1.0 Introduction
Pakistan Water and Power Development Authority (WAPDA) is an integrated utility in
Pakistan. WAPDA is responsible for the development of Hydel Power and Water Sector
Projects in Pakistan. WAPDA operates through- Power wing and Water wing, It is engaged in
the generation, transmission and distribution of power. In addition, it also manages irrigation,
water supply and drainage system in the country. Further, it is also responsible for prevention
of water logging and reclamation of waterlogged and saline lands. Its responsibilities also
include flood management and inland navigation. WAPDA was created as a Semi-
Autonomous Body in 1958. The company is headquartered in Lahore, Pakistan.
National University Of Modern Languages | Final Report on WAPDA 135
The Pakistan Water and Power Development Authority (WAPDA) was established through
an act of parliament in February 1958 for integrated and rapid development and maintenance
of water and power resources of the Country. This includes controlling soil salinity and water
logging to rehabilitate the affected land in order to strengthen the predominantly agricultural
economy of the country. As per the charter, amended in March 1959 to transfer the existing
electricity departments from the federating units to it, WAPDA has been assigned the duties of
investigation, planning and execution of projects and schemes for:
Generation, Transmission and distribution of power,
Irrigation, water supply and drainage,
Prevention of water logging and reclamation of saline land,
Flood control and
Inland navigation.
Under the later on developments, vis-à-vis the “Energy Policy 1994”, setting up of thermal
power generation projects was shifted to the private sector. Similarly, as a result of
restructuring of the Power Wing, the utility part was corporatized into independent companies.
This shift from convergence to divergence gave birth to 13 entities to operate in different
zones. These are National Transmission and Dispatch Company (NTDC), four thermal power
generation companies (GENCOs) and eight distribution companies (DISCOs). The present
status of these companies is of corporate public limited entities under the Umbrella of EPCO,
ultimately to go privatized as planned. The residual Power Wing is therefore now responsible
for major hydro-electric power projects and schemes in operation.
National University Of Modern Languages | Final Report on WAPDA 135
1.2 Water Vision 2025
WAPDA has formulated a comprehensive $25–33 billion National Water Resource and
Hydropower Development Program me, entitled Water Vision 2025. The Water Vision 2025
projects are expected to generate 16,000 MW of hydroelectricity. Other goals are to prevent
water shortages, limit drought and increase water storage for a growing population. Five
massive hydropower projects have been announced by the President of Pakistan; these are to
be completed by 2016, with a generation capacity of 9,500 MW. Two of the projects are ready
for construction, while three are in the stages of feasibility studies and preparation of tender
documents.
Water Vision 2025 consists of three phases. Phase I was expected to start in 1993 but
was delayed. The priority of water sector projects under Phase I of Water Vision 2025 are
Gomal Dam (NWFP), Mirani Dam and Mithan Kot Barrage at Kachhi Canal (Balochistan)
raising of Mangla Dam (Azad Kashmir), Greater Thal Canal phase I (Punjab) and Thar/Rainee
Canals phase I (Sindh). The total cost of these Phase I projects will be $2.467 billion with a
construction period of five years. Under Phase II, Hingol Dam, Balochistan Dam and Satpara
Dam (Northern Areas), Chashma Right Bank Canal and Khurram Tangi Dam (NWFP), phase
II of the Greater Thal Canal Akhori Dam and Sanjwal Dam (Punjab), phase II of Thar/Rainee
Canals, Gajnai and Sehwan Barrage (Sindh) will be completed in 3–6 years, except Basha
Dam, which will take 8–10 years for its completion. The total cost of Phase II projects will be
$8.94 billion. These 11 projects will have a storage capacity of 12.79 million acre-feet, would
generate over 3362 mW of power, and would irrigate 1.4 million hectares of land. Under Phase
III, Yugo Dam, Skardu Dam, Dhok Dam, Rohtas Dam, Naulang Dam and Khadji Dam will be
completed.
National University Of Modern Languages | Final Report on WAPDA 135
1.3 Mission Statement
Our mission is to bring the assurance of energy to our customers, with world class
quality and commitment for satisfaction as we continue in our quest for excellence.
1.4 PROGRESS OF POWER WING IN CURRENT FINANCIAL YEAR
2009/2010
During the year, construction of 267.77 Km long transmission lines and 65 grid stations
(including extension, augmentation and replacement) was achieved).
1.5 GRID SYSTEM OPERATION
The GSO is maintaining as at present 634 grid stations and 31,929 km length of
transmission lines are presently to transmit about 57,157 GWH electricity annually, linking
various power- station to load centers through its four regions i.e. Lahore, Islamabad, Multan
and Hyderabad. These regions are availing technical expertise from Technical Services Group
(TSG) and System Protection. The Transformer Reclamation Workshop is also part of GSO
National University Of Modern Languages | Final Report on WAPDA 135
NUMBER OF GRID STATION
Number of GRID
STATION
Region KV
12 Lahore 500
10 Islamabad 220
68 Multan 132
135 Hyderabad 66
1.6 Wings of WAPDA
There are three main wings in WAPDA.
Water Wing
Power Wing
Finance/coordination wing.
National University Of Modern Languages | Final Report on WAPDA 135
1.6.1 Water Wing
The organization was also entrusted with the work of implementing Indus Basin
Settlement Plan signed between India and Pakistan in 1960 to develop replacement works for
management of river water and irrigation system. Since then it has been engaged in building
water development projects which include extensive research and investigation to augment
country's water resources.
Member (Water) controls the water wing which is divided into North, Central, South
and Northern Areas zones. These zones cover, in general, North West Frontier Province
(NWFP), Punjab, Sindh and Balochistan and Northern Areas respectively. The activity of
water wing involves execution of surface and sub-surface water development and drainage-
Salinity Control and Reclamation Projects (SCARPs). Chief Engineers and Project Directors at
various levels are responsible for effective and timely implementation of Water Wing Projects.
1.6.2 Power Wing
Member (Power) controls the Power Wing, through General Managers and Chief
Engineers in the field of hydro-electric power, coordination and WAPDA Power Privatization
Organization. WAPDA has an elaborate setup headed by a General Manager for training of its
officers and officials at different levels covering all the wings of the organization.
1.6.3 Finance/ coordination wing
Member (Finance) is responsible for the functioning of the departments of Finance,
Internal Audit and Budget and Accounts headed by Chief Auditor (Internal Audit) and Director
General Finance (B&C). He also exercises administrative control over General Manager
National University Of Modern Languages | Final Report on WAPDA 135
(Central Contracts Cell), Director General (Taxes) and Director Public Relations. Managing
Director (Admin) is vested with the responsibility for overall administration and services.
Secretary WAPDA in addition to looking after day-to-day affairs of the Secretariat, prepares
minutes of the Authority’s meetings, maintains records of its decisions and issues its directives
and coordinates among the three Wings besides monitoring and implementation of Authority’s
decisions.
1.7 Authority Fund
The Authority Fund consists of the following:
Loans and grants obtained from the federal and provincial governments
Sale proceeds of WAPDA Bonds
Loans obtained by the Authority with general sanctions of the government
Foreign aids and loans obtained from he IBRD, ADB and other international loan
giving agencies on such terms and conditions as may be approved by the government
Sale of power
All other sums received by the Authority
1.8 Major Functions Of WAPDA
Under the government set out in the License, the WAPDA is entrusted to act as:-
Central Power Purchasing Agency
System Operator
Transmission Network Operator
Contract Registrar and Power Exchange Administrator
National University Of Modern Languages | Final Report on WAPDA 135
1.9 EMPLOYEES BENEFIT PROGRAMME
1.9.1 Medical
In order to provide medical services to all the WAPDA employees and their families
WAPDA has set up an elaborate network of 14 hospitals land 39 dispensaries located at
different stations and cities in the country in addition to WAPDA central hospital at Lahore
that is the headquarters of the organization. WAPDA hospital complex provides
comprehensive medical care and treatment, both for in-door and out-door patients, with
specialized attention and treatment in almost all- medical disciplines. The smaller medical units
look after the requirement at various WAPDA projects and other towns where WAPDA
officers have large concentration. All WAPDA hospitals and dispensaries attend to over 1.60
million patients during report year in their out-door departments while their annual emergency
and casualties attendance exceeds 0.101 million. Besides the medical services include
admission for in-door treatment to over 19,498 patients during report both in WAPDA and
non-WAPDA hospitals. Over 40526 surgical operations are performed in WAPDA hospitals in
additions to specialized treatment for cardiac disease and other serious and other serious
surgical medical cases.
1.9.2 Education
In order to promote and maintain education in various WAPDA colonies and projects,
WAPDA has set up 45 educational institutions which provide education not only to children of
employees stationed in the respective areas but also to the adjacent non- WAPDA population.
These institutions have performed exceedingly well with some remarkable results.
National University Of Modern Languages | Final Report on WAPDA 135
1.9.3 Pension
WAPDA employees are entitled to full pension on reaching the age of superannuation
subject to completing their minimum required service. In financial year 2000-01, as many as
7,875 pension cases were processed involving payment of Rs. 2210.242 million.
1.9.4 Housing
In order to help WAPDA employees build their own houses a number of cooperative
housing societies have been set up in various cities which purchase land and develop
residential plots for allotment to WAPDA employees. The societies at Lahore and Gujranwala
have been completed while work on societies at Sheikhupura, Faisalabad, Peshawar, Quetta
and other towns is in progress.
1.9.5 Training
WAPDA is a second largest organization in Pakistan. To maintain tempo of work in
such a large organization, it is imperative to have standing arrangements for management and
technical training of the officers and staff.
Training activities are conducted in WAPDA to impart basic and advance knowledge to all
officers and staff during different stages of their career. A number of training institutes are
functioning at various places.
WAPDA Staff College, Islamabad.
WAPDA Engineering Academy, Faisalabad
National University Of Modern Languages | Final Report on WAPDA 135
1.10 Thermal Power
As per Government of Pakistan policy all thermal power generation has been
restructured and four corporatized companies namely Jamshoro Power Generation Company
Limited (GENCO-1) head quarter at Jamshoro district Dadu near Hyderabad Sindh, Central
Power Generation Company Limited (GENCO-2) head quarter at Guddu district Jacobabad
Sindh and Northern Power Generation Company Limited (GENCO-3) head quarters at
Muzaffargarh and Lakhra Power Generation Company Limited (GENCO-IV) at Khanote
(Sindh) have been formed and registered. Functioning of GENCOs has commenced.
Jamshoro Power Generation Company Limited GENCO - I
Central Power Generation Company Limited GENCO - II
Northern Power Generation Company Limited GENCO - III
Lakhra Power Generation Company Limited GENCO - IV
National University Of Modern Languages | Final Report on WAPDA 135
WAPDA's Thermal Power Generation is mainly based on generation of power from its
Steam Turbo-Generators, Gas Turbines (simple as well as Combined Cycle Units) installed at
different Power Stations located in Sindh, Punjab and Balochistan provinces. Indigenous Gas
& Coal is the main fuel whereas Furnace oil and HSD are also used as alternative fuel. The
total installed capacity is 4664 MW.
Structural formation of all four GENCOs is as under
JPCL
(GENCO-1)
CPGCL
(GENCO-2)
NPGCL
(GENCO-3)
LPGCL
(GENCO-4)
TPS Jamshoro TPS Guddu TPS Muzaffargarh FBC Lakhra
GTPS Kotri TPS Quetta NGPS Multan -
National University Of Modern Languages | Final Report on WAPDA 135
- - GTPS Faisalabad -
- - GTPS Shahdara -
- - CGTM W/Shop
F/Abad
-
1.11 Pakistan Water and Power Development Authority Key Recent
Developments
Jun 29, 2010
Pakistan May Import 1,000MW Of Power From Iran.
Mar 31, 2010
Engro Energy Achieves Targeted Commercial Operations Date Of 217.3MW Qadirpur
project.
Mar 26, 2010
OFID To Extend Loan Worth $31.10 Million For Neelum-Jhelum Hydropower Plant In
Pakistan.
Feb 15, 2010
National University Of Modern Languages | Final Report on WAPDA 135
WAPDA's Neelum-Jhelum Hydropower Project To Start Production By 2016.
Dec 26, 2009
WAPDA Invites Tenders For Supply Of Station Battery Set For Dargai Power Station.
1.12 WAPDA’s ROLE AS DEVELOPMENT ENTITY
The primary development role of WAPDA has been revived. It is now focusing only on
Hydel Development and Water Sector Projects to support the national economy and poverty
alleviation through improved Hydel-Thermal mix of Power Generation, provision of electricity
at affordable price and most pertinently perspective planning and timely execution of Projects
to meet the Water and Power demand of the growing population, agriculture and industry of
the country.
1.13 Installed Capacity of WAPDA System (as of June 2007)
*Installed Capacity of WAPDA System
(as of June 2007)
Hydel 6444 MW
GENCOs 4675 MW
National University Of Modern Languages | Final Report on WAPDA 135
IPPs 5772 MW (including 30 MW Hydel)
Nuclear IPP (Chashnup) 325 MW
Rental 150 MW
Total 17366 MW
2.0 CUSTOMER SERVICES
Respective distribution companies under PEPCO are responsible to deal with all
matters of their electricity consumers as per their procedures.
LAHORE ELECTRIC SUPPLY COMPANY LIMITED (LESCO)
GUJRANWALA ELECTRIC POWER COMPANY (GEPCO)
FAISALABAD ELECTRIC SUPPLY COMPANY (FESCO)
ISLAMABAD ELECTRIC SUPPLY COMPANY (IESCO)
MULTAN ELECTRIC POWER COMPANY (MEPCO)
2.1 WAPDA
The electricity supply service in Pakistan, initially, was undertaken by different
agencies, both in public and private sectors, in different areas. In order to provide for the
National University Of Modern Languages | Final Report on WAPDA 135
unified and coordinated development of the water and power resources, Water and Power
Development Authority (WAPDA) was created in 1958 through WAPDA Act, 1958.
