James Cheatham, P.E. Director Office of Planning. Washington D.C. Update. What is new?. Recent reorganization HEPI Dissolved Border Planning Team moved to Office of Planning Now is the Border and Corridor Planning Team. reauthorization. Status Oberstar Bill Performance Measures - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Washington D.C.  Update

James Cheatham, P.E.DirectorOffice of Planning

Page 2: Washington D.C.  Update

Recent reorganization HEPI Dissolved Border Planning Team

moved to Office of Planning

Now is the Border and Corridor Planning Team

Page 3: Washington D.C.  Update

Status Oberstar Bill

Performance Measures

Livability

Page 4: Washington D.C.  Update

TIGER I Black River Bridge

Replacement $30m grant/$140m total

TIGER II Niagara Falls Rail Station

$16.5m grant

Page 5: Washington D.C.  Update

Was originally scheduled for Phoenix, Arizona

Rescheduled to be held in San Diego, California

Planned for early February 2011

Hotel TBD

Page 6: Washington D.C.  Update

Minneapolis, MN Mall of America

April 2011 Master Planning

Peer exchange