CONCRETE WORK

SPECIFICATIONS 9 92

Page 2: Vol-II Concrete Work

8/10/2019 Vol-II Concrete Work

http://slidepdf.com/reader/full/vol-ii-concrete-work 2/23

 ONT NTS

Page No.

456

ONCRETE WORK.

47

ATERIAL

48

OARSE AGGREGATE

49

DMIXTURES

50

EMENT CONCRETE

50

ROPORTIONING

50

REP ARA TION

50

ORKABILITY

53

RANS PORTA TION

54

LACING

54

OIvlPACnON

54

ONSTRUCTION JOINTS.

54

ONCRETE UNDER SPECIAL CONDITIONS

54

URING

55

55

5

57

IME CONCRETE

 

ROPORTIONING

57

IXING

57

 

PLACING AND COMPACTION

58lJRING 58

EASUREMENTS

 58

ATE

58

EMENT FLY ASH CONCRETE

 

AMP PROOF COURSE

59

EMENT CONCRETE LAYER

59

URING

59PPLICATION OF HOT BITUMEN

59

ATER PROOFING MATERIALS

59

 

·4.5.5

MEASUREMENTS

59

43

·4 4/CPWD/ND/92

Page 3: Vol-II Concrete Work

8/10/2019 Vol-II Concrete Work

http://slidepdf.com/reader/full/vol-ii-concrete-work 3/23

4 5 6 RATE

ft PPENDIX A

APPENDIX B

ApPENCIX C

APPINDIX D

DETERMINATION OF PARTICLE SIZE

TEST FOR SUFRACE MOISTURE

DETERMINATION OF TEN PRECENT FINE VALUE

SLUMP TEST

 

59

6

61

6

Page 4: Vol-II Concrete Work

8/10/2019 Vol-II Concrete Work

http://slidepdf.com/reader/full/vol-ii-concrete-work 4/23

List of Mandatory Tests

Chapter - 4

Clause /T ,estield/Laboratory

est Procedureinimum

Frequency )ftesting

quantity of

material/work

for carrying

out the test .

4.1.2.2

) Precentage

eneral visualS 2386

s required by

or all

nspection, labor

t.II

ngineer-in-chargeuantities

tory test where

963

equired by the

~ngineer-in-harge or aspedfied

b) Particle

Field or lab.

ppendix A

5 cum

or every sizes required byage

59

45 cum or

distribution

Engineer-iri- part thereofs decided by

Engineer-in-harge

Ten precent

Laboratoryppendix C

5 cumnitial test

Page

60

nd subsequent

test as. when

equired by

E;ngineer-in-

harge

4.2.3

lump Test

 ~_ ~

Appendix D

5 cum

5

cum or par t

P A hhereof or more frequently as

equired byngineer-in-

Charge

Page 5: Vol-II Concrete Work

8/10/2019 Vol-II Concrete Work

http://slidepdf.com/reader/full/vol-ii-concrete-work 5/23

CONCRETE WORK

  ST OF BUEREAU OF INDIAN STANDARD CODES

1. 383-1970 Specification for coarse and fine aggregate from Natural Source for Concrete.

2. 456-1978 Code of practice for plain and reinforced concrete.

3. 516-1959 Method of test for strength of concrete

4. 1199-1959 Method of sampling and analysis of concrete

5. 1200 (pt.II) Method of measurement of building and civil

- 1974, engineering work (concrete work)

6. 1322-1982 Specification for bitumen felt for water proofing and damp proofing.

7. 1791-1985 Specification for batch type concrete mixers.

8. 2386-1963 Method of test for aggregate for concrete work.

a) Pt. I Particle size and shape

b) Pt. II Estimation of deleterious materials iind organic impurities

c

Pt. IIi Specific gravity, density,

 km

and bulking.

d) Pt. IV Mechanical properties

9. 2505-1980 ,General requirement for concrete vibraln irnirit.. Tsioritype.

1O. 2506-1985 General requirement for screedboar ~,ixj.r :;lct{:\brators.

11. 2645-1975 Specification for integral cement waterpmoHng components.

12. 2686-1977 Specification for cinder as fine aggregate for use in Jime concrete.

13. 3068-1986 Specification for broken burnt (clay) coarse aggregate for use in lime concrete.

14. 3812-1981 Specification for flyash for use as pozzo1anaand admixtures

15. 4656-1968 Specification for fonn vibrators for concrete.

16. 7861-1981 Code of practice for extreme weather concreting (Pt. I) recommended practice

for hot weather concreting.

17. 7861-1975 For cold weather concreting

(Pt. II)

18. 9103-1979 For admixtures for concrete

Page 6: Vol-II Concrete Work

8/10/2019 Vol-II Concrete Work

http://slidepdf.com/reader/full/vol-ii-concrete-work 6/23

4 CONCRETE WORK

The concrete can be designed in grades denot

ing characteristic compressive strength or by

volumetric proportion of the constituents. The

concrete by volumetric proportion or nominal

mix concrete of the constituents is specified in

this Chapter

4.1 MATERIAL

4.1.1. Water, cement, lime, fine aggregate or

sand, surkhi, cinder and fly ash shall be as

specified in mortar chapter.

4.1.2 Coarse Aggregate

4.1.2.1 General: Aggregate most of which is

retained on 4.75mm IS Sieve and contains only

as much fine material as is permitted in IS 383

1970 for various sizes and grading is known as

coarse aggregate. Coarse aggregate shall be

specified as stone aggregate, gravel or brick

aggregate and it shall be obtained from ap

proved/authorised sources.

(a) Stone Aggregate : It shall consist of

naturally occuring (uncrushed, crushed

or broken) stones. It shall be hard, strong,

dense, durable and clean. It shall be free

from veins, adherent coatings, injurious

amounts of disintegrted pieces, alkali,

vegetable matter and other deletrious

susbstances. It shall be roughly cubical in

shape. Flaky and elongated pieces shall

be avoided. It shall conform to IS:383

1970 unless otherwise specified.

(b) Gravel: It shall consist of naturally

occuring (uncrushed, crushed or broken)

river bed shingle or pit gravel, It shall be

sound, hard and clean. It shall be free

from flat particles of shale or similar

laminated material, powdered clay, silt,

loam, adherent coatings ,alkali, vegetable,

matter mId other deletrious substances.

Pit gravel shall be washed ~f it contains

soil materials adhering to it. These shall

conform to IS:383-l970 unless other

wise specified.