2.1.1 LAHORE ELECTRIC SUPPLY COMPANY LIMITED (LESCO)
LESCO
The environment and structure of the power industry throughout the world are
undergoing dramatic change. The power sector is moving from monopoly to privatization and
from integration to disintegration. To keep pace with this change, the Government of Pakistan
approved a Strategic Plan in 1994 as a consequence of which the power wing of WAPDA has
been unbundled into 12 Companies for generation, transmission and distribution of electricity.
Lahore Area Electricity Board was reorganized into one such corporatized entity under the
name of Lahore Electric Supply Company (LESCO) with effect from 22-03-1998, with the aim
of commercialization and eventually privatization.
2.1.2 Area of Operation
LESCO's area of responsibility covers Civil Districts of Lahore, Kasur, Okara and
Sheikhupura.
2.1.3 Gujranwala Electric Power Company (GEPCO)
Gujranwala Electric Power Company (GEPCO) has been setup over area of jurisdiction
and network of former Area Electricity Board, which was created in early eighties.
It encompassed the areas of existing Districts of Gjranwala, Hafizabad, Sialkot,
Narowal, Gujrat and Mandi Bahauddin.GEPCO was incorporated on 25th April, 1998 and
obtained certificate for commencement of business on 5th June, 1998.Management and
National University Of Modern Languages | Final Report on WAPDA 135
Administration is entrusted to a Board of Directors. We have about 2,461,729 connections,
Average monthly collection for the year 2009-10 is approximately 3961 million Rupees.
2.1.4 FAISALABAD ELECTRIC SUPPLY COMPANY (FESCO)
FESCO Distributes and supplies electricity to about 2.88 million customers within its
territory with a population over 26.5 million under a Distribution License granted by National
Electric Power Regulatory Authority (NEPRA) pursuant to the Regulation of Generation,
Transmission and Distribution of Electric Power Act, 1997 (NEPRA Act). Geographical
service area of FESCO comprises Faisalabad, Sargodha, Mianwali, Khushab, Jhang, Bhakker,
T.T Singh and Chiniot.
2.1.5 ISLAMABAD ECTRIC SUPPLY COMPANY (IESCO)
Area Electricity Board (AEB) Islamabad was one of the eight AEB's constituted
through amendments in WAPDA Act during 1981. Later Government of Pakistan approved
revamping of WAPDA power sector, resultantly twelve corporate entities were formed. Eight
Distribution and Supply Companies (DISCOs), one National Transmission and Distribution
Company (NTDC) and three Generation Companies (GENCOs). All these companies have
been incorporated under Companies Ordinance 1984.
2.1.6 MULTAN ELECTRIC POWER COMPANY (MEPCO)
MEPCO the Multan Electric Power Company is one of the biggest Distribution
Company of WAPDA. It's area of operation is from Sahiwal to Sadiqabad, Bahawalnager to
Bahawalpur and Tounsa Sharif to Rajanpur and bordering with Sind, Balochistan and NWFP
Map.
National University Of Modern Languages | Final Report on WAPDA 135
The Charter of MEPCO is to provide the reliability, quality and safety of electric power
supply to the consumers in its Jurisdiction.
MEPCO is envisaged for the creation of the resources and engineering plans for additions,
renovation and augmentation of the distribution system in order to achieve charter.
MEPCO is putting efforts to make it a viable and progressive utility to take care of
consumer's power demand.
2.2 Central Power Purchasing Agency (CPPA)
As the Central Power Purchasing Agency (CPPA), for procurement of power from
GENCOs, Hydel & IPPs on behalf of Distribution Companies (DISCOS), for delivery through
500 kV, 220 kV & 132kV Network.
2.2.1 System Operator
For secure, safe and reliable operation, control and generation facilities.
2.2.2 Transmission Network Operator
For Operation & Maintenance, Planning, Design and expansion of the 500 kV and 220
KV.
2.2.3 Contract Registrar And Power Exchange Administrator (CRPEA)
As CRPEA, to record and monitor contracts relating to bilateral trading system.
2.3 Energy Resources & Power Development History
At the time of independence, Pakistan inherited 60MW of power generation capability
for a population of 31.5 million, yielding 4.5 units per capita consumption. Twelve years later,
National University Of Modern Languages | Final Report on WAPDA 135
when WAPDA was created in 1959, the generation capacity had increased to 119 MW. By that
time country had entered the phase of development, which required a dependable and sold
infrastructure, electricity being its most significant part. The task of power dev elopement was
undertaken by WAPDA for executing a number of Hydel and thermal generation projects, a
matching transmission network and a distribution system, which could sustain the load of
rapidly increasing demand of electricity.
The effects of WAPDA’s professional approach to find the solution to multifarious
problems did not take long to show. After first five years of its operation by 1964-65, the
electricity generation capability rose to 636 MW from 119 in 1959, and power generation to
about 2,500 MKWH from 781 MKWH. Number of consumers in 1959 to 688 thousand in
1965, as many as 609 villages had electricity supplied to them by 1959, increasing to 1882 in
1965. The rapid progress witnessed a new life to the social, technical and economic structures
of the country, mechanized agriculture started, industrialization picked up and general living
standards improved. In the year 1980 the system capacity touched 3000 MW which rapidly
rose to over 7000 MW in 1990-91.
Now the total generation capacity from WAPDA’s own hydel and thermal sources after
completion of Chashma Hydro Power Plant plus generation from independent power
procedures stands at 15764 MW.
2.4 Power Sector Reforms & History Of NTDC
Over the past 15 years, Pakistan has been following a strategy of deregulation,
privatization and transformation of its public sector entities (PSEs), including its two major
power utilities, Water and Power Development Authority (WAPDA) and Karachi Electric
National University Of Modern Languages | Final Report on WAPDA 135
Supply Corporation (KESC). WAPDA was established in 1958 as a semi-autonomous agency
to coordinate the development of Pakistan's water and power resources.
NTDC previously was the part of Water and Power Development Authority (WAPDA).
It was known as Transmission and Grid Station. In December 1998, the WAPDA Act was
amended, which allowed the creation of Pakistan Electric Power Company (PEPCO), and
unbundling of WAPDA’s Power Wing into:
eight (9) distribution companies (formed from existing area boards);
three (4) generating companies (comprising 11 of WAPDA’s generating plants); and
National Transmission and Dispatch Company (NTDC).
2.5 Formation of PEPCO
PEPCO was created in May 1998 as a Management Company, owned by Government
of Pakistan vested with the following corporate objectives
The corporatization and commercialization of WAPDA’s assets block in generation,
transmission and distribution.
Overseeing the design and implementation of the Manpower Transition
Program stewardship of early business operations by the newly formed companies
Privatization initiative
2.6 Formation of NEPRA
National University Of Modern Languages | Final Report on WAPDA 135
National Electric Power Regulatory Authority (NEPRA) was created to regulate the
unbundled Power Sector in order to promote competitive power market to ensure reliable
power supply at affordable rates to millions of electricity customers in Pakistan. Major
responsibilities of NEPRA include:
Issuance of licenses to the power utilities.
Tariff determinations in a transparent manner.
Establishment of performance standards for the utilities.
2.7 CHARTER OF DUTIES IN WAPDA
The charter of duties of WAPDA includes investigation, planning, and execution, of
schemes in the following fields.
Generation, transmission and distribution of power.
Irrigation, water supply and drainage.
Prevention of water logging and reclamation of water logged and Salind land.
Flood control and inland navigation.
Inland navigation.
2.8 Follow Sind-Tass Agreement
The organization was also entrusted with the work of implementing Indus Basin
Settlement plan signed between India and Pakistan in 1960 to develop replacement works for
management of river water and irrigation system. The life saving action for Pakistan’s
agriculture has been WAPDA’s role in the field of water logging and salinity. During past four
National University Of Modern Languages | Final Report on WAPDA 135
decades WAPDA has planned and executed 60 scraps at a total cost of Rs.37.8 billion to cover
an area of 19 million acres of affected land for putting it back into production.
National University Of Modern Languages | Final Report on WAPDA 135
2.9 Division of WAPDA
National University Of Modern Languages | Final Report on WAPDA 135
WAPDA
RESIDUAL WAPDA
PEPCO
GENCOS NTDC DISCOS
GENCO-1 (Kotri)
GENCO-3 (Muz. Gh.) 1. IESCO
2. GESCO
3. LESCO
4. MESCO
5. HESCO
6. FESCO
7. QESCO
8. PESCO
9. TESCO
GENCO-2 (Guddu)
GENCO-3 (Muzafargarh)
1. WAT DAMS2. HYDL PWR
GENCO-4 (Lakhra)
NTDC is only one of the above companies, which is connected with all the companies.
Its major operations are based on the purchasing of electricity from generation companies and
selling it to distribution companies.
The other functions of NTDC are performed to handle high voltage electricity wires in
preinstalled electrified areas and those areas to which Discos want to electrify. So we should
have knowledge about all stakeholders which are generating and distributing electricity in
Pakistan like what are their major functions, projects, and their locations in order to make
budgets through which NTDC will earn revenue in future.
2.10 Major Stakeholders Of WAPDA
Now we discuss all the companies which are the major stakeholders of WAPDA.
These are:
Power / Electricity Generation Cos.
Power / Electricity Distribution Cos.
2.11 Major Sources For Generation Of Power / Electricity Are
HYDEL Power (Controlled by Residual WAPDA)
Thermal Power (Controlled by PEPCO)
IPPS (Independent Power Projects) Controlled by PEPCO
Rental Power Projects (Controlled by PEPCO)
National University Of Modern Languages | Final Report on WAPDA 135
2.12 WAPDA Residual Projects & Functions
2.12.1 Water Dam
To Constructing ,repairing & maintaining of dams is the major function of WAPDA.
2.12.2 Hydel Power Generation
As a consequence of partition of the Indo-Pakistan Sub-Continent in 1947, India and
Pakistan became two independent sovereign states. Hydel generation capacity of only 10.7
MW (9.6 MW - Malakand Power Station & 1.1 MW - Renala Power Station) existed in the
territory of Pakistan. With the passage of time, new Hydel Power Projects of Small and
Medium capacities were commissioned including the first water storage dam and power house
at Warsak due to which country's Hydel capability raised to about 267 MW uptill 1963.
The Irrigation System which existed at the time of partition in 1947 was divided
between the two countries without any regards to the irrigation boundaries which resulted in an
international water dispute which was finally resolved by signing of the Indus Water Treaty in
1960 under the aegis of World Bank. The Treaty assigned three Eastern rivers (Ravi, Beas and
Sutlej) to India and three Western rivers (Indus, Jhelum & Chenab) to Pakistan. It also
provided construction of replacement works called Indus Basin Projects (IBP) to compensate
for perpetual loss of Eastern rivers' water. The works proposed under the Treaty included two
multipurpose dams i.e. Mangla Dam on Jhelum river and Tarbela Dam on Indus river having
the provision of power generation. These were commissioned in 1967 & 1977 respectively.
However, their capacities were subsequently extended in different phases.
National University Of Modern Languages | Final Report on WAPDA 135
WAPDA RESOURCES
3.1 Dames
There are many dams under WAPDA control. Some important names of these dams are
given below.
3.1.1 Tarbilla Dam
3.1.2Cashma Power Plant
National University Of Modern Languages | Final Report on WAPDA 135
3.1.3 Mangla Dam
3.1.4 Warsak Dam
National University Of Modern Languages | Final Report on WAPDA 135
3.2 Hydel Generation Capacity
The total capacity of 13 No., Hydel Stations as of today is 6443.56 ~ 6444 MW which
is 37.10% of total installed generation capacity of WAPDA. During 2007~2008, aggregate
energy sharing during the year was 33.32%. The Hydel Generation Capacity was reduced from
6463.16 MW to 6443.56 MW due to decommissioning of Jabban Hydel Power Station after a
fire incident in November, 2006.
3.2.1 Seasonal Variations Of Hydel Generation
The seasonal variations of reservoir levels and consequent reduction in Power outputs
of storage type hydel projects in Pakistan are very pronounced. Tarbela with maximum head of
450 ft. experiences variation of 230 ft. while Mangla has 162 ft. variation against the maximum
cranium of 360ft.
The lean flow period of Tarbela reservoir is from November to June when the Capability
reduces to as low as about 1350 MW against the maximum of 3692 MW during high head
period i.e. August to September (15% permissible overloading on Units 1~10). Lean flow
National University Of Modern Languages | Final Report on WAPDA 135
period of Mangla reservoir is observed from October to March when the minimum generating
capability is 500 MW. The capability rises to as high as 1150 MW during 'high head' period
(15% permissible overloading).
In all, WAPDA's Hydel generating capability varies between the two extremities of
2414 MW and 6746.0 MW over the cycle of a year.
3.3 Pepco Projects & Functions
PEPCO was basically established by the Federal Govt. to supervise all the companies’
transition process from WAPDA. No doubt all the companies are independent and registered
under company ordinance 1984, but PEPCO is working till now & control over there as an
umbrella on all the companies.
3.4 Thermal Power
As per Government of Pakistan policy all thermal power generation has been
restructured and four corporatized companies namely Jamshoro Power Generation Company
Limited (GENCO-1) head quarter at Jamshoro district Dadu near Hyderabad Sindh, Central
Power Generation Company Limited (GENCO-2) head quarter at Guddu district Jacobabad
Sindh and Northern Power Generation Company Limited (GENCO-3) head quarters at
Muzaffargarh and Lakhra Power Generation Company Limited (GENCO-IV) at Khanote
(Sindh) have been formed and registered. Functioning of GENCOs has commenced.
