waverley council operational plan...waverley council’s mission and values through its detailed...

59
WAVERLEY COUNCIL Operational Plan Operational Plan 2012-13 PRICING POLICY, FEES & CHARGES DRAFT April 2012 A12/0193

Upload: others

Post on 05-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

WAVERLEY COUNCIL

Operational PlanOperational Plan

2012-13 PRICING POLICY, FEES & CHARGES

DRAFT

April 2012 A12/0193

Page 2: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Page

The Community's Vision 3

Our Mission and Values 4

Pricing Policy 5

Fees and Charges for 2012-13 Abandoned Cars, Trolleys & Other Items 6Access to Information/Records 6Animals 6Applications 7Building Matters 7Cemetery Services 8Certificates 12Child Care Services 13Fitness Training use of Public Open Spaces 14Community Bus 15Community Garden 15Cultural Activities 15Development Applications 16Filming and Photography in Public Open Spaces 20Library Services 22Maintenance and Repair of Council Property 23Meals on Wheels 24Parking 25Payment Transactions 28Photocopying 28Publications 29Rating & Property Information 30Registration of Premises 31Sending Information 32Telecommunications Levy 32Tenders 32Trees 32Use and Hire of Council Property 32Use and Hire of Public Open Spaces 43Use of Roads, Footpaths and Pedestrian Malls 48Sale/Lease of Council Property 50Security Deposits 50Waste Services 51

Index 54

Contents

Waverley Council Operational Plan 2012-13 - Pricing Policy, Fees and Charges 1

Page 3: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Waverley Council Operational Plan 2012-13 - Pricing Policy, Fees and Charges 2

Page 4: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Our community’s

VisionWe are united by a common passion for our beautiful home between

the city and the sea.

Inspired by the magnificent landscape of Waverley and by the gifts we have inherited from those who have been here before us, we dream of a fulfilling life where…

we are safe

we are reconciled with and value our indigenous past

connections within families and between generations can remain unbroken

we are inspired and able to renew our physical and spiritual wellbeing

everyone is welcome to participate positively in community life

we can express our essential selves through our traditions, our arts,our cultures and our lifestyles

we act together as a compassionate society

the beauty of our beaches, cliffs and coastal lands endures

the architectural landscape is cared for and developed at a human scale anddesign is sensitive to the natural, historical and social contexts

vital services are fully accessible

scarce resources are conserved and fairly shared

local economic prosperity provides opportunities for all

as a local community we have the courage to take a leading place in achievingthe environmental aims of a global society

we are confident our leaders will reflect thoughtfully on our views andbest interests when making decisions for our future

These are the aspirations of our hopeful generation.

We recognise the need to commit to this vision of our future with energy so we can pass these gifts to our children

and they to theirs.

Waverley Council Operational Plan 2012-13 - Pricing Policy, Fees and Charges 3

Page 5: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Waverley Council’s

Mission and valuesThrough its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and depth of community priorities and articulated these in a Vision for the Waverley community. Council’s Mission is to take a leading role in partnership with other levels of government, businesses and community groups and individuals to make the community’s vision a reality.

In doing this, we rely on our commitment to and cohesion as a professional, friendly and ethical Council that consults with and listens to the community. We pride ourselves on bringing the following values alive in our daily activities.

GREAT LEADERSHIP

Great leadership is having the courage to make difficult decisions when they are for the benefit of the whole community and having the skills to engage our teams in providing quality service.

GREAT CUSTOMER SERVICEGreat customer service is the willingness and ability to give priority to customers, delivering high quality services which meet their needs.

RESPECT FOR ALLRespect for all is treating each other and all members of the community in a friendly, fair and equitable way.

WORKING ETHICALLYEthical behaviour is acting in ways that are consistent with the expectation of the organisation to be corruption free and transparent.

WORKING TOGETHERWorking together is about everyone working in partnership (internally and with the community) to achieve common or shared goals.

