vision focus and projects of bcn in smart cities context

Upload: gustavo-silva

Post on 01-Jun-2018

227 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    1/105

    Barcelona Smart City projects

    1

    The vision, focus and projects of the Cityof Barcelona in the context of Smart Cities

    BARCELONA SMART CITY

    Barcelona, 15 October 2012

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    2/105

    Barcelona Smart City projects

    2

    Contents

    I. Smart Barcelona Project

    II. Network architecture

    III. Project map (cross-cutting, vertical, special)

    IV. Innovation in SC projects: Urban Lab

    V. Global planning of projects

    VI. Agreements

    VII. Sector analysis: potential partners

    VIII.Organization and monitoring methodology

    IX. Action Plan

    X. Risks

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    3/105

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    4/105

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    5/105

    Barcelona Smart City projects

    5

    I. Smart Barcelona ProjectParticipation at international events

    Barcelona City Council, in the context of smart cities, participates at various international events in order toadvertise the Smart Barcelona Project abroad and also other initiatives under development.Accordingly, and with the additional aim of acquiring new knowledge related to smart cities in the areas oftechnology, society and sustainability, the city has participated or will participate at such events as:

    26-28 September 2012

    Nice4-6 June 2012

    Vienna

    Major Cities of Europe - Annual Conference

    Conference with speakers from over 30European cities, gathered together todiscuss the current situation and thechallenges of ICT in cities.

    Smart Cities Conference that will bringtogether experts from the public andprivate sectors to discuss newinitiatives, successfully implementedprojects and future prospects.

    Smart Grids Smart Cities Forum 2012

    8-11 October 2012

    Barcelona

    6th Urban Research and Knowledge Symposium- Rethinking Cities: Framing the future

    Over 50 sessions exploring differentissues such as social impact, theeconomy, sustainability, governance,innovation and the limitations ofavailable space, with the participation ofteaching and business experts from

    around the world.

    http://www.bcn.cat/mambient/newsletters/habitaturba/30114.jpeg
  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    6/105

    Barcelona Smart City projects

    6

    I. Smart Barcelona ProjectEuropean Projects

    As regards European projects, Barcelona City Council cooperates with various companies with Europeanprojects such as:

    Development of the Arrowhead project in the framework of the 2012 EuropeanARTEMISInnovationPilotprogramme , in the areas of energy and mobility.

    European FP7 Smart Cities and Smart Grid project, focusing on energy efficiency.

    European LIFE project, an intelligent system for automated urban waste collection.

    European BESOS project (Building Energy decision Support Systems fOr Smartcities), based on a platform designed to support decision-taking on matters ofenergy efficiency.

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    7/105

    Barcelona Smart City projects

    The City Protocol is the whole range of knowledge (open protocols, agreements, good practices,information) that the cities themselves, supported by the academic world and the industrial sector,aregenerating to create, in practice,a global forum for the development of smart cities.

    7

    I. Smart Barcelona ProjectCity Protocol

    1. To encourage and support a new science of cities.

    2. To establish a framework for cooperation between the City Council, universities, companies,organizations and society itself.

    3. To direct and prepare the future of cities.

    4. To understand the driving forces of urban evolution and identify and work on continually changingsolutions.

    5. To identify synergies and innovative and economic opportunities to obtain products and serviceswith added value.

    Basic goals

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    8/105

    Barcelona Smart City projects

    8

    I. Smart Barcelona ProjectCity Protocol Society

    The City Protocol Society is a non-profit organization whose main objective is to prepare, lead anddevelop the City Protocol.

    The City Protocol Society is comprised by agents from industry, universities/research centres in other

    cities around the world and other organizations and companies.

    Parties to the City Protocol Society

    OrganisationsCompanies

    Universities Cities

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    9/105

    Barcelona Smart City projects

    9

    I. Smart Barcelona ProjectWorkshop City Protocol

    Cities Organisations Companies Universities

    AmsterdamBarcelonaBoston

    Buenos AiresBusanCopenhagenDerbyDublinGenevaHelsinkiHyderabadIstanbulLima

    LisbonLivornoLyonMaputo

    MedellnMilanMoscow

    NairobiNew York CityNiceParisQuitoRomeSan FranciscoSeoulTaipeiTurin

    UppsalaVeniceViennaYokohama

    Citizen Housing and Planning CouncilNYEcocities Builders

    Ecocities EmergingEurocitiesEuropean CommissionEuropean Network of Living LabsFundaci Mobile World CapitalGreen Building CouncilInter-American Development BankLiving Labs GlobalMajor Cities of EuropePublic Technology Institute

    Red Espaola de Ciudades InteligentesSmart City World CongressThink InnovationUnited Cities and Local Governments

    AenorCideuCitilab

    ICLEIJNNURMMetropolis

    AbertisAccentureAgbar

    CapgeminiCITIFujitsuGrupo EtraHPIBMITALTELINDRAMicrosoftOracle

    ROS ROCASchneider-TelventSiemensTelefnicaOPENTEXTSAP

    Argonne National LaboratoryBarcelona GSEESADE

    Institute for Advanced Architecture ofCatalonia (IAAC)IESEImperial College Business SchoolLondon School of EconomicsMIT (Architecture & ICT),Rutgers University School of Public Affairs& Administration,Public Technology InstituteUniv. of Cantabria

    Univ. of AlbanyUniv. of ChicagoUniv. of GironaUniv. of SydneyUniv. of Virginia,Univ. Politcnica de Catalunya (UPC)Yonsei University

    On 16 and 17 July the first City Protocol workshop was held in Barcelona. Over 150 delegates from cities, academicinstitutions, organizations and companies from around the world shared the potential value of constructing a cityprotocol. Potential agents who took part are:

    Gold partners:

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    10/105

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    11/105

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    12/105

    Barcelona Smart City projects

    12

    I. Smart Barcelona ProjectCity Protocol Agenda

    CPS: City Protocol Society

    PHASE 1

    Barcelona output 1st C/Pworkshop (16 and 17 July)

    San Francisco output 2nd C/Pworkshop (12 October)

    PHASE 2

    Construction of agreements onprinciples and goals to beaddressed

    PHASE 3

    Set up working groups toparticipate periodically inworkshops

    2012

    Formation of interim secretariat, undertaken by

    Barcelona City Council

    Choice of CPS organogram

    Initial functioning of CPS

    Presentation of conclusions

    Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov

    2013

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    13/105

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    14/105

    Barcelona Smart City projects

    14

    I. Smart Barcelona ProjectGoals and scope

    To adminster this environment it is necessary to use a unified work structure for developing any service:The aim of the Barcelona Smart Project is to provide the city with the right conditions, from both a proceduralpoint of view and as a platform, to accommodate current and future smart city projectsin the city.This environment will allow orderly growth of smart services, both in their conception, implementation andsubsequent operation.To administer this environment it is necessary to implant a unified work structure for developing services:

    Unified monitoring, independent of any service butbringing together information on all of them.

    Smart services developed by different City Council servicedepartments or service companies operating in the city.They are independent but work in the same environment.

    Unified data management platform. This drives thework environment.

    Unified network covering the entire city and connectingeach servicesmechanisms.

    Unified network

    Platform of services

    Monitoring

    Smart services

    Environment

    Social impact

    Building Neighbourhood

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    15/105

    Barcelona Smart City projects

    15

    Contents

    I. Smart Barcelona Project

    II. Network architecture

    III. Project map (cross-cutting, vertical, special)

    IV. Innovation in SC projects: Urban Lab

    V. Global planning of projects

    VI. Agreements

    VII. Sector analysis: potential partners

    VIII.Organization and monitoring methodology

    IX. Action Plan

    X. Risks

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    16/105

    Barcelona Smart City projects

    16

    II. Network architectureGoals

    Provide the City Council with a infrastructure of technology platforms that facilitates the management andoperation of smart cities projects in the city

    At the same time, this structure has to allow management of information about the various services in thecity, both cross-cutting (between services) and vertical (including a centre for global supervision).

    This structure must be built on open platforms.

    The interfaces linking platforms must comply with market standards.

