vision for greater macarthur - amazon s3 · figure 2: greater macarthur structure plan (land...

2
ADVICE ON DRAFT INTERIM PLAN Lot 1 in DP 602888 FIGURE 1: GREATER MACARTHUR VISION TO 2036 Greater Macarthur Land Release Investigation: Preliminary Strategy & Action Plan (2015) Prepared For - Al Maha Pty Ltd Menangle Mount G Greater Macarthur Land Release Investigation Area Priority Precinct Boundary Existing Rail & Station Investigate Rail Electrificatio Proposed New Interchange Existing Roads Planned Major Roads Proposed Bus Priority Corridor Preserve Maldon to Dombarton Freight Rail Waterways Proposed Major Centre Proposed Town Centre Proposed Village Centre Existing Village Centre Developable Land Employment Land Service Industry / Large Format Retail SITE

Upload: others

Post on 26-Sep-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Vision for Greater Macarthur - Amazon S3 · Figure 2: Greater Macarthur Structure Plan (land release areas) NSW Department of Planning and Environment / November 2018 SITE 1:50,000

ADVICE ON DRAFT INTERIM PLAN Lot 1 in DP 602888

FIGURE 1: GREATER MACARTHUR VISION TO 2036Greater Macarthur Land Release Investigation: Preliminary Strategy & Action Plan (2015)

Prepared For - Al Maha Pty Ltd

Preliminary Strategy & Action Plan – Greater Macarthur Land Release 3

Vision for Greater Macarthur

Figure 1 GreaterMacarthur Vision to 2036

Vision for Greater Macarthur

Outer Sydney Orbital /M9

Spring Farm Link Road

0 km 1 52 3 4

Wilton

Preliminary Vision Structure

Greater Macarthur LandRelease Investigation Area

Priority Precinct Boundary

Existing Rail & Station

Investigate Rail Electrification

Proposed New Interchange

Existing Roads

Planned Major Roads

Proposed Bus PriorityCorridor

Preserve Maldon toDombarton Freight Rail

Waterways

Proposed Major Centre

Proposed Town Centre

Proposed Village Centre

Existing Village Centre

Developable Land

Employment Land

Service Industry / LargeFormat Retail

Menangle Park & Mount Gilead

Preliminary Strategy & Action Plan – Greater Macarthur Land Release 3

Vision for Greater Macarthur

Figure 1 GreaterMacarthur Vision to 2036

Vision for Greater Macarthur

Outer Sydney Orbital /M9

Spring Farm Link Road

0 km 1 52 3 4

Wilton

Preliminary Vision Structure

Greater Macarthur Land Release Investigation Area

Priority Precinct Boundary

Existing Rail & Station

Investigate Rail Electrification

Proposed New Interchange

Existing Roads

Planned Major Roads

Proposed Bus Priority Corridor

Preserve Maldon to Dombarton Freight Rail

Waterways

Proposed Major Centre

Proposed Town Centre

Proposed Village Centre

Existing Village Centre

Developable Land

Employment Land

Service Industry / Large Format Retail

Menangle Park & Mount Gilead

SITE

Page 2: Vision for Greater Macarthur - Amazon S3 · Figure 2: Greater Macarthur Structure Plan (land release areas) NSW Department of Planning and Environment / November 2018 SITE 1:50,000

ADVICE ON DRAFT INTERIM PLAN Lot 1 in DP 602888

FIGURE 2: GREATER MACARTHUR STRUCTURE PLAN (LAND RELEASE AREAS)Greater Macarthur 2040 Interim Plan (2018)

Prepared For - Al Maha Pty Ltd

1:50,000 @ A3

DATE: 09.11.2018JOB NO: ND2244DWG NO: 000REV: 5

GREATER MACARTHURPROPOSED STRUCTURE PLAN

Growth Area

LGA Boundary

Train LineTrain Station

Existing HighwayExisting Main RoadOuter Sydney Orbital Corridor Stage 1 (As Exhibited 22 June 2018)

Note: Stage 2 of the OSO To Illawarra Is Under InvestigationIndicative East West Connections

Indicative Transport CorridorIndicative Transport Corridor Northern Section Under InvestigationLocal Centre

Urban Capable Land

Existing Urban Land

Employment LandFuture Employment Potential Subject To InvestigationMixed Use Residential And Employment Subject To Further InvestigationEnvironmental Conservation Subject To The Final Cumberland Plain Conservation PlanVegetation To Be Assessed (For Biodiversity Certification)Proposed Indicative Koala CorridorMt Gilead Heritage Curtilage - Subject To Further Investigation

Upper Canal

Known Easements

Proposed Sydney Metro Western Sydney Airport

Noorumba and Beulah Biobanking

ROAD NETWORK

Interconnected grid road network to be determined at a precinctplanning stage

EXECUTIVE SUMMARY

Figure 2: Greater Macarthur Structure Plan (land release areas)

4 NSW Department of Planning and Environment / November 2018

SITE

1:50,000 @ A3

DATE: 09.11.2018JOB NO: ND2244DWG NO: 000REV: 5

GREATER MACARTHURPROPOSED STRUCTURE PLAN

Growth Area

LGA Boundary

Train LineTrain Station

Existing HighwayExisting Main RoadOuter Sydney Orbital Corridor Stage 1 (As Exhibited 22 June 2018)

Note: Stage 2 of the OSO To Illawarra Is Under InvestigationIndicative East West Connections

Indicative Transport CorridorIndicative Transport Corridor Northern Section Under InvestigationLocal Centre

Urban Capable Land

Existing Urban Land

Employment LandFuture Employment Potential Subject To InvestigationMixed Use Residential And Employment Subject To Further InvestigationEnvironmental Conservation Subject To The Final Cumberland Plain Conservation PlanVegetation To Be Assessed (For Biodiversity Certification)Proposed Indicative Koala CorridorMt Gilead Heritage Curtilage - Subject To Further Investigation

Upper Canal

Known Easements

Proposed Sydney Metro Western Sydney Airport

Noorumba and Beulah Biobanking

ROAD NETWORK

Interconnected grid road network to be determined at a precinct planning stage

EXECUTIVE SUMMARY

Figure 2: Greater Macarthur Structure Plan (land release areas)

4 NSW Department of Planning and Environment / November 2018