WaterNSW
Water Operations Report
Macquarie-Cudgegong
30 November 2017
Dam Storages
WaterNSW Macquarie-Cudgegong Water Ops Report 30 November 2017
0%
20%
40%
60%
80%
100%
120%
140%
160%
Burrendong Dam Storage
2013/14 2014/15 2015/16 2016/17 2017/18
Dam Storages
30 November 2017 WaterNSW Macquarie-Cudgegong Water Ops Report
20%
25%
30%
35%
40%
45%
50%
55%
60%Windamere Dam Storage
2013/14 2014/15 2015/16 2016/17 2017/18
Supplementary Access
No supplementary events in the Macquarie - Cudgegong since the
start of 2017/18.
30 November 2017WaterNSW Macquarie-Cudgegong Water Ops Report
2017/18 Water
Availability for Macquarie
No additional AWD has been announced since 14 August
2017.
Of 124,623 ML of Usage: Lic Env usage 68,227ML and
Irri GS usage 56,396 ML
General Security Available Water Determination
Date AWD ML/Share Total %
1-Jul-17 0.36 36%
14-Aug-17 0.02 38%
30 November 2017 WaterNSW Macquarie-Cudgegong Water Ops Report
Licence Category
Water Availability as of 1st
Nov 2017
Sum of
Share
Component
Sum of
Account
Balance
Sum of
Available
Water
Sum of
AWD Vol
Sum of
Carryover
In
Sum of
Allocation
Assignment
s
In
Sum of
Allocation
Assignments
Out
Sum of
Usage
DOMESTIC AND STOCK 4,307 4,043 3,911 4,307 0 0 0 264
DOMESTIC AND STOCK [DOMESTIC] 787 785 785 785 0 0 0 0
DOMESTIC AND STOCK [STOCK] 170 156 156 170 0 0 0 14
LOCAL WATER UTILITY 16,205 12,853 11,971 16,205 0 0 0 3,352
REGULATED RIVER (GENERAL SECURITY) 613,181 553,447 545,020 232,931 445,614 104,593 102,336 124,623
REGULATED RIVER (HIGH SECURITY) 8,416 6,234 5,538 8,416 0 25 549 1,658
REGULATED RIVER (HIGH SECURITY) [RESEARCH] 4,044 3,531 3,531 4,044 0 0 0 513
REGULATED RIVER (HIGH SECURITY) [TOWN WATER
SUPPLY] 40 40 40 40 0 0 0 0
SUPPLEMENTARY WATER 48,687 48,685 48,685 48,687 -1 9,080 9,080 0
GRAND TOTAL 695,837 629,774 619,638 315,585 445,613 113,698 111,964 130,424
2017/18 Water
Availability for Cudgegong
General Security Available Water Determination
Date AWD ML/Share Total %
1-Jul-17 0.36 36%
14-Aug-17 0.02 38%
30 November 2017 WaterNSW Macquarie-Cudgegong Water Ops Report
Licence Category
Water Availability as of 1st
Nov 2017
Sum of
Share
Component
Sum of
Account
Balance
Sum of
Available
Water
Sum of
AWD Vol
Sum of
Carryover
In
Sum of
Allocation
Assignments
In
Sum of
Allocation
Assignments
Out
Sum of
Usage
DOMESTIC AND STOCK 672 381 380 672 0 0 0 291
DOMESTIC AND STOCK [DOMESTIC] 19 16 16 16 0 0 0 0
DOMESTIC AND STOCK [STOCK] 15 15 15 15 0 0 0 0
LOCAL WATER UTILITY 2,600 2,035 1,993 2,600 0 0 0 565
REGULATED RIVER (GENERAL SECURITY) 19,285 33,788 33,681 7,328 29,029 14 1,404 1,037
REGULATED RIVER (HIGH SECURITY) 5,412 4,883 4,880 5,412 0 0 343 186
REGULATED RIVER (HIGH SECURITY) [RESEARCH] 1 0 0 1 0 0 0 1
SUPPLEMENTARY WATER 1,312 1,312 1,312 1,248 0 0 0 0
GRAND TOTAL 29,316 42,429 42,278 17,291 29,029 14 1,747 2,080
Current Resources
Breakdown
30 Nov 2017 WaterNSW Macquarie-Cudgegong Water Ops Report
112
127
22
21
93
271
36
429
Macquarie - Cudgegong Resource Assessment Breakdown (GL) - 1 November 2017
Environmental General Security
Planned Environmental Water
High Security
Towns, S&D
Evap from Storage
ops Losses
Inaccessible Storage
Irrigation general Security
Total 1,111 GL