GETTING THE JOB DONE SAFELY, SUSTAINABLY AND ON TIMEGetting the job done means providing a service efficiently, effectively and in the safest possible manner within agreed timeframes and due regard for the environment.

Waverley Council Operational Plan 2012-13 - Pricing Policy, Fees and Charges 4

Page 6: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

A.

B.

C.

D.

E.

F.

G. Pricing Policy

The

cha

rge

is a

ref

unda

ble

depo

sit a

gain

st p

ossi

ble

dam

age

to in

fras

truc

ture

, foo

tpat

hs, k

erb,

gut

ters

and

roa

dway

s, b

uild

ings

, par

ks

and

rese

rves

cau

sed

by a

djac

ent d

evel

opm

ent o

r us

e of

faci

litie

s.

Ho

w d

o w

e d

eter

min

e w

hat

to

ch

arg

e fo

r th

e p

rod

uct

s an

d s

ervi

ces

we

pro

vid

e?

We

have

iden

tifie

d se

ven

pric

ing

prin

cipl

es th

at w

e ap

ply

whe

n se

tting

our

fees

and

cha

rges

. T

hese

prin

cipl

es a

re:-

The

pric

e ch

arge

d fo

r th

is p

rodu

ct/s

ervi

ce is

bas

ed o

n fu

ll co

st r

ecov

ery.

The

pric

e ch

arge

d fo

r th

is p

rodu

ct/s

ervi

ce g

ener

ates

cos

t rec

over

y an

d an

app

ropr

iate

ret

urn.

The

pric

e ch

arge

d fo

r th

is p

rodu

ct/s

ervi

ce is

set

by

refe

renc

e to

mar

ket p

rices

.

Not

e: T

he tr

eatm

ent o

f GS

T in

this

pol

icy

is s

ubje

ct to

cha

nge

in a

ccor

danc

e w

ith G

oods

and

Ser

vice

s T

ax le

gisl

atio

n. G

ST

will

app

ly, o

r w

ill n

ot a

pply

(a

s th

e ca

se m

ay b

e) to

the

amou

nts

of th

e fe

es a

nd c

harg

es, i

n ac

cord

ance

with

legi

slat

ive

requ

irem

ents

that

ope

rate

at t

he ti

me

that

the

fee

or

char

ge is

levi

ed.

Tog

ethe

r th

eses

prin

cipl

es m

ake

up o

ur P

ricin

g P

olic

y. O

ur P

ricin

g P

olic

y ai

ms

to s

how

how

we

dete

rmin

e sp

ecifi

c fe

es o

r ch

arge

s. O

ur

sche

dule

of f

ees

and

char

ges

indi

cate

s w

hich

of t

he p

ricin

g pr

inci

ples

app

ly to

eac

h fe

e or

cha

rge.

The

pric

e ch

arge

d fo

r th

is p

rodu

ct/s

ervi

ce is

set

by

regu

latio

n or

oth

er le

gal a

gree

men

t.

No

pric

e is

cha

rged

for

this

pro

duct

/ser

vice

. A

ll co

sts

asso

ciat

ed w

ith p

rovi

ding

this

pro

duct

/ser

vice

are

met

from

gen

eral

inco

me.

The

pric

e ch

arge

d fo

r th

is p

rodu

ct/s

ervi

ce m

akes

a p

artia

l con

trib

utio

n to

war

ds th

e to

tal c

ost o

f pro

vidi

ng th

e se

rvic

e, r

athe

r th

an th

e fu

ll co

st r

ecov

ery,

rec

ogni

sing

the

com

mun

ity b

enef

it it

prov

ides

.

