulatory: Integrated Plan-HPP 1
PROGRAM CASH FLOW PROJECTION ($,000)
Prog CostExp to
Previous Year FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31
$12,943 $1,379 $1,546 $5,713 $4,305 $0 $0 $0 $0 $0 $0 $0
PROJECT DESCRIPTION
PORT-01 Comprehensive I/I Reduction Plan; PORT-02 General I/I Reduction Plan.
PROJECT JUSTIFICATION
As part of HRSD's Integrated Plan, a program of High Priority RWWMP Projects (HPP) will be constructed through 2030. These projects were selected based on theirability to provide the greatest environmental and human health benefits. Further, this $200+ million investment will significantly reduce sanitary sewer overflow (SSO) volume at the 5-year level of service by 47 percent.
FUNDING TYPE CONTACTS
Funding Type: VCWRLF Contacts-Requesting Dept: Operations-InterceptorsContacts-Dept Contacts: Jeff ScaranoContacts-Managing Dept: Engineering
PROPOSED SCHEDULE START DATE COST ESTIMATE
PrePlanning 04/01/2020PER 04/01/2020Design Delay 04/01/2021Design 04/01/2021Bid Delay 02/01/2022PreConstruction 02/01/2022Construction 05/01/2022Closeout 04/01/2024
Cost Estimate Class: Class 5 PrePlanning $100,000PER $1,033,300Design $819,400PreConstruction $20,000Construction $10,950,020Closeout $20,000 Est. Program Cost $12,942,720Contingency Budget $2,640,080
Est. Project Costs $15,582,800
VP018302
VP018302
VP018500
VP018500
VP018304
VP018200
VP014800
VP018301
VP018303
VP018305
VP018200
CAMDEN AVE
RODMAN AVE
I-2646
5
VA-1
64
5-6
LONDON BLVD
I-264
HIGH ST
4
ELM AVEPORTSMOUTH BLVD
5
AIRL
INE B
LVD
4
VP018302Portsmouth Pump Station Upgrades(VIP-HPP-04B)
CIP Location
Portsmouth
Legend
HRSD Interceptor Force MainHRSD Interceptor Gravity Main
3Q HRSD Treatment Plant
3SRP HRSD Pressure Reducing Station
3PS HRSD Pump Station
VP018302
/0 1,400 2,800 4,200 5,600700
Feet
Project Area
±
± Project Interceptor Line!]̂ Project Interceptor Point!]̂ Project Pump Station Point
CIP Project Area
_̂ CIP Interceptor Point_ CIP Pump Station Point
CIP Abandonment
±
± CIP Interceptor Line
Portsmouth Pump Station Upgrades (VIP-HPP-04B) PR_VP018302
System: VIPType: Locality and Private Property
Driver Category: I&I Abatement-IP/RWWMPProject Phase: ProposedRegulatory: Integrated Plan-HPP 1
PROGRAM CASH FLOW PROJECTION ($,000)
Prog CostExp to
Previous Year FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31
$10,527 $0 $0 $0 $0 $0 $289 $762 $6,178 $3,298 $0 $0
PROJECT DESCRIPTION
Portsmouth Pump Station Upgrades PS002 and PS008.
PROJECT JUSTIFICATION
As part of HRSD's Integrated Plan, a program of High Priority RWWMP Projects (HPP) will be constructed through 2030. These projects were selected based on theirability to provide the greatest environmental and human health benefits. Further, this $200+ million investment will significantly reduce sanitary sewer overflow (SSO) volume at the 5-year level of service by 47 percent.
