waterproofing materials commonly applied to commercial building
DESCRIPTION
Waterproofing Materials commonly applied to commercial building, methods of application and systemTRANSCRIPT
Engineering
Design &
Development11
Prepared by:
Bernabe T. Salazar Jr.Roof Management Committee
Waterproofing Materials
Roof Management Committee
Engineering
Design &
DevelopmentRoof Management Committee2
OUTLINE
1. Commonly used waterproofing materials in Mall2. Problems encounter in Malls3. Solutions and Waterproofing System
Engineering
Design &
DevelopmentRoof Management Committee3
Solutions & Waterproofing Systems
• Waterproofing• Protective Coatings
Engineering
Design &
DevelopmentRoof Management Committee4
MEMBRANE (Modified Bitumin)
Surface Preparation1. Surface should be sloped2. Curing of Cement should be achieved (28days)3. Loose concrete should be removed4. Cracked should be repaired using epoxy injection5. Water blast cleaning6. Drying 24 hrs.
End lapping = 6”Side Lapping=4”
Brand: Paraflex & Valli Zaban
Engineering
Design &
DevelopmentRoof Management Committee5
MEMBRANE (Modified Bitumin)
Surface Preparation1. Surface should be sloped2. Curing of Cement should be achieved (28days)3. Loose concrete should be removed4. Cracked should be repaired using epoxy injection5. Water blast cleaning6. Drying 24 hrs.
End lapping = 6”Side Lapping=4”
Brand: Paraflex & Valliu Zaban
Engineering
Design &
DevelopmentRoof Management Committee6
ELASTOMERIC SYSTEM
Surface Preparation1. Removal od damage waterproofing2. Cleaning the surface , removal of other
contaminants3. Repair of cracks thru epoxy injection4. Drying the surface for waterproofing
Engineering
Design &
DevelopmentRoof Management Committee7
ELASTOMERIC SYSTEM
Surface Preparation1. Removal od damage waterproofing2. Cleaning the surface , removal of other
contaminants3. Repair of cracks thru epoxy injection4. Drying the surface for waterproofing
For metal roof , fiber mesh is installed at Seams and flashing
Sealant is applied at text screw
Engineering
Design &
DevelopmentRoof Management Committee8
POLYURETHANE 2 COAT SYSTEM
Surface Preparation1. Surface should be sloped2. Loose concrete should be removed3. Cracked should be repaired using epoxy injection4. Corner : install fillet
DFT = 1mmSolvent Based
Engineering
Design &
DevelopmentRoof Management Committee9
POLYUREA
Surface Preparation1. Loose concrete should be removed2. Cracked should be repaired using epoxy injection3. Surface cleaning, loose particles removal
DFT = 1mmDFT Roofdeck Parking = 2mm
Engineering
Design &
DevelopmentRoof Management Committee10
PU FOAM
Surface Preparation1. Metal roof surface should cleaned 2. Tightening or replacement of loose text screw3. Apply sealant (PU) on all text screw4. Cleaning, removing rust.5. Treatment of corroded area using Rust Converter
DFT = ¾” to 1” Thickness
Engineering
Design &
DevelopmentRoof Management Committee11
CERAMIC INSULATION COATINGS
Surface Preparation
1. Tightening or replacement of loose text screw
2. Apply sealant (PU) on all text screw3. Cleaning, removing rust using sand paper4. Treatment of corroded area using Rust
Converter5. Sealing all seams, overlaps, flashing, and
penetration with maxicryl and high tensile strength fiber cloth
Engineering
Design &
DevelopmentRoof Management Committee12
CERAMIC INSULATION COATINGS
Surface Preparation
1. Removal of Dirt and other contaminants2. Sealing of all seams and text screw using
sealant.
Engineering
Design &
DevelopmentRoof Management Committee13
CERAMIC INSULATION COATINGS
Surface Preparation
1. Removal of all loose scales, flakes, peeling paints using wire brush and scraping or power tools.
2. Cleaning of surface.
Engineering
Design &
DevelopmentRoof Management Committee14
Commonly used waterproofing materials in Mall
1. Modified Bitumen Torch Membrane2. Elastomeric Waterproofing3. Polyurethane4. Polyurea5. PU Foam 6. Ceramic Coating7. Epoxy Coating
Engineering
Design &
DevelopmentRoof Management Committee15
Problems in Malls
Water leaks on the following substrateo Concrete Slabo Metal roofo Concrete guttero Flashing
Rust • Pipes, support and metal roofs
Engineering
Design &
DevelopmentRoof Management Committee16
PHOTOS FORMEMBRANE
Engineering
Design &
DevelopmentRoof Management Committee17
MORE PHOTOS
Engineering
Design &
DevelopmentRoof Management Committee18
MORE PHOTOS
Engineering
Design &
DevelopmentRoof Management Committee19
MORE PHOTOS
Engineering
Design &
DevelopmentRoof Management Committee20
MORE PHOTOS PU FOAM
CRACK ON WALLS
Engineering
Design &
Development21
End of Report