Wav

erle

y C

ou

nci

l Op

erat

ion

al P

lan

201

2-13

- P

rici

ng

Po

licy,

Fee

s an

d C

har

ges

5

Page 7: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

Aba

ndon

ed C

ars,

Tro

lleys

& O

ther

Item

s

Aba

ndon

ed V

ehic

les

Rem

oval

of A

band

oned

Veh

icle

spe

r ve

hicl

e90

.00

B

Veh

icle

Impo

undi

ng F

eepe

r ve

hicl

e42

0.00

BV

ehic

le S

tora

ge F

eepe

r w

eek

60.0

0

B

Impo

undi

ng F

eeS

hopp

ing

Tro

lley

per

trol

ley

65.0

0

CC

rate

s -

Bre

ad, M

ilk, C

hick

en, s

imila

rpe

r cr

ate

2.50

C

Acc

ess

to In

form

atio

n/ R

ecor

dsA

cces

s to

Cou

ncil

Rec

ords

GIP

A A

ct a

pplic

atio

nspe

r ap

plic

atio

n30

.00

F

GIP

A A

ct –

Pro

cess

app

licat

ion

(firs

t 20

hrs

no c

harg

e fo

r pe

rson

al a

ffairs

req

uest

s)

per

hour

(fo

r 2n

d &

su

bseq

uent

hou

r)30

.00

F

GIP

A A

ct –

Pro

cess

app

licat

ion

(firs

t 20

hrs

no c

harg

e fo

r pe

rson

al a

ffairs

req

uest

s) (

fee

redu

ctio

n)

per

hour

(fo

r 2n

d &

su

bseq

uent

hou

r)15

.00

F

App

licat

ions

for

inte

rnal

rev

iew

of P

rivac

y an

d P

erso

nal I

nfor

mat

ion

Act

det

erm

inat

ions

per

appl

icat

ion

40.0

0

F

Sup

ply

of C

ounc

il B

usin

ess

Pap

ers

(Cou

ncil'

s B

usin

ess

Pap

ers

are

open

acc

ess

info

rmat

ion

& c

an b

e do

wnl

oade

d fr

ee o

f cha

rge

on C

ounc

il's

web

site

. If

hard

cop

ies

are

requ

ired

the

GIP

A a

llow

s C

ounc

il to

rec

oup

cost

s fo

r ph

otoc

opyi

ng)

Bui

ldin

g &

Dev

elop

men

t Pla

nsA

dmin

istr

ativ

e se

arch

and

ret

reav

al fe

e w

here

the

file

is a

rchi

ved

or s

tore

d of

f-si

te

per

sear

ch11

2.00

B

Pho

toco

pyin

g Le

gal D

ocum

ents

Und

er S

ubpo

ena

All

copy

ing,

reg

ardl

ess

of p

aper

siz

epe

r ho

ur71

.00

B

Writ

ten

Pro

pert

y S

earc

h an

d Z

onin

g C

ompl

ianc

e In

quiri

esfir

st h

our

174.

00

B

Writ

ten

Pro

pert

y S

earc

h an

d Z

onin

g C

ompl

ianc

e In

quiri

essu

bseq

uent

hou

rs/ p

art

87.0

0

B

Ani

mal

sC

ompa

nion

Ani

mal

s A

ctD

og o

r C

at L

ifetim

e R

egis

trat

ion

Fee

(w

hole

ani

mal

)pe

r re

gist

ratio

n15

0.00

FD

esex

ed D

og o

r C

atpe

r re

gist

ratio

n40

.00

F

Bre

eder

per

regi

stra

tion

40.0

0

FS

peci

al fe

e –

dese

xed

anim

al (

eg, e

ligib

le p

ensi

oner

)pe

r re

gist

ratio

n15

.00

F

201

2/13

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es6

Page 8: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

Ass

ista

nce

anim

al (

eg, g

uide

dog

)pe

r re

gist

ratio

n-

F

Impo

undi

ng F

ees

Fee

s ch

arge

d as

per

the

Pou

nd s

ched

uled

fees

App

licat

ions

Rez

onin

g A

pplic

atio

ns/P

lann

ing

Pro

posa

lsD

epen

ding

upo

n co

mpl

exity

. Min

or r

ezon

ing

gene

rally

ref

ers

to a

sin

gle

allo

tmen

t spo

t rez

onin

g ge

nera

ted

by a

pla

nnin

g an

omal

y or

inco

nsis

tenc

y. T

hese

rez

onin

gs a

re g

ener

ally

not

com

plex

or

cont

entio

us. M

ajor

re

zoni

ngs

gene

rally

ref

ers

to a

ll ot

her

rezo

ne

Min

orpe

r ap

plic

atio

n11

,250

.00

BM

ajor

per

appl

icat

ion

22,4

50.0

0

B

Adv

ertis

ing

per

appl

icat

ion

1,13

0.00

B

Tem

pora

ry S

tree

t Clo

sure

App

licat

ion

(non

-ref

unda

ble)

