CURRICULUM VITAE Vinod Krishnan, Krishna Kripa, Near State Bank of India, Thavakkara, Kannur-670001 Kerala, India. Mobile: 9645772731,8018841244. E-Mail: [email protected] , [email protected] Skype id : vinodk183 CAREER OBJECTIVE Seeking an increasingly responsible position with an opportunity for professional challenge and growth wherein my ability and experience can be utilised at its optimum manner in the field of Electrical and instrumentation Engineering & Construction Management, to achieve the enhanced goals and objectives and thus to become an asset of the company. SUMMARY OF EXPERIENCE More than 23 and half years of experience at various construction sites all over India and abroad mainly in Projects given below, a. Oil refinery – 11 years. b. Petro chemical – 2 years and 8 months. c. Power plant - 5 years and 3 months. d. Cement plant - 1 year and 10 months e. Other projects like fertilizer, saw pipes,fibre glass and electrification of apartment projects - 3 years. Independently executed and completed various electrical projects from 1994 to 2014 of reputed clients. Self-confident, excellent interpersonal and communication skills, good team leader. QUALIFICATION B. Tech. in Electrical Engineering with First class from University of Calicut, Kerala, India. (Passed in 1987). KEY SKILLS 1 Project planning and provide the construction inputs required for preparing project schedule. 2 Site management including site administration and finances. 3 Liaise with client and consultant. 4 Arranging labour license from labour inspector. 5 Arranging electrical contract license from electrical inspector. 6 Arranging electrical draing approval fron electrical inspector. 7 Liaise with subcontractors and suppliers. 1 | Page

Upload: vinod-krishnan

Post on 12-Apr-2017

58 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: VK-Resume

CURRICULUM VITAE

Vinod Krishnan, Krishna Kripa, Near State Bank of India, Thavakkara, Kannur-670001 Kerala, India. Mobile: 9645772731,8018841244. E-Mail: [email protected] , [email protected] Skype id : vinodk183

CAREER OBJECTIVE

Seeking an increasingly responsible position with an opportunity for professional challenge and growth wherein my ability and experience can be utilised at its optimum manner in the field of Electrical and instrumentation Engineering & Construction Management, to achieve the enhanced goals and objectives and thus to become an asset of the company.

SUMMARY OF EXPERIENCEMore than 23 and half years of experience at various construction sites all over India and abroad mainly in Projects given below,

a. Oil refinery – 11 years. b. Petro chemical – 2 years and 8 months. c. Power plant - 5 years and 3 months. d. Cement plant - 1 year and 10 months

e. Other projects like fertilizer, saw pipes,fibre glass and electrification of apartment projects - 3 years.

Independently executed and completed various electrical projects from 1994 to 2014 of reputed clients.Self-confident, excellent interpersonal and communication skills, good team leader.

QUALIFICATION

B. Tech. in Electrical Engineering with First class from University of Calicut, Kerala, India. (Passed in 1987).

KEY SKILLS

1 Project planning and provide the construction inputs required for preparing project schedule. 2 Site management including site administration and finances. 3 Liaise with client and consultant. 4 Arranging labour license from labour inspector. 5 Arranging electrical contract license from electrical inspector. 6 Arranging electrical draing approval fron electrical inspector. 7 Liaise with subcontractors and suppliers. 8 Supervise, review project schedule and progress. 9 Co-ordination with Electrical installation testing and commissioning activities. 10 Co-ordination with instrumentation installation testing and commissioning activities. 11 Monitoring QA/QC of construction activities, review site quality plan and procedures, Preparation of

method statements, ITP and QA/QC documents. 12 Health, Safety, Security and Environment (HSSE) activities of site. SYSTEMS USED MS Office Suite

CAREER SUMMARY

1 | P a g e

Page 2: VK-Resume

A. IOT Engineering Projects Limited, Mumbai.

June 2012 to feb 2014 as Resident construction manager( Chief Manager) for IOCL Paradip Refinery project at Paradip Odisha, India. Installation, testing and commissioning works of Electrical and instrumentation works for the following projects. E&I works for Crude and Product Tankages Facility on BOOT basis.( oil terminal-36 tankages)E&I works for VGO heater, DHDT heater and DCU heater.E&I works for Flare and Blow-down System.