FUNDING TYPE CONTACTS
Funding Type: Cash Contacts-Requesting Dept: Operations-InterceptorsContacts-Dept Contacts: Jeff ScaranoContacts-Managing Dept: Engineering
PROPOSED SCHEDULE START DATE COST ESTIMATE
PrePlanning 07/02/2018PER 02/01/2026Design Delay 09/01/2026Design 09/01/2026Bid Delay 07/01/2027PreConstruction 07/01/2027Construction 10/01/2027Closeout 12/01/2028
Cost Estimate Class: Class 5 PrePlanning $0PER $404,026Design $646,379PreConstruction $242,353Construction $9,233,927Closeout $0 Est. Program Cost $10,526,686Contingency Budget $2,308,482
Est. Project Costs $12,835,168
VP018304
VP018303VP018305
VP018200
CAMDEN AVE
I-264
6
5
5-6
I-264
6
ELM AVE
5
PORTSMOUTH BLVD
DEEP CREEK BLVD
FREDERICK BLVD
GREENWOOD DR
GEOR
GE W
ASHI
NGTO
N HW
Y
SOUTH ST
FREDERICK BLVD
ELLIOTT AVE
LINCOLN ST
DUKE ST
JEFFERSON ST
OAK ST
MAUPIN AVE
PEACH ST
RANDOLPH ST
PHILLIPS AVE
CENTRE AVE
CHESTNUT STPARKER AVE
ASH ST
DOWNES ST
AZALEA AVE
GRAN
D ST
BEACON RD
HANBURY AVE
MANLY ST
WAL
L ST
SUMMERS PL
GOTHIC ST
ARCADIA AVE
BLAC
K LN
ANDREWS ST
DALE DR
SOUTH ST
COLUMBUS AVE
EDISON AVE
CHARLES AVE
SYER RD
EVERGREEN PL
AYLWIN CRES
AMBLER AVE
GREEN POINT LN
PALMETT ST
COLUMBIA ST
ACORN ST
NATHAN CT
VP018303VIP Service Area I-I ReductionPhase III (PORTS)
CIP Location
Portsmouth
Legend
HRSD Interceptor Force MainHRSD Interceptor Gravity Main
3Q HRSD Treatment Plant
3SRP HRSD Pressure Reducing Station
3PS HRSD Pump Station
VP018303
/0 970 1,940 2,910 3,880485
Feet
Project Area
±
± Project Interceptor Line!]̂ Project Interceptor Point!]̂ Project Pump Station Point
CIP Project Area
_̂ CIP Interceptor Point_ CIP Pump Station Point
CIP Abandonment
±
± CIP Interceptor Line
VIP Service Area I/I Reduction Phase III (PORTS) PR_VP018303
System: VIPType: Locality and Private Property
Driver Category: I&I Abatement-IP/RWWMPProject Phase: Pre PlanningRegulatory: Integrated Plan-HPP 1
PROGRAM CASH FLOW PROJECTION ($,000)
Prog CostExp to
Previous Year FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31
$9,366 $351 $925 $859 $2,622 $2,622 $1,986 $0 $0 $0 $0 $0
PROJECT DESCRIPTION
PORT-04 General I/I Reduction Plan; PORT-04-LOP65-1 Data-Driven I/I Reduction Plan; PORT-04-LOP65-2 Data-Driven I/I Reduction Plan; PORT-04-LOP65-3 Data-Driven I/I Reduction Plan.
PROJECT JUSTIFICATION
As part of HRSD's Integrated Plan, a program of High Priority RWWMP Projects (HPP) will be constructed through 2030. These projects were selected based on theirability to provide the greatest environmental and human health benefits. Further, this $200+ million investment will significantly reduce sanitary sewer overflow (SSO) volume at the 5-year level of service by 47 percent.
FUNDING TYPE CONTACTS
Funding Type: VCWRLF Contacts-Requesting Dept: Operations-InterceptorsContacts-Dept Contacts: Jeff ScaranoContacts-Managing Dept: Engineering
PROPOSED SCHEDULE START DATE COST ESTIMATE
PrePlanning 04/01/2021PER 04/01/2021Design Delay 04/01/2022Design 04/01/2022Bid Delay 02/01/2023PreConstruction 02/01/2023Construction 05/01/2023Closeout 04/01/2026
Cost Estimate Class: Class 5 PrePlanning $100,000PER $1,003,700Design $574,500PreConstruction $20,000Construction $7,647,360Closeout $20,000 Est. Program Cost $9,365,560Contingency Budget $1,840,040
Est. Project Costs $11,205,600
VP018304
VP018303
VP018305
CAMDEN AVE
ELM AVE
JEFFERSON ST
PARKER AVE
PALMER ST
ATLANTA AVE
HOOVER ST
FAYETTE ST
CAMDEN AVE
OAK ST
FILLMORE ST
GILMERTON AVE
ACORN ST
VP018304Camden Avenue Pump StationUpgrades (VIP-HPP-04D)
CIP Location
Portsmouth
Legend
HRSD Interceptor Force MainHRSD Interceptor Gravity Main
3Q HRSD Treatment Plant
3SRP HRSD Pressure Reducing Station
3PS HRSD Pump Station
VP018304
/0 110 220 330 44055
Feet
Project Area
±
± Project Interceptor Line!]̂ Project Interceptor Point!]̂ Project Pump Station Point
CIP Project Area
_̂ CIP Interceptor Point_ CIP Pump Station Point
CIP Abandonment
±
± CIP Interceptor Line
Camden Avenue Pump Station Upgrades (VIP-HPP-04D) PR_VP018304
System: VIPType: Pump Stations
Driver Category: I&I Abatement-IP/RWWMPProject Phase: ProposedRegulatory: Integrated Plan-HPP 1
PROGRAM CASH FLOW PROJECTION ($,000)
Prog CostExp to
Previous Year FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31
$5,478 $0 $0 $0 $0 $0 $211 $254 $2,095 $2,918 $0 $0
PROJECT DESCRIPTION
Camden Avenue Pump Station Upgrade (SS-PS-146).
