WAMBO COAL PTY LIMITED
EXTRACTION PLAN
LONGWALLS 11 TO 16
SOUTH BATES UNDERGROUND MINE
APPENDIX HSUBSIDENCE MONITORING PROGRAM
WAMBO COAL PTY LIMITED SOUTH BATES UNDERGROUND MINE
SUBSIDENCE MONITORING PROGRAM
LONGWALLS 11 - 16
PREPARED BY WAMBO COAL PTY LIMITED
JANUARY 2017 Project No. WAM-09-15 Document No. 00820060
Subsidence Monitoring Program – South Bates Underground Mine Longwalls 11-16
SMP LW11-16 Rev E January 2017 Page i
DOCUMENT CONTROL
Document No. SMP LW11-16
Title Subsidence Monitoring Program for South Bates Underground Mine Longwalls 11 to 16 (Whybrow and Wambo Seams)
General Description Monitoring program for subsidence effects for mining of Longwalls 11 to 16 at the South Bates Underground Mine
Key Support Documents - Revisions
Rev No Date Description By Checked
A October 2015 Survey Updates M. Walker -
B October 2015 Final for Submission M. Walker T. Britten
C January 2016 Incorporation of Addendum
WCPL and Resource Strategies
T. Britten
D November 2016 Update to include Longwalls 14 to 16
WCPL and Resource Strategies
-
E January 2017 Final for Submission WCPL and Resource Strategies
M. Walker/ T. Britten
The nominated Coordinator for this document is Technical Services Manager
Subsidence Monitoring Program – South Bates Underground Mine Longwalls 11-16
SMP LW11-16 Rev E January 2017 Page ii
TABLE OF CONTENTS Section Page
1 INTRODUCTION 1
2 SCOPE 1
3 SUBSIDENCE EFFECTS MONITORING AND REPORTING 3 3.1 SUBSIDENCE MONITORING DETAILS 3 3.2 SURVEY ACCURACY AND FREQUENCY 3 3.3 SUBSIDENCE EFFECTS RECORDING AND REPORTING 3
4 MONITORING OF ENVIRONMENTAL CONSEQUENCES 5
5 ROLES AND RESPONSIBILITIES 12
6 REFERENCES 12
LIST OF TABLES
Table 1 Subsidence Effects Monitoring Program Summary
Table 2 Longwalls 11 to 16 Monitoring Program Summary Table 3 Subsidence Monitoring Program Responsibilities Summary
LIST OF FIGURES
Figure 1 Locations of Surface Water and Groundwater Monitoring Sites
Figure 2 Locations of Relevant Biodiversity Monitoring Sites
LIST OF ATTACHMENTS
Attachment 1 Existing and Proposed Subsidence Monitoring Lines
Attachment 2 Subsidence Impact Register
Subsidence Monitoring Program – South Bates Underground Mine Longwalls 11-16
SMP LW11-16 Rev E January 2017 Page 1
1 INTRODUCTION The Wambo Coal Mine is an open cut and underground coal mining operation located approximately 15 kilometres west of Singleton, near the village of Warkworth, New South Wales (NSW). The Wambo Coal Mine is owned and operated by Wambo Coal Pty Limited (WCPL), a subsidiary of Peabody Energy Australia Pty Limited. The South Bates Underground Mine is a component of the approved Wambo Coal Mine. The South Bates Underground Mine commenced in Longwall 11 in February 2016 and involves extraction of coal by longwall mining methods from the Whybrow Seam and Wambo Seam within Coal Lease (CL) 397 and Mining Lease (ML) 1594. This Subsidence Monitoring Plan forms a part of the Extraction Plan being developed for the approved Longwalls 11 to 16. This Subsidence Monitoring Plan has been updated from the previous revision (Revision C) to incorporate Longwalls 14 to 16 in the Wambo Seam.
2 SCOPE Purpose: This Subsidence Monitoring Program for Longwalls 11 to 16 outlines the monitoring
program for subsidence effects for mining of Longwalls 11 to 16 at the South Bates Underground Mine.
Scope: This Subsidence Monitoring Program covers the Longwalls 11 to 16 Application Area. This Subsidence Monitoring Program is a component of the South Bates Underground Mine Longwalls 11 to 16 Extraction Plan. The Subsidence Monitoring Program has been prepared in accordance with Condition 22C(g) of Schedule 4 of the Development Consent (DA 305-7-2003), which states:
22C. The Applicant must prepare and implement an Extraction Plan for the second workings within each seam to be mined to the satisfaction of the Secretary. Each Extraction Plan must:
...
(g) include the following to the satisfaction of DRE:
...
• a subsidence monitoring program to:
– provide data to assist with the management of the risks associated with subsidence;
– validate the subsidence predictions; and
– analyse the relationship between the subsidence effects and impacts under the plan and any ensuing environmental consequences;
…
Subsidence Monitoring Program – South Bates Underground Mine Longwalls 11-16
SMP LW11-16 Rev E January 2017 Page 2
This program has been prepared in consideration of the Draft Guidelines for the Preparation of Extraction Plans Required under Conditions of Development Consents, Project Approvals and Mining Lease Conditions for Underground Coal Mining (Version 5) (Department of Planning and Environment and NSW Trade & Investment – Division of Resources and Energy, 2015), which requires: • proposed subsidence monitoring activities (individually specified);
• information or subsidence parameters to be obtained from each monitoring activity;
• proposed locations and/or extents where each monitoring activity will be undertaken, in particular, the proposed layout and/or locations of instrumentation, monitoring points or inspections (including graphical plans);
• proposed timing, frequency and duration of each monitoring activity;
• proposed monitoring methods, technologies, industry standards or Codes of Practice to be applied in undertaking each monitoring activity;
• proposed measures and procedures for quality assurance and competence of personnel undertaking monitoring activities;
• proposed procedures to record monitoring results;
• proposed reporting of monitoring results;
• capacity of the program to detect early warning of deviations from the defined performance measures and associated performance indicators;
• summarise and consolidate the various monitoring programs presented in each of the key component plans; and
• figures showing the monitoring sites for each of the various monitoring programs. Proposed monitoring and reporting of subsidence effects for Longwalls 11 to 16 is described in Section 3. A summary of monitoring of subsidence impacts and environmental consequences is described in Section 4. This Subsidence Monitoring Program has been prepared by WCPL. The appointment of the team of suitably qualified and experienced experts (which includes representatives from WCPL) has been endorsed by the Secretary of the Department of Planning and Environment (DPE).