(GENCO-I) Jamshoro Power Generation Company Limited.
National University Of Modern Languages | Final Report on WAPDA 135
(GENCO-II) Central Power Generation Company Limited.
(GENCO-III) Northern Power Generation Company Limited.
(GENCO-IV) Lakhra Power Generation Company Limited.
WAPDA's Thermal Power Generation is mainly based on generation of power from its Steam
Turbo-Generators, Gas Turbines (simple as well as Combined Cycle Units) installed at
different Power Stations located in Sindh, Punjab and Balochistan provinces. Indigenous Gas
& Coal is the main fuel whereas Furnace oil and HSD are also used as alternative fuel. The
total installed capacity is 4664 MW.
Structural formation of all four GENCOs is as under:
3.5 IPPS (Independent Power Producers) Controlled By PEPCO
The country had been experiencing severe power shortage during eighties and early
nineties. As a result, load shedding had to be resorted to all over the country. This adversely
affected the national economy. It was not possible for the Govt. to establish Power Plants in
public sector due to shortage of funds. In order to eliminate power shortage/load shedding in
National University Of Modern Languages | Final Report on WAPDA 135
the minimum possible time, the Government constituted an Energy Task Force in 1993 to
devise a consolidated and comprehensive policy for revamping and rejuvenating the energy
sector. On the recommendations of the Energy Task Force, the Government announced a
“Policy Framework and Package of Incentives for Private Sector Power Generation Projects”
in March 1994 for a large scale induction of the private sector in power development. The said
Policy offered a fix level zed tariff of US$ 5.57 / kWh to the prospective investors (US$ 6.1 /
kWh average for 1-10 years) and a number of other incentives to attract foreign investment in
the power sector.
3.5.1 IPP Installed Capacity
In 1994, the government formulated a power policy that allows the private sector
to invest in the power sector to ensure sufficient generation capacity. The policy also
allowed full flexibility to independent power producers (IPPs) to bring capacity on line as
quickly as possible at predetermined power purchase prices. The government guaranteed
implementation, fuel supply, and power purchase. (By 2001, the private sector’s share of
installed capacity reached 5,551MW, all of which were oil-fired thermal plants.)
1292 MW (Net 1200 MW) HUB Power Project the biggest power plant in the private
sector contracted in 1992 started commercial operations in March 1997. Shortly after
National University Of Modern Languages | Final Report on WAPDA 135
commissioning disputes arose between GOP / WAPDA and HUBCO on tariff and other issues.
After protracted negotiations, these were resolved through Settlement Agreement of December
2000 signed by the GOP, WAPDA and HUBCO.
This resulted in a lower tariff entailing a saving of about 3 billion dollars over 30 years
term of the Power Purchase Agreement. WAPDA also privatized its 1638 MW (Net 1342
MW) Gas Turbine Power Station, Kot Addu in June 1996 by incorporating it under the name
of KAPCO and selling its 36% shares to International Power of UK. After extensive
correspondence/negotiations with the International Power, the Power Purchase Agreement and
other relevant documents have been amended, providing inter-alia, reduction in tariff from
Cents 5.60 / kWh to Cents 5.04 / kWh, resulting in a saving of about 1.3 billion dollars to
WAPDA over 25 years term of the Agreement.
3.5.2
Rental Power Projects
During the Government of PM Shaukat Aziz (2006), ECC in its decision of 16th
August, 2006 approved 150 MW Rental Power Plants proposal by WAPDA / NPGCL for
installation at Piranghaib, Multan as emergency measure subject to acceptance of tariff by
NEPRA, stipulating that WAPDA should only rent as much power as is absolutely necessary
to be utilized with high load factor for economic utilization of capacity. The ECC was briefed
by then government that given the urgency to have additional power capacity before next
summer as per WAPDA’s demand projections and the long gestation period for new plant,
renting of plant/plants appears to be the only short term solution if shortfalls are to be met.
National University Of Modern Languages | Final Report on WAPDA 135
Further, as the commissioning of the new IPPs for which gas has already been allocated
will take 2-3 years, practical arrangements may be worked out with the Ministry of Petroleum
and Natural Resources to utilize this gas for the rented plants in the intervening period. The
then Planning and Development Division concurred with the proposal of M/o Water and Power
to keep the momentum of economic growth progressive, and also to meet the high anticipated
power shortages in the country.
During the Caretaker Government of PM Mian Muhammad Sommro (15.02.2008), the
ECC approved four Rental Power Plants each of 200-300 MW (combined capacity 1000-
1200MW) as Rental Power Plants in private sector to be located at Sahiwal, Gakhar,
Kotlakhpath, Sialkot, Shikarpur, Jamshoro, Eminabad & Sheikupura. The ECC advised that the
RPPs be arranged for a period of four years, PEPCO would reevaluate RPPs location sites on
the basis of oil storage space plus transportation and environmental impact. Secretaries Finance
and Water & Power along with MD-PPRA will review the procurement mechanism and avoid
delay in induction of RPPs while making it PPRA- compliant.
3.6 Power Policy
National University Of Modern Languages | Final Report on WAPDA 135
3.6.1 Power Policy 1995
3.6.2 General
The Government of Pakistan in March 1994 announced the Policy Framework and
Package of Incentives for private sector power development in the country. It received a
tremendous response albeit for all Thermal Plants. GOP now intends to encourage proposals
for power generation based on indigenous resources namely its hydel resources. Hydel power
being cheaper, will provide tariff relief to the consumers, utilize indigenous resources, involve
Pakistani entrepreneurs and provide benefits of economic growth to the relatively backward
parts of Pakistan.
3.6.3 The Need For A Separate Hydel Power Policy
In Pakistan nearly all hydro potential results from discharges into the Indus River basin.
Discharges result primarily from precipitation and snow-melt in the northern mountainous
ranges of the country. Discharges take place in small rivulets coming further down to the
bigger tributaries of River Indus and then to Indus River itself. The development of
hydropower projects however, is characterized by remote locations and seasonal variations.
Pakistan's climatic factors including rainfall and snowmelt, make it relatively easy to develop
hydel generation during the months of July to December while the period January to June is
extremely dry in terms of stream flow. In order, therefore, to arrest the risk of over
development in summer months that would create an unbridgeable gap in winter months, the
total requirement of hydel plants in private sector may be limited to 2,000 MW upto the end of
National University Of Modern Languages | Final Report on WAPDA 135
the 9th Five Year Plan. However, the limit of 2,000 MW will be reviewed at a later stage and
can be enhanced to suit the national priorities and power demand growth. Realizing that these
peculiarities of hydropower development necessitate special consideration the Government has
devised an attractive policy package to evoke response of private sector similar to that of
thermal power. The salient features of the policy framework and package of incentives devised
for development of hydropower through private sector.
3.7 Power Policy 2002
3.7.1 Introduction
Electricity constitutes one of the most important components of infrastructure and plays
a key role in national growth and development. With only about half of nearly 140.5 million
people (2001 population estimate) having access to electricity, a huge population base provides
an ideal opportunity for expansion of electricity generation. The growing pace of urbanization
and industrialization also puts a premium on demand for electricity.
Demands for augmenting the power infrastructure, unsatisfactory performance of
public sector entities, ever-squeezing budgets in the public sector, the need to make the tariff
free from subsidies and cross-subsidies and reflect market prices etc., provide motivation for
resource mobilization, improving efficiency through involvement of the private sector, to
reduce the burden on budgetary resources caused by ailing enterprises and more importantly, to
meet consumer expectations within affordable limits of tariff.
Reform of the power sector through restructuring and deregulation is high on the
agenda of the Government of Pakistan (GOP). The GOP is committed to pursue a far-reaching
reform program me for the power sector and to help meet the country's future power needs.
Implementation of the envisaged program me will bring about a gradual transition of the power
National University Of Modern Languages | Final Report on WAPDA 135
system from integrated, state-owned utilities to a decentralized system with separate
generation, transmission and distribution entities, having substantial private ownership and
management, reflecting and encouraging a commercial and competitive operating environment.
3.7.2 Objectives
The main objectives of the Policy are:
To encourage and ensure exploitation of indigenous resources,
which include renewable energy resources, human resources,
participation of local engineering and manufacturing capabilities;
To provide sufficient capacity for power generation at the least
cost, and to avoid capacity shortfalls;
To be attuned to safeguarding the environment.
To ensure that all stakeholders are looked after in the process, i.e. a win-win situation
for all; and
3.7.3 Scope
The scope of the Policy covers.
Projects developed by the public sector and then divested.
Public-private partnership projects; and
Private sector projects;
Public sector projects;
3.8 2009 Policy Framework For New - Captive Power Producers
National University Of Modern Languages | Final Report on WAPDA 135
To lessen the gravity of power shortage in the country it was decided by
WAPDA/PEPCO to acquire surplus and redundant Captive Power from APTMA members as
one of the supply side measures. This Captive Power was mostly oil based. Subsequently,
Sugar Industry also made a similar offer for sale of surplus (biogases based) Captive Power. So
far about 182 MW produced by different CPPs on different fuels could be fed to DISCOs on
take-and-pay-basis at tariffs approved by WAPDA Authority/PEPCO under the guidelines of
NEPRA. Up till now APTMA remains the main contributor.
3.8.1 NTDC Development Programs
3.8.2 Current Projects
Addition of new transmission lines and sub stations is an integral part of NTDC
program for strengthening/augmentation and expansion of the existing integrated system in
order to meet the power transmission requirements efficiently & effectively and for dispersal of
power from generating plants to the load centers.
To cater for the above, a number of schemes have been taken in hand. A list of the
ongoing projects is given in the tables below.
Approved PC-I cost at US$1=Rs. 30.83
National University Of Modern Languages | Final Report on WAPDA 135
3.9 Finance department
Finance department plays vital role in every organization we can say that it’s a back
born of every organization. Without it nobody can start the operations of any type of the
business. WAPDA is generating revenue through producing electricity from Dams selling to
Discos. I have served a week in finance department and learned a lot of things. Mr. Naseem
has guided me for finance department working.
3.9.1 Hierarchy of Finance Department
National University Of Modern Languages | Final Report on WAPDA 135
3.9.2 Manpower in Finance department
National University Of Modern Languages | Final Report on WAPDA 135
Finance Director (NTDC)
Manager Finance
Corp: A/cs
Mgr Fin. (CPC)
D M
(B & A) F & TA
D.M Corp: A/cs-I
D.M Corp: A/cs-II
D.M Corp: A/cs-III
Asstt. Manager
Corp:A/cs (IOT)
Asstt. Manager
Corp:A/cs (Admin)
Asstt. Manager Corp:
A/cs (Compilation)
Pension Cell
Asstt. Manager
Corp:A/cs (GAD)
Asstt. Manager
Corp:A/cs (Estt)
3.9.2.1 Finance Director Staff (Head Office) Summary:
F.D (NTDC) 01
Manager Finance (C.A) 01
Manager Finance (CPC) 01
Deputy Manager (B & A) / F & TA 01
Deputy Manager 03
Assistant Manager 08
Account Officer 16
B. Examiner 01
Steno G-I 01
Steno G-II 02
Account Assistant 23
Cashier 10
Junior Clerk 10
Driver 04
Naib Qasid 06
Daftri 01
------------------------------------------------------------------------------------------------------------------
Total 80
3.9.3 Different sections of Finance Department
National University Of Modern Languages | Final Report on WAPDA 135
3.9.3.1 Budget
Each department of NTDC makes its budget that how much their expenses may occur
during next year. They make their budget through previous year estimated budget and actually
expenses occurred. Each department sends the budgeted expenses requirements to the finance
director office in budget section. Budget section does consolidate all the budgets and make
comparison in one sheet in order to get approval of the budget for all the departments from
higher authorities. Normally the final approval of budget is given less than the amount which is
mentioned in the budget requirement.
Whenever any office informs that more funds are required during a financial year then
solid reason has to given. That request again passes through all formal way to get budget
approval from the higher authorities. This section not only consolidates all the budgets of each
department but also makes the budget of its own department (Finance Director Office).
3.9.3.2 Admin
Admin section exists almost in all departments of the company. This section deals with
all the matters related Human resource like attendance record, salaries, promotion cases
forward to concern persons, maintaining stationary requirements and all the admin work.
3.9.3.3 Banking & Imprest
This section helps to release the funds. Whenever budget approved, copy of budgets
sent to concern departments, offices. Afterwards any office may request to release the funds
which are approved from the higher authorities to Banking & Imprest section. This section
counter check the funds approval and limit then send request to top management.
National University Of Modern Languages | Final Report on WAPDA 135
When request is recommended this section sends request to Manger Finance (treasury)
Nepir Road Lahore. This person currently doing work under PEPCO and manages all the funds
which receive from all the companies which are divided by WAPDA.
3.9.3.4 Inter Office Transactions
Whenever material moves among the departments, then cash is not given and
transaction is recorded internally. This section is responsible to record IOT. After a week or a
month ledgers of internal offices are reconciled.
3.9.3.5 Payment / Establishment Section
This section is responsible to pay the cash. Firstly all bills are checked and verified.
Then limits are checked of that person who claimed the amount by this section. Afterwards
expense is recorded by both way computerized and manually. Then voucher is sent to cashier
who pays the bill by issuing the cheque. Almost all payments are made by bank cheque.
3.9.3.6 Book Keeping
This section is responsible to maintain all the records of accounts files. There are three
types of voucher files.
It includes as under:
Bank Payment Voucher Files
Bank Receipt Voucher Files
Journal Voucher
National University Of Modern Languages | Final Report on WAPDA 135
3.9.3.7 Process of approval and payment for a budget of offices
Firstly budget makes and approves by concerned department chief, then sends to
budget department of finance. Budget department consolidates all the budgets and make
comparison with previous year and make one sheet budget of all departments of NTDC.
