REPORT DA NANG_ Edited Dipl.-Ing Dipl.-Ing WEHRL Bismarc 79312 E German _REV6_2018-01-29.DOCX by: g. (FH) Mar g. Jérémie B LE Umwelt ckstr. 1 – 11 Emmending ny W D "Integrat rtin Schaub Bertrand GmbH 1 gen Waste m Da Nan Khanh Hoa N ted Resou th 1 - 88 manag ng, Vi h Son Nhon urce Mana he Urban N R G In C U U E Ba 8 gemen etnam Land Landf agement in NEXUS" eported to IZ Project ntegrated R ities: the U nited Nation N ESCAP B nvironment angkok 102 nt in m at fill fill n Asian Ci : Resource M Urban Nexu ns, Rajadam Building, 5th and Develo 200, Thailan ities: Managemen us (Nexus I mnern Nok h Floor, opment Div nd Speicherdatum: 201 nt in Asian I) Avenue vision 18-01-29

Upload: others

Post on 26-Mar-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

REPORT DA NANG_

Edited

Dipl.-IngDipl.-IngWEHRLBismarc79312 EGerman

_REV6_2018-01-29.DOCX

by:

g. (FH) Marg. Jérémie BLE Umwelt ckstr. 1 – 11Emmendingny

W

D

"Integrat

rtin Schaub Bertrand GmbH

1 gen

Waste m

Da Nan

Khanh

Hoa N

ted Resou

th

1 - 88

manag

ng, Vi

h Son

Nhon

urce Mana

he Urban N

R

GInCUUEBa

8

gemen

etnam

Land

Landf

agement in

NEXUS"

eported to

IZ Projectntegrated Rities: the United NationN ESCAP Bnvironmentangkok 102

nt in

m at

fill

fill

n Asian Ci

:

Resource MUrban Nexuns, RajadamBuilding, 5thand Develo

200, Thailan

ities:

Managemenus (Nexus Imnern Nok h Floor, opment Divnd

Speicherdatum: 201

nt in Asian I) Avenue

vision

18-01-29

WASTKHAN

REPORT DA NANG_

CONTE

1. ..... Ex

2. ..... In

3. ..... La

3.1.

3.1.1.

3.1.1.1. 3.1.1.2. 3.1.1.3. 3.1.1.4. 3.1.1.5. 3.1.2.

3.1.2.1. 3.1.2.2. 3.1.2.3. 3.1.3.

3.1.4.

3.1.5.

3.1.6.

3.1.6.1. 3.1.6.2. 3.1.6.3. 3.1.6.4. 3.1.6.5. 3.1.6.6. 3.1.6.7. 3.1.6.8. 3.1.7.

3.1.7.1. 3.1.7.2. 3.1.7.3. 3.1.7.4. 3.1.7.5. 3.1.8.

3.2.

3.2.1. 3.2.2.

3.2.2.1. 3.2.2.2. 3.2.2.3. 3.2.2.4. 3.2.2.5. 3.2.2.6. 4. ..... Su

TE MANANH SON

_REV6_2018-01-29.DOCX

ENTS

xecutive su

ntroduction

andfill site

Khanh So

Landfill d

CatchMSWSite lSite hWast

Waste co

FigurFigurFigur

Waste co

Waste m

Landfill h

Site cons

GeneSubsEnvirWastSludgBaseCappSurfa

Landfill g

LandLandLandDischLeac

Mechani

Hoa Nhon

Master P

Update o

ExpeSite lSite hEnvirGeoloHydro

ustainable

AGEMEN / HOA N

ummary ...

n and basic

asessmen

on Landfill ..

data ...............

hment area ...W collection ....

ocation .........history ...........te input .........

omposition (ac

res Ref.1 .......res Ref.2 .......res Ref.3 .......

omposition (fo

management a

health, safety a

struction .......

eral observatiosoil conditions ronmental datate placement age placement

e lining ...........ping layer ......ace water man

gas and leacha

fill gas ..........fill gas collectfill leachate /

harge standarhte treatment

cal waste trea

n Solid Was

Plan of SW tre

of Master Plan

ected MSW voocation .........history ...........ronmental aspogical aspectsological aspecwaste man

NT DA NNHON SI

..................

cs...............

nt ...............

..................

......................

......................

......................

......................

......................

......................

cc. references

......................

......................

......................

or design) .......

and landfill ope

and environm

......................

ons ................/ barriers ......

a ...................and depth ........................................................................nagement ......

ate ................

......................tion options ....leachte treatmds for landfill lupgrade optio

atment plant b

te tratment

eatment compl

n of SW treatm

olume .........................................................

pects ..............s ....................cts .................nagement s

NANG ITE

2 - 88

..................

..................

..................

..................

......................

......................

......................

......................

......................

......................

s) ...................

......................

......................

......................

......................

eration ...........

ment ................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................ment ...............leachate ........ons ................

beside Khanh S

complex (in

lex in Hoa Nho

ment complex

......................

......................

......................

......................

......................

......................system for

8

..................

..................

..................

..................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

Son Landfill s

n planning)

on area .........

in Hoa Nhon a

.....................

.....................

.....................

.....................

.....................

.....................r Da Nang .

..................

..................

..................

..................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

ite ..................

..................

......................

area ..............

......................

......................

......................

......................

......................

........................................

..................

..................

..................

..................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

..................

......................

......................

......................

......................

......................

......................

......................

......................

..................

Speicherdatum: 201

..................

..................

..................

..................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

..................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

..................

18-01-29

... 9

. 12

. 13

. 13

.. 13

.. 13

.. 13

.. 17

.. 18

.. 19

.. 20

.. 20

.. 21

.. 23

.. 23

.. 24

.. 25

.. 27

.. 28

.. 31

.. 33

.. 33

.. 35

.. 36

.. 36

.. 36

.. 36

.. 36

.. 38

.. 40

.. 43

.. 44

.. 48

. 49

.. 49

.. 52

.. 52

.. 52

.. 52

.. 53

.. 54

.. 54 . 55

WASTKHAN

REPORT DA NANG_

4.1.

4.2.

4.2.1.

4.2.2.

4.2.3. 4.2.4.

4.2.5.

4.2.5.1. 4.2.5.2. 4.2.5.3. 4.2.5.4. 4.2.5.5. 4.2.5.6. 4.2.6.

4.2.7.

4.2.7.1. 4.2.7.2. 4.3.

5. ..... C

6. ..... A

TE MANANH SON

_REV6_2018-01-29.DOCX

Da Nang’s

Implemen

Propose

Propose

Phase 1

Phase 1

Phase 2

GenePropoPropoPropoOutloOutlo

Phase 3

Phase 3

PropoPropo

Cost comp

onclusion

ppendices

AGEMEN / HOA N

s objective

tation of a s

d phases and

d phases and

- Step 1: Was

- Step 1a: RD

- Step 2: Mec

eral MYT® proosed MYT® teosed MYT® plosed MYT® plook on combinook on combin

- Step 3a: Pro

- Step 3b: RD

osed treatmenosed RDF pow

pilation ......

.................

.................

NT DA NNHON SI

..................

sustainable

steps for Kha

steps for Hoa

ste acceptance

DF baling (OPT

chanical biolog

cess descriptiechnology for Dant layout .....ant figures ....

ned leachate aned landfill gas

ospects for RD

DF utilization w

nt process in bwer plant figur

..................

..................

..................

NANG ITE

3 - 88

..................

waste man

anh Son site ..

a Nhon site ....

e, screening a

TION) ...........

gical treatmen

ion ................Da Nang in br............................................and process ws and biogas u

DF utilization i

with incineratio

brief ...............res ................

..................

..................

..................

8

..................

nagement s

.....................

.....................

and fractioning

.....................

nt - MYT® proc

.....................rief ..........................................................

water treatmenutilization ......

in cement plan

on .................

.....................

.....................

..................

..................

..................

..................

ystem ........

......................

......................

g ....................

......................

cess ...............

......................

......................

......................

......................nt ..........................................

nts .................

......................

......................

......................

..................

..................

..................

..................

..................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

..................

..................

..................

Speicherdatum: 201

..................

..................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

.....................

..................

..................

..................

18-01-29

. 55

. 55

.. 57

.. 60

.. 61

.. 62

.. 64

.. 64

.. 67

.. 69

.. 70

.. 71

.. 72

.. 73

.. 75

.. 76

.. 82 . 83

. 84

. 87

WASTKHAN

REPORT DA NANG_

LIST OF

Table 1Da Nan

Table 2

Table 3

Table 4Questio

Table 5Da Nan

Table 6Questio

Table 7 ...........

Table 8

Table 9

Table 1landfills

Table 1Plan) ...

Table 1

Table 1

Table 1

Table 1

TE MANANH SON

_REV6_2018-01-29.DOCX

F TABLES

: Sanitationg People’s

: MSW tran

: MSW gen

: Waste amonnaire) ......

: Classificatg Environm

: Waste comonnaire) ......

: Waste com..................

: Specific M

: Landfill ce

0: The max (Reference

1: Land use..................

2: Inquiry lis

3: Output R

4: Cost esti

5: Cost com

AGEMEN / HOA N

n collection fCommittee

nsfer station

neration / co

mounts for K.................

tion – Survemental Prote

mposition fo.................

mposition fo.................

MSW figures

ells of Khan

ximum allowe: QCVN 25

e balance ta.................

st of cemen

RDF power

imation RD

mpilation for

NT DA NNHON SI

fee (Referee) ................

ns (Referenc

ollection (Re

Khanh Son L..................

ey Results fection Rese

or MSW; Re..................

or MSW; Re..................

s for the trea

h Son Land

wable conce5: 2009/BTN

able for Hoa..................

nt plants (Re

plant ..........

F power pla

r proposed

NANG ITE

4 - 88

ence: Decisi..................

ce: EPA / U

eference: E

Landfill (Ref..................

for househoearch Centre

ef.2 (Refere..................

ef.3 (Refere..................

atment plan

dfill ..............

entration of NMT) ..........

a Nhon was..................

eference: In

..................

ant ..............

process ste

8

ion No. 22/2..................

URENCO - W

PA / UREN

ference: EP..................

old solid wae, 2015) .....

ence: EPA /..................

ence: World..................

nt design (R

..................

pollution pa..................

ste treatmen..................

nquiry by D

..................

..................

eps ............

2014/QD-U..................

WEHRLE Q

CO - WEHR

PA / URENC..................

aste; Ref.1 (..................

URENCO ..................

Bank Tech..................

Reference: W

..................

arameters in..................

nt complex ..................

PI with GIZ

..................

..................

..................

BND dated..................

Questionnai

RLE Questi

CO - WEHR..................

(Reference:..................

- WEHRLE..................

hnical Guida..................

WEHRLE) .

..................

n leachate o..................

(Reference..................

support) ...

..................

..................

..................

Speicherdatum: 201

31/7/2014 ..................

re) .............

ionnaire) ....

RLE ..................

: University ..................

..................

ance Repor..................

..................

..................

of solid was..................

e: UPI Maste..................

..................

..................

..................

..................

18-01-29

of . 15

. 16

. 19

. 19

of . 20

. 22

rt). 23

. 24

. 29

ste . 43

er . 50

. 73

. 82

. 82

. 83

WASTKHAN

REPORT DA NANG_

LIST OF

Figure 1

Figure 2

Figure 3(Photo:

Figure 4

Figure 5Questio

Figure 6(Photo:

Figure 7(Photo:

Figure 8slopes)

Figure 9http://ww

Figure 1Tanomb

Figure 1

Figure 1

Figure 1

Figure 1

Figure 1http://wo

Figure 1Questio

Figure 1

Figure 1

Figure 1WEHRL

Figure 2

Figure 2

Figure 2

Figure 2

Figure 2Study S

Figure 2

Figure 2

Figure 2WEHRL

Figure 2

Figure 2

Figure 3

TE MANANH SON

_REV6_2018-01-29.DOCX

F FIGURES

1: MSW col

2: Satellite v

3: Skyline inWEHRLE)

4: Moisture

5: Waste coonnaire) ......

6: ScavengeWEHRLE)

7: ScavengeWEHRLE)

8: Scavenge(Photo: WE

9: Exemplarww.eurowa

10: Bird’s eyboon 2015)

11: Khanh S

12: Operate

13: Scaveng

14: Landfill

15: Climatoorldweather

16: Operatioonnaire) ......

17: HDPE c

18: HDPE c

19: ExemplaLE) .............

20: Estimate

21: Location

22: LFG col

23: Leachat

24: LeachatSSLTS) .......

25: Aeration

26: Discharg

27: CombinLE) .............

28: (left) Tu

29: (right) U

30: Membra

AGEMEN / HOA N

S

lection proc

view of Kha

n the backg.................

content [%]

omposition f.................

ers sifting th.................

ers sifting th.................

ers sifting thEHRLE) .....

rily Sanitaryste.20m.co

ye view Kha.................

Son Landfill

ed landfill ce

ging on the

cell 5 with t

logical Inforr.wmo.int/en

on procedu.................

covering on

covering wit

arily landfill .................

ed LFG rele

n of gas we

lection and

te spillage d

te treatmen.................

n basin of th

ge quality o

ation of bio.................

bular memb

UF-loop with

ane Bio Rea

NT DA NNHON SI

cedure (Ref

anh Son Lan

round illust..................

] vs. heat va

for MSW Re..................

hrough was..................

hrough was..................

hrough was..................

y Landfill Sitm/images/la

anh Son La..................

cell 4 heig

ell 4 (Photo:

landfill site

top-liner (18

rmation for n/city.html?

re of non-ha..................

closed land

h degassing

site with LF..................

ease (Refer

lls in landfil

utilization p

due to impro

t process o..................

he leachate

of the treate

logical treat..................

brane modu

h dedicated

actor proces

NANG ITE

5 - 88

ference: EP

ndfill (Refer

rates the pr..................

alue [kcal/k

ef.2 (Refere..................

ste for recyc..................

ste for recyc..................

ste for recyc..................

te (Referenandfill-profi

andfill (Refe..................

ht (Photo: W

: WEHRLE)

e (Photo: WE

8-2 mm rock

Da Nang (R?cityId=234)

azardous la..................

dfill cell (Ph

g pipes on

FG discharg..................

rence: Preli

ls (Referen

principle (R

oper leacha

on Khanh So..................

e treatment

ed leachate

tment and U..................

ule (Photo: W

circulation

ss (Referen

8

PA / URENC

rence: Goog

roximity of K..................

kg] for MSW

ence: EPA /..................

clables (are..................

clables (are..................

clables (are..................

nce: le.jpg - mod

rence: Prel..................

WEHRLE) ..

) ................

EHRLE) ....

k with thickn

Reference: ) .................

andfill (Refe..................

oto: WEHR

closed land

ge pipes wit..................

minary Fea

ce: WEHRL

Reference: W

ate capturin

on Landfill (..................

plant (Photo

(Photo: WE

UF for sludg..................

WEHRLE) .

pump (Pho

nce: WEHRL

CO - WEHR

gle Earth) ...

Khanh Son ..................

W Ref.1 (Ref

/ URENCO ..................

a of risk be..................

a of risk in f..................

a of risk wh..................

dified) .........

iminary Fea..................

..................

..................

..................

ness of 0.3

..................

erence: EPA..................

RLE) ...........

dfill cell (Pho

th 180° pipe..................

sibility Stud

LE) .............

WEHRLE) ..

g system (P

(Reference:..................

o: WEHRLE

EHRLE) ......

ge separatio..................

..................

oto: WEHRL

LE) ............

RLE Questio

..................

Landfill to D..................

ference: WE

- WEHRLE..................

hind a wast..................

front of a bu..................

hen climbing..................

..................

asibility Stud..................

..................

..................

..................

m) (Photo:

..................

A / URENCO..................

..................

oto: WEHR

e bend (Pho..................

dy SSLTS) .

..................

..................

Photo: WEH

: Preliminar..................

E) ..............

..................

on (Referen..................

..................

LE) .............

..................

Speicherdatum: 201

onnaire) .....

..................

Da Nang cit..................

EHRLE) .....

E ..................

te truck) ..................

ulldozer) ..................

g in the was..................

..................

dy SSLTS, ..................

..................

..................

..................

WEHRLE)

..................

O - WEHRL..................

..................

LE) ............

oto: ..................

..................

..................

..................

HRLE) ........

ry Feasibility..................

..................

..................

nce: ..................

..................

..................

..................

18-01-29

. 14

. 17

ty . 18

. 21

. 22

. 26

. 26

ste . 27

. 27

. 28

. 29

. 30

. 30

32

. 33

LE . 34

. 35

. 37

. 37

. 38

. 39

. 39

. 40

y . 41

. 42

. 42

. 44

. 46

. 46

. 47

WASTKHAN

REPORT DA NANG_

Figure 3

Figure 3

Figure 3

Figure 3

Figure 3(Refere

Figure 3

Figure 3

Figure 3Google

Figure 3

Figure 4

Figure 4

Figure 4

Figure 4

Figure 4

Figure 4

Figure 4

Figure 4

Figure 4

Figure 4

Figure 5

Figure 5

Figure 5

Figure 5

Figure 5

Figure 5

Figure 5

Figure 5

Figure 5

TE MANANH SON

_REV6_2018-01-29.DOCX

31: Membra

32: Gate of

33: Detailed

34: Rubble

35: Step-bynce: WEHR

36: Propose

37: Propose

38: PossibleEarth) .......

39: Propose

40: Magnet

41: Drum sc

42: RDF pa

43: Baled R

44: Flow sc

45: Key com

46: Key com

47: RDF uti

48: Defined

49: Concret

50: Exempla

51: Exempla

52: Moving

53: Basic el

54: Incinera

55: Heat rec

56: Steam t

57: Modular

58: Process

AGEMEN / HOA N

ane Bio Rea

the Mechan

d master pla

processing

y-step approRLE) ..........

ed process

ed process

e areas for .................

ed process

station (Re

creening ma

cking syste

RDF for tran

heme of the

mponents of

mponents of

lization opti

Aerobic Mi

te tunnels in

arily layout

arily flow sh

grates (Ref

lements of R

ator (Refere

covery stea

turbine (Ref

r type filter s

s phases wi

NT DA NNHON SI

actor plant (

nical Waste

an with ratio

plant at Ho

oach MSW t..................

steps 1 and

steps 1 - 3

a MBT plan..................

steps 1 - 3

eference: Eu

achine (Ref

em - baling m

sport (Refe

e MYT® pro

f the “MBT

f the “MBT

ons (Refere

ixing Proces

n the biolog

for propose

heet of an in

ference: I.C

RDF power

nce: Michae

am boiler (R

ference: JSW

system (Re

th CAPEX f

NANG ITE

6 - 88

(Reference:

e Treatment

o 1:500, sym

oa Nhon site

treatment im..................

d 3 for Khan

for Khanh S

nt implemen..................

for Hoa Nh

uRec) .........

ference: JS

machine (R

erence: RET

ocess “MBT

Kahlenberg

Kahlenberg

ence: WEH

ss (Photos:

ical drying (

ed MYT® pla

ncineration

C.E.) ............

r plant (Refe

elis) ...........

Reference: M

WELLE) ....

eference: EL

for impleme

8

: WEHRLE)

t Plant (Pho

mbol KT03/0

e (Photo: W

mplementat..................

nh Son site

Son site (Re

ntation at Kh..................

on site (Ref

..................

Welle) ......

Reference: E

TIM Roman

Kahlenberg

g“ (Referenc

g“ (Referenc

RLE) .........

: WEHRLE

(Reference

ant (Refere

plant (Refe

..................

erence: Mic

..................

Michaelis) ..

..................

LEX) ..........

entation ste

) .................

oto: WEHRL

03 (Referen

WEHRLE) ....

tion with diff..................

(Reference

eference: W

hanh Son s..................

ference: WE

..................

..................

EuRec) .......

ia) ..............

g“ (Referen

ce: WEHRL

ce: WEHRL

..................

/ ZAK) .......

: ZAK) .......

nce: JS WE

rence: EPE

..................

haelis) .......

..................

..................

..................

..................

ps (Referen

..................

LE) ............

nce: UPI Ma

..................

ferent optio..................

e: WEHRLE

WEHRLE) ..

ite (Referen..................

EHRLE) ....

..................

..................

..................

..................

nce: WEHRL

LE) .............

LE) .............

..................

..................

..................

ELLE) ........

EM) ............

..................

..................

..................

..................

..................

..................

nce: WEHR

Speicherdatum: 201

..................

..................

aster Plan) .

..................

ons ..................

E) ................

..................

nce: GIZ / ..................

..................

..................

..................

..................

..................

LE) ............

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

..................

RLE) ...........

