vol 13 - sc11
DESCRIPTION
Vol 13 - SC11TRANSCRIPT
Volume: XIII Part: 1 Chapter: 4 Page No: 131
TABLE NO:1
GENERAL DESCRIPTION
CATCHMENT WATERSHED NO
MICRO WATERSHED NO
AREA(HA) DISTRICT NAME
TEHSIL/BLOCK VILLAGE PHOTO
Satluj Subcatchment Subcatchment No 11
2300 Kinnaur Kalpa Kalpa, Kithi, Duni, Khawangi, Yuvarangi
C:\MWS_21\Photo\SC-11\Table 1\Table1.jpg
LATITUDE LONGITUDE ALTITUDE SLOPE IN DEGREE
RAINFALL(mm) SNOWFALL(mm) TEMPERATURE(Cen) NO OF HOUSE HOLD
31'32' to 31'35'
78'11' to 78'17'
1900m to 5090m
40' to 85' NA NA NA 1395
POPULATION MALE FEMALE CATTLE
PROPOSED NO/NAME PLACE OF INTEREST LIKE TOURISM OR ECOTOURISM
DESCRIPTION MILTCH OTHER
6533 3173 3360 822 3022
Gwarang Nala near Yuvarangi village and Titli Khana recommended for eco tourism places.
NA
The places are at road approach. Suitable for adventure tracking. Climate of the areas is pleasant with dence forests of Chilgoza & Deodar in C-242.
TABLE 1 PHOTO
Subcatchment No 11
Volume: XIII Part: 1 Chapter: 4 Page No: 132
TABLE NO:2
A. STATUS OF LAND USE IN MICRO WATERSHED(HA) B.AREA UNDER FOREST CATEGORY WISE :
LAND USE GOVT AREA
PRIVATE AREA
COMMU AREA TOTAL CATEGORY DPF/RESERVE UPF PASTURE
OTHERS
AGRICULTURE LAND 90 312 0 402 NAME C-243a,b, C-239, 241, NC Goli NA
Radula, Choka, Tasang, Pyagi, Goli Dhar NA
FOREST LAND 328 0 0 328 AREA (HA) 327.81 NA 897 289.25
WASTE LAND 385 0 0 385 SPECIES Neoza, Deodar, Kail, Walnut, Khanor NA NA NA
OTHERS LAND 1186 0 0 1186 DENSITY .1 to .7 NA NA NA
TOTAL 1989 312 0 2301 TABLE NO:3
AREA UNDER PLANTATIONS FOR LAST 15 YEARS
NAME
LATITUDE AND
LONGITUDE
TOTAL AREA (HA)
SAMPLE AREA (HA)
SPECIES PLANTE
D
SAMPLE GAP
FILLING AREA (HA)
SURVIVAL %
TOTAL GAP
FILLING AREA (HA)
AREA NEEDED NEW
PLANTATION(HA)
FENCING REQUIRED
(RM)
REASONS FOR FAILURE
FINAL PRESCRIPTION(Enrichment(HA))
RATE/ HAC
COST (Rs)
C-239
31'33'58" 78'15'50"
160
5 Neoza 3 40
68 35 82500
Due to drought & grazing.
Enrichment = 172
35000 6020000
C-239
31'33'39" 78'15'40"
5 Neoza, Deodar
2 60 Due to drought
& grazing.
C-239
31'33'48" 78'15'43"
5 Neoza, Deodar
1 80 Due to drought
& grazing.
C-240
31'34'38" 78'16'21"
5 Neoza, Deodar
2 60 Due to drought
& grazing.
C-240
31'34'38" 78'16'21"
5 Neoza, Deodar
2 60 Due to drought
& grazing.
C-241
31'32'51" 78'15'16"
5 Neoza, Deodar
2 60 Due to drought
& grazing.
Energy Plantation =
20 138000 2760000
C-242
31'32'14" 78'15'17"
5 Neoza, Deodar
2 60 Due to drought
& grazing.
Tilangi
Slide
31'34'04" 78'16'06"
5 BL 0 100 Due to drought
& grazing.