Subsidence Monitoring Program – South Bates Underground Mine Longwalls 11-16
SMP LW11-16 Rev E January 2017 Page 3
3 SUBSIDENCE EFFECTS MONITORING AND REPORTING
3.1 SUBSIDENCE MONITORING DETAILS Subsidence monitoring lines are monitored until negligible subsidence is detected. Discontinuance of survey of these lines will be totally at the discretion of the Division of Resources and Energy Principal Subsidence Engineer. The monitoring lines for Longwalls 11 to 16 (Line 7XL, Line CL11B, Line CL13B) have been installed as star pickets driven to refusal with a mark then punched into the top and labelled. The marks have been capped with a protective cover that will be removed during survey. Survey pegs shall generally be a minimum of 10 m and a maximum of 20 m apart. Surveys shall be carried out using either differential levelling to class LC accuracy or Trig heightening methods to an accuracy of class B as specified in the Inter-Governmental Committee on Surveying and Mapping Special Publication 1. LiDAR monitoring lines (DL11, CL11A, CL12A and CL13A) will be analysed by creating a surface profile along the line from 3 dimensional LiDAR data. The potential for survey error due to displacement of the data would be minimised through the use of fixed reference points outside the angle of draw. Details of any subsidence impacts observed would be recorded in the Subsidence Impact Register with visual observations documented in the Subsidence Impact Register Assessment Form (Attachment 2). Visual inspections would be undertaken in accordance with the inspection checklist provided in Attachment 2. The Subsidence Impact Register will be maintained as an electronic spread sheet on-site, with hard copies of assessment forms filed in a folder. The data collected under this monitoring program for Longwalls 11 to 16 will be provided to the Division of Resources and Energy in a timely fashion and a suitable format.
3.2 SURVEY ACCURACY AND FREQUENCY The prescribed accuracy, as defined by the Inter-Governmental Committee on the Survey and Mapping Special Publication 1 (ICSM SP1) and the required frequency of the surveys can be seen in Table 1.
3.3 SUBSIDENCE EFFECTS RECORDING AND REPORTING Subsidence survey data for the South Bates Underground Mine will be stored by WCPL in a centralised database, with results from each survey clearly demarcated. Subsidence survey data is provided to the Division of Resources and Energy Principal Subsidence Engineer promptly following each survey. Subsidence effects are also reported under the reporting framework of the Extraction Plan.
Subsidence Monitoring Program – South Bates Underground Mine Longwalls 11-16
SMP LW11-16 Rev E January 2017 Page 4
Table 1 Subsidence Effects Monitoring Program Summary
Survey Line Data Type Survey Accuracy Classification Survey Frequency Survey Status
Visual Inspections
As per the Subsidence Impact Register provided in
Attachment 2
N/A • Within 1 month of longwall extraction that may cause surface movement.
• 3 monthly or more frequent in areas of significance such as creeks, roads and buildings.
• As per monitoring program.
Line 7XL x, y, z ICSM Class B or LC • Twice prior to Longwall extraction that will cause surface movement.
• After completion of each Longwall block.
• Installed and surveyed pre LW11.
• Surveyed post LW11.
Line CL11B z (level and strain
distances)
ICSM Class B or LC • Twice prior to Longwall extraction that will cause surface movement.
• After completion of each Longwall block.
• Installed and surveyed pre LW11.
• Surveyed post LW11.
Line CL13B z (level and strain
distances)
ICSM Class B or LC • Prior to Longwall extraction that will cause surface movement.
• After completion of each Longwall block.
• Installed.
• Base Survey pre LW13 pending.
DL11 Random x, y, z (LiDAR)
<150mm Vert (1 sigma)
• Prior to Longwall extraction that will cause surface movement.
• After completion of each Longwall block.
• Surveyed pre LW11-16.
• Surveyed post LW11.
CL11A Random x, y, z (LiDAR)
<150mm Vert (1 sigma)
• Prior to Longwall extraction that will cause surface movement.
• After completion of each Longwall block.
• Surveyed pre LW11-16.
CL12A Random x, y, z (LiDAR)
<150mm Vert (1 sigma)
• Prior to Longwall extraction that will cause surface movement.
• After completion of each Longwall block.
• Surveyed pre LW11-16.
DL13 Random x, y, z (LiDAR)
<150mm Vert (1 sigma)
• Prior to Longwall extraction that will cause surface movement.
• After completion of each Longwall block.
• Surveyed pre LW11-16.
CL13A Random x, y, z (LiDAR)
<150mm Vert (1 sigma)
• Prior to Longwall extraction that will cause surface movement.
• After completion of each Longwall block.
• Surveyed pre LW11-16.
Subsidence Monitoring Program – South Bates Underground Mine Longwalls 11-16
SMP LW11-16 Rev E January 2017 Page 5
4 MONITORING OF ENVIRONMENTAL CONSEQUENCES The various monitoring programs presented in each of the management plans under the Extraction Plan are summarised in Table 2 and the location of environmental monitoring sites included in Wambo’s various environmental monitoring programs are presented in Figures 1 and 2. Figure 1 presents the location of surface water and groundwater monitoring sites. Figure 2 presents the location of biodiversity monitoring sites. As described in Table 2, visual observation of the Wollemi National Park escarpment will be undertaken as part of the BMP monitoring program. Details of any subsidence impacts observed will be recorded in the Subsidence Impact Register with visual observations documented in the Subsidence Impact Register Assessment Form as provided in Attachment 2. Visual inspections will be undertaken in accordance with the inspection checklist provided in Attachment 2. The Subsidence Impact Register will be maintained as an electronic spreadsheet on-site, with hard copies of assessment forms filed in a folder.
Subsidence Monitoring Program – South Bates Underground Mine Longwalls 11-16
SMP LW11-16 Rev E January 2017 Page 6
Table 2 Longwalls 11 to 16 Monitoring Program Summary
Management Plan Monitoring Component Parameter Frequency
Water Management Plan Bed and bank stability. • Monitoring to distinguish between erosion from mine subsidence instability and erosion from other causes along North Wambo Creek Diversion and Stony Creek.
• In accordance with the SWMP.
Monitoring of surface water quality and flow monitoring sites.
• Monitoring of surface water flow and quality along North Wambo Creek Diversion, Stony Creek and Wollombi Brook in accordance with the SWMP.
• In accordance with the SWMP.
Monitoring of groundwater level and quality.
• Monitoring of groundwater level and quality within the vicinity of the Wambo Coal Mine.
• In accordance with the GWMP.
Inflows to underground workings. • Dewatering volumes and underground water levels in accordance with the GWMP.