(c) Brick Aggregate: Brick aggregate shall

be obtained by breaking well burnt or

overbumt dense brickslbrick bats. They

shall be homogeneous in texture, roughly

cubical in shape and clean. They shall be .'

free from unbumt clay particles. Soluble

salt, silt, adherent coating of soil, veg

etable matter and other deleterious

 

susbstances. Such aggregate should hot

contain more thaIl one percent of sulphates

and should not absorb more than 10 of

their own mass of water, when used in

cement concrete and 20 when used in

lime concrete. It shall conform to IS 306

1986 unless otherwise specified .

. (d) Light weight aggregates such as sintered

fly ash aggregate may also be used pro

vided the engineer in-charge is satisfied

with the data on the proportion of con

crete made with them.

4.1.2.2 Deleterious Material: Coarse aggre

gate shall not contain any deleterious material,

such as pyrites, coal, lignite, mica, shale or

similar laminated material, clay, alkali, soft

fragments, sea shells and organic impurities in

such quantity as to affect the strength or dura

bility of the concrete. Coarse aggregate to be

used for reinforced cement concrete shall not

contain any material liable to attack the steel

reinforcement. Aggregates which are chemi

cally reactive with alkales of cement shall not

be used. The maximum quantity of deleterious

material shall not be more than five percent of

the weight of coarse aggregate when deter

mined in accordance with IS:2386-l963 Pt. II.

4.1.2.3 Size and Grading

(i) Stone aggregate and gravel : It shall be

either graded or single sized as specified.

Nominal size and grading shall be as

under:-

(a) Nominal sizes of graded stone ag

gregate or gravel shall be 40, 20, 16,

or l2.5mm as specified. For any

one of the nominal sizes, the pro

portion of other sizes as determined

by the method prescribed in Appen

dix 'A' on page 59. shall be in

accordance with Table 1.

Page 7: Vol-II Concrete Work

8/10/2019 Vol-II Concrete Work

http://slidepdf.com/reader/full/vol-ii-concrete-work 7/23

TABLE

1

E AGGREGATE OR GRAVEL

Percentage passing by weight) for nominal size of

0mm0mm6mm2.5 mm005 to 1000030 to 705 to 1000000

-

90 to 100

-

90 to 100

10 to 355 to 550 to 700 to 85to 5

- to 10

to 10to 16

  b) Nominal sizes of single sized stone

aggregate or gravel shall be 63,40,

20,16,12.5 or lOmm }sspecified.

For anyone ofthe nominal size, the

TABLE 2

proportion of other sizes as deter

mined by the method prescribed in

Appendix A on page 59 shall be in

accordance with Table 2.

SINGLE SIZED UNGRADED) STONE AGGEGA TE OR GRAVEL

IS Sieve

Designation

Precentage passing by weight) for nominal size of

63mm 40 mm 20 mm 16 mm

12.5 mm 10mm

75mm

63mm

37.5mm

19mm

16mm

11.2mm

9.5mm

4.75mm

2.36mm

1

- 85-100

- 0-30

  5

100

85-100

 2

5

100

85-100

  2

0-5

100

-85-100

0-30

0-5

100

85-100

0-45

0-10

100

85-100

  2

5

Page 8: Vol-II Concrete Work

8/10/2019 Vol-II Concrete Work

http://slidepdf.com/reader/full/vol-ii-concrete-work 8/23

  c) When stone aggregate or gravel

brought to site is single sized

  ungraded), it shall be mixed with

single sizes aggreg:lte of different

sizes in the proportion to be deter

mined by field tests to obtain graded

aggregate of specified nominal size.

For the required nominal size, the

proportion of other sizes in mixed

aggregate as determined by method

prescribed in Appendix A on page

59 shall be in accordance with Table

1. Recommended proportions by

volume for mixing of different sizes

of single size ungraded) aggregate

to obtain the required nominal size

of graded aggregate are given in

Table 3.

TABLE 3

SINGLE SIZED UNGRADED) STONE AGGREGATE OR GRAVEL

Cement

concrete

1:6:12

1:6:12

1:5:10

1:5:10

1:4:8

1:4:8

]:3:6

1:3:6

1:3:6

1:2:4

1:2:4

1:2:4

1:1 1/2:3

Nominal size

 pints of single size aggregate

of graded

of size

aggrggate

required

50mm0mm

0mm

33

71/2

-

21/2

-

1/2

21/2

6

2

-

2

41/2

-

1

1/2

-

1/2

11 2

-

41/21/2

-

3

20

-

2

12.5mm lOmm

3

Note:

  i) The proportions indicated in table 3 above

are by volume when considered neces

sary, these proportions may be varied

marginally by Engineer-in-charge after

making sieve analysis of aggregate

brought to site for obtaining required

graded aggregate. No adjustment<; in rate

shall be made for any variation in the

proportions so ordered by the Engineer

in-charge. If single size coarse aggregate

 

are not premixed at site to obtain the

graded coarse aggregate required for the

the mix, the volume of single size aggre

gates required for the mix shall be suit

ably increased to account for reduction in

total volume at the site of mixing

  ii) Brick Aggregate: Nominal size of brick

aggregate shall be 40 mm and its grading

shall be as specified in Table 4 when

tested for sieve analysis by the method

prescribrd in Appendix A on page 59.

 

Page 9: Vol-II Concrete Work

8/10/2019 Vol-II Concrete Work

http://slidepdf.com/reader/full/vol-ii-concrete-work 9/23

TABLE 4

Brick Aggregate

IS Sieve Designation precemage passing

  byweight)

75

mm

100

gross measurements of the stacks ·is to be made

in respect of aggregates of nominal size below

40mm.

4.1.3 Admixtures: When required, admix

tures of approved quality shall be mixed with

concrete, as specified. The admixtures shall

confonn to IS 9103-1979.

37.5

mm

95 - 100

4

Cement Concrete.

19.0 mm 45 - 100

4.75 mm 0 - 5

Note: Coarse aggregate for cement con-

crete shall generally conform to

para 4.2.1 oOS 456-1978 and fine

aggregate shall conf01ill to IS:383

1970

4.1.2.4 Stacking: Aggregate shall be stacked

on a hard, dry and level patch of ground. When

stack piling, the aggregate shall not form pyra

mids resulting in segregation of different sized

materials. It shall be stacked separately accord

ing to nominal size of coarse aggregates. Stack

ing shall be done in regular stacks, of height not

exceeding 100 em.

