Waste Discharge Requirements (WDR)

Waste Discharge Requirements (WDR)

Orange County Sanitation DistrictWDR Awareness Training

Revision September 30, 2005

Orange County Sanitation DistrictWDR Awareness Training

Revision September 30, 2005

What is the WDR?Why was It Created?

What is the WDR?Why was It Created?

Prevent Sanitary SewerOverflows (SSOs)Prevent Sanitary SewerOverflows (SSOs)

Protect Waterways from Sewage into Storm DrainsProtect Waterways from Sewage into Storm Drains

Ocean Water Closures

Ocean Water Closures PostingsPostings AdvisoriesAdvisories

Long-TermPostings

Long-TermPostings

OCSD WDR Service Area471 square miles239 million gallons per day2.4 million population17 cities, 8 special districts

Military Bases

OCSD WDR Service Area471 square miles239 million gallons per day2.4 million population17 cities, 8 special districts

Military Bases

PacificOcean

Outfall Pipe

ReclamationReclamationPlant No. 1Plant No. 1

TreatmentTreatmentPlant No. 2Plant No. 2

NewportNewport Beach Beach

Fountain ValleyFountain Valley

Santa AnaSanta Ana

Buena Buena ParkPark

FullertonFullerton

Tustin - OCSDTustin - OCSD

Garden GroveSanitary DistrictGarden Grove

Sanitary District

La HabraLa HabraBreaBrea

PlacentiaPlacentia

AnaheimAnaheim

OrangeOrange

La PalmaLa Palma

CypressCypress

IRWD &IRWD &

StantonStanton

VillaVillaParkPark

Costa MesaCosta Mesa Sanitary District Sanitary District

HuntingtonBeach

HuntingtonBeach

SealSealBeachBeach

OrangeCountyOrangeCounty

IrvineIrvine

Sunset BeachSanitary DistrictSunset Beach

Sanitary District

Midway CitySanitary District

Midway CitySanitary District

Yorba LindaYorba LindaYLWD &YLWD &

UnincorporatedAreas - OCSD

UnincorporatedAreas - OCSD

Rossmoor/Los AlamitosRossmoor/Los Alamitos Area Sanitary District Area Sanitary District

WDR Will AffectAll DepartmentsWDR Will AffectAll Departments

Update existing procedures & programs

Implement new policies & procedures

Provides integration and focus

Update existing procedures & programs

Implement new policies & procedures

Provides integration and focus

Monthly Steering CommitteeMonthly Steering Committee

OCSD (lead)

Anaheim

Placentia

Orange

Huntington Beach

OCSD (lead)

Anaheim

Placentia

Orange

Huntington Beach

Garden Grove Sanitary District

Costa MesaSanitary District

Garden Grove Sanitary District

Costa MesaSanitary District

Departmental LiaisonsDepartmental Liaisons Regional Assets &

ServicesNick ArhontesPatrick McNelly

Tech ServicesDindo CarrilloJerry Evangelista Becky Brooks (Auditor)

EngineeringJim Burror

HR & TrainingRich Spencer

Regional Assets & ServicesNick ArhontesPatrick McNelly

Tech ServicesDindo CarrilloJerry Evangelista Becky Brooks (Auditor)

EngineeringJim Burror

HR & TrainingRich Spencer

CommunicationsIngrid Hellebrand

Info TechPatrick Miles

Records Mgmt Juanita Skillman

FinanceBob Geggie

LegalPaula YoostOmar Sandoval

CommunicationsIngrid Hellebrand

Info TechPatrick Miles

Records Mgmt Juanita Skillman

FinanceBob Geggie

LegalPaula YoostOmar Sandoval

General ProvisionsGeneral Provisions

Develop a Sewer System Mgmt Plan (SSMP) – update, continuously improve

RWQCB inspections and compliance enforcement

Training for affected jobs

Inform, educate, communicate and keep public updated

Develop a Sewer System Mgmt Plan (SSMP) – update, continuously improve

RWQCB inspections and compliance enforcement

Training for affected jobs

Inform, educate, communicate and keep public updated

WDR OverviewWDR Overview

Capacity Assurance

Engineering

Fats, Oils, andGrease (FOG)

System O&M

Records Mgmt

Capacity Assurance

Engineering

Fats, Oils, andGrease (FOG)

System O&M

Records Mgmt

SSO Response PlanSSO Response Plan

SSO

Contact & NotifyContact & Notify ContainContain ControlControl

Clean UpClean Up Calculate & ReportCalculate & Report

Key DeliverablesKey Deliverables

Completed:

Apr. 26, 2002 – SSO Monitoring and –ongoing– Reporting Program

Sep. 30, 2002 – Plan and Schedule for SSMP

Jan. 1, 2003 – SSO Emergency ResponsePlan

June 15, 2003 – Preventative MaintenanceProgram

Completed:

Apr. 26, 2002 – SSO Monitoring and –ongoing– Reporting Program

Sep. 30, 2002 – Plan and Schedule for SSMP

Jan. 1, 2003 – SSO Emergency ResponsePlan

June 15, 2003 – Preventative MaintenanceProgram

Key Deliverables (cont’d)Key Deliverables (cont’d)

Completed:

July 30, 2004 – Legal Authority to control I/I, sewer design,

installation and testing, FOG ordinance

Dec. 30, 2004 – FOG Disposal Alternatives– Grease Control Program

Completed:

July 30, 2004 – Legal Authority to control I/I, sewer design,

installation and testing, FOG ordinance

Dec. 30, 2004 – FOG Disposal Alternatives– Grease Control Program

Key Deliverables (cont’d)Key Deliverables (cont’d)

Completed:

July 30, 2005 – Capacity Evaluation

Sep. 30, 2005 – Sewer Rehabilitation Plan– Final SSMP

Completed:

July 30, 2005 – Capacity Evaluation

Sep. 30, 2005 – Sewer Rehabilitation Plan– Final SSMP

WDRWDRProgram of continuous audit and improvement

Keep public informed

“We do it right”

Program of continuous audit and improvement

Keep public informed

“We do it right”

Patrick McNelly(714) 593-7163Division: Regional Assets and ServicesE-mail: [email protected]

Patrick McNelly(714) 593-7163Division: Regional Assets and ServicesE-mail: [email protected]

Orange County Sanitation Districtwww.ocsd.comOrange County Sanitation Districtwww.ocsd.com

Questions?Questions?