vol iii of iv - section 11 - 01 general specification
TRANSCRIPT
-
8/10/2019 Vol III of IV - Section 11 - 01 General Specification
1/224
PROJEKMASSRAPIDTRANSITLEMBAHKELANG
JAJARANSUNGAIBULOH KAJANG
GENERALSPECIFICATION
FORCIVILENGINEERINGWORKS
DocumentReferenceNo. : KVMRT/PDP/SBK/GEN/OP/GS/CS/0001
Revision : 00
DateIssued : 22nd
August2011
-
8/10/2019 Vol III of IV - Section 11 - 01 General Specification
2/224
PageNotUsed
-
8/10/2019 Vol III of IV - Section 11 - 01 General Specification
3/224
PROJEKMASSRAPIDTRANSITLEMBAHKELANG
JajaranSungaiBuloh Kajang
GeneralSpecificationforCivilEngineeringWorks
KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 i Revision:00
AMENDMENTHISTORY
REVISIONNO. DETAILSOFAMENDMENT
00
First
issue.
-
8/10/2019 Vol III of IV - Section 11 - 01 General Specification
4/224
PROJEKMASSRAPIDTRANSITLEMBAHKELANG
JajaranSungaiBuloh Kajang
GeneralSpecificationforCivilEngineeringWorks
KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 ii Revision:00
Page
Not
Used
-
8/10/2019 Vol III of IV - Section 11 - 01 General Specification
5/224
PROJEKMASSRAPIDTRANSITLEMBAHKELANG
JajaranSungaiBuloh Kajang
GeneralSpecificationforCivilEngineeringWorks
KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 TOC1of8 Revision:00
TABLEOFCONTENTSPage
SECTIONG1 GENERAL
G1.1
Applicationof
the
General
Specification
......................................................................................
G1
1
G1.2 Abbreviationsanddefinitions.......................................................................................................G11
G1.3 Glossaryofterms..........................................................................................................................G15
G1.4 Trials..............................................................................................................................................G16
G1.5 StandardsandCodesofPractice..................................................................................................G16
G1.6 Drawings........................................................................................................................................G17
G1.7 ContractorsDrawings...................................................................................................................G17
G1.8 MetricandImperialunits..............................................................................................................G18
G1.9 DimensionsfromDrawings...........................................................................................................G18
G1.10 Investigationdata.........................................................................................................................G18
G1.11 SurveyoftheSite..........................................................................................................................G19
AppendixAG1.1 RequirementsForAsBuiltSurveys................................................................G117
SECTIONG2THESITE
G2.1 AccesstotheSite..........................................................................................................................G21
G2.2 Siterestrictions.............................................................................................................................G21
G2.3 Siteservices...................................................................................................................................G22
G2.4 Sitecleanliness..............................................................................................................................G24
G2.5 ParkingFacilities............................................................................................................................G25
G2.6 SitePestControl............................................................................................................................G26
G2.7 Conditionsfortemporarylandallocation.....................................................................................G26
G2.8 SiteSecurity...................................................................................................................................G26
G2.9 GeneralWorksTrains....................................................................................................................G26
G2.10
ContractorsOwn
Rolling
Stock.....................................................................................................
G2
7
G2.11 DefinedAreaandRestrictedAreaWorkingandWorksTrainOperations...................................G28
AppendixAG2.1 RequirementsofWorksPackageContractorsOwnRollingStock................G211
SECTION3 SITEESTABLISHMENT
G3.1 UseoftheSite...............................................................................................................................G31
G3.2 Submissionofparticulars..............................................................................................................G31
G3.3 SurveyoftheSite..........................................................................................................................G32
G3.4
Fencesand
Signs
on
the
Site
.........................................................................................................
G3
2
G3.5 SiteOfficeAccommodationforthePDP,PDPRandtheSupervisingConsultant.........................G33
-
8/10/2019 Vol III of IV - Section 11 - 01 General Specification
6/224
PROJEKMASSRAPIDTRANSITLEMBAHKELANG
JajaranSungaiBuloh Kajang
GeneralSpecificationforCivilEngineeringWorks
KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 TOC2of8 Revision:00
Page
G3.6 TheWorksPackageContractor'sSiteAccommodation................................................................G36
G3.7 VehiclesforthePDPandSupervisingConsultant.........................................................................G36
G3.8 ClearanceoftheSite.....................................................................................................................G38
G3.9 Attendance....................................................................................................................................G38
G3.10 MaterialTestingLaboratory..........................................................................................................G39
G3.11 ProvisionForSurveyInstrumentsandChainmen.......................................................................G310
G3.12 PhotographicRecords.................................................................................................................G310
G3.13 ProhibitionofAdvertising...........................................................................................................G312
SECTIONG4 THEWORKS
G4.1 ProjectExecutionPlan..................................................................................................................G41
G4.2 MethodStatements,andInspectionandTestingPlans...............................................................G42
G4.3 NormalworkinghoursatSite.......................................................................................................G42
G4.4 Drawingsandschedulesforplantandequipment.......................................................................G43
G4.5 StagenotificationandinspectionofWorks..................................................................................G43
G4.6 Demolitionworks..........................................................................................................................G44
G4.7 Constructionrestraints.................................................................................................................G44
G4.8 TemporaryWorks.........................................................................................................................G45
G4.9
OffSite
Fabrication
Works
............................................................................................................
G4
8
G4.10 Constructionequipmentandplant...............................................................................................G48
G4.11 ProtectionoftheWorks................................................................................................................G49
G4.12 ApprovalsfromRelevantAuthorities..........................................................................................G410
G4.13 TechnologyTransfer....................................................................................................................G411
SECTIONG5WORKINROADS
G5.1 MaintenanceofExistingRoads,Bridges,Culverts,etc.................................................................G51
G5.2
Temporarydiversions
and
traffic
management
...........................................................................
G5
2
G5.3 HalfwidthConstructionandTrafficControl.................................................................................G58
G5.4 TemporaryTrafficSigns................................................................................................................G58
G5.5 TemporaryRoutes.........................................................................................................................G59
G5.6 Useofroadsandfootways............................................................................................................G59
G5.7 Pedestrianrequirements..............................................................................................................G59
G5.8 Temporarystreetlighting...........................................................................................................G510
G5.9 Reinstatementofroadsandfootways........................................................................................G511
G5.10
TrafficManagement
Implementation
Team
...............................................................................
G5
11
-
8/10/2019 Vol III of IV - Section 11 - 01 General Specification
7/224
PROJEKMASSRAPIDTRANSITLEMBAHKELANG
JajaranSungaiBuloh Kajang
GeneralSpecificationforCivilEngineeringWorks
KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 TOC3of8 Revision:00
Page
SECTIONG6DAMAGEANDINTERFERENCE
G6.1 Damageandinterference.............................................................................................................G61
G6.2 Watercoursesanddrainagesystems............................................................................................G62
G6.3 Utilitiesandotherservices............................................................................................................G63
G6.4 Conditionsurveyofexistingbuildingsandstructures..................................................................G66
G6.5 Structures,roadsandotherproperty...........................................................................................G66
G6.6 Treesandothersimilarobstructions............................................................................................G66
G6.7 Avoidanceofnuisance..................................................................................................................G66
G6.8 ProtectionofExistingRailways.....................................................................................................G67
G6.9 ElectromagneticCompatibility......................................................................................................G68
AppendixAG6.1
Reference
List
Of
Standards
Relating
To
EMC
...............................................
G6
14
SECTIONG7TEMPORARYELECTRICITYSUPPLY
G7.1 WorkonSite..................................................................................................................................G71
G7.2 Electrical general.........................................................................................................................G71
G7.3 Scope.............................................................................................................................................G72
G7.4 Materials,appliancesandcomponents........................................................................................G72
G7.5 Designconsiderations...................................................................................................................G72
G7.6
Mainsvoltage
................................................................................................................................
G7
2
G7.7 Typesofdistributionsupply..........................................................................................................G72
G7.8 Protectionofcircuits.....................................................................................................................G73
G7.9 Earthing.........................................................................................................................................G73
G7.10 Plugs,socketoutletsandcouplers................................................................................................G73
G7.11 Cables............................................................................................................................................G73
G7.12 Transformersandswitchgearintunnels......................................................................................G74
G7.13 Lightinginstallation.......................................................................................................................G74
G7.14
Electricalmotors
...........................................................................................................................