Summary of jobs executed

Indepedently handled sites successfully.Site administration including managing of site finances.Managing of QA/QC activities .Preparation of method statement,ITP ,QA/QC documents.Evaluation and requirement of staffs and tools & tackles required for site based on contract document and work order.Managing of HSSE activities.Arranging of labour licence from labour inspector.Arranging electrical contract licence for construction project from electrical inspector.Approval of electrical installation by electrical inspector.Approval of electrical drawings with electrical inspector.

Mobilisation and demobilisation of site. Coordination with subcontractor. Coordination with suppliers (consumables). Cost control of site activities.

Erection of transformer upto 53 MVA(66 kV).Erection of 6.6,11 kV switchgears , 415 V Power control centres, motor control centres, battery bank and battery chargers,AC/DC power supply system, control panels.Laying of HT cables upto 11 kV grade, laying of LT power and control cables of various sizes,fibre optic cables, telephone cables ,PA cables, instrumentation cables etc. End termination and straight through joints upto 33 kV, LT power and control cables and instrumentation cables.

Installation of lighting system, earthing and lightning system. Installation of telephone and PA system. Monthly invoicing. Preparation of reconciliation statement, and other site closing documents.

Installation of instruments like pressure transmitter , pressure guages, gas detectors control valves,air line,impulse line ss tubing etc.

Site documentation works.

B. Danway Electrical and Mechanical Engineering LLC,Abu Dhabi.

April 2011 to May 2011 as Project Manager for Al-Ras Al-Akthar and Baynoona street upgrading and trafic improvement Project(MEP) at Abu Dhabi. – Electrical works.

Summary of jobs executed.

Installation of 11 kV transformer, Power control centres, lighting panels.Laying of power and control cables. telephone, fire alarm cables.Installation of fire alarm system.Installation of street lighting poles and lighting fixtures.

C. Prakash construction Kannur, Kerala.

Total experience of 1 year 8 months from May 2009 till December 2010 as site manager for apartment project which includes electrical, telephone, plumbing works as per architectural drawings at Kannur, Kerala.- Electrical works.

D. ETA Power Project Division, Dubai.

Total experience of 1 year 9 months from June 2007 till March 23rd, 2009 as electrical Site Manager.Client - M/s Dubai water and electricity authority, Phase III, Al Aweer, Dubai

2 | P a g e

Page 3: VK-Resume

Project: 4x200 MW open cycle power plant at Phase III, Al Aweer, Dubai.(a JV between ETA and Siemens-EPC project)- Electrical works.

Summary of jobs executed.

Erection of generator step-up transformer upto 233/310 MVA(11 kV),unit auxiliary transformer of 18/24 MVA and other HT/LT transformers of various ratings.Erection of 11 kV switchgears , 415 V Power control centres, motor control centres, battery bank and battery chargers,AC/DC power supply system, control panels, Generator circuit breakers, isolated phase bus duct up to 11 kV.Laying of HT cables upto 11 kV grade, laying of LT power and control cables of various sizes.telephone cables etc. End termination and straight through joints upto 11 kV, LT power and control cables and instrumentation cables

Installation of lighting system, earthing and lightning system. Installation of telephone and PA system. Cathodic protection system. Preparation of reconciliation statement, and other site closing documents. Site documentation works.

E . M/s Petron Engineering Construction Ltd, Mumbai ,India

As Resident construction Manager, Electrical Total experience of 18 1/2 years, from 1989 January to 2007 June.

Summary of jobs executed.

Independently handled several sites successfully.Site administration including managing of site finances.

