water tanks - ggmining.com · 2 / water tanks water tanks / 3 quality tank construction: • large...

4
Water Tanks STRONGER, LIGHTER, MORE PRODUCTIVE SOLUTIONS AUSTRALIAN DESIGNED AND MANUFACTURED MOBILE WATER TANK MODULES FOR THE HARSHEST MINING CONDITIONS

Upload: others

Post on 17-Oct-2019

17 views

Category:

Documents


1 download

TRANSCRIPT

Water TanksSTRONGER, LIGHTER, MORE PRODUCTIVE SOLUTIONS

AUSTRALIAN DESIGNED AND MANUFACTURED MOBILE WATER TANK MODULES FOR THE

HARSHEST MINING CONDITIONS

2 / Wate r ta n ks Water tanks / 3

Quality Tank Construction:

• Large capacity water tank modules for installation on OEM cab chassis.

• Proven design incorporating internal baffle system comprising of horizontal and vertical baffles for improved on-road stability / water surge management, as well as considerable structural strength.

• Certified Australian Made product, manufactured at G&G’s Perth, Western Australia facility.

• Fully screened (removable) bolt on filler chute on left hand side (drivers side) of tank.

• Externals primed and painted and internals lined with tank liner for maximum tank life

• Internal polypropylene pipework for suction and to forward mounted cannon for rust free operation.

Proudly Designed and Manufactured by G&G in Perth, Western Australia

Safe and Service Technician Friendly:

• Accessible and removable rear spray shelf mounted system module for enhanced serviceability.

• Manhole covers and internal ladders for each individual compartment for safe and easy service access.

• Raiseable tank design, enabling service technician access to machine transmission and truck chassis.

• Fold away tank access steps to top of tank from front deck ensures clear access to the engine hood and engine compartment.

• Safety lanyard support adjacent to cannon on tank roof.

• Fold down hand rails with 100mm high kick rail and self-closing safety access gate on roof of tank.

• Non-slip surface on top of tank

Haul Road Sprays, Firefighting Cannon, Hose Reel and Control System:

• Three (3) x Single acting hydraulic operated spray heads (double action and additional sprays available as optional upgrades) ensuring generous water flow and haul road coverage.

• Remote controlled stainless-steel firefighting and washdown cannon located on roof of tank.

• 20m long firefighting pressure hose reel with adjustable spray nozzle mounted on spray shelf at rear of tank.

• Additional water connections for firefighting and washdown hoses including 65mm BIC fitting in spray bar and 100mm NB Camlok fitting on dump valve.

• Robust electric over hydraulic control system with electric in-cab control system and safety cutoffs.

Standard Models

CATERPILLAR 785C

KOMATSU 785-7

CATERPILLAR 777

1 20,000 LITRES

80,000 LITRES

76,000 LITRES

G&G have designs on file for a wide range of tanks, with a library of products we have produced through our years of operation, so if your truck model is not listed please give us a call to discuss.

ggmining.com

4 / Wate r ta n ks Water tanks / 5

Aftersales and Spare Parts

Designed in conjunction with our own service technicians, G&G tanks and spray systems are robust and maintenance friendly. However, all mechanical systems need maintenance, repair and spare parts, and so we ensure that our products are supported - and so we have service technicians, parts manuals and spares in order to keep you up and running should the need arise.

[email protected]@ggmining.com

Optional Extras The below are a list of our standard optional extras. If you have specific needs or site requirements for options that are not listed please contact us.

CUSTOMISABLE TO YOUR OPERATIONAL REQUIREMENTS

DRIVERS CAB CANOPY

SIDE WALL SPLASH GUARDS

REAR MOUNTED HYDRAULIC TYRE FIRE SPRAY

CAB CONTROLLED 1000L FOAM INDUCTION SYSTEM (SEE LEFT)

GROUND SPEED CONTROL SYSTEM (ADE)

REVERSING CAMERA SYSTEM WITH WIDE LENS

CAMERA MOUNTED TO WATER CANNON

UPGRADE BASE WATER PUMP WITH 100X125X315 IMPELLER

ROCK FILTER BETWEEN REAR WATER OUTLET AND WATER PUMP

CANNON RELOCATED AND MOUNTED TO TANK FRONT WALL (SEE LEFT)

BOLT-ON GALVANIZED SERRATED GRATING ON TANK ROOF (CAT785 ONLY)

EXTERIOR WEKA WATER SIGHT LEVEL TUBE

HOSE REEL RELOCATED AND PLUMBED TO TRUCK FRONT BUMPER

ADDITIONAL SPRAY HEAD (UPGRADE FROM 3 TO 4)

DOUBLE ACTING SPRAYHEADS (UPGRADE FROM SINGLE ACTING)

80MM BALL VALVE ON OVERFLOW PIPE

65MM BIC FITTING ON REAR SPRAY BAR

2X CERTIFIED ROOF LANYARDS

ggmining.com

6 / Wate r ta n ks

G&G MINING FABRICATION PTY LTDggmining.comTelephone: +61 (0)8 6258 3333Email: [email protected] Address: PO Box 1095, Midland DC, WA 6936 AUSTRALIA

Copyright G&G Mining Fabrication Pty Ltd 2010-2019. ABN: 86 169 498 408