Resource Assessment
30 November 2017 WaterNSW Macquarie-Cudgegong Water Ops Report
Macq Cudge Resource Assessment -
Burrendong Dam1-Sep-16 1-Oct-16 1-Feb-17 1-May-17 1-Jun-17 1-Aug-17 1-Aug-17 1-Sep-17 1-Oct-17 1-Nov-17
Planning Horizon (drought sequence)Sept 16 – Jun
18
Oct 16 – Jun
18
Feb 17 – May
18
May 17- May
18
Jun 17- May
18
Aug 17- May
18
Aug 17- May
19
Sep 17- May
19
Oct 17- May
19
Nov 17- May
19
AWD Announcement Date 1-Sep-16 1-Oct-16 1-Jul-17 1-Jul-17 1-Aug-17 1-Sep-17 1-Oct-17 1-Nov-17 1-Dec-17
Min Inflow SequenceOct 16 – Jun
18
Oct 16 – Jun
18
Feb 17 – May
18Jul 17- May 18
Jul 17- May
18
Aug 17- May
18Sep 17- May 19
Oct 17 - May
19
Nov 17 - May
19
Dec 17 - May
19
GL
Opening storage volume 967 1501 1125 1044 1042 1035 1035 974 910 826
Plus volume available through Bulk Water
Transfer39 0 71 81 81 81 62 62 62 62
Plus minimum expected inflow sequence over
planning horizon443+101 101 26 21 21 18 130 96 89 43
Less amount of dead storage -34 -34 -34 -34 -34 -34 -34 -34 -34 -34
Less evaporation allowance -147.6 -128 - 94 -57 -53 -55 -103 -104 -98 -93
Less remaining essential requirements -314 -304 - 215 -199 -199 -187 -346 -331 -318 -314
Less unallocated storage volume -220 -364 - 192 -266 -285 -4 -4 -2 -1 -2
Less volume remaining in irrigator accounts -433.4 -439 - 376 -330 -313 -472 -480 -460 -474 -429
Less volume remaining in environmental
accounts-215 -333 - 311 -260 -260 -365 -370 -338 -276 -239
Amount available for allocation (+ve) /
Amount of inflow required before new allocation
can be made (-ve)
186 0 16 -110 -137 -140 -180
Allocation % = ~23% alloc Alloc Reset 2 % alloc
6 Month Rainfall and Inflow
30 November 2017 WaterNSW Macquarie-Cudgegong Water Ops Report
24 Month Rainfall and Inflow
30 November 2017 WaterNSW Macquarie-Cudgegong Water Ops Report
Inflows are consistent with rainfall
over the past 6 month period. Actual
inflows for last 6 months were only
22 GL which is nearly equal to 99th
percentile inflows.
Inflows are consistent with rainfall over the past 12 months. Actual inflows for the last12 months were around 168GL. Most of the inflows were up to end of April17 and the percentile was equal to 50% condition. However, from May 17 the condition were drier and only 22GL of inflows were recorded. The cumulative inflows turned out to be less than than 80th percentile for rest of the year.
Rainfall and Inflow (dam)
30 November 2017 WaterNSW Macquarie-Cudgegong Water Ops Report
0
200
400
600
800
1000
1200
May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17
Infl
ow
Vo
lum
e (
GL
)
Burrendong Dam - 6 month inflows/statistical inflows
99 percentie
80 percentile
50 percentile
20 percentile
Actual Inflow
0
200
400
600
800
1000
1200
1400
1600
Infl
ow
Vo
lum
e (
GL
)
Burrendong Dam - 12 month inflows/statistical inflows
99 percentie
80 percentile
50 percentile
20 percentile
Actual Inflow
Inflows are consistent with rainfall
over the past 6 months. Actual
inflows for the last 6 months were
around 200ML which is equal to 99%
inflow conditions.
Dry condition throughout has
resulted in very less inflows into
Windamere dam. Over the past 12
month period the actual inflow were
only 4.5 GL which is just better than
99% inflow conditions.