Budget checked by Finance Director and Approved by Board of Directors. Then fund demand
request is sent to Banking and Imprest Section to release the funds. The request is flowed from
top to bottom and after implementation bottom to top.
3.9.3.8 Letter of Credit
This section is deals all matters of import and export of equipment of electricity
transmission.
3.9.3.9 Pension Cell
This section is very important for the every permanent employee after his retirement.
However this section deals with all the employees of NTDC but working under the Director
Finance.
3.9.3.10 G.A.T
This section deals with the issuance, control of employees salary slips, incentives, and
allowances.
3.9.3.11 G.S.T
This section deals with the deduction of taxes from the salaries of employees and other
tax payable equipments.
National University Of Modern Languages | Final Report on WAPDA 135
3.9.3.12 Consolidation
This section basically collects the accounting record from all sections, consolidate them
and make consolidated final account of NTDC.
3.10 FINANCIAL OVERVIEW OF WAPDA
FINANCIAL RESULTS DURING 2008-2009
FINANCIAL OVERVIEW OF WAPDA
FINANCIAL RESULTS DURING 2008-2009
Revenue (Rs. in Million)
Sale of Electricity 62,745.023
Rental & Service Income 182.537
Amortization of Deferred Credit 1,009.089
Other Income 1,592.379
Total Revenue 65,529.028
National University Of Modern Languages | Final Report on WAPDA 135
EXPENSES
Cost of Electricity 61,886.892
Operating Expenses (inch depreciation) 6,637.902
Financial Charges 304.739
Tax -
Total Expenses 68,829.533
Loss for the year (3,300.505)
FINANCIAL POSITION AS ON 30.06.2009
ASSETS (Rs. in Million)
Tangible Fixed Assets 39,704.222
Long Term Advances / deposits 23.281
Current Assts 26,123.094
Total Assets 65,850.597
National University Of Modern Languages | Final Report on WAPDA 135
Equities & Liabilities (Rs. in Million)
Share Capital & Reserves 4,779.078
Long Term liabilities 16,220.889
Current Liabilities 44,850.630
Total Expenses 65,850.597
National University Of Modern Languages | Final Report on WAPDA 135
COORDINATION
4.1 Coordination
The head of this department is Muhammad Adeeb (Deputy Director Account). 27 employees
are working in this department. This department maintain the record of all the subordinate
offices, maintain their account and prepare financial statements and also make investments of
the funds of this department. The main function of book keeping department includes
4.1.1 Book Keeping
Book keeping section maintains the record of the entire department, make financial statements
and also compile their records. Following is the procedure of book keeping:
Cash Book Entries
i. Imprest cash book
ii. Collection cash book
General Ledger
Subsidiary Ledger
Trial Balance
Statement of Profit and Loss
National University Of Modern Languages | Final Report on WAPDA 135
All the accounts are prepares manually but only Trial balance is prepares with the help of
computer software.
4.1.2 Investment
The budgeted and consolidation department usually invest in the banking sector and they invest
for short or long period of time.
4.2 Budgeting Department
This department prepares, compile, approve and estimate the budget of all the department of
WAPDA. Assistant Director Muhammad Ahmed Qureshi who is responsible for the working
this department and he checks and approve the budgets. All the budgets are prepared by
Account and budgeting officer Muhammad Inam. Here below is the Performa of budget.
4.2.1 Type of Budget
There are three types of budgets:
Estimated Budget
Purposed Budget
Revised/Final Budget
4.2.2 Preparation of Budget
Purposed budget is prepares in the concerned department and compile in the budgeting
department. Budgeting department prepare estimated and revised budget.
National University Of Modern Languages | Final Report on WAPDA 135
4.2.3 Who Approves the Budget?
When a department sends its purposed budget to the budgeting department then this
department after discussion approves this budget and budget is approve by Deputy Director B
& C and then sends it to the D.G Finance B & C.
4.3 BUDGET AND CONSOLIDATION
4.3.1 Introduction of B&C Department
Budget and consolidation department plays very important role in WAPDA. Pakistan
water and power development authority is an autonomous government body created by the
virtue of water and power development authority act 1958 .its statutory mandate is to utilize
water and power resources of the country on the a undefined and multipurpose basis .WAPDA
was empowered , among other to frame scheme for the generation of hydel and thermal power,
transmission and distribution of power and construction ,maintenance and operation of power
houses and WAPDA has been divided into three major entities for according and financing
purpose via “power”,” water” and co-ordination wings power wing activities except hydel
power have now been transferred to PEPCO.
The matter relating to the budget and accounts of the coordinating wing are handled by
director general finance (B&C) WAPDA, Lahore who report to the authority through member
finance WAPDA. He has three directors under him namely director, finance (admin &
regulation), director finance (budget consolidation) and director accounts (funds).
4.3.2 Jobs Perform By Budget and Consolidation Department
National University Of Modern Languages | Final Report on WAPDA 135
The director finance (budget & consolidation) is responsible to the director general
finance (B&C) WAPDA, Lahore. He is assisted by 3 officers in BPS-18, 5 officers in BPS-17,
7 officers in BPS-16 and 60 non gazette employees as per attached organization chart.
Following jobs and being performed in the directorate.
Dealing with the audit report/advances/draft paras pertaining to the common services
offices (annexure A&B)
Consolidation of accounts of the offices/organization of the coordinating (common
services) wing of WAPDA.
The pre-audit and payment in respect of claim relating to the common services offices.
Consolidation of accounts of the offices/organization of the coordinating Issuing of
funds to the common services offices(annexure)
Investment of the surplus funds of WAPDA with different banks/financial institution
with the approval of the competent authority
The maintenance of the receivable /payable accounts with power wing, water wing and
the corporative entities under PEPCO and reconciliation of sub accounts with these
quarters.
The director finance (B&C) WAPDA works as member of WAPDA welfare fund.
Maintaince of the accounts of employees’ medical benevolent fund.
Maintenance of authorities bank accounts and reconciliation with the banks
. Preparation /process of cases regarding grants of the long term advances and
earmarking of funds for employees of coordinating wing of the WAPDA.
National University Of Modern Languages | Final Report on WAPDA 135
Process of the cases of the purchase of the physical assets received from different
offices by the scrutiny committee constituted under economy measures.
Scrutiny/process of (a) revised budget estimates and budget estimate (b) cases of the
additional budget grants and (c) re-appropriation of budget grants in respect of the
accounting units of the coordinating. Wing, WAPDA hospital dispensaries under D.G
(medical services) WAPDA Lahore and other directorates roe which payment is being
made centrally (annexure A)
Administration of employees of finance cadre from BPS 1 to 15.
4.3.3 Departments under Budget and Consolidation, we have visited:
Insurance
Funds (Budgeting)
Pension
Coordination (Book keeping)
4.3.4 Expenditure of the Coordinating:
Expenditure of the coordinating wing is met with from share (authority overhead)
provided by power and water wing@ 1.0% and 0.8% of the budget of the concerned wing
respectively. The size of the budget of the coordinating wing for year 2009-10 is Rs 982.407
million.
4.3.5 Capacity of the Budget Grant of the WAPDA Hospital
National University Of Modern Languages | Final Report on WAPDA 135
The capacity of the budget grants of the WAPDA hospital/dispensaries under (medical
services) WAPDA is Rs 1010.53 million. The expenditure of WAPDA medical directorate is
met with from amount provided by three wings of WAPDA and the corporative entities of the
PEPCO on the basis of the number of the employees (serves/retired) of the respective
wing/entity receiving medical from these hospital/dispensaries.
4.3.6 Offices on the Payment Roll of the Director General Finance (B&C)
Authority {G.M (Admin), Director General (S&GA), Director (S&E), Secretary,
WAPDA And Director (Legal)}
Admin &Coordinating
Director(O&M)
Director General Finance (B&C)
Director General WAPDA Audit
Director ( Stationary Store)
Director (Security)
Law Division
Director (Pension)
General Manager; Central Contract Cell
Secretary, WAPDA Welfare Fund.
Director (Rules)
National University Of Modern Languages | Final Report on WAPDA 135
Telephone Exchange
Director General(Insurance)
WAPDA Lodges/Hostels
Director Accounts (Funds)
Director Education
Director Intelligence
2.6.19 General Manager (M&S) WAPDA
4.4 Offices under Financial Control of the General Finance (B&C)
Sr. # Name Of The Organization Code
1 Director General Finance (B&C) HOC
2 Director General, Medical Services, WAPDA Complex Lahore WMS
3 Transport Directorate, Sunny View, Lahore TPT
4 WAPDA Printing Press Sunny View, Lahore WPP
5 Central Stores Stationary Sunny View Lahore WSS
6 Chief Auditors WAPDA Al-Jannat Building, Bank Square Lahore CAR
7 Public Relation Division, G26 WAPDA House Lahore DPR
8 Building Circle, 334-WAPDA House Lahore BCD
9 XEN Building Division Hyderabad WBH
National University Of Modern Languages | Final Report on WAPDA 135
10 XEN Building Division, Peshawar WBP
CHAPTER 5
HYDEL Department
5.1 Hydel
This department plays back born role in WAPDA. Through it WAPDA produce more
than 5100 MW electricity at cheap cost because electricity produce through HYDEL and
HYDEL means generate or creating power through flow of water than moving turbines
because of this power generate. The HYDEL generation is 98% under the WAPDA from
HYDEL development projects. The electricity which produce through HYDEL is very low
cost just less than RS 70.
5.2 Functions of hydel:
HYDEL department is performs many function but some Following are the main
function performs by the hydel development head office situated in Gardee Trust Building
Napier road Lahore.
National University Of Modern Languages | Final Report on WAPDA 135
5.2.1 Budget Section
Assistant Director Mjahid Hussain is the head of this section. The main responsibilities of
this section include:
Prepare the estimated budget
Compile the budget
Approved or make queries the budget of a sub office
Note: Budget prepares at site and compile in this department.
This section approve loan for the construction of new dams, for repair and maintained
of hydel power stations, for purchase of machinery, stationery and traveling expenses of the
hydel offices. This section compares the new budget with the estimated budget and then
approved and sends this budget to the G.M Finance office for the approval a payment of fund.
5.2.2 Inter Office Transaction (IOT) Section
Assistant account officer Tahir Abbass Khan is supervising this section. IOT section is
responsible for the transaction between sub offices of the hydel development. Debit/Credit
invoices and Super scrap cheque are used for inter office transaction. The balances are
quarterly reconciled and cash section of the IOT is transfer and received funds to the sub
ordinate offices.
5.2.3 Compilation Section
National University Of Modern Languages | Final Report on WAPDA 135
The budget and account officer Waqas Ahmed is controlling all the working of
compilation section. This section compiles the data and accounts of sub offices, check their
balance sheet, cash statements and other financial record. For this purpose they are using
software named as ERP (Enterprise Recourse Planning).
5.2.4 Imprest, Establishment and Account Section
There are two sub sections of this section
Establishment
This section pass all those expenses which are needed by the admin section for the operation,
check all the payment voucher and assign a token number to these vouchers. The budget and
account officer can pass any amount for recurring expenses but for the non recurring expenses
he can approved only up to Rs. 50000.
Banking and Imprest
This section deals in the Imprest expenses of:
head office (Hydel Development)
20 lower foundations offices.
Being head office it provides the funds to the above mention offices. Imprest limit for the
recurring expenses is depends upon their budget and monthly expenses. At least 3 months
National University Of Modern Languages | Final Report on WAPDA 135
expenses should consider knowing the imprest limit. Following are the main recurring
expenses of offices under hydel development:
Salary
Utility Bills
Traveling and Accommodation etc.
There are three main types of account using this office are:
Main Imprest account
Imprest account
Collection
Amount from main imprest account can only transfer through authority letter form the imprest
account the amount can be transfer through the bank cheque and for collection cheque there is
no advice and no cheque is use the amount transfer directly to the head office’s account.
5.2.5 Admin Section
Admin department play vital role in WAPDA. Because it joint all department of
WAPDA with each another. The admin department controls the working of the overall
department, assign their duties, and arrange training programs for employees inside the office
or for the employees in the sub offices. There are 1600 employees working under this
department.
5.3 Share and capacity of hydel throughout total generation
National University Of Modern Languages | Final Report on WAPDA 135
Before 10 years generation is 70% from HYDEL and 30% from thermal but now the
30% from HYDEL and 70% from thermal. So the cost is very high because of more thermal
generation. The capacity of HYDEL production is 27000 million units to 30000 million killo
watts (MKH) but still the total requirement is 90000 mkh.
5.4.1 Sources of generation
HYDEL generation is getting from fallow of water in dams such as
Terballa dam
Varsac dam
Mangla dam
Other small dams
5.4.2 WAPDA thermal
Four generation companies which are categories as company one, company two,
company three and company four. For example the generation company at Jamshoro.
5.4.3 Fuel wise generation
Fuel wise generation provide electricity according to the following ways.
Use Furness oil or residue Furness oil(RFO)
Use of gas
Use of high speed diesel(HSD)
Use of coal.
National University Of Modern Languages | Final Report on WAPDA 135
5.4.4 Cost of thermal generation
The cost of thermal generation is very high according to the HYDEL generation. The
cost of thermal generation of electricity is rupees 300000 million annually.
5.4.5 Independent power producers (IPP)
These are private companies generate the electricity and make the contract with
WAPDA and provide the electricity to WAPDA according to the decided rates.
5.4.6 Sharing the capacity
The generation companies is provide 35000 million units and from GENCOS 17000
million units.
5.4.7 Not exact prices of all generation companies
All IPP charge different rates . there in no similarity in rate among IPP.