G7
4
G7.15 Inspectionandtesting...................................................................................................................G75
G7.16 Identification.................................................................................................................................G75
G7.17 Maintenance.................................................................................................................................G75
G7.18 Maintenancerecord......................................................................................................................G75
G7.19 ElectricitysupplyforOtherWorksContractorsandtrialoperations...........................................G75
G7.20 Metering........................................................................................................................................G77
G7.21 Paymentofelectricitycharge.......................................................................................................G77
-
8/10/2019 Vol III of IV - Section 11 - 01 General Specification
8/224
PROJEKMASSRAPIDTRANSITLEMBAHKELANG
JajaranSungaiBuloh Kajang
GeneralSpecificationforCivilEngineeringWorks
KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 TOC4of8 Revision:00
Page
SECTIONG8MATERIALS,EQUIPMENT,ANDSPAREPARTS
G8.1 Materials.......................................................................................................................................G81
G8.2 MaterialsandequipmentprovidedbyOtherWorksContractors................................................G82
G8.3 SupplyofSparePartsandSpecialTools........................................................................................G83
G8.4 PackingandStorage......................................................................................................................G84
G8.5 ShippingandDelivery....................................................................................................................G87
SECTIONG9SAFETY&HEALTH
G9.1 WorksPackageContractor'sSafety&HealthObligations............................................................G91
G9.2 LawsandRegulations....................................................................................................................G92
G9.3 Contractor'sSafetyandHealthPersonnel....................................................................................G92
G9.4 Safety&HealthPlan.....................................................................................................................G94
G9.5 Safety&HealthRiskAssessment..................................................................................................G95
G9.6 Emergencypreparednessandresponse.......................................................................................G96
G9.7 Incidentnotificationandreporting...............................................................................................G97
G9.8 ControlofSafety&HealthNonCompliance................................................................................G97
G9.9 TrafficManagementandPublicSafety.........................................................................................G98
G9.10 GeneralSafetyandHealthRequirements....................................................................................G98
G9.11
Safetyand
Health
Meetings
........................................................................................................
G9
15
G9.12 Safety&HealthDocumentation.................................................................................................G915
G9.13 Monthlyprogressreport.............................................................................................................G915
G9.14 Training.......................................................................................................................................G916
G9.15 SafetyandHealthInspectionandAuditing.................................................................................G916
SECTIONG10QUALITYASSURANCEANDQUALITYCONTROL
G10.1 Introduction................................................................................................................................G101
G10.2
MinimumQA/QC
Requirements
.................................................................................................
G10
1
G10.3 QualityManagementResponsibility...........................................................................................G104
G10.4 QA/QCProgramandPlan............................................................................................................G104
G10.5 DocumentControl.......................................................................................................................G106
G10.6 ProductIdentificationandTraceability.......................................................................................G107
G10.7 InspectionandTesting................................................................................................................G107
G10.8 NonComplianceandDispositionofNonConformingMaterials.............................................G1010
andConstructedWorks
G10.9
Correctiveand
Preventive
Actions
............................................................................................
G10
11
G10.10 QualityAuditsandTraining.......................................................................................................G1011
-
8/10/2019 Vol III of IV - Section 11 - 01 General Specification
9/224
PROJEKMASSRAPIDTRANSITLEMBAHKELANG
JajaranSungaiBuloh Kajang
GeneralSpecificationforCivilEngineeringWorks
KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 TOC5of8 Revision:00
Page
SECTIONG11ENVIRONMENTALMANAGEMENT
G11.1 GeneralEnvironmentalManagement........................................................................................G111
G11.2 LegalRequirements.....................................................................................................................G111
G11.3 Environmentalpersonnel............................................................................................................G112
G11.4 DetailedEnvironmentalImpactAssessment(DEIA).................................................................G112
G11.5 EnvironmentalManagementPlan(EMP)..................................................................................G112
G11.6 ErosionandSedimentControlPlan(ESCP)...............................................................................G114
G11.7 Deliverables.................................................................................................................................G114
G11.8 EnvironmentalProtectionWorks................................................................................................G115
G11.9 StormwaterManagement...........................................................................................................G118
G11.10Environmental
Incidents
.............................................................................................................
G11
8
G11.11 EnvironmentalMonitoring,SiteInspectionandauditing...........................................................G118
G11.12 Training,Promotionandawareness...........................................................................................G119
G11.13 Meetings...................................................................................................................................G1110
G11.14 NonCompliance........................................................................................................................G1110
SECTIONG12PLANNING,PROGRAMMINGANDPROGRESSMONITORINGOFTHEWORKS
G12.1 PlanningandProgramming.........................................................................................................G121
G12.2
Planningand
Programming
Organization
...................................................................................
G12
1
G12.3 ProgrammeSubmissions.............................................................................................................G121
G12.4 ProgressMonitoring....................................................................................................................G121
G12.5 ProgrammeRequirements..........................................................................................................G122
G12.6 BaselineProgramme...................................................................................................................G124
G12.7 Design,ProcurementandManufacturingProgramme...............................................................G126
G12.8 ArchitecturalBuildersWorksandFinishes(ABWF)and............................................................G128
BuildingServicesProgramme
G12.9
Testingand
Commissioning
Programme
....................................................................................
G12
9
G12.10 CoordinatedInstallationProgramme........................................................................................G129
G12.11 ThreeMonthRollingProgramme.............................................................................................G1210
G12.12 ScheduleofDesign....................................................................................................................G1211
G12.13 TimeChainageProgramme.......................................................................................................G1213
G12.14 TrackRelatedInstallationProgramme(TRIP)...........................................................................G1213
G12.15 ConstructionEquipment&LabourReturns..............................................................................G1215
G12.16 MonthlyProgressMeetingandReport.....................................................................................G1215
G12.17 ProgrammeAnalysisReport......................................................................................................G1218
-
8/10/2019 Vol III of IV - Section 11 - 01 General Specification
10/224
PROJEKMASSRAPIDTRANSITLEMBAHKELANG
JajaranSungaiBuloh Kajang
GeneralSpecificationforCivilEngineeringWorks
KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 TOC6of8 Revision:00
Page
SECTIONG13LIAISONWITHOTHERS
G13.1 Liaisonwithothers......................................................................................................................G131
G13.2 WorkbyOtherWorksContractors.............................................................................................G131
G13.3 Coordinationandcooperation....................................................................................................G132
G13.4 OtherProjectContractsandCoordination................................................................................G132
G13.5 InterfaceManagementPlansandInterfaceControlDocuments...............................................G134
G13.6 CoordinationwithOtherWorksContractorsinpreparingCSDsandSEMs................................G136
G13.7 CoordinationMeetings...............................................................................................................G138
AppendixAG13.1 TableofContentsforInterfaceManagementPlan.....................................G139
AndInterfaceControlDocument
SECTIONG14DOCUMENTMANAGEMENT
G14.1 Documents,submissionsandcorrespondence..........................................................................G141
G14.2 ElectronicFileFormats................................................................................................................G142
G14.3 Submissionsprogramme.............................................................................................................G143
G14.4 Submissionandreviewprocedure..............................................................................................G144
G14.5 Projectrecords............................................................................................................................G145
SECTIONG15GENERALREQUIREMENTSFORBUILDINGSERVICESANDARCHITECTURAL
BUILDERSWORKS
AND
FINISHES
G15.1 General........................................................................................................................................G151
G15.2 Submissions.................................................................................................................................G151
G15.3 Coordination...............................................................................................................................G151
G15.4 SubmissionsforBuildingServicesWorks....................................................................................G151
G15.5 SubmissionsforArchitecturalBuildersWorksandFinishes.......................................................G156
SECTIONG16SOFTWAREMANAGEMENTANDCONTROL
G16.1
General........................................................................................................................................
G16
1
G16.2 SoftwareQualityAssurancePlan................................................................................................G161
G16.3 SoftwareReleaseControl............................................................................................................G163
G16.4 SoftwareProgressTracking.........................................................................................................G164
G16.5 SoftwareAudit............................................................................................................................G165
G16.6 SoftwareDocumentation............................................................................................................G166
G16.7 SafetyIntegrityLevel...................................................................................................................G166
G16.8 SoftwareDeliverablesandLicenses............................................................................................G167
G16.9 Backup.........................................................................................................................................G168
AppendixAG16.1 TypicalTableofContentsforSoftwareQualityAssurancePlan...................G169
-
8/10/2019 Vol III of IV - Section 11 - 01 General Specification
11/224
PROJEKMASSRAPIDTRANSITLEMBAHKELANG
JajaranSungaiBuloh Kajang
GeneralSpecificationforCivilEngineeringWorks
KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 TOC7of8 Revision:00
Page
SECTIONG17SYSTEMSAFETY
G17.1 ConstructionRiskManagement..................................................................................................G171
G17.2 SystemAssurance.......................................................................................................................G171
SECTIONG18TESTINGANDCOMMISSIONING
G18.1 General........................................................................................................................................G181
G18.2 TestingandCommissioning........................................................................................................G181
G18.3 OperationsManuals....................................................................................................................G182
G18.4 AsBuiltDrawings........................................................................................................................G182
G18.5 Training.......................................................................................................................................G183
G18.6 TrainingMethods........................................................................................................................G185
ENDOFTABLEOFCONTENTS
-
8/10/2019 Vol III of IV - Section 11 - 01 General Specification
12/224
PROJEKMASSRAPIDTRANSITLEMBAHKELANG
JajaranSungaiBuloh Kajang
GeneralSpecificationforCivilEngineeringWorks
KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 TOC8of8 Revision:00
PageNot
Used
-
8/10/2019 Vol III of IV - Section 11 - 01 General Specification
13/224
PROJEKMASSRAPIDTRANSITLEMBAHKELANG
JajaranSungaiBuloh Kajang
GeneralSpecificationforCivilEngineeringWorks
SectionG1 General
KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G11of18 Revision:00
SECTIONG1
GENERAL
Applicationof
theGeneral
Specification
G1.1
(1)
Theprovisions
contained
in
the
Particular
Specification
and
the Drawings shall in the event of any inconsistency or
discrepancy prevail over the provisions contained in this
General Specification (GS) and the Materials and
WorkmanshipSpecification.