    The platforms must include the possibility of scalable growth.

    The architecture must allow the integration of current City Council services and platforms.

    The proposed architecture must integrate the current philosophy of non-replicated basic information.

    The proposed architecture must accommodate the iCity and Open Data projects in particular, responding toa philosophy of an open platform for non-corporative, third-party use.

    The Situation Room, for monitoring the state of the city, both in terms of services and projects.

    1

    2

    3

    4

    5

    6

    7

    8

    9

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    17/105

    Barcelona Smart City projects

    17

    Sensor platform BD

    Centres de

    control

    External

    control

    centres

    City OS iCity

    BI

    Area

    Basic

    Information

    SDK

    external

    integration

    Situation RoomBI VISTA

    Sensors

    ...

    Service

    applications

    OpenD

    ata

    CityOpen

    Apps

    OPEN Data +

    APPS

    Video

    platform

    Sensors...

    Cameras...

    Other

    sensor

    platforms

    ScadasIRIS

    APPS

    Mycelium

    Centres de

    controlControl centres

    Support services for SmartCity business applications

    Interface standard for inter-operation with the sources of information

    Citysemantics

    Events Management

    and Repository BD

    Processes

    Security

    Management

    Analysis

    Sources of

    informationabout the city

    SmartCity

    applications

    II. Network architectureLayout

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    18/105

    Barcelona Smart City projects

    18

    Contents

    I. Smart Barcelona Project

    II. Network architecture

    III. Project map (cross-cutting, vertical, special)

    IV. Innovation in SC projects: Urban LabV. Global planning of projects

    VI. Agreements

    VII. Sector analysis: potential partners

    VIII.Organization and monitoring methodology

    IX. Action Plan

    X. Risks

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    19/105

    Barcelona Smart City projects

    19

    III. Map of cross-cutting projects(a) Situation Room

    SITUATION ROOM

    INTEGRATION AND SHARING

    of information about the city and its services

    Infrastructures

    Emergencies

    State ofservices

    OFFLINE Information

    Publiccompanies

    Privatecompanies

    City Council

    ONLINE InformationCONTROL CENTRES

    Xarxa unificada

    Plataforma de serveis

    Monitoratge

    Environment

    Impacte social

    Building Barri

    PresentationSituation Room

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    20/105

    Barcelona Smart City projects

    20

    Situation Room Jordi Cirera

    NMN

    BSP

    SR

    Environment

    Impacte social

    Building Barri

    III. Map of cross-cutting projects(a) Situation Room

    Platform for integrating and sharing informationabout the city and its services

    Goal

    Definition (functional level, ICT and organization)and implementation of a comprehensive platformfor the storage and analysis of meaningful data,monitoring operations and the evolution ofincidents, and control of the citys strategicprojects.

    Scope

    Basic information and mapping (IMI):

    development of visualization software (VISTA)SITEP: third-party integration

    Possible interested partners

    Project being defined. Preparation of draft project

    State

    Definition of draft pilot project for approval by theManagement.

    Next goals

    Pending information. Deadline 25 October

    Budget 2012

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    21/105

    Barcelona Smart City projects

    21

    III. Map of cross-cutting projects(b) Urban platform (Barcelona Sensor Platform)

    BSP: Acquisition

    It will take into consideration: Physical characteristics of the installation

    of devices

    The protocols used for sending data

    BSP: Transport

    Provides various mechanisms to send datafrom the devices to the data centre (WiFi,3G).

    BSP: Storage

    Supplies the devices aggregated data to the

    applications

    Data storage and processes

    Data transport

    Data acquisition

    Vertical services

    Barcelona Sensor Platform

    NMN

    NMN

    BSP

    SR

    Environment

    Impacte social

    Building Barri

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    22/105

    Barcelona Smart City projects

    22

    Barcelona Sensor Platform (BSP) Jordi Cirera

    NMN

    BSP

    SR

    Environment

    Impacte social

    Building Barri

    III. Map of cross-cutting projects(b) Urban platform (Barcelona Sensor Platform)

    Cross-cutting technology platform for themanagement of telecommunications networks andinfrastructure in the city

    Goal

    Functional and technological definition of theplatform, considering all the networks andinfrastructures of the New Municipal Network.Implementation of ICT and SSII, official approval ofsuppliers and definition of procedures

    Scope

    Opentrends

    Possible interested partners

    Project being defined. Preparation of draft project.

    State

    Definition of draft pilot project for approval bythe Management.

    Next goals

    Pending information. Deadline 25 October

    Budget 2012

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    23/105

    Barcelona Smart City projects

    23

    Jordi Cirera

    NMN

    BSP

    SR

    Environment

    Impacte social

    Building Barri

    III. Map of cross-cutting projects(c) City OS

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    24/105

    Barcelona Smart City projects

    24

    III. Map of cross-cutting projects(d) Telecommunications network (New Municipal Network)

    CO-

    RE

    X.TRANS-

    PORT

    XARXA

    ACCS

    U

    SUARIS

    Mesh

    Cmeres

    Semfors

    ServeisB:SMAltres

    X. WiFi CiutadX.WiFi Corporatiu

    (via pblica)

    ServeisCorporatiusViaPblica

    WiFiCiutad

    WiFiPagament

    XTC(ADSL)

    Edificis

    Altres

    WiFi

    Oficines

    XarxaIMI(LAN)

    CPD Adjudicatari CPD Mobilitat CPD B:SMCPD IMI

    Electrnica

    Fibra ptica

    Serveis3G/4G

    XarxaFIBRA

    PTICAAjuntament

    Coherent and unified layer of networks at the disposal of the layer of services and applications forusers.

    New model with several horizontal layers supported by a cross-cutting fibre-optic infrastructure.

    NMN

    BSP

    SR

    Environment

    Impacte social

    Building Barri

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    25/105

    Barcelona Smart City projects

    25

    NMN

    BSP

    SR

    Environment

    Impacte social

    Building Barri

    III. Map of cross-cutting projects(d) Telecommunications network (New Municipal Network)

    The cross-cutting project for the New Municipal Network of

    communications will be implemented in three phases:

    Integration of fibre-optic networks (IMI Administrative Board), giving consideration to

    the corporate network, already maintained by the IMI, the 22@ network, the Mobilitynetwork and the network of the tunnels in BCN.

    Expansion of network and exploitation of surpluses, fostering a change to networkarchitecture with two goals: to integrate all fibre-optic networks in a single network and

    increase their capacity so that excess capacity can be put to non-corporate use.

    FO-WiFi integration, considering a joint operating model, with the possibility ofoutsourcing management.

    1

    2

    3

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    26/105

    Barcelona Smart City projects

    26

    New Municipal Network (NMN)Technical level: Toni Carol

    Business level: Paco Rodrguez

    NMN

    BSP

    SR

    Environment

    Impacte social

    Building Barri

    III. Map of cross-cutting projects(d) Telecommunications network (New Municipal Network)

    Integration of municipal digital communicationsnetworks

    Goal

    Integration of fibre-optic network: corporate,tunnels, mobility and in 22@. Analysis of technical,business and legal levels

    Scope

    CiscoAbertis

    Possible interested partners

    Project being defined. Preparation of draft project.

    State

    Definition project partners: 15 OctPresentation draft project: 25 Oct

    Upcoming

    goals

    Pending information. Deadline 25 October

    Budget 2012

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    27/105

    Barcelona Smart City projects

    27

    III. Map of vertical projectsGoals

    The goal of the smart city projects under development in the city of Barcelona is to provide an infrastructurethat guarantees the development of a range of services in order to:

    Increase the efficiency of public servicesImprove the quality of lifeIncrease the opportunities offered by the city to individuals and companiesImprove the standard of environmental sustainability

    To this end, the setting has been defined, in relation to different service areas, in order to accommodatecurrent and future smart projects in the city.

    WATER ENERGYICT MATTER MOBILITY

    Environment

    Building Neighbourhood

    Social and community impact

    NATURE

    NMN

    BSP

    SR

    Environment

    Impacte social

    Building Barri

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    28/105

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    29/105

    Barcelona Smart City projects

    29

    OBJECTIVE

    Implementation of a solution that will optimize and centralize the collection, integration,processing and dissemination of information provided by the noise sensors of different suppliers.