18-01-29

. 47

. 48

. 51

. 53

. 56

. 57

. 58

. 59

. 60

. 61

. 62

. 63

. 63

. 64

. 65

. 66

. 66

. 67

. 68

. 69

. 76

. 77

. 77

. 78

. 79

. 80

. 81

. 85

WASTKHAN

REPORT DA NANG_

LIST OF

BMZ

BOD

CAPEX

CEMS

CER

CH4

CHP

CO2

COD

CV

DAMP®

DISED

DO

DoC

DoIT

DoF

DoNRE

DoST

DoT

DPI

DPC

DS

EIA

EPA

FGT

FIT

GCL

GHG

GIZ

GoVN

GWP

H2S

HDPE

HIW

HSE

TE MANANH SON

_REV6_2018-01-29.DOCX

F ACRONY

Germ

Biolo

X Cap

Con

Cert

Meth

Com

Carb

Che

Calo® Defi

Da N

Diss

Dep

Dep

Dep

E Dep

Dep

Dep

Dep

Da N

Dry

Env

Env

Flue

Feed

Geo

Gree

Deu

Gov

Glob

Hyd

High

Haz

Hea

AGEMEN / HOA N

YMS

man Federa

ogical Oxyg

pital Expens

ntinuous em

tified Emiss

hane

mbined Hea

bon Dioxide

emical Oxyg

orific Value

ned Aerobi

Nang Institu

solved Oxyg

partment of

partment of

partment of

partment of

partment of

partment of T

partment of

Nang Peopl

Substance

ironmental

ironmental

e Gas Treat

d In Tariff

osynthetic C

en House G

tsche Gese

vernment of

bal Warming

rogene Sul

h-Density P

ardous Indu

alth, Safety a

NT DA NNHON SI

al Ministry f

gen Demand

ses

ission mon

sion Reduct

t and Powe

e

gen Demand

c Mixing Pr

ute for Socio

gen

Constructio

Industry an

Finance

Natural Res

Science an

Transport

Planning an

le’s Commit

(Content)

Impact Ass

Protection A

ment

Clay Liner

Gas

ellschaft für

Viet Nam

g Potential

phide

olyurethane

ustrial Wast

and Environ

NANG ITE

7 - 88

for Econom

d

itoring syste

ion

er plant

d

rocess

o-Economic

on

d Trade

sources and

d Technolo

nd Investme

ttee

sessment

Agency (su

Internation

e

te

nment

8

ic Cooperat

em

c Developm

d Environm

ogy

ent

b-organizat

ale Zusamm

tion and De

ment

ent

tion of DoN

menarbeit

evelopment

RE)

Speicherdatum: 20118-01-29

WASTKHAN

REPORT DA NANG_

HSW

HW

HWIP

IAIA

LFG

MBT

MBR

MLSS

MOIT

MSW

MYT®

MZR

NHIW

NHMW

NHSW

NHW

OPEX

PE-LD

PE-HD

pH

PMU

PPE

QCVN 2

QCVN 4

RDF

SW

UF

UN-ESC

URENC

VAST

VND

ZAK

TE MANANH SON

_REV6_2018-01-29.DOCX

Haz

Haz

Haz

Inter

Land

Mec

Mem

Mixe

Mini

Mun

Max

Mult

Non

Non

Non

Non

Ope

Poly

Poly

pote

Proj

Pers

25 25-2SOL

40 40-2WAS

Refu

Solid

Ultra

CAP Unit

CO Da N

Viet

Viet

Zwe

AGEMEN / HOA N

ardous Soli

ardous Was

ardous Was

rnational As

dfill Gas

chanical Bio

mbrane Bio-

ed Liquor S

istry of Indu

nicipal Solid

ximum Yield

ti Zone Rea

n-Hazardous

n-Hazardous

n-Hazardous

n-Hazardous

erational Ex

yethylene (lo

yethylene (h

entia Hydrog

ect Manage

sonal Prote

2009/BTNMLID WASTE

2011/BTNMSTEWATER

use Derived

d Waste

a-Filtration

ted Nations

Nang Urban

nam Acade

nam Dong

eckverband

NT DA NNHON SI

id Waste

ste

ste Incinera

ssociation fo

ological Trea

-Reactor

uspended S

ustry and Tr

Waste

d Technolog

actor

s Industrial

s Medical W

s Solid Was

s Waste

penses

ow-density)

high-density

genii

ement Unit

ction Equip

MT NATIONE LANDFILL

MT NATIOR

d Fuel

Economic a

n Environme

emy of Scien

Abfallbeha

NANG ITE

8 - 88

ation Plant

or Impact A

atment

Solids

rade

gy

Waste

Waste

ste

)

y)

pment

NAL TECHNLS

NAL TEC

and Social

ent Compa

nce and Te

ndlung Kah

8

Assessment

NICAL REG

CHNICAL

Commissio

ny

chnology

hlenberg

GULATION

REGULATI

on for Asia a

ON LEAC

ON ON

and the Pac

Speicherdatum: 201

CHATE FRO

INDUSTRI

cific

18-01-29

OM

IAL

EXEC

REPORT DA NANG_

1. EXE

In this smately Khanh S

Da Nankilometraverage

Da Nanports thtion sinc(until en

Khanh SThe siteshops, ohas twotons/daymillion m

Thus Dwaste trThe origThe newcling raand to rhilly loca

For eacaim of iprove thcollectespecificrequiredmensionManage

Khanh S

To reduseparatdrum scwould hbaled (ocement

If a mecto be ad

CUTIVE S

_REV6_2018-01-29.DOCX

CUTIVE SU

study viable1,000 tonneSon Landfil

ng is the foures with 1,0ed 730 tons

ng Urban Ene MSW to ce 1st Janund of 2014).

Son Landfie is equippeoffice. Instao waste incy non-hazam³ left in 20

a Nang Citreatment coginal plan cw treatmentes, to minreduce/miniation and th

ch site, Khancorporatinhe economied at the twoc informatiod technical ned and buement Syste

Son Landfil

uce the amotes the enecreen (screhave to be option) and plant).

chanical-biodded as we

SUMMA

UMMARY

e solutions es per day l and the pr

urth largest046,876 ress/day in 201

nvironment Khanh Son

uary 2007. T.

ll site (32.2ed with the fallations for cinerators foardous med016, it will be

ty People's omplex in Hovered an at complex wimise operamise distur

he rocky ter

anh Son anng advanceic and ecoloo sites and n and politprocesses

udgeted in them emerge

l Site

ount of MSWrgy-rich coa

een size 150landfilled. utilized as

ological treaell, the entire

RY

for an enviof municipa

rojected Hoa

t city in Viesidents in 26, coming f

Company n Landfill (~The total am

2 ha) consisfollowing inlandfill gas

or the 16 toical waste e filled com

CommitteeHoa Nhon (area of 100will be desiating costs rbances for rrain may m

d Hoa Nhod mechanicogical situathese data ical guidelinwere adap

his study. Ad for the tw

W to be landarse plastic0 mm). ThuThe remainRefuse De

atment (MBTe MSW cou

9 - 88

ironmentallyal solid wasa Nhon Sol

etnam and l2015). The from approx

(URENCO)14 km frommount of MS

sts of 5 celnfrastructures capturing ons/day of (NHMW). A

mpletely by 2

e (DPC) dev(~20 km fro

0 ha, this waigned to prby leveragnearby urb

make conditi

on, a waste cal biologicaation of was

were combnes of dec

pted to the sAs a result, wo locations

dfilled, a mec fraction frous only the ning 40 % erived Fuel

T) for the truld be proce

8

y friendly aste are giveid Waste Tr

argest city municipal s

x. 160,000 h

), a state-owm Da Nang cSW dispose

ls of 3 ha ee: vehicle scand utilizatinon-hazard

And althoug2021.

veloped a Mom Da Nanas reduced ocess all tying synergian settlemeons on site

managemeal waste tre

ste disposalbined with inision-makersite conditiothe followinKhanh Son

echanical pom the fine60 % consof the coa(RDF) in a

eatment of essed to en

and future-pen for two lreatment Co

in Central Vsolid wastehouseholds

wned entercity). The laed of at the

each for socale, leachaion do not edous industgh Khanh S

Master Plang city and ~to 70 ha in

ypes of wases between

ents. Howevdifficult.

ent concepteatment tec. The concenternationalrs (stakehoons. Finallyng conceptsn and Hoa N

re-treatmen fraction ric

sisting of thrse fractionn external c

the fine fracergy-rich R

proof disposandfill sitesomplex.

Vietnam (1e (MSW) in s.

rprise, colleandfill has b

e landfill is 1

olid waste (ate treatmeexist. Addititrial waste (

Son had a c

n in 2016 fo~6 km fromthe revised

ste, to incren the differever, the poo

t was devechnologies iepts were bl, regional a

olders). Suby the new ps for a SustaNhon.

nt step is prch in organhe fine fractn (plastics ecombustion

ction rich inRDF and onl

Speicherdatum: 201

sal of appros: The exist

,285.4 squaDa Nang c

ects and trabeen in ope1,870,000 to

SW) disposnt plant, woionally the s(NHIW) andcapacity of

or a new som Khanh Sod plan in 20ease the reent processorly develop

loped with in order to based on das well as sbsequently plants were ainable Wa

roposed whics by usingtion (organietc.) could

n process (e

n organics wly a very sm

18-01-29

oxi-ting

are city

ns-era-ons

sal. ork-site d 8 1,5

olid on). 17.

ecy-ses ped

the im-ata ite-the di-

aste

hich g a cs) be

e.g.

was mall

EXEC

REPORT DA NANG_

amount screen w

Apart fradvanta

- SuThtre

- Thw

These mfilling pr

The promaximusumptiokilns or

Hoa Nh

The proas for thtion fromRDF fro

Unlike ition of tthe connext seaccepta

CUTIVE S

_REV6_2018-01-29.DOCX

t of inert suwould have

rom makingages:

uch an MBhus the laneatment pla

he landfill ghich are pa

measures wractice has

oposed MBTum utilizatioon that the power plan

on Solid W

oposed conhe Khanh Sm the fine fom the MBT

n Khanh Sothe RDF. Thstruction ofttlements is

ance of an in

SUMMA

bstances (ee to be sligh

maximum

T plant woudfill leacha

ant – could b

gas could bert of a MBT

would consion the envi

T facilitateson of the ca

RDF will bnts.

Waste Treatm

cept for HoSon site witfraction. Ag

T before ent

on, an incinhis is owedf an incineras larger. Hencineration

RY

e.g. gravel, tly modified

use of the

uld automate – which be effective

e collected T-plant.

iderably relronment.

s the maximalorific valuebe accepted

ment Compl

oa Nhon coh a drum s

gain, the (optering the th

neration pla to the factation plant, ence it is aplant.

10 - 88

glass) woud (screening

energy in t

atically compis until tod

ely treated b

and be use

ieve the ne

mum extense of the MSd as fuel in

lex

mprises thecreen (screptionally) bahermal utiliz

ant is includts, that thereand that th

assumed tha

8

uld have to g size to be

the waste, t

prise a statay only poo

by the MBT

ed to gener

egative env

sion of the SW. Howev energy co

e same comeening size aled coarse

zation.

ded in the ce is plenty

he distance at there wo

be landfillereduced fro

the MBT pla

te-of-the-artorly treatedsystem.

rate power u

ironmental

operationaver, the connsuming pr

mbination o80 mm) se

e fraction co

concept for of space atbetween th

ould certain

ed. In this com 150 mm

ant would h

t effluent tred by the exi

using the b

impact the

l landfill lifencept is basrocesses, e

of pre-treatmeparating thould be ble

Hoa Nhon t Hoa Nhonhe Hoa Nhonly be less

Speicherdatum: 201

case the drm to 80 mm)

have two mo

eatment plasting leach

iogas facilit

present la

e-time and sed on the e.g. in cem

ment and Me coarse fr

ended with

for the utilin site, even on site and problems w

18-01-29

rum ).

ore

ant. ate

ties

nd-

the as-ent

MBT rac-the

sa-for the

with

EXEC

REPORT DA NANG_

Realiza

This repand subthe RDplants, e

Estimat

-----

T

Estimat

T

-----

T

CUTIVE S

_REV6_2018-01-29.DOCX

tion of tech

port emphabsequent BF as fuel fetc.).

ted Investm

Pre-treatme

MYT® proce

Biological d

---------------

Total

ted return:

Tipping fee

Feed in tari

RDF value

---------------

Total

SUMMA

nical conce

asizes the nBiological Drfor industrie

ment Costs

ent U

ess U

drying U

----------------

U

U

iff U

U

----------------

RY

epts, costs,

necessity torying. If comes with a h

s (CAPEX):

USD 4 Mill

USD 44 Mil

USD 9 Mill

---------------

USD 57 Mil

USD 22 / to

USD 0.105

USD 14 / to

---------------

11 - 88

return (esti

o implementmbined thehigh energy

:

lion

lion

lion

------

lion

on U

/ kWh; U

on; U

---------------

U

8

mations)

t a Mechanse technoloy demand

USD 7.8 M

USD 4.2 M

USD 2.5 M

----------------

USD 14.5 M

nical Pre-treogies allow (cement fa

Million / year

Million / year

Million / year

----------------

Million / year

eatment as the therma

ctories, coa

r

r

r

--

r

Speicherdatum: 201

well as MYal utilizational fired pow

18-01-29

YT® n of wer

INTRO

REPORT DA NANG_

2. INTR

The Urbcan conEconomschaft fresourcfor Ecocities inprovidinpossible

The taroverexpprox. 1,(approxapprox. Santa Rthe citieand spetension

The tasVietnamtion or pand was

ODUCTI

_REV6_2018-01-29.DOCX

RODUCTIO

ban Nexus ntribute sub

mic and Socfür Internati

ce managemnomic Coo

n seven cong technicae, the imple

rget group oploitation un,200,000 re

x. 13,000,00 300,000 re

Rosa (togetes Pekanbaecial develotowards the

sk includes m, Tanjung projected shste treatme

ION AND

N AND BA

approach ibstantially tcial Commisionale Zusa

ment in Asiaperation anuntries (Chl advice to

ementation o

of this apprnd pollutionesidents). In00 residentsesidents). Oher with mo

aru and Tanopment zone south" the

the Nexus Pinang / Indhutdown of nt methods

D BASIC

SICS

is aiming foto the sustassion for Asammenarbean Cities: thnd Develophina, India,

municipal of practical

roach is then of resourcn China thes) and in Th

On the Philipore than 50njung Pinane Da Nang e integration

partner citdonesia anlandfill sites

s.

S

12 - 88

or integrateainability ofsia and the eit (GIZ) Gmhe urban nepment (BMZ

Indonesia,administraUrban Nex

e populatioces. In Mone approachhailand the ppines the a00,000 residng (approx (approx. 7n of two Ind

ties and thed Santa Ros and set-u

8

d planning f cities andPacific (UNmbH are im

exus", finanZ). The proj

Mongolia, tions for thus initiative

on of Asian ngolia the a engagestwo cities C

approach is dents), in In. 1,230,00070,000 resi

dian cities N

eir relevant osa / Philippp of an alte

and managd their regioN-ESCAP) amplementingced by the ject supporPhilippines

he design, ts.

Nexus parapproach cthe two cit

Chiang Mai relevant fo

ndonesia it a0 residents)idents) are agpur and

municipal pines) in thernative was

gement proons. The Uand the Deug the projeGerman Ferts up to tws, Thailandthe plannin

rtner-cities concerns Ulties Rizhao und Korat r the cities aims at the) and in VieconcernedRajkot has

departmeneir approacste disposa

Speicherdatum: 201

ocesses whUnited Natioutsche Gesect "Integraederal Miniswelve selec, Vietnam)

ng and, whe

suffering frlan Bator (a

o and Weifa(together wNaga City a

e populationetnam the c. With the "taken place

ts (Da Nanh on renatul infrastruct

18-01-29

hich ons sell-ted stry ted by

ere

rom ap-ang with and n of city ex-e.

ng / ura-ure

LAND

REPORT DA NANG_

3. LAN

3.1. K

3.1.1.

Prior to naire, t(URENCKhanh S

A site vconditioment, e

Additionvisit.

More dafied and

The follo

3.1.1.1.

Da Nancities. Sest city 2015) reid wastehouseho

The prowill be a

The lantres wesend of 2

3.1.1.2.

Da Nanports th

MSW iscedure

DFILL SIT

_REV6_2018-01-29.DOCX

DFILL SITE

HANH SON

LANDFIL

the site visthe EnvironCO) provideSon Landfil

visit of the Kons, waste nvironment

nal informat

ata were cod interpreted

owing parag

CATCH

ng is the fouSituated on

in Central esidents ane (MSW) geolds.

ojected popabout 1.3 m

ndfill is locatst of the Da2014, a tota

MSW C

ng Urban Ene MSW to K

s collected ais as follow

TE ASES

E ASESSM

N LANDFIL

L DATA

sit a questionmental Pred substantl site.

Khanh Soninputs, lan

tal aspects

tion was giv

ollected by td based on

graphs high

HMENT AR

urth largest the coast oVietnam. T

nd a populateneration in

ulation in 2million (Refe

ted in Khana Nang Cityal of 1,870,0

COLLECTIO

nvironment Khanh Son

and transpows:

SSMENT

ENT

LL

onnaire wasrotection Atial informa

Landfill toodfilling pracetc. of the s

ven during f

the project the results

hlight the da

REA

city in Vietnof the EasteThe city is stion density

n Da Nang c

020 will be rence: http:

nh Son villay centre. It h000 tons of

ON

Company Landfill.

orted to the

T

13 - 88

s submitted Agency (EPation on var

ok place onctice, leachsite were pr

follow-up m

team afterof site spec

ata obtained

nam in termern Sea, at tspread overy of 810 rescity average

about 1.6 m://www.eria.

age, Hoa Khhas been inMSW have

(URENCO)

landfill daily

8

to the munPA) and thious aspect

n 19th Novehate and larovided by U

meetings wit

the site visicific observ

d and evalu

ms of urban the openingr 1,285.4 sq

sidents per ses 730 tons

million resid.org/RPR_F

hanh Nam w operation sbeen depo

), a state-ow

y between 5

nicipal authohe Urban Ets of the wa

ember 2016andfill-gas cURENCO d

th municipa

it and meetations made

ated for Kh

population ag end of thequare kilomsquare kilom/day (in 201

dents, of whFY2014_No

ward, Lien since 1st Ja

osited at the

wned enter

5 am and 1

orities. WithEnvironmenaste manag

6. Informaticapturing, leuring this v

al authorities

tings and hae during the

hanh Son La

and one of e Han River

metres, withmetre. The 16) from ap

hich the urbo.38_Chapte

Chieu distranuary 2007e landfill site

rprise, colle

2 pm. The

Speicherdatum: 201

h the questiontal Compagement on

on on the seachate treisit.

s after the s

ave been vee site visit.

andfill.

the major pr, it is the la1,046,876 municipal s

pprox. 160,0

ban populater_2.pdf).

ict, 14 kilom7 and until

e.

ects and tra

collection p

18-01-29

on-any the

site eat-

site

eri-

port arg-

(in sol-000

tion

me-the

ns-

pro-

LAND

REPORT DA NANG_

Figure 1: M

For the

t

w

o

c

Dependcollectio

The colChau 1Beach R

In additduring nand colon the s

DFILL SIT

_REV6_2018-01-29.DOCX

MSW collection

MSW colle

tricycles

wastebins,

on-schedule

compressio

ding on the on methods

lection of th Area, Hai Route, Son

ion, URENCnight time. lect waste istreets or br

TE ASES

procedure (Ref

ction the fo

placed at fi

e waste bin

on waste tru

local charas.

he MSW is Chau 2 ArTra Area, T

CO also caThe waste in tricycles rought to wa

SSMENT

ference: EPA / U

llowing equ

xed position

ns

ucks.

acteristics,

performed area, Hoa VThanh Khe

rries out theon streets which subsaste bin lifti

T

14 - 88

URENCO - WEH

uipment is a

ns on the st

the MSW i

along the foVang Area,

1 Area and

e cleaning ois collected

sequently ang gatherin

8

HRLE Question

available:

treets

s collected

ollowing 10 Lien Chieu Thanh Khe

of the streed manuallyre emptied

ng points for

naire)

using one

collection r Area, Ngu

e 2 Area.

ets during da, i.e. workeeither into

r collection.

of the abo

routes: Camu Hanh Son

aytime anders use broo

public was

Speicherdatum: 201

ove mention

m Le Area, Hn Area, Riv

the sweepoms to swete bins plac

18-01-29

ned

Hai ver-

ping eep ced

LAND

REPORT DA NANG_

For the waste trnot spec

For theUBND d

Table 1: S

No.

I Ht

1 Thr

2 S

3 S

II Hit

1 S

2 S

3 S

III Sotm

1 L(

2 >

IV Cmrm

CurrentSon Lan

DFILL SIT

_REV6_2018-01-29.DOCX

waste collerucks with acified numb

eir servicesdated 31/7/2

anitation collect

C

Householdsturing/busin

Tenement hhouses, lowrented hous

Small alleys

Streets/road

Householdsng/businessthan 1m3 wa

Small alleys

Streets type

Streets type

Schools, kinorganizationtablishmentmilitary base

Less than 1(by contract

>= 1m3 was

Contracts wmedical instrestaurants,markets… (

tly Da Nangndfill) in ope

TE ASES

ection and a capacity

ber of hook

, URENCO2014 (see T

tion fee (Refere

Content

s without maess activitie

houses, temw-cost houseses

s

ds

s with manus activities waste/month

s

e 3, 4, 5

e 1, 2

ndergartensns, businesss, student des

m3 waste/mt)

ste/month

with hospitaltitutions, ho, railway sta(m3)

g city has theration:

SSMENT

transportatbetween 3.lift trucks (R

O charges aTable 1 belo

nce: Decision N

anufac-es

Vh

mporary es,

//

//

//

ufactur-w/t less

Vh

//

//

//

s, state s es-dorms,

month Vza

Vw

s, otels, ations,

Vw

e following

T

15 - 88

ion URENC.5 and 10 toReference:

a collectionow):

No. 22/2014/QD

Unit Pric

VND/per houold/per mon

/

/

/

VND/per houold/per mon

/

/

/

VND/per orgation/per m

VND/m3 of waste

VND/m3 of waste

5 transfer s

8

CO providesons each. AURENCO).

n fee accor

D-UBND dated 3

ce Wi

use-nth

11,8

18,1

23,6

use-nth

36,3

52,7

70,9

gani-month

118,

150,

190,

stations (in

s a total nuAdditionally

rding to De

31/7/2014 of Da

Colle

thout VAT

18

82

36

64

27

09

182

000

909

a distance o

umber of 39y, URENCO

ecision No.

a Nang People’s

ection Fee

With

13,000

20,000

26,000

40,000

58,000

78,000

130,000

165,000

210,000

of 5 - 10 km

Speicherdatum: 201

9 compressO conveys o

22/2014/Q

s Committee)

h VAT

0

0

0

m to the Kha

18-01-29

sion of a

QD-

anh

LAND

REPORT DA NANG_

Table 2: M

No. S

1 D

2 Dk

3 NT

4 H

5 H

Waste ftions to stationsabout 2

At presespontanmetal, prated qu

DFILL SIT

_REV6_2018-01-29.DOCX

MSW transfer sta

Station

Do Xu

Dau Moi Maket

Nguyen DucTrung

Hoa An

Hoa Tho

Total

from alleys be compre

s to the Kh00 addition

ent 100 % oneous by soplastic) for suantities.

TE ASES

ations (Referenc

Are

(m

24

ar- 12

c 27

26

24

and residenessed into canh Son Lal collection

of the MSWome people sale to scra

SSMENT

ce: EPA / UREN

ea 2)

0 Nui Dist

6 Dau

0 61 NSt.,

4 01 YWar

0 394DonDist

ntial areas icontainers. TLandfill site.n points are

W is depositeor local wo

ap collectors

T

16 - 88

NCO - WEHRLE

Locatio

Thanh St., trict

u Moi Marke

Nguyen DucThanh Khe

Yen The, Hord, Cam le D

4 CMT8 St., ng Ward, Catrict

is collectedThen, hook. In additione operated t

ed at the laoman unionss. However

8

E Questionnaire

on

Hai Chau

et

c Trung e District

oa An District

Hoa Tho am Le

by workersk lift trucks tn to the abthroughout t

ndfill site. Ws to separar, there are

e)

Amou(ton/da

16

13

13

7

12

61

s and transpransport the

bove mentiothe city.

Waste sepate types of wnone availa

unt ay)

ported to the waste frooned 5 tran

aration at sowaste (papable figures

Speicherdatum: 201

he transfer som the transnsfer statio

ource is mosper, cardboas for the se

18-01-29

sta-sfer ons,

stly ard, pa-

LAND

REPORT DA NANG_

3.1.1.3.