(2) The provisions contained in the GS shall prevail over the
provisionscontainedintheStandards,CodesofPracticeand
similarstandarddocumentsstatedintheContract.
(3) This GS shall be read in conjunction with other documents
includedin
the
Contract.
(4) Allclauseandsectionreferences intheGSshallrefertothe
Sections, SubSections, clauses and subclauses within this
documentunlessspecificallydescribedotherwise.
(5) References in the Contract to "General Specification" shall
meanthisdocumentandtotheprovisionscontainedherein.
(6) Further to the requirements of the Conditions of Contract
concerning the sufficiency of the Contract Documents, the
WorksPackage
Contractor
shall
promptly
notify
the
PDP
of
any error, omission, fault or other defect in the Drawings
and/orSpecificationswhichhediscoverswhenreviewingthe
ContractorExecutingtheWorks.
Abbreviations
and
definitions
G1.2 (1) Abbreviations used in the GS shall have the following
meanings:
ABWF : ArchitecturalBuilders'WorksandFinishes
AC : AlternatingCurrent
ALARP : AsLowAsReasonablyPossible
ASTM : AmericanSocietyforTestingandMaterials
BMS : BuildingManagementSystem
BS : BritishStandard
CAD : ComputerAidedDrafting
CAR : CorrectiveActionRequest
CICE : ContractorsIndependentCheckingEngineer
CIDB : ConstructionIndustryDevelopmentBoard
-
8/10/2019 Vol III of IV - Section 11 - 01 General Specification
14/224
PROJEKMASSRAPIDTRANSITLEMBAHKELANG
JajaranSungaiBuloh Kajang
GeneralSpecificationforCivilEngineeringWorks
SectionG1 General
KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G12of18 Revision:00
CPM : CriticalPathMethod
CSD : CombinedServicesDrawings
DEIA : DetailedEnvironmentalImpactAssessment
DID
:
Departmentof
Irrigation
and
Drainage
DOSH : DepartmentofOccupationalSafety&Health
DSM : DeterministicSafetyAnalysis
E&M : ElectricalandMechanical
EMP : EnvironmentalManagementPlan
EN : EuropeanStandards
ERP
:
EmergencyPreparedness
and
Response
Plan
ESCP : ErosionandSedimentControlPlan
GS : GeneralSpecification(thisdocument)
ICD : InterfaceControlDocument
IEC : InternationalElectrotechnicalCommission
IEE : InstitutionofElectricalEngineers
IEEE
:
Institutionof
Electrical
and
Electronic
Engineers
IMP : InterfaceManagementPlan
IP : IndustrialProtection
ISO : InternationalOrganisationforStandardization
ITP : InspectionandTestingPlan
LBS
:
LocationBreakdown
Structure
M&WS: MaterialsandWorkmanshipSpecification
MSDS : MaterialSafetyDataSheet
NCR : NonComplianceReport
OBS : OrganisationBreakdownStructure
PAT : PartialAcceptanceTests
PCMM:
ProjectCodes
and
Method
of
Measurement
PDM : PrecedenceDiagrammingMethod
-
8/10/2019 Vol III of IV - Section 11 - 01 General Specification
15/224
-
8/10/2019 Vol III of IV - Section 11 - 01 General Specification
16/224
PROJEKMASSRAPIDTRANSITLEMBAHKELANG
JajaranSungaiBuloh Kajang
GeneralSpecificationforCivilEngineeringWorks
SectionG1 General
KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G14of18 Revision:00
(3) Further to Clause 1.1 of the Conditions of Contract, the
following words or phrases used in the GS shall have the
meaningsgiventothembelow:
Baseline Programme means the Works Package
Contractorscoordinated
detailed
programme
for
the
Works
prepared in accordance with Clause G12.6, and which is
referred to in the Conditions of Contract as the baseline
programme, Approved Programme or Approved Revised
Programme,dependingonthestatusoftheprogramme.
Commissioning means all activities and operations to be
performedbytheWorksPackageContractor toensurethat
allmachinery,apparatusandsystems, insofaras ispossible,
is capable of being fully operated by the Works Package
Contractor to satisfy all Integrated Test functions and tests
tobeperformedduringtheTestRunningperiod.
Completion Testsmeans tests including InstallationTests,
PAT, SAT, TOC and PRO to be executed after the supply,
deliveryandinstallationofthePermanentWorksbutpriorto
practical completion of the Works or after any part of the
Permanent Works contained in any section of the Works is
installed but prior to practical completion of the section of
theWorksinwhichthepartiscomprised.
Contractors
Independent
Checking
Engineer
means
the
Registered Professional Engineer appointed by the Works
Package Contractor to independently check and certify the
designofTemporaryWorks.
"DefinedArea"meansanareaoftrackasdescribedinClause
G2.11.
DesignDocumentsmeansalldrawings,designcalculations,
software, specifications, samples, patterns, models, written
procedures and all other documents and things relating to
the
design
of
the
Permanent
Works
and/or
the
Temporary
Works which are prepared by or on behalf of the Works
PackageContractor.
"General Works Train" or Works Train means any rolling
stockprovidedbythePDPortheWorksPackageContractor
respectively for thepurposeofcarryingout installationand
testingworkswithintheDefinedAreaorRestrictedArea.
IntegratedTestmeansthosesystemwideoperabilitytests
tobeundertakenbytheWorksPackageContractorwhereby
the
Works
Package
Contractor
shall
demonstrate
the
compatibility between his plant and the plant of Other
WorksContractors.
-
8/10/2019 Vol III of IV - Section 11 - 01 General Specification
17/224
PROJEKMASSRAPIDTRANSITLEMBAHKELANG
JajaranSungaiBuloh Kajang
GeneralSpecificationforCivilEngineeringWorks
SectionG1 General
KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G15of18 Revision:00
Monthly Progress Report means a report which shall be
preparedandsubmittedbytheWorksPackageContractorto
the PDP on a monthly basis, detailing the progress of the
ContractandothermattersasspecifiedinSectionG12.
"Operating
Railway"
means
the
existing
railway
tracks
currentlyinrevenueoperationorinTrialOperationsandany
ancillaryareassuchasthedepots,sidings,stations,terminus
and traction power feeder stations which form part of the
operatingsystem.
"RailwayOperator"meansPrasarana(oroneof itsgroupof
companies),orKTM,orothersuchcompanywhichoperates
or will operate the particular railway or transit system
referredtointheclauseinwhichthetermhasbeenapplied.
"RelevantAuthority"
means
any
Government
department
or
publicbodyhavingjurisdictioninrelationtotheWorks.
"Restricted Area" means the location in the railway under
construction which houses electrical or mechanical
equipmentthathasbecomeenergisedandhencepotentially
dangeroustopeopleworkinginthearea. Whenthetermis
usedfortrackareaitsassociatedpowerrailisenergisedand
it isbarricadedfromunauthorisedaccessandtrainsmaybe
runningathighspeedfortesting.
S
curve
means
the
graphical
relationship
between
the
planned (and actual where appropriate) quantity of
completed work (or resources) and time. The curve
producedistobeillustratedonanaccumulativebasiswhere
the slope of the line indicates the rate of undertaking the
workorrateofexpenditureoftheresources.
TestRunningmeansthatperiodofPAT,SAT,andTOCprior
toTrialRunningwhentheOtherWorksContractorsshallbe
testing their plant and equipment and run the same in
conjunction
with
the
Railway
Operator.
In
addition
during
thisperiodsystemwidetestsshallbeundertakenthatshall
requiretheattendanceofrelevantOtherWorksContractors.