4.1.2.5 Testj'ttg : Coarse aggregate shall be

tested for the followings (as per IS : 2386

1963) :

(a) . Determination of particle size and shape

(Appendix' A' on page 59)

(b) Estimation of organic impurities (as per

IS:2386-1963 Part II)

(c) Surface moisture (Appendix 'B' on page

60)

(d) Determination of 10 fine value (Ap-

pendix

 c

on page 60)

4.1.2.6 Measurements: The aggregates shall

be measured in stacks and paid for after making

a deduction of? .5 of the gross measurements

of stacks in respect of aggregates of nominal

size 40 mm and above. No deduction from the

4.2.0 This shall be prepared by mixing graded

stone or bIick aggregate of nominal size as

specified with tIne aggregate and cement in

specified proportions with required quantity of

water.

The grading and quality of aggregates shall be

such as to give rninimum compressive strength

of 140 kg/cm2 and 210 kg cm2 at 7 days and 28

days respectively in case of mix 1:2:4. (One

cement: Two Coarse sand: Four stone aggre

gate)

One sample consisting of 6 cubes 15x15x15

em shall be taken for every 15 cubic metre or

part there of of cement concrete 1:2:4. The cube

tests shall not be carried out in case the quantity

.of cement concrete placed on any day is less

-than 15 cubic metre unless otherwise speci

fied. For other details, refer Chapter on R.C.C

work.

4.2.1 Proportioning: It shall be done by

volume. Boxes of suitable size shall be used for

measuring sand and aggregate. The internal

dimentions of the boxes shall be generally

35x25x40 cm deep or as otherwise approved·

by the Engineer-in-charge. The unit of mea

surement of cement shall be a bag of 50 kg. and

this shall be taken as 0.035 cubic metre. While

./

measuring the aggregate, shaking, ramming or

heaping shall not be done. The proportioning·

of sand shall be on the pasis of it~ dry volume

and in case of damp sand, allowances for

bulkage shall be made as given in the chapter

for mortar.

4.2.2 Preparation: This shall be prepared

by mixing coarse aggregate, fine aggregate and

cement in specified proportions with required

quantity of water. ,Nominal size and quality of

aggregate shall be as specified.

Page 10: Vol-II Concrete Work

8/10/2019 Vol-II Concrete Work

http://slidepdf.com/reader/full/vol-ii-concrete-work 10/23

Except where brick aggregate is used in cement

concrete, minimum compressive strength on

works test for different concrete mixes sha11be

.as specified for various grades prepared by

volume basis, in Table 5 below. The work test

s ll be carried out for every 15 cum of a day s

concrc6ng unless otherwise specified.

Table 5

in Compressive strength

5cm cube in

kg/cm2

8 days

101575654010

4.2.2.2 Power Loader : Mixer will be fitted

wiL~ a power loader complying with the fol

lowing requirements.

a) The hopper sha11be of adequate capacity

to receive and discharge the maximum

nominal batch

of

unmixed materials with

oui: spillage under normal operating con

ditions on a level site.

Note: In such a case the volume of the

maximum nominal batch of mixed

material is 50 greater than the

nominal mixed batch capacity

b) The minimum inside wid~h Qfthe feeding

edge of the hopper shall be as specified

below in table 6.

Table 6

c) The design of the loader shall be such that

it allows the loading hopper to be el

evated to such a height that the centre line

of the chute plate of the hopper when in

discharge position, is at an angle of not

less than 50° to the horizontal. A me

chanical device to aid discharge of the

contents as quickly as possible from the

hopper to the drum ma y also be provided.

Even when a mechanical device is pro-

4.2.2.1 Mixing: Concrete shall be mixed in

mechanical batch type concrete mixers con

forming to IS 1791-1985 having two blades

and fitted with power loader (lifting hopper

type). Half bag mixers and mixers without

lifting hoppers shall not be used for mixing

concrete. In exceptional circumstances, such

as mechanical breakdown of mixer, work in

remote areas or power breakdown and when

the quantity· ef concrete work is very small,

hand mixing :may be done with the specific

prior permission of the Engineer-in-Charge in

writing subject to adding 10 extra cement.

When hand mixing is permitted, it shall be

carried out on a water tight platform and care

shall be taken to ensure that mixing is contin

ued until the concrete is uniform in colour

.

consistency. Before mixing the brick aggre

gate shall be well soaked with water for a

minimum period of two hours and stone aggre

gate or gravel shall be washed with water to

remove, dirt, dusCand 6therforei~n mateIials.

For guidance. the mixing time maybe 1-1/2 to

2 minutes, for hydrophobic cement it may be

taken as 2-1/2 to 3 minutes.

51

Nominal size

of mixer

(1 ,

NT

or

R), litre

140

200

280

375

500

1000

T=tilting

NT=nontilting

R=Reverse

Minimum inside

width of hopper

feeding edge in

 

1.0

1.1

1.2

1.4

1.5

2.0

Page 11: Vol-II Concrete Work

8/10/2019 Vol-II Concrete Work

http://slidepdf.com/reader/full/vol-ii-concrete-work 11/23

vided, it is recommended that the angle of

centre line of the chute plate of the hopper

when in discharge position, should be as

larger as parcticable, preferably not less

than 40° to horizontal.

following limits :

Cement

Fine aggregate

8

d) Whe,n the means of raising and lowering

the loading hopper includes flexible wire

ropes winding on to a drum or drums, the

method of fast~ning the wire to rope to

the drums shall be such as to avoid, as far

as possible any tendency to cut the strands

of, the ropes and the fastening should

preferably be positioned clear of the bar

rel of the drum for example, outside the

drums flange. When the loading hopper

is lowered to its normal loading position,

there should be at least one and a half

drums of rope on the drum.

e) Gutch brake and hydraulic control lever

shall be designed so as to prevent dis

placement by liberation or by accidental

contact with any person.

,f) The clutch and brake cotrol arrangements

shall also be so designed that the operator

can control the falling speed of the loader.

g) Safety device shall be provided to secure

the hopper in raised position when not in

use.

4.2.2.3 Mixing efficiency: The mixer shall be

tested under normal working conditions in

accordance with the method specified in IS

464:3 - 1968 with a view to check its ability to

mix the ingredients to obtain concrete having

uniformity within the prescribed limits. The

uniformity of mixed concrete shall be evalu

ated by finding the precentage variation in

quantity (mass in water) of cement, fine aggre~

gate and coarse aggregate in a freshly mixed

batch of concrete:

The precentage variation between the quanti

ties of cement, fine aggregate and coarse aggre

gates (as found by weighing in water) in the

two halves of a batch and average of the two/

halves of the batch shall not be more tha_uihe

Coarse aggregate

5

4.2.2.4 Machine Mixing : The mixer drum

shall be flushed dean with water. Measured

quantity of coarse aggregate shaH be placed

first in the hopper. This shall be followed with

measured quantity of fine aggregate and then

cement. In case fine aggregate is damp, half the

required quantity of coarese aggregate shall be

placed in the hopper, followed by fine aggre

gate and cement. Finally the balance quantity

of coarse aggregate shall be fed in the hopper,

  then the dry materials are slipped into the

drum by raising the hopper. The dry material

shall be mixed for atleast four turns of the

drum. While the drum is rotating, water shall

be added graduaHy to achieve the water cement

ratio as specified or as required by the Engi

neer-in-charge. After adding water, the mixing

shall be continued until concrete of uniform

colour, uniformly distributed material and

conistency is obtained. Mixing shall be done

for atleast two minutes after adding water. If

there is segregation after unloading from the

mixer, the concrete should be remixed.

