  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    1/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 1 9/17/2008

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    2/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 2 9/17/2008

    LIST CONTENT

    DAY 1: ……………………………………………………………………………….. 03

    1. Create .dg1

    2. Set up Custom Vulcan Dynamic Array Configuration3. Setup Preferences4. Display Data Tip for Block Model5. Display Data Tip for drilling6. Run Locate Definition for Drillhole7. Load Drillholes by Filter8. Import Drillhole file from csv to Vulcan isis database

    DAY 2: ……………………………………………………………………………….. 22

    1. Validity Isis database in Vulcan2. Draw point dataa. Change symbol draw point data inside of Isis fileb. Modify symbolc. Display draw point mapping result on screen

    3. Statistic4. Import ASCII file to design layer in Vulcan5. Display list of groups inside a layer6. Change color of the groups7. Find out the group inside of layer8. Polygon edit

    9. Create structure ---- strike dip

    DAY 3: ……………………………………………………………………………….. 52

    1. Create Collar detail data from drill hole plan view2. Import Maxibore survey use import ASCII3. Insert point4. Block Model View

    a. Use sliceb. Use block

    c. Use dynamic block model5. Reservea. Reserves --- Generalb. Advance Reserve --- Grade/Tonne report ….c. Advance Reserve --- Advance grade/Tonne reportd. Advance Reserve --- Advanced Reserves Editor

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    3/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 3 9/17/2008

    DAY 1: 8 September 2008

    1. CREATE .dg1

    Step 1:Vulcan: Project set-up

    1. Create Start file name ---- it will become dg1 name2. Project prefix ---- IMPORTAN: the name has to similar with scd file 3. Environment prefix ---- PTFI

    Step 2:Project coordinate extentsCreate maximum minimum for Easting, Northing and Level (depend on the project area)

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    4/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 4 9/17/2008

    2. CUSTOM VULCAN DYNAMIC ARRAY CONFIGURATION

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    5/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 5 9/17/2008

    3. SETUP PRFERENCES

    Step 1:Open Tools menu ----- Preferences …

    WorkbenchKeep it same as above 

    Vulcan explorerShow layer description 

    triangulationKeep it same as above 

    Envisage --- Dialog and PopusChange right mouse click display history list items 

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    6/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 6 9/17/2008

    Graphic --- input1. Change setup the rotate mode

    2. Wheel ---- DON’T tick this boxes

    triangulationChange setup back group color (inside the circle) 

    DraglineReset horizontal and vertical offset each time the split Block panel is displayedDON’T tick this box

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    7/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 7 9/17/2008

    4. DISPLAY DATA TIP for BLOCK MODEL

    Open Big Gossan model: bgt.bmf

    Step 1:Open Block menu --- View Slice

    Step 2Block Model Slice

    1. Select variable name 2. tick on enable data tips 3. OK 

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    8/88

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    9/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 9 9/17/2008

    5. DISPLAY DATA TIP for DRILLING

    Step 1: Open geology menu ---- drilling ---- Data Tips 

    Step 2: Data Tip Fields 

    Select table

    Step 3: Display field Select table 

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    10/88

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    11/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 11 9/17/2008

    Step 3: Locate – Definition

    Step 4: Open geology menu ---- drilling utilities ---- Run Locate Definition

    Step 5: Select locate id from the list 

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    12/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 12 9/17/2008

    FINAL PRODUCT: The boxes show drill holes which Sirga content 

    7. LOAD DRILLHOLES by FILTER

    Step 1: CREATE FILTEROpen Geology menu --- drilling --- selection filter 

    Step 2: SELECTION FILTERYou have to click create if you want to make new filter  

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    13/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 13 9/17/2008

    Step 3: Create select object where ---- ASSAYPB>=5.0 

    Step 4: 1. Load drill holes by Filter

    2. Filter name --- select from the list the filter that you have created (pbgt5ppm)3. tick on Load new ISIS database and give the name --- if you want to make new ISIS data

    base4. OK

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    14/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 14 9/17/2008

    FINAL PRODUCT:Drill holes have more than 5 ppm Pb

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    15/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 15 9/17/2008

    8. IMPORT DRILLHOLE FILE FROM csv to Vulcan Isis database

    Pay attention:1. How many csv data that will be imported to Vulcan isis database?2. Create new design file in Vulcan.