TrialRunningmeansthatperiodimmediatelyfollowingthe
completion of a section of railway under construction, but
prior to opening, when the Railway Operator shall be
operating the rolling stock and all other systems and
generally using the railway as though a scheduled service
was operating, except for the absence of farepaying
passengers.
Glossaryof
terms
G1.3 (1) Words and expressions to which meanings are assigned in
anySectionoftheGSshallhavethesamemeaningsinother
-
8/10/2019 Vol III of IV - Section 11 - 01 General Specification
18/224
PROJEKMASSRAPIDTRANSITLEMBAHKELANG
JajaranSungaiBuloh Kajang
GeneralSpecificationforCivilEngineeringWorks
SectionG1 General
KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G16of18 Revision:00
Sections of the GS except when the context otherwise
requires.
(2) Utilitiesareelectricity,lighting,trafficcontrol,telephoneand
other communication cables, gas, water supply, sewerage
and drainage, including all associated protection, supports,
ancillarystructures,
fittings
and
equipment.
(3) Survey Datum Levels refers to the prevailing datum system
applicabletotheKlangValley.
(4) The survey projection and the coordinates used on the
Drawings refers to theprevailing surveysystemapplicable to
theKlangValley.
Trials G1.4 (1) Trials shall be carried out as stated in the Materials and
Workmanship Specification to demonstrate that proposed
materials
and
methods
of
construction
will
produce
work
whichcomplieswiththespecifiedrequirements.
(2) Trials shall be carried out before the construction of the
relevant Permanent Works commences so as to allow the
PDPasufficientperiodtodetermineifthetrialcomplieswith
thespecifiedrequirements.
(3) Trials shall be carried out using materials and methods of
constructionofthetypesandlocationsapprovedbythePDP.
(4)
If,in
the
opinion
of
the
PDP,
work
which
complies
with
the
requirementsoftheContracthasnotbeenproduced inthe
trial, particulars of proposed changes to the materials or
methodsofconstructionshallbesubmitted forapprovalby
thePDP,andfurthertrialsshallbecarriedoutuntilrelevant
work which complies with the specified requirements has
been produced in the trial, unless otherwise agreed by the
PDP.Worksforwhichtrialsarerequiredshallnotcommence
until, in the opinion of the PDP, work which complies with
thespecifiedrequirementshasbeenproducedinthetrial.
(5) UnlesspermittedbythePDP,thematerialsandmethodsof
constructionusedtoproduceworkwhichcomplieswiththe
specifiedrequirementsinatrialshallnotbechangedunless
furthertrialshavebeencarriedouttodemonstratethatthe
proposedchangesaresatisfactory.
Standardsand
Codesof
Practice
G1.5 (1) The particular edition of any Standard or Code of Practice
applicable to the Works, shall be the edition stated in the
Specifications. If no edition is specified, the Standard or
CodeofPracticeshallbedeemedtobetheeditioncurrentat
thetime
of
Tender,
unless
otherwise
approved
by
the
PDP.
If
theMalaysianStandardexists,whichthePDPdeterminesto
beequivalenttotheBritishorotherStandardspecified,then
-
8/10/2019 Vol III of IV - Section 11 - 01 General Specification
19/224
PROJEKMASSRAPIDTRANSITLEMBAHKELANG
JajaranSungaiBuloh Kajang
GeneralSpecificationforCivilEngineeringWorks
SectionG1 General
KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G17of18 Revision:00
theMalaysianStandardshallbefollowed.
(2) In the event of any discrepancy between the provisions of
the Specifications and the provisions within the relevant
Standards or Codes of Practice as mentioned in this
Specification, then the provisions of the Specifications shall
takeprecedence.
(3) The Works Package Contractor shall provide for the use of
the PDP such Standards and Codes of Practice as may be
required intheexecutionoftheWorks. Theseshallremain
thepropertyoftheWorksPackageContractor.
(4) The Permanent Works, and, where appropriate, materials
andworkmanship,shallbe inaccordancewiththeMaterials
andWorkmanshipSpecificationandtherequirementsofthe
Contract, or where no standard is identified, the Works
Package Contractor shall make a proposal which shall be
subjecttoapprovalbythePDP.
Drawings G1.6 (1) A list of those drawings forming part of the Contract
(Drawings)isincludedintheSpecificationsifapplicable.
(2) All references to drawing numbers shall refer to the latest
amendmentofthatdrawing.
(3) On completion of each section of the Works the Works
Package Contractor shall be responsible for modifying the
Drawingsto
reflect
the
as
built
condition.
This
exercise
shall
include for all amendments to dimensions, removal or
amendment to notes, changes from future tense to past
tenseandmaterialsused.
(4) For build only contracts, the asbuilt drawings shall be
carried out on soft copies of the Drawings which shall be
providedtotheWorksPackageContractorforthispurpose.
(5) For design and build contracts, the asbuilt drawings shall
be
endorsed
by
the
Works
Package
Contractors
Design
Consultant.
Contractors
Drawings
G1.7 (1) The preparation and submission of drawings, sketches,
figures, diagrams, illustrations and the like by the Works
PackageContractorintheexecutionoftheWorks,shallbein
accordance with the PDPs CAD requirements or other
standardapprovedbythePDP. Anysoftcopiesofdrawings
provided for theuseof theWorksPackageContractorshall
be modified by him if necessary to ensure that his
submissionscomplywiththeapprovedCADrequirements.
(2) The Works Package Contractor shall be responsible for the
production of AsBuilt drawings. These shall include, but
-
8/10/2019 Vol III of IV - Section 11 - 01 General Specification
20/224
PROJEKMASSRAPIDTRANSITLEMBAHKELANG
JajaranSungaiBuloh Kajang
GeneralSpecificationforCivilEngineeringWorks
SectionG1 General
KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G18of18 Revision:00
are not limited to: structural design drawings; architectural
drawingsincludingdetaildrawings,framingplans,fixingsetc;
E&M drawings including details of components, fixing,
conduit locations; drawings of all services. These shall be
preparedandsubmittedinaccordancewithSectionG14.
(3)
TheWorks
Package
Contractor
shall
submit
the
following
no.
ofcopiesofAsbuiltdrawings:
a) Four sets of A1 size drawings comprising 1 set of
originalreproducibledrawingsand3setsofnonfade
prints.
b) SixsetsofA3sizeprintsreducedfromtheoriginalA1
sizedrawings.
c) FoursetsofelectroniccopiesstoredonCDROM.
(4) The Works Package Contractor shall be responsible for the
production of all drawings required for submission to
statutorybodies,otherGovernmentDepartments,andutility
undertakingsinordertoprogresstheWorks.
Metricand
Imperialunits
G1.8 Specifications in imperial units shall not be substituted for
Specifications in metric units stated in the Contract without the
priorapprovalofthePDP.
Dimensions
fromDrawings
G1.9 Dimensions shall not be obtained by scaling from the Drawings.
Dimensions
which
are
not
shown
on
such
drawings
or
calculable
from dimensions shown on such drawings shall be obtained from
thePDP.
Investigation
data
G1.10 (1) Utility investigation data, ground investigation, laboratory
investigation, laboratory testing data, rock cores and soil
samples taken from ground investigation commissioned or
obtained by the PDP in connection with the Project, are
availableforinspectiononapplicationtothePDP.
(2) Theutility investigationdata,ground investigationdataand
laboratory
testing
data
are
made
available
to
the
Works
Package Contractor solely for the purpose of assisting the
WorksPackageContractortomakehisowninterpretationof
thegroundconditionsandutilitylocations. Theaccuracyor
reliability of the information given in the information
supplied,preparedorcommissionedatanytimebythePDP
in connection with the Works and adjacent or interfacing
worksisnotwarrantedandthePDPshallhavenoliabilityto
theWorksPackageContractorinanymannerwhatsoeverfor
suchinformation.
(3) Allotheradditionalutilityinvestigation,groundinvestigation
and laboratory testing required for the execution of the
-
8/10/2019 Vol III of IV - Section 11 - 01 General Specification
21/224
PROJEKMASSRAPIDTRANSITLEMBAHKELANG
JajaranSungaiBuloh Kajang
GeneralSpecificationforCivilEngineeringWorks
SectionG1 General
KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G19of18 Revision:00
WorksshallbecarriedoutbytheWorksPackageContractor
inaccordancewiththeContract.
G1.11 SurveyoftheSite
SurveyWorks G1.11.1 (1) The PDP has established a Primary Control Survey Network
for
the
Project.
