    RESERVOIR

    65000 x 2CLARIFIER

    CHLORINE ALUMLIME

    BLOWDOWN

    GRAVITY

    FILTERMUWP RWP

    PROCESS FLOW CHART-JHANOR

    FILTER

    WATERSUMP

    DMPLANT

    CT

    MAKE UPCLARIFIED WATER TANK

    DRINKING

    WATER

    SOFTENING

    PLANT

    PRESSURE FILTER

    HVAC System Steam generationGT Injectio

  • 7/28/2019 Water Conservatio RJPC 20032012

    4/28

    JHANOR-GANDHAR

    WATER CONSERVATION MEASURES

    ZERO-DISCHARGE OF:

    TREATED SEWAGE FROM PLANT &

    TOWNSHIP.

    GRAVITY & PRESSURE FILTER BACKWASH

    EFFLUENTS.

    CLARIFIER BLOW-DOWN EFFLUENT.

    BOILER BLOW DOWN WATER

  • 7/28/2019 Water Conservatio RJPC 20032012

    5/28

    JHANOR-GANDHAR

    Gr.Filter BW

    WHRB Blow

    Down

    STP

    Township

    PlantGardening/

    drain

    Sludge

    Sludge Pit

    Clarifier

    under flow

    Pr. Filter BW

    SupernatantSump Drain

    ETP

    CT Basin

    WATER CONSERVATION MEASURES

    DAILY SAVINGS

    OF 300-500M3

    OFFRESH WATER

    Clarifiedwater

  • 7/28/2019 Water Conservatio RJPC 20032012

    6/28

    Water Consumption Reduction measures

    Re-use of treated sewage water for

    horticulture purpose:

    The treated sewage from STP is utilised for

    horticulture purpose & thus reducing therequirement of fresh water.

    Operating CW system at higher COC:

    Earlier the project operated the CW system as

    per the design COC of 4.0 To reduce the water

    consumption, the project is now operating the

    CW system with higher COC of about 4.3 4.5.

  • 7/28/2019 Water Conservatio RJPC 20032012

    7/28

    JHANOR-GANDHAR

    WATER CONSERVATION MEASURES

    SAVINGS :

    Pumping of fresh water and effluent.

    Around 720 M3/day of make up water.

    Reduction of effluent by 720 M3/day.

    OPTIMIZING COC OF CW SYSTEM FROM 4.0 TO 4.5 :

  • 7/28/2019 Water Conservatio RJPC 20032012

    8/28

    MAKE-UP VS COC

    A. Increasing the ability of

    CW system to hold higher

    concentrations of TDS

    will increase the COC,and will decrease the CW

    Blow down.

    B. Cooling tower water

    treatment provided by

    newer high-bonding

    strength ploymers will

    achieve higher COC.

    RJPC (WR-1)- 2012

  • 7/28/2019 Water Conservatio RJPC 20032012

    9/28

    N-Pit Pumps Priming

    Fume absorbers-

    HCl Tanks

    Gardening

    Continuous

    Flushing in

    toilets

    Over Flow

    Daily Monitoring

    JHANOR-GANDHAR

    POTABLE WATER CONSERVATION MEASURES

    DRASTIC REDUCTION IN POTABLE WATER THROUGH:

    PotableWater

    Use

  • 7/28/2019 Water Conservatio RJPC 20032012

    10/28

    JHANOR-GANDHAR

    Potable water consumption during last 4 years

    2007-08 2008-09 2009-10 2010-11

    Total Potable water 230.34 225.74 211.74 215.29

    Townshp_total 186.98 186.53 180.75 182.91

    Plant_total 43.36 39.21 30.99 32.38

    0.0025.00

    50.00

    75.00

    100.00

    125.00

    150.00

    175.00

    200.00

    225.00

    250.00

    275.00

    300.00

    CONSUMPTION(1000M3)

    JGGPP POTABLE WATER CONSUMPTION

  • 7/28/2019 Water Conservatio RJPC 20032012

    11/28

    JHANOR-GANDHAR

    Potable water consumption during last 4 years

    2.12

    2.14

    2.16

    2.18

    2.2

    2.22

    2.24

    2.26

    2.28

    2.3

    2.32

    2007-08 2008-09 2009-10 2010-11

    WaterC

    onsumption(lacsM3)

    Potable water Consumption

    2007-08

    2008-09

    2009-10

    2010-11

  • 7/28/2019 Water Conservatio RJPC 20032012

    12/28

    JHANOR-GANDHAR

    WATER CONSERVATION MEASURES

    RINSE WATER RECYCLING- FY 06-07

    Separation of rinse water effluent (which is

    comparable to raw water) from regenerationeffluent.