TOTAL :
160 40 14 68 35 82500 8780000
Volume: XIII Part: 1 Chapter: 4 Page No: 133
TABLE 3 PHOTOS
C-239 C-239 C-239 C-240
C-240 C-241 C-242 Tilangi Slide
Volume: XIII Part: 1 Chapter: 4 Page No: 134
TABLE NO:4
SOIL & MOISTURE CONSERVATION MEASURES NEEDED IN FOREST AREAS
NAME OF AREA
LATITUDE/ LONGITUDE
PRESCRIPTION QUANTITY
AVAILABILTY OF LOCAL MATERIAL
OLD WORK NEED REPAIRING (QUANTITY)
FINAL PRESCRIPTION
RATE/CUM
COST (Rs)
NEW PRESCRIPTION
NEW QUANTITY
C-239
31'33'58"78'15'50"
Live Hedge 180 Rms
Stone & local species NA NA NA NA NA
CheckDams
2x1.5x1.5m = 40 Nos
31'33'48"78'15'43"
2x1.5x1.5m = 50 Nos
Brushwood 50 Rms
31'33'39"78'15'40" Live hedge 360 Rms
31'33'58"78'15'50" CheckDams 2x1.5x1.5m = 50 Nos
31'33'39"78'15'40"
Trenching 1x.50x.30m = 200 Nos
CheckDams 2x1.5x1.5m = 60 Nos
31'33'58"78'15'50"
Live Hedge 350 Rms
Brushwood 60 Rms
31'33'48"78'15'43" Live Hedge 360 Rms
31'33'58"78'15'50"
Trenching
1x.50x.30m = 250 Nos
31'33'48"78'15'43" 1x.50x.30m = 200 Nos
31'33'39"78'15'40" Brushwood 50 Rms
C-240
31'34'38"78'16'21"
CheckDams
2x1.5x1.5m = 30 Nos
Stone & local species NA NA NA NA NA
31'34'38"78'16'21"
2x1.5x1.5m = 20 Nos
Trenching 1x.50x.30m = 200 Nos
31'34'38"78'16'21"
Live Hedge
200 Rms
31'34'38"78'16'21" 360 Rms
31'34'38"78'16'21" Trenching 1x.50x.30m = 250 Nos
C-241 31'32'51"78'15'16"
Live Hedge 420 Rms
Stone & local species NA NA NA NA NA
Brushwood 40 Rms
Trenching 1x.50x.30m = 250 Nos
CheckDams 2x1.5x1.5m = 30 Nos
C-242 31'32'14"78'15'17"
Trenching 1x.50x.30m = 300 Nos
Stone & local species NA NA NA NA NA
CheckDams 2x1.5x1.5m = 100 Nos
Brushwood 50 Rms
Live Hedge 480 Rms
Tilangi Slide 31'34'04"78'16'06" Trenching 1x.50x.30m = 150 Nos
Stone & local species NA NA NA NA NA
Volume: XIII Part: 1 Chapter: 4 Page No: 135
TABLE 4 PHOTOS C-239 C-239 C-239 C-240
C-240 C-241 C-242 Tilangi Slide
TABLE NO:5
AGROFORESTRY
PRESENT STATUS FUTURE REQUIREMENT
TYPE OF TREE
PRESENT NOs PRESENT SPECIES
FUTURE NOs FUTURE SPECIES
NEED FOR EXTENSION
SOURCE OF PLANTING STOCK(Nearest Nursery)
TREES 1200 Deodar, Kail, Poplar, Kunish, Willow, Neoza, Siaru 2500
Deodar, Kail, Poplar, Kunish, Willow, Neoza, Siaru Y Recong Peo Nursery.
WILD FRUIT 2000 Walnut, Khanor, Neoza, Chulli, Bemi, Peach, Heer, Siaru 2000
Walnut, Khanor, Neoza, Chulli, Bemi, Peach, Heer, Siaru Y Recong Peo Nursery.
MEDICINAL 1800
Karu, Patish, Hathpanja, Discoria, Kuth, Dhoop, Chora, Chukri, Bankakri, Zeera, hGuchhi, Brahamkamal, Pathartod 2500
Karu, Patish, Hathpanja, Discoria, Kuth, Dhoop, Chora, Chukri, Bankakri, Zeera, hGuchhi, Brahamkamal, Pathartod Y Recong Peo Nursery.
Volume: XIII Part: 1 Chapter: 4 Page No: 136
TABLE NO:6
GRAZING LANDS
Name LATITUDE/LONGITUDE AREA(HA) SPECIES
WEED REMOVAL SEEDING CLOSURES Other
PEOPLES SUGGESTION
Rate/ Hac (Rs)
Cost (Rs)
Warkhalgang & Tasang Kanda NA 155
Local grass Yes Yes No
31000 fodder plants and grass seeds are required.