• In accordance with the SWMP.
Diversion and subsidence monitoring program for the North Wambo Creek Diversion.
• As outlined in the SWMP, including: monitoring of Index of Diversion Condition; Landscape Function Analysis (LFA); riparian vegetation; aerial photography; long and cross-section surveys (extracted from LiDAR); and geomorphic condition and efficacy of subsidence management or rehabilitation works.
• In accordance with the SWMP.
Visual inspection of the North Wambo Creek Diversion.
• Inspections for surface cracking and/or surface ponding.
• Daily inspections when extraction is occurring directly beneath North Wambo Creek Diversion.
Land Management Plan Fences. • Visual observation to record the initial condition of fences.
• Visual observation to record the condition of fences following extraction of Longwalls 11 to 16.
• Prior to secondary extraction of Longwalls 11 to 16.
• Following completion of secondary extraction of Longwalls 11 to 16.
Subsidence Monitoring Program – South Bates Underground Mine Longwalls 11-16
SMP LW11-16 Rev E January 2017 Page 7
Table 2 (Continued) Longwalls 11 to 16 Monitoring Program Summary
Management Plan Monitoring Component Parameter Frequency
Land Management Plan (Cont.)
Ground surface. • Visual observation to record the initial condition of the ground surface.
• Visual observations of the ground surface behind the longwall face to identify potential surface cracks.
• Visual observations of low lying areas (i.e. the North Wambo Creek Diversion) to identify potential surface ponding.
• Visual observations of the ground surface to identify stabilisation of erosion and groundcover.
• Prior to secondary extraction of Longwalls 11 to 16.
• Monthly inspections during secondary extraction of Longwalls 11 to 16, increased to weekly inspections during extraction within 100 m of the North Wambo Creek Diversion.
• Following a significant rainfall event (i.e. 40 mm within 24 hours).1
• Monthly inspections until stabilisation of erosion and groundcover is >60%.
Cliffs. • Visual observations of cliffs for signs of recent rock fall and/or instability (high definition video/photos recorded via an unmanned aerial vehicle [UAV]).
• Prior to secondary extraction of Longwalls 11 to 16; following completion of secondary extraction of Longwall 11; following completion of secondary extraction of Longwall 12; following completion of secondary extraction of Longwall 13; following completion of secondary extraction of Longwall 14; following completion of secondary extraction of Longwall 15; and following completion of secondary extraction of Longwall 16.
Subsidence Monitoring Program – South Bates Underground Mine Longwalls 11-16
SMP LW11-16 Rev E January 2017 Page 8
Table 2 (Continued) Longwalls 11 to 16 Monitoring Program Summary
Management Plan Monitoring Component Parameter Frequency
Biodiversity Management Plan General monitoring of flora, fauna and aquatic ecosystems.
• Monitoring in accordance with the BMP. • In accordance with the BMP.
Subsidence impacts to Wollemi National Park escarpment.
• Visual observations of the Wollemi National Park escarpment for signs of recent rock fall and/or instability (high definition video/photos recorded via an UAV).
• Prior to and following completion of each longwall in accordance with the LMP.
Heritage Management Plan Artefact scatters and isolated finds.
• Surface cracks and/or erosion in the vicinity of artefact scatters or isolated finds.
• In accordance with the HMP (monthly during extraction of longwall panels in immediate proximity to a site).
Built Features Management Plan –
WCPL Asset Management Plan
All built features. • Visual observations to record the general condition of WCPL assets including safety and serviceability.
• Monthly inspection during secondary extraction of Longwalls 11 to 16.
Active service lines. • Visual observations to record the general condition of WCPL active service lines including safety and serviceability.
• Daily inspections commencing when secondary extraction is within 100 m of WCPL active service lines and undertaken until the active mining face is 100 m past the line.
Culverts. • Visual observations to record cracking of concrete culverts or grade reversal.
• Prior to secondary extraction within 100 m of culverts and undertaken at 50 m intervals until the active mining face is 100 m past the culverts.
Roads and tracks. • Visual observations to record condition of roads and tracks, including surface cracks, buckling and general safety.
• Prior to secondary extraction within 100 m of any WCPL asset and undertaken at 50 m intervals until the active mining face is 100 m past the WCPL asset.
Subsidence Monitoring Program – South Bates Underground Mine Longwalls 11-16
SMP LW11-16 Rev E January 2017 Page 9
Table 2 (Continued) Longwalls 11 to 16 Monitoring Program Summary
Management Plan Monitoring Component Parameter Frequency
Built Features Management Plan –
WCPL Asset Management Plan (Cont.)
Mine dewatering and water supply pipelines.
• Monitoring of pipeline integrity at fixed points.
• Monitoring to detect abnormal changes in flow.
• Daily inspections commencing when secondary extraction is within 100 m of WCPL active service lines and undertaken until the active mining face is 100 m past the pipeline.
• Continuous (SCADA) monitoring of pump and pipeline conditions.
Public Safety Management Plan
Fences. • Visual observation to record the initial condition of fences.
• Visual observations to record the condition of fences during extraction of Longwalls 11 to 16.
• Visual observations to record the condition of fences following extraction of Longwalls 11 to 16.
• Prior to secondary extraction of Longwalls 11 to 16.
• Monthly inspections during secondary extraction of Longwalls 11 to 16.
• Following completion of secondary extraction of Longwalls 11 to 16.
Warning signs.
• Visual observation to record the initial condition of existing warning signs (e.g. legibility).
• Visual observations to record the condition of warning signs (e.g. legibility) during extraction of Longwalls 11 to 16.
• Prior to secondary extraction of Longwalls Longwalls 11 to 16.
• Monthly inspections during secondary extraction of Longwalls Longwalls 11 to 16.
Rehabilitation Management Plan (MOP)
Remediate subsidence areas. • Visual monitoring to identify any requirement for maintenance measures and/or remedial works.
• Monthly inspections until monitoring confirms stabilisations of erosion and groundcover is >60%.
Installed sediment control structures.
• Inspected of capacity, structural integrity and effectiveness in accordance with the ESCP.
• Monthly and/or following a significant rainfall event (i.e. 20 mm within 24 hours, midnight to midnight).
1 Inspection to occur once access is practically available following the rainfall event. Inspections would not occur for subsequent rainfall events within 7 days of previous inspection.
Scrub
Road
Wallaby
(Jerrys Plains Road)
HighwayGolden
!(
!?
!?
!? !? !?!?
!?
!?
!?
!?
!?
!?
!?
!?
!?
!?
!?!?