The
Works
Package
Contractor
shall
reference this network and undertake all survey works
necessary to establish, maintain control of and record the
locations, alignments and levels of the Works. The survey
worksshall,withoutlimitation,include:
a) ASurveyControlNetworkfortheWorks. TheWorks
Package Contractor shall within two (2) calendar
months from the date of the Letter of Acceptance
complete and submit for the PDPs approval his
SurveyControlNetwork.
b) An Initial Land Record Survey or surveys of parts of
the Site, which shall be completed together with
drawingrecordspriortocommencementofworkon
thatpartoftheSite.
c) AllsurveysrequiredduringtheprogressoftheWorks
to control and record the location, alignment and
leveloftheWorks.
d) TheasbuiltsurveysofthePermanentWorksandthe
preparation
of
Survey
Records
Drawings
in
accordance with the requirements of this Section
G1.11.
e) Whereapplicable,thedeformationmonitoringofany
Permanent Works which are constructed on
reclaimedland.
f) Precondition surveys of buildings, structures and
otherfacilitiespotentiallyaffectedbytheworks.
g)
Videosurveys
of
all
existing
drains
and
sewers
within
the Site and to the nearest manhole or catchpit
outsidetheSiteboundary.
(2) For the Survey Control Network, the Works Package
Contractor is required to establish a first order Horizontal
Survey Control Network that consists of Primary Control
StationsplusaVerticalSurveyControlNetworkatgradelevel
to be established that consists of Bench Marks. The
requirements and standards of accuracy for the networks
shallbe
:
-
8/10/2019 Vol III of IV - Section 11 - 01 General Specification
22/224
PROJEKMASSRAPIDTRANSITLEMBAHKELANG
JajaranSungaiBuloh Kajang
GeneralSpecificationforCivilEngineeringWorks
SectionG1 General
KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G110of18 Revision:00
HorizontalNetwork Requirements
Accuracy 1:100,000forundergroundworkssections.
1:60,000forelevatedworkssections
Origin MajorTrigonometrical Stations.
Distancesbetween
adjacent
stations
established
tobebetween500mand1000m.
VerticalNetwork Requirements
Accuracy Levellingrouteshorterthan1km:
+/ 1mm N(whereNisnumberofsetup) Levellingrouteover1km:
+/ 4mm K(whereKisinkilometres)forundergroundworkssections
+/ 6mm K(whereKisinkilometres)forelevatedworkssections
Origin Atleast2agreedpermanentbenchmarksat
bothendsofthelevellingrouteshouldbe
selected.
(3) The location of control stations and benchmarks must be
safe, stable and easily accessible. The Works Package
Contractor is responsible for site clearance to ensure inter
visibility between horizontal control stations and to obtain
allrelevantpermitsforperformingthesurvey.
(4) SurveyStationMarkerstobeinstalledforthenewHorizontal
ControlNetwork
Stations
and
Benchmarks
shall
be
in
one
of
thefollowingtypes:
SurveyMarker GroundConditions
TriangulationMonument(Concrete
pillar)
Hilltop
PicketBox Openground
SurveyNail Kerbstones,pavement,concrete
sumps,concreterooforstructures
StainlessSteelRodBenchMark Concretewall/structuresornatural
rock
(5) Priortothecommencementoffieldobservations,theWorks
Package Contractor must submit for approval a Survey
Method Statement that includes the following information
to demonstrate that the survey is capable of achieving the
accuraciesandstandardsofthisGS:
a) TheroutingandconfigurationsoftheNetworks,
b) Thepreanalysisreports,
c) The use of techniques, instruments, equipment,
materials and data processing and computing
-
8/10/2019 Vol III of IV - Section 11 - 01 General Specification
23/224
PROJEKMASSRAPIDTRANSITLEMBAHKELANG
JajaranSungaiBuloh Kajang
GeneralSpecificationforCivilEngineeringWorks
SectionG1 General
KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G111of18 Revision:00
softwarepackages,
d) Surveyoperationschemeandqualityprocedures,
e) Staffingqualificationsandexperience,and
f)
Data
handling
procedures
and
data
format
for
final
resultsubmissions.
(6) Oncompletionofthesurvey,theWorksPackageContractor
shallsubmitthefollowingdeliverables:
a) A survey report summarizing instruments used,
survey procedures, approach to adjustment
computationandanalysisresult.
b) Hard and softcopy of a Survey Album that includes
network diagrams and location sketches, Station
SummarysheetforeachStationandBenchMarkwith
acoordinatelistofalltheStationsandBenchMarks.
c) Original field notes, data disks, field sketches,
computation sheets for all reduction computation
andadjustmentresults.
d) Avalidcalibrationcertificateforeachinstrumentand
valid license for each software package used in the
survey.
(7) The Initial Land Record Survey shall be undertaken prior tothecommencementofworksonSiteandnoworksmaybe
carriedoutonanypartoftheSiteuntilithasbeensurveyed
andthesurveyrecordsapprovedbythePDP. Itshall:
a) Recordalloriginallandforms,features,levelsandthe
like.
b) Establish the lines, levels and boundaries of the
Works.
c)
Locate
or
confirm
the
details
and
location
of
all
utilitiesandservicesonorintheSite.
d) Check where relevant adjacent roads, buildings,
structuresandanyconstructionworknotassociated
withtheContractarelocated.
(8) The Initial Land Record Survey shall be undertaken with a
view to providing sufficient detailed information of major
existing features which are to be demolished or altered
duringthecourseoftheWorksandformthebasisforfuture
Site reinstatement and as a record for details/standards
requiredforsuchreinstatement.
-
8/10/2019 Vol III of IV - Section 11 - 01 General Specification
24/224
PROJEKMASSRAPIDTRANSITLEMBAHKELANG
JajaranSungaiBuloh Kajang
GeneralSpecificationforCivilEngineeringWorks
SectionG1 General
KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G112of18 Revision:00
(9) Precondition surveys of buildings and structures shall be
carried out by a suitably qualified engineer or qualified
building surveyor, as necessary for the nature of the
structure concerned and which shall produce an accurate
record (together with photographic records) of the existing
stateof
the
structure
prior
to
the
commencement
of
work
in
theconcernedarea. Inadditiontoanyreportsissuedtothe
Relevant Authorities, the Works Package Contractor shall
submitthree(3)copiesofthepreconditionsurveyreportsto
the PDP not less than twentyeight (28) days prior to the
commencementofworkinthatarea.
(10) The Works Package Contractor shall conduct video record
surveysofallexistingdrainageandseweragesystemswithin
anddirectlyadjacenttotheSiteandsubmittothePDPtwo
copies
of
all
survey
records
and
video
footage
prior
tocommencement of any works within the relevant parts of
the Site. The surveys shall extend to the first manhole
outsidetheSiteboundary.
(11) The Works Package Contractor shall conduct video record
surveys of all existing and new drainage and sewerage
systemswithintheSiteandsubmittothePDPtwocopiesof
allsurveyrecordsandvideofootagewithintwentyeight(28)
days of the issue of the Certificate of Practical Completion
fortheWorks.
SurveyQuality
Plan
G1.11.2 TheWorksPackageContractorshallsubmitforapprovalbythePDP
withinone (1)month fromthedateoftheLetterofAcceptance,a
SurveyQualityPlanorplansforthecontrolofallsurveywork. The
SurveyQualityPlanshalldefine:
a) The organization, responsibilities and authorities given to
identifiedpersonnel.
b) The methods and procedures for establishing, maintaining
controlofandrecordingallsurveyactivitiesrequiredbythe
Contract.
c) The proposed method of recording the data arising from
these surveys and the electronic digital format for such
records.
e) TheSurveyPlaninaccordancewiththisSection.
f) The method and procedure for notifying the PDP of all
surveyactivities.
g)
The
methods
and
procedures
for
the
calibration
of
thesurveyequipment.
-
8/10/2019 Vol III of IV - Section 11 - 01 General Specification
25/224
PROJEKMASSRAPIDTRANSITLEMBAHKELANG
JajaranSungaiBuloh Kajang
GeneralSpecificationforCivilEngineeringWorks
SectionG1 General
KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G113of18 Revision:00
h) Thefrequencyofmonitoring forallSurveyControlNetwork
Points.
TheSurvey
Manager
G1.11.3 TheWorksPackageContractorshallappointasuitablyqualifiedand
competentpersonastheSurveyManager,toberesponsibleforthe
task
of
ensuring
that
the
requirements
of
the
Survey
Quality
Plan
are implemented and maintained. The Works Package Contractor
shallatthetimeofsubmissionoftheSurveyQualityPlan,submitfor
approval by the PDP details of the qualifications, experience,
authorityandresponsibilitiesoftheproposedSurveyManager.