Improved seeds be seeded in the Kandas. 27000 4185000
TABLE NO:7
TEMPLE/PRIVATE/COMMUNITY/PANCHAYAT FOREST AREA NAME AREA(HA) LATITUDE/LONGITUDE SPECIES GAP FILLING MAINTENANCE NEW PLANTATION SOIL CONSERVATION MEASURES(QUANTITY)
NA NA NA NA NA NA NA NA
TABLE NO:8
PERFORMA FOR SOIL AND WATER CONSERVATION FOR NON-FOREST AREA(Nala & Khads)
NAME OF AREA
LATITUDE/ LONGITUDE
PRESCRIPTION QUANTITY
AVAILABILITY OF LOCAL MATERIAL
OLD WORKS NEEDING REPAIR(QUANTITY)
LIFT IRRIGATION(HT/ACERAGE)
FINAL PRESCRIPTION
RATE/UNIT COST(Rs)
NEW PRESCRIPTION NEW QUANTITY
Kashmir Nala (3 Kms)
31'33'46" 78'15'38"
Live Hedge
750 Rms
Stone & local species NA NA
Live Hedge 900 Rms 9.6 8640
Water Harvesting Structure 20x2x4m=1 Nos 62290 1245800
CheckDams
7x2x2.5m = 23 Nos
CheckDams
7x2x2.5m = 7 Nos 17277 846573
15x2x2.5m = 12 Nos 15x2x2.5m = 4 Nos 17277 1036620
10x2x2.5m = 19 Nos 10x2x2.5m = 6 Nos 17277 1036620
Brushwood 130 Rms Brushwood 150 Rms 62 9300
Tilangi Nala (1.5 Kms)
31'34'00" 78'15'50"
CheckDams 7x1.5x1.5m = 17 Nos
Stone & local species NA NA
CheckDams 7x1.5x1.5m = 6 Nos 10033 421386
Live Hedge 300 Rms Live Hedge 450 Rms 9.6 4320
CheckDams 5x1.5x1.5m = 23 Nos CheckDams 5x1.5x1.5m = 7 Nos 10033 351155
Brushwood 60 Rms Brushwood 75 Rms 62 4650
Tilangi Nala -II (2 Kms)
31'34'18" 78'16'02"
Water Harvesting Structure 8x2x4m = 02 Nos
Stone & local species NA NA
Water Harvesting Structure 8x2x4m = 1 Nos 62290 498320
CheckDams
7x1.5x1.5m = 11 Nos
CheckDams
7x1.5x1.5m = 4 Nos 10033 280924
5x1.5x1.5m = 08 Nos 5x1.5x1.5m = 2 Nos 10033 100330
Brushwood 110 Rms Brushwood 110 Rms 62 6820
Live Hedge 300 Rms Live Hedge 600 Rms 9.6 5760
Volume: XIII Part: 1 Chapter: 4 Page No: 137
TABLE 8 PHOTOS
Kashmir Nala Tilangi Nala Tilangi Nala -II
TABLE NO:9
PERFORMA FOR LANDSLIDE
NAME OF AREA/LOCATION
LATITUDE/LONGITUDE
DAMAGE/RISK TO LIFE & PROPERTY
MEASURES TAKEN
TYPE OF SOIL AND ROCK
DEGREE OF SLOPES/SEVERITY
OCCURRENCE(Season)
ROAD CONSTRUCTION
QUARRY
OTHER CONSTRUCTIONS
NATURAL
FINAL PRESCRIPTION
RATE/UNIT COST(Rs)
NEW PRESCRIPTION
NEW QUANTITY
Ghaso Slip (150x60m)
31'33'37" 78'16'11" Property NA Clay Severe Rainy No No No Yes Live Hedge 150 Rms 9.6 1440
Khawangi (150x100m)
31'32'58" 7816'42"
Life & property NA
Clay & Sandy
Very Severe Rainy No No No Yes Live Hedge 300 Rms 9.6 2880
NH 22 from Powari to Pangi Nala (2 Kms) NA Property NA NA NA NA NA NA NA Yes
Retaining Wall Gabion
15x2x2.5m = 68 Nos 17277 17622540
Powari (2 Hact)
31'33'09" 78'16'43"
Life & property NA
Clay & loose stone
Very Severe Rainy Yes No No Yes
Retaining Wall Gabion
50x2x2.5m = 06 Nos 17277 5183100
Road from Kalpa to Boktu (200 Mtr) NA Property NA NA NA NA NA NA NA Yes
Retaining Wall Gabion
15x2x2.5m = 10 Nos 17277 2591550
Volume: XIII Part: 1 Chapter: 4 Page No: 138
Road from Powari to Kalpa (2Kms) NA Property NA NA NA NA NA NA NA Yes
Retaining Wall Gabion
15x2x2.5m = 80 Nos 17277 20732400
Road from Recong Peo to Pangi Nala (500
Mtr) NA Property NA NA NA NA NA NA NA Yes
Retaining Wall
Gabion
15x2x2.5m
= 20 Nos 17277 5183100
Tilangi Dakho (1000mx200m)
31'34'03" 78'16'32"
Life & property NA
Clay & Sandy
Very Severe Rainy No No No Yes
Retaining Wall Gabion
50x2x2.5m = 18 Nos 17277 15549300
TABLE 9 PHOTOS
Ghaso Slip Khawangi Powari Tilangi Dakho
TABLE NO:9A
INFORMATION ON (CULTIVATION / LIFE STOCK / FUEL / FODDER / MFP)
1.Fruits FRUIT NAME VARIETY(LOCAL/IMPROVED)
USE OF FERTILISERS
USE OF INSECTICIDES PROBLEMS FACED
Walnut Local No No
Wild animals destroys the crops. Fertilisers and insecticides not being provided in due time.