    Tips:It will be better if the design file similar with the csv files that will be imported.

    •  Tables related to amount of csv files•  Name have to similar with csv table header

    Example:a. Total csv files 5 (dh_assay.csv; dh_collar.csv; dh_geology.csv; dh_rkmechs.csv;

    dh_survey.csv)b. Look at the header inside of each csv file.

    Step 1:  Create new design file (.dsf file) 1. Open Isis2. File --- New design3. Create new dsf file --- example : mich.dsf4. OK

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    16/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 16 9/17/2008

    Step 2:  new design file1. Create description --- example: Michael_data2. Type ----- clock on attribute then select the type ---- use drilling3. Desurvey Style ---- select : Tangent

    Step 3:  Insert table and row1. Open table menu --- Insert --- Tips: create name of table similar to csv file name.2. Create row (see picture) ---- Tips: make rows name similar to header of csv file3. Completed this stage --- total table will be same as the total csv files that will be imported

    to Vulcan isis file.

    4. Determine the “Primary Key” to connect between one to other table – exam: HOLEID5. CLOSE and SAVE the new dsf file.6. Please check the new dsf file

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    17/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 17 9/17/2008

    Step 4: Open File menu ---- Import Export ----- Import CSV ….

    Step 5: 1. Select design file from the list ---- choose MICH2. Create NEW name of Optional database identifier ----- Example: DDH_DATA

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    18/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 18 9/17/2008

    3. Next

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    19/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 19 9/17/2008

    Step 6: 1. Complete Data file --- select the list of csv files. If you don’t find the csv files, please

    check from window explorer the csv files have been under Vulcan active folder2. NEXT3. Complete field connection ---- Index field on this table: select HOLEID4. FINISH5. You have to do it for all DB records --- at this example total 5 DB records/ 5 csv files (see

    picture above)

    Step 7: 1. Save the specification2. FINISH

    CHECK YOUR NEW ISIS DATA.

    Step 7: 1. File --- Open Database2. ISIS file --- select the new isis file that

    you have created ----gtsddh_data.mich (gts is project;ddh_data is name of isis data base;

    mich is name of design file that weused)

    3. Make sure that you don’t tick on thebox of ensure project prefix

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    20/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 20 9/17/2008

    THE IMPORT WAS SUCCESSWe want to fill blank RQD coulomb

    Step 8: Create script for RQD (see above) ---- example: rqd_int02.dcf

    Step 9: Open Utilities menu ----Script -----Run

    Step 10: Select from the list script --- rqd_int02.dcf

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    21/88

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    22/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 22 9/17/2008

    DAY 2: 9 September 2008

    1. VALIDITY Isis database in Vulcan

    Step 1: Validation Specifications1. Open isis --- Utilities ---- Validate …2. Create new specification file (.dbv file), or select/ browse .dbv file if you have created

    before ---- example: create new name: check.dbv

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    23/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 23 9/17/2008

    Step 2:Select Database  --- click on ISIS file and select the isis file from list or browse

    Step 3:Down hole checks  --- Total depth ---- click on “match total depths for collar and geology

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    24/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 24 9/17/2008

    Step 3:Down hole checks  --- Overlapping intervals ---- click on “Check for overlapping interval”

    Step 3:Individual field checks  --- minimum maximum Values ---- click on “Check for minimummaximum Value” ---- completed the table as above

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    25/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 25 9/17/2008

    Step 4:Mandatory  --- click on “Check all values are set” ---- completed the table as above

    Step 5:Report  

    1. Create new report .csv file --- example: check_1.csv2. Format --- click on csv3. Viewing --- click on view report in --- select Excel

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    26/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 26 9/17/2008

    Step 6:Save and Run ----- create new specification file with .dbv extension --- example: check.dbvWe can modify this file --- select this file in step 1 and save and run in different name in this step

    REPORT: check in window explorer --- check.csv file  

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    27/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 27 9/17/2008