Khanh Scentre (chanicaindustria

Figure 2: S

The lan

w

S

DFILL SIT

_REV6_2018-01-29.DOCX

SITE L

Son Landfil(Trung Vuoal sorting plaal facilities a

Satellite view of

dfill site is e

Electronic vhas assureweighed)

Non-hazard

Leachate tr

Sludge trea

Hazardous

Lighting sys

Internal roa

TE ASES

LOCATION

l is located ng theatre)ant for MSWand close to

Khanh Son Lan

equipped w

vehicle scaed that the

dous SW la

reatment sy

atment syste

SW treatm

stem, work

ad system, t

SSMENT

on Hoang V. East to th

W (along theo Da Nang’s

ndfill (Reference

ith the follow

ale for wastscale is in

ndfill (munic

ystem

em

ent zone (w

office and o

trees.

T

17 - 88

Van Thai Se landfill sit

e Ba Na - Ss city subur

e: Google Earth

wing main f

te trucks (noperation a

cipal waste

waste incine

other ancilla

8

Street, aboute there is auoi Mo Roarbs.

h)

facilities (all

not operatedand that ev

cells 1-5), w

erator)

ary works

t 7 km Norta quarry. Inad). The site

in operatio

d during thevery incomi

with total ar

th-West of Dn the west, e is located

on):

e site visit ng and out

rea of ~15 h

Speicherdatum: 201

Da Nang’s cthere is a m close to ot

but URENCtgoing truck

ha

18-01-29

city me-her

CO k is

LAND

REPORT DA NANG_

Figure 3: S

3.1.1.4.

The Kha

Cells 1 and covwhen Ction. * ‘temporaon top. In t

The Ha(N/A inf

(i)

(ii)

The Lea

DFILL SIT

_REV6_2018-01-29.DOCX

Skyline in the ba

SITE H

anh Son La

and 2 havevered with

Cell 4 went in

rily closed’ meathe end, the wh

zardous Wafo on the pre

Incinera

Incinera

achate Trea

TE ASES

ackground illust

HISTORY

andfill site st

e both been HDPE. Instnto service,

ans the cells canole landfill will lo

aste Incinerecise date)

ator for med

ator for haza

atment Plan

SSMENT

rates the proxim

tarted opera

operated stead, Cell 3, but today c

n be opened anook like a big “w

ration Plant. The HWIP

dical waste

ardous indu

nt has starte

T

18 - 88

mity of Khanh So

ations in Ja

since 1/20073 went into cells 3 and

nd re-operated bwaste” hill.

t (HWIP) staP is equippe

(throughput

ustrial waste

ed its opera

8

on Landfill to Da

nuary 2007

7. In 9/2013service in 4 are being

by merging with

arted its oped with 2 inc

t capacity 2

e (throughp

tion in 2007

a Nang city (Pho

7.

3, they were9/2013. Th

g operated.

h other cells in o

eration latecinerators:

200 kg/h)

ut capacity

7.

oto: WEHRLE)

e both temphere is no iCell 5 is no

order to increas

e in 2007 or

100 kg/h).

Speicherdatum: 201

orarily closenformation

ot yet in ope

e the dumping a

r early in 20

18-01-29

ed* on

era-

area

008

LAND

REPORT DA NANG_

3.1.1.5.

In Tableamount

Table 3: M

MSW ge

Urban aSuburbaTotal:

MSW co

Urban aSuburbaTotal:

In total tons/day8 t/d of

Due to tween 5to enter

Table 4: W

No.

1

2

3

Betweefailed. Tcollectiolected b

The am2015 toNHIW. URENCVietnamLtd. ThURENC

DFILL SIT

_REV6_2018-01-29.DOCX

WASTE

e 3 the annt of MSW co

MSW generation

enerated:

area: an areas:

ollected:

area: an areas:

approx. 73y of non-hanon-hazard

the hot clim5 am and 12ring and re-w

Waste amounts f

Waste typ

Municipal w

Non-hazar

Non-hazar

Total

n 2009 andThe numeroon system (by trucks).

mount of nono 5,250 tons

TransportaCO Da Nanm Green Ene NHIW th

CO).

TE ASES

E INPUT

nual amounollected and

/ collection (Re

(2015) (2015) (2015)

(2015) (2015) (2015)

30 tons/dayazardous inddous medica

mate, the cit2 pm. A vehweighed aft

for Khanh Son L

pe

waste

rdous indust

rdous medic

d 2011, a pious reasons(waste sepa

n-hazardouss/year in 20ation to Khg, URENCO

nvironmentahat’s being

SSMENT

nt of MSW d transporte

eference: EPA /

314, 21,335,

237, 14,251,

y of MSW dustrial wasal waste (N

ty’s MSW ishicle scale iter having d

Landfill (Referen

trial waste

cal waste

iloting phass include (1arated at so

s industrial 016. Note: Tanh Son LO Ha Noi,

al Co. Ltd., Alandfilled is

T

19 - 88

caused by ed to the lan

URENCO - WE

,027 t,599 t,622 t

,464 t,256 t,720 t

are brougste (NHIW)HMW).

s collecteds located a

dumped the

nce: EPA / URE

Average

(tons/da

se for segre) insufficienource into d

waste (NHThe landfilleLandfill andURENCO QAnh Duongs collected

8

Da Nang’sndfill site.

EHRLE Questio

ons/year ons/year ons/year

ons/year ons/year ons/year

ht to the l are dispos

24 h per dat the site en

e waste.

ENCO - WEHRL

e amount

ay)

73

1

75

egation of wnt awarenesdifferent typ

IW) landfilleed NHIW cod treatmentQuang Nam Environme and trans

s residents

nnaire)

andfill site.sed on the s

ay and tranntrance and

LE Questionnair

0

6

8

4

waste at souss among thpes was the

ed increaseonstitutes at on site om, GreenVient Co. Ltd.ported duri

is shown a

Additionalsite togethe

sported to td trucks are

re)

urce was pehe locals; (2en mixed ag

d from 4,75bout 35-46

of NHIW iset Environm, Ph Ha Ening daytime

Speicherdatum: 201

as well as

lly approx. er with appr

the landfill weighed p

erformed bu2) inconsistgain when c

54 tons/yea% of the to

s executed ment Co. Lvironment C

e. (Referen

18-01-29

the

16 rox.

be-rior

ut it ent col-

r in otal by

td., Co. ce:

LAND

REPORT DA NANG_

Most of confirmebesidessomewhcharged

3.1.2.

For thisand hea

The figumore de

3.1.2.1.

The comcording

In needfor thin

Normallfor "Nylrepeate

Table 5: CResearch

DFILL SIT

_REV6_2018-01-29.DOCX

f the NHIW ed by URE

s URENCOhere and dod by the lan

WASTE C

s study the at (calorific)

ures for theetailed expla

FIGUR

mposition aRef.1 are s

of explanafilm plastic

ly suburbanon" given in

ed and more

lassification – SCentre, 2015)

TE ASES

is dumped ENCO. How

O. Accordingo not transpdfill operato

COMPOSIT

waste cha value of th

water (moiained in cha

RES REF.1

as well as thshown in Ta

ation is the fbags (PE-L

n areas are n Table 5 se detailed w

Survey Results f

SSMENT

on private wever, thereg to URENport it to theors.

ION (ACC.

racteristics ree referen

isture) contapter 3.1.3.

he moistureable 5.

figure givenLD). All othe

assumed tshow the opwaste charac

for household s

T

20 - 88

sites (privae are privat

NCO, some e landfill bec

REFEREN

in terms oces have b

tent for the .

e content of

n for Nylon er (3D) plas

to use less pposite. Thicterisation.

olid waste; Ref.

8

ate dumpingte companiof these p

cause they

NCES)

of waste coeen conside

design of th

f household

in Table 5. tic is summ

plastic bagss questiona

.1 (Reference: U

g) and the cies involvedprivate comwant to avo

mposition, ered (see fo

he proposed

solid waste

In this casemarized unde

s than urbaable point s

University of Da

current pracd in the NH

mpanies dumoid paying t

water (moiollowing sub

d treatment

te (MSW) in

e the term "er "Plastic"

an areas – bshould be re

a Nang Environm

Speicherdatum: 201

ctice is not HIW collectmp the NHthe tipping

sture) contb-chapters)

t concepts a

n Da Nang

"Nylon" stanin Table 5.

but the figuesolved wit

mental Protectio

18-01-29

yet tion

HIW fee

ent ).

are

ac-

nds

res h a

on

LAND

REPORT DA NANG_

As expeage of othe moisuch a h

Figure 4from urbshows sthe wate

Figure 4: M

3.1.2.2.

The comRef.2 ar/ UREN

The secduring tbetter w(heat) vRef.2 is

DFILL SIT

_REV6_2018-01-29.DOCX

ected, the Morganics costure contehigh organi

4 illustrates ban and susignificantlyer content o

Moisture conten

FIGUR

mposition ore shown inCO.

cond referethe site invewith the highvalue. With s much clos

TE ASES

MSW of Daorresponds ent of 39 - 5c content is

the correlauburban arey lower valuof urban wa

t [%] vs. heat va

RES REF.2

of Da Nang n Table 6 an

ence confirmestigations. her moisture

1,500 - 2,0er to the ex

SSMENT

Nang contwith a high50 % does s supposed

ation betweeeas for the ues for the aste has far

alue [kcal/kg] fo

MSW, its wnd Figure 5.

ms the consIn Ref. 2, th

e content (6000 kcal/kg

xpected figu

T

21 - 88

tains a high moisture cnot really mto be more

en the moisfigures givecalorific valess impac

or MSW Ref.1 (R

water/moist. The inform

siderably hihe high per60 %) in theg (6,276 - 8ures for MSW

8

h amount ofcontent of thmatch with e wet.

sture contenen in Tablealue at comt on the cal

Reference: WEH

ture contenmation was

gh organic rcentage of e MSW. The8,368 kJ/kgW with a hig

f organics. The MSW. Y53 - 70 % o

nt and the h5. It is not

parable waorific value

HRLE)

t and its caprovided by

content whorganics (6

e same appg) the calorgh moisture

Typically, aYet in the Dof organics

heating valuticeable thaater contentthan on su

alorific valuey questionn

hich has als66.71 %) coplies for the rific value oe content.

Speicherdatum: 201

a high percea Nang MS

s. A MSW w

e of the waat urban wats. In additiburban was

e accordingaire from E

so been fouorrelates mulower calor

of the MSW

18-01-29

ent-SW, with

aste aste on,

ste.

g to PA

und uch rific

W in

LAND

REPORT DA NANG_

Table 6: W

Organic w

Paper 

Cardboar

Cloth 

Wood 

Plastic m

Plastic ba

Diaper 

Leather/r

Metal  

Glass 

Stones 

Soil and s

Coal/Cind

Hazardou

Others 

Water co

Calorific v

 

Figure 5: W

DFILL SIT

_REV6_2018-01-29.DOCX

Waste compositio

waste 

rd 

ix 

ags 

rubber 

sand  

der 

us 

ontent/Moisture

value Ho 

Waste composit

TE ASES

on for MSW; Re

M

M

M

M

M

M

M

M

M

M

M

M

M

M

M

M

Sum  M

e  M

k

k

tion for MSW Re

SSMENT

ef.2 (Reference

Mass‐% 

Mass‐% 

Mass‐% 

Mass‐% 

Mass‐% 

Mass‐% 

Mass‐% 

Mass‐% 

Mass‐% 

Mass‐% 

Mass‐% 

Mass‐% 

Mass‐% 

Mass‐% 

Mass‐% 

Mass‐% 

Mass‐% 

Mass‐% 

kcal/kg 

kJ/kg 

ef.2 (Reference

T

22 - 88

: EPA / URENC

66.7

2.8

2.3

2.6

1.2

1.7

12.1

0.0

0.4

1.0

1.8

1.6

1.4

0.6

0.2

3.1

100.0

60 (+/‐10

1,500 – 2,

6,276 – 8,

: EPA / URENC

8

CO - WEHRLE Q

71%

81%

38%

62%

23%

70%

13%

00%

44%

01%

89%

63%

48%

60%

27%

10%

00%

0) %

,000

,368

CO - WEHRLE Q

Questionnaire)

t/year

t/year

t/year

t/year

t/year

t/year

t/year

t/year

t/year

t/year

t/year

t/year

t/year

t/year

t/year

t/year

t/year

  

  

 

Questionnaire)

223,895 

9,431 

7,988 

8,793 

4,128 

5,706 

40,711 

1,477 

3,390 

6,343 

5,471 

4,967 

2,014 

906 

10,404 

335,625 

Speicherdatum: 201

18-01-29

LAND

REPORT DA NANG_

3.1.2.3.

The pubprovidesTable 7calorific

Table 7: W

3.1.3.

The pro3.1.2.2)sumptioon the w(see alsTable 8well with

As nextvey on actual ncould bewaste mbe heedextra 25

DFILL SIT

_REV6_2018-01-29.DOCX

FIGUR

blished Wos specific f shows figu

c value as th

Waste compositio

WASTE C

ocess desig). But sinceons had to bwater bindinso Table 7).8). This valuh the EPA/U

t steps we rthe water c

nature of the gained. H

meaning thisded when d5 % capacit

TE ASES

RES REF.3

orld Bank Tfigures for tures for MSWhe weighted

on for MSW; Re

COMPOSIT

gn was base their data be made in ng capacity . Using thesue is higherURENCO v

recommendcontent of the Da NangHigher wates should nodesigning thty were alre

SSMENT

echnical Gthe composW from Mand average o

ef.3 (Reference

ION (FOR D

ed on the won water corder to beof the sepa

se data, a wr than the 4alues for th

d to carry othe differeng waste anr contents i

ot be a probhe effluent tady include

T

23 - 88

uidance Resition and tnila. The re

of character

: World Bank Te

DESIGN)

waste compcontent did e able to desarate waste water conten43,8 % pub

he water con

ut another nt waste frad the assuin waste us

blem for the treatment.

ed in the eff

8

eport “Munithe water/m

eport also existic fraction

echnical Guidan

position as not corres

sign the profractions as

nt in the wablished by tntent of 50-

analysis of actions. Thumptions usually resultssubsequen

Hence in afluent treatm

cipal Solid moisture conxplains the ns of the wa

nce Report)

defined bypond to theocess. The s publishedste of 52,38he Univers70 %.

the waste wus more desed as desis in more lent aggregatenticipation o

ment plant.

Waste Incintent of diffmethod of c

aste.

y EPA/UREe waste coassumption

d in the Wor8 % was deity of Da N

with a moreetailed inforgn basis foeachate seees. Yet thisof this extra

Speicherdatum: 201

ineration” aferent wastcalculating

NCO (chapmposition, ns were basrld Bank repetermined (sang but fits

e detailed smation on

or the proceeping from aspect hasa leachate,

18-01-29

also tes. the

pter as-sed port see s in

sur-the ess the s to an

LAND

REPORT DA NANG_

Table 8: S

3.1.4.

Facilitietreatmezone inc

Significaexist.

The siteother an

DFILL SIT

_REV6_2018-01-29.DOCX

pecific MSW fig

WASTE M

es for landfent are exiscluding was

ant scaveng

e conveys oncillary work

TE ASES

gures for the trea

MANAGEM

filling of MSstent on siteste incinerat

ging activitie

of an distincks.

SSMENT

atment plant de

ENT AND L

SW, leachae and are itors is also

es at the sit

ct road syste

T

24 - 88

esign (Reference

LANDFILL

ate collectioin operationexisting an

te were obs

em and is e

8

e: WEHRLE)

OPERATIO

on and lean. A Hazardd in operati

served as w

equipped wi

ON

chate treatdous Solid on.

well as large

ith a lighting

tment as wWaste (HS

e uncovered

g system, w

Speicherdatum: 201

well as sludSW) treatm

d tipping are

workshops a

18-01-29

dge ent

eas

and

LAND

REPORT DA NANG_

3.1.5.

During Environto) are l

a

S

t

t

saa

No landvisit.

Due to sues dumended

DFILL SIT

_REV6_2018-01-29.DOCX

LANDFIL

the site visment (HSEisted:

Missing acc

Insufficient as, leachate

Scavenging

Unclear sta

Poor / inade

No installatthe environ

Methane (Ctimes highe

Hydrogen Sspreads in as 0.5 ppb an anaesthing after les

dfill fires or s

the importauring the sitd.

TE ASES

L HEALTH

sit in 11/ 20E) rules wer

cess contro

security due ponds

g behind an

atus of scav

equate pers

tions for lanment

CH4) releaser than CO2

Sulphide (Hlow concenH2S can be

hesia of the ss than one

signs of sub

ance and thte visit. An

SSMENT

, SAFETY A

016 differenre observed

l (who is en

ue to missin

d around m

engers (aut

sonal protec

ndfill gas ca

e to the atm)

H2S) releasentrations thee perceivedodour rece

hour of exp

bsurface co

he complexadditional H

T

25 - 88

AND ENVIR

nt issues thad. Below the

ntering the s

g fencing o

moving vehic

thorized? /

ction equipm

apturing in p

mosphere (

e to the enve typical smd by the hueptors occuposure.

ombustion w

xity of this toHSE-survey

8

RONMENT

at may colle most obvi

site?)

of the site’s

cles / mach

unauthorize

ment (PPE)

place - Unim

(Note: Gree

vironment (mell of rotten

man nose. urs. H2S at c

were either

opic it was y of the land

ide with geious points

dangerous

ines (e.g. w

ed?) presen

) in usage

mpeded em

enhouse ga

(Note: H2S n eggs. At g

At higher cconcentratio

reported or

not possibdfill site is t

eneral Healt(including

areas (e.g.

waste trucks

nt on the du

mission of la

as potential

is a highly gas concentconcentratioons >100 p

r observed d

ble to addretherefore st

Speicherdatum: 201

th, Safety abut not limi

dumping a

s, bulldozers

mpsite

andfill gas i

of CH4 is ~

toxic gas ttrations as lons >100 pppm is poiso

during the s

ess all HSEtrongly reco

18-01-29

and ted

are-

s)

nto

~20

hat low pm on-

site

is-om-

LAND

REPORT DA NANG_

Figure 6: S

Figure 7: S

DFILL SIT

_REV6_2018-01-29.DOCX

Scavengers sifti

Scavengers sifti

TE ASES

ng through was

ng through was

SSMENT

ste for recyclable

ste for recyclable

T

26 - 88

es (area of risk

es (area of risk

8

behind a waste

in front of a bul

truck) (Photo: W

ldozer) (Photo:

WEHRLE)

WEHRLE)

Speicherdatum: 20118-01-29

LAND

REPORT DA NANG_

Figure 8: S

3.1.6.

The genthe site tices loobarriersOnly leaoverview

Figure 9: E

DFILL SIT

_REV6_2018-01-29.DOCX

Scavengers sifti

SITE CON

neral site cvisit in 11/2

oked at. Figs, waste disachate treaw on the fin

Exemplarily San

TE ASES

ng through was

NSTRUCTIO

onditions a2016. Wastgure 9 illussposal, coveatment facilndings obse

nitary Landfill Sit

SSMENT

ste for recyclable

ON

nd design fte inflow an

strates an eering, leachities are m

erved during

te (Reference: h

T

27 - 88

es (area of risk

features of nd compositexemplarily hate and la

missing in thg the site vis

http://www.euro

8

when climbing

the Khanh tion data wesanitary la

andfill gas chis schemesit as comp

owaste.20m.com

in the waste slo

Son Landfere discussndfill site wcapturing an. The followared to Fig.

m/images/landfil

opes) (Photo: W

fill were exased and opewith the basnd landfill gwing sectio. 9.

l-profile.jpg - mo

Speicherdatum: 201

WEHRLE)

amined durerational prsic modulesgas utilizatins provide

odified)

18-01-29

ring rac-s of on. an

LAND

REPORT DA NANG_

3.1.6.1.

The totaleachateareas acell with

Figure 10:

Althouglandfill wclosed b

At the elandfill othe resu(Reference

DFILL SIT

_REV6_2018-01-29.DOCX

GENER

al area of te treatment

and the remh a size of 3

Bird’s eye view

gh a figure fowas initiallyby 2/2021, w

end of 2016operation ault, that the e: EPA / URENC

TE ASES

RAL OBSE

he Khanh St, 3.8 ha for

maining ~15 3 ha. A bird’

w Khanh Son La

or the approy designed which leave

6 a capacityare in place

landfill will CO - WEHRLE

SSMENT

RVATIONS

Son Landfilr hazardousha as the as eye view

ndfill (Referenc

oved total cfor an oper

es ~3 years

y of 1,496,2and estima

be filled comQuestionnaire)

T

28 - 88

S

l is 323,935s SW treatmactual dumof the landf

ce: Preliminary F

capacity (m³ration until more for o

274 m³ wasation of opempletely by

8

5 m² (32.2ment, 9.6 hp site. The fill is shown

Feasibility Study

³) of Khanh 2023. Howeperation.

s still availaerating peri

y 2021.

ha) is divida for buildi~15 ha are

n in Figure 1

y SSLTS, Tanom

Son Landfiever, nowa

ble for landod calculat

ded as follong zones, r

e split into c10.

mboon 2015)

ill has not badays it is e

dfilling. Guidtion have be

Speicherdatum: 201

ws: 3.8 ha roads & grecells 1-5, ea

een given, expected to

delines for een done w

18-01-29

for een ach

the be

the with

LAND

REPORT DA NANG_

Figure 11:

Ta

N

1

2

3

4

5

The remamount sity of 1covering

The Kanot wellof the o

DFILL SIT

_REV6_2018-01-29.DOCX

Khanh Son Lan

able 9: Landfill c

No. Ar

1 3

2 3

3 3

4 3

5 3

maining volut of waste to1 (very highg material (

nh Son Lanl managed,perated cel

TE ASES

ndfill cell 4 heig

cells of Khanh S

rea (ha)

ume for lano be landfillh)for the dusoil), this re

ndfill is loca because alls being un

>20

SSMENT

ht (Photo: WEH

Son Landfill

Statu

compl

compl

not fu

filling

unfille

dfilling wased was giveumped and esults in a c

ated in a hilareas usedcovered (se

m

T

29 - 88

HRLE)

s

letely filled

letely filled

ll

in progress

ed

s given withen with app compacted

calculated re

ly area withfor dumpingee Figure 1

8

s

approx. 1.5prox. 336,00d waste anemaining la

h moderate g are widel2).

