Creamfields Music Festival 2011 GPT Waste Management Limited 14 Whitworth Court, Manor Farm Road, Manor Park, Runcorn, Cheshire WA7 1WA Tel: 0844 854 5000 Fax: 01928 571 335 www.gptwaste.com About the Project: Creamfields is the North West’s major Music Festival event and is held over the August Bank Holiday week- end each year. Hosting over 50,000 visitors in total each day of the festival, 45,000 of whom camp at the site each night. The event produced over 500 tonnes of waste over the whole weekend. A whole range of containers and services were provided to site in the week before the event, throughout the event days themselves and after the event for the immense post festival clean up which took almost 2 weeks to complete. Client: Nu Kleen Location: Creamfields Music Festival Date: August 2011 Sector: Festivals Festivals Case Study 40yrd Roll On Off Containers for GMW 40yrd Roll on Off Containers for Metal Waste 1100Ltr Eurobins 240Ltr Eurobins Refuse Collection Vehicles Direct Tipping Facilities Services and Products: Project Challenges continued: The post event clean up saw all the abandoned tents being cleared from site, along with tonnes of general waste and all the waste collected was transported to our nominated Materials Recycling Facility, where the waste was subjected to a recycling programme to ensure the maximum amount of waste was recycled or re-used. Plans are already underway for the 2012 event, where the visitor numbers are expected to increase further. The UK’s leading independent provider of waste management solutions to both the public and private sector. Project Challenges: In order to operate safely and to ensure that the site was clean and tidy for the start of each day, our teams worked through the night on the days of the event itself, with collections being made during the early hours. The weather also played a part, with heavy rain causing all sorts of problems for the vehicles but by using a variety of containers and vehicles, it was possible to clear site of all the waste within 10 days after the event.

Upload: simply-marcomms

Post on 15-Mar-2016

216 views

Category:

Documents


2 download

DESCRIPTION

GPT Waste Management provides waste solutions for festivals.

TRANSCRIPT

Page 1: Waste management solutions in festivals - Creamfields case study

Creamfields Music Festival 2011

GPT Waste Management Limited14 Whitworth Court, Manor Farm Road, Manor Park, Runcorn, Cheshire WA7 1WATel: 0844 854 5000 Fax: 01928 571 335www.gptwaste.com

About the Project:

Creamfields is the North West’s major Music Festival event and is held over the August Bank Holiday week-end each year. Hosting over 50,000 visitors in total each day of the festival, 45,000 of whom camp at the site each night. The event produced over 500 tonnes of waste over the whole weekend.

A whole range of containers and services were provided to site in the week before the event, throughout the event days themselves and after the event for the immense post festival clean up which took almost 2 weeks to complete.

Client: Nu KleenLocation: Creamfields Music FestivalDate: August 2011Sector: Festivals

Festivals Case Study

40yrd Roll On Off Containers for GMW

40yrd Roll on Off Containers for Metal Waste

1100Ltr Eurobins

240Ltr Eurobins

Refuse Collection Vehicles

Direct Tipping Facilities

Services and Products:

✓✓✓✓

Project Challenges continued:

The post event clean up saw all the abandoned tents being cleared from site, along with tonnes of general waste and all the waste collected was transported to our nominated Materials Recycling Facility, where the waste was subjected to a recycling programme to ensure the maximum amount of waste was recycled or re-used. Plans are already underway for the 2012 event, where the visitor numbers are expected to increase further.

The UK’s leading independent provider of waste management solutions to both the public and private sector.

Project Challenges:

In order to operate safely and to ensure that the site was clean and tidy for the start of each day, our teams worked through the night on the days of the event itself, with collections being made during the early hours.

The weather also played a part, with heavy rain causing all sorts of problems for the vehicles but by using a variety of containers and vehicles, it was possible to clear site of all the waste within 10 days after the event.