water allocation committee river basin hydrologic model development schedule

6
Water Allocation Water Allocation Committee Committee River Basin Hydrologic River Basin Hydrologic Model Development Model Development Schedule Schedule Division of Water Resources Division of Water Resources July 13, 2011 July 13, 2011

Upload: gaenor

Post on 05-Jan-2016

33 views

Category:

Documents


3 download

DESCRIPTION

Water Allocation Committee River Basin Hydrologic Model Development Schedule. Division of Water Resources July 13, 2011. IMPROVE RIVER BASIN MODELING – SL 2010-143. Models for all river basins Model components Report annually to the ERC Approval by the EMC. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Water Allocation Committee River Basin Hydrologic Model Development Schedule

Water Allocation CommitteeWater Allocation Committee

River Basin Hydrologic Model River Basin Hydrologic Model Development ScheduleDevelopment Schedule

Division of Water ResourcesDivision of Water Resources

July 13, 2011July 13, 2011

Page 2: Water Allocation Committee River Basin Hydrologic Model Development Schedule

IMPROVE RIVER BASIN IMPROVE RIVER BASIN MODELING – SL 2010-143 MODELING – SL 2010-143

Models for all river basinsModels for all river basins Model componentsModel components

Report annually to the ERC Report annually to the ERC

Approval by the EMC Approval by the EMC

Page 3: Water Allocation Committee River Basin Hydrologic Model Development Schedule

Status of River Basin Hydrologic Model Status of River Basin Hydrologic Model Development in North CarolinaDevelopment in North Carolina

Slide - Slide - 33

Page 4: Water Allocation Committee River Basin Hydrologic Model Development Schedule

River Basin Water Resources Plans and River Basin Water Resources Plans and Hydrologic ModelsHydrologic Models

Water Resources Plans Water Resources Plans

(No EMC Approval)(No EMC Approval)

River Basin Hydrologic ModelsRiver Basin Hydrologic Models(EMC Approval)(EMC Approval)

Page 5: Water Allocation Committee River Basin Hydrologic Model Development Schedule

Model Development ScheduleModel Development Schedule

1/2010 5/2011 9/2012 2/2014 6/2015 11/2016 3/2018 8/2019 12/2020 4/2022 9/2023

Yadkin-Pee Dee River Basin

Onslow Bay

Chowan River Basin

Albemarle Sound

Savannah River Basin

Catawba River Basin

Watauga River Basin

New River Basin

Lumber River Basin

French Broad River Basin

Hiwassee River Basin

Little Tennessee River Basin

Roanoke River Basin

Neuse River Basin

Cape Fear River Basin

Broad River Basin

Tar-Pamlico River Basin

Start Date

Model

Plan

Page 6: Water Allocation Committee River Basin Hydrologic Model Development Schedule

For additional information on river For additional information on river basin modelsbasin models

Steve Reed at (919) 715-5424 or Steve Reed at (919) 715-5424 or

[email protected]

Neelufa Sarwar at (919) 715-0386 or Neelufa Sarwar at (919) 715-0386 or [email protected] . .

Or the DWR website at Or the DWR website at http://www.ncwater.org/Data_and_Modeling/