    2. DRAW POINT DATA

    a. Change symbol draw point data inside of isis file

    Table 1: Isis data from draw point mapping

    SYMBOL (ARROW2) ; SYMIZ; SYMANG

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    28/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 28 9/17/2008

    STEP 1:Open Utilities ---- Field Calculation

    1. Complete the table as above; change the ARROW2 in table 1 to ARROW12. Click OK

    Table 2: Isis data from draw point mapping AFTER CHANGE THE SYMBOLSYMBOL (ARROW1) ; SYMIZ; SYMANGQuick from isis data --- don’t forget to SAVE

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    29/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 29 9/17/2008

    b. Modify symbol --- ARROW1

    STEP 1:1. Open File menu ---- symbols --- Load

    2. Select symbol name from the list

    STEP 2:1. Click on the object2. File --- symbols ---- click at “Inherent Color3. File --- symbols --- save

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    30/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 30 9/17/2008

    c. Display draw point mapping result on screen

    STEP 1:Open Geology menu ---- Sampling ---- open database

    STEP 2:Select draw point mapping isis data from list r browse

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    31/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 31 9/17/2008

    STEP 3:

    Open Geology menu ---- Sampling ---- List …

    STEP 4:

    STEP 5:1. Select DOZ OK2. Keep blast Designs as default OK

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    32/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 32 9/17/2008

    STEP 5:1. Select sample field --- example EQCU2. Select color Legend ---- example 5.00INT

    STEP 6:Completed Sample labeling as above

    STEP 6:Completed Symbols Color as above

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    33/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 33 9/17/2008

    THE RESULT:

    Note:The color and size of “ARROW1” symbol show the value of eqcu.We can change for other variables

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    34/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 34 9/17/2008

    3. STATISTICS

    STEP 1:Open Analyse --- Statistic ---- Advance Statistics …

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    35/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 35 9/17/2008

    STEP 2:Open Specification ----- create new or select from list (if you have created before) SpecificDefinition File (.sdf). Example: stats_1.sdf

    STEP 3:General Setup

    1. Please setup the colors and Graph text size as you want

    2. You can save as template file  

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    36/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 36 9/17/2008

    STEP 4:Data Element:

    1. Select Specify data to Include from thelist --- example: Drillhole_Database

    2. Attributes edit•  Select drill hole isis file•  Select field name that we want

    (example: CU and AU)•  Advance setting as X axis

    3. Data condition --- from here we cancreate what kind of condition that wewant. Example we want Condition onall variables have to greater than 0.0(see side picture)

    4. We can save this data Element settingas template

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    37/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 37 9/17/2008

    STEP 5:Global Conditions --- if we want to bounding triangulation.For this exercise keep it same as default

    STEP 6:Graph Type:

    1. in this stage we can choose what kind of Graphic type that we want.2. Create in title coulomb $x

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    38/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 38 9/17/2008

    STEP 7:Graph Type: click in Attributes coulomb – we have to set up the graphic picture that we wantHorizontal Axis and Vertical Axis

    STEP 8:Output Display ----- please setup the output file that you want.

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    39/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 39 9/17/2008

    Result 1: on the Vulcan screen

    Histogram Graph:Sample Count Vs Assay AU

    Value Range; Sample count and % totalsamples

    Value (y) Vs % total sample (x) GENERAL: min, max; SD; range; average act

    Result 2: on the Excel file

    The product file: sdf and srf files.

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    40/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 40 9/17/2008

    4. IMPORT ASCII file to design layer in Vulcan

    STEP 1:Open File menu --- Import Export ---- Import ASCII

    STEP 2:ASCII Data Read:

    1. Select data file name (this is csv file that we want to import to design database in Vulcan)2. Create layer name for objects3. Data disposition --- tick on Character separated data4. NEXT

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    41/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 41 9/17/2008

    STEP 3:Point Record:

    1. Field separatingcharacter createdcoma (,)

    2. Filed No, we have tocheck the csv datathat we want toimport. What’snumber of coulombfor X,Y,Z

    3. Point connection, thisis depend on resultthat we want to get inVulcan.

    STEP 4:Data Format

    Comment lines start withcharacter(s) --- this isdepending on the csv data. Ifit has no data on top we haveto create any character/ alphain box (see side picture)

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    42/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 42 9/17/2008

    STEP 5:The result: we have imported topo point from spots_262.csv to Vulcan use import ASCII menu.

