vulcan - graham quarry

3
JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BY DATE DRAWN BY DATE REVISION DESCRIPTION These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP. 08/06/2015 VULCAN - GRAHAM QUARRY FAIRFAX COUNTY, VIRGINIA 36736.314 1 OF 1 FIGURE 1: SITE LOCATION AND TOPOGRAPHY MAP B. NORRIS S. VARGO J. BROOKS Y:\804\36736.314 Graham Quarry Vulcan\DWG\JPA Figure 1_9\JPA Figures 1_9_TG - BN.dwg | Plotted on 9/14/2015 3:45 PM | by Brianne Norris 1"=2000' U.S.G.S. 7.5 SERIES QUADRANGLES FORT BELVOIR, VIRGINIA 1965 (PHOTOREVISED 1983, BATHYMETRY ADDED 1982) OCCOQUAN, VIRGINIA 1956 (PHOTOREVISED 1984) SCALE: 1" = 2,000' FAIRFAX COUNTY PROJECT AREA PROPOSED FAIRFAX RESERVOIR AT GRAHAM QUARRY VULCAN CONSTRUCTION MATERIALS NOTE: ALL LOCATIONS ARE APPROXIMATE. N

Upload: others

Post on 02-Oct-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: VULCAN - GRAHAM QUARRY

JOB N

O.

SH

EET NO

.

SCALE

DES

IGN

ED B

Y

CH

ECKED

BY

DATE

DRAW

N B

Y

DATE

REVISION DESCRIPTION

These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but notlimited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP.

08/06/2015

VULCAN - GRAHAM QUARRYFAIRFAX COUNTY, VIRGINIA

36736.314

1 OF 1

FIGURE 1: SITE LOCATION AND TOPOGRAPHY MAP

B. N

ORRIS

S. V

ARG

O

J. BRO

OKS

Y:\804\36736.314 Graham Quarry Vulcan\DWG\JPA Figure 1_9\JPA Figures 1_9_TG - BN.dwg | Plotted on 9/14/2015 3:45 PM | by Brianne Norris

1"=2000'

U.S.G.S. 7.5 SERIES QUADRANGLESFORT BELVOIR, VIRGINIA 1965 (PHOTOREVISED 1983, BATHYMETRY ADDED 1982)

OCCOQUAN, VIRGINIA 1956 (PHOTOREVISED 1984)SCALE: 1" = 2,000'

FAIRFAX COUNTY

PROJECTAREA

PROPOSED FAIRFAX RESERVOIR ATGRAHAM QUARRY

VULCAN CONSTRUCTION MATERIALS NOTE: ALL LOCATIONS ARE APPROXIMATE.

N

Page 2: VULCAN - GRAHAM QUARRY

OCCOQUAN RIVER

OCCOQUAN RIVER

FAIRFAX COUNTY

PRINCE WILLIAM COUNTY

GRAHAM I QUARRY PIT

ELK HORN RUN

VEPCO EASEMENT

VEPCO EASEMENT

100'

ELK HORN RUN

160

165

PROPOSED63" PIPE

PROPOSED63" PIPE

LITTLE OCCO

QU

AN

RUN

225 200

250

PROPOSED63" PIPE

225

JOB NO.

SHEET NO.

SCALE

DESIGNED BY

CHECKED BY

DATE

DRAWN BY

DATE

REV

ISIO

N D

ESCRIP

TIO

N

Thes

e pl

ans

and

asso

ciat

ed d

ocum

ents

are

the

excl

usiv

e pr

oper

ty o

f TIM

MO

NS

GR

OU

P a

nd m

ay n

ot b

e re

prod

uced

in w

hole

or i

n pa

rt an

d sh

all n

ot b

e us

ed fo

r any

pur

pose

wha

tsoe

ver,

incl

usiv

e, b

ut n

otlim

ited

to c

onst

ruct

ion,

bid

ding

, and

/or c

onst

ruct

ion

stak

ing

with

out t

he e

xpre

ss w

ritte

n co

nsen

t of T

IMM

ON

S G

RO

UP

.