5 million m³00 tons/yead taking intndfill opera

slopes. Thy-stretched

³ at the endar. With an ato account

ation period

he active dud with large

Speicherdatum: 201

d of 2016. Tassumed dethe additioof 4-5 year

umping areasurface are

18-01-29

The en-

onal rs.

a is eas

LAND

REPORT DA NANG_

Figure 12:

Figure 13:

DFILL SIT

_REV6_2018-01-29.DOCX

Operated landf

Scavenging on

TE ASES

fill cell 4 (Photo:

n the landfill site

SSMENT

: WEHRLE)

(Photo: WEHR

T

30 - 88

RLE)

8 Speicherdatum: 20118-01-29

LAND

REPORT DA NANG_

3.1.6.2.

With thesubsoil

Geolog

Tc

Cgs

T“

T

T

s

T

Hydrolo

SStST

Gt

Earthqu

AtAV

DFILL SIT

_REV6_2018-01-29.DOCX

SUBSO

e completeconditions

gical condit

The geologcrushed gra

Clay loam gravel mixesand smea

The perme“impermeab

The thickne(at the deep

The texture

Bedrock hemorphic rocsisting of gn

This format

ogical cond

Surface waStream 1: ters/sec. Stream 2: The two strmainly flow

Groundwatetions made low ground

uake zone

An earth quthe KhanhASSESSMEVIETNAM, Institute of

TE ASES

OIL CONDI

d WEHRLEand barriers

tions

gical barrieravel (eluvia

is yellow, lied in with cr or sandy l

eability is quble/waterpro

ess of the gpest drill ho

e of the Clay

ere appearsck belonginneissised q

tion is widel

ditions

ater: On thThe main s

Flowing froreams mergs in the rain

er: The aquat drill-hole

, varying fro

uake zone ch Son LaENT OF ENguyen HoGeophysics

SSMENT

TIONS / BA

E Questionns:

r of the Khl-deluvial or

ight yellow,lay loam incoam.

uite compleoof”, but ma

geological bole 8.0 m).

y loam chan

s to be quiteg to Formauartz schist

y spread in

he entire Kstream runn

om South-Ege in the Weny season.

uifer is connes, the grouom place to

classificatioandfill site EARTHQUAong Phuongs, Vietnam A

T

31 - 88

ARRIERS

naire UREN

hanh Son Lrigin).

white greycreases wit

ex, rangingainly being

arrier is rat

nges from h

e shallow (ation A Vuonts.

n Hoa Tho, H

Khanh Sonning from S

East to Nortest-North an

nected to thundwater levo place.

on for the reis unkno

AKE/TSUNg; EarthquaAcademy o

8

NCO provid

Landfill area

y or sometith soil depth

from “perm“poorly perm

her thin. On

hard to flexib

from 2.4 - 8ng, originat

Hoa Phat, H

n Landfill aSouth to No

th-West witnd flow into

he surface wvel is high,

egion is avaown (see AMI HAZAake Informaf Science a

ded the follo

a mainly co

mes black h. The clay

meable” ovemeable” to “

n average it

ble paste.

88.0 m), coing from Pa

Hoa Khanh

area there orth with a

h a flowrate the Thanh

water bodieranging bet

ailable, but tRECENT

ARD AND ation and Tand Technol

owing infor

onsists of c

grey; amouy loam layer

er “poorly “waterproof

t amounts t

omposed maleozoic Ag

and other p

are two s flowrate o

te of about Khe gully.

es. Accordintween 0.1 m

the exact cACHIEVE

RISK MITTsunami Walogy (VAST

Speicherdatum: 201

mation on

clay loam a

unt of crushr is mixed w

permeable”f”.

to about 3.5

mainly of mege (Oav2) co

places.

mall streamf about 1.5

0.5 liters/sSurface wa

ng to obserm to 2.0 m

lassificationEMENTS OTIGATION arning Cent

T).

18-01-29

the

and

hed with

” to

5 m

eta-on-

ms. 5 li-

sec. ater

rva-be-

n of ON IN

tre,

LAND

REPORT DA NANG_

Landfil

Agv((

Figure 14:

Neither for land

DFILL SIT

_REV6_2018-01-29.DOCX

l liner

Liner 1 (topleachate (se

Liner 2 (wa

A GCL is a geomembravery low hy(leachate) o(Reference: http

Liner 3 (bot

Landfill cell 5 w

for the alrefill gas capt

TE ASES

p-liner): layee Figure 1

terproof mid

woven fabane and geydraulic conout of the laps://en.wikipedia

ttom-liner):

with top-liner (18

eady closedturing in pla

SSMENT

yer of rock4). Underne

d-liner): A g

ric-like matosynthetic,

nductivity. Tandfill. a.org/wiki/Geos

Clay.

8-2 mm rock wit

cells 1 - 2 ace (addition

T

32 - 88

(2-18 mm)eath this lin

geosynthetic

terial, primawhich inco

The resulting

synthetic_clay_li

th thickness of 0

nor for the nal informat

8

with a thicner the leach

c clay liner

arily used foorporates a g lower per

iner)

0.3 m) (Photo: W

open cells tion see cha

ckness of 0hate collect

(GCL).

or the lining bentonite ormeability s

WEHRLE)

3 - 5 are anapter 3.1.7.

0.3 m to filttion system

of landfillsor other claylows the ra

ny measure1).

Speicherdatum: 201

ter and collis situated.

. It is a kindy, which haate of seepa

ement statio

18-01-29

ect .

d of s a

age

ons

LAND

REPORT DA NANG_

3.1.6.3.

Accordihttp://woAugust)

The temtremely tion in th

Figure 15:

3.1.6.4.

Althougthe nonweighedactual w

NHW cnon-haz

The proQuestio

Ct

C0

DFILL SIT

_REV6_2018-01-29.DOCX

ENVIR

ng to availorldweather) is ~ 65 mm

mperature rahumid and

he landfill.

Climatological

WASTE

gh the landfin-hazardousd on enterinwaste amou

ould be muzardous me

ocess of duonnaire as fo

Cut and moto a new wa

Dump the flection syst

Continue to0.2 m soil c

TE ASES

ONMENTA

able meteor.wmo.int/en

m and durin

anges fromd hot, poten

Information for

E PLACEM

ill site is ops waste (Nng the landunt.

unicipal/domedical waste

umping the ollows:

ove the leacaste cell.

first waste ltem. Additio

o dump, levcovering lay

SSMENT

AL DATA

orological dn/home.htmg the rainy

25 to 34°Cntially enhan

Da Nang (Refer

MENT AND

en 24/7, theHW), whichfill site and

mestic solide (NHMW) a

waste has

chate pipelin

ayer up to onal 0.2 m s

el, and comyer on top.

T

33 - 88

data for Da ml), the ave

season (Se

C (see Figuncing the ra

rence: http://wo

DEPTH

e site operah has been re-weighed

d waste (Mand will be d

been expla

ne in the le

4 m height soil covering

mpact(1) was

8

Nang (Woerage rainfaeptember - D

re 15). Theate of waste

orldweather.wmo

ation is mosn collected d after havi

SW), non-hdeposited o

ained by UR

achate drai

in order tog layer on to

ste with a th

orld Weatheall during thDecember)

e site is there degradati

o.int/en/city.htm

stly done at and transp

ng dumped

hazardous on the landfi

RENCO in

nage hole b

protect anop.

hickness of

er Informatihe dry seas

is ~ 382 m

refore categion and lea

ml?cityId=234)

t daytime. Tported by Ud the waste

industrial will.

the comple

before dum

d cover the

f 2 m. Again

Speicherdatum: 201

ion Serviceson (Januarm.

gorized as chate gene

The trucks wURENCO, a, to detect

waste (NHIW

eted WEHR

mping waste

e leachate c

n an additio

18-01-29

e at ry -

ex-era-

with are the

W),

RLE

in-

col-

onal

LAND

REPORT DA NANG_

T

Tc

W

s

t

s

(1) D

The ope(see Fig

Figure 16:

DFILL SIT

_REV6_2018-01-29.DOCX

The next wing layer of

The final hecell 4 (52 m

Waste leveing the daysurface to e

In the procethe slope 3

HDPE covebe closed a

HDPE layesurface. During the site v

eration procgure 16):

Operation proc

TE ASES

waste layers0.2 m until

eight of all wm) and cell 5

lling: After dy. When theeliminate od

ess of bury:1.

ering: Is appand won’t re

er on closed

visit no "compa

cedure of t

cedure of non-ha

SSMENT

are set upthe final he

waste cells5 (52 m).

dumping, the truck is ledour emissio

ying the was

plied once teceive any m

d cells and

cting" machines

he landfill s

azardous landfil

T

34 - 88

continuouseight is achi

s are as foll

he waste is evelling theons.

ste, the fina

the cells hamore waste

landfill gas

s were visible, b

site for non

ll (Reference: E

8

sly to achievieved.

ows: cell 1

levelled ane waste, pro

al slope bel

ve reachede.

s capturing

but bulldozers

n-hazardous

EPA / URENCO

ve the heig

(36 m); cel

d compacteobiotics are

t around wa

their final h

pipework i

s waste (NH

- WEHRLE Que

ht of 2 m th

ll 2 (36 m);

ed(1) into a fe sprayed o

waste cells is

height. The

installation

HW) is sho

estionnaire)

Speicherdatum: 201

hen soil cov

cell 3 (44

flat landfill donto the wa

s levelled w

en the cells

on the HD

own as follo

18-01-29

ver-

m);

dur-aste

with

will

PE

ows

LAND

REPORT DA NANG_

Figure 17:

Waste ithe dumpactors

A figureof propesetting b

The depdumpinginduces

Trucks was of thwith soi

Since larainfall c

3.1.6.5.

DistribuURENCempty cURENC

DFILL SIT

_REV6_2018-01-29.DOCX

HDPE covering

is brought tmping area,) were not v

e for the dener compactbehaviour w

position andg takes pla

s strong odo

which transhe landfill wl at the end

arge areas can easily p

SLUDG

tion of surCO that surpcell 5 to theCO.

TE ASES

g on closed land

to the site e spread anvisible on K

nsity of the ing of the w

within the la

d incorporatace at variouour emission

sport cover were properd of each wo

of the opepenetrate an

GE PLACEM

rplus sludgeplus sludgee operated

SSMENT

dfill cell (Photo:

either with pnd levelled bhanh Son L

compactedwaste leadsandfill.

tion of the wus places ans as well a

material werly covered orking day.

rated landfind drench t

MENT

e was not e from the e

cells. Deta

T

35 - 88

WEHRLE)

pick-up trucby BulldozeLandfill site

d waste wass to conside

waste doesat the sameas the thin f

ere not visibwith soil. U

ill cells are the waste.

noticeableexisting leacails on the d

8

cks or with ers. Proper during the s

s not givenerably highe

not seem te time. The film plastic b

ble during tURENCO c

not covere

during thechate treatmdistribution

collecting vcompacting

site visit.

by URENCer filling vol

to follow a ssubsequen

bags being

he site visitconfirmed th

ed with geo

e site visit. ment facilitiof the slud

vehicles, it g machines

CO. Anyhowumes and

specific regnt spreadingblown away

t, neverthelehat the was

otextiles or

But it waes is pump

dge were no

Speicherdatum: 201

is unloadeds (waste co

w, the absencorrespond

ime, since g of the way by the win

ess some aste is cove

HDPE linin

s reported ped across ot provided

18-01-29

d in om-

nce ing

the aste nd.

are-red

gs,

by the by

LAND

REPORT DA NANG_

3.1.6.6.

Informanor obs

3.1.6.7.

The clorial has

CompacHDPE lthe site compac

3.1.6.8.

Conduitwere no

Alreadyprevent

3.1.7.

Since thand LFGforce to

3.1.7.1.

Landfill HDPE dging of t

A basicavailablfill cells.

It was mvestor fo

DFILL SIT

_REV6_2018-01-29.DOCX

BASE

ation on the erved durin

CAPPI

sed cells 1-partially be

ction of theiner) do novisit. Surfa

ction and ina

SURFA

ts around tot visible.

y filled landft the infiltrat

LANDFIL

he dumpingG are expe encourage

LANDF

gas (LFG) degassing pthe pipes w

c gas captue as wheth. Methane r

mentioned bollowing a t

TE ASES

LINING

base liningng the site v

NG LAYER

-2 were coveen applied.

e waste bodt appeared ce (rain) waadequate g

ACE WATE

he filled an

fill cells or ation of rain w

L GAS AND

g of waste ected to be e the local a

FILL GAS

discharge pipes are no

with debris.

uring systemer proper L

rich landfill g

by URENCOtender in 20

SSMENT

g of the landvisit.

R

vered with a.

dy and stabto be very

ater puddlesrading (see

ER MANAG

nd covered

areas that awater.

D LEACHA

on Khanh an issue d

authorities to

pipes wereot equipped

m is not in FG wells hagas is relea

O, that the 017.

T

36 - 88

dfill cells 1-

a HDPE line

bility of the good. Sign

s on the HDe Figure 18)

EMENT

landfill cel

are not yet

ATE

Son Landfiduring the no improve th

e installed td with a 180

place or if ave been in

ased into the

LFG captu

8

5 was not p

er. Soil as a

soil coverinns of surfacDPE of cell ).

ls, to collec

operated a

ll site will cnext 20 to 3he environm

to degas th0° pipe ben

it is, it wasnstalled dure atmosphe

ring / utiliza

provided by

an interim o

ng layer (sue subsiden1-2 are indi

ct and dive

are protecte

continue un30 years. Tmental situa

e closed cend (see Figu

sn’t visible.ing the fillin

ere (↑ GWP

ation will be

y the landfill

or permanen

uspected tonce were obicators for t

rt storm-wa

ed with HDP

ntil 2021, lahis should

ation on this

ells (see Fiure 19) to a

. There is nng progresseP).

e awarded t

Speicherdatum: 201

l managem

nt cover ma

o be under bserved durhe poor wa

ater into du

PE liner wh

ndfill leachbe the driv

s landfill site

igure 18). Tavoid the clo

no informates of the la

to a private

18-01-29

ent

ate-

the ring aste

ucts

hich

ate ving e.

The og-

tion nd-

in-

LAND

REPORT DA NANG_

Figure 18:

Figure 19:

DFILL SIT

_REV6_2018-01-29.DOCX

HDPE covering

Exemplarily lan

TE ASES

g with degassing

ndfill site with LF

SSMENT

g pipes on close

FG discharge pi

T

37 - 88

ed landfill cell (P

ipes with 180° p

8

Photo: WEHRLE

pipe bend (Phot

E)

o: WEHRLE)

Speicherdatum: 20118-01-29

LAND

REPORT DA NANG_

In the poperateorganic utilizatio

Concepnomicalunits is

Figure 20:

3.1.7.2.

The conwould athe biog

Both cotribute tportant

In Figurgas pipe

DFILL SIT

_REV6_2018-01-29.DOCX

previous SSed cells 1-3

matter in ton with a lar

pts with staglly preferenno longer p

Estimated LFG

LANDF

nstruction oallow for thegas to an en

ombustion oto a reductaspect in te

re 21 the pe work are s

TE ASES

SLTS Repowas estim

he cells wilrge CHP pla

ged CHP unces. Duringpossible, the

G release (Refer

FILL GAS C

of landfill gae degassingnergy recov

options, thetion of metherms of the

rincipal of lshown.

SSMENT

ort from 201ated to decl be digesteant installat

units may hg the final e remaining

rence: Prelimina

COLLECTIO

s (LFG) colg process overy plant (e

installationhane-rich lavary high g

locating wa

T

38 - 88

15 for Khancrease dramed, the totation over the

elp to operphase, whe

g landfill gas

ary Feasibility S

ON OPTION

llection welof the landfie.g. CHP) o

n of CHP uandfill gas

green-house

aste-buried

8

nh Son Lanmatically unl amount ofe entire per

rate the lanen an econs has to be

tudy SSLTS)

NS

ls connecteill cells in ar flare syste

nits and theescaping in

e-potential o

pipes as w

ndfill site, thntil 2024 (sf LFG will nriod of time.

ndfill gas utnomic operaflared off.

ed to a netw controlled

ems.

e installationto the atmof Methane

well as the g

he LFG relesee Figure 2not allow an

tilization plaation of eve

work of comand safe w

on of a flaremosphere. T

(CH4).

gas wells w

Speicherdatum: 201

ease from 20). Since n economica

ant under een small C

mmon drainaway, deliver

e system, coThis is an

with connec

18-01-29

the the ally

co-HP

age ring

on-im-

ted

LAND

REPORT DA NANG_

Figure 21:

Landfill landfill i~20 tim

Economgas engsuppliedture.

Figure 22:

DFILL SIT

_REV6_2018-01-29.DOCX

Location of gas

gas collectinto the atmes lower tha

mically moregine which id to the ele

LFG collection

TE ASES

s wells in landfil

tion and flarmosphere. San for CH4,

e sensible is coupled wctric power

and utilization p

SSMENT

ls (Reference: W

ring is an aSince the grthe oxidatio

s the utilizawith a gener

grid or use

principle (Refere

T

39 - 88

WEHRLE)

ppropriate reenhouse on of the LF

ation of the rator (see F

ed on site fo

ence: WEHRLE

8

method to agas potent

FG in a flare

LFG for thFigure 22). Tor providing

E)

avoid Methaial (GHG) oe is a must.

e productioThe produce power for t

ane (CH4) rof Carbon D

on of electriced electric the landfill

Speicherdatum: 201

release fromDioxide CO2

c energy benergy cansite infrastr

18-01-29

m a

2 is

y a be

ruc-

LAND

REPORT DA NANG_

3.1.7.3.

During t

It was mleachatetem contreatme

Althougseeps ftransfer

Figure 23:

URENC(until 08ment plNoi).

On site entire pas follow

The leaand thetreatmethe sep

DFILL SIT

_REV6_2018-01-29.DOCX

LANDF

the site visit

mentioned e drainage nducts leac

ent area. Th

gh a properfrom the disrring surplus

Leachate spilla

CO has bee8/2016 the ant was bu

URENCO rocess hadws:

chate treatme householdent process tic tanks) in

TE ASES

FILL LEAC

t in 11/2016

by URENCsystem and

chate from ae pump sta

r leachate csposed wass sludge fro

age due to impro

en responsicompany Q

uilt 2006-20

presented t already be

ment systemd waste wat

starts with n the Collec

SSMENT

HATE / LEA

6 the existin

CO that thed that 100 %all waste ce

ation include

capturing sste (see Figom the leach

oper leachate ca

ible for the Quoc Viet o07 by the c

the leachateeen presente

m of Khanhter brought the collecti

ction Tank.

T

40 - 88

ACHTE TR

ng leachate

e bottom of % of the lanells to a coes 2 pumps

system wasgure 23). Ahate treatm

apturing system

operation perated thecompany S

e treatmented in the pr

h Son Landf(from the s

ion of both The mixed

8

REATMENT

capturing a

f all cells wndfill leachaollection po

and one el

s said to exvisible pipeent plant to

m (Photo: WEHR

of the leace leachate tEEN (Vietn

t plant of Khrevious SSL

fill treats boseptic tanksthe leachat leachate a

and treatme

was equippeate was capnd. From thectrical boa

xist, it was e laid direct

o the landfill

RLE)

chate treatmtreatment pnamese com

hanh Son LLTS Report

th the leachs) to the sitete and housand househ

ent system w

ed with PE ptured. Thehere, it is pard.

noticeable tly on top o (see Figure

ment plant splant). The lmpany, hea

Landfill only from 2015

hate from the by vacuusehold was

hold waste w

Speicherdatum: 201

was analyse

covering ae collector spumped to

that leachof liner 1 is e 14).

since 09/20eachate tre

ad office in

briefly but and explain

he landfill ceum trucks. Tte water (frwater will th

18-01-29

ed.

and sys-the

ate for

016 eat-Ha

the ned

ells The rom hen

LAND

REPORT DA NANG_

be pumthe anatation pmentatioagain a sedimenmetals) After thestored aStudy SSL

The ent

Figure 24:

Specificthe efflumeet dicharged

In additate treaple livin

Leactank)

A

DFILL SIT

_REV6_2018-01-29.DOCX

ped into anerobic procrior to beinon pond, thsettling age

ntation tankfollowed by

e third sediat the final LTS).

tire process

Leachate treatm

c plant parauent from tischarge limd into the ne

ion to the patment procg nearby th

chate coll)

Anaerobi

Aerosedimanox

TE ASES

n Anaerobiccess, chemig allowed t

he clear waent is addek, the clear y an aerateimentation tpond, and

s of the leac

ment process o

meters werhe leachate

mits standaearby Phu L

pollution of tesses also

he site.

ection an

ic phase

obic phasmentatioxic tank, a

Dischargnearby P

SSMENT

Cover Lagcals will be o flow (by gter will be fd before flofraction of t

ed tank (to atank the trethen finally

chate treatm

n Khanh Son La

re not provide treatmentrds (not proLoc River.

the river by cause sign

nd storag

(Anaerob

se (succen tanks, calgae, aer

ge pond aPhu Loc R

T

41 - 88

goon where added to th

gravitation) further treatowing into ththe liquid wadd oxygeneated water y released i

ment plant is

andfill (Referen

ded by UREt plant is veovided by U

the poorly tnificant odou

ge (buffer

bic tank)

ssion ofchemicalrobic tan

and releasRiver

8

the bulk of he leachateto the first

ted in Anoxhe second s

will be treaten) and then

will flow thnto the env

s shown in t

ce: Preliminary

ENCO. But ery poor (sURENCO).

treated leacur emission

addingsk)

se to the

the organic/waste watesedimentat

xic fermentasedimentatied in an algflow to the rough three

vironment. (

the following

Feasibility Stud

it became oee Figure 2The treate

chate, the ans which are

,

c matter is der to acceletion pond. A

ation tank, aon tank. Aftae tank (to third sedim

e open pon(Reference: Pre

g Figure 24

dy SSLTS)

obvious tha26) and wil

ed landfill le

anaerobic / e a nuisanc

Speicherdatum: 201

digested. Aferate sedimeAfter the seand then onter the secoabsorb hea

mentation tads and will

eliminary Feasib

4:

t the qualityll certainly

eachate is d

aerobic leace for the pe

18-01-29

fter en-edi-nce ond avy

ank. be

bility

y of not dis-

ch-eo-

LAND

REPORT DA NANG_

Figure 25:

Figure 26:

DFILL SIT

_REV6_2018-01-29.DOCX

Aeration basin

Discharge qual

TE ASES

of the leachate

lity of the treate

SSMENT

treatment plant

d leachate (Pho

T

42 - 88

t (Photo: WEHR

oto: WEHRLE)

8

RLE)

Speicherdatum: 20118-01-29

LAND

REPORT DA NANG_

During tthat the2017 an(3.86 mcence wm³/d anthe systered witincrease

3.1.7.4.