!?
!?
!?
!?
!?
!?
!?
!?!?
!?
!?!?
!?
!?
!?
!?
!?
!?
!?
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
WollombiBrook
Wollombi
Brook"
Approved Montrose Water Storage(Not Yet Constructed)
Wam
bo
Creek
WOLLEMI NATIONAL PARK
Creek
Ston
y
"
Previous Alignment of North Wambo Creek
DD Extension
A
C
B
United Collieries
"
South Wambo Dam
WARKWORTH
"
Wambo Access Road
"Wambo Coal Terminal
Hunter ValleyOperations
"
Product CoalConveyor
"
Administration Buildingsand Workshops
WarkworthMine
RWEP Wambo Coal Terminal
Hunter ValleyOperations
CCL 743
CCL 743
"
North Wambo Creek Diversion
LW12
LW13
LW16
LW15
LW14
LW11
"South Bates (Wambo Seam)
Underground Mine
"
South Bates (Whybrow Seam)
Underground Mine
E
Wambo Cr
eek
North
Waterfa
ll
Creek
Redbank Creek
Hunter
River
"
Administration Access Road(Not Constructed)
"
CHPP Portal
FM1
FM11
SW01!(!(
CL 397
ML 1594
ML1594
CL 365
CCL 743
ML 1402
ML 1572 CL 374
SW14
SW20
SW32a
FM2
FM4
FM5
FM6
FM7
FM8
FM9
FM10
FM3
SW02
SW03
SW04
SW05
SW06
SW07
SW08
SW12
SW15
SW27a
SW29
SW30
SW31
SW38
SW39
SW40
SW52
SW54
P106P109
P114P116
P202
P206P301
P315
GW02
GW08
GW09
GW11
GW12
GW13
GW14
GW15
GW16 GW17
GW18
GW19
GW21
GW22
N2
N3
N5
BH2ABH2
BH4C
BH1FBH1G
WAMBORE SOUTH
WAMBO-03
P1
P3
P11
P16
P20
305000
3050
00
310000
3100
00315000
3150
00
6390000 6390000
6395000 6395000
WAM-09-15_Sth Bates EP_Longwalls11-16_SMP_201C
Locations of Surface Water andGroundwater Monitoring Sites
Figure 1
0 2
Kilometres
W A M B O C O A L M I N E±
Source: Department of Lands (July 2009); WCPL (2016); WCPL Orthophoto (July 2016)
LEGENDWCPL Owned LandMining and Coal Lease BoundaryExisting/Approved Surface Development AreaSouth Bates (Whybrow Seam) Underground MineSouth Bates (Wambo Seam) Underground MineOther Approved Underground DevelopmentRemnant Woodland Enhancement Program (RWEP) AreaExtraction Plan Application AreaGroundwater Monitoring SiteSurface Water Quality Monitoring SiteSurface Water Flow Monitoring Site
GDA 1994 MGA Zone 56approx 2 km !
!(
!(
!?
Scrub
Road
Wallaby
(Jerrys Plains Road)
HighwayGolden
!(
!(
#*
#*
#* #*#*
#* #*
#*
#*
#*#*
#*#* #*
#*#*
#*
#* #*
#*
#*
#*
#*#*
#*
#*
!(
!( !(!(
!(
!(
!(!(!(
!(
!(!(
!( !(
!(
!(
!(!(
!(
!(
!(
!( !(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(!(!(
!(!(
!(!(
!(
!(!(
!(
!(
!(!(
!(
!(
!(
!(
#*
#*
#*
#*
#*
#*
#*
#*
#*
CHPP
V2-A1V1-A2
V6-B1V6-B3
V6-B2V1-B2
V1-A1
V3-B1
V2-B1V1-B3 V2-B2
V5-B2 V5-B1
V5-B3
V1-B1
V6-B2c
V14-B1
V14-B2
V9-A1
V14-A1
V9-B2V13-B1
V6-B1c
V6-A1c
V11-B2
V10-B1V9-B1
V10-A2
V10-A1V11-B1
V6-B4
V5-B4V10-B3
V6-A3
WollombiBrook
Wollombi
Brook"
Approved Montrose Water Storage
(Not Yet Constructed)W
ambo
Creek
WOLLEMI NATIONAL PARK
Creek
Ston
y
"
Previous Alignment of North Wambo Creek
DD Extension
A
C
B
United Collieries
"
South Wambo Dam
WARKWORTH
"
Wambo Access Road
"Wambo Coal Terminal
Hunter ValleyOperations
"
Product CoalConveyor
"
Administration Buildingsand Workshops
WarkworthMine
RWEP Wambo Coal Terminal
Hunter ValleyOperations
CCL 743
CCL 743
"
North Wambo Creek Diversion
"South Bates (Wambo Seam)
Underground Mine
"
South Bates (Whybrow Seam)
Underground Mine
E
Wambo Cr
eek
North
Waterfa
ll
Creek
Redbank Creek
Hunter
River
"
Administration Access Road(Not Constructed)
"
CHPP Portal
CL 397
ML 1594
ML1594
CL 365
CCL 743
ML 1402
ML 1572 CL 374
305000
3050
00
310000
3100
00315000
3150
00
6390000 6390000
6395000 6395000
WAM-09-15_Sth Bates EP_Longwalls11-16_SMP_202E
Locations of RelevantBiodiversity Monitoring Sites
Figure 2
0 2
Kilometres
W A M B O C O A L M I N E±
Source: Department of Lands (July 2009); WCPL (2016); WCPL Orthophoto (July 2016)
LEGENDWCPL Owned LandMining and Coal Lease BoundaryExisting/Approved Surface Development AreaSouth Bates (Whybrow Seam) Underground MineSouth Bates (Wambo Seam) Underground MineOther Approved Underground DevelopmentRemnant Woodland Enhancement Program (RWEP) AreaExtraction Plan Application Area
GDA 1994 MGA Zone 56
!( Flora Monitoring Plot#* Bird Monitoring Site!( Riparian Monitoring Cross-section#* LFA Monitoring Location - Riparian
Subsidence Monitoring Program – South Bates Underground Mine Longwalls 11-16
SMP LW11-16 Rev E January 2017 Page 12
5 ROLES AND RESPONSIBILITIES Key responsibilities of WCPL personnel in relation to this Subsidence Monitoring Program are summarised in Table 3. Responsibilities may be delegated as required.
Table 3 Subsidence Monitoring Program Responsibilities Summary
Responsibility Task
General Manager • Ensure resources are available to WCPL personnel to facilitate the completion of responsibilities under this Subsidence Monitoring Program.