PROJECT JUSTIFICATION
As part of HRSD's Integrated Plan, a program of High Priority RWWMP Projects (HPP) will be constructed through 2030. These projects were selected based on theirability to provide the greatest environmental and human health benefits. Further, this $200+ million investment will significantly reduce sanitary sewer overflow (SSO) volume at the 5-year level of service by 47 percent.
FUNDING TYPE CONTACTS
Funding Type: Revenue Bond Contacts-Requesting Dept: Operations-InterceptorsContacts-Dept Contacts: Jeff ScaranoContacts-Managing Dept: Engineering
PROPOSED SCHEDULE START DATE COST ESTIMATE
PrePlanning 08/01/2025PER 02/01/2026Design Delay 07/01/2026Design 07/01/2026Bid Delay 09/01/2027PreConstruction 09/01/2027Construction 12/01/2027Closeout 05/01/2029
Cost Estimate Class: Class 5 PrePlanning $0PER $210,787Design $295,933PreConstruction $10,200Construction $4,961,284Closeout $0 Est. Program Cost $5,478,204Contingency Budget $1,095,678
Est. Project Costs $6,573,882
VP018305VP018304
VP018303
CAMDEN AVE
I-264
I-264
ELM AVE
DEEP
CRE
EK B
LVD
FREDERICK BLVD
PORTSMOUTH BLVD
GEORGE W
ASHINGTO
N HWY
FREDERICK BLVD
PALMER ST
LINCOLN STOAK ST
JEFFERSON ST
WATTS AVE
LANSING AVE
ELLIOTT AVE
RANDOLPH ST
BEECH ST
DES MOINES AVE
PARKER AVE
AZALEA AVE
PIEDMONT AVE
WILCOX AVE
CENTRE AVE
SUMMIT AVE
CHARLESTON AVE
DALE DR
HIGHLAND AVE
EDISON AVE
LINDSAY AVE
BEACON RD
NASHVILLE AVE
DOWNES ST
HOOVER ST
MANLY ST
PULASKI ST
COLUMBUS AVE
CLUVERUS ST
ACORN ST
LEXINGTON DR
ATTWATER LN
VP018305Camden Avenue GravityImprovements (VIP-HPP-04E)
CIP Location
Portsmouth
Legend
HRSD Interceptor Force MainHRSD Interceptor Gravity Main
3Q HRSD Treatment Plant
3SRP HRSD Pressure Reducing Station
3PS HRSD Pump Station
VP018305
/0 540 1,080 1,620 2,160270
Feet
Project Area
±
± Project Interceptor Line!]̂ Project Interceptor Point!]̂ Project Pump Station Point
CIP Project Area
_̂ CIP Interceptor Point_ CIP Pump Station Point
CIP Abandonment
±
± CIP Interceptor Line
Camden Avenue Gravity Improvements (VIP-HPP-04E) PR_VP018305
System: VIPType: Locality and Private Property
Driver Category: I&I Abatement-IP/RWWMPProject Phase: ProposedRegulatory: Integrated Plan-HPP 1
PROGRAM CASH FLOW PROJECTION ($,000)
Prog CostExp to
Previous Year FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31
$2,621 $0 $0 $0 $0 $0 $45 $242 $1,677 $656 $0 $0
PROJECT DESCRIPTION
Camden Avenue gravity main (GM) capacity improvements: Upgrade 1,670 linear feet (LF) of 12-inch GM to 15-inch GM; Upgrade 2,170 LF of 17-inch GM to 21-inch GM and 370 LF of 15-inch GM to 18-inch GM.
PROJECT JUSTIFICATION
As part of HRSD's Integrated Plan, a program of High Priority RWWMP Projects (HPP) will be constructed through 2030. These projects were selected based on theirability to provide the greatest environmental and human health benefits. Further, this $200+ million investment will significantly reduce sanitary sewer overflow (SSO) volume at the 5-year level of service by 47 percent.