SurveyPlan G1.11.4 Each survey undertaken by the Works Package Contractor shall be
deemed to be a quality control activity. A Survey Plan or plans
suitablystructuredtocomplywiththerelevantrequirementsofthis
sectionshallbesubmittedforapprovalbythePDP.TheSurveyPlan
shalldefinetheprogrammeandfrequencyrequiredfor:
a) Theestablishmentofsurveycontrolorreferencepoints.
b) Constructionsurveys,whicharetobeundertakentocontrol
theworkduringeachconstructionprocess.
c) Progresssurveys,whicharetobeundertakentorecordthe
statusoftheworkforpurposessuchastheachievementof
KeyDatesandMilestones.
d) Asbuilt surveys, which are to be undertaken to record the
location,
alignment
and
level
of
all
completed
elements
of
thePermanentWorks.
e) Whereapplicable,themonitoringofthelevelsofPermanent
Workswhichareconstructedonreclaimedland.
f) Ascheduleformonitoringofdeformationandsettlementof
existingstructuresandbuildingswithinthezoneofinfluence
ofconstructionshallbemaintainedwhereapplicable.
Monitoringof
SurveyWorks
G1.11.5 TheWorksPackageContractorshallprovideallreasonablefacilities
tothe
Supervising
Consultant,
and
others
authorised
by
the
PDP
to
witness any survey activity and to check the accuracy of the
measurementsandtherecordsofsuchactivities. Thisshallinclude
without limitation, the provision of all survey measurements in
electronicdigitalformatandotherrecordsuponrequest.
AsBuilt
Surveys
G1.11.6 Unless otherwise agreed with the PDP, the Works Package
Contractor shall ensure that the asbuilt surveys are undertaken
withintwo(2)daysofthecompletionofeachstageorsectionofthe
PermanentWorksandthesurveyrecordsubmittedforapprovalby
thePDPwithinseven(7)daysthereafterandshallbesuchthat:
(1) the determinationof frequencyof the location and level of
eachelementofthePermanentWorksshallcomplywiththe
-
8/10/2019 Vol III of IV - Section 11 - 01 General Specification
26/224
PROJEKMASSRAPIDTRANSITLEMBAHKELANG
JajaranSungaiBuloh Kajang
GeneralSpecificationforCivilEngineeringWorks
SectionG1 General
KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G114of18 Revision:00
requirementsofAppendixAG1.1;
(2) the determination of accuracy for the location and level of
the Permanent Works shall be commensurate with the
constructiontolerancesthatareapplicabletothePermanent
Works;and
(3) if a concession has been permitted by the PDP for a
deviation from the required level and or alignment, then
sufficient additional points shall be provided to define the
fullextentofeachdeviation.
Measurement
Units
G1.11.7 The units of measurement for recording the asbuilt location and
levelofthePermanentWorksshallbeasfollows:
LinearMeasurements: Metres
VerticalMeasurements
:
Metres
AngularMeasurements: Clockwisefrom0to360Degrees.
Azimuth: LocalPlaneRectangularSystem
Deformation
Monitoring
G1.11.8 WhereapartorasectionofthePermanentWorksisconstructedon
reclaimedland,theWorksPackageContractorshallsubmit,atleast
twentyeight (28)days prior to thecompletion ofany part ofsuch
work, details of the surveys required for the monitoring of both
vertical and horizontal movement of the completed works. These
detailsshall,
without
limitation,
define:
a) Theextentofeachsurvey.
b) ThetimebetweenthecompletionoftheworkandtheInitial
Survey.
c) Thefrequencyofthesubsequentsurveys.
d) Theformatinwhichthedatawillberecorded.
e) Theformatand frequency forreportingtheresultsofthese
surveysto
the
PDP.
MainSurvey
ControlPoints
forOther
Works
Contractors
G1.11.9 The Works Package Contractor shall provide and protect until
handed over a series of Main Survey Control Points for the Other
Works Contractors. They shall be ready one month prior to the
access of the Other Works Contractor. The maximum spacing
between the Main Survey Control Points shall be no more than
250mandshallbeintervisible. Thematerialsforthesurveymarker
shall be proposed by the Works PackageContractor and approved
by the PDP. Main Survey Control Points shall be placed such that
theyremain
accessible
before,
during
and
after
track
construction.
Detailed requirements for the Main Survey Control Points for
differentstructuresarespecifiedbelow.
-
8/10/2019 Vol III of IV - Section 11 - 01 General Specification
27/224
PROJEKMASSRAPIDTRANSITLEMBAHKELANG
JajaranSungaiBuloh Kajang
GeneralSpecificationforCivilEngineeringWorks
SectionG1 General
KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G115of18 Revision:00
a) TunnelandStationStructure
Main Survey Control Points shall be established for each
tunnel bore on each track inside the Stations. The Survey
Control Points shall be located on the tunnel roof or walls
clearof
the
track
and
walkway
concrete.
Additional
points
shallbe installedateach levelwithinthestationtosuitthe
OtherWorksContractorsrequirements.
b) ViaductStructure
MainSurveyControlPointsshallbeestablishedfortheDown
Trackonly iftheyarevisible forboth trackson theviaduct.
Otherwise additional Main Survey Control Points along the
Up Track will be required. The Main Survey Control Points
shall be located on the upper surface of the viaduct deck
within1m
distance
from
the
column
pier
at
the
fixed
end
of
theviaductdeck.
c) AtGrade
MainSurveyControlPointsshallbeestablishedwithin20m
of the mainline tracks. Otherwise additional Main Survey
Control Points will be required for other tracks. The Main
Survey Control Points shall be located offset from track
centrelineandclearoftheballastonfixedstructures.
AsBuilt
Survey
Record
Drawings
G1.11.10
TheWorks
Package
Contractor
shall
prepare
and
maintain
aset
of
drawings of the Permanent Works to show the asbuilt survey
records in accordance with Appendix AG1.1 and to identify all
deviations thereto, whether due to the PDPs instructions, the
WorksPackageContractorsmethodofconstruction,siteconditions
or any other reason. Unless otherwise permitted by the PDP, the
Works Package Contractor shall ensure that the data from the as
built surveys is incorporated into the As Built Survey Record
Drawings and submitted for approval within fourteen (14) days of
the dateof theasbuiltsurvey.Thepreparationand submissionof
AsBuilt
Survey
Record
Drawings
shall
comply
with
the
requirements
ofthePDPsCADstandards.
Deliverables G1.11.11 (1) One complete set of As Built Survey Record Drawings, in a
form acceptable to the PDP, shall be signed by the Works
PackageContractorsSurveyManagerasbeingatruerecord
ofthePermanentWorksasbuilt. TheAsBuiltSurveyRecord
DrawingsshallbesubmittedtothePDPandapprovalpriorto
applying for a Certificate of Practical Completion for the
relevantSectionorforthewholeoftheWorks.
(2)
Onecomplete
set
of
As
Built
Survey
Record
Drawings
shall
comprisethefollowing:
-
8/10/2019 Vol III of IV - Section 11 - 01 General Specification
28/224
PROJEKMASSRAPIDTRANSITLEMBAHKELANG
JajaranSungaiBuloh Kajang
GeneralSpecificationforCivilEngineeringWorks
SectionG1 General
KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G116of18 Revision:00
(a) Three(3)A1sizepaperprintsofeachdrawing.
(b) One(1)A1sizenegativecopyofeachdrawing.
(c) Two(2)setsofelectronicCADfiles.
(3)
Further
to
ClauseG1.7(2),
As
Built
Survey
Record
Drawings
mayalsoformpartoftheAsbuiltdrawings, ifacceptable
tothePDP,andprovidedinthequantitiesspecifiedinClause
G1.7(3).
Monthly
Report
G1.11.12 TheWorksPackageContractorshallinclude inhismonthlyreporta
section covering the Survey Works. This section of the monthly
report shall comment on the Survey Works undertaken and the
Survey Records completed. The report shall also show planned
SurveyProgrammesforthefollowingmonth.
-
8/10/2019 Vol III of IV - Section 11 - 01 General Specification
29/224
PROJEKMASSRAPIDTRANSITLEMBAHKELANG
JajaranSungaiBuloh Kajang
GeneralSpecificationforCivilEngineeringWorks
SectionG1 General
KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G117of18 Revision:00
APPENDIXAG1.1
REQUIREMENTSFORASBUILTSURVEYS
ITEM REQUIREMENTSFORASBUILTSURVEYSASBUILTSURVEY
RECORDDRAWINGS
EARTHWORKANDPAVEMENTS
1) Earthworksand
landscaping
Locationandlevelsatagridof20mcentres LocationPlan
2) Roads&Footpaths Crosssectionsatmaximumof20mintervalsforeachlayer.