The drum shall be emptied before recharging.

When the mixer is closed down for the day or

at any time exceeding 20 minutes, the drum

shall be flushed cleaned with water.

 4.2.2.5   nd Mixing: When hand mixing

has been specifically permitted in exceptional

circumstances by the Engineer-in-Charge. in,

writing, subject to adding 10 extra cement, it

,shall be carried out on a smooth, clean and

water tight platform of suitable size. Measured

quantity of sand shal1.be spread evenly on the

platform and the cement shall be dumped on

the sand and 9Jstributed~evenely. Sand and

cem~ELshall15e mixed intimately with spade

/ _,until the mixture is of even colour throughtout.

Measured quantity of coarse aggregate shall be

Page 12: Vol-II Concrete Work

8/10/2019 Vol-II Concrete Work

http://slidepdf.com/reader/full/vol-ii-concrete-work 12/23

spread on top of cement _sand mixture and

mixing done by shovelling and turning till the

coarse aggregate gets evenly distributed in the

cement sand mixture. Three quarters of the

total quantity of water required shall be added

in a hollow made in the middle of the mixed

pile and the material is turned towards the

middle of pile with spade. The whole mixture

is turned slowly over and again and the remain

ing quantity of water is added gradually. The

mixing shall be continued until concrete of

uniform colour and consistency is obtained.

The mixing platform shall be washed and

cleaned at the end of the day.

4.2.3 Workability: The quantity ofl water

to be used for each mix shall be such that the

concrete is of. adequate workability for the

placing condition~ of the concrete arid can

properly be compacted with the means ~peci

fied.Generally the quantity of water to be used

for each mix of 50 kgs. cement shall not be

more than 34litres for 1 :3:6 mix 30 litres for

1:2:4 mix 30 litres for 1:1-1/2:3 mix and 25

litres for 1:1:2 mix. In case of vibrated con

crete the quantity of water may be suitably

reduced to avoid segregation. The quantity of

water shall be regulated by carrying out regular

slump tests as described in Appendix D on

page 62. The slump and workability for differ

ent kind of works shall be as per ta ble 7 ~elow.

Placing conditions.

TABLE NO.7

Degree of workability

Value of Workability

Concreting of shallow

sections with vibration

Very low.

0.75-0.80

Compacting

factor.

 

~J

Concreting of lightly

reinforced section

with vibration.

Concreting of lightly

reinforced section without

vibration or heavily

reinforced sections with

. vibration.

Concreting of heavily

reinforced sections.

without vibration.

Low

Medium

High

Slump up to. 25mm

J

10-5 seconds vee

bee time

or 0.8-0.85

compacting factor.

25-75mm

slump for 20mm

aggregate. ~~

75-125 mm slump

for 20mm

aggregate .

. Note:- Whe~considered necessary the workability of the concrete may also be ascertained by

 ..---ompacting factortest and vee- bee. censistometer method as specified in IS: 1199~1959. For

~~/ suggested ranges of value of workability of concrete by the above two methods reference

- may be made to IS:456-1978. i

53

Page 13: Vol-II Concrete Work

8/10/2019 Vol-II Concrete Work

http://slidepdf.com/reader/full/vol-ii-concrete-work 13/23

4.2.4 Transportation: Concrete shall be

transported from the mixer to the· place of

laying as rapid I

 

as possible by methods which

will prevent the segregation or loss of any of

the ingredients and maintaining the required

workability.

4.2.5 Placing: The concrete shall be depos

ited as nearly as practicable in its final position

to aviod rehandling. It shall be laid gently (not

thrown) and shall be thoroughly vibrated and

compacted before setting commences and

should not be subsequently disturbed. Method

of placing shall be such as to preclude segrega

tion. Care shall be taken to avoid displacement

of reinforcement or movement of form work

and damage due to rams.

4.2.6 Compaction : Concrete shall be

throughly compacted and fully worked around

embedded fixtures and into comers of the fonn

work. Compaction shaH be done by mechani

cal vibrator of appropriate type till a dense·

concrete is obtained. The mechanical vibrators

shall conform to IS 2505-1980 specifications

for concrete vibrators (immersion type). To

prevent seggregation, over vib~ation shall be

avoided. The use of mechanical vibrator may

be relaxed by the Engineer-in-charge at his

discretion for certain items and permit hand

compaction.

Hand compaction shall be done with the help of

tamping rods. Compaction shall be completed

before the initial setting starts. For the items·

where. mechanical vibrators are not to be used,

the contractor shall take permission of the

Engineer-in-Charge in writing before the start

of the work. After compaction the top surface

shall be finished even and smooth with wooden

trowel before the concrete begins to set.

4.2.7 Construction Joints: Concreting shall

be carried out continuously upto construction

joints. The position and arrangement of con

struction joints shall be as shown in the struc

tural drawings or as directed by the Engineer

in-Charge. Number of such joints shall be kept

minimum. Joints shall be kept as straight as

possible.

54

4.2.7.1 When the work has to be resumed on a

surface which has hardned. such surface shall

be roughend. It shaH then be swept clean and

throughly wetted. For vertical joints, neat ce

ment slurry, of workable consistency by using

2 kgs. of cement per sqm shall be applied on the

surface before it is dry.

For horizontal joints, the surface shall be cov

ered with a layer of mortar about 1O-15mm

thick composed of cement and sand in the same

ratio as the cement and sand in concrete mix.

This layer of cement slurry of mortar shall be

freshly mixed and applied immediately before

placing of the concrete.

4.2.7.2 Where the COi1cretehas not fully hard

ened, alliaitance shall be removed by scrub

bing the wet surface with wire orbristle brushes,

care being taken to avoid dislodgement of

particles of coarse aggregate. The surface shall

be throughly wettcd and all free water re

moved. The surface shall then be coated with

neat cement slurry @ 2 kgs of cement per sqm.