FUNDING TYPE CONTACTS
Funding Type: Cash Contacts-Requesting Dept: Operations-InterceptorsContacts-Dept Contacts: Jeff ScaranoContacts-Managing Dept: Engineering
PROPOSED SCHEDULE START DATE COST ESTIMATE
PrePlanning 08/01/2025PER 02/01/2026Design Delay 09/01/2026Design 09/01/2026Bid Delay 06/01/2027PreConstruction 06/01/2027Construction 09/01/2027Closeout 11/01/2028
Cost Estimate Class: Class 5 PrePlanning $0PER $63,340Design $205,595PreConstruction $53,995Construction $2,297,683Closeout $0 Est. Program Cost $2,620,613Contingency Budget $574,421
Est. Project Costs $3,195,034
VP018400 STATE ST
STATE ST
8
I-264
I-464
I-264
I-464
STATE ST
EMMETT PL
W INDIAN RIVER RD
VP018400State Street Pressure ReducingStation and Offline Storage (VIP-HPP-05)
CIP Location
Norfolk
Legend
HRSD Interceptor Force MainHRSD Interceptor Gravity Main
3Q HRSD Treatment Plant
3SRP HRSD Pressure Reducing Station
3PS HRSD Pump Station
VP018400
/0 110 220 330 44055
Feet
Project Area
±
± Project Interceptor Line!]̂ Project Interceptor Point!]̂ Project Pump Station Point
CIP Project Area
_̂ CIP Interceptor Point_ CIP Pump Station Point
CIP Abandonment
±
± CIP Interceptor Line
State Street Pressure Reducing Station and Offline Storage (VIP-HPP-05)
PR_VP018400
System: VIPType: Offline Storage
Driver Category: I&I Abatement-IP/RWWMPProject Phase: ProposedRegulatory: Integrated Plan-HPP 1
PROGRAM CASH FLOW PROJECTION ($,000)
Prog CostExp to
Previous Year FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31
$18,926 $215 $161 $161 $161 $161 $161 $569 $652 $4,149 $9,383 $3,153
PROJECT DESCRIPTION
Install new Pressure Reducing Station (PRS) with 35 feet of assistance - New Location; Install new 2.3 MG storage tank.
PROJECT JUSTIFICATION
As part of HRSD's Integrated Plan, a program of High Priority RWWMP Projects (HPP) will be constructed through 2030. These projects were selected based on theirability to provide the greatest environmental and human health benefits. Further, this $200+ million investment will significantly reduce sanitary sewer overflow (SSO) volume at the 5-year level of service by 47 percent.
FUNDING TYPE CONTACTS
Funding Type: Revenue Bond Contacts-Requesting Dept: Operations-InterceptorsContacts-Dept Contacts: Jeff ScaranoContacts-Managing Dept: Engineering
PROPOSED SCHEDULE START DATE COST ESTIMATE
PrePlanning 03/01/2020PER 07/01/2026Design Delay 01/01/2027Design 01/01/2027Bid Delay 11/01/2028PreConstruction 11/01/2028Construction 02/01/2029Closeout 11/01/2030
Cost Estimate Class: Class 5 PrePlanning $1,020,000PER $242,760Design $1,194,420PreConstruction $22,440Construction $16,420,980Closeout $25,500 Est. Program Cost $18,926,100Contingency Budget $3,872,512
Est. Project Costs $22,798,612
VP018500
VP018500
VP018500
VP014800
VP018301
VA-164
VA-1
64
MIDTOWN TUNNEL
US-58
HARPER AVE
SEABOARD AVE
TUNNEL
FACI
LITY R
D
PINNERS AVE
ORAP
AX S
T
HILL AVE
LANGLEY RD
VP018500Elizabeth River Crossing ReliabilityImprovements
CIP Location
Norfolk
Legend
HRSD Interceptor Force MainHRSD Interceptor Gravity Main
3Q HRSD Treatment Plant
3SRP HRSD Pressure Reducing Station
3PS HRSD Pump Station
VP018500
/0 760 1,520 2,280 3,040380
Feet
Project Area
±
± Project Interceptor Line!]̂ Project Interceptor Point!]̂ Project Pump Station Point
CIP Project Area
_̂ CIP Interceptor Point_ CIP Pump Station Point
CIP Abandonment
±
± CIP Interceptor Line
Elizabeth River Crossing Reliability Improvements PR_VP018500
System: VIPType: Pipelines
Driver Category: Aging Infrastructure/RehabilitationProject Phase: Pre PlanningRegulatory: None
PROGRAM CASH FLOW PROJECTION ($,000)
Prog CostExp to
Previous Year FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31
$2,205 $543 $1,511 $150 $0 $0 $0 $0 $0 $0 $0 $0
PROJECT DESCRIPTION
This project will install two metering vaults and a bypass pump connection. One metering vault will replace the failed direct bury meter at Pinners Point. The other metering vault will be located in Norfolk to provide information about the condition of the river crossing. An emergency pump connection will be installed at the Pinners Point diversion structure, and that structure will be demolished.