The dis2009/BTregulatioof solid

In the reate of s10 below

Table 10: T2009/BTNM

N

1

2

3

4

Colleacwat

Colleacwat

Colleacwat

DFILL SIT

_REV6_2018-01-29.DOCX

the site vise existing lend that the

million USD)was grantednd meet the tem is in opth HDPE we while the

DISCH

scharge stTNMT whicon stipulatewaste land

egulation Qsolid waste w):

The maximum aMT)

No.

BOD

COD

Tota

Amm

lumn A spchate of soter supply p

lumn B1 prchate of soter sources

lumn B2 schate of soter sources

TE ASES

it and durineachate treaupgrade wi) is annound; constructQCVN disc

peration. Towhile 7 ha a

concentrati

ARGE STA

tandards foch is the nates the maxifills when d

QCVN 25 thelandfills dis

allowable conce

Paramet

D5 (20°C)

D

al Nitrogen

monium, by

pecifies maxolid waste lpurpose;

rescribes molid waste la

not used fo

pecifies maolid waste la

not used fo

SSMENT

ng the followatment planill be paid e

nced to havtion should charge stano be noticedre still openons of the l

ANDARDS

or treated tional technmum allowischarged i

e maximumscharged in

entration of pollu

ters

y N

ximum perandfills wh

maximum peandfills opeor domestic

aximum peandfills newor domestic

T

43 - 88

w up meetint with an aentirely by tve been alre

have startendard. Howed: The landn. Thus, duleachate wi

FOR LAND

leachate nical regulatable concento the rece

m permittednto the rece

ution parameter

Maxim

A

30

50

15

5

rmitted conen discharg

ermitted coerated beforc water supp

ermitted conwly built fromc water supp

8

ngs with thactual capache city of Deady approed in 4/2017ever, in reafill is not coring the raill decrease

DFILL LEAC

from landftion on leacntration of teiving sourc

concentrateiving sourc

rs in leachate of

mum allowa

centration ged into wa

oncentrationre January ply purpose

ncentration m January ply purpose

e local authcity of 450

Da Nang. A oved for this7). The implity, this can

overed fully,ny season, .

CHATE

fills are rechate from sthe pollutionce.

ion of polluce is specifi

f solid waste lan

able conce

B1

100

400

60

25

of the pollater source

n of the pol01, 2010 w;

of the pol01, 2010 w.

horities it wm³/d will bbudget of 8

s upgrade (proved plantn only be co, i.e. only 5 the leacha

egulated bsolid wasten paramete

tion parameied as follow

ndfills (Referenc

entration (m

B

5

3

6

2

lution paraes used for

llution parawhen discha

lution parawhen discha

Speicherdatum: 201

was mentione upgraded88 billion V(Investmentt will treat 5onfirmed on.5 ha are c

ate volume

y QCVN e landfills. Ters in leach

eters in leaws (see Ta

ce: QCVN 25:

mg/l)

B2

50

00

60

25

meters in domestic

ameters in arged into

meters in arged into

18-01-29

ned d in ND t li-500 nce ov-will

25: This ate

ch-able

LAND

REPORT DA NANG_

3.1.7.5.

BIOLOG

The typpre-denblend owastewtransfermonia. A

The firsanoxic crease ttrophic denitrificcomes i

The denstabilizinot nee

DFILL SIT

_REV6_2018-01-29.DOCX

LEACH

GICAL TRE

pical applicanitrification tof water an

water (landfir system, usA further de

Figure

t biological conditions the rate of dbacteria utcation is nointo effect th

nitrification ng the pH.

ed to be ox

TE ASES

HTE TREAT

EATMENT

ation for an tank followe

nd microorgll leachate)sing jet aerescription of

e 27: Combinati

process stein a denitridenitrificatiotilize this caormally reqhe plant wil

process saThe biodegidised in th

CNO3 54

SSMENT

TMENT UP

aerated bioed by a dowganisms (ac to produce

rators, provif the biolog

ion of biological

ep is a pre-ification veson an externarbon sourcquired to ml denitrify us

aves energygradable mae later nitri

HC 4

T

44 - 88

GRADE OP

ological treawnstream nctivated slue a high quides oxygenical process

l treatment and

denitrificatiossel using nal carbon ce to reduceet the totsing the ava

y and chematter which ification pro

ba hicheterotrop

Denit

8

PTIONS

atment procnitrification tudge) whichuality treaten for the bios is below (

UF for sludge s

on. This is areadily biodsource (e.g

ce nitrate toal N dischaailable BOD

micals (e.g. cis consume

ocess. This

N 2acteria 2

trification

cess for landtank. Theseh work on d effluent. odegradatiosee also Fig

separation (Refe

a natural prdegradable

g. acetic acido moleculararge conseD in the leac

caustic soded in the de

reduces ae

CO2 42

dfill leachate process vthe contamA highly efon of COD/gure 27):

erence: WEHRL

rocess takin organic md) can be ar nitrogen. Aent. Howevechate.

da) otherwisenitrificationeration ene

OH 24

Speicherdatum: 201

e comprisevessels holdminants in fficient oxyg/BOD and a

LE)

ng place undmaterial. To added. HeteA high rateer, before t

se required process do

ergy consum

18-01-29

s a d a the

gen am-

der in-

ero-e of this

for oes mp-

LAND

REPORT DA NANG_

tion. In caustic

The actis oxidiznitrite. Tis biolog

The contion sysby an extored ansures ef

By definria/biombio-oxidmoved o

ULTRA

The ultrtrue UFprovides

The ‘mixlar memand anysafely re

The tubtion (MLsmaller

DFILL SIT

_REV6_2018-01-29.DOCX

addition, assoda for pH

tivated sludzed in two Then nitrite-gically remo

ncentration stem, locatexternal blownd used to fficient oper

nition, all bimass that hadation of caon a regula

FILTRATIO

rafiltration pF tubular mes the comp

xed liquor’ mbranes in oy COD frometained with

bular membLSS) compbioreactors

TE ASES

s alkalinity H-stabilizatio

ge is then tstages: Fi

-oxidizing boved.

of oxygen ed inside thewer. The discontrol ope

ration with l

ological treaas grown d

arbohydratear basis to m

ON

plant is basembrane mlete retentio

of activatedorder to sepm suspendhin the syste

rane modulpared to oths and reduc

SSMENT

is recovereon.

transferred rst, ammonacteria (nitr

2

4

2

32

ONO

ONH

in the nitrifie bioreactorssolved oxyeration of thower expen

atment procduring the ws contained

maintain the

ed on a sidmodules. Thon of bioma

d sludge anparate the t

ded solids mem and are

les allow thher membr

ced volume

T

45 - 88

ed during de

to the nitrifnia-oxidizingrobacter) ox

Nitrif

Nitrobacte

2

Nitrosomo2

O

O

ication tankr, continuouygen (DO), he blowers nditure on e

cesses creawaste waterd in the wa

e desired slu

de-stream che use of thass.

d effluent istreated wasmaterial, ple continuous

he operationrane systemof the wast

8

enitrification

fication tankg bacteria xidize nitrite

fication

3re

2ason

2

2

NO

NO

k should ranusly aeratespH and temto maintain

energy.

ate excess r treatment

aste water. udge conce

crossflow mhe tubular m

s pumped frste water frous macro-msly fed back

n at much hms. This cate sludge to

n, this elimin

k. In the nitr(nitrosomon

e to nitrate.

2 42 OH

nge betwees the biomasmperature inn the desire

‘sludge’. Thprocess an

The excessntration and

membrane fimembrane

rom the bioom the activmolecules ak, as retenta

higher mixedan provide

dewater.

nates the re

rification tanas) oxidizeIn the same

4 H

en 1–3 mg Oss with air bn the bioreaed residual

he latter, in nd is a by-s sludge ned sludge ag

iltration promodules (s

oreactor throvated sludgand colloidate, into the

d liquor solmajor cost

Speicherdatum: 201

equirement

nk ammonie ammoniae reactor CO

O2/L. An aebeing providactor are mo DO. This e

fact, is bacproduct of eeds to be ge.

ocess by ussee Figure 2

ough the tuge. All bacteal matter, a

e bioreactor

ids concentt savings, e

18-01-29

for

um a to OD

era-ded oni-en-

cte-the re-

sing 28)

bu-eria are

r.

tra-e.g.

LAND

REPORT DA NANG_

Figure 28:

Figure 29:

The UFUF-looppending

Each Ucrossflo

The sidsystemsplaceme

Occasiovia the wclean thmated awhile th

Compartration ptainer. Cduring t

Figure 3balancinthroughUF memcalled rclean ef

DFILL SIT

_REV6_2018-01-29.DOCX

(left) Tubular m

(right) UF-loop

system typp. The comg on the req

UF-loop hasow velocity a

e-stream cs, thus requents.

onally the Uwash pump

he membraand require

he remaining

red to otheplants are dConsequenthe operatio

30 shows tng tank, fol

h the manifombranes whretentate) isffluent. Figu

TE ASES

membrane modu

with dedicated

pically consplete ultraf

quired throu

s a dedicatalong the m

rossflow pruiring much

UF membrap by using wnes can bees only ming loops are

r membrandesigned astly the oper

on and clean

the typical slowed by th

old of the UFhich are cons recirculateure 31 show

SSMENT

ule (Photo: WEH

circulation pum

ists of 2 - 6iltration plaghput.

ted circulatimembrane, t

rocess offerh less mem

ne moduleswater or pee dosed intonimum attenin operatio

e systemss a closed rator does nning proced

set-up of a he bioreactoF loops. Eannected in sed back intws an MBR

T

46 - 88

HRLE)

mp (Photo: WEH

6 tubular meant can com

ion pump (to reduce fo

rs very highmbrane area

s will need rmeate stor

o the wash ntion. The n.

(e.g. with sloop system

not get in codure, and no

Membraneors. Form th

ach of the Useries. Theo the bioloplant for lea

8

HRLE)

embrane momprise seve

(see Figureouling and m

h permeatea and subs

to be rinsered in the wtank. The rindividual U

submersiblems and areontact with o aerosols a

e Bio Reacthe bioreactF loops circ released flgy. The soachate treat

odules conneral UF-loop

e 29) sizedmaintain a h

flux, compstantial cost

ed or cleanewash tank. Arinse and cUF loops c

e membranee located inany activateare produce

tor (MBR) pors, the actculates the ow from thelids-free petment.

nected in seps operatin

d to providehigh permea

pared to otht savings fr

ed. This canAny chemic

clean procedcan be rinse

es), the cronside a builded sludge oed.

process begtivated sludactivated se UF memb

ermeate is d

Speicherdatum: 201

eries to formg parallel, d

e the requiate flux.

her membrarom future

n be achievcals neededdure are aued or clean

ossflow ultrading or a coor waste wa

ginning withdge is pumpludge over branes (thedischarged

18-01-29

m a de-

red

ane re-

ved d to uto-ned

afil-on-

ater

h a ped the so as

LAND

REPORT DA NANG_

Figure 30:

Figure 31:

DFILL SIT

_REV6_2018-01-29.DOCX

Membrane Bio

Membrane Bio

TE ASES

Reactor proces

Reactor plant (

SSMENT

ss (Reference: W

(Reference: WE

T

47 - 88

WEHRLE)

EHRLE)

8 Speicherdatum: 20118-01-29

LAND

REPORT DA NANG_

3.1.8.

Next to operatiocapacitythe SW 10 % ba

Currentfactory f

Figure 32:

DFILL SIT

_REV6_2018-01-29.DOCX

MECHAN

the Khanh on in 2015 wy was steadrecycling p

ack to the la

tly the operfor site visit

Gate of the Me

TE ASES

ICAL WAS

Son Landfiwith a capadily increaseplant can reandfill.

ation of thets was denie

echanical Waste

SSMENT

STE TREAT

ll, there exiscity of 50 toed and rangcycle maxim

e SW recyced.

e Treatment Pla

T

48 - 88

TMENT PLA

sts a SW reons/day of Sged around mum about

cling plant is

nt (Photo: WEH

8

ANT BESID

ecycling plaSW for trea200 tons/d90 % of rec

s stopped f

HRLE)

DE KHANH

nt (see Figutment and ray in late 2ceived SW

for unknown

SON LAND

ure 32). Therecycling. T015. It wasamount and

n reasons.

Speicherdatum: 201

DFILL SITE

e plant starThe through

expected td would ret

Access to

18-01-29

E

rted put hat urn

the

LAND

REPORT DA NANG_

3.2. H

3.2.1.

On AugUBND oNhon colowing a

Article complexKT03/03

I. Locat

1. Locat

2. Borde

Bordersfollowin

- The Ea

- The W

- The So

- The N

3. Scale

- Total p

II. Land

1. Plann

ConstruDifferen

- Manag

- Domes

- Indust

- Constr

- Hazard

- Landfi

- Infrast

- Trees

2. Detai

DFILL SIT

_REV6_2018-01-29.DOCX

OA NHON

MASTER

gust 3rd 201on approvaommune, Harticles are

1. Approvex in Hoa N3 prepared

tions, bord

tion: Area b

ers for land

s for land ug limits:

ast border

West border

outh border

orth border

e:

planning are

d use plann

ning conten

uct solid want functional

gement offic

stic solid wa

trial waste re

ruction was

dous waste

lls and land

tructure con

for isolation

iled land us

TE ASES

SOLID WA

PLAN OF S

16, Da Nanl of a detai

Hoa Vang dcovered:

e the detaiNhon commby Urban P

ders and pla

belongs to H

use:

se are defi

: Hill/Mo

: Electric

r : Plannin

r: Hill/Mount

ea: 1,001,3

ning:

nt:

aste treatml zones incl

ce

aste recycli

ecycling pla

ste treatmen

e treatment

dfill cells

nnecting wo

n and lands

se planning:

SSMENT

ASTE TRAT

SW TREAT

ng City Peled Master istrict with a

led construmune, attacPlanning Ins

anning sca

Hoa Nhon c

ned by the

ountain

cal Safety C

ng road B =

tain

39 m2

ment compleuded:

ng plant

ant

nt zone

zone

orks

scaping tree

T

49 - 88

TMENT CO

TMENT CO

ople's ComPlan 1: 500

a total area

uction mastched the dstitute (UPI)

ale:

commune, H

points: R1

Corridor 500

= 16.5 m

ex with mo

es.

8

MPLEX (IN

MPLEX IN

mmittee (DP0 for the soof 1,001,33

ter plan, radetailed ma) with the fo

Hoa Vang ru

, R2, …, R

0 kV

odern and e

PLANNING

HOA NHON

PC) issued olid waste tr39 m². With

tio 1:500 foaster plan wllowing mai

ural district,

R19 (attache

environmen

G)

N AREA

Decision Nreatment coh this Maste

for solid wawith ratio 1in content:

Da Nang C

ed drawing

ntally-friend

Speicherdatum: 201

No. 5230 Qomplex in Her Plan the

aste treatm1:500, sym

City.

) and with

ly technolo

18-01-29

QD-Hoa fol-

ent bol

the

ogy.

LAND

REPORT DA NANG_

Table 11: L

III. Tech

Before csultantslection aban wadocume

Article

- Either and coo

- DoNRmaster Environ

- Peoplewith relaplan acdeadlinesion.

- DoC aplan acc

Article

Article Departmtee of Hregisterbe resp

DFILL SIT

_REV6_2018-01-29.DOCX

Land use balan

hnical infra

conducting s to prepareand treatme

ater supply)ents should

2.

the investooperating w

RE is assignplan; studymental Imp

e’s Commitated organcording to re for planni

and Peoplecording to a

3. This Dec

4. Office Mment of TranHoa Vang rured land offonsible for

TE ASES

ce table for Hoa

astructure s

the next coe the technient to meet and submbe sent to

or or the owith UPI in im

ed to instruy on the apppact Assess

ttee of Hoa isations for regulationsing announ

e’s Committassigned fun

cision shall

Manager of tnsport (DoTural district; ice of Da Nimplementi

SSMENT

a Nhon waste tr

system pla

onstruction cal infrastrut the standa

mit to DoC fDoC by late

wner has to mplementing

uct land procpropriate lansment and s

Vang ruralborder dem

. The deadlcement is n

ee of Hoa nctions and

take effect

the People'T), DPI, DepChairman o

Nang City; Gng this Dec

T

50 - 88

reatment comple

anning:

steps, eitheucture plannards for disfor appraisaest 25 days

conduct bag border de

cedure accondfill in ordesubmit for a

l district is amarcation, line for bordnot more th

Vang rural d tasks.

from the da

's Committepartment ofof People’sGeneral Dircision. /.

8

ex (Reference:

er the invesning documcharging toal and appafter issuin

asic construemarcation a

ording to reer to eliminpproval.

assigned topublic listinder demarc

han 20 days

district are

ate of signin

ee, Directorf Finance (D Committee

rector of UP

UPI Master Pla

stor or the oments with tho external soroval accor

ng this Decis

uction stepsas approved

egulations aate environ

o be the leang and annocation is nots from the s

e assigned t

ng.

rs of all DepDoF); Chairme of Hoa NhPI and all re

an)

owner has tohe focus onource (relatrding to regsion.

s according d.

according tonmental poll

ad agency aouncement t more thansigning date

to manage

partments: man of Peo

hon commuelated orga

Speicherdatum: 201

o contact con leachate cted to safe gulations. T

to regulatio

o the approvlution; prepa

and cooperthe approv

n 15 days, e of this De

the approv

DoC, DoNRople’s Commne; Directornizations sh

18-01-29

on-col-ur-

The

ons

ved are

rate ved the eci-

ved

RE, mit-r of hall

LAND

REPORT DA NANG_

Figure 33:

On SepNo. 219Nhon Cto split t

- Projecof constthe land

- Projecjects in of techning MSWcollectioThe proation ea

- Projeccycling and a h

DFILL SIT

_REV6_2018-01-29.DOCX

Detailed maste

ptember 22n

99 / SKHDTCommune, Hthe expendi

ct “Road to truction of t

dfill.

ct “Infrastruinfrastructu

nical infrastW and hazaon and treaoject shouldarly in 2019

ct “SW treatzone an inazardous w

TE ASES

er plan with ratio

nd 2016, DeT-KTDN, whHoa Vang diture for the

the new latransportati

cture in theure construcructure for ardous wasatment syst aim at givi.

tment Comndustrial wawaste treatm

SSMENT

o 1:500, symbol

epartment ohich reportsistrict, in wh

e SW treatm

ndfill in Hoaon projects

e new landfction and urthe new lan

ste landfill ctem); worksng priority t

plex in Hoaaste recycliment zone.

T

51 - 88

KT03/03 (Refe

of Planning s on the conhich DPI pr

ment comple

a Nhon Cos will be the

fill in Hoa Nrban develondfill includcells, leachas infrastructo the const

a Nhon Comng zone a

8

erence: UPI Mas

and Investmnstruction ooposed to D

ex into three

mmune”: Te investor fo

Nhon Commopment shaling: execut

ate collectiocture connetruction of 1

mmune”: incconstructio

ster Plan)

ment (DPI) of the SW trDa Nang Pee projects:

he Project or the cons

mune”: The ll be the invive’s office;

on and treatection; trees1 sanitary la

cluding a doon demolitio

issued the reatment coeople’s Com

Managemestruction of

PMU of investor for th sanitary latment systes and landsandfill to be

omestic waon waste tr

Speicherdatum: 201

Official Letomplex in Hmmittee (DP

ent Unit (PMa new road

vestment pe construct

andfills (inclem, landfill gscape desi put into op

ste / MSW reatment zo

18-01-29

tter Hoa PC)

MU) d to

pro-tion ud-gas gn.

per-

re-one

LAND

REPORT DA NANG_

3.2.2.

Meanwhoriginal duced tthat so plot and

3.2.2.1.

The SWSon Lan

At prese2015). Bwaste a

3.2.2.2.

The newdriven d

The treahazardoticated t

O

3.2.2.3.

When vThe eximation o

For the required

Currentshows a

DFILL SIT

_REV6_2018-01-29.DOCX

UPDATE

hile the new100 ha. In o 70 ha butfar no exac

d its exact lo

EXPEC

W treatmentndfill is clos

ent 730 tonBased on th

amount is ex

SITE L

w SW treatdistance to t

atment comous industritreatment c

Processing

Increased r

Optimisatio

Make use o

Reduced di

SITE H

visiting the psting narrowon the site

new SW td to provide

tly a gradeda photo of th

TE ASES

OF MASTE

w site for trecent meet will still bect area planocation with

CTED MSW

t complex insed.

ns/day (335he projectexpected to e

LOCATION

tment compthe Khanh S

mplex will beal waste, n

concepts the

all types of

recycling rat

on of operat

of synergies

isturbance o

HISTORY

proposed siw road runhistory was

reatment coe better acce

d area of thehe rubble p

SSMENT

ER PLAN O

he SW Treetings with e on the samnning drawihin the origin

W VOLUME

n Hoa Nhon

,625 tons/yd growth ofexceed 1,00

plex in HoaSon Landfil

e designed on-hazardoe new site w

f waste

tes

ing costs

s between d

of nearby p

te in Hoa Ns through a

s not provide

omplex, theess for veh

e proposed rocessing p

T

52 - 88

OF SW TRE

eatment Cothe stakehome locationng is availanal 100 ha

n will receiv

year) of MSWf the popula00 tons/day

a Nhon will l is ~ 6 km (

to processous medicalwill offer the

different was

opulation.

Nhon in Novagricultural ed by UREN

e expansionhicles, partic

site in Hoaplant as see

8

EATMENT C

mplex will olders it wan. The Urbaable yet. Hearea have s

ve the entire

W are geneation to 1,6y.

be in ~ 20(~ 2 km line

s all types ol waste, con

e following b

ste treatme

vember 2016land with s

NCO.

n of roadscularly large

a Nhon is usen in in 11/2

COMPLEX

comprise os confirmed

an Planning ence neitheso far been

e amount o

erated by 100,000 res

0 km distanear distance

of waste (e.nstruction wbenefits:

nt processe

6 the accesscattered se

inmidst thise trucks.

sed for rubb2016.

IN HOA NH

only 70 ha d that the a Institute (U

er the shapeconfirmed.

of waste on

,046,876 reidents in 20

nce to Da Ne).

.g. municipawaste etc.).

es

ssibility by rettlements.

s agricultura

ble process

Speicherdatum: 201

HON AREA

instead of area will be UPI) confirme of this 70

nce the Kha

esidents (ba020, the MS

Nang city. T

al waste, noUsing soph

oad was poSpecific inf

al land will

sing. Figure

18-01-29

A

the re-

med ha

anh

ase SW

The

on-his-

oor. for-

be

34

LAND

REPORT DA NANG_

Figure 34:

3.2.2.4.

