  • 8/8/2019 Walterdale Bridge Replacement Presentation

    1/26

    www.edmonton.ca/RoadPlans

    Public Open House

    November 18, 2010

  • 8/8/2019 Walterdale Bridge Replacement Presentation

    2/26

    www.edmonton.ca/RoadPlans

    ee ng urpose

    To provide background and context information

    To share information on potential roadway modifications and

    bridge style options

    To gather your input on the options, specifically how they

    impact:

    Your use of the area as a motorist, transit user, resident, visitor,

    cyclist, and/or pedestrian;

    Nei hbourhood and communit access and

    Use and enjoyment of the River Valley and its parks and

    facilities.

    November 18, 2010Slide 2

  • 8/8/2019 Walterdale Bridge Replacement Presentation

    3/26

    www.edmonton.ca/RoadPlans

    gen a

    Project Objectives & Timelines

    Background & Context

    Ke Desi n Considerations

    Roadway Options

    Bridge Styles

    Question & Answer Session

    November 18, 2010Slide 3

  • 8/8/2019 Walterdale Bridge Replacement Presentation

    4/26

    www.edmonton.ca/RoadPlans

    ro ec me nes an ec ves

    Concept Phase: Review and evaluate alternatives, including

    Bridge location;

    Signature bridge styles;

    Approaches/exits (Queen Elizabeth Park Road/Walterdale

    Road ;

    Access for affected adjacent stakeholders; and,

    Safe accommodation of pedestrians and non-motorized

    .

    November 18, 2010Slide 4

  • 8/8/2019 Walterdale Bridge Replacement Presentation

    5/26

    www.edmonton.ca/RoadPlans

    ac groun on ex

    A replacement bridge is needed

    2008 study (Walterdale Bridge Crossing Strategic Planning

    Concept Study.)

    The replacement will be a functional signature bridge.

    Concept design to include location, alignment, impacts and

    constraints.

    Project work is being coordinated with other planning initiatives in

    the area, specifically including:

    West Rossdale Urban EPCOR Rossdale

    Design Plan Repurposing Expo 2017

    November 18, 2010Slide 5

  • 8/8/2019 Walterdale Bridge Replacement Presentation

    6/26

    www.edmonton.ca/RoadPlans

    ey es gn ons era ons

    ccess ra c accommo a on rom ve o venue.

    Grades at south approach.

    Detouring and closure impacts, utility staging.

    Aesthetics signature bridge.

    Traditional Burial Grounds and Fort Edmonton Cemetery

    Commemoration Site, historical resources.

    North Saskatchewan River Valley plans.

    Environmental policies and procedures.

    ,Rossdale repurposing, EXPO 2017 bid, and other area plans.

    Pedestrian and cyclist accommodation.

    November 18, 2010Slide 6

  • 8/8/2019 Walterdale Bridge Replacement Presentation

    7/26

    www.edmonton.ca/RoadPlans

    a e ear

    on uc e mee ngs n erv ews w ey s a e o er groups o a e.

    Met twice with Aboriginal Elders, including a pipe ceremony.

    Issues raised by key stakeholders:

    o The project presents an opportunity to address vehicle traffic issues

    and to improve pedestrian and cyclist circulation throughout the

    area.

    o The challenge for this project is to achieve a balance between

    providing improved access for private vehicles to downtown

    Edmonton and protecting/preserving the character, safety and

    integrity of the communities that the roadways approaching thebridge replacement will be impacting.

    November 18, 2010Slide 7

  • 8/8/2019 Walterdale Bridge Replacement Presentation

    8/26

    www.edmonton.ca/RoadPlans

    a e ear con

    ssues a se y ey a e o ers:

    o Better signage and wayfinding should be provided to improve

    circulation into and out of the river valley.

    o The bridge design needs to reflect the history of the area.

    o This is a relatively small area and the bridge and roadways must fit

    the small area.

    o East/west flows (River Valley Road through Rossdale) must be

    maintained and/or improved.

    o Make better use of Gatewa Boulevard and Cal ar Trail not 99

    Street and 109 Street) to funnel vehicle traffic in and out ofdowntown.

    November 18, 2010Slide 8

  • 8/8/2019 Walterdale Bridge Replacement Presentation

    9/26

    www.edmonton.ca/RoadPlans

    a e ear con

    ssues a se y ey a e o ers:

    o Current traffic volumes on Gateway Boulevard, Calgary Trail and

    109 Street onto Walterdale Hill and Queen Elizabeth Park Road are

    o era e, u ese s ou no ncrease an no a ona proper y

    or parkland should be sacrificed to achieve greater roadway

    capacity.o o no con nue o ave anes sou o e r ge ave o merge

    into two lanes on the bridge and then expect to 4 lanes again on the

    other side of the bridge.

    o wo way ra c on e r ge s es ra e.