    SCOPE

    Definition of a functional and technological solution to integrate the available 21 sound levelmeters, expandable to an ideal target of 5-6 units per district, in order to have approximately 50

    sensors distributed throughout the city.STATE

    Project in deployment phase.

    NMN

    BSP

    SR

    Environment

    Impacte social

    Building Barri

    III. Map of vertical projectsEnvironmental projects

    GOALS

    21 sound meters already operating

    The target is 50 operational sound

    meters

    Urban soundmeter

    Person responsible: Arantxa Millas (City Services and Environment)

    Partner

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    30/105

    Barcelona Smart City projects

    30

    OBJECTIVE

    To control the noise inside premises using standardized acoustic limiters to ensure noise does notexceed the established threshold.

    SCOPE

    They will be used in various establishments depending on the agreed range of action. There arealso hand-held sound level meters, used by technicians from the districts to carry out inspections

    and monitor sound levels.STATE

    Project in operation.

    NMN

    BSP

    SR

    Environment

    Impacte social

    Building Barri

    III. Map of vertical projectsEnvironmental projects

    GOALS

    Information pending update

    Person responsible: Arantxa Millas(City Services and Environment)

    Partner

    SR

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    31/105

    Barcelona Smart City projects

    31

    OBJECTIVE

    Remotely record and monitor the environmental impact of the work being done in the Avinguda delEstatut,through a system of sensors.

    SCOPE

    Monitoring and analysis of data relating to the state of the work, submitted by a system consistingof approximately of 20 sensors.

    STATE

    Project in operation.

    NMN

    BSP

    SR

    Environment

    Impacte social

    Building Barri

    III. Map of vertical projectsEnvironmental projects

    20 sensors already installed

    and fully operative

    GOALS

    Person responsible: Tomas Gea (Head ofProjects and Public Works Dept. of Environment)

    SR

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    32/105

    Barcelona Smart City projects

    32

    III. Map of vertical projectsICT projects

    OBJECTIVE

    Creation of a neighbourhood WIFI network in Barcelona to share products and services usingintegrated information systems and the development of a technological platform compatible withthe network.

    SCOPE

    Development of the "Whabit" online platform to share resources, objects, spaces, etc.. Available forcomputers, tablets and mobile phones.

    STATE

    Pilot project being deployed in Les Corts neighbourhood.

    NMN

    BSP

    SR

    Environment

    Impacte social

    Building Barri

    Information pending update

    GOALS Person responsible: Xavier Roca

    SR

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    33/105

    Barcelona Smart City projects

    33

    III. Map of vertical projectsICT projects

    OBJECTIVE

    Deployment of a WiFi network using public WiFi, which allows access to Internet in municipalspaces, and WiFi in the streets , forming the municipal network.

    SCOPE

    Network of 251 public WiFi points and 469 active points making up the WiFi street network,prioritizing areas with the highest demand in order to improve efficiency and allow the emergenceof new applications.

    STATE

    Project in operation.

    NMN

    BSP

    SR

    Environment

    Impacte social

    Building Barri

    251 public WiFi points and 469

    active points that make up the WiFi

    street network

    Map of WiFi stations in Barcelona

    GOALS Person responsible: Miriam Alvarado

    SR

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    34/105

    Barcelona Smart City projects

    34

    OBJECTIVE

    Progressiveintroduction of contactless payment using NFC technology for all types of services.

    SCOPE

    Development and implementation of the first phase, during 2012, of payment by NFC contactlesscards, in order to introduce a second phase, in 2013: payment by mobile phone. Bicing servicepayments will be included.

    STATE

    Project in deployment phase.

    NMN

    BSP

    SR

    Environment

    Impacte social

    Building Barri

    III. Map of vertical projectsICT projects

    Information pending update

    Partners

    Presentation of the project TAP & GO: NFC

    Barcelona, February 2012

    GOALS Person responsible: Sergi Jerez

    SR

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    35/105

    Barcelona Smart City projects

    35

    OBJECTIVE

    Development of a solution to detect the whereabouts and area of influence of touristsin the cityof Barcelona, through the roaming service.

    SCOPE

    Functional and technological definition of the control system, implementation of the solution andmonitoring and analysis of results.

    STATE

    Pilot project under development.

    NMN

    BSP

    SR

    Environment

    Impacte social

    Building Barri

    III. Map of vertical projectsICT projects

    Partners

    Information pending updateROAMING

    GOALS Person responsible: Information pending

    SR

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    36/105

    Barcelona Smart City projects

    36

    NMN

    BSP

    Environment

    Impacte social

    Building Barri

    III. Map of vertical projectsICT projects

    OBJECTIVE

    Firm commitment to e-government through the installation of Punt BCN terminals to carry outprocedures in council offices and public spaces.

    SCOPE

    Installation of innovative self-service electronic terminals to speed up the management of thecommonest municipal procedures and improve access to municipal information and resources.

    STATEPilot project in operation.

    Information pending update

    Punt BCN Terminal

    GOALS Person responsible: Information pending

    SR

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    37/105

    Barcelona Smart City projects

    37

    OBJECTIVE

    Installation of a SCADA system for automated centralized telemanagement of irrigationinfrastructures in order to control the duration and frequency of irrigation in each area, dependingon needs.

    SCOPE

    Development of a sensor system that integrates temperature, salinity and humidity sensors that

    make it possible, through an irrigation controller, to send the necessary information to the SCADAmanagement system.

    STATE

    Pilot projectin Parc Joan Mir under development.

    NMN

    BSP

    Environment

    Impacte social

    Building Barri

    III. Map of vertical projectsWater projects

    Information pending update

    Garden with humidity sensor

    GOALS Persons responsible: Francesc Hernndez - Cristina Vila

    SR

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    38/105

    Barcelona Smart City projects

    38

    OBJECTIVE

    Implementation of a SCADA system for telecontrol of ornamental fountains.

    SCOPE

    Integration of information from different suppliers in order to manage its operation.

    STATE

    Project in progress.

    NMN

    BSP

    Environment

    Impacte social

    Building Barri

    III. Map of vertical projectsWater projects

    Information pending update

    SCADA

    Partner

    GOALS Person responsible: Francesc Soler

    SR

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    39/105

    Barcelona Smart City projects

    39

    OBJECTIVE

    Study of municipal buildings to analyze and determine the most suitable model of self-development of energy servicesand their economic viability.

    SCOPE

    Study of 10-15 municipal buildings in the tertiary sector to analyze their energy model and developa pilot project in two of the buildings under study to collect data on the technical management of

    buildings.STATE

    Pilot project under development.

    NMN

    BSP

    Environment

    Impacte social

    Building Barri

    III. Map of vertical projectsEnergy-saving projects

    Partners

    Information pending update

    GOALS Person responsible: Manel Torrent

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    40/105

    SR

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    41/105

    Barcelona Smart City projects

    41

    OBJECTIVE

    Implementation of an air conditioning system that provides all buildings or centres of consumptionwith thermal energy in the form of the hot and/or cold water they need for air conditioning.SCOPE

    Air conditioning system that incorporates improvements in energy efficiency, environmental impact,management, and economic impact. It is currently installed in the Forum and is being expanded tothe 22@ district and the Zona Franca.

    STATE

    Pilotproject in operation.

    NMN

    BSP

    Environment

    Impacte social

    Building Barri

    III. Map of vertical projectsEnergy-saving projects

    Information pending update

    GOALS Person responsible: Information pending

    SR

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    42/105

    Barcelona Smart City projects

    42

    NMN

    BSP

    Environment

    Impacte social

    Building Barri

    III. Map of vertical projectsEnergy-saving projects

    OBJECTIVE

    Introduction of electricity meters in the home in order to rationalize domestic energy consumptionpatterns.SCOPE

    Boosting the installation of meters at affordable prices that display power consumption, allowingresidents to know their consumption and adopt good practices in relation to the consumption ofelectricity at home.

    STATE

    Pilot project in operation.