PROJECT JUSTIFICATION
The existing meter at Pinners Point is a direct bury style meter, making it inaccessible for maintenance. The meter is at the end of its useful life and has failed. This metering location is necessary to capture flow information from the south side of the Elizabeth River in Portsmouth, including flows from Camden, Rodman, and Elmhurst Pump Stations. The new meter location in Norfolk will provide critical, missing information on the condition of the river crossing, as currently there is not a means to identify failure of that crossing. The new emergency pump connection at the abandoned diversion structure at Pinners Point will provide a means for conveying flow in the event of a failure of the Elizabeth River crossing. At present, if the crossing fails, overflows will occur in downtown Portsmouth. This new connection provides a single point of collection for the overflow, and removes the risk to the downtown area.The abandoned diversion structure at Pinners Point will be demolished, as it is currently a safety risk.
FUNDING TYPE CONTACTS
Funding Type: Revenue Bond Contacts-Requesting Dept: Operations-EEMContacts-Dept Contacts: Phil HubbardContacts-Managing Dept: Operations-Interceptors
PROPOSED SCHEDULE START DATE COST ESTIMATE
PrePlanning 07/01/2019PER 07/29/2019Design Delay 09/17/2019Design 09/01/2019Bid Delay 05/01/2021PreConstruction 08/01/2021Construction 09/01/2021Closeout 07/01/2022
Cost Estimate Class: Class 5 PrePlanning $0PER $89,583Design $450,000PreConstruction $15,000Construction $1,500,000Closeout $150,000 Est. Program Cost $2,204,583Contingency Budget $100,000
Est. Project Costs $2,304,583
GN017900
GN016392GN016391GN016390
VP018800
VP019100VP019200
AB011800
43RD ST
VP018800Virginia Initiative PlantAdministration Building Renovation
CIP Location
Norfolk
Legend
HRSD Interceptor Force MainHRSD Interceptor Gravity Main
3Q HRSD Treatment Plant
3SRP HRSD Pressure Reducing Station
3PS HRSD Pump Station
VP018800
/0 130 260 390 52065
Feet
Project Area
±
± Project Interceptor Line!]̂ Project Interceptor Point!]̂ Project Pump Station Point
CIP Project Area
_̂ CIP Interceptor Point_ CIP Pump Station Point
CIP Abandonment
±
± CIP Interceptor Line
Virginia Initiative Plant Administration Building Renovation
PR_VP018800
System: VIPType: Facilities, Buildings and Capital Equipment
Driver Category: Aging Infrastructure/RehabilitationProject Phase: PERRegulatory: None
PROGRAM CASH FLOW PROJECTION ($,000)
Prog CostExp to
Previous Year FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31
$2,695 $234 $1,671 $777 $13 $0 $0 $0 $0 $0 $0 $0
PROJECT DESCRIPTION
This project is to renovate the existing 1990 and 1974 administration areas.
PROJECT JUSTIFICATION
This project will provide additional administration offices, lunch room, conference room, bathrooms and unisex bathrooms for Solids Treatment and Solids Handling.
FUNDING TYPE CONTACTS
Funding Type: Revenue Bond Contacts-Requesting Dept: Operations-TreatmentContacts-Dept Contacts: Tim MarshContacts-Managing Dept: Operations-Treatment
PROPOSED SCHEDULE START DATE COST ESTIMATE
PrePlanning 07/01/2020PER 02/02/2021Design Delay 05/04/2021Design 05/05/2021Bid Delay 09/03/2021PreConstruction 09/04/2021Construction 11/02/2021Closeout 11/03/2022
Cost Estimate Class: Class 5 PrePlanning $0PER $64,090Design $338,976PreConstruction $0Construction $2,252,028Closeout $40,000 Est. Program Cost $2,695,094Contingency Budget $539,018
Est. Project Costs $3,234,112
VP018900NORCHESTER ST
MYRTLE AVE
CORPREW AVE
GATE HOUSE RD
NORCHESTER AVE
CORPREW LN
COLC
HEST
ER M
EWS
COLCHESTER CRES
PARK CRES
E NORCHESTER MEW
S
DOWNHAM WAY
COLC
HEST
ER C
RES
VP018900Norchester Pump Station ScreeningImprovements
CIP LocationLegend
HRSD Interceptor Force MainHRSD Interceptor Gravity Main
3Q HRSD Treatment Plant
3SRP HRSD Pressure Reducing Station
3PS HRSD Pump Station
VP018900
/0 110 220 330 44055
Feet
Project Area
±
± Project Interceptor Line!]̂ Project Interceptor Point!]̂ Project Pump Station Point
CIP Project Area
_̂ CIP Interceptor Point_ CIP Pump Station Point
CIP Abandonment
±
± CIP Interceptor Line
Norchester Pump Station Screening Improvements PR_VP018900
System: VIPType: Pump Stations
Driver Category: Performance UpgradesProject Phase: ProposedRegulatory: None
PROGRAM CASH FLOW PROJECTION ($,000)
Prog CostExp to
Previous Year FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31
$469 $0 $89 $310 $70 $0 $0 $0 $0 $0 $0 $0
PROJECT DESCRIPTION
This project will upgrade the screening equipment at the Norchester Pump Station.