Mining Engineering Manager (Underground Mine Manager)
• Ensure this Subsidence Monitoring Program is implemented.
Technical Services Manager
• Ensure monitoring and reporting required in accordance with this Subsidence Monitoring Program is carried out within specified timeframes, are adequately checked and processed and are prepared to the required standard.
Environment and Community Manager
• Undertake environmental monitoring required in accordance with the Extraction Plan and ensure the Subsidence Impact Register is kept up to date and hard copies of the assessment forms are filed / stored correctly.
Underground Mining Engineer
• Become familiarised with environmental aspects which require monitoring in accordance with the Extraction Plan.
Mine Surveyor • Undertake all monitoring in accordance with this Subsidence Monitoring Program to the required standard within the specified timeframes and ensure data are adequately checked, processed and recorded.
6 REFERENCES
Department of Planning and Environment and NSW Trade & Investment – Division of Resources and Energy (2015) Guidelines for the Preparation of Extraction Plans Required under Conditions of Development Consents, Project Approvals and Mining Lease Conditions for Underground Coal Mining. Version 5. Draft.
Wambo Coal Pty Limited (2003) Wambo Development Project Environmental Impact Statement.
Subsidence Monitoring Program – South Bates Underground Mine Longwalls 11-16
SMP LW11-16 Rev E January 2017
ATTACHMENT 1
EXISTING AND PROPOSED SUBSIDENCE MONITORING LINES
L
W
1
S
U
M
P
D
R
I
V
A
G
E
4
1
7
P
A
N
E
L
L
W
1
S
U
M
P
D
R
I
V
A
G
E
4
1
3
P
A
N
E
L
4
1
5
P
A
N
E
L
4
1
6
P
A
N
E
L
4
1
8
P
A
N
E
L
4
1
9
P
A
N
E
L
4
1
2
P
A
N
E
L
L
O
N
G
W
A
L
L
1
L
O
N
G
W
A
L
L
2
L
O
N
G
W
A
L
L
3
4
1
5
P
A
N
E
L
4
1
6
P
A
N
E
L
2
7
m
I
S
-
4
1
5
-
6
INSEAM BORES
100.0
56789
10
11
12
14
15
16
17
18
19
20
21
22
24
25
26
27
28
29
30
31
32
33
34
35
36
40
37
B HDG
A HDG
A HDG
B HDG
13
38
100.0
100.0100.0
100.0
100.0
100.0
90.0
90.0
110.0
110.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
102.2
102.2
87.892.0
92.0
122.0114.086.0
100.0
114.0
100.0
100.0
100.0
100.0
100.0
86.0
100.0
114.0
100.0
100.0
100.0
95.0
95.0
91.0
105.0
114.0
100.0
100.0
100.0
86.0100.0
100.0
100.0
100.0100.0
38.5
38.5
38.5
38.5
38.5
38.5
38.5
38.5
38.5
38.5
38.5
38.5
38.5
38.5
38.5
41.0
38.5
38.5
37.4
37.4
37.4
37.4
37.4
37.4
37.4
37.4
37.4
35.1
35.1
35.1
37.4
37.4
37.4
37.4
37.4
35.1
37.4
37.4
37.4
35.1
37.4
37.4
37.4
37.4
37.4
37.4
37.4
35.1
35.1
100.0
100.0
100.0
100.0
100.0
100.0
100.0
110.0
110.0
90.0
90.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
87.2
100.0
100.0
100.0
100.0
100.0
112.8
100.0
100.0
100.0
100.0
100.0
100.0
100.0
90.0
90.0
97.2
110.0
112.8
100.0
100.0
100.0
100.0
100.0
87.2
100.0
112.8
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
87.2
100.0100.0100.0100.0
A HDG
B HDG
Maingate 2
A HDG
B HDG
Maingate 2
A HDG
B HDG
Maingate 2
A HDG
B HDG
Maingate 2
A HDG
B HDG
Maingate 2
A HDG
B HDG
Maingate 2
A HDG
B HDG
Maingate 2
A HDG
B HDG
Maingate 2
A HDG
B HDG
Maingate 2
A HDG
B HDG
Maingate 2
A HDG
B HDG
Maingate 2
Maingate 1
A HDG
B HDG
Maingate 1
A HDG
B HDG
Maingate 1
A HDG
B HDG
Maingate 1
A HDG
B HDG
Maingate 1
A HDG
B HDG
Maingate 1
B HDG
Maingate 1
A HDG
B HDG
Maingate 1
A HDG
B HDG
Maingate 1
A HDG
B HDG
Maingate 1
A HDG
B HDG
Maingate 1
A HDG
B HDG
6789
10
11
12
13
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
5
14
1
2
4
LONGWALL 1
LONGWALL 2
LONGWALL 3
100.0
B HDG
49.9
50.938.1
64.938.1
100.02
70.28
70.27
85.15
85.13
39.77
41.14
A HDG
100.0
100.0
103.4
30.4
100.0
96.6
30.4
100.26
100.0
30.4
100.0
100.0
30.4
100.0
100.0
30.4
100.0
100.0
30.4
100.0
100.0
30.4
100.0
100.0
28.7
100.0
100.0
28.7
100.0
110.5
28.7
100.0
100.0
3
0
.
5
101.0100.0
110.5
100.0
100.0
100.0
100.0
100.446
90.0
100.0
110.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0100.5100.2100.2100.2100.2100.2100.2100.2100.2
100.0
100.2
100.0
100.2
56789
10
11
12
13
14
15
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
Tailgate 1Tailgate 1Tailgate 1Tailgate 1Tailgate 1Tailgate 1Tailgate 1Tailgate 1Tailgate 1Tailgate 1Tailgate 1
B HDG
A HDG
B HDG
A HDG
B HDG
A HDG
B HDG
A HDG
B HDG
A HDG
B HDG
A HDG
B HDG
A HDG
B HDG
A HDG
B HDG
A HDG
B HDG
A HDG
B HDG
A HDG
37
39
40
B HDG
A HDG
4
41
3
0
.
5
3
0
.
5
3
0
.
5
3
0
.
5
3
0
.
5
3
0
.
5
3
0
.
5
3
0
.
5
3
0
.
5
3
0
.
5
3
1
.
3
15
a
31.5
42.0
108.0
86.0
100.0100.0
16
28.7
101.0
28.7
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
3
2
.
0
3
2
.
7
3
3
.
4
3
4
.
1
3
4
.
8
3
5
.
5
3
6
.2
3
6
.
9
3
7
.