    Information pending update

    GOALS Person responsible:

    B l S Ci j

    SR

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    43/105

    Barcelona Smart City projects

    43

    OBJECTIVE

    Replacement of the current connections through the radio networkin lighting cabinets with WiFior fibre-optic connections.

    SCOPE

    Solution that will allow the integration of different types of services and the expansion of theexisting ones, opening the door to the integration of different smart services.

    STATE

    Project under development.

    NMN

    BSP

    Environment

    Impacte social

    Building Barri

    III. Map of vertical projectsEnergy-saving projects

    Information pending update

    GOALS Person responsible: Josep M. Berengueres

    Partners

    B l S t Cit j t

    SR

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    44/105

    Barcelona Smart City projects

    44

    OBJECTIVE

    Telecontrol of escalators and lifts using a SCADA system allowing the integration of informationfrom different suppliers of control devices.

    SCOPE

    Integration and control of information from different providers that currently work with BarcelonaCity Council inorder to manage operation.

    STATE

    Project in deployment phase.

    NMN

    BSP

    Environment

    Impacte social

    Building Barri

    III. Map of vertical projectsEnergy-saving projects

    Partners

    Information pending update

    GOALSPerson responsible: Felipe Linares (Dept.Road Serviceability)

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    45/105

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    46/105

    Barcelona Smart City projects

    SR

    i

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    47/105

    Barcelona Smart City projects

    47

    OBJECTIVE

    Introduction of ultrasonic sensors and radio frequency identification devices (RFID) in bins andcontainers to create a cheaper and more sustainable system of waste collection.

    SCOPE

    Solution that will monitor and optimize collection routes and (potentially) adapt them dynamicallyto needs. This new system will allow customisable management of waste collection in largeshopping precincts with Pay As You Throw (PAYT) models.

    STATE

    Project in operation.

    NMN

    BSP

    Environment

    Impacte social

    Building Barri

    III. Map of vertical projectsWaste matter projects

    Information pending update

    GOALS Person responsible: Information pending

    Barcelona Smart City projects

    SR

    E i t

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    48/105

    Barcelona Smart City projects

    48

    OBJECTIVE

    Implementation and development of ICT solutions and applications that serve the public throughthe orthogonal bus network.

    SCOPE

    Definition and implementation of ICT applications and smart services applicable to the variousbus-stops that make up the orthogonal network, including services related to the bus service orusing the bus-stop infrastructure to provide other public services.

    STATE

    Pilot project under development.

    NMN

    BSP

    Environment

    Impacte social

    Building Barri

    III. Map of vertical projectsMobility projects

    Information pending update

    GOALS Person responsible: Frederic Pijoan

    Orthogonal Bus Network

    Barcelona Smart City projects

    SR

    Environment

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    49/105

    Barcelona Smart City projects

    49

    OBJECTIVE

    Development of a system to provide information about the location and status (free/in use) ofparking spaces.

    SCOPE

    Definition and implementation of the system in the 22@, combining parking for neighbours only,pay and display parking and public underground parking, with the aim of introducing the systemthroughout the city to create new services and business models.

    STATE

    Pilot project under development

    NMN

    BSP

    Environment

    Impacte social

    Building Barri

    III. Map of vertical projectsMobility projects

    Information pending update

    GOALS Person responsible: Information pending

    Barcelona Smart City projects

    SR

    Environment

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    50/105

    Barcelona Smart City projects

    50

    OBJECTIVE

    Development of smart mobility solutions, associated with the electric mobility infrastructure beingpromoted by the City Council.

    SCOPE

    Identification of needs and available resources, definition of mobility strategic objectives andimplementation of the most suitable projects.

    STATEPilot project under development.

    NMN

    BSP

    Environment

    Impacte social

    Building Barri

    III. Map of vertical projectsMobility projects

    Information pending update

    GOALS Person responsible: Adri Gomila

    Partners

    Barcelona Smart City projects

    SR

    Environment

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    51/105

    Barcelona Smart City projects

    51

    OBJECTIVE

    Control and management of tourist coaches wishing to park in the area of the Sagrada Famlia,through telemanagement of special parking places for this type of vehicles.

    SCOPE

    Development of a pilot project in the area of the Sagrada Famlia with the possibility of applying it inother tourist areas

    STATE

    Pilot project in operation.

    NMN

    BSP

    Environment

    Impacte social

    Building Barri

    III. Map of vertical projectsMobility projects

    Information pending update

    GOALS Person responsible: Eduard Ramia

    Partners

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    52/105

    Barcelona Smart City projects

    SR

    Environment

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    53/105

    y p j

    53

    OBJECTIVE

    To boost the introduction, promotion and development of electric mobility in the city using privateelectric vehicles, and the gradual conversion of the municipal fleet to electric vehicles.

    SCOPE

    Live is a platform that promotes electric vehicles in the city as an opportunity to positionBarcelona as a world centre for innovation in electric mobility. Its implementation will help toreduce exhaust emissions and improve air quality, and reduce noise pollution.

    STATE

    Project in operation.

    NMN

    BSP

    Impacte social

    Building Barri

    III. Map of vertical projectsMobility projects

    Information pending update

    GOALS Person responsible: Information pending

    Partners

    Barcelona Smart City projects

    SR

    Environment

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    54/105

    y p j

    54

    OBJECTIVE

    Development of solutions for sustainable mobility with the aim of promoting the development ofelectric cars and improving mobility in the city.

    SCOPE

    Identification of solutions to promote the introduction of mechanisms related to electric vehiclesand favour the implementation of solutions that improve mobility in the city.

    STATE

    Pilot project under development.

    NMN

    BSP

    Impacte social

    Building Barri

    III. Map of vertical projectsMobility projects

    Information pending update

    GOALS Person responsible: Adri Gomila

    Partners

    Barcelona Smart City projects

    SR

    Environment

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    55/105

    y p j

    55

    NMN

    BSP

    Impacte social

    Building Barri

    III. Map of vertical projectsMobility projects

    OBJECTIVE

    Deployment of a system of sensors to estimate the travel time associated with different routes

    around the city.

    SCOPE

    Detection of the degree of traffic congestion in different areas of the Eixample district through asystem of 50 sensors, in order to announce through various channels (information boards, web,mobile app) the estimated travel times for different routes.

    STATE

    Pilot project in operation.

    Information pending update

    GOALS Person responsible: Information pending

    Partners

    Barcelona Smart City projects

    SR

    Environment

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    56/105

    56

    OBJECTIVE

    Introduction of ICT solutions in the management of traffic lights to enhance mobility of emergencyvehicles (fire, ambulance, police...)

    SCOPE

    Analysis, coordination and implementation of new dynamic tools (and improvement of existingones) for traffic light management in streets of specific importance.

    STATE

    Pilot project under development

    NMN

    BSP

    Impacte social

    Building Barri

    III. Map of vertical projectsMobility projects

    Information pending update

    GOALS Person responsible: Information pending

    Barcelona Smart City projects

    SR

    Environment

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    57/105

    57

    OBJECTIVE

    Development of three large-scale pilot projects in Barcelona, Berlinand Paris Grand aimed at usingICT services to help achieve the integration of solutions for intelligent electromobility as part of anintegrated system that respects the environment.

    SCOPE

    Pilot project with three basic ideas: 1) public service of electric motorcycles, 2) unification of public

    mobility services and electric motorcycle service in the tourist sector, and 3) deployment of anelectric vehicle fleet for municipal maintenance services

    STATE

    Pilot project under development.

    NMN

    BSP

    Impacte social

    Building Barri

    III. Map of vertical projectsMobility projects

    Information pending update

    GOALS Person responsible: Information pending

    Partners

    Barcelona Smart City projects

    SR

    Environment

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    58/105

    58

    OBJECTIVE

    Initiative of the Catalan company Radio Taxi 033, addressed to citizens with a commitment tocaring for the environmentSCOPE

    400 eco-friendly hybrid vehicles (vehicles that use alternative energy: LPG, Natural Gas andelectricity)

    STATE

    Project in operation.