PROJECT JUSTIFICATION
The existing Norchester Pump Station has an inline grinder that failed after only 3 years of service. Failure of the grinder appeared to be due to a heavy sand load in the influent stream that wore down the teeth and the bearings of the grinder cassette. However, the body of the grinder also showed very heavy metal corrosion due to high levels of hydrogen sulfide in the wet well. As a result, an evaluation of all screening technologies was performed to ensure a longer life expectancy and more reliable operation of the upgraded equipment. This project will design and construct the screening upgrades at this station.
FUNDING TYPE CONTACTS
Funding Type: Revenue Bond Contacts-Requesting Dept: Operations-InterceptorsContacts-Dept Contacts: Jeff ScaranoContacts-Managing Dept: Engineering
PROPOSED SCHEDULE START DATE COST ESTIMATE
PrePlanning 07/07/2021PER 10/01/2021Design Delay 02/01/2022Design 02/01/2022Bid Delay 08/01/2022PreConstruction 08/01/2022Construction 10/01/2022Closeout 09/01/2023
Cost Estimate Class: Class 5 PrePlanning $0PER $25,500Design $76,500PreConstruction $5,100Construction $357,000Closeout $5,100 Est. Program Cost $469,200Contingency Budget $102,000
Est. Project Costs $571,200
VP019000COLLEY AVE
COLLEY AVEW BRAMBLETON AVE
FAIRFAX AVE
W OLNEY RD
DUNDA
FF ST
PEMBROKE AVE
WAGN
ER R
D
CHIL
DREN
'S L
N
VP019000Colley Ave Pump Station PumpReplacement
CIP LocationLegend
HRSD Interceptor Force MainHRSD Interceptor Gravity Main
3Q HRSD Treatment Plant
3SRP HRSD Pressure Reducing Station
3PS HRSD Pump Station
VP019000
/0 110 220 330 44055
Feet
Project Area
±
± Project Interceptor Line!]̂ Project Interceptor Point!]̂ Project Pump Station Point
CIP Project Area
_̂ CIP Interceptor Point_ CIP Pump Station Point
CIP Abandonment
±
± CIP Interceptor Line
Colley Avenue Pump Station Pump Replacement PR_VP019000
System: VIPType: Pump Stations
Driver Category: Aging Infrastructure/RehabilitationProject Phase: ProposedRegulatory: None
PROGRAM CASH FLOW PROJECTION ($,000)
Prog CostExp to
Previous Year FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31
$650 $10 $64 $576 $0 $0 $0 $0 $0 $0 $0 $0
PROJECT DESCRIPTION
This project will replace the existing extended shaft pumps at Colley Avenue Pump Station with new constant speed dry pit submersible pumps. Architectural updates will also be made to help the station blend with the surrounding area.
PROJECT JUSTIFICATION
The existing pumps at the Colley Avenue Pump Station were installed circa 1970. Two of the three pumps are Allis-Chalmers pumps, which are no longer manufactured, making spare parts very difficult to find. A recent drawdown test performed in June 2020 showed that the two smaller pumps are operating at 70% of their original hydraulic capacity, and the large pump is operating at approximately 45% of its capacity. In addition, the smaller pumps are undersized for wet weather head conditions, forcing the third pump to be used as both the lead and wet weather pump. As a result, a 6-inch emergency bypass pump has been installed at the station to provide additional wet weather pumping capacity. Due to the loss of hydraulic efficiency and their age, these pumps cost approximately $10,000 per year more in power, labor and maintenance costs than properly sized new pumps. In addition, replacing the pumps would allow the Godwin pump to be removed, improving the aesthetics of the station, and allowing this pump to be used elsewhere in the system.