Managing of QA/QC activities.Preparation of method statement,ITP ,QA/QC documents.Managing of HSSE activities.Arranging labour licence from labour inspector.Arranging electrical contract licence for construction project from electrical inspector.Approval of electrical drawings with electrical inspector.

Approval of electrical installation by electrical inspector.Arrangement of staffs and tools & tackles required for site after evaluation of contract document and work order.

Mobilisation and demobilisation of sites. Coordination with subcontractor. Coordination with suppliers(consumables) Cost control of site activities.

Erection of transformer upto 53 MVA(33 kV),Erection of 6.6,11,33 kV switchgears , 415 V Power control centres, 415 V motor control centres, battery bank and battery chargers,AC/DC power supply system, control panels.Laying of HT cables upto 33 kV grade, laying of LT power and control cables of various sizes,fibre optic cables, telephone cables ,PA cables, instrumentation cables etc. End termination and straight through joints upto 33 kV, LT power and control cables and instrumentation cables

Installation of lighting system, earthing and lightning system. Installation of telephone and PA system.

Erection of lime stone stacker/ reclaimer and coal stacker / reclaimer. Cathodic protection Monthly invoicing. Preparation of reconciliation statement, and other site closing documents.

Installation of instrumentation panels, marshalling cabinets,DCS ,junction boxes etc and instruments like pressure transmitter , pressure guages, gas detectors control valves, air line,impulse line,ss tubing etc.

Site documentation works.

CONSTRUCTION PROJECTS: Installation testing and commissioning of the following electrical and instrumentation projects,

1. M/s Indian Oil Corporation Ltd., Panipat , Haryana, IndiaProject: CDU/VDU (Crude and Vacuum distillation unit), DCU (Delayed Cocker - electrical

3 | P a g e

Page 4: VK-Resume

Unit), SRU (Sulphur Recovery Unit), 210 MW Integrated Power Plant (for Bharat Heavy Electricals Ltd) and Off-sites & Utilities. – Electrical works.Position held – Resident construction manager(Resident Manager)- from 01-06-2004 to 31-07-2007.Handled site activities Independently.

2. M/s Ambuja cements Ltd. Uttarakhand,India - Electrical works. Project: Grinding unit including packing plant.

Position held – Coordinator( Engineer Gr I) from 01-04-2006 to 31-07-2007.Coordinated site activities from IOCL Panipat,Haryana.

3. M/s Indian Oil Corporation Ltd., Paradip, Orissa. – Electrical works.Project: Construction Power Supply works (LSTK) for IOCL, Paradip Refinery Project.- electricalPosition held - Resident Engineer ( Engineer Gr II) from 0102-2001 to 31-09-2002 and 01-01-2003 to 31-05-2004.Handled site activities Independently.

4. M/s Associated Cement Companies Ltd., Madhukkarai , Tamil Nadu, India. Project: 15 MW captive power plant. (Coal based).- Electrical works.

Position held – Resident Engineer (Engineer Gr II).Handled site activities Independently5. M/s Associated Cement Companies Ltd., Wadi, Karnataka, India

Project: cement plant project.- Electrical works.Position held – Resident Engineer( Engineer Gr I)I from 01-08-2000 to 31-01-2001.Handled site activities Independently.

6. M/s Mangalore Refinery and Petrochemicals Ltd., Mangalore, Karnataka, IndiaProject:- petroleum product pipe line project. - Electrical works.Position held – Engineer Gr II from 01-07-2000 to 31-07-2000.

7. M/s Bharat Petroleum Corporation Ltd., Mumbai, IndiaProject:- DHDS plant.- Electrical works.Position held – Resident Engineer(Engineer Gr II) from 01-06-1998 to 30-06-2000.Handled site activities Independently.

8. Ms Tata Electrical companies. Kundli, Maharashtra, India.Project: Pumping of water storage units at Kundli, Maharashtra.- Electrical works.Position held – Nominated as coordinator(Engineer Gr II) from 01-08-1998 to 30-03-2000. Coordinated site activities from BPCL ,Mumbai.