5.4.8 By pass of merit order
This contract make through NATIONAL POWER CONTROL ORDER. A rate which
different companies offer and WAPDA make the contract according to rate and prices from the
suitable companies. Fro example the requirement of power in Lahore but cost rupees 6.50 per
unit which can get from the nearest place of the Lahore or from Karachi is rupees 5 per unit of
National University Of Modern Languages | Final Report on WAPDA 135
the cost but with conveyance cost is rupees 7 per unit. The suitable is first one because is its
price rupees 6.5 per unit and order is take place from this company by WAPDA.
5.4.9 Purpose of bypass of merit order
According to the bypass of merit order observing the demand and order for generation
companies
5.4.10 Cost break up
Fixed cost paid even units is closed. Fixed cost always charge on capacity. According
the WAPDA consider the total cost plus development cost.
5.4.11 Making the cost break up
In costing and planning department discuss and calculate the components of costs
which are included both fixed cost and variable cost through the ENERGY PURCHASE
PRICE and CAPACITY PURCHASE PRICE. Energy purchase price or EPP showing the
variable cost and Capacity purchase price or CPP included on fixed cost. The variable cost
showing the costs of fuel, gas, and other variable costs but the fixed costs are normally
included on operating and maintenance costs.
5.4.12 Energy purchase price (EPP)
In which discuss the total variable cost which normally consists fuel cost plus VOM.
Variable operating maintenance cost (|VOM)
Consumption of gas and fuel :
National University Of Modern Languages | Final Report on WAPDA 135
Consumption of gas and fuel in terms of rupees.
5.4.13 Admin cost
In admin cost included the salaries, wages, and other operating costs.
5.4.14 Capacity purchase prices (CPP)
CPP is covering the fixed cost of the departments and on the projects.
5.4.15 Esclateable
According to CPP in this department discuss and calculate the fixed operating and
maintenance cost and secondly discuss the returns.
5.4.16 Debit service liability (DSL)
In which discuss the principle amount and interest, secondly some units of generations
electricity seasonally and the fixed cost bear throughout the year.
5.4.17 Contract from IPP
National University Of Modern Languages | Final Report on WAPDA 135
IPP provide electricity to the WAPDA, WAPDA making contract from these
independent power producers for example contract to the company which charge variable cost
from EPP on fuel base generation. So WAPDA agreement to this company and decide the fuel
price for example the cost is rupees 45000/3000 units. So the price is rupees 15 per unit.
5.4.18 Indexation Factor
In which calculate and decide the rate according to the units such as 100million units in
1997, the cost is rupees 1 per unit. so the cost is also rupees 100million.
5.4.19 Fuel Indexation
It means charge the cost according to the fuel rate. The rate decide according to the
current rate of fuel .for example the fuel indexation is 100million units and the rate is rupees 15
per unit. The cost is rupees 1500million and the units are measure in maga watts. these are
always calculate monthly.
5.4.20 According to CPP
In which for example 100million units and the reference price is rupees 10 per unit. so
the cost is rupees 10000million.In that method the major thing is factor of the rate of dollar.
for example we assume the rate of dollar is equal to rupees 80 and the cost is now rupees
80000million.
National University Of Modern Languages | Final Report on WAPDA 135
5.4.21 Line losses
According to the WAPDA there are different types of the line losses which are
underlying.
5.4.22 Transmission and distribution losses (TSD)
These losses are adjusted as the cost on the remaining units.
5.4.23 Busbar
The losses adjust according to the NATIONAL TRANSMISSION ANT DISPATCH
COMPANY (NTDC) to grid estuations and drop electricity due to the flow of current.
5.4.24 Deduction term
The line losses are bear due to deduction of bills.
5.4.25 Defective term
In which meters are defectives then making estimated units according to previous units
consumption of last 11 months or currently corresponding month or last year month estimated.
5.4.26 Critical path method
National University Of Modern Languages | Final Report on WAPDA 135
CPM is used in manufacturing process according to the time and motion study.
According to the CPM the work done accurately and timely so according to this costing and
planning department is very important for their project and work on them.
5.4.27 Structure of line losses
WAPDA (residual) out of 13 companies such as LESSCO, FASSCO, KESSCO, and
other companies. Divide in different companies for identified their functions. In 13 companies
9 companies are DISCO (distribution companies) and 4 companies are GENCOS (making
power through fuel).
5.5.1 GENRATION COMPANIES
1. WAPDA ( just HYDEL )
2. GENCOS
3. IPP
5.5.2 Pipe line of Electricity
National University Of Modern Languages | Final Report on WAPDA 135
5.5.3 Distribution margin
The margin which can get from deduction of cost in sale. This margin showing that the
excess amount which getting in according to costing and planning department through the
deduction of all costs from sale.
5.5.4 Sale in price
Selling price = Distribution margin + cost
Distribution margin= Sale – cost
5.5.5 Establishment cost
National University Of Modern Languages | Final Report on WAPDA 135
NTDC
DISCOS
GRID STATION
FINAL CONSUMER
Operating and maintenance cost (O&M )
Depreciation
Return on assets (ROA )
Return on assets ( DM )
5.5.6 Tariffs Partitions
NEPRA give prices according to the different types of prititions of tariffs which are
followings.
5.5.7 Regulatory Tariff
NEPRA regulate the tariff then government of Pakistan (GOP) notify of this tariff. The
other name of the regulatory tariff is determining tariff.
5.5.8 Notified Tariff
The notified tariff showing by the government which are different from the determine
or regulatory tariff.
5.5.9 Consumer Tariff:
This type of tariff making according to the consumer. The first two tariffs may be same
but the consumer tariff is different from these two.
National University Of Modern Languages | Final Report on WAPDA 135
5.5.10 Changes in Tariff / Unstructured Tariff
It means changes of prices of fuel or increases the prices of fuel which are impact on
the tariff prititions. This irrational price increase of fuel prices so it is called unstructured tariff.
5.5.11 Structured Tariff
In which included structure changes or base changes because of returns. After this
structure changes this determination of prices.
A1: Domestic tariff of household.
A2: For commercial usage.
B1,B2,B3: Industrial categories according to their usage of electricity
C1: Big units of industrial
D1,D2: Tube wells and agriculture tariff
E1: Temporary connection which are domestic or construction
E2: For commercial business
F: seasonal connection such as rice and ice mill. In which concept of fix charges. In
which according to 6 month included the normal tariff plus 20% increment for seasonal
working
G: In which included the street lights (how many pools).
5.5.12 Average sale rate
Average sale rate = Total sale / Units (average tariff by NEPRA)
National University Of Modern Languages | Final Report on WAPDA 135
5.5.13 Revenue
Revenue = Units * Price
5.5.14 Subsidy
The subsidy is always providing by the government of Pakistan to WAPDA.
5.5.15 Gross subsidy
The subsidy which provides by the all tariff to each other.
5.5.16 Break up
This break up basis on tariff, product mix (use units in tariffs), projection units.
5.5.17 Total budget
Total budget = Operating and maintenance budget + capital budget
5.5.18 Zero base budgeting
Zero base budgeting justify why increase budget? What reasons and justify the all
reasons.
National University Of Modern Languages | Final Report on WAPDA 135
5.5.19 National Electric Power Regulatory Authority (NEPRA)
GENRATION
DISTRIBUTION
5.5.20 Revenue
According to standard average produced units of 28000 million units. Revenue split in
fixed and variable according to percentage. Variable cost / units and fixed cost measure in
mega watts. WAPDA HYDEL capacity 6444 mega watts.
CHAPTER 6
DIRECTOR OF WATER (WAPDA), WAPDA HOUSE LAHORE
The director of water control and discuss the varies functions which are followings.
Making dams
Water reservoir
Making canals
Research laboratories
National University Of Modern Languages | Final Report on WAPDA 135
Tube wells to needy areas
Research projects
Research on agriculture
Research on earth
6.1 Dams
There are two major purposes of the making dams.
6.1.1 Water reservoir
The water reservoir making for the purpose of the storage of the water not for the
creation or generation of the power. In which showing the range of projects and how to make
the projects and whose are work on that projects . In water reservoir to observe the
organization, s capacity. The example of the reservoir is CHASHMA RISORWIRE, the
purpose of this project use for just agriculture purpose. The generation of electricity at chashma
barrage which is near from the chashma reservoir. The other purpose of this to increase the
generation of fish.
6.2 Canals
6.2.1 Kachi canal
A project for agriculture purpose start from the province of the SINDH and after
running throughout the province of the PUNJAB backed in the SINDH.
6.2.2 Thar canal
National University Of Modern Languages | Final Report on WAPDA 135
A big project which start with billions rupees in the province of the SINDH. It also
running throughout the province of the PANJAB and use for agriculture purpose throughout
KHUSHAB, BHAKAR, and JHANG and throughout PUNJAB.
6.2.3 Cost of thar canal
Cost of pc1 is rupees 32000 million and cost of pc 2 rupees 48000 million.
6.3 Budgeting
In budgeting categorized because of different sources of funding according to PUBLIC
SECTOR DEVELOPMENT PROGRAM ( PSDP ) and other function involved in it.
6.4 Public sector development program ( PSDP )
Funding from government of Pakistan according to federal government. In October
letter from government of budget circular which define for estimate expenditure of future one
year and demands send to federal government according to projects.
Write done all information and submit all proposal, this department received proposals
from project and submit after checking to government. Checking accuracy record of usage of
fund, caution calculation according to historical session, check trial balances and accumulated
expenses calculate and less from pc 1 cost then available future calculation. Recognize the
caution is accurate and locate break up of finance of projects which included the fixed cost in
following ways
Establishment charges for admin
Calculate overhead charges which are 2.25%
Interest during the construction (IDC).
Consultant charges.
National University Of Modern Languages | Final Report on WAPDA 135
Add up all of them are called the total fixed cost and not compromise on that cost,
compulsory pay and assets locations and needs of new assets according to the requirements
then calculate the expected valve of assets. The excess amount consume on project work and
submit the proposal after the detail of all heads expenses such as admin expenses detail or
break ups. All expenses and where these are consumed such as salaries, travelling allowances,
daily allowances, power free supply, building rent, rates and taxes, computer charges,
stationary, advertisement charges, etc.
e.g. the high increase of mangla dam cost is rupees 53000 million the budget is rupees 11000
million, in which fixed cost is rupees 2057 million and cost on work rupees 9000 million.
6.5 Procedure
This department received the proposals from the projects and overseeing them and
estimates the suitable values, detail of contractors.
Detail of contractors
How many payments and future payments
Work currently, previously, and future work
Mention time period, if time over run then reasons of this and time extensions.
All 42 projects discuss in this departments and the cost is rupees 101 billion deposits as
a proposals to the federal government in this year
Maintain books and send to GENERAL MANAGER OF FINANCE, MEMBER
WATER, CHAIRMAN and back to this department then making the cover letter and
send to the federal government. After this procedure decide the meetings which are
followings.
6.6 Meetings
National University Of Modern Languages | Final Report on WAPDA 135
6.6.1 Priority meeting
After the all procedure the proposal send to the federal government which making the
deductions on that budget in priority meeting.
6.6.2 ANNUAL PLANT COORDINATION COMMITTEE ( APCC )
After the priority meeting the budget send to the APCC. The approve budget is just
rupees 10 billion by APCC meeting in this year but the proposal which this department send to
priority meeting is rupees 101 billion, so the deduction by the APCC is rupees 91 billion.
After extensions of that budget approved by APCC is rupees 16 billion.
6.7 NATIONAL ECONOMIC CONCIL (NEC)
After the APCC the budget is finalize in the NEC. In that meeting foll0wing authorities
involve and attend these meetings by the one or all of them.
GM NORTH(KHAIBAR PAKHTOONKHAH)
GM SOUTH
GM(PUNJAB)
GM(NOTTREN AREAS)
CHAIRMAN(WAPDA)
In this meeting the parliament involves and approve and finalize the budget then
signature on that budget by the president. Now the current budget is approving of rupees 16
billion.
After approve the final budget by the NEC the amount is give in the four faces. If any
problem inure discuss according to the cash plan not according to the proposal. The relief is
National University Of Modern Languages | Final Report on WAPDA 135
received in first quarter then to projects provide monthly and progress reports of previous
month from projects.
After quarter the federal government checking the work completed or not first quarter.
Discuss on the proposals and the review all quarters, after 6 months and after 1 year.
6.8.1 Function Director Of Water (WAPDA)
6.8.2 Cash plan:
In which showing that how many cash use in four quarters according to approved the
final budget by the NEC.
6.8.3 Work plan:
It shows that how many work in 4 quarters, monthly, after 6 month and yearly.
Central work development party (CWDP)
If budget less then rupees 5 million then use in provincial works.
6.8.4 Token Provision
Token amount from the government against guarantee of projects. If situation is
unfavorable where project start, investment excess on project due to law & order situation. If
saving i.e. rupees 5million then surrender to federal government or secondly. Transfer amount
to needy project to just allocating projects which allocate against token money.
National University Of Modern Languages | Final Report on WAPDA 135
6.8.5 Off Funds
It means making a case of needy project transfer amount from continual project
savings, approve by federal government or at same amount then use or federal government
order to give past of that amount any other project, the federal government saying about it.
6.9 Cost of generation of electricity
PARTICULAR GENERATION(GWH) COST (RS. IN
MILLLION)
HYDEL 28000 30000
National University Of Modern Languages | Final Report on WAPDA 135
THERMAL
GENCOS
19000 125000
IPPS 36000 290000
TOTAL
GENERATION
83000 445000
GENERATED/ PURCHASE 83000 units
UNIT LOST 17000 units
UNITS SOLD 66000 units
SALE VALUE Rupees 356000 million
PER UNIT SALE RATE Rupees 5.4 per unit
7.0 FOREIGN CURRENCY DEPARTMENT
7.1 Funds Allocate By the Authority
I visited in Foreign currency department in my 4 weak of Internship Mr Shoail Ahmed
Director of Foreign Currency give brief knowledge of this department .WAPDA needs funds
National University Of Modern Languages | Final Report on WAPDA 135
for its steadily expanding development programs and other functions in terms of its charter.