An EnviLaw, 27

The pursider thHoa Nhimpact physicataken anot requmakers of detai(Reference

(Reference

DFILL SIT

_REV6_2018-01-29.DOCX

Rubble process

ENVIR

ironmental 7 Dec, 1993

rpose of thee environm

hon. The Inassessmen

al, social, annd commitmuire adhereto account

led environe [1]: https://en.

e [2]: https://en.

TE ASES

sing plant at Ho

ONMENTA

Impact Ass3).

e environmemental impa

ternational nt as "the pnd other relements madence to a pret for environmental studwikipedia.org/w

wikipedia.org/w

SSMENT

oa Nhon site (Ph

AL ASPECT

sessment (E

ental impaccts when dAssociation

process of evant effecte" [1]. Enviedetermine

nmental valudies and puwiki/Environment

wiki/Environment

T

53 - 88

hoto: WEHRLE)

TS

EIA) study is

ct assessmeeciding to gn for Impacidentifying,

ts of develoronmental i

ed environmues in theirblic commetal_impact_asse

tal_impact_asse

8

)

s required (

ent (EIA) is give approvct Assessm predicting

opment propimpact asse

mental outcor decisions aents on the pessment_-_cite_

essment_-_cite_

(according E

to ensure thval for the Sent (IAIA) d, evaluatingposals prioressments aome, but ratand to justifpotential en_note-2)

_note-3)

Environmen

hat decisionSW treatmedefines an g and mitigr to major deare unique ither they refy those denvironmenta

Speicherdatum: 201

ntal Protect

n makers coent complexenvironmen

gating the becisions ben that they

equire deciscisions in li

al impacts [2

18-01-29

tion

on-x in ntal bio-eing

do sion ght 2].

LAND

REPORT DA NANG_

3.2.2.5.

Apparenjudged t

In particall area

The suifore sta

3.2.2.6.

The proroundininstallat

Since tha storm

DFILL SIT

_REV6_2018-01-29.DOCX

GEOLO

ntly the geto be critica

cular, the ro(e.g. for ex

tability of thrting with th

HYDRO

oposed newg rising tertions, also c

he Hoa Nho water conc

TE ASES

OGICAL AS

ological sital (rocks etc

ocky subsoixcavation wo

he terrain mhe developm

OLOGICAL

w landfill siterrain can cocan storm w

on area is ccept) is requ

SSMENT

SPECTS

uation at thc. in the und

l can lead torks) and th

must be exament phase

L ASPECTS

e in the Hoaollect storm

water infiltrat

close to oneuired.

T

54 - 88

he proposederground).

to difficultieshus to highe

mined closee.

S

a Nhon aream water whi

te into the p

e of Da Nan

8

ed new lan

s in the infraer costs for

ely and con

a is situatedch would t

planned lan

ng city’s wa

dfill site in

astructural civil works.

nfirmed by g

d in midst a hen flow todfill.

ater reservo

Hoa Nhon

developme.

geological s

hilly landscowards the

oirs, further

Speicherdatum: 201

n area can

ent of the ov

site survey b

cape. The sprojected s

research (e

18-01-29

be

ver-

be-

sur-site

e.g.

SUSTSYST

REPORT DA NANG_

4. SUS

4.1. DA

Da Nanwith a s

In this csustainaable urb

A sustawaste cposal sy

4.2. IM

Alreadyhad chobilities ether dist

For thischanicaComple

For the propose

Wa

RD

Me

RD

RD

The maall treatwith the

TAINABLTEM FOR

_REV6_2018-01-29.DOCX

TAINABLE

A NANG’S

ng, the fourtstrong comm

context andable waste ban develop

ainable wascollection – ystem.

MPLEMENT

y while workosen DoNRexist to conturbances a

s reason theal-Biologicalex but also f

implemented (see also

aste accepta

DF bailing (P

chanical bio

DF utilization

DF utilization

ain benefit otment procee most esse

LE WASTR DA NA

E WASTE M

OBJECTIV

th largest cmitment to b

in additionmanageme

pment.

te managein particula

TATION OF

king on this RE und URE

tinue operaand contam

e present stl Treatmentfor Khanh S

ation of theo Figure 35)

ance, scree

Phase 1 - S

ological trea

n e.g. in cem

n in related

of this graduess have toential steps,

TE MANANG

MANAGEME

VE

city in Vietnbecoming a

to numeroent system i

ment systear an effect

F A SUSTAI

study, it beENCO on thations at theination of th

tudy indicatt Plant (MB

Son Landfill.

e sustainab):

ening and fra

tep 1a)

atment with

ment plants

incineration

ual concept o be realize

which can

AGEMEN

55 - 88

ENT SYSTE

nam, is wide‘green city’

us other infis also an im

m means -tive and en

INABLE W

ecame knowhe 31st of Jue Khanh Sohe environm

tes which poBT), not on.

le waste m

actioning (P

MYT® proc

(Phase 3 -

n (Phase 3

is that it ined from thethen be foll

NT

8

EM FOR DA

ely viewed ’ by the yea

frastructuramportant pa

- besides wvironmenta

ASTE MAN

wn that DPCuly 2017 to n Landfill s

ment.

ossibilities tnly for the

anagement

Phase 1 - S

cess and bio

- Step 3a)

- Step 3b).

creases the start. The lowed by fu

A NANG

as well-plaar 2025.

l measuresart of Da Na

aste avoidaally friendly

NAGEMENT

C (the higheexamine wite during th

there are foplanned H

t system a

tep 1)

ological dry

e chances orealization rther steps

nned and w

s, the implemang’s strate

ance and cwaste recy

T SYSTEM

est institutiowhich technohe next yea

or the realizoa Nhon S

step-by-ste

ying (Phase

of realisatioof the conat a later st

Speicherdatum: 201

well-govern

mentation ogy for susta

omprehensycling and d

on in Da Naological pos

ars without f

zation of a MSW Treatm

ep approach

e 2 - Step 2)

n because cept can sttage.

18-01-29

ed,

of a ain-

sive dis-

ng) ssi-fur-

Me-ent

h is

)

not tart

SUSTSYST

REPORT DA NANG_

Figure 35:

The prospecificthereof

T

T

C--

T

The wa(Khanh for the t

SynergySon sitewhich istion pro

TAINABLTEM FOR

_REV6_2018-01-29.DOCX

Step-by-step a

oposed metc waste con

resulting th

Treatment o

Treatment c

Compositio- high organ- high avera

Feed in tari

Terms of op

aste managSon and H

thermal utili

y effects fore (e.g. imprs currently rcesses mig

LE WASTR DA NA

pproach MSW t

thods and tnditions in Vhe low calor

of Municipa

capacity 1,0

on of MSW nic content age moistur

iff (FIT): 0.1

peration >=

gement conHoa Nhon). zation of th

r the mecharovement ofreleased intght be bette

TE MANANG

treatment imple

their combiVietnam, esific value of

al Solid Was

000 tons/da

(~67 %) re content (~

05 USD/kW

20 years.

ncept outlinThis appliee produced

anical biolof the currento the atmosr at the new

AGEMEN

56 - 88

ementation with

ination (seespecially thf the MSW:

ste (MSW) a

ay

~52 %)

Wh

ned above es to the md RDF.

gical treatmnt leachate tsphere), wh

w Hoa Nhon

NT

8

different options

e 4.2.3 andhe high org

and Non Ha

can basicechanical b

ment are motreatment phereas the pn site, since

s (Reference: W

following) ganic and m

azardous In

ally be impbiological tr

ore favouraprocess; cappublic accepless people

WEHRLE)

are alreadmoisture co

ndustrial Wa

plemented reatment of

ble at the epturing of thptance for te are living

Speicherdatum: 201

y heeding ontent and

aste (NHIW)

at both siMSW as w

existing Khahe landfill gthermal utilinearby.

18-01-29

the the

)

tes well

anh as, za-

SUSTSYST

REPORT DA NANG_

4.2.1.

Since ththe exising conc

The puron the lrial withof the mfraction livered >150 mPhase 1

Figure 3>150 mprocessfor a tec

Figure 36:

Systemvalue ofwas RD

If the sa“organic

TAINABLTEM FOR

_REV6_2018-01-29.DOCX

PROPOS

he projectedsting Khanhcept. The p

rpose of theandfill site.

h a calorific moist organ

<150 mm wto an off-s

mm can be 1, the amou

37 presentsmm which cos. Note: Thechnological

Proposed proc

s for the enf the RDF h

DF being pro

ame happec-rich” fracti

LE WASTR DA NA

ED PHASE

d SW treatm Son Landfrocess step

e initial StepThis shall bvalue >17,0

nic matter wwould still bite energetbailed to r

unt of landfil

s with Stepould take pe intermediaupgrade of

ess steps 1 and

nergy utilizahas been puoduced at D

ned in Vietnion - could b

TE MANANG

ES AND STE

ment compleill site is mops and phas

p 1 in Phasbe achieved000 kJ/kg fwith a low cbe landfilledic utilizationreduce its lled waste c

p 3a in Phaplace e.g. inate Step 2 if the initial p

d 3 for Khanh So

ation in Eurublicly recogDa Nang, th

nam, then Sbe added to

AGEMEN

57 - 88

EPS FOR K

ex in Hoa Noving into thses propose

se 1 is the rd by a drumfrom the inccalorific vald in Phase n. With thevolume an

could be red

ase 3 a posn a nearby n Phase 2 i

process set-

on site (Referen

rope have gnized, the e same cou

Step 2 - a mo the then a

NT

8

KHANH SO

Nhon area whe focus of aed for Khan

reduction ofm screen thacoming MSWue will pas1, whereas optional Sd transportduced by 40

ssible utilizcement plais not show-up.

nce: WEHRLE)

impressiveldemand fo

uld happen

mechanical-already exis

ON SITE

will not be reany environh Son are d

f the amounat separateW, by usingss the screes the fractioStep 1a thetation costs0 % for Kha

ation of forant or in ann in Figure

y demonstrr the RDF rin Da Nang

-biological tting pre-trea

ealized in thnmentally frdisplayed in

nt of MSW es plastic ang a 150 mmen. Thus on

on >150 mme separateds. With the anh Son.

r the bailednother energ

37 since th

rated that orises dramag as well.

treatment patment proc

Speicherdatum: 201

he near futuiendly upgra

n Figure 37.

to be dumpnd other ma

m screen. Mnly the siev

m could be d RDF fractrealisation

d RDF fractgy-demand

his step stan

once the utatically. If the

process for cess (Step

18-01-29

ure, ad-

ped ate-ost ved de-tion n of

tion ing nds

ility ere

the 1).

SUSTSYST

REPORT DA NANG_

The propresentbined wreducedcement required

With theto be chof the Mbiogas.

The enethe bioloprocess

With thimain tomany yeheat anlogical pfill, can creatingate trea

Figure 37:

There acal-biolothe mos

TAINABLTEM FOR

_REV6_2018-01-29.DOCX

oposed biolots a valuablwith a biologd to an exte

kilns. Sincd by externa

e implemenhanged fromMYT® plant.

The dewate

ergy-rich (oogical dryins steps.

is concept, o be landfilleears to comd power (Cprocess. Thbe treated

g synergies atment will e

Proposed proc

are no reliabogical treatst likely are

LE WASTR DA NA

ogical treatmle alternativgical dryingent which ace the biologal energy-de

ntation of Stm 150 mm t. There the ered output

optionally bang, to allow

only a veryed. Addition

me, can be CHP) stationhe landfill le

in an adapbetween th

ensure that

ess steps 1 - 3

ble data avment proceas for the r

TE MANANG

ment proceve to the cug step, the llows the egical dried emanding p

tep 2 in Phato 80 mm. Tsoluble org

t of the perc

ailed) fractiofor an ener

y small amonally, landfiutilized tog

ns in order teachate, whpted proceshe waste anthe treated

for Khanh Son

ailable on tess for Khanealization. T

AGEMEN

58 - 88

ess is a Maxurrent practmoisture conergetic utiRDF is not

processes.

ase 2 the eThis fractionganic compcolation is th

on >80 mmrgetic utiliza

ount of resill gas, whicether with tto produce

hich will alsoss-water-trend the leachwaste wate

site (Reference

the actual anh Son LanThere are t

NT

8

ximum Yieldtice for landontent in thilization of tt reactive, it

exchangeabn <80 mm i

pounds of thhen dried in

m can be mation. Figure

idues (sandch will be rethe biogas felectric ene

o continue teatment plahate treatmer actually m

e: WEHRLE)

area for the ndfill at prewo areas b

d Technologdfilling the ohe output frthis high qut can be sto

ble screens s treated by

he waste arn a biologica

ixed and ble 37 shows

d, glass andeleased frofrom the MYergy and toto seep fromnt followingent. In addi

meets the d

implementsent. Howeoth of whic

gy (MYT®) organic-richrom the MYuality RDF fored until it

of the drumy the percore being traal drying ste

lended with all three of

d other inerom the existYT® proces

o provide hem the bottog the MYT®

ition, the imischarge lim

tation of sucever, Figurech would be

Speicherdatum: 201

process whh MSW. CoYT® processfor examplets utilization

m screen neolation proceansformed iep.

h the outputf the propos

rt material) ting landfill s in combin

eat for the bm of the laprocess, th

mproved leamits.

ch a mechae 38 highlige large enou

18-01-29

hich om-s is e in n is

eed ess nto

t of sed

re-for

ned bio-nd-hus ch-

ani-hts

ugh

SUSTSYST

REPORT DA NANG_

for the iarea of The larg

Figure 38:

TAINABLTEM FOR

_REV6_2018-01-29.DOCX

implementathe two wit

ger area of

Possible areas

LE WASTR DA NA

ation of the h 7.5 ha wa10 ha is loc

s for a MBT plan

TE MANANG

proposed pas originallycated partia

nt implementatio

AGEMEN

59 - 88

process Stey reserved flly outside t

on at Khanh Son

NT

8

ep 1, Step 1for the expathe current

n site (Referenc

1a, Step 2 aansion of theborders of K

ce: GIZ / Google

and Step 3ae existing reKhanh Son

e Earth)

Speicherdatum: 201

a. The smaecycling plaLandfill site

18-01-29

aller ant. e.

SUSTSYST

REPORT DA NANG_

4.2.2.

The impsince thwaste s

Howevetime, a ic utilisin

A grate the regicement Phase 3

If the Rbaling ohandlingbe unde

Even if cancelleNhon S

Figure 39:

TAINABLTEM FOR

_REV6_2018-01-29.DOCX

PROPOS

plementatiohere is plenstreams (see

er, since thelikely prospng of the ou

incineratioional cemekilns (see a

3 could be c

RDF has to of the wastg of the waerstood as a

DPC’s deced, Figure 3W treatmen

Proposed proc

LE WASTR DA NA

ED PHASE

n of a sustanty of spacee also Figur

e SW treatmpect for this utput from a

n plant at Hnt producealso Chapteconnected w

be transpote is recomste. Howevan option.

cision to con39 clarifies nt complex w

ess steps 1 - 3

TE MANANG

ES AND STE

ainable wase at the sitere 33).

ment compsite could b

a MYT® plan

Hoa Nhon srs cannot ber 4.2.6). Fiwith the ups

orted over lmmended (Sver, this inve

ntinue operathat all optiwould be av

for Hoa Nhon s

AGEMEN

60 - 88

EPS FOR H

ste managee (70 ha) fo

lex in Hoa be to becomnt (located a

site could bbe convinceigure 39 illustream proc

longer distaStep 1a). Testment is n

rating the Kons for the vailable.

site (Reference:

NT

8

HOA NHON

ment systeor the handl

Nhon area me the locatat Khanh So

e an alternaed to use thustrates howcess Steps

ances to itshis reducesnot mandat

Khanh Son LMBT and I

WEHRLE)

N SITE

m at Hoa Ning and the

will not be tion of an inon Landfill s

ative for thehe generatew the incine1 and 2.

s final destis transport ory for the

Landfill durincinerator p

Nhon site woe processin

realized foncinerator fosite).

e RDF utilized substituteration plan

nation, comcosts and process, so

ing the nexprocess ste

Speicherdatum: 201

ould be viabg the differ

or an indefinor the energ

zation, in cate fuel in tht in Step 3b

mpression afacilitates

o Step 1a is

xt years will eps at the H

18-01-29

ble, rent

nite get-

ase heir b in

and the s to

be Hoa

SUSTSYST

REPORT DA NANG_

4.2.3.

Waste A

The mixfeeding mixed w

Magnet

The macharge directionsystem.there it

The alm

Figure 40:

Drum S

The proproposeslope ofthe slop

Inside, tbe rippe

The pre

TAINABLTEM FOR

_REV6_2018-01-29.DOCX

PHASE 1

Acceptance

xed waste ihopper of

waste is fed

t Station

agnet stationand a crossn of the dru. The cleancould possi

most iron-fre

Magnet station

Screen

oposed drued mesh sizf ~1-2° to e

pe prevents

the rotatinged up opene

e-treated mi

LE WASTR DA NA

- STEP 1: W

e

s unloadedthe pre-tre to the mag

n (see Figuswise disch

um screen aning conveyibly be colle

ee mixed wa

(Reference: Eu

m screeninzes are 15nsure that tthat the dru

g drum is eqed during th

xed waste i

TE MANANG

WASTE AC

into a waseatment sysgnet station

re 40) consharge conveand separatyor of the mected in a p

aste is then

uRec)

g machine 0 mm in Pthe materiaum gets clo

quipped withe sieving p

is then be tr

AGEMEN

61 - 88

CCEPTANC

ste pit. Thenstem wherewhere ferro

sists of a steyor for ferrtes iron from

magnet forwit and later

conveyed

(see FigurPhase 1 and

l moves throgged.

th bag openprocess.

ransported

NT

8

CE, SCREE

n an autome large impuous metals

teel frame, rous metalsm the waste

wards the irodelivered to

into the dru

re 41) splitsd 80 mm inrough the dr

ning device

to the feedi

ENING AND

ated diggerurities are sare separat

an over-bels. The magne flow cominon to the cro a recycling

m screenin

s the wastn Phase 2. rum during

s to ensure

ing conveyo

D FRACTIO

r loads the sorted out. ted automa

lt magnet wnet is attachng from therosswise cog process.

ng machine.

te into two The drum the sieving

e that the w

ors of the M

Speicherdatum: 201

ONING

waste into After that

tically.

with length dhed in feedpre-treatm

onveyor. Fr

.

fractions. Tscreen has process, th

waste bags

MYT® proces

18-01-29

the the

dis-ing ent

rom

The s a hus

will

ss.

SUSTSYST

REPORT DA NANG_

1 frame s

4 Casing

Figure 41:

4.2.4.

RDF Pa

The optcase thethe tranbaled R

The precompac

The pacribbons characteand give

Bales phigher cmaximutheir higwheel lonance c

The higfilm, it isdisadvabecause

TAINABLTEM FOR

_REV6_2018-01-29.DOCX

structure

Drum screenin

PHASE 1

acking Syste

tional packie distance bnsport costsRDF is also s

essing of thcting rollers.

cking systeand net bi

erized by loes the finish

produced wicompactionum volume ogh compactoader are hcosts.

gh compactis no proble

antages of te of their r

LE WASTR DA NA

g machine (Ref

- STEP 1A

em (Baling)

ing system between thes for baled storable an

e RDF is d.

em uses filmndings. Theow operatinhed bale a f

ith the propn than balesof ~1.3 m³ wtion reducehalved. The

ion of wasteem to erect he square b

round shap

TE MANANG

2 walkwa

5 hopper

ference: JS Wel

A: RDF BAL

)

presses the waste treRDF is low

d stackable

one in a pr

m to pack we bales are ng costs. Dufixed cross

posed packis produced with lower ds the consu

e packaging

e reduces tinterim sto

bale systeme there is e

AGEMEN

62 - 88

ay with railing

r

lle)

LING (OPTI

e RDF intoatment planwer due to e - even in t

ress equipp

waste, furth fixed withouring the pabracing.

ing system with conve

density. Theumption of g system is

transport corages of an

m. Round baenough spa

NT

8

ON)

o bales. Thent and the R

its considehe open air

ped with 2 r

her there is out steel or acking proc

have a volentional roue large volufilm accord

s characteri

osts. When ny size. Theales are droace for the

3 screen

6 landing

e baling of RDF utilizaterable smar.

rotating, hyd

no use of plastic straess the film

lume of ~2.und baling sme of the p

dingly; the dzed by low

using the re round balopped direce gripping d

ning drum

g leg

RDF is rection site is laaller volume

draulically d

aluminium-appings, so m is stretche

.8 m³ and asystems whproduced rodistances c

w operationa

recommendling systemctly next to edevice pick

Speicherdatum: 201

commendedarge, becau

e. Additiona

down-press

-profiled prethe system

ed up to 70

a considerahich achieveund bales a

covered by al and main

ded packagm eliminates

each other,up the rou

18-01-29

d in use ally,

sing

ess m is 0 %

ably e a and the

nte-

ing all so

und

SUSTSYST

REPORT DA NANG_

bales. Texcludethe presstored c

Figure 42:

A signifvehiclesare virturoutes f

Figure 43:

TAINABLTEM FOR

_REV6_2018-01-29.DOCX

Thus, durined so it resuss vessel, completely l

RDF packing s

ficant advans (Figure 43ually eliminfor RDF tran

Baled RDF for

LE WASTR DA NA

g erection ulted in a soso they doleakage- an

system - baling m

ntage of the3 shows thenated by thensports.

transport (Refe

TE MANANG

of bale stoolid bale stoo not punctund emission

machine (Refere

e baling is the baled RDFe baled RD

rence: RETIM R

AGEMEN

63 - 88

orage damaorage. Bulkyure the film

n-proof.

ence: EuRec)

hat no leakiF on a transDF. Both as

Romania)

NT

8

ages of filmy parts are

m during tra

ing water essporting vehspects ensu

caused bydeformed b

ansport and

scapes fromhicle). Moreure a notice

y the grippiby the pressd storage. T

m the RDF eover, the oeable relief

Speicherdatum: 201

ng device as rollers insThe bales a

packed on odor emissiof of the tran

18-01-29

are side are

the ons nsit

SUSTSYST

REPORT DA NANG_

4.2.5.

4.2.5.1.

