w31p4q-13-t-0051 exhibit a page 1 of 58 technical...

58
W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL DOCUMENT SUMMARY LIST DI-MGMT-80368A Status Report 30 Oct 06 Data Item No. A001 CAT 1 DI-MISC-80508B Technical Report-Study/ 14 Noc 06 Data Item No. A002 Services CAT 1 DI-MGMT-80227 Contractor’s Progress, 05 Sep 86 Data Item No. A003 Status, and Management CAT 1 Report DI-ADMN-81373 Presentation Material 01 Oct 93 Data Item No. A004 CAT 1 DI-MGMT-81117 Technical and Management 19 Dec 90 Data Item No. A005 Work Plan DI-ADMN-81505 Report, Record of Meeting/ 20 Nov 95 Data Item No. A006 Minutes DI-MGMT-80004A Management Plan 30 Oct 06 Data Item No. A007 CAT 1 DI-FNCL-80331A Funds and Manhour 30 Oct 06 Data Item No. A008 Expenditure Report CAT 1 DI-ADMN-81313A Progress Report (Studies) 08 Nvo 06 Data Item No. A009 CAT 1 DI-MGMT-81334D Contract Work Breakdown 18 May 11 Data Item No. A010 Structure CAT 1 DI-MGMT-81467 Cost/Schedule Status Report 19 Oct 95 Data Item No. A011 (C/SSR) CAT 1 DI-MGMT-81468 Contract Funds Status Report 19 Oct 95 Data Item No. A012 (CFSR) CAT 1 DI-MGMT-80555A Program Progress Report 14 Nov 06 Data Item No. A013 CAT 1 DI-ADMN-81249A Conference Agenda 01 Oct 93 Data Item No. A014 CAT 1

Upload: duongbao

Post on 30-Jan-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 1 of 58 TECHNICAL

DOCUMENT SUMMARY LIST

DI-MGMT-80368A Status Report 30 Oct 06 Data Item No. A001 CAT 1 DI-MISC-80508B Technical Report-Study/ 14 Noc 06 Data Item No. A002 Services CAT 1 DI-MGMT-80227 Contractor’s Progress, 05 Sep 86 Data Item No. A003 Status, and Management CAT 1 Report DI-ADMN-81373 Presentation Material 01 Oct 93 Data Item No. A004 CAT 1 DI-MGMT-81117 Technical and Management 19 Dec 90 Data Item No. A005 Work Plan DI-ADMN-81505 Report, Record of Meeting/ 20 Nov 95 Data Item No. A006 Minutes DI-MGMT-80004A Management Plan 30 Oct 06 Data Item No. A007 CAT 1 DI-FNCL-80331A Funds and Manhour 30 Oct 06 Data Item No. A008 Expenditure Report CAT 1 DI-ADMN-81313A Progress Report (Studies) 08 Nvo 06 Data Item No. A009 CAT 1 DI-MGMT-81334D Contract Work Breakdown 18 May 11 Data Item No. A010 Structure CAT 1 DI-MGMT-81467 Cost/Schedule Status Report 19 Oct 95 Data Item No. A011 (C/SSR) CAT 1 DI-MGMT-81468 Contract Funds Status Report 19 Oct 95 Data Item No. A012 (CFSR) CAT 1 DI-MGMT-80555A Program Progress Report 14 Nov 06 Data Item No. A013 CAT 1 DI-ADMN-81249A Conference Agenda 01 Oct 93 Data Item No. A014 CAT 1

Page 2: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 2 of 58 DI-ADMN-81250A Conference Minutes 01 Oct 93 Data Item No. A015 CAT 1 DI-MISC-80711A Scientific and Technical 21 Jan 00 Data Item No. A016 Reports CAT 1 DI-MCCR-80700 Computer Software Product 26 Oct 88 Data Item No. A017 End Items CAT 1 DI-ADMN-80925 Revision to Existing 05 Jan 90 Data Item No. A018 Government Document CAT 1 DI-SESS-81758 Logistics Management 16 Jul 08 Data Item No. A019 Information (LMI) Data CAT 1 Product(s) DI-MGMT-80061A Engineering and Technical 28 Mar 91 Data Item No. A020 Services Accomplishment CAT 1 Report DI-ATTS-80283B Test Program Set (TPS) 11 Feb 97 Data Item No. A021 CAT 1 This is not the official title you have to use the official title in block 4 and you can subtitle this in block 5 Acceptance Test Procedures (ATPS) DI-ATTS-80285C Engineering Support Data 09 Feb 06 Data Item No. A022 (ESD) CAT 1 DI-CMAN-80463C Engineering Release Record 30 Sep 00 Data Item No. A023 CAT 1 DI-QCIC-80553a Acceptance Test Plan 14 Nov 06 Data Item No. A024 CAT 1 DI-NDTI-80566A Test Plan 14 Nov 06 Data Item No. A025 CAT 1 DI-CMAN-80639C Engineering Change Proposal 30 Sep 00 Data Item No. A026 CAT 1 DI-CMAN-80642C Notice of Revisions 30 Sep 00 Data Item No. A027 CAT 1