    November 18, 2010Slide 9

  • 8/8/2019 Walterdale Bridge Replacement Presentation

    10/26

    www.edmonton.ca/RoadPlans

    a o ou n

    ow o ese op ons mpac :

    Your use of the area as a motorist, transit user, resident, visitor,

    cyclist, and/or pedestrian;

    Neighbourhood and community access; and,

    Use and en o ment of the River Valle and its arks and facilities.

    November 18, 2010Slide 10

  • 8/8/2019 Walterdale Bridge Replacement Presentation

    11/26

    www.edmonton.ca/RoadPlans

    oa way p on

    November 18, 2010Slide 11

  • 8/8/2019 Walterdale Bridge Replacement Presentation

    12/26

    www.edmonton.ca/RoadPlans

    oa way p on

    November 18, 2010Slide 12

  • 8/8/2019 Walterdale Bridge Replacement Presentation

    13/26

    www.edmonton.ca/RoadPlans

    oa way p on

    November 18, 2010Slide 13

  • 8/8/2019 Walterdale Bridge Replacement Presentation

    14/26

    www.edmonton.ca/RoadPlans

    oa way p on

    November 18, 2010Slide 14

  • 8/8/2019 Walterdale Bridge Replacement Presentation

    15/26

    www.edmonton.ca/RoadPlans

    gna ure r ge

    Point of pride

    Entrance to downtown

    Touch the water

    Examples

    High Level Bridge,

    Edmonton

    Brooklyn Bridge, New York

    Lions Gate Bridge,

    Vancouver

    Le Pont du Gard,

    near Nimes, France

    November 18, 2010Slide 15

  • 8/8/2019 Walterdale Bridge Replacement Presentation

    16/26

    www.edmonton.ca/RoadPlans

    r ge equ remen s

    River crossing

    Vehicular traffic

    Pedestrians

    Respect

    Existing bridge heritage

    Histor of site

    Cyclists Legislature grounds

    Adjacent neighborhoods

    Legacy

    Residents and tourists

    1% for public art

    November 18, 2010Slide 16

  • 8/8/2019 Walterdale Bridge Replacement Presentation

    17/26

    www.edmonton.ca/RoadPlans

    x s

    Precedents

    Section through river valley

    Bridge types

    Girder

    Arch

    Extradosed

    Cable-stayed

    November 18, 2010Slide 17

  • 8/8/2019 Walterdale Bridge Replacement Presentation

    18/26

    www.edmonton.ca/RoadPlans

    r er

    New I-35W Bridge

    Minnea olis Minnesota

    November 18, 2010Slide 18

  • 8/8/2019 Walterdale Bridge Replacement Presentation

    19/26

    www.edmonton.ca/RoadPlans

    rc

    Apollo Bridge,

    Slovakia

    November 18, 2010Slide 19

  • 8/8/2019 Walterdale Bridge Replacement Presentation

    20/26

    www.edmonton.ca/RoadPlans

    x ra ose

    Golden

    Ears Bridge,

    November 18, 2010Slide 20

  • 8/8/2019 Walterdale Bridge Replacement Presentation

    21/26

    www.edmonton.ca/RoadPlans

    a e-s aye

    Photo by zoetnet

    Erasmus Bridge,

    November 18, 2010Slide 21

    ,Photo by jar0d

  • 8/8/2019 Walterdale Bridge Replacement Presentation

    22/26

    www.edmonton.ca/RoadPlans

    e es r ans an yc s s

    Safety

    Connection

    Inte ration with trails

    Experience not speed

    Alameda Bridge

    Valencia S ain

    November 18, 2010Slide 22

  • 8/8/2019 Walterdale Bridge Replacement Presentation

    23/26

    www.edmonton.ca/RoadPlans

    ex eps

    Project Timelines

    Interim Plan Goes to Transportation and Public Works Committee

    Januar 2011

    Public Information Session

    February/March 2011

    April 2011

    Plan Goes to Council

    April 2011

    November 18, 2010Slide 23

  • 8/8/2019 Walterdale Bridge Replacement Presentation

    24/26

    www.edmonton.ca/RoadPlans

    a o ou n

    How do these options impact:

    Your use of the area as a motorist, transit user, resident, visitor,

    cyclist, and/or pedestrian;

    Neighbourhood and community access; and,

    November 18, 2010Slide 24

  • 8/8/2019 Walterdale Bridge Replacement Presentation

    25/26

    www.edmonton.ca/RoadPlans

    To ensure everyone has a chance to be heard:

    Each speaker will have 2 minutes for their question or comment. 1

    minute is allowed for1 follow-up question.

    3 people may ask questions in each round. They will be given

    microphones.

    There will be 3 rounds of questions.

    Additional questions from same person not recognized until no new

    participants are wanting to ask questions.

    Please use micro hones as this session is bein recorded.

    November 18, 2010Slide 25

  • 8/8/2019 Walterdale Bridge Replacement Presentation

    26/26

    www.edmonton.ca/RoadPlans

    os ng

    .

    Please visit the display area to view the alternatives and speak withproject team members.

    ease ou commen orms.

    November 18, 2010Slide 26