    We do the same steps for other csv files. Example: blines_262.csv (the result, see above)

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    43/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 43 9/17/2008

    We do the same steps for other csv files. Example: boundary_262.csv (the result, see above)

    STEP 6:Open 3 layers that we have created and create triangular surface

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    44/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 44 9/17/2008

    STEP 7:Open Model menu --- Triangular Surface ----- Data (keep it same as default)

    STEP 8:We have to use boundary

    1. Open Model menu --- Triangular Surface ----- Boundary2. Make it same like picture above

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    45/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 45 9/17/2008

    RESULT: We have created topo triangulation from 262 topo sheet

    5. Display list of groups inside a layer

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    46/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 46 9/17/2008

    6. Change color of the groups

    STEP 1:Open Design menu --- Attribute Edit --- Graphics

    STEP 2:The picture show 3 kind of colors base on groups

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    47/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 47 9/17/2008

    7. Find out the group inside of layer

    STEP 1:

    Open Analyse menu --- Details --- Find Objects

    STEP 2:Select the attribute and type the condition (see picture above) --- CLICK FIND

    RESULT:The arrow find groups that we selected

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    48/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 48 9/17/2008

    8. POLYGON EDIT

    STEP 1:Open Design menu --- Polygon Edit ---- Radii …

    STEP 2:Create radius and segmentModify color and line styleSave as Layer nameOK

    STEP 3:Select by LAYER

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    49/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 49 9/17/2008

    RESULT

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    50/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 50 9/17/2008

    9. CREATE STRUCTURE --- use three point (strike dip)

    STEP 1:Open Analyse menu ---- Details ---- Strike Dip

    STEP 2:Select three points in plane ---- use snap point

    STEP 3:1. create line see picture above (blue line)2. Relimit distance

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    51/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 51 9/17/2008

    STEP 4:Open Geology Menu ---- Fault Manipulation ---- Projection

    STEP 5:

    1. Create Fault dip Project by relativedistance --- example -500 (minus)  

    STEP 6:

    1. Create Fault dip Project by relativedistance --- example 500 (positive)  

    We have 3 line (see picture) Create solid triangulation to connect all line

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    52/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 52 9/17/2008

    DAY 3: 10 September 2008

    1. Create Collar detail data from drill hole plan view

    STEP 1:Drill plan lava script --- to create collar detail from drill hole plan which displayed on screen

    STEP 2: Lava script: name: drill_plan.lava

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    53/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 53 9/17/2008

    RESULT: Check in the explorer, the result is excel file (see above)

    2. Import Maxibore survey data use import ASCII

    STEP 1:File --- import export ----- Import ASCII

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    54/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 54 9/17/2008

    STEP 2:Browse maxibore data which want to transfer, create new layer name, choose data disposition

    STEP 3:Fill X, Y, Z and name field (make sure the field No. is same as the txt file ), choose pointconnection

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    55/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 55 9/17/2008

    STEP 4:Keep it same

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    56/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 56 9/17/2008

    STEP 5:Create “#” inside of the box of comment line start character (same like the txt data below)

    STEP 6:Add “#” in front of Row 1 and 2, because it is not data

    RESULT:Green color is drill hole plan, red color is the maxibore survey data for this drill hole

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    57/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 57 9/17/2008

    4. Insert point

    STEP 1:Open Design menu --- point insert ---- interpolate

    STEP 2:Choose equal distance and enter distance (exp: 3 m)

    RESULT:The line separated for 3 m interval

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    58/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 58 9/17/2008

    4. Block Model View (cip_special_0807.bmf and bgt.bmf)

    Use model: cip_special_0807.bmf

    a. Block model View ---- Use slice

    STEP 1:Block ---- Viewing ----- Slice

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    59/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 59 9/17/2008

    STEP 2:Choose the variable name, tick “Enable data tips”

