waller creek 8 th street side weir cfd modeling and simulation alden research laboratory inc. 30...

24
Waller Creek 8 th Street Side Weir CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September 1, 2009 Scenario 4

Upload: theodora-randall

Post on 22-Jan-2016

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Waller Creek 8 th Street Side Weir CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September

Waller Creek 8th Street Side Weir CFD Modeling and Simulation

ALDEN Research Laboratory Inc.30 Shrewsbury St., Holden, MA 01520

Preliminary Results

September 1, 2009

Scenario 4

Page 2: Waller Creek 8 th Street Side Weir CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September

Iso-surface plot of water colored with velocity magnitude (solid component is transparent to see the water surface)

* velocity magnitude color scale shows the actual range of velocity values throughout the system

(ft/s)

Page 3: Waller Creek 8 th Street Side Weir CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September

Iso-surface plot of water colored with velocity magnitude (solid component is not shown to see clearly the water surface)

* velocity magnitude color scale shows the actual range of velocity values throughout the system

(ft/s)

Page 4: Waller Creek 8 th Street Side Weir CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September

Iso-surface plot of water colored with free surface elevation

(Plan view)

(ft)

Page 5: Waller Creek 8 th Street Side Weir CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September

Iso-surface plot of water colored with free surface elevation

(showing water surface elevation in the building)

(ft)

Page 6: Waller Creek 8 th Street Side Weir CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September

Iso-surface plot of water colored with free surface elevation

(showing water surface elevation downstream of inline weir)

* note the color scale range: 458 ft. to 460 ft.

(ft)

Page 7: Waller Creek 8 th Street Side Weir CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September

Plot of velocity contour with vectors(slice plane cut at elevation 457 ft.)

Page 8: Waller Creek 8 th Street Side Weir CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September

Plot of velocity contour with vectors(slice plane cut at elevation 457 ft.)

Page 9: Waller Creek 8 th Street Side Weir CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September

Plot of velocity contour with vectors(slice plane cut at elevation 455 ft.)

Page 10: Waller Creek 8 th Street Side Weir CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September

Plot of velocity contour with vectors(slice plane cut at elevation 455 ft.)

Page 11: Waller Creek 8 th Street Side Weir CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September

Plot of velocity contour(slice plane cut vertically at different locations.)

Page 12: Waller Creek 8 th Street Side Weir CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September

Plot of velocity contour with vectors(slice plane cut at elevation 445 ft.)

Page 13: Waller Creek 8 th Street Side Weir CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September

Plot of velocity contour with vectors(slice plane cut at elevation 445 ft.)

* same with slide 12 except walls were removed for clear view under the net deck.

Page 14: Waller Creek 8 th Street Side Weir CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September

Plot of velocity contour with vectors(slice plane cut at elevation 445 ft.)

* same with slide 13 with different color scale.

Page 15: Waller Creek 8 th Street Side Weir CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September

Plot of velocity contour with vectors(slice plane cut at elevation 445 ft.)

* closer look at the building

Page 16: Waller Creek 8 th Street Side Weir CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September

Plot of velocity contour with vectors(slice plane cut at elevation 445 ft.)

* same with slide 15 with different color scale.

Page 17: Waller Creek 8 th Street Side Weir CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September

Velocity contour plot of water at the entrance of each bay

Average velocity, V = 6.96 ft/s

Volume flow rate, Q = 205 cfs

Average velocity, V = 7.72 ft/s

Volume flow rate, Q = 147 cfs

Average velocity, V = 12.69 ft/s

Volume flow rate, Q = 343 cfs

Page 18: Waller Creek 8 th Street Side Weir CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September

(streamlines are shown entering the building)

Velocity contour plot of water at the entrance of each bay

Page 19: Waller Creek 8 th Street Side Weir CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September

Plot of streamlines colored with velocity magnitude(plan view)

Page 20: Waller Creek 8 th Street Side Weir CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September

Plot of streamlines colored with velocity magnitude(isometric view)

Page 21: Waller Creek 8 th Street Side Weir CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September

Plot of streamlines colored with velocity magnitude(isometric view)

Page 22: Waller Creek 8 th Street Side Weir CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September

Plot of streamlines colored with velocity magnitude(isometric view)

Page 23: Waller Creek 8 th Street Side Weir CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September

Plot of streamlines colored with velocity magnitude(plan view)

Page 24: Waller Creek 8 th Street Side Weir CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results September

Plot of streamlines colored with velocity magnitude(plan view)