    NMN

    BSP

    Impacte social

    Building Barri

    III. Map of vertical projectsMobility projects

    Information pending update

    GOALS Person responsible: Information pending

    Barcelona Smart City projects

    SR

    Environment

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    59/105

    59

    OBJECTIVE

    Application of smart city solutions for improving and managing the transition from the city to theSierra de Collserola.

    SCOPE

    Implementation and integration of ICT platforms and applications for the management oftransitional open spaces between the urban and natural environment, and for the definition and

    location of neighbourhood amenities between the city and the park.STATE

    Pilot project under development.

    NMN

    BSP

    Impacte social

    Building Barri

    III. Map of vertical projectsNature projects

    Information pending update

    GOALS Person responsible: Information pending

    Barcelona Smart City projects

    SR

    Environment

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    60/105

    OBJECTIVE

    Creation of energy self-sufficient blocks in order to improve practices related to consumption andproduction of energy.

    SCOPE

    Study and definition of practices to improve energy production and consumption through thedevelopment of a pilot project in 2 buildings.

    STATEPilot project under development.

    49

    NMN

    BSP

    Impacte social

    Building Barri

    III. Map of vertical projectsBuilding and neighbourhood projects

    Information pending update

    GOALS Person responsible: Josep M. Berengueres

    Partners

    Barcelona Smart City projects

    SR

    Environment

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    61/105

    OBJECTIVE

    Monitoring of municipal buildings in order to define actions to reduce energy consumption by20%, as well as monitoring of solar panel energy production

    SCOPE

    Monitoring of electricity and natural gas consumption and temperature in 31 additional buildings,as well as the 23 already monitored, in order to define possible measures to reduce consumption.

    STATE

    Project in deployment phase.

    49

    NMN

    BSP

    Impacte social

    Building Barri

    III. Map of vertical projectsBuilding and neighbourhood projects

    Information pending update

    GOALS Person responsible: Manel Torrent

    Partners SIGE, WIT,

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    62/105

    Barcelona Smart City projects

    SR

    Environment

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    63/105

    63

    OBJECTIVE

    To monitor the operation of solar panels and their energy production

    SCOPE

    Monitoring of approximately 59 solar power stations

    STATE

    Pilot project in deployment phase.

    NMN

    BSP

    Impacte social

    Building Barri

    III. Map of vertical projectsBuilding and neighbourhood projects

    Information pending update

    GOALSPerson responsible: Manel Torrent(Energy Agency)

    Barcelona Smart City projects

    SR

    Environment

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    64/105

    64

    OBJECTIVE

    Introduction of telematic devices for especially vulnerable groups, for monitoring and control.

    SCOPE

    Implantation of various services such as telecare for the elderly with difficulties (50,000 users), inorder to communicate any problem, incident or fall to a round-the-clock rescue centre. Peripheraldevices installed in homes and also connected to the centre to warn of gas escapes or fire, report

    user activity, etc..STATE

    Project in operation.

    NMN

    BSP

    Impacte social

    Building Barri

    III. Map of vertical projectsProjects with social and community impact

    Information pending update

    GOALS Person responsible: Information pending

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    65/105

    Barcelona Smart City projects

    SR

    Environment

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    66/105

    66

    OBJECTIVE

    Redistribution of tourist flows around the city.

    SCOPE

    Implementation of ICT applications that encourage and facilitate the movement of tourists todifferent areas around the city through their promotion, offering alternatives and clearing the mostpopular spots.STATE

    Pilot project under development

    NMN

    BSP

    Impacte social

    Building Barri

    III. Map of vertical projectsProjects with social and community impact

    Information pending update

    GOALS Person responsible: Information pending

    Barcelona Smart City projects

    SR

    Environment

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    67/105

    67

    NMN

    BSP

    Impacte social

    Building Barri

    III. Map of vertical projectsProjects with social and community impact

    OBJECTIVE

    Use of the postal service resources as a 2.0 channel for learning about the needs of the city.

    SCOPE

    Definition and implementation of procedures to optimize the value of the assets of the postalservice, facilitating the integration of tools for mobility in public ICT platforms around the city.

    STATEPilot project under development.

    Information pending update

    GOALS Person responsible: Information pending

    Barcelona Smart City projects

    SR

    Environment

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    68/105

    68

    NMN

    BSP

    Impacte social

    Building Barri

    III. Map of vertical projectsProjects with social and community impact

    OBJECTIVE

    The city council is finalizing the main points of the reform to be carried out in Passeig de Grcia. Aspart of this reform, the plan to develop a number of smart projects should be noted.

    SCOPE

    1. Mobile application for taxi drivers indicating available space in taxi ranks2. Mobile application for loading/unloading zones3. Queue-counting system at tourist attractionsSTATE

    Pilot project under development

    Information pending update

    GOALS Persons responsible: Eduard Ramia, Toni Roig, Xavier Sunyer

    Partners

    Barcelona Smart City projects

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    69/105

    III. Map of vertical projectsSpecial project- Passeig de Grcia

    The city council is finalizing the main points of the reform to be carried out in Passeig de Grcia. Aspart of this reform, the plan to develop a number of smart projects should be noted.

    Mobile applicationfor taxi driversindicating availablespace in taxi ranks

    Mobile application forcontrolling parking timein loading/unloadingzones

    Strengthening the municipal network Mobile phone apps

    HD cameras

    Expansion ofWiFi coverage

    Mobile application topromote shoppingand tourism

    Expansion of FO networkwith pre-installation ofmultiservice lamp posts

    69

    Barcelona Smart City projects

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    70/105

    70

    IV. Innovation in Smart City ProjectsUrban Lab

    Testing space to accommodate projects that provide benefits to citizens and solveunresolved needs in different areas.

    Integrated Urban Infrastructure Solution (SIIUR): System of LED lighting technologyequipped with sensors that detect and process environmental information about presence,

    temperature, humidity, noise and pollution. It also includes other features such as Wi-Fi accesspoints, point of information, etc..

    Noise pollution

    Telematic reading of gas, electricity and water meters

    Sustainable mobility: Deployment of the infrastructure necessary to install chargingstations for electric vehicles (posts)

    Traffic control cameras

    Sensor systems: Installation of level sensors in waste containers, sensors thatcommunicate use of parking spaces, etc.

    Barcelona Smart City projects

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    71/105

    71

    Contents

    I. Smart Barcelona Project

    II. Network architecture

    III. Project map (cross-cutting, vertical, special)

    IV. Innovation in SC projects: Urban LabV. Global planning of projects

    VI. Agreements

    VII. Sector analysis: potential partners

    VIII.Organization and monitoring methodology

    IX. Action Plan

    X. Risks

    Barcelona Smart City projects

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    72/105

    72

    IV. Innovation in Smart City ProjectsiCity: Access to public infrastructures

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    73/105

    Barcelona Smart City projects

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    74/105

    74

    Contents

    I. Smart Barcelona Project

    II. Network architecture

    III. Project map (cross-cutting, vertical, special)

    IV. Innovation in SC projects: Urban LabV. Global planning of projects

    VI. Agreements

    VII. Sector analysis: potential partners

    VIII.Organization and monitoring methodology

    IX. Action Plan

    X. Risks

    Barcelona Smart City projects

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    75/105

    75

    V. Global planning of projectsApproximate schedule

    MayActivity plan June July2013 2014 2015

    NEW MUNICIPAL NETWORK

    BARCELONA SENSOR PLATFORM

    SITUATION ROOM

    Preliminary analysis and draft project

    Budget allocation and planning

    Audit and asset inventory

    Phase 0

    Phase 1

    Phase 2

    Preliminary analysis and draft project

    Budget allocation and planning

    Phase 0

    Phase 1

    Phase 2

    Preliminary analysis and draft project

    Budget allocation and planning

    Phase 0

    Phase 1

    Phase 2

    Aug Sept Oct Nov Dec

    2012

    Vertical SERVICES Pending development with the respective service areas

    Resolution of tendering process Award

    Project planning

    Project planning

    Decision-taking

    Decision-taking

    Decision-taking

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    76/105

    Barcelona Smart City projects

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    77/105

    77

    VI. AgreementsPublic-private partnership

    Barcelona has developed a collaborative company-City Council model forcompanies wishing to carry out research on the provision of services and

    the smart management of urban space.