Page 3: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 3 of 58 DI-CMAN-80643C Specification Change Notice 30 Sep 00 Data Item No. A028 CAT 1 DI-DRPR-80651 Engineering Drawings 18 Jul 88 Data Item No. A029 CAT 1 DI-MISC-80750 Technical Data Package 23 Jan 89 Data Item No. A030 Review Report CAT 1 DI-CMAN-80792A Validation Report 21 Jun 91 Data Item No. A031 CAT 1 DI-SESS-81000D Product Drawing and 05 Nov 09 Data Item No. A032 Associated Lists CAT 1 DI-SDMP-81261 Commercial Item Description 28 Apr 92 Data Item No. A033 CAT 1 DI-IPSC-81427A Software Development Plan 10 Jan 00 Data Item No. A034 CAT 1 DI-IPSC-81428A Software Installation Plan 10 Jan 00 Data Item No. A035 CAT 1 DI-IPSC-81429A Software Transition Plan 10 Jan 00 Data Item No. A036 CAT 1 DI-IPSC-81430A Operational Concept 10 Jan 00 Data Item No. A037 Description CAT 1 DI-IPSC-81431A System/Subsystem 10 Jan 00 Data Item No.038 Specification CAT 1 DI-IPSC-81433A Software Requirements 15 Dec 99 Data Item No. A039 Specification CAT 1 DI-IPSC-81435A Software Design Description 15 Dec 99 Data Item No. A040 CAT 1 DI-IPSC-81437A Database Design Description 15 Dec 99 Data Item No. A041 CAT 1 DI-IPSC-81438A Software Test Plan 15 Dec 99 Data Item No. A042 CAT 1 DI-IPSC-81439A Software Test Description 15 Dec 99

Page 4: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 4 of 58 Data Item No. A043 CAT 1 DI-IPSC-81440A Software Test Report 15 Dec 99 Data Item No. A044 CAT 1 DI-IPSC-81441A Software Product 15 Dec 99 Data Item No. A045 Specification CAT 1 DI-IPSC-81442A Software Version Description 11 Jan 00 Data Item No. A046 CAT 1 DI-IPSC-81443A Software User’s Manual 11 Jan 00 Data Item No. A047 CAT 1 DI-IPSC-81444A Software Center Operator 11 Jan 00 Data Item No. A048 Manual CAT 1 DI-IPSC-81445A Software Input/Output Manual 15 Dec 99 Data Item No. A049 CAT 1 DI-IPSC-81446A Computer Operation Manual 15 Dec 99 Data Item No. A050 CAT 1 DI-SDMP-81465A Performance Specification 01 Aug 03 Data Item No. A051 Documents CAT 1 DI-ILSS-81523B Training Conduct Support 30 Aug 01 Data Item No. A052 Document CAT 1 DI-CMAN-80858B Contractor’s Configuration 30 Sep 00 Data Item No. A053 Management Plan CAT 1 DOD 4120.3-M Defense Standardization Jul 93 Tech SOW Program (DSP) Policies CAT 0 para. 3.21.TD1.a And Procedures DI-MISC-80508B Technical Report-Study/ 14 Nov 06 Data Item No. A054 Services CAT 1

Page 5: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 5 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A001 Status Report 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MGMT-80368A Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT. B

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 6: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 6 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A002 Technical Report-Study/Services 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-MISC-80508B Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 7: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 7 of 58

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A003 Contractor’s Progress, Status and Management Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED PRICE

DI-MGMT-80227 Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders. Electronic Copies are to be submitted in Microsoft EXCEL format.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 8: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 8 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A004 Presentation Material 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-ADMN-81373 Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: : Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 9: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 9 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A005 Technical and Management Work Plan 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-MGMT-81117 Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 10: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 10 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A006 Report, Record of Meeting/Minutes 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-ADMN-81505 Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 11: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 11 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A007 Management Plan 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-MGMT-80004A Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 12: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 12 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A008 Funds and Manhour Expenditure Report 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-FNCL-80331A Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 13: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 13 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A009 Progress Report (Studies) 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-ADMN-81313A Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 14: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 14 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A010 Contract Work Breakdown Structure 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-MGMT-81334D Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 15: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 15 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A011 Cost/Schedule Status Report (C/SSR) 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-MGMT-81467 Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM

16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 16: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 16 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A012 Contract Funds Status Report (CFSR) 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-MGMT-81468 Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 17: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 17 of 58

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A013 Program Progress Report 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-MGMT-80555A Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