Levelpointsoneachcrosssectionnottoexceed10mintervals
andtoincludeeachchangeofhorizontalandvertical
alignment,thecentrelineandtheedgesofeachlayer. All
streetfurnitureandmanholes
LocationPlanand
crosssections
showingalllayers
3) Carparks Asforitem1 LocationPlanand
crosssections
showingalllayers
STRUCTURES
4) PilesandPileCaps Foundinglevel,cutofflevel&locations. LocationPlan
5) Foundations,
footings
Foundinglevelsat5mcentres;location&leveloftop
foundationconcrete
LocationPlan
6) Floorslabs Location&levelsofunderside&finishedfloorsurfaceat5m
centres
LocationPlan
7) Columns Locationofcentrepointatcolumnhead&foot LocationPlan
8) Walls Locationofinner&outerfacesateachendofwall,atvertical
constructionjointsandatanychangesofalignment. Where
topofwallisexposedthefinishedlevelsat5mcentresandat
anychangesofalignment.
LocationPlan
9) Beams Locationofcentrelineandsoffitlevelateachendofbeamor
atmaximum10mcentre
LocationPlan
10) Elevatedslabs Location&leveltotopsurfaceat5mcentres LocationPlan
11) Tunnelsand
StationPlatforms
Eightpointswrigglesurvey(asbuilt)at2mcentres LocationPlan
12)
Viaduct
Cross
Sections
not
to
exceed
5m
intervals
plus
at
all
MovementJoints Location
Plan
DRAINAGEWORKS
13) Stormwaterdrains
sewerdrains,orany
gradedpipeworks
Location&levelofstormwaterdrains invert,sewerdrains
invert,andpipeinvertevery50m&ateachchangeof
horizontalorverticalpipealignment,type&sizeofstorm
waterdrain,sewerdrain,andpipe.
Planandlong
sectionshowing
changesofgrade,
invertlevels,drain
typesandsizes,pipe
types&sizesandthe
depthbelowthe
designedtopof
earthworksorlayerwork
-
8/10/2019 Vol III of IV - Section 11 - 01 General Specification
30/224
PROJEKMASSRAPIDTRANSITLEMBAHKELANG
JajaranSungaiBuloh Kajang
GeneralSpecificationforCivilEngineeringWorks
SectionG1 General
KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G118of18 Revision:00
ITEM REQUIREMENTSFORASBUILTSURVEYSASBUILTSURVEY
RECORDDRAWINGS
14) Manholes,Septic
Tanks&Soakaways
Location,size&typeofmanhole,&manholecover&invert
level. Incoming&outgoingpipelines,sizeandinvertlevel
Includeinabove
plans
15) Outfalls Locationandinvertlevel Includeinabove
plans
16) Headwalls Locationandlevel Includeinabove
plans
17) Gullies Location,leveldepthandsize Includeinabove
plans
18) Sumps,pumps
roddingeyes,etc
Locations,sizeandtype Includeinabove
plans
19) Pipework Location,leveloftopofearthworksorlayerworks&levelof
pipecentrelineevery10mandateachchangeofhorizontalor
verticalpipealignment,pipetypeandpipesize.
LocationPlan
20)
Valves,Unions
Location,
size
and
type
Expansion
Joints,
Pump,
etc. Location
Plan
ENDOFSECTION
-
8/10/2019 Vol III of IV - Section 11 - 01 General Specification
31/224
PROJEKMASSRAPIDTRANSITLEMBAHKELANG
JajaranSungaiBuloh Kajang
GeneralSpecificationforCivilEngineeringWorks
SectionG2TheSite
KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G21of12 Revision:00
SECTIONG2
THESITE
Accessto
the
SiteG2.1
(1)
The
Works
Package
Contractor
will
be
given
access
to
the
Site
inaccordancewiththeConditionsofContract.
(2) TheWorksPackageContractor shall at all timespermit and
facilitateaccesstotheSiteandtheWorksbythestaffofthe
PDP, Supervising Consultant, and all other personnel
authorisedbythePDP.
(3) TheWorksPackageContractor shall at all timespermit and
facilitateaccesstotheSitebyGovernmentdepartmentsand
utility undertakers, and other Relevant Authorities for the
inspectionand
maintenance
of
their
facilities
located
within
theSite.
(4) The Works Package Contractor shall permit and facilitate
accesstotheSiteandtheWorksbyOtherWorksContractors
during the times specified in the Contract or as otherwise
instructedbythePDP.
(5) Unless otherwise permitted by the Contract, the Works
Package Contractor shall maintain ingresses and egresses
(including designated emergency access routes) to all
properties and facilities within and around the Site. Any
alternative access arrangements proposed by the Works
PackageContractor shallbe safeand free fromhazardsand
shall be subject to the approval of the RelevantAuthorities
andofthePDP.
(6) TheWorksPackageContractorshallberesponsibleforliaising
withandobtainingpermissionfromallowners/occupiersof
private land and properties in order to gain access to such
properties for the purpose of carrying out survey works,
monitoringworks,
investigation
works
and
the
like.
Siterestrictions G2.2 (1) TheparticularusetowhichtheSite isputshallbesubmitted
for approval by the PDP and theWorks PackageContractor
shall:
a) confine his use of the areas of the Site to purposes
having been approved by the PDPwho reserves the
right to extend, amend or restrict the uses towhich
areasof theSitewillbeput,which rightshallnotbe
unreasonablyapplied;
b) refrainfromdepositingrubbishorcausingnuisanceor
permittingnuisance to be caused and, exceptwhere
-
8/10/2019 Vol III of IV - Section 11 - 01 General Specification
32/224
PROJEKMASSRAPIDTRANSITLEMBAHKELANG
JajaranSungaiBuloh Kajang
GeneralSpecificationforCivilEngineeringWorks
SectionG2TheSite
KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G22of12 Revision:00
approvedbythePDP,depositingearthonorremoving
earthfromareasoftheSite;
c) refrain from obstructing manholes, utility access
pointsandthelike.
(2)
Workother
than
that
necessary
for
completion
of
the
Works
shallnotbecarriedoutonSite.
(3) AtalltimeswhilsttheWorksPackageContractorhasaccessto
theSite,heshallprovidemeansofdistributingloadsimposed
by Works Package Contractors Equipment and traffic and
preventdamagetoutilitiesandservices.
(4) Except where otherwise provided, the Works Package
ContractorshallnotpermitanypersontoresideontheSite.
(5)
Unlessotherwise
stated,
the
Works
Package
Contractor
shall
payallratesandchargesofanynaturewhatsoeverarisingout
of his use of the Site and all other works areas provided
thereinundertheContract.
(6) The location and size of stockpile material, including
excavated material within the Site, shall be submitted for
approvalbythePDP.Allstockpilesshallbemaintainedatall
timesinastablecondition.
(7) TheWorksPackageContractor shallnotallowanimals tobe
broughtonto
the
Site.
Siteservices G2.3 (1) TheWorksPackageContractorshallprovideallsiteservicesas
necessaryandappropriatefortheconstructionoftheWorks,
whichshallinclude,butnotnecessarilybelimitedto:
a) electricity;
b) water;
c) compressedair;
d)
sitecommunication
facilities;
e) temporarydrainageandsewagedisposal;
f) temporaryfireprotectionsystems;
g) temporarylightningprotection;
h) dangerousgoodsstores;and
i) temporarylightingfacilities.
(2)
Suchservices
shall
be
provided
by
the
Works
Package
Contractor for use solely in connection with the proper
executionof theWorks.TheWorksPackageContractorshall
-
8/10/2019 Vol III of IV - Section 11 - 01 General Specification
33/224
PROJEKMASSRAPIDTRANSITLEMBAHKELANG
JajaranSungaiBuloh Kajang
GeneralSpecificationforCivilEngineeringWorks
SectionG2TheSite
KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G23of12 Revision:00
comply with all regulations of the utility undertakers and
Government Departments concerned. The Works Package
Contractor shall provide and maintain all installations
associatedwithsuchservicesandinrelationtheretoshalltake
allreasonableprecautionstosafeguardthesafetyandhealth
of all persons and the security of the Site. The PDP may
require the immediate disconnection or alteration of such
installations or portions thereof as he considers to be
prejudicialtosafety,healthorsecurity.Assoonasanyorall
oftheWorksPackageContractor's installationsareno longer
requiredfortheexecutionoftheWorks,theyshallbeentirely
removedtothesatisfactionofthePDP.
(3) All installations shall comply fully with all appropriate
statutoryrequirements.Pipes,tubes,ductsorcablescrossing
highways,footpaths,orrightsofwayshallberampedoveror
recessedbelow
the
surface.