The MYcess is waste isly biodewashedanaerobbiogas. percolatthe wasthat the

After thtion protheir difunit is tvolume is suppotime in tbe expa

The follbuilt at t

Figure 44:

The MBdelivereby a loabags ar

TAINABLTEM FOR

_REV6_2018-01-29.DOCX

PHASE 2

GENER

YT® processespecially

s conveyed egradable od out (percobic fermentaThe effluention proces

ste which ar waste still

e percolatiocess fractiofferent enerthat throughis reduced

osed to be uthe percolaanded to me

owing procthe Kahlenb

Flow scheme o

BT plant Kaed to a wastader to protre ripped op

LE WASTR DA NA

- STEP 2:

RAL MYT®

s is a multipsuitable forto a 2-stag

organic matolation). Theation, whernt from the s and partlyre not biodecontains str

on stage thonates the drgy contenth this proce and in parused as a fotors is veryeet future d

cess flow diberg landfill

of the MYT® pro

hlenberg cote acceptantect the subpen, then th

TE MANANG

MECHANIC

PROCESS

ple-stage prr wet, wast

ge biologicatter is hydre heavily lore anaerobianaerobic

y dischargeegraded withructure mat

e waste is dried wastes. The adv

ess the caloallel biogasorm of fuel. short. Sincemands on

agram (see site in Ger

cess “MBT Kah

omprises fivnce hall whebsequent me waste is t

AGEMEN

64 - 88

CAL BIOLO

S DESCRIPT

rocess for thte rich in oral process. lrolysed aeroaded procec microorgadigesters, t

ed to a wasthin the 2-daterial which

mechanica. These fra

vantage of toric value iss is produce This proce

ce MYT® is throughput

e Figure 44many.

hlenberg“ (Refer

ve treatmenere first of aachinery. Intreated furt

NT

8

OGICAL TR

TION

he treatmenrganics. Aftn the first s

robically aness water isanisms tranthe so-callete water treays the wasis advantag

ally dewaterctions repretreating mus increaseded. This is eess is suitaba modular tt capacity.

) illustrates

rence: WEHRLE

nt steps. Firall the bulkyn the seconher by scre

REATMENT

nt of municier a mechatage of thisd all water

s then sent nsform the d digestateatment pro

ste remains geous for th

ed and biolesent the dinicipal solid

d, while at tespecially imble for large technology,

the MYT®

E)

rst (Waste Ay waste is p

nd step (Meening, meta

T - MYT® PR

ipal solid wanical pre-ps biological r soluble coto the secoorganics in

e, is returnecess. The cin the perc

he percolati

logically driifferent typed waste bythe same timportant w volumes as, a MYT® pl

process wh

Acceptancepicked out aechanical Pral separator

Speicherdatum: 201

ROCESS

aste. The pprocessing process reaompounds aond stage, to energy-r

ed partly to constituentsolators enson.

ied. A sepaes of RDF wy a percolatime the wahen the was the retentlant can eas

hich has be

e) the wasteand separare-Treatmers and man

18-01-29

pro-the

adi-are the rich the s of ure

ara-with tion

aste aste tion sily

een

e is ted nt), ual

SUSTSYST

REPORT DA NANG_

sorting mechan(Biologimixed aname Dmogenizlysing thaerobic the discwateredThere thcroorgamateriapresentallows t(e.g. siz

The figu

Figure 45:

TAINABLTEM FOR

_REV6_2018-01-29.DOCX

in order to rnical procescal Step): T

and soaked DAMP, whiczing the wahe organic reactor for

charge limitd and the she dewater

anisms in thl leaving thts Refused the classificze, calorific

ures 45 and

Key componen

LE WASTR DA NA

remove eithsses. They The waste ewith water.

ch stands faste, disintefraction. Th

r biogas prots. The leasolids are tred materiahe waste is he biologicaDerived Fu

cation of thevalue, chlo

d 46 show th

nts of the “MBT

TE MANANG

her scrap mare followe

enters a so The aerob

for Defined egrating thehe organic eoduction. Thched wastetransported l is aeratedsufficient t

al drying is uel (RDF). Te RDF in oride conten

he key com

Kahlenberg“ (R

AGEMEN

65 - 88

metal or toxiced by biologcalled Mult

bic process Aerobic M

e remainingenriched prhe effluent e is release

to the hald in drying tto dry off thstabilized a

The final treorder so prot).

ponents of

Reference: WEH

NT

8

c/harmful sgical step, ti Zone Reaconditions iixing Proce

g material (erocess watefrom the an

ed from thels for the btunnels., Thhe waste, sand - with aeatment steoduce vario

the MBT pl

HRLE)

ubstances. the core stctor (MZR)n the MZR

ess. This ope.g. packager is conditionaerobic pre MZR aftebiological dhe heat prodso no externa moisture ep (Mechanous fractions

ant Kahlenb

These firsttep of the M. In the MZare stated peration is ging, diaperoned and frocess is puer about 2-3rying (Bioloduced by thnal heat is content of

nical Materis with spec

berg.

Speicherdatum: 201

two steps aMYT® proceR the wastein the proceaiming at

rs) and hydfed into an aurified to m3 days, is dogical Dryinhe aerobic required. Tabout 10 %

al Separatiocific propert

18-01-29

are ess e is ess ho-

dro-an-eet de-

ng). mi-

The % - on) ties

SUSTSYST

REPORT DA NANG_

Figure 46:

Figure 4Kahlenb

Figure 47:

TAINABLTEM FOR

_REV6_2018-01-29.DOCX

Key componen

47 shows eberg”.

RDF utilization

LE WASTR DA NA

nts of the “MBT

examples f

options (Refere

TE MANANG

Kahlenberg“ (R

for the utiliz

ence: WEHRLE

AGEMEN

66 - 88

Reference: WEH

zation of th

E)

NT

8

HRLE)

he Refuse DDerived Fuuel (RDF) fr

Speicherdatum: 201

rom the “M

18-01-29

MBT

SUSTSYST

REPORT DA NANG_

4.2.5.2.

DAMP®

In orderspecific

Figure 48:

The bioDAMP®

In this pgets disagitatorhand pamateria

The percess waganic ric

After thchanicabiologic

Biologic

One advterial caand its drastica

TAINABLTEM FOR

_REV6_2018-01-29.DOCX

PROPO

® Reactors

r to be ablec needs of th

Defined Aerobi

ological step®. DAMP is t

process the sintegrated rs on the onartially crusl.

rcolation waater is digech feedstoc

e waste haally dewatercal drying.

cal Drying

vantage of an be storedproperties d

ally reduced

LE WASTR DA NA

OSED MYT

e to implemhe site.

ic Mixing Proces

p is the cothe short fo

waste is coand homog

ne hand supsh the mate

ater washessted anaero

ck.

as been treared to fulfil

the RDF prd and transdue to bioc

d, to deprive

TE MANANG

T® TECHNO

ment the MY

ss (Photos: WE

re of the Mrm for Defin

ontinuously genized by pport the traerial to allow

s out solublobically in a

ated for 2 -the moistu

roduced by sported andhemical rea

e any microo

AGEMEN

67 - 88

OLOGY FOR

YT® proces

EHRLE / ZAK)

MYT® procened Aerobic

y fed into holarge, robu

ansfer of thew the proce

le organic ma separate

- 3 days in ure requirem

MYT® is itsd used on dactions. To organisms o

NT

8

R DA NANG

ss in Da Na

ess and incc Mixing Pro

orizontal reast agitators

e material thess water t

matter fromfermentatio

the DAMP®

ments for fu

s biochemicdemand with

achieve thiof the water

G IN BRIEF

ang, is has

cludes the mocess.

actors, the D, while prochrough the rto get in m

the waste.on stage to

® reactors, urther treat

cal stability. hout riskingis, the mater required fo

F

to be cust

most innov

DAMP® reacess water reactors anaximum co

This heavigain bioga

the solid mtment in the

This meang changes oerial’s moistor their met

Speicherdatum: 201

tomised to

ative proce

ctors, wheris added. T

nd on the otontact with

ily loaded pas from the

material is me downstre

ns that the mof the mateture contentabolism.

18-01-29

the

ess:

re it The her the

pro-or-

me-am

ma-erial nt is

SUSTSYST

REPORT DA NANG_

The dryand ecocrete tuthe orgaheat. Torange, acient to of <25 %

Many ythis proc

Becausaggregathe emis

Figure 49:

TAINABLTEM FOR

_REV6_2018-01-29.DOCX

ying of the onomical waunnels (Figuanic matter o enhance tair is supplievaporate

% are achie

ears of expcess so tha

e of the higates are fulssion of odo

Concrete tunne

LE WASTR DA NA

material leaay using soure 49) micstill presen

their metabied to eachthe remain

eved with no

perience witat it finally re

gh potentialy closed aours into th

els in the biolog

TE MANANG

aving the Dlely the hea

croorganismnt in pores, olism and to tunnel. Thing humidityo external h

th this techeached toda

l of odour eand their exe environm

ical drying (Refe

AGEMEN

68 - 88

DAMP® procat generate

ms, which ae.g. as pro

o keep the his is automy of the wa

heat require

nology at tay’s much i

emissions ixhaust air isent to an ab

ference: ZAK)

NT

8

cess is dond by microo

are already ocess watertemperature

matically conste and to dments.

he MYT® Pmproved co

n drying stes extracted bsolute min

ne biologicaorganisms: present in

r, producinge inside eacntrolled. Thedry it off. Th

Plant Kahlenondition.

ep, all tunnand sufficiimum.

ally in an eWithin tightthe materi

g thereby Cch tunnel we generatedhereby moi

nberg helpe

nels, belts, ently treate

Speicherdatum: 201

nergy-efficitly closed coal, metabol

CO2, water awithin a desid heat is susture conte

ed to fine-tu

machines aed to minim

18-01-29

ent on-lize and red uffi-ents

une

and mize

SUSTSYST

REPORT DA NANG_

4.2.5.3.

In Figur4.5 ha is

Figure 50:

TAINABLTEM FOR

_REV6_2018-01-29.DOCX

PROPO

re 50 the prs required.

Exemplarily lay

LE WASTR DA NA

OSED MYT

roposed MY

yout for propose

TE MANANG

T® PLANT L

YT® plant (S

ed MYT® plant (

AGEMEN

69 - 88

LAYOUT

Step 2) is s

Reference: JS W

NT

8

hown. For t

WELLE)

the proposeed MYT® pl

Speicherdatum: 201

ant an area

18-01-29

a of

SUSTSYST

REPORT DA NANG_

4.2.5.4.

In the fo2) are li

Main co

--

A-

W

---

--

-----

Output o

W

TAINABLTEM FOR

_REV6_2018-01-29.DOCX

PROPO

ollowing thested:

omponents

Defined Ae- multi zone- dewaterin

Anaerobic s- anaerobic

Waste air tr

Biogas utiliz- co-genera- gas holde- biogas de

Followed by- by aerobic- discharge QCVN 40-

Key data bi- tunnel dry- approx. 12- wheel load- input mix: - energy co

of proposed

RDF: approper mills, po

Residual m

Metals: 80 -

Water: up to

LE WASTR DA NA

OSED MYT

e main comp

robic Mixinge reactors g presses

stage c reactors

reatment

zation ation machinr sulphurisat

y treatmentc + membra treated pro-2011/BTNM

ological dryying as desc2 tunnel boxders for tunapprox. 55

onsumption

d MYT® pro

ox. 540 tonsower plants

material: app

- 100 % rec

o 320 m³/d;

TE MANANG

T® PLANT F

ponents, the

g Process (

nes

ion

of processane methodocess waterMT (Nationa

ying: cribed xes nel chargin

50 tons/day for biologic

cess (inclus

s/day (DS >s

p. 0.5 - 2 %

cycling rate

; discharged

AGEMEN

70 - 88

FIGURES

e output an

(DAMP®)

water r acc. al Technica

ng → approx.

cal drying ap

sive drum s

>85 %; appr

→ disposal

→ seconda

d acc. QCV

NT

8

d key figure

al Regulatio

193,000 tonpprox.10 kW

screen overf

rox. 17 MJ/k

ary raw mate

VN 40-2011/

es of the pro

n on Indust

ns/year (@ Wh/t input tr

flow >80 mm

kg); selling t

erial

/BTNMT

oposed MY

trial Wastew

Ho 9 MJ/kgreatment pla

m)

to cement f

Speicherdatum: 201

YT® plant (S

water)

g) ant

facilities, pa

18-01-29

tep

a-

SUSTSYST

REPORT DA NANG_

Key figu

C

S

C

C

T

O

T

T

A proceappend

4.2.5.5.

The comprocesstreatmeeffluent existingtreat thecosts fowould bproximaMYT® s

For the duced ping costdoublingreductiolie at ab

TAINABLTEM FOR

_REV6_2018-01-29.DOCX

ures

Capacity

Power gene

Staff deman

Constructio

CAPEX

Total:

OPEX

Revenues Tipping feeFIT: RDF value:(based on iTotal Reven

ess flow diaices in Cha

OUTLO

mbined aers will certainent plant (ac

treatment g leachate tre MYT® eff

or the upgrabe required ately 1.9 miurplus wate

operating personnel rets of leachag of the plaon of about bout 3.20 US

LE WASTR DA NA

1 3

eration 5 4

nd 7

on period 2

P M B

1

: (

( (nformation nues (appro

agram with apter 6.

OOK ON CO

robic treatmnly show bectual capacplant for threatment shfluent. Suchade of the leif the plant llion USD iner.

costs of a cequirementate treatmennt's treatme20 %. ThusSD.

TE MANANG

1,000 tons/d356,000 ton

5.85 MW gr4.35 MW ne

70

20-24 mont

Pre-treatmeMYT® proceBiological D

15.4 USD/to 4.7 Million

(22 USD/ton(0.1005 US(14 USD/tonfrom intern

ox.)

a mass ba

OMBINED L

ment of landenefits. Thecity of 450 me MYT® pro

hows the deh an enlargeachate treawere to be

n investmen

combined es and largent after the ent volume s the expec

AGEMEN

71 - 88

day ns/year

ross et

h

ent: aess: aDrying: a

a

on USD/year

n) 7D/kWh) 4n) 2ational cem

1

alance for t

LEACHATE

dfill leachate approved m³/d) amouocess requesired resulement wouatment plan built at ano

nt costs for

effluent treaer procurem

upgrade aby adding t

cted treatme

NT

8

approx. 4 Mapprox. 44 Mapprox. 9 M

approx. 57 M

(without ref

7.80 Million 4.20 Million 2.50 Million ment produc14.5 Million

the propose

E AND PRO

te together budget for

unts to ~ 88ires a simillts, this site

uld require ant of ~3.86 mother site. Sthe combin

atment planment volume

re expectedthe MYT® eent costs pe

Million USDMillion USDMillion USD

Million USD

financing)

USD/year USD/year USD/year

cers) USD/year

ed MYT® pr

OCESS WA

with surpluthe upgrade

8 billion VNDar investmecould then

an investmemillion USDSo this woued treatme

nt there are es etc. will sd to lie at affluent is ex

er m³ for a c

D D D

D

rocess is in

ATER TREA

us water fre of the exiD (3.86 milent. If the un be expandent of abou

D. And not tld result in

ent of landfil

also positisave money

about 4.00 Uxpected to rcombined tr

Speicherdatum: 201

ncluded in

ATMENT

rom the MYsting leachlion USD).

upgrade of ded in orderut 50 % of the 100 % tsavings of al leachate a

ve effects: y. The operUSD per m³result in a creatment pl

18-01-29

the

YT® ate An the r to the that ap-and

re-rat-³; a

cost ant

SUSTSYST

REPORT DA NANG_

Hence t

900 m³/

4.2.5.6.

With theso far nthe exislandfill cone in o

In case cells cothere arpect wo

TAINABLTEM FOR

_REV6_2018-01-29.DOCX

the amount

/day * 0.80

OUTLO

e exceptionnot been absting landfilcells which order to be a

an MYT® puld be enerre no reliabould have to

LE WASTR DA NA

of money s

USD saving

OOK ON CO

n of installatble to fully cl body couhas so far nable to extra

plant were trgetically ut

ble figures oo be examin

TE MANANG

saved by tre

gs * 365 day

OMBINED L

tions for thecapture andld only be not been inact the land

to be built ailized togeth

on usable laned in a sep

AGEMEN

72 - 88

eating the e

ys = approx

LANDFILL

e partial land utilize the

accomplishstalled a ga

dfill gas in fu

at Khanh Sher with the

andfill gas qparate study

NT

8

effluents join

x. 263,000 U

GAS AND

ndfill gas coemitting lan

hed at dispas capturinguture and b

Son Landfill,e biogas froquantity andy.

ntly will rang

USD / year.

BIOGAS U

ollection, thendfill gas. Aroportionateg system coe able to at

the landfillm the anae

d quality at

ge around:

.

UTILIZATIO

e Khanh SoA retrofit of ely high coould still be t least feed

l gas from terobic stagethe present

Speicherdatum: 201

ON

on Landfill hgas wells i

osts. Howevequipped wit to a flare.

the connece. However,t time, this

18-01-29

has nto

ver, with .

ted as as-

SUSTSYST

REPORT DA NANG_

4.2.6.

Refuse rectly inof Da Nsupport12). As the cem

A survepany Hcompanseveral

It can beIt can afuel willcase in

Table 12: I

No.  N

1  C

2 CN

3 CN

4 VN

5 NN

There istion in Vrope. Fplant (Fwhere tcooperauation.

In Vietnfor the u

TAINABLTEM FOR

_REV6_2018-01-29.DOCX

PHASE 3

derived fuen the cemenNang where t). Out of nia result of

ment compa

ey across VOLCIM, if

ny has alreayears now.

e assumed also be ass be recognEurope).

Inquiry list of ce

Name 

COSEVCO

COSEVCO Nang 

COSEVCO Nang 

VICEM Hai Nang 

Ngu Hanh SNang 

s certainly sVietnam, sinor example

France) beehe RDF outation is eco

nam the setutilization of

LE WASTR DA NA

- STEP 3A

el (RDF) cant kiln. Theinterviewed

ine requestthis survey

nies near D

ietnam showthe calorific

ady been us.

that most cumed, howized and R

ement plants (Re

Cement Pla

19 Cement

6 Cement P

Van Cemen

Son Cemen

still a great nce RDF is e have the en cooperattput of the B

onomically v

ting up of cf RDF as an

TE MANANG

A: PROSPE

an be used refore cemed whether thts, only foury, it can be Da Nang.

wed that RDc value excsing RDF fr

cement planwever, that oRDF be acce

eference: Inquir

ant Da Nan

t Plant Da

Plant Da

nt Plant Da

t Plant Da

need for infwell accepMYT® Kahing from theBiological Dvery attracti

comparable n energy so

AGEMEN

73 - 88

CTS FOR R

as a substent producihey were inr answered summarize

DF would bceeded 17,rom the MB

nts in Vietnaonce test mepted by lo

ry by DPI with G

No. N

ng  6  Q

7  L

8  D

9  X

 

formation apted as a suhlenberg plae very begi

Drying is utilve for all p

structures ource.

NT

8

RDF UTILIZ

titute fuel inng compan

nterested ind. None of ted that ther

be acceptab,000 kJ/kg. T plants Ka

am have littmaterial is acal cement

GIZ support)

Name

Quang Tri C

Luks Cemen

Dong Lam C

Xuan Thanh

nd advice oubstitute fueant (Germanning with lized very sarties and h

in the ceme

ZATION IN

n the cemennies within a

using RDFthe four ware is curren

ble for the inIncidentall

ahlenberg a

tle or no expavailable, tht manufactu

Cement Plan

nt Plant Hue

Cement Pla

h Cement P

on the use oel in numerony) as welone of the uccessfullyhas turned

ent industry

CEMENT P

nt industry,a radius of F (Inquiry byas interest intly no inter

nternationaly, this part

and Symeva

perience wihe value of urers (as wa

nt 

nt Hue 

Plant 

of RDF in cerous cemenl as the MYglobal cem

y in the cemto become

y could be v

Speicherdatum: 201

PLANTS

preferably about 300

y DPI with Gn RDF (Taest in RDF

l cement coticular cemad (France)

th RDF so fthe substit

as already

ement prodt plants in EYT® Symev

ment producment kilns. T

a win-win

very benefic

18-01-29

di-km

GIZ able

by

om-ent for

far. ute the

uc-Eu-vad ers

This sit-

cial

SUSTSYST

REPORT DA NANG_

Hence wlization cement on the psystem.

Discuss

C

C

c

S

In case steps tosame timsupportwhere wYet it toRDF.

Apart frer, the fulfillingenerget

TAINABLTEM FOR

_REV6_2018-01-29.DOCX

we recommof RDF witindustry w

purchase of.

sions with th

Highlighting

Considerati

Definition o

Consideratiment plants

Potential co

Possible agco-utilizatio

Subject to tment plant

the cemenowards a reme must Dat in order towaste treatmook even th

om the cemuse of RDF modern tectic utilization

LE WASTR DA NA

mend Da Nath the localould result f fuels, Da

he cement i

g the advan

ion of techn

of the require

ion of the tes

osts for the

greement oon of RDF b

the financiafor the ther

nt industry segulation foa Nang Cityo address tment has alhese countr

ment industrF as substichnical stann of RDF.

TE MANANG

ang City to s or/and regin a win-wiNang City w

ndustry sho

tages for th

nical require

ed RDF qua

echnical eq

improveme

n cost-shary the ceme

al involvememal recove

shows no sor the compy be aware the necessaready reachries many y

ry, other inditute fuel wndards (e.g.

AGEMEN

74 - 88

strike up intgional cemen situation would save

ould include

he cement p

ements whe

ality for co-u

quipment av

ent of the flu

ring betweent plants

ent of Da Nry

signs of willpulsory co-that the ceary upgradehed an advyears to ow

dustries couwould presu. exhaust ga

NT

8

tensive andent industryfor both pa

e on the inv

e:

plants, espe

en feeding R

utilization in

vailable for

ue gas treat

en the ceme

Nang City, a

lingness to utilization oment plantses a co-utilanced leve

wn up to the

uld be consppose that as cleaning

d results-oriy. A co-utilizarties: the cevestment co

ecially the sa

RDF into the

n the cemen

flue gas tre

ment

ent plants a

agreement

cooperate of RDF cous may requilization of Rl, co-utilizate advantage

idered as uthe existin

g) and that t

ented discuzation of thement plan

ost for a the

aving-effec

e kiln

nt kilns

eatment (FG

and Da Nan

on a paym

with Da Nauld be consire technicaRDF entailstion of RDFes of the c

users of the ng combustthey hold a

Speicherdatum: 201

ussions on he RDF by nts would saermal recov

ts for fuels

GT) at the

ng City for

ment of the

ang City, lesidered. At al and financs. In countr is status-qo-utilization

RDF. Howion plants alicense for

18-01-29

uti-the ave ery

ce-

the

ce-

egal the cial ries uo.

n of

ev-are the

SUSTSYST

REPORT DA NANG_

4.2.7.

The termrial withIncinera"therma

The incthe ash removethe flueand pared in thdistrict htor.