    The City Council provides human and material resources that depend onthe companysnature, scope and contribution, and the importance of the

    proposal.

    Objectives

    To collaborate with companies to develop new, clearly innovativeproducts aimed at improving urban management.

    Benefits

    The contribution of municipal knowledge in the generation of the product.The possibility of generating patents on cutting-edge commercialproducts tested and validated by a city.

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    78/105

    Barcelona Smart City projects

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    79/105

    79

    VI. AgreementsAgreement with GDF Suez

    Analysis of energy alternatives and feasibility of a district heating & cooling network in Sagrera Feasibility study for the use of new energy sources, and better use of existing ones Identification of areas likely to install new heating and cooling networks Dissemination of heating and cooling network technology and benefits

    Pilot projects to be developed as part of the contract

    develop:

    Creation of smart clients Near zero energy balance

    Promotion of on-site generation

    Heating andcooling

    networks

    Decentralisedproduction

    Definition of a tendering and contract model that allows outsourcing of energy servicesEnergy supply

    Construction of scenarios based on the expectations / uses of residents Environmental optimisation of scenarios of urban redevelopment

    Adaptation of the City Council for the management of energy resources

    Evaluation of the impact of energy use on water resources, and its evolution

    Sustainableurban planning

    Diagnosis and optimisation of the City Council vehicle fleets Test of fuel cell / electric vehicle coupling

    Modelling of static and dynamic transport

    Sharing of different types of electric vehicles Micro management platform for merchandise

    Sustainablemobility

    Installation of a special dashboard for the cityDashboard

    Barcelona Smart City projects

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    80/105

    80

    VI. AgreementsAgreement with Schneide Telvent

    Proposals included in the agreement for cooperation:

    Creation of a working group with the aim of identifying needs and available resources,defining the strategic objectives of mobility and developing Smart Mobility projects andservicesthat cover the identified technological needs.

    Smart MobilityPlan

    Development of a pilot project for saving energy in 2 buildings.Smart Grids

    Creation of the Smart City Centre of Excellence in Barcelona to promote the knowledgeand development of technologies for smart, integrated management of the city.

    Centre forExcellence

    Development of an Smart City platform for integrated city management, which will beproposed for evaluation in Barcelona. All aspects related to smart mobility will bedeveloped in the first stage .

    ICM Platform

    A working group will be set up to define the projects to be developed in each case.The current agreement focuses on mobility projects. The completion of a workshop on energy efficiency and

    building projects is pending.

    Barcelona Smart City projects

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    81/105

    81

    VI. AgreementsOther agreements for cooperation

    Indra is working with Barcelona City Council to reach an agreement for cooperationin the development of the Arrowhead project within the framework of the 2012European ARTEMIS Pilot Innovation Programme in the areas of energy and mobility,so far without specifying the pilot projects to be developed.

    Telefnica and Abertis have both signed agreements with Barcelona City Councilwithout specifying the precise projects to be developed, but in both cases posing

    collaboration in theprocess of integration of municipal networks

    as the mainobjective, as well as the development of a sensor platform (BSP).

    Barcelona Smart City projects

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    82/105

    82

    Contents

    I. Smart Barcelona Project

    II. Network architecture

    III. Project map (cross-cutting, vertical, special)

    IV. Innovation in SC projects: Urban LabV. Global planning of projects

    VI. Agreements

    VII. Sector analysis: potential partners

    VIII.Organization and monitoring methodology

    IX. Action Plan

    X. Risks

    Barcelona Smart City projects

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    83/105

    83

    VII. Analysis of the sectorMap of potential partners

    New Municipal Network

    Sensor Platform

    Situation Room

    WATER ENERGYICT MATTER MOBILITY NATURE

    Environment

    Social and community impact

    Technical Business Legal

    Building

    Barcelona Smart City projects

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    84/105

    84

    VII. Analysis of the sectorMap of potential local partners

    New Municipal Network

    Sensor Platform

    Situation Room

    WATER ENERGYICT MATTER MOBILITY NATURE

    Environment

    Building

    Social and community impact

    Technical Business Legal

    Barcelona Smart City projects

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    85/105

    85

    VII. Analysis of the sectorMap of partners

    Underdevelopment

    Head of projectGlobal

    Assessment

    New Municipal Network

    Sensor Platform

    Situation Room

    WATER ENERGYICT MATTER MOBILITY NATURE

    Environment

    Building

    Social and community impact

    Technical Business Legal

    Apart from external partners, IMI will act as a technology consultant in the different business areasof a cross-cutting nature in the setting of smart cities, engineering the design phases andsupporting the phases of deployment and operation.

    Barcelona Smart City projects

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    86/105

    86

    Contents

    I. Smart Barcelona Project

    II. Network architecture

    III. Project map (cross-cutting, vertical, special)

    IV. Innovation in SC projects: Urban LabV. Global planning of projects

    VI. Agreements

    VII. Sector analysis: potential partners

    VIII.Organization and monitoring methodology

    IX. Action Plan

    X. Risks

    Barcelona Smart City projects

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    87/105

    87

    VIII. Organisation and monitoring methodologyCreating the project office

    The definition, deployment and management of Smart Barcelona projects implies the need to organize awide range of actions in a multidisciplinary, complex and technologically innovative environment, whichincludes a variety of activities and multiple agents. This requires comprehensive coordination by a ProjectManagement Office (PMO),which acts as point of reference for the project.

    PMO

    Municipal service user

    areas

    Environment

    TMB

    BSM

    ...

    Smart Barcelona Actions

    Municipal Institute ofComputing (IMI)

    Altres...

    Partners

    Alignment of strategiesCoordination of activities Project management Evaluation and recommendations

    Quality and improvement planDocuments and reportsAdjustments and solution of

    contingencies

    Other providers

    Barcelona Smart City projects

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    88/105

    88

    VIII. Organisation and monitoring methodologyProject coordination

    The mission of the project coordination office headed by Doxa Consulting will be to:Situate the different smart projects in Barcelona in line with the City Councilsstrategic vision.Centralise information on the progress of the various projects.Inform the Management Committee of the evolution of the projects, using global dashboards.

    CoordinatingOffice

    Project ManagementCommittee

    City Council

    smart cities

    Strategy

    Supervision

    Reporting

    WATER ENERGYICT MATTER MOBILITY

    Environment

    Building Neighbourhood

    Social and community impact

    NATURE

    Barcelona Smart City projects

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    89/105

    89

    VIII. Organisation and monitoring methodologyOrganisation and model of relations

    Doxa Multidisciplinary Work Team

    Daniel Martnez, Montse Costa

    General management - Barcelona C.C.

    Toni Vives, Manel Sanrom, Josep Ramon

    Ferrer

    Project Management - Barcelona C.C.

    Paco Rodrguez

    Doxa Project Management

    Jordi Sala, Javier Ramrez

    Doxa Strategic Management

    Josep Grau, Pedro Lisbona

    Barcelona C.C. Project Team

    Jordi Cirera, Toni Carol

    Model of organization of the project work team and the model of relations and communication between

    Barcelona City Council and Doxa Consulting.

    Barcelona Smart City projects

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    90/105

    90

    VIII. Organisation and monitoring methodologyMonitoring methodology

    Executive Committee(strategic

    management)

    MonitoringCommittee

    (projectmanagement)

    Working Committee

    Three-monthly /Ad-hoc

    Monthly

    Weekly

    Smart Barcelona Executive Committee report Smart Barcelona dashboard Smart Barcelona project management dashboard

    Smart Barcelona monitoring report Specific monitoring reports Smart Barcelona dashboard Special dashboards

    Project status report Special dashboards

    Risk Committee Ad-hoc Risk analysis Contingency plans

    Periodicity Documentation and monitoring tools

    The following monitoring methodology is proposed for Project management phase.