    STEP 3:Choose legend and slice sections (expl: by RL coord: 3000 mL)

    STEP 4:Choose the variables

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    60/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 60 9/17/2008

    RESULT:We can see directly the information when we put the cursor on the block.

    b. Block Model View ---- Use blocks

    STEP 1: Open Block model, viewing, blocks 

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    61/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 61 9/17/2008

    STEP 2: Choose variable name form, click use solid shading 

    STEP 3: select specific blocks by: variable Form and value: tkp 

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    62/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 62 9/17/2008

    RESULTSlice view block model at 3000 mL and load block model tkp (karume intrusion)

    REQUEST:

    Load block model in 3D view and cut by topography

    Note: change model to bgt.bmf

    STEP 1: Open Block model, viewing, blocks 

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    63/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 63 9/17/2008

    STEP 2: Choose variable name form, click use solid shading 

    STEP 3: select specific blocks by: variable Form and value: always air 

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    64/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 64 9/17/2008

    RESULT:block model in 3D view and cut by topography

    d. Block Model View ---- Use dynamic block model

    STEP 1: Open Block model, viewing, Load dynamic model (use big Gossan model)

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    65/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 65 9/17/2008

    STEP 2: Open Block model, viewing, Load dynamic model (use big Gossan model)

    STEP 3: use criteria Tick at “use test condition” --- eqcu gt 0.1

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    66/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 66 9/17/2008

    RESULT:Bgt.bmf model, eqcu greater that 0.2%

    5. RESERVE:

    USE MODEL: bgt.bmf

    a. Reserves --- GENERAL

    STEP 1:Open Block menu --- Reserve --- General

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    67/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 67 9/17/2008

    STEP 2:1. Choose grade variable that we want to calculate2. Tick on use density variable --- select sg from the list3. Tick on save report file --- give name: reserve_1A

    STEP 3:Keep it same, we don’t want to use cut-off grade

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    68/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 68 9/17/2008

    STEP 4:1. Use specific blocks by “bounding triangulation” (example we use bgtw_skarn.00t)2. Tick on Reverse matching

    Note:Please open the bgtw_skarn.00t, if we have more than 1 triangulation on screen we have to clickon the triangulation that we want to use for boundary

    RESULT:Open the window explorer, looking for reserves_1A. file and open it in WordPad

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    69/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 69 9/17/2008

    b. Advanced Reserves --- Grade/Tonne Report ….

    STEP 1:Open Block menu --- Advanced Reserve --- Grade/Tonne Report ….

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    70/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 70 9/17/2008

    STEP 2:1. Create Report Title : example ---

    GRADE TONNES REPORT

    2. Select grade variable from the list ---example: EQCU

    3. Click on use density variable ---select sg from the list

    4. Click on cutoff set by increment ----example: first 0; Last 5; increment0.5

    5. Click on Report Cutoff IncrementValues

    6. Create output file name ---- exampleGT_1

    STEP 3:Select Secondary Grade Variables and decimals from the list

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    71/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 71 9/17/2008

    STEP 4:Select specific blocks and choose by bounding triangulation

    STEP 5:Select triangulation by picking off screen

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    72/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 72 9/17/2008

    STEP 6:Pick triangulation from the screen.

    RESULT:Open the window explorer, looking for gt_1. file and open it in WordPad

    c. Advanced Reserves --- Advanced Grade/Tonne Report …

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    73/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 73 9/17/2008

    STEP 1:Open Block model Menu --- Advanced Reserves --- Advanced Grade/Tonne Report …

    STEP 2:Open reserves specification file

    1. create specification files --- example: gt_12. Block model --- use big Gossan block model: bgt.bmf

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    74/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 74 9/17/2008

    STEP 3:Grade Variable

    1. Select grade variable from the list --- example: eqcu2. Use density variable --- select “sg” from the list

    STEP 3:Secondary grade: select the variables from the list

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    75/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 75 9/17/2008

    STEP 4:Grade Cutoff: set grade cutoff by increment or set by value.For this exercise we use grade cutoff by increment (first 0.0; Last 5; Increment 0.5)

    STEP 5:Select the triangulation that we want to use as boundary.We can use browse the file or pick from screen

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    76/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 76 9/17/2008

    STEP 6:Block selection: we will use all blocks. If we want to make block selection, we can click on“change” and create the block selection.