While thgrates icombus

In EuroIncinerasecondswith thiswhich mwaste fe

The fluehot watecess.

The steturbinesated byenergy low-calo

In the foment is

TAINABLTEM FOR

_REV6_2018-01-29.DOCX

PHASE 3

m “incinerath a consideration togethal treatment

cineration ofmostly inord from the

e gas to therticulate polhe incineratheating) or

he old inciin incineratstion chamb

pe, the Waation plantss in order tos regulationmake it poseedstock.

e gases froer or steam

eam produces for generay incineratioefficiency i

orific heat a

ollowing Figillustrated.

LE WASTR DA NA

- STEP 3B

tion” standsrable calorifher with ot".

f waste conrganic (inerincineration

e exhaust glutants befotion can besteam for g

nerators wetion plants ber and allow

ste Incinera must be do ensure th

n most of thssible to he

om the incinm. Hence th

ed by suchation of elecon plants tos a combin

after the turb

gure 51 an

TE MANANG

B: RDF UTIL

s for a wastfic value suther high-te

nverts the ft) constitue

n part, thereas cleaning

ore the air d used to pr

generating e

ere equippefor MSW bws an optim

ation Directdesigned to he proper bhe Europeaat up the b

neration thehe flue gase

a system tctrical poweo supply a nation of elebine for dist

exemplarily

AGEMEN

75 - 88

LIZATION W

te treatmentch as for exemperature

feedstock innts of the c

e is the so-cg. There thedispersed inrovide eitheelectric pow

ed with a sbecause themized, more

ive regulateheat flue g

reakdown on incinerati

boiler in cas

en pass thees are coole

typically haer. Alternatidistrict heaectricity gentrict heating

y incineratio

NT

8

WITH INCIN

t process thxample orga waste tre

nto ash, fluecombusted wcalled fly-ase flue gasento the atmoer hot watewer with a s

stationary ge moving ge efficient an

es all techngases to a of toxic orgon plants ase of low o

super heaed down be

s 400°C at vely, hot wa

ating infrastneration co purposes.

on plant wit

NERATION

hat involvesanic substa

eatment sys

e gas (exhawaste are reh, fine parti

es are scrubosphere. Th

er for heat cteam turbin

grate, they grate pushend complete

ical aspectstemperaturanic substa

are equippeor poor calo

ters where efore the fin

a pressureater insteadructure. Mombined wit

th moving g

s the combuances contastems are

aust gas) aemoved. Beicles which bbed to remhe heat whconsuming ne liked up w

nowadays es the waste combustio

s of an incinre of at leasances. In ored with addorific values

they transfnal flue gas

e of 40 bar ad of steam ore beneficth a system

grates and

Speicherdatum: 201

ustion of maained in was

described

and heat. Wesides the aare carried

move gaseoich is generservices (e

with a gene

have movte through on.

neration plast 850°C forder to comitional burns in the mix

fer the heats cleaning p

and is usedcan be genial in terms

m for using

flue gas tre

18-01-29

ate-ste.

as

With ash by ous rat-e.g. era-

ving the

ant. or 2 mply

ers xed

t to pro-

d in ner-s of the

eat-

SUSTSYST

REPORT DA NANG_

Figure 51:

4.2.7.1.

Genera

Primarycess. In

The plalaws, en

Using rereducesleachate

TAINABLTEM FOR

_REV6_2018-01-29.DOCX

Exemplarily flow

PROPO

l principles

y objective on Figure 53

ant is designvironmenta

esiduals ass the enviroe etc.) and

LE WASTR DA NA

w sheet of an in

OSED TREA

of the plantthe basic e

ned to meeal needs an

s energy soonmental imthe necess

TE MANANG

ncineration plan

ATMENT P

t is the usalements of t

et all of thend an endur

urce is not mpact causeary traffic to

AGEMEN

76 - 88

nt (Reference: E

PROCESS I

age of RDFthe RDF po

e client’s rering stability

only a queed by the do do that.

NT

8

EPEM)

IN BRIEF

F from the mower plant a

equirementsy and wear r

estion of reddisposal wit

mechanical-are shown.

s within theresistance.

ducing the cth all its co

-biological t

e limits give

costs for dionsequence

Speicherdatum: 201

treatment p

en by physi

isposal, it aes (malodou

18-01-29

pro-

ical

also urs,

SUSTSYST

REPORT DA NANG_

The pla

S

G

A

Figure 53:

TAINABLTEM FOR

_REV6_2018-01-29.DOCX

nt consists

Modular pa

Post combu

Heat recove

Steam turb

Generator

Dry sorption

Fan and sta

Automation

Basic elements

LE WASTR DA NA

of the follow

addle movin

ustion cham

ery steam b

ine

n flue gas c

ack

n system.

s of RDF power

TE MANANG

wing main c

g incinerato

mber

boiler

cleaning sys

plant (Referenc

AGEMEN

77 - 88

components

or

stem

ce: Michaelis)

NT

8

s:

Figure 52: Mooving grates (Re

Speicherdatum: 201

eference: I.C.E.)

18-01-29

)

SUSTSYST

REPORT DA NANG_

Feeding

The macontrol s

Incinera

The incmovemeextensiv

The fueashing gasificaand de-

The chathe bottiliary air

The pro

The temquantity

Ash rem

The botashes a

TAINABLTEM FOR

_REV6_2018-01-29.DOCX

g system

ain fuel will system to c

ator

inerator conent of fuel ave requirem

Figu

el is movedsystem. Th

ation proces-ashing syst

amber is cotom has gotr is distribut

ovided incin

mperature oy of auxiliary

moval syste

ttom ash droare removed

LE WASTR DA NA

be RDF. Thcharge the i

nstruction (sand ashes t

ments on ma

ure 54: Incinera

through byhe fuel is mss. A contintem.

ompletely clt a high conted from the

erator type

of the gasifiy air and op

m

ops behind d continuou

TE MANANG

he feeding dncinerator c

see Figure hrough the

aintenance

tor (Reference:

y means ofixed intensuous gasific

added with ntent of alume sides to th

is also able

ication/incinptionally by

the last stasly by a pla

AGEMEN

78 - 88

duct is equchamber wi

54) achievechamber aand repair.

Michaelis)

f several pasively by sucation and

a high quaminium oxidhe gasificati

e to handle

neration chathe use of a

age of the inate conveyo

NT

8

ipped with th fuel.

es the high nd without

addle movech rotating incineration

ality refractode which maon chambe

fuels with v

amber is abauxiliary fue

ncinerator inor to a sepa

a double fla

incinerationusing a mov

er systems paddle sys

n is secured

ory lining. Esakes it veryr.

very high ca

bout 900°Cel.

n a water fillrate ash sto

ap controlle

n level of thving grate s

from the instems. Thisd by an auto

specially thy wear resis

alorific value

C and is con

led containeorage conta

Speicherdatum: 201

ed by the fir

he fuel and system with

nlet to the ds improves omatic feed

e refractorystant. The a

es.

ntrolled by

er. The cooainer.

18-01-29

ring

the h its

de-the ing

y of ux-

the

oled

SUSTSYST

REPORT DA NANG_

Second

The proincineramore th

Optimumerator. incinerafurans a

This coture of Waste burner aburn-ou

Heat rec

The steperheat

In additance ofequippe

The stedensate

The conthe exis

TAINABLTEM FOR

_REV6_2018-01-29.DOCX

combustio

oduced gas ated in a coan 900°C.

m combustIn addition

ators. Thereand hydroca

mbustion cabove 850°Incinerationand an oxy

ut of organic

covery stea

eam generated steam fr

ion to high f corrosive aed with auto

eam systeme tank and f

ndensing systing steam

LE WASTR DA NA

n chamber

has a high ombustion c

ion conditioto this, the

efore the rearbons.

hamber ens°C for moren Directive ygen and tec pollutants

am boiler

tor is a sysrom the ene

heat transfeatmosphere

omated soot

includes efeed-water t

ystem and fsystem.

TE MANANG

calorific vachamber at

ons are creae incineratioesulting flue

sures the ce than 2 seand protec

emperature and CO.

stem of tubeergy of the f

er ratio the es and foult blowers an

quipment ntank with de

feed-water

Figure 55: H

AGEMEN

79 - 88

alue and conan oxygen

ated by thison temperae gas has

complete bueconds whiccts the envi

measurem

e heat exchflue gas.

design of thing and thand a dust d

necessary toe-aerator.

treatment a

Heat recovery st

NT

8

ntains organ excess of

s homogeneature is highonly minor

urn-out of thch is one oironment fro

ment at the f

hangers and

he heating sat the surfaischarge sy

o build a clo

and conditio

eam boiler (Ref

nic compon5 - 8 Vol%

eous fuel gaher compar

concentrat

he flue gas f the requirom harmfuflue gas ou

d a demiste

surfaces paces are eas

ystem.

osed circuit

oning are a

ference: Michae

nents and C% and at a t

as generatered to convtions of CO

and a flue rements of l emissions

utlet ensure

er unit to pr

ays attentionsy to clean

t like valves

assumed to

elis)

Speicherdatum: 201

CO. This gasemperature

ed in the incventional grO, dioxins a

gas tempethe Europe

s. An auxilie the compl

roduce dry

n to the avo. The boile

s, pumps, co

be used fr

18-01-29

s is e of

cin-rate and

era-ean ary ete

su-

oid-r is

on-

rom

SUSTSYST

REPORT DA NANG_

Steam t

The ma(see Fig

The turb

S

G

O

C

Flue ga

The insIncinera

Dependsystem duction

The usugas trea

Reactiobuild upbags arcomes cake to system

TAINABLTEM FOR

_REV6_2018-01-29.DOCX

turbine

ain steam prgure 56) wh

bine genera

Steam turb

Gear unit

Electrical ge

Oil unit

Condensing

s cleaning

stalled flue gation Directi

ding on the will be useof effluents

ual absorbeatment are a

on products p a filter care cleaned too big. Ththe feedingis shown.

LE WASTR DA NA

roduced in thich is capa

ator set con

ine

enerator

g system.

Figure 56:

gas treatmeive will be fu

size of thed. The desi

s.

ents are sodan additive

and fly ashke which aby impulse

he filter cakg unit and it

TE MANANG

the steam gble to conve

sists of:

Steam turbine

ent system ulfilled.

plant and ign of this s

dium bicarbodosing syst

hes are remctually raise

es of pressues drop intt will be reci

AGEMEN

80 - 88

generator isert the who

(Reference: JS

will secure

the desiredsystem avoi

onate or limtem, a reac

oved from tes the efficurized air oto a collectiirculated to

NT

8

s directly ledle volume o

SWELLE)

e that all req

d operationads the cons

me based adctor, a bag f

the flue gasciency of theonce the preing hopper.the reactor

d to the bacof the main s

quired limits

al additives sumption of

dditive. Maiilter system

s by a bag fe separatioessure drop A screw c

r. In Figure

ck-pressure steam to el

s of the Eu

a dry flue f fresh wate

in componem and a draf

filter. Theseon of pollutap over the conveyor m57 the mod

Speicherdatum: 201

steam turbectricity.

ropean Wa

gas treatmer and the p

ents of the fft fan.

e particles thants. The fifilter bags

moves the fidular type fi

18-01-29

bine

aste

ent pro-

flue

hen lter be-lter lter

SUSTSYST

REPORT DA NANG_

A speed

Control

A controplayed oof oxyge

Continu

The pro

T

TAINABLTEM FOR

_REV6_2018-01-29.DOCX

d controlled

system

ol system con a monitoen and carb

uous emissio

ovided CEM

HF, HCl, SO

Pressure

Temperatur

Dust

LE WASTR DA NA

d draft fan le

Figure 57: Mod

checks andor. Importanbon monoxi

on monitori

MS allows fo

O2, CO, Tot

re

TE MANANG

eads the flue

dular type filter s

d monitors tnt data like de are mea

ng system

or monitoring

tal C, O2

AGEMEN

81 - 88

e gas throu

system (Referen

the whole cthe temper

asured and

(CEMS)

g of the follo

NT

8

gh the stac

nce: ELEX)

combustionratures of brecorded co

owing param

k.

process. Mboth combusontinuously

meters:

Main paramstion cham

y.

Speicherdatum: 201

meters are dbers, conte

18-01-29

dis-ents

SUSTSYST

REPORT DA NANG_

4.2.7.2.

In the fo

Key dat

S

S

*

Table 13: O

Output:

Bottom

FGT re

Gross p

Cost es

Table 14: C

1 C

2 O

(

3 R

(

TAINABLTEM FOR

_REV6_2018-01-29.DOCX

PROPO

ollowing, the

ta RDF Pow

Incinerator/

Steam syst

Steam turb

Footprint 3,

Input mix: a* Note: For the

Output RDF pow

:

ashes

esiduals

power produ

stimation

Cost estimation

CAPEX

OPEX

(without refi

Revenues

(through FIT

LE WASTR DA NA

OSED RDF

e key data f

wer Plant:

/combustion

ems as des

ine as desc

,500 m²

approx. 0.8*

calculation of th

wer plant

ction

RDF power pla

nancing)

T)

TE MANANG

POWER P

for the RDF

n lines as de

scribed

cribed

x 540 tonshe generated en

ant

USD

USD/ye

USD/ye

AGEMEN

82 - 88

PLANT FIGU

F power plan

escribed

s/day → appnergy a safety re

ear

ear

NT

8

URES

nt (Step 3b)

prox. 151,00eduction of 20 %

a

45,00

5,25

17,59

) are summ

00 tons/yea% has been incl

pprox. MW

20

00,000

51,000

97,000

arized:

r @ Ho 17 Mluded

approx

35,00

3,9

approx.

Speicherdatum: 201

MJ/kg)

. tons/year

00 - 50,000

900 - 6,000

MWh/year

167,200

18-01-29

SUSTSYST

REPORT DA NANG_

4.3. C

The tabthe ope

The caldistributtipping f

Table 15: C

TAINABLTEM FOR

_REV6_2018-01-29.DOCX

OST COMP

ble below shrational cos

culations wtion as defifees, reven

Cost compilatio

LE WASTR DA NA

PILATION

hows the susts (OPEX)

were based ned in Tabues from R

n for proposed

TE MANANG

ums for inveand the Re

on the wasle 8 (chapteDF and from

process steps

AGEMEN

83 - 88

estment (CAevenues.

ste composer 3.1.3) asm power fed

NT

8

APEX) - as

sition and ths well as ond into the gr

s defined in

he assumpn the data orid (data dis

the technic

ptions on thon the revesplayed in T

Speicherdatum: 201

cal commen

e particle snues from

Table 15).

18-01-29

nts,

size the

CONC

REPORT DA NANG_

5. CON

In this stions at landfill lThe releinto theexistingate are nearby given a

Da Nanposal oflights ctreatmefrom the

Since thlow-calowhich relected o

T

T

T

T

T

Tt

After thebe furth

I. E

II. Ft

Figure 5Phasessite or m

CLUSION

_REV6_2018-01-29.DOCX

NCLUSION

study the wt the existinleachate treease of the

e atmospheg leachate tr

removed. Phu Loc riperspective

ng is lookingf approxima

concepts thent of wet, oe treated wa

he municipaoric organiceduces the on the basis

The method

There is no

The proces

The procesumes and f

The proces

The procestreated.

e pre-treatmher treated o

Energetic u

Further redthe dry and

58 outlines 1 - 3. Bas

multiple site

N

waste manang Khanh Seatment aree environmere should breatment plThe insufficver. Stratege for an env

g for viable ately 1,000 at can be organic-richaste.

al solid wasc constituen

water conts of the follo

d has prove

o need to so

ss produces

ss operates footprints.

ss is to a gre

ss has alrea

ment the waor utilized by

utilization in

uction of th energy-rich

the resultssed on these waste man

gement situSon Landfill e particularlentally relevbe stopped ant only paciently treatgies are reqvironmental

solutions ttonnes perflexibly ada

h waste und

te does notts, a mecha

tent and breowing criteri

en useful in

ort the house

s biogas wh

with very s

eat extent fr

ady been tes

aste has a y two differe

a thermal t

e water conh waste in t

s of this stuse CAPEX fnagement s

84 - 88

uation of Dahave show

ly importantvant greenhin the shor

art of the ented landfill quired to ely friendly w

to ensure ar day of muapted to dder the par

t burn sponanical-bioloeaks down a:

the treatme

ehold waste

ich can be c

hort retentio

ree of emiss

sted at two

significantlyent strategi

reatment

ntent by methe cement

udy in termsfigures indi

solution can

8

a Nang Citywn that the t in order tohouse gas rt term by t

nvironmentaleachate to

ensure that waste mana

n environmnicipal solidifferent wasrticular aspe

taneously dgical pre-trethe organic

ent of mixed

e.

converted in

on times wh

sions.

sites where

y improved es:

eans of bioloindustry, pa

s of CAPEXvidual conf be figured

y is reflecteissues of la

o improve tMethane (Ctaking technally harmful oday is discthe growing

agement infr

entally friend waste. Thste composect of provi

due to its hieatment me

cs. The prop

d municipal

nto electrica

hich results

e typical Asi

calorific he

ogical dryinaper industr

X for the prfigurations fout.

ed. The on-andfill gas the conditioCH4) with tnical measusubstances

charged ang Da Nangrastructure.

ndly and fuhe study spsitions espeiding a high

igh water coethod has bposed proce

waste.

al energy.

in small bu

ian waste h

eating value

ng and subsry or coal po

roposed profor the set-

Speicherdatum: 201

-site investigtreatment a

ons at the she landfill gures. With s of the lea

nd pollutes g population.

ture-proof decifically higecially for h energy yi

ontent and been proposedure was

uilding vol-

has been

e and can th

sequent useower plants

ocess stepsup of a sin

18-01-29

ga-and site. gas the ch-the

n is

dis-gh-the eld

the sed se-

hus

e of s.

s in gle

CONC

REPORT DA NANG_

At this ptained dliminarylogical sreliable

Figure 58:

Long-tecontext sion mapects of

Irrespecergetic plant wifollowin

T

c-tt-f-

CLUSION

_REV6_2018-01-29.DOCX

point it shoduring this sy character,surveys, etcdata basis.

Process phase

erm commitmof this stud

akers of enf economic

ctive of the use of the with downstreg advantag

The comburific value incombustion- Improved the specifiction grate. - Specific hflue gas and- Reduction

N

uld be notestudy. Since it is recom

c.) in order t.

es with CAPEX f

ments fromdy. Here, furnergy-consuand ecolog

outcome owaste, the ineam energy

ges:

stion follown terms of dn side: burn-out w

c slag fractio

igher thermd thus impr

n of the spe

ed that the e the inform

mmended toto update, v

for implementat

local consurther discusuming facilitgical benefit

f further resnvestment sy utilization

wing an MBTdimension a

ith simultanon and redu

mal / electricroved steamcific volume

85 - 88

CAPEX camation is pao carry out fverify and c

tion steps (Refe

umers for assions and rties (see ats of utilizing

search, theshould be ininstead of

T is fed withand energy

neous increauction of the

cal efficiencym parametere flow on th

8

lculations hrtially incomfurther invesomplete the

erence: WEHRL

acceptance research wolso chapterg the RDF s

authors ren a combineinvesting in

h material ofdensity, wit

ase in slag e thermal st

y is possiblers (p and T)e flue gas s

have been bmplete and ostigations (ee present in

E)

of the RDFould have tor 4.2.6). Dushould be o

commend ted mechani a direct inc

f a significah the follow

quality (lessresses, esp

e due to hig). side with po

based on inoften of a ve.g. waste

nformation a

F were not oo follow to curing discusoutlined in p

that in the cically-biologcineration b

antly higher wing advanta

s organic), pecially on t

gher "heat-t

ositive effect

Speicherdatum: 201

nformation ovague and panalysis, ge

and to obtai

obtained in convince dessions the articular.

case of an egical treatmbecause of

specific calages on the

reduction othe combus

ight" in the

ts on the de

18-01-29

ob-pre-eo-n a

the eci-as-

en-ent the

lo-e

of s-

e-

CONC

REPORT DA NANG_

st-

At

t

Tf

Tsf

T

t%

T

Tc

Td

T

CLUSION

_REV6_2018-01-29.DOCX

sign dimenstiveness of - Reduction

An mechanthe RDF.

Low-caloric

MBT allowsmanual sor

In the combthermal sideMBT for dry

The combinfeed quanti

The combinstage, this aful with rega

The solublebiogas utilizturbine from% can be a

The energy

The grid preconsiderab

The flue gadensate in t

The combuno longer s

N

sioning (flueflue gas cle

n of specific

nical biologic

c componen

s a higher arting stages

bination of Me. For examying or acce

nation of MBty / quality.

ned processalso resultsards to the

e organic cozation in a cm an incinerachieved.

y loss due to

e-zone can ly higher.

as cleaning the flue gas

stion proceubject to flu

e gas ductseaning. CAPEX / O

cal pre-trea

nts as well a

and more sp).

MBT and comple could eelerating bio

BT and com

s can be bus in a higherexpensive s

omponents combined hration plant.

o evaporatio

be dimens

can be dimes is significa

ess becomeuctuations.

86 - 88

s, blowers, e

OPEX (refer

atment signi

as water are

pecific mate

ombustion texcess heaological pro

mbustion is m

uilt step by sr design andstages (biog

of the wasteat and pow. In a mode

on of the wa

ioned small

ensioned mantly lower.

s significan

8

etc.) as well

rence net e

ficantly red

e removed b

erial utilizatio

here may bt from the ccesses.

more flexibl

step. For ead planning rgas, combu

e are convewer (CHP) srn CHP pla

ater in a com

ler, since th

more cost-ef

ntly more sta

l as the spe

lectricity).

uces the ch

by mechani

on rate (thro

e consideracombustion

le with rega

ach further oreliability, wustion).

erted into enstation is mnt electrical

mbustion pr

he energy co

ffectively sin

able since t

ecific perform

hloride conc

ical pre-trea

ough mecha

able synergprocess be

ards to fluctu

or subsequewhich is part

nergy rich bmore efficien

l efficiencie

rocess is re

ontent of th

nce the amo

he material

Speicherdatum: 201

mance / effe

centration of

atment.

anical and

gies on the e used in the

uations in th

ent design ticularly hel

biogas. The nt than in a s of up to 4

educed.

e waste is

ount of con-

supplied is

18-01-29

ec-

f

e

he

p-

40

-

s

APPE

REPORT DA NANG_

6. APP

ENDICES

_REV6_2018-01-29.DOCX

ENDICES

S

87 - 888 Speicherdatum: 20118-01-29

APPE

REPORT DA NANG_

ENDICES

_REV6_2018-01-29.DOCX

S

88 - 888