The Authority is entitled to draw upon Authority Fund, which consists of:
Grants made by the Federal and Provincial Governments for specific jobs.
Loans obtained from the Federal and Provincial Governments.
Sale proceeds of WAPDA bonds issued under the authority of government.
Sale of power.
All other sums received by the Authority.
As a mean of self-sufficiency WAPDA is also required to finance a part of its power
development programs through funds rise from revenue surplus of the Electricity Operations
Branch. This is termed as self-financing the quantum of which is determined by the federal
government.
Loans obtained by the authority with the special or general sanction of the Government.
Foreign aids and loans obtained from the IBRD, ADB and other International lending
Now in current situation Foreign Currency department plays vital role because many
countries and different financial institutions give loan and aid for finish current energy crises.
Some important role of foreign currency department given below
7.2 Objective of Foreign currency department
Foreign currency department working only for the development in WAPDA. The
projects which have made or in working process depended on the foreign loan and aid. So this
National University Of Modern Languages | Final Report on WAPDA 135
department plays back born role in WAPDA power generation. This department also provide
valuable profit to government of Pakistan. Foreign exchange transactions developed from the
growth of WAPDA activity among the help of different countries. As business relations grew,
the importance of monitoring the value of foreign currency and trading it in the market
facilitated a need to establish foreign exchange departments WAPDA.
7.3 Core working
7.3.1 PC 2
In pc 2 WAPDA makes feasibility report how much capacity of new project for which
WAPDA want to take loan.
7.3.2 PC 1
In pc 1 WAPDA start working on the project with the amount of
7.4.1 Why WAPDA take loan
WPADA is a working all areas in Pakistan and it is working on non profit bases. So
without improving its capacity it can not meet the demand of general public. And also it is
single power Generation Company Which provide Electricity directly to people.
National University Of Modern Languages | Final Report on WAPDA 135
7.4.2 Reasons
There are some reasons for which WAPDA take loan
Install new power plants
Decrease short fall
Meet electricity requirement in future
No alternative power production
Demand increase every year
So WPADA takes loan for meet the demand of electricity which increases day by day.
7.5 Foreign Currency
In which currency WPADA takes loan it return loan in same currency. Normally
WAPDA takes loan in dollar currency.
Loan is combination of Principle amount + Interest
7.6 Agreement
When WAPDA need loan it make agreement with money provider intuitions. This
agreement includes following information like
Rate of interest
National University Of Modern Languages | Final Report on WAPDA 135
Place of payment
Issue date
Mode of payment
loan return date
Payment guarantee
agreement signed
7.7 Foreign Loan
Foreign loan are those loan which is taken outside the boundary of country. WPADA is
a large organization and it is working on non profit bases so it is very difficult for it to install
new power plant which need billions of investment and without improving its capacity it can
not meet the demand of general public. So WPADA takes loan for meet the demand of
electricity which increases day by day.
7.8 Parties
These are three parties involve at the time of making agreement of taking loan. These
parties are following
Borrower WAPDA
Guarantor Government or Commercial banks
Lender Who provide loan
National University Of Modern Languages | Final Report on WAPDA 135
7.9 Types of Foreign Loan
There are two types of foreign loan
Direct Loan
Relending loan
7.10 Direct Loan
Direct loan WAPDA takes itself from commercial bank and other financial institutions.
Normally WAPDA itself give guarantee for loan but some time government can also give
guarantee. WAPDA has responsibility to return loan to the loan provider.
7.11 Relending Loan
In relending loan government it self involve directly for providing loan to WAPDA.
Foreign country or financial intuition provide loan to government and government reissue this
loan to WAPDA. WAPDA receive loan indirectly. Government receive loan at low rate of
interest like 2 or 3 percent but when government issue this loan to WAPDA than government
charge 15 percent rate of interest before two years ago it is 17 percent but now due to finish
power crises government reduce it.
7.12 Rates
National University Of Modern Languages | Final Report on WAPDA 135
It is duty of WAPDA foreign currency department that fixed rate of loan that it return
according to KIBOR or LIBOR rate. If once rate id determine than it can not be change till the
project ended.
7.13 Loan provided Institution
Normally WAPDA takes loan for following financial intuition.
World Bank
Asian Development Bank
IMF(International Monetary Fund)
Kuwait fund
Some financial Institutions of France, United Kingdom, United State of America, Sudia Arabia
and Dubai
Currently loan Status
National University Of Modern Languages | Final Report on WAPDA 135
Intuited Amounts $
World Bank 54 Millions
Asian Development Bank 27 Millions
International Monetary Fund 13 Millions
Kawait Fund 8 Millions
Sudia Arabia Fund 31 Millions
National University Of Modern Languages | Final Report on WAPDA 135
Marine Insurance
8.1 Marine insurance procedure
It has been observed that the detailed procedure as laid down in this office circular no
INS/RRK/F. claim /cir-/6877/6974 dated April 26, 1969 and no INS/gen/707/7587
dated 03-07-72 for reporting of marine claim is not being properly followed. Any
lapse is apt to result in the non acceptance of marine insurance claims and this causes
loss to the authority .in order to avoid loss and obtain expeditious settlement of these
claims, the instruction contained in the above quoted circulars have been modified up
to date in the from of precise required to be observed in the a given situation as
followed which may please be followed faithfully by all concerned.
It may kindly be noted documentation of a claim is the primary responsibility of the
consignees and mere intimation of loss to the insurance department does not absolve
the consignee of their responsibility. The consignees are therefore, in all
circumstances responsible to finalize the claims as early as possible. They should
provide, complete document to the insurance department WAPDA, Lahore within a
reasonable period i.e. 15 days after lodging the claim. However the period in the
respect of the Performa invoice and foreign supplier’s reply in the case of the receipt
of short material should not exceed two months. If the documents are not received
within above period, the insurance department will not be in a position to pursue the
claim with M/s. national Insurance Corporation.
National University Of Modern Languages | Final Report on WAPDA 135
The marine policy protects the consignment right from the supplier warehouses
anywhere in the world to port of shipment, marine voyage to the port in Pakistan and
thence by inland transit right up to job site. This period is maximum 90 days after the
arrival of the ship at the port of discharge and the policy immediately expires on the
arrival of goods at final destination whichever is earlier.
At the time of issuance of the purchase order, a copy of the same should be provided
to the director insurance, WAPDA Lahore. he purchase order should clearly contain
instruction binding the suppliers to supply non negotiable document to the director
insurance for taking the insurance cover of the material shipped by sea not exceeding
Rs25,000.000/-(Rupees two crore fifty lac) a week before the sailing of the vessel .
the shipment which exceeds Rs25,000,000/- but does not exceed Rs100,000,000/- is
held covered if notice is received in writing at least 14 days before the actual date of
the shipment . The limit of consignment in other modes of transportation is as under.
By post parcel Rs 5, 00,000/- (Rs. Five lacs) per carry.
By rail/truck Rs 10, 00,000/- (Rs. Ten lacs) per carry.
By air Rs 20, 00,000/- (Rs twenty lacs) per carry.
8.2 Damages at destinations
Goods which have reached the ultimate destination and kept in the story for eight days
without opening of the cases are with out survey will be held covered against undisclosed
damages clause and additional premium will have to be paid at following rates.
up to first 2 months 5% per month of the full premium
This will be reckoned from excluding premium for war risk cover
National University Of Modern Languages | Final Report on WAPDA 135
the date of consignment
reach the job site.
up to subsequent 6 months 10% per month of full premium
Excluding premium for war risk cover
up to further one years 15% per month of full premium
excluding premium for war risk cover
8.3 Storage risk clause
n case of material does not reach the final destination with in 90 days after the
discharge of goods from the carrying vessel at the port of destination i.e. Karachi will be held
covered during temporary storage at the following rates:
up to 30 days to be reckoned additional 10% of the full premium including
premium for war risk cover
From date of expiry of 90 days are allowed
For each additional 30 days additional 10% of the full premium including
premium for war risk cover.
As soon as the goods are received in store the receiving officer should check the entire
material with in 8 days of arrival of the goods. In case of loss or damages consignee should
immediately inform the director insurance WAPDA Lahore. In case of loss Particular of the
consignment should be prepared and claim with insurance department, WAPDA immediately
on the receipt of goods other wise the consignee will be responsible for loss. Where the value
National University Of Modern Languages | Final Report on WAPDA 135
of the loss made but not later than 8 of the arrival of goods at side to this office along whit the
following information/document:-
purchase order number
invoice number and date
name of vessel
bill lading number
approximate amount of loss
Whenever the material reached the destination, report of the loss with in 8 days must
also be lodged with the national insurance corporation, offices located at Karachi,
Quetta, Multan, Lahore, Faisalabad, Rawalpindi and Peshawar whichever is nearer to
the consignee with a copy to this office .
Full cooperation should be extended to the surveyors and this may be insured that the is
conducted properly by the surveyors, the attendance certificate should not be issue to the
surveyor until and unless complete survey is carried out satisfactorily by the survey surveyors
8.4 Short and wrong material
It has been noticed that some times material is short and wrong shipped by the
foreigner supplier and consignee consider this lapse as the liability of the insurers. It may be
kept in mind that the insurers are not responsible for short and wrong packing of the material.
Therefore the consignees must immediately refer such cases to the suppliers and finalize with
them directly. Such types of deficiency required to be detected with in 8 days of the receipt of
goods. When such reports are logged with the suppliers it is required to be done under the
National University Of Modern Languages | Final Report on WAPDA 135
intimation to the insurance department, WAPDA, enabling them to lodge first information
report with the insurers. However where it is proved that loss is not on suppliers account and a
certificate to this effect is obtained from the supplier only then the matter may be taken up with
the WAPDA Insurance Department who in tern will lodge with the claims with the insurers on
the basis of the first information reports. This will only be practicable if the documents by the
consignees are provided to the insurance department WAPDA well in this time. The agency
commission of the local agent may not be paid in case of shortage until and unless the claim is
decide by the insurance company and the reply of the foreign suppliers regarding shortage in
original is provided by the local agent. Where the surveyor has declared the loss due to the
short packing the claim of short packing does not lie against insurers and necessary steps may
be taken for the recovery of the loss from the suppliers or recovered from the commission of
his local agent as the case may be.
8.5 Documentation
While analysis the cause of the delay in the acceptance of Marine claims it has been
noticed that claims are not drawn in acceptance with existing procedure are not supported with
the essential documents. This is a very serious situation as the acceptance or repudiation of the
claims depends upon the supply of following documents which should be furnished to
the insurance department WAPDA within 15 days after lodging the claim.
Claim bill
Performa invoice (for this time limit is 2 months)
Survey report
National University Of Modern Languages | Final Report on WAPDA 135
Original invoice
Bill of lading
Warehouse examination report
Estimate in case of repair. Three quotations of repairers may be attached with the repair
bill;
Warehouse examination report and the survey report are the basic documents on which
the claims are drawn. Claim bill should strictly be in accordance with the survey
reports as its acceptance depends on the remarks of the surveyors and remarks of the
consignee in the warehouse examination report. Therefore while filling up the
warehouse examination report unwarranted remarks should not be given this may
prejudice the claim. Similarly no statement should be made to the surveyor which may
jeopardize the interest of WAPDA. In case the consignee consider that the award
given by the surveyor is not in accordance with the damages sustained by the
authority, it is their foremost duty to challenge the survey report with facts and figures
and substantiate their view point most judiciously and provide a copy to insurance
department WAPDA, to enable them to take up the matter with surveyor. But in no
case the consignees should arrange the repair/replacement in contradictions of the
survey report until and unless the challenged survey report have been got revised from
surveyors in accordance with our genuine claims.
In case of repairs recommended by the surveyors the approval to carry out the repair
may be obtained from the national insurance corporation, Lahore through insurance
department, WAPDA, otherwise the claim will not be paid by the national insurance
corporation Lahore.
National University Of Modern Languages | Final Report on WAPDA 135
It needs to be emphasized that timely submission of documents listed above is of
paramount importance for the settlement of claims and arrangement will be made by
the consignee to supply these documents for all new and pending claims.
Consignees are requested to pay personal attention in the completion of new cases so
that claims may not return unsettled. If case which remain unsettled for more than 3
months because of non supply of the Performa invoice and other essential documents
the responsibility will be that of consignees and the matter will be referred to the
Authority.
8.6 Procedure for recovery of loss/damage of consignment
It has been observes that the marine insurance procedure circulated with this office
No. SOM/M/GEN/79/7409 date: 01-07-1979 is the being follow in letter and Spirit by the
WAPDA Consignee causing un-due delay in lodging the claim and ultimate loss to the
Authority. For instance
The loss is not reported within the stipulated period of 8 days and the insurers have to
charge the storage premium for the delayed period by way of deduction from the claim
as per terms of the insurance Policy.
Clean receipts are given to the Carrier/Transporter by the consignee when the packages
are in doubtful/damages condition thus the carriers escape their legal liability.
The claim damages during transit are not lodged on the carrier through Chief Resident
Representative Karachi in time. Thus the claim is accepted by the insurers after
deduction of share of the carrier.
National University Of Modern Languages | Final Report on WAPDA 135
The claim bill rendered is not often supported with the Performa Invoice,
carrier/Suppliers reply and other documents which results in-ordia=nate
Delay in settlement of the claims.