    Barcelona Smart City projects

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    91/105

    91

    Contents

    I. Smart Barcelona Project

    II. Network architecture

    III. Project map (cross-cutting, vertical, special)

    IV. Innovation in SC projects: Urban LabV. Global planning of projects

    VI. Agreements

    VII. Sector analysis: potential partners

    VIII.Organization and monitoring methodology

    IX. Action Plan

    X. Risks

    Barcelona Smart City projects| 25 de Juny de 2012

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    92/105

    92

    IX. Action planShort-term actions (I)

    Internal meetings withrepresentatives of the

    IMI for the jointidentification and

    definition of functionalrequirements

    Identification andcreation of working

    group with ICTsuppliers to analyse

    possible solutions andtechnology platforms

    Definition of drafttechnical project and

    preparation ofprovisional schedule

    and provisional budget

    Strategic analysis anddecision-taking by CityCouncil management

    Decision-takingDefinition of draft

    projectTechnical analysis

    Conclusion offunctional analysis

    Short-term action plan for cross-cutting projects

    Beginning of October End of October End of October Middle of November

    Barcelona Smart City projects

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    93/105

    93

    IX. Action planShort-term actions (II)

    Meetings with CityCouncil departments /

    internal clients toidentify needs and

    jointly defineobjectives, scope and

    functional

    requirements

    Identification andcreation of a working

    group with ICTsuppliers to analyse

    possible solutions andtechnology platforms

    Definition of drafttechnical project and

    preparation ofprovisional schedule

    and provisional budget

    Strategic analysis anddecision-taking by CityCouncil management

    Decision-takingDefinition of draft

    projectTechnical analysisFunctional definition

    Short-term action plan for verticalprojects (services)

    October End of October End of November Middle of December

    Barcelona Smart City projects

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    94/105

    94

    IX. Action planMeeting track record (II)

    Date Area Participants Partners Order of Business

    30/05/2012 SmartBCN Paco Rodrguez (IMI)Jordi Cirera (IMI)

    Kick off

    04/06/2012 SmartBCN Josep Ramon FerrerPaco Rodrguez (IMI)

    Planning

    05/06/2012 NMN Toni Carol (IMI) Network integration / Infrastructures

    07/06/2012 Situation RoomUrban Platform

    Jordi Cirera (IMI)Glria Grau (TESEM)

    State/ progress Urban PlatformKey ideas Situation Room

    Other projects integratable in Smart City

    07/06/2012 NMN Toni Carol (IMI) Current state of NMN and lines to follow

    08/06/2012 SmartBCN Paco Rodrguez (IMI) Executive monitoring of project

    08/06/2012 Situation Room Arturo Gaviln (IBM)Francisco Romero (IBM)

    Jordi Cirera (IMI)Marc Garriga (IMI)

    IBM IOC Platform developed by IBMfor Situation Room

    11/06/2012 Vertical services Paco Rodrguez

    Ramon Segarra (22@)

    Situation of SmartCity vertical projects

    11/06/2012 Monitoring Josep Ramon FerrerPaco Rodrguez (IMI)

    Executive meeting for monitoring

    11/06/2012 SmartBCN Josep Ramon FerrerPaco Rodrguez (IMI)

    Smart proposals Passeig de Grcia

    12/06/2012 SmartBCN Josep Ramon FerrerPaco Rodrguez (IMI)

    Smart Passeig de Gracia

    Barcelona Smart City projects

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    95/105

    95

    IX. Action planMeeting track record (III)

    Date Area Participants Partners Order of Business

    13/06/2012 BUP David Clavera (HP)/Xavier Gonzalo (HP)Fernando Pulido (HP)/Guido Fezzini (HP)Gloria Grau (TESEM)Frederic Lompart (Barcelona City Council)

    HP Urban PlatformBig DateSecurity

    13/06/2012 Situation Room Jordi Cirera (IMI)Gloria Grau (IMI)

    Organisation Situation Room

    14/06/2012 Network Mariano Lamarca (IMI) Networks Pilot Projects in operation

    15/06/2012 Energy Josep Ramon FerrerPaco Rodrguez (IMI)Gil Soto Tolosa (Philips)

    Philips Smart lighting

    18/06/2012 Vertical services Paco Rodrguez (IMI)Sergi Jerez (IMI)Alberto Cceres (Clear Channel)Jordi Sez (Clear Channel)

    Clear Channel Wifi innovation

    18/06/2012 Situation Room Josep Ramon FerrerBCN City Council - Cartography

    Tool

    18/06/2012 Energy Rom Llagostera (Manager Envr.) /

    Jordi Cirera (IMI) / Ramon Sagarra (22@)Cristina Castells (Dir. Energy and Envr.)Josep Maria Berengueras (Energy and

    Envr.)

    Smart Cities services / agreements

    (Environment)

    18/06/2012 Energy Rom Llagostera (Manager M.A) /Jordi Cirera (IMI) / Ramon Sagarra (22@)Cristina Castells (Dir. Energy and Envr.)

    Smart Cities services / agreements(Environment)

    Barcelona Smart City projects

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    96/105

    96

    IX. Action planMeeting track record (IV)

    Date Area Participants Partners Order of Business

    18/06/2012 Energy Rom Llagostera (Manager Envr. ) / JordiCirera (IMI) / Ramon Sagarra (22@)Manel Torrent (Energy Agency BCN - Envr.)

    Smart Cities services / agreements(Environment)

    18/06/2012 Water Rom Llagostera (Manager Envr.) / JordiCirera (IMI) / Ramon Sagarra (22@)Cristina Vila (Water cycle, Envr.)

    Smart Cities services / agreements(Environment)

    19/06/2012 Water Josep Ramon FerrerPaco Rodrguez (IMI)Cristina Vila (Water Cycle, Envr.)Ramon Dern (Better Consultants)

    Sewer system

    19/06/2012 Monitoring Josep Ramon FerrerPaco Rodrguez (IMI)Maite Rodrguez Manzano

    Executive meeting for monitoring

    21/06/2012 Mobility Paco Rodrguez (IMI)Jordi Cirera (IMI) / Mariano Lamarca (IMI)Adri Gomila (Dir. Mobility Services)

    Smart Cities services / agreements

    22/06/2012 Vertical services Josep Ramon Ferrer

    Paco Rodrguez (IMI)Others

    GDF Suez Meeting preparation of agreements

    25/06/2012 Monitoring Josep Ramon FerrerPaco Rodrguez (IMI)

    Executive meeting for monitoring

    27/06/201228/06/2012

    SmartBCN Josep Ramon FerrerPaco Rodrguez (IMI)Ramon Sagarra (22@)

    IBM Workshop IBM

    Barcelona Smart City projects

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    97/105

    97

    IX. Action planMeeting track record (V)

    Date Area Participants Partners Order of Business28/06/2012 Vertical services Jordi Cirera (IMI)/ Toni Carol (IMI)

    TMBTMB network bus shelters

    29/06/2012 Situation Room Paco Rodrguez (IMI) / Jordi Cirera (IMI)Eduard Martin (IMI)Javier Gil (IBM) / ArturGabiln (IBM) / Francisco Romero (IBM) /Siddharth N Purohit (IBM) / StevenDegennaro (IBM)

    IBM IOC platform developed by IBM

    02/07/2012 Situation Room Jordi Cirera Analysis state of pilot projectsSituation Room

    03/07/2012 Energy Paco Rodrguez (IMI)Cristina Castells (Dir. Energy and Envr.)Gil Soto Tolosa (Philips)

    Philips Smart lightingworkshop

    04/07/2012 Energy - Dept. StreetLighting

    Josep M BerengueresBegoa TomasRoberto Frago (TESYSE)

    Project definition- Pay per light

    04/07/2012 SmartBCN Paco Rodriguez (IMI)Joan Batlle

    Redefine Metropolis subsidy CISCOagreement

    04/07/2012 Waste Josep Ramon FerrerPaco Rodriguez (IMI)

    Csar Gil (Ros Roca)

    RosRoca Waste collection

    05/07/2012 Monitoring Josep Ramon FerrerPaco Rodriguez (IMI)

    Executive meeting for monitoring

    06/07/2012 Vertical services Jordi Cirera (IMI)Carmen Marzo (Urban Planning), Adolf Creus(Urban Planning)Carlos Alonso (TMB), JuanManelMorales(TMB), Raquel Ullate (TMB)