Rainfall and Inflow (dam)
30 November 2017 WaterNSW Macquarie-Cudgegong Water Ops Report
0
5
10
15
20
25
30
35
40
45
May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17
Infl
ow
Vo
lum
e (
GL
)
Windamere Dam - 6 month inflows/statistical inflows
99 percentie
80 percentile
50 percentile
20 percentile
Actual Inflow
0
10
20
30
40
50
60
70
80
Infl
ow
Vo
lum
e (
GL
)
Windamere Dam - 12 month inflows/statistical inflows
99 percentie
80 percentile
50 percentile
20 percentile
Actual Inflow
Operational Loss
Operational loss is water above that which could reasonably be expected to pass the
last extraction point on each given river/creek being supplied with regulated flow
(dam releases and controlled tributary inflows – not supplementary flows)
30 November 2017 WaterNSW Macquarie-Cudgegong Water Ops Report
Macquarie Cumulative TotalsSales +
Environmental
delivery
(Excluding
Supplemantary)
Operational
SurplusActual Target
July 7,170 705 10% 5%July-Aug 37,066 1,383 4% 5%July-Sep 94,229 2,073 2% 5%July-Oct 189,139 4,307 2% 5%July-Nov 0% 5%July-Dec 0% 5%July-Jan 0% 5%July-Feb 0% 5%July-Mar 0% 5%July-Apr 0% 5%July-May 0% 5%July-Jun 0% 5%
0%
2%
4%
6%
8%
10%
12%
July July-Aug
July-Sep
July-Oct
July-Nov
July-Dec
July-Jan
July-Feb
July-Mar
July-Apr
July-May
July-Jun
Op
era
tio
na
l S
urp
lus
/ S
ale
s (
%)
Macquarie River - Water Delivery Operational Surplus Vs Sales - 2017-18 Cumulative %
(regulated licenced and discretionary env. flow delivery is included in sales)
Target 5%
Storage Forecast
30 November 2017 WaterNSW Macquarie-Cudgegong Water Ops Report
0%
20%
40%
60%
80%
100%
120%
140%
Jul-1
5
Jul-1
5
Aug-1
5
Sep-1
5
Oct-
15
No
v-1
5
De
c-1
5
Jan-1
6
Feb
-16
Ma
r-1
6
Apr-
16
Ma
y-1
6
Jun-1
6
Jul-1
6
Aug-1
6
Sep-1
6
Oct-
16
No
v-1
6
De
c-1
6
Jan-1
7
Feb
-17
Ma
r-1
7
Apr-
17
Ma
y-1
7
Jun-1
7
Jul-1
7
Aug-1
7
Sep-1
7
Oct-
17
No
v-1
7
De
c-1
7
Jan-1
8
Feb
-18
Ma
r-1
8
Apr-
18
Ma
y-1
8
Jun-1
8
En
d o
f M
on
th S
tora
ge
Le
ve
l in
%
Period
Burrendong Dam Forecast Storage Levels(assessment done end of Oct 2017)
Actual
Dry 80% COE
Median 50%COEWet 20% COE
Minimum99% COE
• Plan to deliver about 400GL of Licenced water in 2017-18
• The first round of watering for the summer crop has ended.
• Second round would probably start around 3rd week of Nov
• About 135GL has been delivered to Marshes from both licenced and EWA allocations in 2017-18.
• Next Delivery of S&D flows will likely to be in Autumn 2018
• Minimal operational shortfalls and Ops losses planned
• Water Order Debiting will be applied to licence holders with a history of over-ordering. Please see fact sheet
30 November 2017 WaterNSW Macquarie-Cudgegong Water Ops Report
System Operations Plan
System Outage Plan
Dam maintenance impacting supply
• Planned outage – none.
• Fluctuations in river flows due to investigation works for
reinstating Cold Water Pollution temperature curtain.
Weirs
• Planned outage – none.
Regulators
• Planned outage – none.
30 November 2017 WaterNSW Macquarie-Cudgegong Water Ops Report
PrognosisChances Of Improvement
The chances of improved General Security allocation, based on different
inflow scenarios are as follows:
Potential Inflow Conditions Macquarie
Total General Security AWD (%)
1-Feb-17 1-July-18
Dry
(80% inflows: 4
chances in 5)
38% and carry over
from 2016-17
38% and carry over from
2016-17
Average(50% inflows: 1
chances in 2)38% and carry over
from 2016-17
48% and carry over from
2016-17
Wet(20% inflows: 1
chances in 5)48% and remaining
carryover from 2016-17
100% and remaining
carryover from 2016-17
30 November 2017 WaterNSW Macquarie-Cudgegong Water Ops Report