    Collection of rinse & back wash water

    from stream and ACF to Rinse pit. Pumping back to clarifier.

  • 7/28/2019 Water Conservatio RJPC 20032012

    13/28

    REGN. O/LRINSE OUTLETSERVICE O/LB/W O/LB/W I/LSERVICE I/L

    TO N.PIT

    SBA MB

    TO STORM

    WATERDRAIN

    ACF SAC

    RAIN WATER FROM DMPROOF

    OLD SCHEME FOR DM PLANT

    DM

    TANK

    MODIFIED SCHEME FOR DM PLANT

    NEW RINSE

    PITTO DM CLARIFIER

    TO STORM

    WATERDRAIN

    ACF SAC

    RAIN WATER

    FROM DMP ROOF

    DM

    TANK

    TO

    N.PIT

    SBA MB

    NEW HDPE LINE

  • 7/28/2019 Water Conservatio RJPC 20032012

    14/28

    SCOPE FOR FURTHER WATER CONSERVATION

    Pilot Study for Effluent recycling

    A pilot study to know the

    feasibility of effluent recycling

    was carried out at the station with

    CW blow down water.

    The CW blow down, approx. 150-

    200 M3/hr, which constitutes

    about 90% of the plant liquid

    effluent was treated with a skid

    mounted combined Microfiltration and Reverse Osmosis

    unit.

    Pilot Study Model

    RO SYSTEM

  • 7/28/2019 Water Conservatio RJPC 20032012

    15/28

    SCOPE FOR FURTHER WATER CONSERVATION

    PROPOSED RO SYSTEM

  • 7/28/2019 Water Conservatio RJPC 20032012

    16/28

    JHANOR-GANDHAR

    Raw water consumption vs Raw water Intake from river

    Raw water

    Intake from

    river

    Raw water

    drawl from

    Reservoir

    Difference in

    water drawl

    Genera

    tion

    (MU)

    Spec.Raw

    water

    Consump

    tion

    (Lit/U)

    2008-09 79,62,500 69,62,460 10,00,040 4,150 1.92

    2009-10 85,91,484 72,77,257 13,14,227 4,488 1.91

    2010-11 77,58,185 65,85,995 11,72,190 4,058 1.91

  • 7/28/2019 Water Conservatio RJPC 20032012

    17/28

    SCOPE FOR FURTHER WATER CONSERVATION

    WATER BALANCE STUDY DONE

    Period Water Level Total waterLoss

    Evaporationloss

    Un-accountable

    loss

    (Percolation/

    seepage Loss)

    FY- Oct 10 3.45 mtr 120 m3/hr 15 m3/hr 105 m3/hr

    FY- Jan 10 3.8 mtr 155 m3/hr 15 m3/hr 140 m3/hr

    FY-07 3.5 mtr 165 m3/hr 15 m3/hr 150 m3/hr

    Reservoir level is being maintained between

    2.3 m to 2.8 m to minimize the loss

  • 7/28/2019 Water Conservatio RJPC 20032012

    18/28

    SCOPE FOR FURTHER WATER CONSERVATION

    WATER BALANCE STUDY DONE

    UNACCOUNTED LOSS-120 M3

    ESTIMATED EVAPORATION LOSS: 15-20 M3

    WHAT ABOUT

    100 M3

    ?