FUNDING TYPE CONTACTS
Funding Type: Revenue Bond Contacts-Requesting Dept: Operations-InterceptorsContacts-Dept Contacts: Jeff ScaranoContacts-Managing Dept: Operations-Interceptors
PROPOSED SCHEDULE START DATE COST ESTIMATE
PrePlanning 04/01/2021PER 07/01/2021Design Delay 09/01/2021Design 09/01/2021Bid Delay 04/01/2022PreConstruction 04/01/2022Construction 08/01/2022Closeout 04/01/2023
Cost Estimate Class: Class 5 PrePlanning $10,000PER $15,000Design $45,000PreConstruction $5,000Construction $565,000Closeout $10,000 Est. Program Cost $650,000Contingency Budget $150,000
Est. Project Costs $800,000
GN017900
GN016392GN016391GN016390
VP019100
VP018800
VP019200
AB011800
43RD ST
VP019100Virginia Initiative Plant IncineratorBurner Replacement
CIP LocationLegend
HRSD Interceptor Force MainHRSD Interceptor Gravity Main
3Q HRSD Treatment Plant
3SRP HRSD Pressure Reducing Station
3PS HRSD Pump Station
VP019100
/0 130 260 390 52065
Feet
Project Area
±
± Project Interceptor Line!]̂ Project Interceptor Point!]̂ Project Pump Station Point
CIP Project Area
_̂ CIP Interceptor Point_ CIP Pump Station Point
CIP Abandonment
±
± CIP Interceptor Line
Virginia Initiative Plant Incinerator Burner Replacement PR_VP019100
System: VIPType: Biosolids
Driver Category: Aging Infrastructure/RehabilitationProject Phase: ProposedRegulatory: None
PROGRAM CASH FLOW PROJECTION ($,000)
Prog CostExp to
Previous Year FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31
$1,800 $0 $600 $900 $300 $0 $0 $0 $0 $0 $0 $0
PROJECT DESCRIPTION
This project is to replace the Hauck burners for both incinerators at the Virginia Initiative Plant.
PROJECT JUSTIFICATION
The existing Hauck burners and controls are obsolete making it difficult to find replacement parts. The burners are 40 years old and ,in some instances, the burner pilots have been unsafe to light-up. The proposed American Burners are reliable with proven record at HRSD. The specified proposed burners are Low- NOx and are necessary for future incinerator compliance.
FUNDING TYPE CONTACTS
Funding Type: Revenue Bond Contacts-Requesting Dept: Operations-TreatmentContacts-Dept Contacts: Sami GhosnContacts-Managing Dept: Engineering
PROPOSED SCHEDULE START DATE COST ESTIMATE
PrePlanningPERDesign DelayDesignBid DelayPreConstruction 07/07/2021Construction 11/03/2021Closeout 11/01/2023
Cost Estimate Class: Class 4 PrePlanning $0PER $0Design $0PreConstruction $0Construction $1,800,000Closeout $0 Est. Program Cost $1,800,000Contingency Budget $180,000
Est. Project Costs $1,980,000
GN017900
GN016392GN016391GN016390
VP019200
VP018800
VP019100
AB011800
43RD ST
VP019200Virginia Initiative Plant MotorControl Center Replacements
CIP LocationLegend
HRSD Interceptor Force MainHRSD Interceptor Gravity Main
3Q HRSD Treatment Plant
3SRP HRSD Pressure Reducing Station
3PS HRSD Pump Station
VP019200
/0 170 340 510 68085
Feet
Project Area
±
± Project Interceptor Line!]̂ Project Interceptor Point!]̂ Project Pump Station Point
CIP Project Area
_̂ CIP Interceptor Point_ CIP Pump Station Point
CIP Abandonment
±
± CIP Interceptor Line
Virginia Initiative Plant Motor Control Center Replacements
PR_VP019200
System: VIPType: Electrical
Driver Category: Aging Infrastructure/RehabilitationProject Phase: ProposedRegulatory: None
PROGRAM CASH FLOW PROJECTION ($,000)
Prog CostExp to
Previous Year FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31
$1,875 $0 $604 $1,271 $0 $0 $0 $0 $0 $0 $0 $0
PROJECT DESCRIPTION
This project is to design and replace five (5) Motor Control Centers (MCC) and a Main Distribution Panel located in the Incinerator Building at Virginia Initiative Plant (VIP) installed in the 1970's. This project will also replace a 1980's vintage MCC located in the Blower Building. Both MCC's have reached the end of their useful life.
PROJECT JUSTIFICATION
During an annual thermographic inspection signs of bus deterioration and heat anomalies were discovered. The MCC's are critical to plant operations. The five MCC'sin the incinerator building supply power to the furnace, ID fan, Centrifuges, and Building Services. The MCC located in the Blower Building supplies power to the Blowers, Primary Clarifiers, Grit Tanks, and Chemical Building. This project will increase plant process reliability and improve employee safety by reducing the likelihood of an arc flash event.