6
3
8
.
3
18.32
36.9
87.8
38.5
41.0
41.0
41.0
41.0
38.5
41.0
41.0
41.0
38.5
41.0
41.0
38.5
38.5
41.0
41.0
41.0
38
3
8
.
6
37.3 62.8
36.557.1
43.1
1
9
.
4
9
A HDG
23
38.5
39
41.0
114.0
114.0
100.0
86.0
20.1
79.9
42.0
27.411.3
42.0
4
4
.
7
17.0
37.4
100.0
46.2
100.0
35.1
37
35.1
38
100.0 100.0
37.4
72.2
85.0
35.1
42
39
1
37.8
37.8
38.7
45.44
45.45
209.96
35.1
40
41
47.935.1
35.1 35.1
35.1
210.0
10.0
10.0
(1
)(2
)(3
)(4
)(5
)(6
)(7
)(8
)
INSEAM BORES (TG1-15AB)
INSEAM BORES (TG1-15AB)
R
i
d
g
e
U
n
d
e
r
g
r
o
u
n
d
W
o
r
k
i
n
g
s
M
i
n
e
d
E
x
t
e
n
t
-
W
h
y
b
r
o
w
S
e
a
m
(
b
a
c
k
f
i
l
l
e
d
w
i
t
h
w
a
s
h
e
r
y
t
a
i
l
i
n
g
s
)
R
e
f
e
r
t
o
R
e
c
o
r
d
T
r
a
c
i
n
g
N
o
.
7
4
6
A
E
x
.
B
a
t
e
s
O
p
e
n
C
u
t
M
i
n
e
d
E
x
t
e
n
t
-
W
h
y
b
r
o
w
S
e
a
m
(
B
a
c
k
f
i
l
l
e
d
,
P
a
r
t
i
a
l
R
e
h
a
b
)
A
d
d
e
d
t
o
R
e
c
o
r
d
T
r
a
c
i
n
g
N
o
.
7
2
8
A
(
r
e
f
e
r
t
o
O
r
i
g
i
n
a
l
R
T
7
6
5
)
C
u
r
r
e
n
t
W
a
m
b
o
O
p
e
n
C
u
t
M
i
n
e
d
E
x
t
e
n
t
-
W
h
y
n
o
t
S
e
a
m
(
B
a
t
e
s
P
i
t
)
(
b
a
c
k
f
i
l
l
e
d
w
i
t
h
s
p
o
i
l
)
R
e
f
e
r
t
o
R
e
c
o
r
d
T
r
a
c
i
n
g
N
o
.
7
2
8
A
C
u
r
r
e
n
t
W
a
m
b
o
O
p
e
n
C
u
t
M
i
n
e
d
E
x
t
e
n
t
(
B
a
t
e
s
S
o
u
t
h
P
i
t
)
W
h
y
n
o
t
S
e
a
m
F
l
o
o
r
(
p
a
r
t
i
a
l
l
y
b
a
c
k
f
i
l
l
e
d
w
i
t
h
s
p
o
i
l
)
R
e
f
e
r
t
o
R
e
c
o
r
d
T
r
a
c
i
n
g
N
o
.
7
2
8
A
1
N
O
R
T
H
2
N
O
R
T
H
Current W
am
bo O
pen C
ut
Mined E
xtent (B
ates S
outh P
it)
Whybrow
S
eam
F
loor
Refer to R
ecord T
racing N
o. 728A
S
W NE
T
XS
h
e
d
F
A
N
S
T
R
A
C
K
E
D
V
E
H
I
C
L
E
S
O
N
L
Y
!
S
T
E
E
P
G
R
A
D
E
S
F
u
e
l
B
a
y
S
o
u
th
B
a
te
s
U
G
In
-
P
it
D
R
A
IN
GA
TE
G
R
A
D
E
1
I
N
5
.
5
D
R
A
I
N
G
A
T
E
D
R
A
IN
P
E
R
I
M
E
T
E
R
T
R
A
I
L
R
O
A
D
T
R
A
I
L
P
E
R
I
M
E
T
E
R
RO
AD
LHD & QDS Go Line
S
B
W
R
O
M
S
T
O
C
K
P
I
L
E
SB
U S
UM
P
IG
LO
O
IG
LO
O
B
A
S
E
O
F
M
IN
O
R
C
L
IF
F
S
B
A
S
E
O
F
M
A
J
O
R
C
L
I
F
F
S
B
A
S
E
O
F M
IN
O
R
C
LIF
FS
B
A
S
E
O
F
M
I
N
O
R
C
L
I
F
F
S
D
U
M
P
T
O
E
E
x
t
e
r
n
a
l
L
e
a
s
e
B
o
u
n
d
a
r
y
LINE CL1A
L
IN
E
S
C
1
LIN
E 2
XL
C
L
1
A
7
5
C
L
1
A
7
4
C
L
1
A
7
3
C
L
1
A
7
2
1357
1362
1363
1364
1365
1366
1368
1370
1371
1372
1373
1375
1376
1377
1379
1380
1381
1382
1383
1384
1385
1386
1388
1389
1390
1391
1392
1393
1395
1396
1397
1398
1399
1400
1408
1409
1410
1411
1413
1414
1416
1417
1418
1419
1421
1422
1423
1424
1425
1426
1427
1428
1429
1430
1431
1432
1433
1434
1435
1436
1437
1438
1439
1440
1441
1442
1443
1444
1445
1446
1447
1448
1449
C
L
1
A
7
1
C
L
1
A
7
0
C
L
1
A
6
9
C
L
1
A
6
8
C
L
1
A
6
7
C
L
1
A
6
6
C
L
1
A
6
5
C
L
1
A
6
4
C
L
1
A
6
3
C
L
1
A
6
2
C
L
1
A
6
1
C
L
1
A
6
0
C
L
1
A
5
8
C
L
1
A
5
7
C
L
1
A
5
6
C
L
1
A
5
5
C
L
1
A
5
4
C
L
1
A
5
3
C
L
1
A
5
2
C
L
1
A
5
1
C
L
1
A
5
0
C
L
1
A
4
9
C
L
1
A
4
8
C
L
1
A
4
7
C
L
1
A
4
6
C
L
1
A
4
5
C
L
1
A
4
4
C
L
1
A
4
3
C
L
1
A
4
2
C
L
1
A
4
1
C
L
1
A
4
0
C
L
1
A
3
9
C
L
1
A
3
8
C
L
1
A
3
7
C
L
1
A
3
6
C
L
1
A
3
5
5
D
C
L
1
A
3
3
C
L
1
A
3
2
C
L
1
A
3
1
C
L
1
A
3
0
C
L
1
A
2
9
C
L
1
A
2
8
C
L
1