On t.hissurface, a layer of concrete not exceed

ing 150 mm in thickness shall first be placed

and shall be well rammed against comers and

close spots; work, thereaftei, shall proceed in

the normal way.

4.2.8 Concreting under special conditions

4.2.8.1 Work in extreme weather conditions

During hot and cold weather, the concreting

shall be done as per the procedure set out in

IS:7861 (Part-I) - 1975 and IS:786 1(Part II)

1981 respectively. Concreting shall not be

done when the temperature falls below 4.5°C.

In cold weather, the concrete placed shall be

protected against frost. During hot weather, it

shall be ensured that the temperature of wet

concrete does not exceed 38° C.

4.2.8.2 Under water concreting

Concrete shall not be deposited under water if

it is practicable to de-water the area and place

concrete in the regular manner. The concrete

shall contain at least 10 more cement than

Page 14: Vol-II Concrete Work

8/10/2019 Vol-II Concrete Work

http://slidepdf.com/reader/full/vol-ii-concrete-work 14/23

that required for the same mix placed in dry

conditions, the quantity of extra cement vary

ing with conditions of placing with prior writ

ten permission of the engineer-in-charge. Such

extra cement will be paid extra. The volume of

coarse aggregate shall not c;;

l~SS

than 1-1/2

times nor more than twice the fine aggregate

and slump not less than 100mm nor more than

18Omm. Where found necessary to deposit any

concrete under water; the method, equipment,

materials and mix shall first be got approved by

the Enginer-in-Charge. Concrete shall be de

posited continuously until

it

is brought to re

quired height. While depositing, the top sur

face shall be kept as nearly level as possible

and the formation of heaps shaH be avoided.

The concrete shall be deposited under water by

one of the approved methods such as tremie

method, drop bottom bucket, bags, grouting

etc. as per details given in IS 456-1978. Ifit is

necessary to raise the water after placing the

concrete, the level shall be brought up slowly

\vithoutcreating any waves or commotion tend

ing to wash away cement or to distrub the fresh

concrete in any way. -

4.2.9. Curing: When the concrete begins to

harden i.e. two to tl1f.t~eours after compaction,

the exposed surfaces shall be kept damp with

moist guny bags, sand or any other material

approved by the Enginner-in-Charge. 24 hours

after compaction, the exposed surface shall be

kept continuously in damp or wet conditions

by ponding or by covering wit.l], a layer of

sacking,canvass, hessian or similar absorbent

materials and kept constantly wet for atleast7

days where ordinary portland cement is used

and 10days, where portland pozzolona cement

is used from the date of placing of concrete. For

concrete work with other types of cement,

curing period shall be as dirceted by the Engi

neer-in-Charge.

Approved curing compounds may be used in

lieu of moist curing with the permission of the

Engineer-in-Charge. Such compounds shall be

applied to all exposed surfaces of the concrete

as soon as possible after the concrete has set.

4 2 9

Fresh y laid concrete shall be protected

from rain by suitable covering.

55

4.2.9.2 Over the foundatioljl concrete, the ma

sonry work may

be

started after 48 hours ofits

compaction but the curing of exposed surfaces

of cement concrete shall be continued along

with the masonry work for atleast 7 days. And .

where cement concrete is used as base concrete

for flooring, the flooring may be commenced

before the cUling period of base concrete is

over but the curing of base concrete shall be

continued along with top layer of flooring for

a minimum period of 7 days.

4.2.10 Testing of concrete will be done as

described in chapter ofR.C.C.

 

4.2.11 Form work : Form work shall be as

specified in R.C.C chapter and shall be paid for

separately unless otherwise specified.

4.2.12 Finishes: Plastering and special fin

ishes other than those, obtained through form

work shall be specified and paid for separately

unless otherwise specified.

4.2.13 Measurements:

4.2.13.1 Dimensions of length, breadth  

thickness shall be measured correct to nearest

cm. except for the thickness of slab

 

partition

which shall be measured to nearest 5 mm.

Areas shall be worked out to nearest 0.01

square metre and the cubic contents of cons6li

dated concrete shall be worked out to nearest

0.001 cubic metres. Any work done in excess

over the specified dimension or sections shown

in the drawing or as required by Engineer-in

Charge be ignored.

4.2.13.2 Concrete work executed in the follow

ing conditions shall be measured separately

a. Work in or under water

b. Work in liquid mud

c. Work in or under foul positions

4.2.133

Cast-m-situ conc,rete and or precast

cOIlcrete work Shall be measured in stages

described in the item of work, such as;

Page 15: Vol-II Concrete Work

8/10/2019 Vol-II Concrete Work

http://slidepdf.com/reader/full/vol-ii-concrete-work 15/23

c. Between two specified floor levels

b. Openings upto 0.1 sq. metre

(1000 sq.cm)

4.2.13.4 No deduction shall be made for the

follpwing

e. Between two specified heights or

depths with reference toplinth level/

defined datum level.

4.2.13.6 Cast-in-situ concret shall be classified

and measured as follows :

a) Foundation, footings, bases for columns

b) Walls (any thickness) including attached

pilasters, buttresses, plinth and string

cours~s, fillets etc.

Shelves

Slabs

c)

d)

e)

4.2.13.5 Cast-in-situ and precast concrete work

shall be measured separately.

Chajjas including portions bearing on the

wall

t) Lintels, beams and bressummers

g) Columns, piers abutments, pillars, post

and struts

h) Stair case including stringer beams but

excluding landings.

i) Balustrades, newels and sailhg

j) Spiral stairase (including landings)

k) Arches

1) Domes, vaults

m) Shell roof, arch ribs and folded plates

n) Chimneys and shaft.

0) Breast walls, retaining, walls, return w~lls

p) Cqncrete fIlling to precast components

q) Kerbs, steps and the like

r) String or lacing courses, parapets, copings,

bed block, anchor blocks, plain window

sills and the like

s) Cornices and moulded windows sills.

t) Louvers, fins, facia.

Small voids such as shaded por

tions in Figure below when these do

not exceed 40 sq cm each in cross

section.

Volume occupied by pipes, con-,

duits, sheathing etc. not exceeding

100 sq em each in cross sectional

areas.

a. Ends of dissimilar materials for ex

ample beams, posts, girders,'fafters,

purlins trusses corbels and steps

upto 500sq cm in cross sections.

t

'a.

At or near the ground level

f b. Upto specified floor level

d. Up~o specified height above or

depth below plinth 'level/defined

datum level

.j C.

 :1

I d.

 ~

\.,

Note: In calculating area of opening, the

thickness of any separate lintel or sill shall be

included in the height. Nothing extra shall be

payable for forming such openings or voids.