FUNDING TYPE CONTACTS
Funding Type: Revenue Bond Contacts-Requesting Dept: Operations-TreatmentContacts-Dept Contacts: Sherman PresseyContacts-Managing Dept: Operations-EEM
PROPOSED SCHEDULE START DATE COST ESTIMATE
PrePlanningPERDesign DelayDesign 07/12/2021Bid DelayPreConstructionConstruction 05/15/2022Closeout
Cost Estimate Class: Class 5 PrePlanning $0PER $0Design $350,000PreConstruction $0Construction $1,525,000Closeout $0 Est. Program Cost $1,875,000Contingency Budget $305,000
Est. Project Costs $2,180,000
High Priority Projects Round 2 Project 4 PR_VP019300
System: VIPType: Pipelines
Driver Category: I&I Abatement-IP/RWWMPProject Phase: ProposedRegulatory: Integrated Plan-HPP 2
PROGRAM CASH FLOW PROJECTION ($,000)
Prog CostExp to
Previous Year FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
PROJECT DESCRIPTION
High Priority Project (HPP) Round 2 Project 4 consists of the following Regional Wet Weather Management Plan (RWWMP) Project ID and general description:VIP-RWWMP-41 Norfolk I/I Reduction
PROJECT JUSTIFICATION
As part of the RWWMP submitted to the DEQ and EPA, HRSD developed an approach to recognize the highest-priority system improvements with the greatest relative environmental benefit. The result being the identification of High-Priority Projects (HPPs). The initial HPPs (Round 1) were identified in the RWWMP, submitted to EPA in September of 2017, and are scheduled to be constructed between plan approval and 2030. Further review of RWWMP projects was conducted in2019 to find beneficial solutions to implement as a second set of HPPs (identified as Round 2). A prioritization methodology was used to identify improvements to minimize sanitary sewer overflow (SSO) volume. Rounds 1 and 2 of High-Priority Projects were scheduled with consecutive 10-year implementation periods starting with Round 1 being completed between plan approval and 2030. Prior to commencement, HRSD will review the Round 2 projects to confirm that they are still expected to meet the desired result and confirm this in a check in with the EPA/DEQ. To modify the list of specific Round 2 HPP projects, HRSD will show that the revised set of projects will attain a minimum of the samepercent reduction, or better.
FUNDING TYPE CONTACTS
Funding Type: Cash Contacts-Requesting Dept: EngineeringContacts-Dept Contacts: John DanoContacts-Managing Dept: Engineering
PROPOSED SCHEDULE START DATE COST ESTIMATE
PrePlanning 07/01/2031PER 07/01/2033Design DelayDesign 01/01/2034Bid DelayPreConstruction 01/01/2035Construction 02/01/2035Closeout 10/01/2036
Cost Estimate Class: Class 5 PrePlanning $247,600PER $619,000Design $742,800PreConstruction $123,800Construction $10,523,000Closeout $123,800 Est. Program Cost $12,380,000Contingency Budget $0
Est. Project Costs $12,380,000
High Priority Projects Round 2 Project 5 PR_VP019400
System: VIPType: Pipelines
Driver Category: I&I Abatement-IP/RWWMPProject Phase: ProposedRegulatory: Integrated Plan-HPP 2
PROGRAM CASH FLOW PROJECTION ($,000)
Prog CostExp to
Previous Year FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
PROJECT DESCRIPTION
High Priority Project (HPP) Round 2 Project 5 consists of the following Regional Wet Weather Management Plan (RWWMP) Project IDs and general descriptions:VIP-RWWMP-12 May Avenue Storage TankVIP-RWWMP-14 Norfolk City System ImprovementsVIP-RWWMP-13 Willoughby Avenue Pump Staion Upgrade
PROJECT JUSTIFICATION
As part of the RWWMP submitted to the DEQ and EPA, HRSD developed an approach to recognize the highest-priority system improvements with the greatest relative environmental benefit. The result being the identification of High-Priority Projects (HPPs). The initial HPPs (Round 1) were identified in the RWWMP, submitted to EPA in September of 2017, and are scheduled to be constructed between plan approval and 2030. Further review of RWWMP projects was conducted in2019 to find beneficial solutions to implement as a second set of HPPs (identified as Round 2). A prioritization methodology was used to identify improvements to minimize sanitary sewer overflow (SSO) volume. Rounds 1 and 2 of High-Priority Projects were scheduled with consecutive 10-year implementation periods starting with Round 1 being completed between plan approval and 2030. Prior to commencement, HRSD will review the Round 2 projects to confirm that they are still expected to meet the desired result and confirm this in a check in with the EPA/DEQ. To modify the list of specific Round 2 HPP projects, HRSD will show that the revised set of projects will attain a minimum of the samepercent reduction, or better.
FUNDING TYPE CONTACTS
Funding Type: Revenue Bond Contacts-Requesting Dept: EngineeringContacts-Dept Contacts: John DanoContacts-Managing Dept: Engineering
PROPOSED SCHEDULE START DATE COST ESTIMATE
PrePlanning 07/01/2033PER 07/01/2033Design DelayDesign 07/01/2034Bid DelayPreConstruction 12/01/2035Construction 01/01/2036Closeout 10/01/2038
Cost Estimate Class: Class 5 PrePlanning $298,800PER $747,000Design $896,400PreConstruction $149,400Construction $12,699,000Closeout $149,400 Est. Program Cost $14,940,000Contingency Budget $0
Est. Project Costs $14,940,000