D D F

Page 18: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 18 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A014 Conference Agenda 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-ADMN-81249A Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 19: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 19 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A015 Conference Minutes 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-ADMN-81250A Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page 20: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 20 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A016 Scientific and Technical Reports 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-MISC-80711A Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 21: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 21 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A017 Computer Software Product End Items 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-MCCR-80700 Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 22: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 22 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A018 Revision to Existing Government Document

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED PRICE

DI-ADMN-80925 Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 23: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 23 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A019 Logistics Management Information (LMI) Data Product(s)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED PRICE

DI-SESS-81758 Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 24: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 24 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A020 Engineering and Technical Services Accomplishment Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED PRICE

DI-MGMT-80061A Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 25: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 25 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A021 Test Program Set (TPS) Acceptance Test Report (ATR)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED PRICE

DI-ATTS-80283B Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 26: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 26 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A022 Engineering Support Data (ESD) 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-ATTS-80285C Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 27: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 27 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A023 Engineering Release Record 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-CMAN-80463C Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 28: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 28 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A024 Acceptance Test Plan 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-QCIC-80553A Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 29: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 29 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A025 Test Plan 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-NDTI-80566A Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 30: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 30 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A026 Engineering Change Proposal 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-CMAN-80639C Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 31: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 31 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A027 Notice of Revisions 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-CMAN-80642C Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 32: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 32 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A028 Specification Change Notice 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-CMAN-80643C Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 33: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 33 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A029 Engineering Drawings 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-DRPR-80651 Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 34: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 34 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A030 Technical Data Package Review Report 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-MISC-80750 Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 35: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 35 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A031 Validation Report 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-MGMT-80792A Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 36: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 36 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A032 Product Drawings and Associated Lists 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-SESS-81000D Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 37: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 37 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A033 Commercial Item Description 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-SDMP-81261 Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 38: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 38 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A034 Software Development Plan 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-IPSC-81427A Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: : Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 39: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 39 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A035 Software Installation Plan 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-IPSC-81428A Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: : Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 40: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 40 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A036 Software Transition Plan 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-IPSC-81429A Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: : Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 41: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 41 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A037 Operational Concept Description 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-IPSC-81430A Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: : Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 42: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 42 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A038 System/Subsystem Specification 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-IPSC-81431A Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: : Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 43: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 43 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A039 Software Requirements Specification 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-IPSC-81433A Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: : Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 44: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 44 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A040 Software Design Description 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-IPSC-81435A Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 45: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 45 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A041 Database Design Description 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-IPSC-81437A Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 46: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 46 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A042 Software Test Plan 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-IPSC-81438A Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 47: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 47 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A043 Software Test Description 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-IPSC-81439A Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 48: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 48 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A044 Software Test Report 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-IPSC-81440A Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 49: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 49 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A045 Software Product Specification 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-IPSC-81441A Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 50: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 50 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A046 Software Version Description 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-IPSC-81442A Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 51: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 51 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A047 Software User’s Manual 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-IPSC-81443A Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 52: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 52 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A048 Software Center Operator Manual 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-IPSC-81444A Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 53: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 53 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A049 Software Input/Output Manual 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-IPSC-81445A Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 54: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 54 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A050 Computer Operation Manual 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-IPSC-81446A Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 55: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 55 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A051 Performance Specification Documents 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-SDMP-81465A Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 56: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 56 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A052 Training Conduct Support Document 4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

PRICE

DI-ILSS-81523B Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90

Page 57: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 57 of 58

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A053 Contractor’s Configuration Management Plan

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED PRICE

DI-CMAN-80858B Tech SOW para 4.0 SEE ITEM 16 NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEE ITEM 16

SEE ITEM 16 b. COPIES SECT.

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16 Reg

Repro

16. REMARKS: Blocks 7-14: Will be defined in individual task orders.

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page 58: W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL …acc.army.mil/contractingcenters/acc-rsa/files/ExpressRFQ/Tech/Tech... · W31P4Q-13-T-0051 EXHIBIT A Page 1 of 58 TECHNICAL . DOCUMENT

W31P4Q-13-T-0051 EXHIBIT A

Page 58 of 58

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Technical 1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GRO

A054 Technical Report-Study/Services Performance Review Report 4. AUTHORIA020TY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MISC-80508B BPA Para 45 AMSAM-AC-OS-OA NSP 7. DD 250 REQ 9.DIST STATEMENT

REQUIRED 10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION IN SEE

ITEM 16

SEMIA SEE ITEM 16

b. COPIES SECT. B

8. APP CODE SEE ITEM 16

11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION

a. ADDRESSEE Draft

Final

SEE ITEM 16

SEE ITEM 16

SEE ITEM 16

Reg

Repro

16. REMARKS: The semi-annual report shall be delivered 15 days after the end of the Ninth (9) month after Blanket Purchase Agreement (BPA) award and every sixth (6) month thereafter. The second semi-annual submission shall include a short summary and then a year to date roll-up for the entire program, followed by a breakout for the base period and each award year..

SEE ITEM 16 0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, 1 Jun 90