08/06/2015

VU

LCAN

- G

RAH

AM

QU

ARRY

FAIR

FAX C

OU

NTY

, VIR

GIN

IA

36736.314

1 OF 1

FIG

URE

2: E

XIS

TIN

G C

ON

DIT

ION

S M

AP

B. NORRIS

S. VARGO

J. BROOKS

Y:\8

04\3

6736

.314

Gra

ham

Qua

rry

Vul

can\

DW

G\J

PA

Fig

ure

1_9\

JPA

Fig

ures

1_9

_TG

- B

N.d

wg

| Plo

tted

on 9

/15/

2015

8:2

4 A

M |

by B

riann

e N

orris

----

PERENNIAL STREAM CHANNEL

WETLAND BOUNARY

PALUSTRINE EMERGENT WETLAND (PEM)

PALUSTRINE FORESTED WETLAND (PFO)

PALUSTRINE SCRUB/SHRUB WETLAND (PSS)

OPEN WATER BOUNDARY

INTERMITTENT STREAM CHANNEL

PROJECT AREA

LEGEND

MINERAL RESERVE EXTRACTION GRAHAM QUARRY

VULCAN CONSTRUCTION MATERIALSFAIRFAX COUNTY, VIRGINIA

N

SCALE: 1" = 1,200'

Page 3: VULCAN - GRAHAM QUARRY

JOB NO.

SHEET NO.

SCALE

DESIGNED BY

CHECKED BY

DATE

DRAWN BY

DATE

REV

ISIO

N D

ESCRIP

TIO

N

Thes

e pl

ans

and

asso

ciat

ed d

ocum

ents

are

the

excl

usiv

e pr

oper

ty o

f TIM

MO

NS

GR

OU

P a

nd m

ay n

ot b

e re

prod

uced

in w

hole

or i

n pa

rt an

d sh

all n

ot b

e us

ed fo

r any

pur

pose

wha

tsoe

ver,

incl

usiv

e, b

ut n

otlim

ited

to c

onst

ruct

ion,

bid

ding

, and

/or c

onst

ruct

ion

stak

ing

with

out t

he e

xpre

ss w

ritte

n co

nsen

t of T

IMM

ON

S G

RO

UP

.

Y:\8

04\3

6736

.314

Gra

ham

Qua

rry

Vul

can\

DW

G\J

PA

Fig

ure

1_9\

JPA

Fig

ures

1_9

_TG

- B

N.d

wg

| Plo

tted

on 9

/15/

2015

9:4

1 A

M |

by B

riann

e N

orris

1 OF 1

FIG

URE

3: O

VER

VIE

W O

F PR

OPS

ED P

LAN

AN

D K

EY M

AP

B. NORRIS

S. VARGO

J. BROOKS

08/07/2015

VU

LCAN

- G

RAH

AM

QU

ARRY

FAIR

FAX C

OU

NTY

, VIR

GIN

IA

36736.314

1"=350'

PERENNIAL STREAM CHANNEL

WETLAND BOUNARY

PALUSTRINE EMERGENT WETLAND (PEM)

PALUSTRINE FORESTED WETLAND (PFO)

PALUSTRINE SCRUB/SHRUB WETLAND (PSS)

PALUSTRINE OPEN WATER (POW)

OPEN WATER BOUNDARY

INTERMITTENT STREAM CHANNEL

PROJECT AREA

LEGEND

PROPOSED ACCESS ROAD

FORESTED BUFFER PRESERAVATION

FORESTED BUFFER RESTORATION

PROPOSED PLANT LOCATION

OVERBURDEN STORAGE PILE

PHASE LINE

DIVERSION DITCH (BASE FLOW)

ENLARGEMENT AREA (SEE SUBDEQUENT FIGURES)

FORESTED BUFFER PRESERAVATION(PROVIDED BY VULCAN CONSTRUCTION MATERIALS)

(PROVIDED BY FAIRFAX WATER AUTHORITY)

PROPOSED 63' PIP

MINERAL RESERVE EXTRACTIONGRAHAM QUARRY

VULCAN CONSTRUCTION MATERIALSFAIRFAX COUNTY, VIRGINIA

FIGURE 4

FIGURE 5

FIGURE 6

FIGURE 7