L

~~

[- J1

I

11

I

+-L

1--- L-+

I

AREA OF

FI6

  Te

G

SHALL U.

==

Lx E3

C~

Jf

REA Of

fIe

H 52 J

SHALL BE-:zL;><[AVfRJ6E. Cf

-f--L --+-L-+

AHD FY]

 

F

~[~ t;

[-=:1~

- -

-+

- . +

- L --+

-- L -+

J

.....••

I

Page 16: Vol-II Concrete Work

8/10/2019 Vol-II Concrete Work

http://slidepdf.com/reader/full/vol-ii-concrete-work 16/23

4.3 LIME CONCRETE

Class B - Semi hydraulic lime used for lime

concrete.

Class A Eminently hydraulic lime. used

  r

structural purposes.

4.2.14 Rate: The rate is inclusive of the cost

of labour and materials involved in all the

operations described above.

4.3.2.1 Machine Mixing: The mixer shall be

flushed clean with water. Mixing shall be done

by pouring measured quantity of coarse aggre

gate and wet ground mortar for one batch in the

drum of the mixer, while it is revolving. The

quantity of materials loaded in the drum shall

not exceed the rated capacity of the mixer. The

water shall be added gradually upto the re

quired quantity and the wet mixing of batch

shall be continued for at least two minutes in

the drum till concrete of uniform colour uni

formly distributed materials and consistency is

obtained. The consistency of the.concrete shall

be such that the mortar does not tend to separate

from the coarse aggregate. If there is segrega

tion after unloading from the mixer the con

crete should be removed. The entire concrete of

batch shall be discharged before the materials

for the new batch are poured into .the drum.

Before suspending the work, the mixer shall be

cleaned by revolving the drum with plenty of

water each time.

100 parts o.l4.Pmm nomimil size graded stone

aggregate, gravel or brick aggregate as speci

fied and 40 parts oflime mortar of the specified

mix.

4.3.2 Mixing: Concrete shall be mixed in a

mechanical mixer. Inexceptional circumstances

specified in 4.2.2.1 hand mixing may be done

with the specific permission of the Engineer

in-Charge in writing. Before mAing, briCKS

aggregate shall be well soaked with water for a

minimum period of 2 hours and stone aggre

gate or gravel shall be washed with water to

remove dirt, dust or any other foreign materi

als.

4.3.2.2 Hand Mixing: When hand mixing is

specifically permitted by Engineer-in-Charge,

it shall be done on a clean and water tight

masonry platform of sufficient size t<;>rovide

ample mixing space. The specified wet lime

mortar shall be laid on the top of the aggregate

and turning shall be done over and again with

addition of necesary quantity of water till a

uniform mix of required consistency is ob

tained. The consistency of the concrete shall be

such that the mortar shall not tend to separate

 

from the coarse·aggregate.

Method of measurement

In cubic meters

In cubic meters

In square metres stating

the thickness or in cubic

meters.

In square metres stating

the thickness or in cubic

metres.

In square metres stating

the partition s thickness

In square meters stating

the thickness

f. Light weight

Partitions

e. Hollow block work

Classifications

4.3.1 PROPORTIONING:Theproportions

of aggregate to lime mortar shall be done by

volume. Generally lime is prepared by mixing

4.3.0 This shall be prepared by mixing coarse

aggregate and lime mortar in the specified

proportions with required quantity of water.

Lime shall conform to IS 712 - 1984 shall be

classified as below.

b. String or lacing

courses, copings;

bed plats, plain

windows sills,

shelves, louvers,

steps etc.

c. Kerbs, edgings etc.

d. Solid block work

a. Wall panels

4.2.13.7 Precast cement concrete solid articles

shall be measured separately and shall include

use of moulds, finishing the top surfaces even

and smooth with wooden trowel, before setting

in position in cement mortar 1:2 (1 cement :2

coarse sand). Plain and moulded work shall be

measured separately and the work shall be

classified and measured as under.

 

Page 17: Vol-II Concrete Work

8/10/2019 Vol-II Concrete Work

http://slidepdf.com/reader/full/vol-ii-concrete-work 17/23

Table S

FL Y ASH CONCERETE MIXES

portland cement and llyash in specified propor

tions with required quantity of water. The

recommended cmnposition of cement fly ash

concrete are as under:

Flyash

2 5

I 28 Kg/cm2

Sand

:~oo

J

tone Aggregate

--.

Le,-ill

Concrete

  1:4:8)

Cement

1.0

  ordinary Portland)

Flyash

2.0

7 kg/cm2

Sand

3 5

Stone aggregate

9

J

Compressive Strength

at St;ven days.

Cement 1.0

  Ordinary Port land)

Lean concrete 1:5:10)

Composition Dry volume)

4.3.4 Curing: After the concrete has begun

to harden i.e. about

 4

hours after its placing

and compaction, .thc curing shall be done by

keeping dIe concrete damp with moist gunny

bags, sand, or any other method approved by

the Engineer-in-Charge for a minimum period

of? days. Till then, masonryand Hooring work

over the foundation or base concrete shall not

be started.

4.3.5: Measurements:

4.3.3 Placing and Compaction: Concrete

shall be laid anduot. thrown) in layers while it

is quite fresh. Each layer shall be throughly

rammed and consolidated before the succeed

ing layer is placed. Consolidated thickness of

each layer shall not exceed 15 em. Joints where

necesary shall be staggered in different layers

unless otherwise specified. Ramming shall be

done by heavy iron rammers of 4.5 kg to 5.5 kg.

The area of each rammer shall not be more than

300 sq. em. Ramming shall be continued tin a

skin of mortar covers the surface completely.

Concrete laid on a particular day shall be

consolidated throughly on the same day before

the work is stopped. Ramming on the follow

ing day shall not be done. Freshly laid concrete

shall be protected from rains by suitable cover-

·ings.

4.3.5.1: Length, breadth and depth orthickness

shall be measured correct to a em and the

consolidated cubic contents of the concrete

shall be calculated nct to the nearest 0.01 cubic

metre. Concrete laid in excess of the dimen

sions shown in the drawings shall not be mea

sured.

Note: No flyash is to be added to

Puzzolona Portla~d cement in any case which

itself contains flyash

4.4.1: Proportioning shall be as specified in

4.2.1

4.3.5~2: Deductions shall be as specified in

4.2.13.4

4.3.6: Rate: The rate shall include the cost of

materials and labour involved in all operation

described above.