9. Ms Ovens corning – Panvel, Maharashtra Project- Fibre glass –Electrical works. Position Held – Engineer Gr IV from 01-03-1998 to 31-05-1998

10. M/s Garware Chemicals Ltd., Aurangabad, Maharashtra, IndiaProject: DMT plant.- electrical Position held – Engineer-in-charge( Engineer Gr III) from 01-02-1997 to 28-02-1998.Handled site activities Independently.

11. M/s Tata Electrical Companies Ltd., Bhira, Maharashtra, IndiaProject: 150MW pumped storage unit.- Electrical and Instrumentation works.Position held - Engineer-in-charge (Engineer Gr III) from 01-10-1994 to 31-01-1997.Handled site activities Independently.

12. M/s Jindal saw pipes ltd., Nashik, Maharashtra, IndiaProject: SAW pipe project.- Electrical works.Position held –Engineer Gr IV from 01-02-1994 to 31-09-1994

13. M/s Maruti Udyog Ltd., Gurgaon, Haryana, IndiaProject: 25MW captive power plant.- Electrical works.Position held – Engineer Gr IV 01-12-1993 TO 31-01-1994

14. M/s Tata electrical Ltd, Trombay,Maharashtra Project- 500 MW thermal power plant.- Electrical works. Position held – Engineer Gr II from 01-10-1993 to 31-11-1993.

15. M/s State Fertilizer Manufacturing Corporation Ltd, Srilanka .Project: Dismantling, salvaging of electrical items for packaging including documentation of electrical works of Fertilizer plant.- Electrical works.Position held - Engineer Gr IV from 01-06-1993 to 31-09-1993

16. M/s Gujarat Ambuja Cement Ltd, Kodinar, Gujarat, India.Project: 1.2 MTPA cement plant project. – Electrical and Instrumentation works.Position held – Engineer Gr IV from 01-08-1992 to 31-05-1993

17. M/s Gujrat Godrej Innovative Chemicals Ltd., Walia, Gujarat, IndiaProject:- Alpha Olefin plant project.- Electrical works.Position held – Engineer Gr V from 01-02-1991 to 31-07-1992

18. M/s Indian Oil Corporation Ltd., Barauni Refinery, Bihar, IndiaProject:- Atmospheric vacuum units – i.e. Revamping of AVU I & 2- Electrical andIinstrumentation works.Position held – Engineer Gr V from 01-03-1990 to 30-01-1991

19. M/s Vinyl Chemicals Ltd., Mahad, Maharashtra, India

4 | P a g e

Page 5: VK-Resume

Project:- Poly Vinyl Chloride project.- Electrical works.Position held – Engineer Gr V from 01-12-1989 to 28-02 1990

20. M/s JK Cements, Neemuch Madhya Pradesh, India. Project: Handled Construction of lime stone stacker and reclaimer and coal stacker and reclaimer of cement plant.- Mechanical works.Position held – GET from 01-06-1989 to 30-05-1989

21. M/s Indian Petrochemicals Corporation Ltd,. Nagothane, Maharashtra, IndiaProject: 3x25MW gas turbine and 25 MW Steam turbine Captive Power Plant (combined cycle power plant).- Electrical orks.Position held – GET from 21-01-1989 to 31-05-1989

PERSONAL INFORMATION Date of Birth : 18th March 1963Sex : MaleMarital Status : MarriedReligion : HinduNationality : IndianLanguages Known : English, Hindi & MalayalamPermanent Address : Krishna Kripa,

Near State Bank of India, Thavakkara , Kannur-670 001 ,Kerala , India

Passport details : Passport No. Z 1835288 , validity –10/05/18 Driving license : a) India – OR 0420020042882, UAE - 1372340

I hereby declare that the informatioin furnished are true to the best of my knowledge.

VINOD KRISHNAN

5 | P a g e