Specific
services
shall
comply
withthefollowing:
a) Electricity
The electricity supply shall comply with the
requirementsofSectionG7herein.
b) Water
Anadequatesupplyofpotablewatershallbeprovided
at
the
Site,
including
provision
to
the
satisfaction
ofthewatersupplyauthorityofanystoragetankssothat
sufficient potable water is always available for the
executionoftheWorks.
c) CompressedAir
Except in pressurised workings, the compressed air
supply forpneumatictoolsandequipmentshallbeat
apressureofnotmorethan0.9MN/m2orothersuch
pressureasmaybe limitedbyprevailing regulations.
Detailsof
proposed
air
supply
for
use
in
pressurised
workings shall be submitted by the Works Package
ContractorforapprovalbythePDP.
d) SiteCommunicationFacilities
The Works Package Contractor shall install efficient
means of site communications including messenger,
telephone and,where appropriate, twoway radio to
thesatisfactionofthePDP.Intunnelwork,theWorks
Package Contractor shall install telephone
communicationbetween
tunnel
faces,
bottoms
and
tops of shafts and the Works Package Contractor's
officeandPDP'soffice. Temporary telephonepoints
-
8/10/2019 Vol III of IV - Section 11 - 01 General Specification
34/224
PROJEKMASSRAPIDTRANSITLEMBAHKELANG
JajaranSungaiBuloh Kajang
GeneralSpecificationforCivilEngineeringWorks
SectionG2TheSite
KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G24of12 Revision:00
alongtunnelsshallbeprovidedatevery500metres.
e) TemporaryTunnelandSubwayVentilation
The temporary ventilation system for tunnels and
subways shall achieve aminimum air velocity of 0.3
m/secand
shall
prevent
still
air
in
equipment
rooms,
cross passages and niches. The Works Package
Contractor shallensure thatallemissions,discharges
oroperations shall include localventilation toensure
suitableemissiondilution. Ifadditional ventilation is
required to support the activities of the Works
PackageContractor inaccordancewiththeairquality
guidelines of BS6164, this shall be provided by the
Works Package Contractor. All practical measures
shallbetaken,includingtheuseofcatalyticconverters
toensure
that
diesel
operating
plant
is
maintained
and
operated to a high standard in order to minimize
emissionsandensuremaximumdilution.
(4) ThePDPwill instructtheWorksPackageContractorastothe
requirements for site services tobe connected to thePDP's
portable site accommodation at any given location and the
Works PackageContractor shall provide andmaintain these
servicesduringhisuseoftheSite.
Sitecleanliness G2.4 (1) The Site shall bemaintained in a clean and tidy condition.
Materials,including
materials
required
for
Temporary
Works
shallbestoredinanorderlymanner. Rubbish,debris,cement
bags,disused formwork,disusedpackagingandthe likeshall
be disposed of at least once a day and the works areas
cleanedbyflushingwithwaterifnecessarysothattheSiteis
kept constantly cleanand tidy. Notwithstanding the above,
theWorksPackageContractorshallalsoplacerubbishbinsat
strategiclocationsthroughouttheSite.
(2) TheWorksPackageContractorshallthroughouttheperiodof
theContractprovideacentraldebriscollectionpointonSite,
as approvedby thePDP. OtherWorksContractors shallbe
required todeposit theirdebris in this collectionpointona
dailybasisandtheWorksPackageContractorshallathisown
expenseprocure the regular collection and removalof such
debris from the Site.Aftereveryworks shift, allwork areas
shallbecleanedandmadetidytothesatisfactionofthePDP.
(3) As part of the Works Package Contractors general
housekeeping, the removal of all unused materials,
construction detritus, general waste, redundant packaging
andthe
like,
shall
be
planned
and
carried
out
on
aregular
basis,andwhichshallalsobepartofhisfirecontrolstrategy
for the Site. In addition, the Works Package Contractors
-
8/10/2019 Vol III of IV - Section 11 - 01 General Specification
35/224
PROJEKMASSRAPIDTRANSITLEMBAHKELANG
JajaranSungaiBuloh Kajang
GeneralSpecificationforCivilEngineeringWorks
SectionG2TheSite
KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G25of12 Revision:00
housekeepingproceduresshallalsoincludethemonitoringof
waste and detritus produced and left on the Site byOther
Works Contractors to ensure that the Other Works
Contractors are also removing suchmaterials from the Site
expeditiously, and to alert the PDP in cases of non
cooperationinsuchmatters.
(4) The Works Package Contractor shall ensure that no earth,
debris,orrock isdepositedonpublicorprivaterightsofway
asa resultof theWorks, includinganydepositsarising from
themovementofWorksPackageContractorsEquipment.All
roads, both within and external to the Site which are
impactedonbytheWorksshallbekeptincleanconditionby
theWorksPackageContractor.Allhaulroadswillberegularly
gradedandwatered,asnecessarytominimisedustnuisance.
(5)
The
Works
Package
Contractor
shall
provide
and
maintain
apatrol unit for the duration of theContract. The unit shall
compriseone(1)foremanandtwo(2)labourerswhoshallall
be delegated fulltime to the unit. Themain duties of the
patrol unit shall include the up keeping of proper lighting,
signingandguardingprovisionsaswellasotherrelatedduties
asdirectedfromtimetotimebythePDP.
(6) Thepatrolunit shallbe required toworkoutside theWorks
PackageContractor'snormalworkinghours ifsorequiredby
thePDP.
(7) The Works Package Contractor shall provide all necessary
protective clothing, safety equipment, hand tools, ladders,
trestles,power supply, replacement equipment and the like
fortheexclusiveuseofthepatrolunit.
Parking
Facilities
G2.5 (1) The Works Package Contractor shall provide adequate
parking facilities formobile equipment and vehicles on or
closetotheSite.
(2) The parking facilities shall provide adequate space for
parkingall
mobile
equipment,
works
vehicles,
delivery
vehicles,stafftransportationvehiclesandvisitorsvehicles.
(3) WheretheparkingfacilitiesarelocatedontheSite,covered
walkwaysshallbeprovidedbetweentheparkingareasand
Site facilities such as offices, storage, and accommodation
areas.
(4) WheretheparkingfacilitiesarelocatedawayfromtheSite,
shuttle bus services and covered waiting areas shall be
providedtofacilitatethemovementofpeoplebetweenthe
parkingfacilityandtheSite.
(5) TheWorksPackageContractorshallatno timepermitany
-
8/10/2019 Vol III of IV - Section 11 - 01 General Specification
36/224
PROJEKMASSRAPIDTRANSITLEMBAHKELANG
JajaranSungaiBuloh Kajang
GeneralSpecificationforCivilEngineeringWorks
SectionG2TheSite
KVMRT/PDP/SBK/GEN/OP/GS/CS/0001 G26of12 Revision:00
mobileequipmentorvehicletobeparked inareasthatare
notdesignatedparkingfacilities.
(6) TheWorksPackageContractorshallatalltimesensurethat
public nuisance is not caused by the parking of mobile
equipmentandvehiclesassociatedwiththeWorks.
G2.6 SitePestControl
RodentControl G2.6.1 The Works Package Contractor shall at all times take effective
measures to prevent damage by rodents to the PermanentWorks
andconstituentparts thereof,suchascables,electroniccards,etc.,
during theexecutionof theWorksandshalladvise thePDPofsuch
measurestakenaccordingly.
Preventionof
mosquito
breeding
G2.6.2 Measuresshallbe taken topreventmosquitobreedingon theSite.
Themeasurestobetakenshallincludethefollowing:
a) Emptycans,oildrums,packingsandotherreceptacleswhich
may retainwater shall be deposited at a central collection
pointandthosenotrequiredforfutureuseshallberemoved
fromtheSiteregularly.
b) Standing water shall be removed or, where this is not
practicable treated at least once every week with an
environmentally acceptable product which will prevent
mosquitobreeding.
c)
WorksPackage
Contractors
Equipment
and
other
items
on
theSitewhichmay retainwater shallbe stored, coveredor
treatedinsuchamannerthatwaterwillnotberetained.
Conditionsfor
temporaryland
allocation
G2.7 The Works Package Contractor shall comply with the obligations,
requirements and restrictions applicable to any land allocation for
theWorksPackageContractor'suse.
SiteSecurity G2.8 (1) TheWorks Package Contractor shall establish, operate, and
maintainasecuritysystemfortheSiteinaccordancewiththe
requirementsoftheParticularSpecification.
(2) The Works Package Contractor shall provide adequate
training forhis securitystaff toensure that theyareable to
dischargetheirsecuritydutiesproperly.
(3) ThePDPssecuritystaffshallconductinspectionsandsecurity
auditsontheSitefromtimetotime,andthePDPshallnotify
the Works Package Contractor of any required remedial
measures or recommended improvements to the Works
Package Contractors security system arising from such
inspectionsandaudits.
GeneralWorks
Trains
G2.9 (1) ThePDPwillarrange forGeneralWorksTrainstobeusedby
theWorksP