Peach Local No No
Apricot Local No No
Neoza Local No No
Bemi Local No No
Chulli Local No No
Apple Royal, Rich Red, Spur, Golden, Red Royal, Delicious Yes Yes
Pears Local No No
Volume: XIII Part: 1 Chapter: 4 Page No: 139
2.CROPS : CROPS NAME VARIETY(LOCAL/IMPROVED) USE OF FERTILISERS USE OF INSECTICIDES PROBLEMS FACED
Rajmash Local No No
Wild animals destroys the crops.
Fafra Local No No
Koda Local No No
Wheat Local No No
Barley Local No No
Potato Local No No
Bithu Local No No
Ogla Local No No
Maize Local No No
3.VEGETABLE : VEGETABLE NAME VARIETY(LOCAL/IMPROVED) USE OF FERTILISERS USE OF INSECTICIDES PROBLEMS FACED
Frenchbeans Local No No
Wild animals destroys the crops.
Brinjal Local No No
Peas Local No No
Ladyfinger Local No No
Capsicum Local No No
Tomato Local No No
Cauliflower Local No No
Cabbage Local No No
4. LIVE STOCK : LIVE STOCK(NO) BREED WHETHER SELLING THE PRODUCT PROBLEM FACED
Ox - 287 Local No Fodder shortage is faced. Wild animals damages the cattle.
Cow - 822 Local & Jersey Yes
Sheep/Goat - 2735 Local Yes
5.FUEL/FODDER : FUEL/FODDER MANAGEMENT REQUIREMENT AVAILABILITY GAP PERCENTAGE SOURCE
FUEL Yes 10% 90% LPG & Depot supply
FODDER Yes 20% 80% Purchase & forests
Volume: XIII Part: 1 Chapter: 4 Page No: 140
MINOR FOREST PRODUCTS (MFP) MINOR FOREST PRODUCTS EXISTING NAME SUGGESTIONS
Patish Patish
Extention of Medicinal/Herbal plants is required and cycle be maintained.
Hathpanja Hathpanja
Discoria Discoria
Dhoop Dhoop
Karu Karu
Pathartod Pathartod
Kuth Kuth
Chora Chora
Chukri Chukri
Bankakri Bankakri
Zeera Zeera
Guchhi Guchhi
Brahamkamal Brahamkamal
PEOPLES PARTICIPATION:
MAIN PROBLEMS SUGGESTION FOR IMPROVEMENT PEOPLES PRIORITIES
No check on environment is being kept keeping in view the global warming.
Environment monitoring committee be managed to keep check on the climate.
Top Priority.
Irrigation channels and drainage system in the area are very poor. Good quality of irrigation channel or Pipeline be provided for irrigation purposes and proper drainage be made.
Dumping of muck by various construction activities are creating huge silt in the rivers and landslided.
Earmarking of dumping sites is urgently required before starting the any construction. Priority.
Shortage of fodder is faced in the villages. Fodder plants be planted in blank areas to fulfill the requirement of fodder.
COSTING:
TABLES TABLE 3 TABLE 4 TABLE 6 TABLE 8 TABLE 9 TOTAL
COST 8780000 0 4185000 5857218 137219128 156041346