Shipping documents such as invoice, bill of lading and shop survey report and ocean
freight are provided in installments. This further delays settlement of claim.
8.7 Settlements
In order to avoid loss to the authority and over-come the above situation and for the
quick settlement of the claim, the following steps may kindly be taken to safe guard the interest
of the Authority:-
The information of loss should be reported direct to the nearest office of National
insurance corporation indicated under para-14, with a copy to these office within a
period of 08 days.
In case the carrier/transporter delivers the packages in damages condition, the following
remarks on the delivery challan/truck receipts should be mentioned
Conditions causing loss to the authority. Estimated loss will follow.”
The consignee should notify the estimated amount of lass/damage on receipts of the
material in warehouse to the chief resident representative Karachi immediately so that
necessary recovery may be effected from the carriers/transporters bills. it may please be noted
that I case of default the national insurance corporation will deduct 20% amount for our claim.
This does not only cause loss to the authority but also invites audit objection.
National University Of Modern Languages | Final Report on WAPDA 135
In case the material was found short/wrong the foreign suppliers should be asked to
make good the shortage or wrong shipment.
The consignee while rendering the claim bill make kindly ensures that all necessary
documents i.e. proforma invoice, carrier/transporter and suppliers reply
accepting/declinging therir liabilities are attached.
A complete set of shipping documents, suppliers invoice, packing list, bill of lading,
ship survey report and ocean freight may please be supplied by the chief resident
representative Karachi/consignee to avoid un-necessary correspondence on the issue.
National University Of Modern Languages | Final Report on WAPDA 135
WAPDA EQUIPMENT PROTECTION SCHEME
9.1 Introduction to scheme
“Self insurance scheme (sis)” was introduced in 1987 without any injection of equity
by the WAPDA. Instead, the whole funding requirements are fulfilled through the
contributions and profit on investments of weps surplus funds. It was restructured/renamed as
“WAPDA equipments protection scheme (weps)” by the authority in its meeting held on April
17, 2001 and notified vide office order no.ins/Weps/3305-55 dated May 05, 2001. It is now
converted into an independent accounting unit w.e.f. July 01, 2005.
9.2 Objective
The main objective of WEPS is to protect the WAPDA equipment against the risk of
potential losses.
9.2.1 Equipments covered under the scheme
Presently the following equipments of WAPDA are covered under the scheme.
National University Of Modern Languages | Final Report on WAPDA 135
Electrical & mechanical equipments installed at all grid station of DISCOS and NTDC.
All power houses.
WAPDA house building, lifts and AC plant.
WAPDA printing press.
Reclamation work station at Shalimar, Kot-lakhpat, Lahore, and Faisalabad.
Research and test laboratory Faisalabad.
9.2.2 Risk covered under the scheme
Fire loss.
Mechanical damage.
9.2.3 Risk not covered under the scheme
Earthquakes, volcanic eruption or other convulsion of nature.
Typhoon, hurricane, tornado, cyclone or other atmospheric disturbance and flood.
War invasion, act of foreign enemy, hostilities or war like operations. Civil war
Mutiny riots, military of popular rising insurrection, rebellion, revolution & state of
seize.
Nuclear reaction, nuclear radiation or radioactive Contamination.
Losses/damages occurred due to faulty operation and defective design/material of unit.
National University Of Modern Languages | Final Report on WAPDA 135
WORK DONE BY ME
10.1 About Internship
I completed 6 week internship at WAPDA which is from 26.04.2010 to19.06.2010
with break from 17.05.2010 to 30.05.2010. I hope that Internship experience open doors for me
of many opportunities because in this internship I learn a lot which give me help in my future.
The employee of WAPDA is very corporative. The environment of the WAPDA is quite
friendly. The staff is very efficient here and deals the transactions of authority on daily basis by
providing efficient and timely services. They want to change the current situation in country
for the progress of our mother land.
The internship give me a lot of knowledge and confidence in me. I suggest that other
Numlians should do internship in WAPDA because it’s a large organization which work on
non profit bases. Internship program is an important part to give student an opportunity to have
experience of practical field. Unless and until the student experience the novelty of practical
work, their knowledge of what they study in theoretical courses remains incomplete. The most
important point is internship program is that the student should spend their time in a true
National University Of Modern Languages | Final Report on WAPDA 135
manner and with the spirit to learn practical orientation of theoretical study of framework.
I have learned in finance departments of WAPDA as under
10.2 Coordination department
Learning in Coordination department
10.2.1 Investment
The budgeted and consolidation department usually invest in the banking sector and they invest
for short or long period of time.
10.2.2 Book Keeping
Book keeping section maintains the record of the entire department, make financial statements
and also compile their records.
General Ledger Subsidiary Ledger
Trial Balance
Cash Book Entries
Statement of Profit and Loss
All the accounts are prepares manually but only Trial balance is prepares with the help
of computer software.
National University Of Modern Languages | Final Report on WAPDA 135
10.3 HYDEL
10.3.1 Learning in HYDEL department
10.3.2 Measure the cost of HYDEL
The cost incure to produce the electricity measure in units and cost is in rupees and per
units.
This generation is measure in units and when combine calculate or measure use the
term of million gaga watt .
10.3.3 Share and capacity of HYDEL throughout total generation
Before 10 years generation is 70% from HYDEL and 30% from thermal but now the 30%
from HYDEL and 70% from thermal. So the cost is very high because of more thermal
generation. The capacity of HYDEL production is 27000 million units to 30000 million
kilo watts (MKH) but still the total requirement is 90000 MKH.
10.3.4 Energy purchase price (EPP)
National University Of Modern Languages | Final Report on WAPDA 135
In which discuss the total variable cost which normally consists fuel cost plus VOM.
Variable operating maintenance cost (VOM)
Consumption of gas and fuel
10.3.5 Tariffs partitions
NEPRA give prices according to the different types of partitions of tariffs which are
followings.
10.3.6 Regulatory tariff
NEPRA regulate the tariff then government of Pakistan (GOP) notify of this tariff. The
other name of the regulatory tariff is determining tariff.
10.3.7 Notified tariff
The notified tariff showing by the government which are different from the determine
or regulatory tariff.
10.3.8 Budget section
Prepare the estimated budget and revised budget.
10.3.9 Inter office transaction (IOT) section
Debit/Credit invoices are used for inter office transaction.
National University Of Modern Languages | Final Report on WAPDA 135
10.4 Director of water (WAPDA), WAPDA house Lahore
10.4.1 Learning in Director of water (WAPDA), WAPDA house Lahore
This department received the proposals from the projects and overseeing them and
estimates the suitable values, detail of contractors.
Detail of contractors
How many payments and future payments
Work currently, previously, and future work
Mention time period, if time over run then reasons of this and time extensions.
All 42 projects discuss in this departments and the cost is rupees 101 billion deposits as
a proposals to the federal government in this year
Maintain books and send to GENERAL MANAGER OF FINANCE, MEMBER
WATER, CHAIRMAN and back to this department then making the cover letter and send to
the federal government
10.4.2 Work plan:
National University Of Modern Languages | Final Report on WAPDA 135
It shows that how many work in 4 quarters, monthly, after 6 month and yearly
10.4.3 Cash plan
In which showing that how many cash use in four quarters according to approved the final
budget by the NEC
10.5 Budget and consolidation department
Learning in Budget and consolidation department
How to Dealing with the audit report/advances/draft pares pertaining to the common
services offices
Consolidation of accounts of the offices/organization of the coordinating Issuing of
funds to the common services offices
Maintenance of authorities bank accounts and reconciliation with the banks
The maintenance of the receivable /payable accounts with power wing, water wing and
the corporative entities under PEPCO and reconciliation of sub accounts with these
quarters.
Maintenance of the accounts of employees’ medical benevolent fund
The director finance (B&C) WAPDA works as member of WAPDA welfare fund.
How Preparation /process of cases regarding grants of the long term advances and
earmarking of funds for employees of coordinating wing of the WAPDA. Process of
National University Of Modern Languages | Final Report on WAPDA 135
the cases of the purchase of the physical assets received from different offices by the
scrutiny committee constituted under economy measures.
10.5 Foreign currency department
10.6.1Learning in Foreign currency department
10.6.2 Core working
Foreign currency department working only for the development in WAPDA. The
projects which have made or in working process depended on the foreign loan and aid.
So this department plays back born role in WAPDA power generation. This department
also provide valuable profit to government of Pakistan.
10.6.3 PC 2
In pc 2 WAPDA makes feasibility report how much capacity of new project for which
WAPDA want to take loan.
10.6.4 PC 1
National University Of Modern Languages | Final Report on WAPDA 135
In pc 1 WAPDA start working on the project with the amount of project.
10.6.5 Foreign Currency loans
In which currency WPADA takes loan it return loan in same currency. Normally
WAPDA takes loan in dollar currency.
Loan is combination of Principle amount + Interest
10.6.6 Direct Loan
Direct loan WAPDA takes itself from commercial bank and other financial
institutions. Normally WAPDA itself give guarantee for loan but some time government can
also give guarantee. WAPDA has responsibility to return loan to the loan provider.
10.6.7 Relending Loan
n relending loan government it self involve directly for providing loan to WAPDA.
Foreign country or financial intuition provide loan to government and government reissue this
loan to WAPDA. WAPDA receive loan indirectly. Government receive loan at low rate of
interest like 2 or 3 percent but when government issue this loan to WAPDA than government
charge 15 percent rate of interest before two years ago it is 17 percent but now due to finish
power crises government reduce it.
10.6.8 Return Rates
It is duty of WAPDA foreign currency department that fixed rate of loan that it return
according to KIBOR or LIBOR rate. If once rate id determine than it cannot be change till
the project ended
Currently loan Status
National University Of Modern Languages | Final Report on WAPDA 135
Intuited Amounts $
World Bank 54 Millions
Asian Development Bank 27 Millions
International Monetary Fund 13 Millions
Kawait Fund 8 Millions
Sudia Arabia Fund 31 Millions
10.7 Marine insurance department
10.7.1 Learning in Marine insurance department
10.7.2 Marine insurance procedure
The marine policy protects the consignment right from the supplier warehouses
anywhere in the world to port of shipment, marine voyage to the port in Pakistan and
thence by inland transit right up to job site.
10.7.3 Liabilities of the career , bailer or third party
On arrival of the port of the discharge i.e. Karachi, while applying for a delivery order,
original bill of lading dully attested by the consignee should be provided to the port
authorities.
National University Of Modern Languages | Final Report on WAPDA 135
10.7.4 Storage risk clause
In case of material does not reach the final destination within 90 days after the
discharge of goods from the carrying vessel at the port of destination i.e. Karachi will be
held covered during temporary storage at different rates.
10.8 WAPDA equipment protection scheme department
10.8.1 Equipments covered under the scheme
of WAPDA are covered under the scheme.
Electrical & mechanical equipments installed at all grid station of DISCOS and NTDC.
All power houses.
WAPDA house building, lifts and AC plant.
WAPDA printing press.
Reclamation work station at Shalimar, Kot-lakhpat, Lahore, and Faisalabad.
Research and test laboratory Faisalabad.
10.8.2 Risk covered under the scheme
National University Of Modern Languages | Final Report on WAPDA 135
Fire loss.
Mechanical damage.
10.8.3 Risk not covered under the scheme
Earthquakes, volcanic eruption or other convulsion of nature.
Typhoon, hurricane, tornado, cyclone or other atmospheric disturbance and flood.
War invasion, act of foreign enemy, hostilities or war like operations. Civil war
Mutiny riots, military of popular rising insurrection, rebellion, revolution & state of
seize.
Nuclear reaction, nuclear radiation or radioactive Contamination.
Losses/damages occurred due to faulty operation and defective design/material of unit.
Working Experience
Internship is one of the crucial and difficult decisions of the career of a student. The
internship acts as a passage towards the achievement of future job. It not only encourages the
student to enter the social circle of practical life but also motivates him or her towards
implementation of the knowledge gained from the studies. It enlightens the thinking pattern of
the students’ mind and shows him or her small glimpse of the practical work environment. The
student is thus able to understand the working conditions and the implications present in the
environment about which he or she is unaware. During the internship period a student gets the
chance to meet the highly skilled and professional people related to his area of interest as well
as other people. This interaction gives him or her handful experience about the present systems
National University Of Modern Languages | Final Report on WAPDA 135
being followed in the market. He is able to learn certain key and fundamental functions that are
neither to be found in any university nor in books.
The student who is under going the process of learning in any organization gets the
opportunity to observe the functioning of that organization. He is able to see how do
organizational goals are achieved with the contribution of a large number of employees
working collectively. It is also to see how the tasks, duties are and responsibilities have been
distributed to various people and how their individual work is reconciled and presented to the
management for decision making and to the general public as one unit.
11.1 Learning / Achievements
In period of internship I got the chance to learn a great deal about the various
procedures and regulations observed at WAPDA. Some were good and some need to be
improved in my opinion.
11.2 Positive Points
Government support
Vertically integrated utility
Restructuring of Pakistan power sector
National University Of Modern Languages | Final Report on WAPDA 135
The internee must not take the task he cannot perform in the efficient manner because
that will bring a bad name on his part.
I got to chance to observe how employees behave in organizational culture.
The process of segmentation of large tasks in big organizations helps the employees
perform the tasks in a better and effective manner.
It is also important for the internees to not to be over efficient because the people
already working in the organization are more skilled and professional than the internee.
It is essential that the employee must be honest with his work and duties that were
assigned to him because honesty will lead that organization to glory.
The top priority for the organization is the fulfillment of its goals so that it can maintain
the position in the market.
By working in large organizations I got the chance to learn the professional norms and
behaviors observed in WAPDA.
I have acquired the ability to adapt myself with the changing taking place in the
environment.