    TMB Bus stops

    Barcelona Smart City projects

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    98/105

    98

    IX. Action planMeeting track record (VI)

    Date Area Participants Partners Order of Business

    06/07/2012 NMN Paco Rodriguez (IMI)Juan Blanco (CISCO)/ Joan Rodriguez (CISCO)Jordi Alviny (ABERTIS)/ Antoni Liria(ABERTIS)

    CiscoAbertis

    Integration of infrastructures

    06/07/2012 Vertical services Josep Ramon FerrerFrancisco Rodrguez (IMI)Ramon Sagarra (22@)/ Cristina Castells

    (M.A)/ Cristina Vila (Water Cycle)/ Joan Batlle(International Coop. ) / Enric Lambies (LegalDept. Urban Habitat)GDF SUEZ: Bernard Archilla/ Xavier PUYAL/Bertrand MARTIN/David SERRANO/CarlosMoreno/ Isabel Tejero

    GDF Suez Monitoring pilot project development -GDF Suez

    09/07/2012 Vertical services Cristina Vila (Water Cycle, Envr.)Jos Miguel Guilln (SSII Water Cycle)Ramon Sagarra (22@)

    Water cycle

    09/07/2012 Vertical services Olga Pallas (Pers.Resp. SSII of Urban Habitat ) SSII in Urban Habitat

    09/07/2012 Vertical services Jordi Cirera (IMI)Jose Miguel Guillen/ Izaskun Marti

    Solution for park enclosure

    09/07/2012 Monitoring Josep Ramon FerrerPaco Rodriguez (IMI)

    Executive meeting for monitoring

    11/07/2012 Situation Room Paco Rodriguez (IMI)Jordi Cebrian (IMI)/J. Linares (IMI)

    VISTA

    Barcelona Smart City projects

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    99/105

    99

    IX. Action planMeeting track record (VII)

    Date Area Participants Partners Order of Business

    11/07/2012 Situation Room Paco Rodrguez (IMI)Jordi Cebrin /J. LinaresArturo Gavilan (IBM)/Francisco Romero (IBM)

    IBM smart Barcelona - IOC IBM IMI

    12/07/201212:00

    SmartBCN Josep Ramon FerrerPaco Rodrguez (IMI)Jaume Bordell (BSM)

    Toni Roig (BSM)

    BSM Smart Passeig de Grcia

    12/07/201214:00

    SmartBCN Josep Ramon FerrerPaco Rodrguez (IMI)

    Telvent Monitoring of City Protocol

    13/07/2012 Vertical services Manel Torrent (Technical Dir. EnergyAgency)Emma Santacana

    Energy in municipal buildingsAEB Monitoring

    16/07/201217/07/2012

    SmartBCN City Protocol sessions

    18/07/2012 Vertical services Josep Mirabent Elecnor

    Deimos

    Smart projects in BCN

    18/07/2012 Vertical services Cristina Vila (Water Cycle, Envr.)Jordi CireraFerran Fort (PAYMACOTAS)Aleix Parra (Iberfluid)

    Irrigation telemanagement

    Barcelona Smart City projects

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    100/105

    100

    IX. Action planMeeting track record (VIII)

    Date Area Participants Partners Order of Business

    20/07/2012 Smart BCN Josep Ramon Ferrer Executive meeting for monitoring

    20/07/201210:00

    Vertical services Reuni TMB IMI Urban PlanningJordi Cirera (IMI) /Carmen Marzo (UrbanPlanning)/ Adolf Creus (Urban Planning)Carlos Alonso (TMB)/ Juan Manel Morales(TMB)/Raquel Ullate (TMB)

    TMB Bus shelters - Tender for new bus stops

    20/07/2012

    12:30

    Smart BCN Paco Rodrguez (IMI) Monitoring of smart projects

    23/07/2012 Vertical services Josep Ramon FerrerPaco Rodrguez (IMI)

    Pilot Projects Smart City

    24/07/2012 Vertical services Cristina Vila (Water Cycle) Irrigation telemanagement

    24/07/2012 Smart BCN Vicen Castanyo (Telvent) Telvent Projects Telvent agreement

    26/07/2012 Smart BCN Toni Roig (BSM)Xavier Sunyer (Tourism)Vicen Castanyo (Telvent)

    Telvent Smart Passeig de Grcia

    27/07/2012 Vertical services Josep Ramon Ferrer

    Paco Rodrguez (IMI)Others (GDF Suez)

    GDF Suez GDF Suez agreement

    27/07/2012 Situation Room Paco Rodrguez (IMI)Juan Manuel Miras, rep. (SITEP)ngel Casquero, technician (SITEP)Absent: Ermengol Casanovas (SITEP)

    SITEP Presentation model Situation Room

    Barcelona Smart City projects

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    101/105

    101

    IX. Action planMeeting track record (IX)

    Date Area Participants Partners Order of Business

    27/07/2012 Vertical services Cristina Castells (Dir. Energy and Envr.)Joan Batlle (Internacional cooperation)

    Smart energy projects

    27/07/201213:00

    NMN Paco Rodrguez (IMI)Francesc Bert (CISCO)Antoni Liria (ABERTIS)

    AbertisCISCO

    Monitoring of integrated networkmanagement

    30/07/2012

    11:00

    Vertical services Frederic Pijoan (TMB)

    Jorge Carles-Tolra Hjorth-Andersen (TMB)Paco Rodrguez (IMI)

    TMB Orthogonal network

    07/08/2012 Vertical services Jordi Saez (Clear Channel) Clear Channel Smart project proposal

    06/09/2012 Vertical services JR Ferrer (IMI), Paco Rodrguez (IMI),Cristobal Escoda (NAE)

    NAE Mail group collaboration

    06/09/2012 NMN Paco Rodrguez (IMI), Toni Carol (IMI), ToniLiria (Abertis), Joan Rodrguez (Cisco)

    CiscoAbertis

    Monitoring of integrated networkmanagement

    06/09/2012 Vertical services JR Ferrer, Paco Rodrguez (IMI) Passeig de Grcia

    07/09/2012 Situation Room

    BSPvertical

    JR Ferrer, Paco Rodrguez (IMI)

    Elisa Martn (IBM)

    IBM IBM collaboration

    12/09/2012 NMN Toni Carol (IMI) State of project

    12/09/2012 Smart Barcelona JR Ferrer, Paco Rodrguez (IMI) Monitoring and planning of projects

    14/09/2012 Vertical services GDF Suez Smart Barcelona - GDF

    Barcelona Smart City projects

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    102/105

    102

    IX. Action planMeeting track record (X)

    Date Area Participants Partners Order of Business

    14/09/2012 Vertical services - AgBar: Josep Maria Callis, Jordi Pujades,Xavier Fuente- Farell: Joan Valls- Urban Habitat: Olga Palls- Water Cycle: Cristina Vila, Paco Hernndez- IMI: Jordi Cirera

    AgBarFarell/Nettek

    Samcla

    Irrigation telemanagement

    14/09/2012 Vertical services Toni Carol (IMI), Miriam Alvarado (IMI) Passeig de Grcia

    Barcelona Smart City projects

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    103/105

    103

    IX. Action planPending meetings

    AGBAR

    ETRA

    Endesa

    Philips Clear Channel

    Schneider (Organisation of sessions)

    Ros Roca

    Correus

    Urban Lab

    Telefnica

    Qualcom

    Better Barcelona Digital

    Dept. Mobility

    There are currently various meetings pending in order to monitor the various lines of work. These willinvolve:

    Barcelona Smart City projects

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    104/105

    104

    Contents

    I. Smart Barcelona Project

    II. Network architecture

    III. Project map (cross-cutting, vertical, special)

    IV. Innovation in SC projects: Urban LabV. Global planning of projects

    VI. Agreements

    VII. Sector analysis: potential partners

    VIII.Organization and monitoring methodologyIX. Action Plan

    X. Risks

  • 8/9/2019 Vision Focus and Projects of Bcn in Smart Cities Context

    105/105