    STEP 7:Save and Run:

    1. create new file for save specification ---- example: gt_res_spec2. create the output file ---- gt_2.rep3. create spreadsheet name ----- Grade_Tonne_Report.xls4. click on output to excel spreadsheet and create excel chart

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    77/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 77 9/17/2008

    RESULT: check the result in windows explorer --- open gt_2.xls file

    d. Advanced Reserves --- Advanced Reserves Editor

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    78/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 78 9/17/2008

    STEP 1:Open Block Model Menu --- Advances Reserves ---- Advanced Reserves Editor

    STEP 2:Create Reserve specification file or select the res files if you have created .res file beforeExample: we create bg_2.resSelect current Block Model. (example: bgt.bmf model)

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    79/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 79 9/17/2008

    STEP 3:Variable --- Break down field ---- select the variables 

    STEP 4:Product codes ---- keep it same

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    80/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 80 9/17/2008

    STEP 5:Grade variable

    1. Select density from the list --- choose sg2. Fill default as 03. Select variables that you want from the list4. Select type from the list ---- wt by mass (grade), wt by vol (non grade) or sum

    STEP 6:Cut off Grade: we can use cutoff grade if we want. But not for this time so we keep it same

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    81/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 81 9/17/2008

    Regions:We can use this menu if we want to bound the model base on polygon, Centre line (CL) ortriangulationExample: for stoping mine we can use stope center line and give the dimension of the stope

    But for this exercise we don’t use this stage.So we pass to block selection menu.

    STEP 7:Block selection: we will use all blocks. If we want to make block selection, we can click on“change” and create the block selection.

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    82/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 82 9/17/2008

    STEP 8:Save SpecificationCreate new file name: …… res (example we make same file name with step 2: bg_2.res)We can modify bg_2.res file with choose this file from the list (step 2) and give the different filename in step 8

    Then we have to calculate bg_2.res fileThe result is .dmp file ---- example bg_2.dmp file

    STEP 9: CALCULATE:1. Select the DMP file name from the list. The file names are same as .res files that we have

    created. Example: we select bg_2.dmp file then calculate2. tick on Output CSV file

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    83/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 83 9/17/2008

    NOW WE HAVE dmp FILE (bg_2.dmp) and csv file

    Open from window explorer to see the csv file.

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    84/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 84 9/17/2008

    CREATE REPORT FILE 

    STEP 9:Open Report template from the list. The extension files are .tabThe file names in the list will same as .res file that we created before

    1. Select report template file (example: bg_2.tab)2. thick in read columns from dump file then select .dmp files from the list (bg_2.dmp)

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    85/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 85 9/17/2008

    STEP 10:Page set up

    STEP 11:Header footer

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    86/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 86 9/17/2008

    STEP 12:Report Columns ---- from this sample we created 22 columns (see the picture)

    STEP 13:Report Tables --- from this sample we created 4 tables (see the picture)

    STEP 14:Save report template ---- we can create new report file name, use extension file .tabExample: we give name bg_2.tab

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    87/88

    Vulcan Intermediate training; 8-10 sept 2008

    Michael Page 87 9/17/2008

    NOW WE have 2 FILES:1. .dmp FILE (bg_2.dmp)2. .tab file or REPORT template FILE (bg_2.tab)

    Then we have to GENERATE the final report

    STEP 15: GENERATE1. Select Reserves dump file from list ---- select: bg_2.dmp file

    2. Create Output file with extension file use .rep ---- example: bg_2.rep 3. All tables or select tables ---- example select all table 

    4.We can choose the output report :

     a. Output command to report window b. Post report to graphics c. Out put to excel spread sheet, create the spread sheet name

  • 8/20/2019 Vulcan Intermediate Training Michael Notes

    88/88

    Vulcan Intermediate training; 8-10 sept 2008

    FINAL RESULT:We have 4 kind of table (check step 13)