A
2
7
C
L
1
A
2
6
C
L
1
A
2
5
C
L
1
A
2
4
C
L
1
A
2
3
C
L
1
A
2
2
C
L
1
A
2
1
C
L
1
A
2
0
C
L
1
A
1
9
C
L
1
A
1
8
C
L
1
A
1
7
C
L
1
A
1
6
C
L
1
A
1
5
C
L
1
A
1
4
C
L
1
A
1
3
C
L
1
A
1
2
C
L
1
A
1
1
C
L
1
A
1
0
C
L
1
A
0
9
C
L
1
A
0
8
C
L
1
A
0
7
C
L
1
A
0
6
C
L
1
A
0
5
C
L
1
A
0
4
C
L
1
A
0
3
C
L
1
A
0
2
C
L
1
A
0
1
C
L
1
A
0
0
C
L
1
A
-
0
1
C
L
1
A
-
0
2
C
L
1
A
-
0
3
C
L
1
A
-
0
4
C
L
1
A
-
0
5
C
L
1
A
-
0
6
C
L
1
A
-
0
7
C
L
1
A
-
0
8
C
L
1
A
-
0
9
C
L
1
A
-
1
0
C
L
1
A
-
1
1
C
L
1
A
-
1
2
C
L
1
A
-
1
3
C
L
1
A
5
9
L
I
N
E
'R
'
LIN
E 'Z
'
L
I
N
E
'S
'
L
W
1
S
U
M
P
D
R
I
V
A
G
E
4
1
7
P
A
N
E
L
L
W
1
S
U
M
P
D
R
I
V
A
G
E
4
1
3
P
A
N
E
L
4
1
5
P
A
N
E
L
4
1
6
P
A
N
E
L
4
1
8
P
A
N
E
L
4
1
9
P
A
N
E
L
4
1
2
P
A
N
E
L
L
O
N
G
W
A
L
L
1
L
O
N
G
W
A
L
L
2
L
O
N
G
W
A
L
L
3
4
1
5
P
A
N
E
L
4
1
6
P
A
N
E
L
2
7
m
I
S
-
4
1
5
-
6
H
ig
h
w
a
ll
T
o
e
H
ig
h
w
a
ll C
r
e
s
t
A
llu
v
ia
l H
ig
h
w
a
ll C
r
e
s
t
Allu
via
l H
ig
hw
all C
re
st
H
i
g
h
w
a
l
l
T
o
e
H
i
g
h
w
a
l
l
C
r
e
s
t
A
l
l
u
v
i
a
l
H
i
g
h
w
a
l
l
C
r
e
s
t
H
ig
h
w
a
ll T
o
e
H
ig
h
w
a
ll C
re
s
t
H
ig
h
w
a
ll T
o
e
H
ig
h
w
a
ll C
re
st
A
llu
v
ia
l H
ig
h
w
a
ll C
r
e
s
t
Alluvial H
ighw
all C
rest
Allu
via
l H
ig
hw
all C
re
st
Allu
via
l H
ig
hw
all C
re
st
A
l
l
u
v
i
a
l
T
o
e
Hig
hw
all T
oe
W
hybrow
S
eam
Hig
hw
all C
re
st
Pro
po
se
d H
ig
hw
all T
oe
DD
16
44
.7
(S
TA
RT
)
DD
S
t
e
p
o
v
e
r
0
.
7
m
t
o
c
r
e
a
t
e
w
a
lk
s
id
e
DD
R
com
menced 17/02/2016
D
C
DD
17
75
.2
(S
TA
RT
)
D
D
DD
com
pleted 2/07/2016
DD
R
R
R
R
com
menced 4/08/2016
16
16
113.8
113.8
113.8
113.8
1
1
15
36.8
17
41.3
18
41.3
19
41.3
116.5
116.5
116.5
116.5
LONGWALL 16
100
200
300
400
500
600
700
800
900
1000
1100
1200
1300
1400
1500
LONGWALL 15
100
200
300
400
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600
1700
LONGWALL 14
100
200
300
400
500
600
700
800
900
1000
1100
1200
1300
1400
37.7
37.7
C
R
Top of Seam
(Surveyed)
R
R
R
DD
Travel Road
37.7
31.5
37.7
31.5
169.4
75.8
75.8
169.4
1
31.5
1500
Open
T
XS
h
e
d
F
A
N
S
T
R
A
C
K
E
D
V
E
H
I
C
L
E
S
O
N
L
Y
!
S
T
E
E
P
G
R
A
D
E
S
F
u
e
l
B
a
y
S
o
u
th
B
a
te
s
U
G
In
-
P
it
D
R
A
IN
GA
TE
G
R
A
D
E
1
I
N
5
.
5
D
R
A
I
N
G
A
T
E
D
R
A
IN
P
E
R
I
M
E
T
E
R
T
R
A
I
L
R
O
A
D
T
R
A
I
L
P
E
R
I
M
E
T
E
R
RO
AD
LHD & QDS Go Line
S
B
W
R
O
M
S
T
O
C
K
P
I
L
E
SB
U S
UM
P
IG
LO
O
IG
LO
O
B
A
S
E
O
F
M
IN
O
R
C
L
IF
F
S
B
A
S
E
O
F
M
A
J
O
R
C
L
I
F
F
S
B
A
S
E
O
F M
IN
O
R
C
LIF
FS
B
A
S
E
O
F
M
I
N
O
R
C
L
I
F
F
S
D
U
M
P
T
O
E
P
P
P
P
P
P
P
P
P
P
1000V x2, 4
15V x1
1
0
0
0
V
x
2
, 4
1
5
V
x
1
M
IN
D
EPTH
0
.6
m R
ED
U
N
D
AN
T
R
E
D
U
N
D
A
N
T
P
6
6
k
V
6
6
k
V
11K
V
1
1
K
V
11KV on ground
11K
V
(
+
P
h
o
n
e
&
O
p
t
i
c
C
a
b
l
e
)
(+
P
h
o
n
e
&
O
ptic C
able)
1
1
K
V
11K
V
11K
V
(
+
P
h
o
n
e
&
O
p
t
i
c
C
a
b
l
e
)
T
a
n
k
s
R
L
7
8
m
T
a
n
k
s
R
L
9
5
m
T
a
n
k
s
R
L
1
5
0
m
1
1
K
V
11KV
415V
240V
W
3
5
1
1
k
V
1
1
k
V
11KV
11K
V
4
1
5
v
RE
DU
ND
AN
T C
AB
LE
415v
415v
W
A
T
E
R
W
A
T
E
R
4
1
5
v
REDUNDANT CABLE
C
A
B
LE
?