By observing the organizational rules and regulations of WAPDA I have got familiarity
with the practical environment.
I have been involved in various activities that have helped me to acquire coordination
with other staff members of the department.
The internee must have good communication skill because he has to provide his
supervisor complete information.
National University Of Modern Languages | Final Report on WAPDA 135
The internee must be able to understand the working of the system quickly as the staff
expect the internee to do so as they avoid repeating the instructions.
Senior staff members are mentors so the internee must follow their instructions and
always welcome their advice.
The internee also needs to focus on the performance of the tasks assigned to him/her
and not poke his nose in others affairs.
The behavior and attitude of senior staff with internee good and should be appraised.
I learnt that employees work better in friendly and co-operative atmosphere.
In my observation every staff member provides me guideline to better understand the
organization culture and Policies.
11.3 Negatives Points
When the internee goes to the practical work place from the university area, he seeks
proper guidelines from the senior staff that is not provided to them.
Limited Geographic Market
Reduction In Net Electrical Output And Profit Margin
Mangla Dam Issue
Bad policies
In an office environment, there is a personal bias among employees and that goes on for
years.
National University Of Modern Languages | Final Report on WAPDA 135
There is communication gap among the employees of the organization.
There is lack of positive synergy among the employees that prevents them to work
collectively and achieve excellence.
Employees of the organization keep their personal goals ahead of the organizational
goals.
The employees tend to protect each other when some one breaks the organizational rules.
Most of the employees of organization are not technology oriented and they avoid using
latest technology.
SWOT
Strengths
Rising Electricity Demand
Development Projects
WAPDA has monopoly in market
Company has huge amount of assets
Security Systems
National University Of Modern Languages | Final Report on WAPDA 135
Transportation systems
WAPDA provide large number of facilities, allowances and benefits to its employees
and these are sources of motivation for workers.
Most are employees are satisfied with there jobs because work assigned to them is
interesting and work load is low as compared to other business organizations each
employee is assigned with the work he can perform with perfection.
WAPDA do time to monitoring over its wings to increase efficiency.
Pensions systems
Weakness
Political Instability
Scarcity Of Resources
All though there are competent and high qualified workers but a large part of
employees are incompetent and low qualified as compared to their job specification
matriculates and intermediate are working at the job specification of MBAs or other
master degree holders. That’s why qualitative performance of these workers is limited.
In spite of presence of technology many jobs are done manually.
The controls are heads or not effected.
National University Of Modern Languages | Final Report on WAPDA 135
Political powers in recruiting due to which some incompetent candidates were
recruited.
Over employees and low productivity.
Communication systems among departments are not sufficient.
Lack of loyalty.
Consistency and regulatory in staff.
Dependency on the power production and distribution companies.
Increase In demand day by day -
Opportunities
WAPDA is able to produce more then 80000 MGW electricity through different dams.
WAPDA has opportunity rises dams height Manglla and remove mud in tarbilla dam
which can increase Electricity generation capacity.
Gomal zam dam project
Miran dam project
Mangla dam raising
Canal system
Rehabilitation of transmission line to prevent from line losses
National University Of Modern Languages | Final Report on WAPDA 135
Time execution of development projects
Information technology
Re generate electricity through Tarbilla dam.
Threats
Politics in employees and labor unions.
Political instability can effect to development projects.
Slow developments process.
Change in government policies.
Terrorism in our county is biggest threat to authority.
Uncertain economic condition.
Electricity demand is increasing day by day due to this main grid station goes to trip.
Bad reputation.
National University Of Modern Languages | Final Report on WAPDA 135
RECOMMENDATIONS
13.0 Recommendations
Here are some weak areas which I perceived during my internship in WAPDA and
some recommendations are given as under:
13.1 Investment
National University Of Modern Languages | Final Report on WAPDA 135
Invest in the Kala Baag Dam and Basha Dam Making.
13.2 Line losses
Line losses should be decreased to 3% currently it is 20% but it should more decrease
as soon as possible back its increase expenses of WAPDA.
13.3 Electricity saver appliances
Electricity saver appliances should be introduced in the country
13.4 Media Campaign
A strong media campaign should also be introduced on TV. Channels to create
awareness in the society to decrease energy consumption.
13.5 Privatization
WAPDA should not privatize all its companies. In my opinion if these companies will
work under one authority it will be better for economy as well as for WAPDA too.
National University Of Modern Languages | Final Report on WAPDA 135
13.6 Training and development.
It is correct that “if you are not going forwards, you are in fact going backwards”.
Current employees have skill deficiencies. Increased efficiency results in financial gain. It is
very true “if you think training is expensive try ignorance”. Attitude, skills, and knowledge can
be enhanced through effective training. The current status of training in WAPDA requires
improvement & changes. The following subjects may also be included by Staff College in their
courses as under:
Investment and portfolio management, corporate finance, MIS (accounting software)
Leadership, Time management, Change management, Organizational behavior, Quality
management, Motivation, Corporate culture.
13.7 Long term debts
This increase in Long-Term debts is not good indication for WAPDA because due to
this increase WAPDA has to pay more interest as shown in profit and loss Account of Power
Wing of WAPDA. So, WAPDA should reduce these long term debts, if it wants to earn more
profit.
13.8 Financial charges
National University Of Modern Languages | Final Report on WAPDA 135
Increase in financial charges has resulted in the reduction of profit of WAPDA. In order
to earn more profit WAPDA should control these financial Charges rather should reduce these
financial charges
13.9 Investment in other business
WAPDA should also invest in some profitable business like share of different
companies
except the sale of electricity.
13.10 Free in making decision
WAPDA is an independent organization so it should be independent in decision
making. If the WAPDA is free in decision making, it will reduce its extra cost such as loyalty
cost, IPPC payments, etc.
13.11 Fair payment of electricity bills
It is well known that big industrialist and land lords especially of out tribal areas do not
make fair payment of electricity bills. Due to this unfair payment WAPDA as well as economy
suffers. So these industrialists and landlords should be completed by the state to pays their
electricity bill fairly.
13.12 Contracts with IPP
National University Of Modern Languages | Final Report on WAPDA 135
The contracts of IPP most be eliminated as soon as possible because they sell electricity
to WAPDA sell electricity to consumers at considerable low rates, due to which not only
WAPDA but economy also suffers.
13.13 Blockade of promotions.
Employee’s motivation and productivity increases with opportunities to grow. It
develops a strong psychological contract and makes an employee competitive from
opportunities within organization. In WAPDA, at this stage there is severe blockade of
promotions due to which there is resentment and distrust amongst cadres. Inefficiency is
another effect of delayed promotions apart from brain drain. So promotion should be in time as
per criteria.
13.14 Job rotation
Most of employees are stick to one set only, which result that they become master of
one particular job and lose their grip on other operations. So all employees should have regular
job rotation.
13.15 Courses
National University Of Modern Languages | Final Report on WAPDA 135
Refresher Courses for the staff are most important in any international organization
foreign experts can also be called for this purpose
13.16 Working Environment
Working environment, equipment, furniture and staff dressing should be according to
the modern style.
13.17 Generation of electricity from coal
Generation of electricity from coal is another source of generation of electricity.
Generation from coal is cheaper from hydel.
13.18 Control of line losses
The line losses can be controlled by regular check on lines, meters of commercial as
well as for industrial sector. It will reduce WAPDA cost and will increase its profit.
Recommendation for the NUML:
While studying in NUML, I have analyzed some problem. Keeping in views those
problems following are my recommendations:
The institute also should arrange the field tours for its students to enhance and give the
market exposures.
National University Of Modern Languages | Final Report on WAPDA 135
The management of this prestigious institute should introduce the training programs
among the departments i.e. IAS & IBA same as the UMT does with the IBA for the
promotion of students.
This institute also should organize the seminars with the cooperation of industries like
with Chamber of Commerce and Supply Chain Group of Pakistan that assist its
Students and the market will know its students.
CONCLUSION
After completing my internship in WAPDA, I have concluded the company as under:
National University Of Modern Languages | Final Report on WAPDA 135
Rise in the oil prices pushing electricity tariff very high. As a result, manufacturing
costs and inflation are at the rising trend, export competitiveness is eroded and the
pressure on the balance of payments is increasing. These factors adversely affect the
present growth trajectory of the economy.
AL though there are competent and high qualified workers but a large part of
employees are incompetent and low qualified as compared to their job specification
matriculates and intermediate are working at the job specification of MBAs or other
master degree holders. That’s why qualitative performance of these workers is limited.
The country also needs to look at other alternative sources of energy.
In Pakistan the current energy crisis stems from the decline in hydro sources
of energy and over reliance on the expansive source of electricity. Presently,
oil-based thermal plants accounts for 68% of generating capacity,
hydroelectric plants for 30% and nuclear plants for only 2% .This has led to a huge
generation costs, which in turn adversely affect the
economy over the past eight years.
WAPDA has monopoly in market.
The government needs to focus on the proper development of human resources to cater
to the energy sector.
WAPDA had friendly atmosphere with its employees.
WAPDA has the largest operational infrastructure and this type of structure exist only
in 7 to 8 countries in the world.
National University Of Modern Languages | Final Report on WAPDA 135
WAPDA has large number of departments and each department has different section
but not proper coordination between them but not proper coordination between them.
Every task is accomplished after long process, because each file moves vertically, goes
from top to bottom and then bottom to top.
Company’s staff is hard working and well trained comparatively.
The process of maintaining and developing transmission lines is very slow.
Financial policies are well placed in books but not being practiced fully.
Company is required to acquire the latest technologies to install in grid stations to
prevent from line losses and fire in case of over loading on transmission lines.
To maintain a useful survival in the face of global and local challenges WAPDA needs
to adopt professionalism and develop aggressive policy to retain a highly motivated
work force by offering attractive financial and career development incentives.
The long execution times, poor project management skills and consistent delays and
high transmission and distribution losses have thrown the country into a crisis. If timely
action is not taken, this will seriously.
The government needs to take a holistic approach towards the sector in order to cut the
power deficit.
ABBRIVIATIONS
ABL Allied Bank Limited
National University Of Modern Languages | Final Report on WAPDA 135
ADB Asian Development Bank
APCC Annual plant coordination committee
B/O Budget & Accounts Officer
BPS Basic Pay Scale
CBR Central Board of Revenue
CPP Captive Power Producer
CPP Cost and capacity purchase price
CPPA Central Power Purchasing Agency
CRPEA Contract registrar and power exchange administrator
CWDP Central work development party
D.G Director general
DISCOS Distribution Company
DSL Debit service liablity
ECC Economic Coordination Committee
ERP Enterprise recourse planning
FESCO Faisalabad Electric Supply Company
GENCOS Generation Company
GESCO Gujranwala Electric Supply Company
GFAIO Gross fixed assets in operations
GOP Government of Pakistan
National University Of Modern Languages | Final Report on WAPDA 135
GSC Grid System Construction
GSO Grid System Operation
HBL Habib Bank Limited
HESCO Haidarabad Electric Supply Company
HSD High speed diesel
IBP Indus Basin Projects
IDC Interest during the construction
IESCO Islamabad Electric Supply Company
IPPS Independent Power Producers
IOT Inter office transaction
IMF International monetary fund
JBIC Japan Bank for International Cooperation
KESC Karachi Electric Supply Corporation
KV Kilovolt; it is the amount of voltage required to run the motor.
KVA Kilovolt Ampere; it is the product of current and voltage required to run
the motor or a device.
KW Kilowatt; the kilowatt is equal to one thousand watts.
KWH Kilowatt Hour
L & CA Legal and Corporate Accounts
LESCO Lahore Electric Supply Company
National University Of Modern Languages | Final Report on WAPDA 135
MCB Muslim Commercial Bank Limited
MESCO Multan Electric Supply Company
MW Megawatt; the megawatt is equal to one million watts.
NAB National Accountability Bureau
NEC National economic council
NEPRA National Electric Power Regulatory Authority
NFIO Net fixed assets in operations
NPCC National Power Control Company
NSRO Next Senior Reporting Officer
NTDC National Transmission and Dispatch Company
O&M Operating and maintenance cost
O/O Office Order
PC Project cost
PEPCO Pakistan Electric Power Company
PESCO Peshawar Electric Supply Company
RFO Residue furness oil
SOP Standard Operating Procedure
T&D Transmission and distribution losses
UBL United Bank Limited
VOM Variable operating maintenance cost
National University Of Modern Languages | Final Report on WAPDA 135
W Watt; One watt is equal to 1 joule (J) of energy per second.
WAPDA Water and Power Development Authority
WEPS WAPDA equipments protection scheme
WPPO WAPDA Power Privatization Organization
REFERENCES
National University Of Modern Languages | Final Report on WAPDA 135
Following are the references through which I have obtained the data about the authority during
my internship in WAPDA as under:
Director Muhammad Farooq Memon(Finance)
Deputy Director Muhammad Razzaq Gill(EST& Admin)
Director Muhammad Arshad (B&C)
Assistant Director Naveed Querashi (B&C)
Director Najeeb Tariq (Pension & insurance)
Budget and account officer Sohail Ahamed (Pension & insurance)
Assistant Director Muhammad Nadeem (Finance water)
Assistant Director Mjahid Hussain( Hydel)
Budget and account officer Waqas Ahmed( Hydel)
Websites:
o www.wapda.gov.pk/
o www. ntdc .com.pk/
o www. pepco .gov.pk /
APPENDICIES
Internship Completion Certificate
National University Of Modern Languages | Final Report on WAPDA 135
Internship Evaluation Performa
National University Of Modern Languages | Final Report on WAPDA 135
CHAPTER NO 17
17.0 APPENDICIES
National University Of Modern Languages | Final Report on WAPDA 135
National University Of Modern Languages | Final Report on WAPDA 135