4 4 CEMENT-FLY ASH CONCRETE

4.4.2: Mixing shall be as specified in 4.2.2

except that the flyash shall be placed in the

hopper before cement in case of machine mix

ing.

4.4.3: Pladng and Gompaction shall be as

specified in 4.2.5

 

4.2.6.

4.4.4: Curing shall be as specified in\4 ..2.9.

4.4.0: Fly Ash concrete shall be prepared by

mixing graded coarse aggregate of nominal

size as specified with fine aggregate, ordinary

4.45:

Fonn work shall be as specified in

4.2.11.

58

Page 18: Vol-II Concrete Work

8/10/2019 Vol-II Concrete Work

http://slidepdf.com/reader/full/vol-ii-concrete-work 18/23

TABLE 9

APPENDIX A

  lause 4.1.2.3   4.1.2.5

Maximum weight for

I.S. Sieve 45 em dia 30 em dia

sieve sieve

kg

kg

10

4.5

8

3.5

6

2.5

4

2

3

1.5

2

l.{i

1.5

0.75

1.0

0.50

0.30

45mm

37.5mm

31.5mm or 22.1mm

19mm

16mm or 11.2mm

9.5mm

5.6mm

4.75mm

3.35m

In order that the sieves shall not be overloaded,

care must be taken to ensure that the maximum

sieve loads shown in table below are not ex

ceeded at the completion of sieving.

The apparatus, sample size and test procedure

shall be same as specified in sub-head MOR

TARS

DETERMINA TION OF PARTICLE

SIZE

4.5.6 Rate: The rate is inclusive of the cost

of materials and labour involved in all the

operations described above except for the ap

plication of a coat of hot bitumen and addition

of water proofing materials which shall be paid

forseparately, unless otherwise specified .

specifications stating the quantity of water

proofing material in litres or kg per 50 kg of

cement and will be paid for separately;

4.5.5. Measurements: The length and

breadth shall be measured correct to a em and

its area shall be calculated in square metres

correct to two places of decimal. The depth

shall not be less than the specified thickness at

any section.

4A7:

Rate: Rate shall include the cost of

materials and labour involved in all the opera

tions described above.

4.4.6: .Measurements shall be as specified in

4.2.13.

4.5 DAMP PROOF COURSE

4.5.1: Cement Concrete layer: This shall

consist of cementconcrete of specified propor

tions and thickness. The surface of brick or

stone masonry work shall be levelled and pre-

,pared before laying the cement concrete. Edge

of damp poof course shall be straight, even and

vertical. ~ide shuttering shall consist of steel

forms and shall be strong and properly fixed so

. that it does not get di~turbed during compac

tion and the mortar 40es not leak throgh. The

concrete mix shall be of workable consistency

and shall be tamped throughly to make a dense

mass. When the sides are removed, the surface

should come out smooth without honey-comb

ing. Continuity shall be maintained while lay~

ing the cement concrete layer and laying shall

be terminated only at the predetermined loca

tion where damp proof course is to be discon

tinued. There shall be no construction joint in

the Damp Proof Course.

4.5.2 Curing: Damp proof course shall be

cured for at least seven days, after whichit shall

be allowed to dry.

4.5.3

Application of Hot Bitumen: Where

so directed, hot biutmen in specifed quantity

shall be applied over the dried up surface of

cement concrete, properly cleaned with brushes

and finally with a piece of cloth .soaked in

kerosene oil. .Bitumen of penetration A 90 or

equivale~t where used shall be heated to a

temperature of

16 °

± SoC. The hot bitumen,

shall be applied uniformally. allover, so that no

blank spaces are left anywhere. It will be paid

for separately.

••.5.4 Water proofing ~aterials : Where

so specified, water proofing material of ap

proved qhality shall be added to the concrete

mixture in accordance with the m:mufacturer s

5~4/CPWD/ND/92

59

Page 19: Vol-II Concrete Work

8/10/2019 Vol-II Concrete Work

http://slidepdf.com/reader/full/vol-ii-concrete-work 19/23

The sample weights taken_will thus nanniilly

require several aperatians on each sieve~ Each

sieve shauld be shaken separately over a Clean

-tray arreceiveruntil namare than a tiace passes,

but in any case for nat less than twO minutes.

Material shauld nat be forced through _the

apertures but hand placing is pennitted.

A

light

brush should be -used with fine sieves~ The

cumulative weight passing each sieve shauld

be clacuJated as a percentage afthe total sample

weight to the nearest whale number.

cantact with the aggregate shall be m.a

chined and case hardened ar atherwise

treated sa as to have a diamand VH)

pyramid hardness num ber af nat less than

-650 VH.

  b) A staight metal tamping rod af circular

crass-section 16 mm in diameter and 45

to 60 cm lang, raunded at ane end.

  c) A balance af capacity 3 kg, readable and

accurate to ane gram:

  d) I.S Sieve af sizes 12.5, 10 and 2.36 mm

  e) A campressian testing machine capable

af applying a laad af 50 tonnes and which

can be ape rated to give aunifann rate af

laading sa that the maximum

10

ad in any

test is reached in 10 minutes. This laad

may vary from 0.5 to 50 tannes.

  f) Far measuring the sample, a cylindrical

metal measure af sufficent rigidity to

retain its fann under rough usage and af

the fallawing internal dimensians:

  g) Means af measuring the reductian in the

distance between the plates afthe testing

machine to-the nearest ane millimetre

during the test far example, dial gauge).

Test Sample :- .Material fo r the test shall

cansists af aggregate passing a 12.5 mm I.S.

Sieve and retained an a 10 mmI.S. Sieve. The

aggregate shall be tested in a surface dry can

ditian. If dried by heating the periad af drying

shall nat exceed faur haurs, the temperature

shall be 100° tall ace and the aggregate shall

becaale~ to roam temperature befare testing.

The quantity af aggregate shall be such ~at the

dept~ afmaterial in the.cylinder, aftertamping

as described belaw, shall be 10 cm. _.

The weig~ta~ m,aterial camprising the test

saI11pleshall be de~enpined weight A) and the

same weight af sample shall be taken far the

. repeat test.

APPENDIX B

TEST FOR SURFACE MOISTURE

 Clalise 4.1.2.5

Take a sample af wet aggregate and weigh it

 A Then place it in a frying pan and gently

apply heat, meanwhile stirring with a glass rod

until the surface maisture disappears. This is

apparent when the aggregate lases its shining

wet appearance and becames dull, ar when it

just attains a free running canditian. The satu

rated surface-dry material is then weighed B).