WATER
A
IR
W
A
T
E
R
W
AT
ER
A
IR
AIR
AIR
4
1
5
v
11KV
DATA
FLOXAL
EMULSION
11KV
11K
V
11K
V
11KV
11K
V
1
1
K
V
Buried
11kv
Buried
11kv
C
a
b
le
T
ra
y
WATER
P
T
R
T
R
T
R
T
R
T
R
c
a
b
l
e
re
d
u
n
d
a
n
t
p
r
o
p
o
s
e
d
e
a
r
t
h
b
u
r
i
e
d
p
r
o
p
o
s
e
d
c
a
b
l
e
t
r
a
y
s
p
o
w
e
r
415v
W
ATER
AIR
415v
AIR
A
I
R
W
A
T
E
R
A
I
R
W
A
T
E
R
AIR
WA
TE
R
Cable Tray
Cable T
ray
2
4
0
v
A
IR
W
3
4
W
3
3
W
3
6
W
3
7
W
3
8
W
3
9
W
4
0
W
4
0
A
W
4
0
B
+F
ibre
+
P
h
o
n
e
+
P
h
o
n
e
+
F
ib
e
r
?
?
C
A
B
LE
?
7X
L
7X
L
7X
L
B
A
S
E
O
F
M
IN
O
R
C
L
IF
F
S
B
A
S
E
O
F
M
A
J
O
R
C
L
I
F
F
S
B
A
S
E
O
F
M
I
N
O
R
C
L
I
F
F
S
Applic
ation A
rea
Applic
atio
n A
rea
Application Area
Full Extraction BoundaryCurrent Open Cut Extraction
Approval Area
Underground Workings
Existing Whybrow Seam
Underground Workings
(Arrowfield Seam Seam)
United Collieries
Revision No.
Drawing No.
CheckedDrawnScale:Date Sheet SizeApproved
WAMBO COAL PTY LIMITED
Prepared by NWU Survey Ph: 02 65 702318
ABN 13 000 668 057
Jerry's Plains Rd, WarkworthVia Singleton, NSW, 2330
Phone: 02 65 702200Fax: 02 65 702290
South Bates Underground Mine
Extraction Plan - Longwalls 14 to 16
Plan 7 - Proposed and Existing Subsidence Monitoring
A 30/11/2016 MJW TB
(Whybrow/Wambo Seam)
Wambo Opencut Void
3
0
4
0
5m Contours (AHD)
For Submission
Monitoring Marks
Existing Subsidence
Surface
1XL95 T95
Monitoring Marks used
Old United UG Subsidence
9
0
Wambo Seam Workings
Existing South Bates Underground
Monitoring LiDAR
Subsidence
Profile Locations
(Wambo UG) for NWU Multi Seam
Contours (5m)
Underground Workings
North Wambo
Wambo Seam Workings
Proposed South Bates UndergroundCurrent Underground Extraction
Approval Area Whybrow Seam
1371
Monitoring Marks used
Old Wollemi UG Subsidence
for NWU Multi Seam
Water course
/ Drain
Subsidence Monitoring Program – South Bates Underground Mine Longwalls 11-16
SMP LW11-16 Rev E January 2017
ATTACHMENT 2
SUBSIDENCE IMPACT REGISTER
Subsidence Monitoring Program – South Bates Underground Mine Longwalls 11-16
SMP LW11-16 Rev E January 2017 Page A2-1
Table A2-1 Example Subsidence Impact Register (Electronic Version Maintained On-Site)
Impact Register Number1
Impact Description
Does Impact Exceed the Performance
Measure/Indicators?
(Yes/No/ Not Applicable)
Management Measures Implemented
Were Management
Measures Effective?
(Yes/No)
Notes:
1: Fill out all details in the Assessment Form and record the register number here.
Subsidence Monitoring Program – South Bates Underground Mine Longwalls 11-16
SMP LW11-16 Rev E January 2017 Page A2-2
SUBSIDENCE IMPACT REGISTER ASSESSMENT FORM
Date and Time
Observer (Name and position)
Register Number (i.e. Number 1, 2, etc.)
Longwall Number
Longwall Chainage
Area Inspected Examples: location of crack, include GPS co-ordinates and a sketch
INSPECTION ITEM CHECKED COMMENTS (Examples: nature and extent of impact, any relevant
information, attach photographs)
Surface Cracking
Surface Humps (compression)
Surface Ponding
Access Tracks/Serviceability of built features
Warning Signage
Powerline – poles, insulators, conductors, conductor clearance
Other
Actions Required
Management or Contingency Measures Implemented
Effectiveness of Management or Contingency Measures
WCPL Key Personnel Notified (include date of email)
Technical Services Manager __/__/____
Environment and Community Manager __/__/____
Subsidence Monitoring Program – South Bates Underground Mine Longwalls 11-16
SMP LW11-16 Rev E January 2017 Page A2-3
SUBSIDENCE INSPECTION CHECKLIST WHERE TO INSPECT • 500 metres behind and 100 metres in front of the current longwall face position. EXTENT OF INSPECTION • Include the area of active subsidence based on the 26.5 degree angle of draw. WHAT TO LOOK FOR • Surface Cracking: inspect edges of extraction void and travelling abutments.
• Surface Humps: inspect near centre of extracted panels and travelling abutment.
• Surface Ponding: inspect low lying areas for evidence of increased/new ponding.
• Access Tracks: inspect for step change in land surface and changes in access for serviceability.
• Warning Signage: inspect condition and legibility of relevant warning signage.
• Powerlines: inspect for changes of conductor clearance and power pole condition.
• Check the serviceability of built features (e.g. fences, buildings, dams and access tracks).
• Note any flooding hazards for access tracks.
• Carry out any inspections required in accordance with the Built Features Management Plan for Longwalls 11 to 16.
ACTIONS IF AN IMPACT IS IDENTIFIED 1. Employ additional subsidence warning signs if necessary.
2. Notify Key Personnel (including asset owner if relevant [e.g. if asset is not a WCPL-owned asset]).
3. Assess impact against requirements of the relevant TARP and implement actions as required.
4. Record implemented actions in the Subsidence Impact Register Assessment Form.
5. Notify the principal subsidence engineer.
6. Notify other stakeholders as required (e.g. DPE, DRE etc.).