Warwick Boulevard Warwick Boulevard
Townhall MeetingTownhall Meeting
May 21, 2007May 21, 2007
Thomas A. Druhot, P.E.Thomas A. Druhot, P.E.VDOT Hampton Roads DistrictVDOT Hampton Roads District
Peninsula Area Construction EngineerPeninsula Area Construction Engineer
AgendaAgenda
• General Overview of ProjectGeneral Overview of Project
• Project 1 StatusProject 1 Status
• Project 2 StatusProject 2 Status
• Project 3 StatusProject 3 Status
• Contact Information and Contact Information and UpdatesUpdates
Introductions to PlayersIntroductions to Players
Lauren Hansen Lauren Hansen VDOT Public Relations SpecialistVDOT Public Relations Specialist
W 757-925-2583 / F 757-925-1558 / C 757-W 757-925-2583 / F 757-925-1558 / C 757-619-4163619-4163
[email protected]@VDOT.Virginia.gov
Thomas A. Druhot, P.E. Thomas A. Druhot, P.E. VDOT Peninsula Area Construction VDOT Peninsula Area Construction EngineerEngineer
W 757-253-4832 / F 757-253-5148 / C 757-W 757-253-4832 / F 757-253-5148 / C 757-592-6068592-6068
[email protected]@VDOT.Virginia.gov
Introductions to PlayersIntroductions to Players
Thomas Slaughter, P.E. Thomas Slaughter, P.E. Special Projects EngineerSpecial Projects Engineer
W 757-926-8611 W 757-926-8611
[email protected]@nngov.com
Everett Skipper P.E. Everett Skipper P.E. Assistant Director of EngineerAssistant Director of Engineer
W (757) 926-3778 W (757) 926-3778
[email protected]@nngov.com
Aerial Photo Prior to ConstructionAerial Photo Prior to Construction
CNUCNU
HospitalHospitalMariner’s Mariner’s MuseumMuseum
Rte 17Rte 17
Rte 60Rte 60
Current Traffic Levels at 47,000 ADTWith Annual Growth Less Than 1% = 54,000 in 2026
PROJECT SCOPERemove Roadway Lights / Install New Lights
PROJECT SCOPERelocate Utilities and Improve Storm Drainage System
January 2007January 2007May 2007May 2007
CNUCNU
HospitalHospital
Mariner’s Mariner’s MuseumMuseum
Completion Completion Late Summer 2007Late Summer 2007
• Construction Began in Construction Began in October 2006October 2006
• Upgrade all underground Upgrade all underground utilities throughout the 2.1 utilities throughout the 2.1 mile projectmile project C
UL
PE
PP
ER
CU
LP
EP
PE
R
Project 2 StatusProject 2 Status
WE
LL
ES
LE
YW
EL
LE
SL
EY
NE
TT
LE
SN
ET
TL
ES
TU
RL
ING
TO
N
TU
RL
ING
TO
N
AL
PIN
EA
LP
INE
ME
LLO
N
ME
LLO
N
DE
EP
CR
EE
KD
EE
P C
RE
EK
MID
DLE
SE
X/H
IDE
NW
OO
D
MID
DLE
SE
X/H
IDE
NW
OO
DP
EN
NIN
GTO
N
PE
NN
ING
TON
SW
EE
TB
RIA
RS
WE
ET
BR
IAR
UN
IVE
RS
ITY
UN
IVE
RS
ITY
PR
INC
E D
RE
WP
RIN
CE
DR
EW
GL
EN
DA
LE
GL
EN
DA
LE
NU
TM
EG
NU
TM
EG
HID
EN
HID
EN
MIN
TO
NM
INT
ON
WH
ITTI
ER
WH
ITTI
ER
Building Building UnderUnder
Building OverBuilding Over
Change, Adapt, OvercomeChange, Adapt, Overcome
Change, Adapt, OvercomeChange, Adapt, Overcome
18 in Ø24 in Ø30 in Ø42 in Ø48 in Ø54 in Ø60 in Ø72 in Ø
Phase 2Phase 2
Completed Completed to Dateto Date
Scheduled Scheduled for Summer for Summer
20072007
18 in Ø24 in Ø30 in Ø42 in Ø48 in Ø54 in Ø60 in Ø72 in Ø
Phase 2Phase 2
Requested Requested NN Sewer NN Sewer Repair LocRepair Loc
Warwick Blvd WideningWarwick Blvd WideningProject 3Project 3
• Widen Warwick Boulevard to Widen Warwick Boulevard to three lanes in each directionthree lanes in each direction
• Replace the median barriersReplace the median barriers• Repave old lanesRepave old lanes• Bid Date September 2007Bid Date September 2007• Construction for this phase is Construction for this phase is
expected to take about 2 expected to take about 2 years.years.
Warwick Blvd WideningWarwick Blvd WideningProjectsProjects
Update Information available at:Update Information available at:– www.warwickboulevard.org
ContactsContacts• VDOT Construction Project ManagerVDOT Construction Project Manager
– Tom Druhot, P.E.Tom Druhot, P.E.– [email protected] [email protected] – 757-253-4832757-253-4832
• Public AffairsPublic Affairs– Lauren HansenLauren Hansen– [email protected]@VDOT.Virginia.gov– 757-925-2583757-925-2583