vt oct 10 to 16,2010

8
On Going Projects 22A, K.K. Salai, Kaveri Rangan Nagar, Saligramam, Ch - 93. Ph : 23761460, 2376 2730, 2376 1562, 23761571 23761567, 2376 0137, 2376 0046, 2376 0275 [email protected] Salim’s Civil Engineering Enterprises No escalation in contract value No escalation in contract value Please visit us for site inspection and further details. Timings : 9.30 a.m to 1.00 p.m. & 3.00 p.m. to 7.30 p.m. AYYAPPANTHANGAL “ Prim White” at Ashok Nandavanam, Ayyappanthangal “PRIM ROSE” at E.V.P. Park Avenue, Ayyappanthangal 6 Flats each in one block with four side compound wall. VIRUGAMBAKKAM 1.Thirukkai Avenue, Virugambakkam Main Road. 2.Abirami Nagar, Virugambakkam

Upload: vadapalani-times

Post on 10-Mar-2016

224 views

Category:

Documents


2 download

DESCRIPTION

Neighbourhood Newspaper

TRANSCRIPT

Page 1: VT Oct 10 to 16,2010

On Going Projects

22A, K.K. Salai, Kaveri Rangan Nagar, Saligramam, Ch - 93.

Ph : 23761460, 2376 2730, 2376 1562, 2376157123761567, 2376 0137, 2376 0046, 2376 0275

[email protected]

Salim’s Civil Engineering Enterprises

No escalation in contract valueNo escalation in contract value

Please visit us for site inspection and further details.Timings : 9.30 a.m to 1.00 p.m. & 3.00 p.m. to 7.30 p.m.

AYYAPPANTHANGAL “ Prim White”

at Ashok Nandavanam, Ayyappanthangal

“PRIM ROSE”at E.V.P. Park Avenue, Ayyappanthangal

6 Flats each in one block with four side compound wall.

VIRUGAMBAKKAM 1.Thirukkai Avenue, Virugambakkam Main Road.2.Abirami Nagar, Virugambakkam

Page 2: VT Oct 10 to 16,2010
Page 3: VT Oct 10 to 16,2010

You can send your queriesrelated to legal problem to [email protected]

Page 4: VT Oct 10 to 16,2010
Page 5: VT Oct 10 to 16,2010
Page 6: VT Oct 10 to 16,2010
Page 7: VT Oct 10 to 16,2010
Page 8: VT Oct 10 to 16,2010

( (