  • 7/28/2019 Water Conservatio RJPC 20032012

    19/28

    NET ANNUAL WATER SAVINGs

    Present Practices

    Zero Effluent Discharge-

    1,09,500 m3

    Optimizing COC-1,92,720m3

    Recycling of Rinse water-

    23000 m3

    Total water savings=3,25,220 M3/Annum

    Potential savings

    Eflluent (CW Blowdown)

    Recycling by RO-13,14,000

    Unaccounted Loss@100m3/hr=8,76,000

    Total Potential savings=

    21,90,000M3/Annum

    RJPC (WR-1)- 2012

  • 7/28/2019 Water Conservatio RJPC 20032012

    20/28

    JHANOR-GANDHAR

  • 7/28/2019 Water Conservatio RJPC 20032012

    21/28

    RAIN WATER HARVESTING

    CAN BE OF TWO TYPES:

    Collection and use

    Recharging to underground aquifers.

    FORMULA FOR RAIN WATER COLLECTIONQUANTITY:

    Q = A x C x rain fallQ is in M3

    A, the area is in M2, Rain fall is in meters and C is the run-

    off coefficient.

    JHANOR-GANDHAR

    WATER CONSERVATION MEASURES INITIATIVES

  • 7/28/2019 Water Conservatio RJPC 20032012

    22/28

    HOW MUCH WATER?

    Parameter Value

    Total AreaMain Plant, sq.m 14,40,400

    Collection area, % 90

    Avg. Rain Fall, mm 650

    Run off coeff., % 60

    Run off Water Qty. M3 5,05,440

    Rain fall during Jun- Sep, mm 550

    Run off during Jun-Sep, M3 4,20,000

    JHANOR-GANDHAR

    RAIN WATER HARVESTING INITIATIVES

  • 7/28/2019 Water Conservatio RJPC 20032012

    23/28

    From Main plant, around 2.7 lacs M3 ofwater can be collected with:

    A 3.0 m height check dam storing

    12500 M

    3

    of water in drain. A pit to collect and pump to reservoir

    @ 300M3/hr.

    Separate collection of better qualityroof water is being considered.

    JHANOR-GANDHAR

    RAIN WATER HARVESTING INITIATIVES

  • 7/28/2019 Water Conservatio RJPC 20032012

    24/28

    THE DRAIN SYSTEM IN MAIN PLANT:

    D1 D2 D3 D4 D5

    2.95 m

    2.55 m

    1.60 m 1.00 m 0.60 m

    (L = 725m) (L = 1550m) (L = 3120m) (L

    =3120m)

    (L =

    3120m)

    JHANOR-GANDHAR

    RAIN WATER HARVESTING INITIATIVES

    Sufficient for 15

    days requirement

    at full

    load,amounting to

    Rs.16,20,000/-

  • 7/28/2019 Water Conservatio RJPC 20032012

    25/28

    JHANOR-GANDHAR

    RAIN WATER HARVESTING INITIATIVES

    Ground water recharging is being

    considered.

    Average yearly rain fall of 650 mm.

    Area = 50 acre = 2,20,000 sq.M

    Around 75,000 M3 of rain water can be used

    for aquifer recharging annually.

    This qnty. is more than 6 months

    consumption of potable water in the colony.

    For Township

  • 7/28/2019 Water Conservatio RJPC 20032012

    26/28

    JHANOR-GANDHAR

    RAIN WATER HARVESTING INITIATIVES

    For Township

  • 7/28/2019 Water Conservatio RJPC 20032012

    27/28

    WATER BALANCE (M3/DAY)

    RAW WATER- 26500

    CLARIFIED WATER- 26500

    FILTER WATER

    5400

    SOFT WATER-

    100

    CT MAKEUP

    21000

    DRINKINGWATER

    700

    DM PLANT

    4500

    MISC. US

    200

    EVAP.

    16800

    BLOWDOWN

    4200

    STEAM CYCLE

    400

    GT INJECTION

    3600

  • 7/28/2019 Water Conservatio RJPC 20032012

    28/28

    CONDENSER AUXILLIARYCOOLING

    2000M3/HR

    Cl2 dosing

    Servicewatersystem

    Fire Fighting

    Blow down

    240M3/HR

    H2SO4 dosingSide filters

    CT

    720m3/hr

    40000m3/hr

    2000m3/hr

    MAKEUP

    960M3/HR

    TREATMENT

    CHEMICAL

    DOSING

    CW SCHEMATIC AT JHANOR