Cantinue the heating there~fter until the mais~

ture is evaparated and weigh the dry sample

  C). The surface maisture is then calculated as

fallaws:-

A B

Surface maisture ,,;lOOx -

C

It is expressed as a pyrcentge af dry aggregate.

APPENDIX C

DETERMINA TION OF TEN PERCENT

FINE VALUE

 Clause 4.1.2.5.

Apparatus :- The apparatus far the standard

test shall cansist af the fallawing:

  a) A 15 cm diameterapen-ended steel cylin

der~with plunger and base-plate, as shawn

ip Fig. an page NO . 61. The surfaces in

 

Diameter

Height

l1.5cm

18.0 cm

Page 20: Vol-II Concrete Work

8/10/2019 Vol-II Concrete Work

http://slidepdf.com/reader/full/vol-ii-concrete-work 20/23

,NOTE::' .Abou , 6.5 kg~of natUral aggregate is

require~to provide the ~two'testsanJpl~s: --ess

of lig])tweight aggregate is' reqUired.

c~ , :

.

,

~  .-..

The measuring cylinder is filled ill three layers '

of approximately equal,depth: with aggre&ate

'passing a 12.5mm,tS~Sieve and refainedoriJO

mm I.S.Sieve. :Eachlayer is subje~ted to 25

strokes f:r:omthe tamping rod (16 mm dia and, :'

45 to 60 cm long) ropn<: edaq, one end, care,

being takenin case of we.ak m;uerials not to

break the partic1es.:The surface,of 1lle aggre

gate shall be carefully.1~v~~led and the plunger

inserted so that it rests h<;>rlzontallyon this

surface. 11/;

Test Ptocedur~ :- Theapparatus, with thet~st·

sample alld plunger in position; shall tpeI) 'be

placed ill the'compression'te~tingmachiiie:'

, ~,

 . - .~-~ -   ,

The load shall'be applied at a,umfoml rate so as

. ~ . ',' .* .

to cause a total pen~tration of the p iIDger in 10

minutes of' about; 15.qrnm for rounded or

partially~qunded aggregat~s (for example,~ex

panded shales

~9

slags ..ll.es~:figu~ts Il}aybe

varied accordJ-ng t9 he exte~t

  t

therqunding

or honey combing.

>

After reaching the required tfiaximum peIJetra~

tion, the load shall be released and the whole of

- the material removed, from 'the cylinder and

sieved on a 2.36 mm I.S. Sieve. 'DIe fines

passing the sieve, shall be weighed, and this

weight expressedl as a precentage of the:'weight

of the test sample. 'Nqrmally, this percentage

will fall within the range 7.? to 12.5; butifiL

does not, a further test shag be made, at a load

adjusted appropriately, to bring th~ precentage

fines within the range of 7:5 to 12.5

A repeat test shall ,be made at the ,load thaL

gives as percentge fines within the range 7.5 to

12.5.

Cah;ulations:- Themeanp~[centage filles fro,m

the two tests at'thiscload shall be used In the

_.~

following form\lla .to' calculate. the load' re.t

quired

19

give 10 percentage fines.

.

,....

Load:required·for 10 percent filles

=

14·x X

Y+4

Where X=Load in tonnes and

Y=mean ~rcentage fines from two test at X

tomles load.

  porting ofr,esults:- ~,~ load required, to

produce 10 percent fines shall be ~eported to

'the nearest whole number for loads of 10

tonnes <?rmore, the nearest 0...5 tonneJor loads

. ofless than 10 tonnes. The v'alue expressed to

the nearest 0.5 tonne shouldbe as follows:

i

(a) For'normal concrete, not less than 5

tonnes.

(b)' Forweating sufaces, noiles's°than 10

, tonnes.

(c) For granolithic concrete, not less than 15

tonnes.

-,

t2

••

o

~- ,--,,~ ~- ~ t , ,~.~: ~: ~ -, : ~

'. APPt>~ATyS'{F()R'bEfE~A

p

Of ~ ,

TENPERCENT FINE. v AdJE, .

61

Page 21: Vol-II Concrete Work

8/10/2019 Vol-II Concrete Work

http://slidepdf.com/reader/full/vol-ii-concrete-work 21/23

 PPEN IX

SLUMP TEST

 Clause 4.2.3

Apparatus : Mould shall consists of a metal

frustum of cone having the following internal

dimensions :-

Bottom diameter 20 cm

Top diameter ..: : lOcm

Height 30cm

The mould shall be of a metal other than brass

,and aluminium, of at least 1.6 mIl} or 16 BO)

thickness. The top and bottom shall be open

and at right angles to the axis of the cone. The

mould shall have a smooth internal surface. It

shall be provided with suitable foot pieces and

handles to facilitate lifting it from the moulded

concrete test specimen in a vertical direction as

required by the test. A mould provided with a

suitable guide attachment may be used .

 

mping roishall be of steel or other suitable

material 16 mm in diameter 60 mm long and

rounded at one end.

Procedure:- The internal surface.ofthe mould

shall be throughly cleaned and free from super

fluous moisture and any set concrete before

commencing the test~The mould shall be placed

on a smooth horizontal, rigid ana non absor

bent surface viz. levelled metal plate. The

operator shall hold the mould firmlyin place

while it is being filled with test specimen of

concrete. The mould shall be filled in four

layers, each approximately one quarterofheight

of mould. Each layer shall be tamped with

twenty five strokes of the rounded end of the

tefiping rod. The strokes shall be distributed in

a uniform manner over the cross section of the

mould and for the second and subsequent lay

ers shall penetrate into the under-lying layer. ,

The bottom layer shall be tamped through out  -  

its depth. After the top layer has been rodded,

the concrete - shall be struck off level with

trowel or the tamping rod, so that the mould is

exactly fIlled. Any mortar which shallleatc out

between the mould and the base plate shall be

cleaned away. The mould shall be removed

from the concrete immediately after filling by

raising it slowly and carefully in a vertical

direction. The moulded concrete shall then be

-allowed to subside and the slump shall be

measured immediately by determining the dif

ference between the height of the mould and

that of the highest point of specimen.

-,

The aboye operations shall be carried out at a

place free from vibration or shock, and within

a period of two minutes after sampling.

Result:- The slump shall be recorded in terms

of millimetres of subsidence of the specimen

during the test Any slump specimen which

collapses or s~ears offlaterallygives incorrect

result. If this occurs, the test shall be repeated

with another sample.

The slump test shall not be used for very dry

mixes as the results obtained are not accurate.

62·

Page 22: Vol-II Concrete Work

8/10/2019 Vol-II Concrete Work

http://slidepdf.com/reader/full/vol-ii-concrete-work 22/23

 OT S

6