Str

eet p

artie

spe

r ap

plic

atio

n13

0.00

BC

onst

ruct

ion

activ

ities

per

appl

icat

ion

500.

00

B

Com

mer

cial

eve

nts

per

appl

icat

ion

500.

00

B

App

licat

ion

to a

lter

Str

eet N

umbe

rA

sses

smen

t by

Cou

ncil

Offi

cer

per

appl

icat

ion

235.

00

B

Bui

ldin

g M

atte

rsB

uild

ing

Insp

ectio

n F

ees

(Cou

ncil

is P

rinci

pal C

ert

ifier

and

Issu

er o

f Con

stru

ctio

n C

ertif

icat

e)E

stim

ated

cos

t of b

uild

ing

wor

k (in

clud

ing

digi

tisin

g an

d st

orag

e)U

p to

$15

,000

2 in

spec

tions

max

imum

175.

00

B

$15,

001

to $

30,0

00

4

insp

ectio

ns m

axim

um32

5.00

B$3

0,00

1 to

$40

,000

(fo

r fir

st $

30,0

00 p

lus

0.55

% o

f con

trac

t pric

e th

erea

fter)

32

5.00

B$4

0,00

1 to

$20

0,00

0 (f

or fi

rst $

40,0

00 p

lus

0.33

% o

f con

trac

t pric

e th

erea

fter)

375.

00

B

$200

,000

+ (

for

first

$20

0,00

0 pl

us 0

.22%

of c

ontr

act p

rice

ther

eafte

r)

85

5.00

B

Add

ition

al In

spec

tion

Fee

s (if

app

licab

le)

Insp

ectio

n F

eepe

r ho

ur10

4.00

Bpe

r su

bseq

uent

hal

f hou

r or

par

t the

reof

52.0

0

BIn

spec

tion

fees

may

be

the

subj

ect o

f neg

otia

tions

whe

re e

xcep

tiona

l circ

umst

ance

s ex

ist.

Adm

inis

trat

ion

Fee

s (C

ounc

il is

Prin

cipa

l Cer

tifie

r b

ut n

ot is

suer

of C

onst

ruct

ion

Cer

tific

ate)

Up

to $

100,

000

230.

00

B

$101

,000

to $

200,

000

400.

00

B

$201

,000

to $

300,

000

500.

00

B

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es7

Page 9: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

Adm

inis

trat

ion

Fee

s (C

ontin

ued)

$301

,000

+60

0.00

BA

dditi

onal

War

ning

Sig

ns fo

r B

uild

ing

Site

s R

elat

ing

to S

oil &

Wat

er M

anag

emen

t25

.00

B

Cem

eter

y S

ervi

ces

Mem

oria

l Gar

den

Plo

ts –

25

year

Ren

ewab

le T

enur

eS

ingl

e In

term

ents

Mem

oria

l gar

den

allo

catio

n fo

r on

e in

term

ent.

Spa

ce fo

r a

plaq

ue o

n ga

rden

edg

ing

with

inte

rmen

t of a

shes

in g

arde

n be

d.P

urch

ase

and

inte

rmen

t (pl

aque

not

incl

uded

)2,

015.

00

�E

Dou

ble

Inte

rmen

tsM

emor

ial g

arde

n al

loca

tion

for

two

inte

rmen

ts.

Gar

den

edgi

ng o

r ci

rcul

ar m

ound

whe

re a

vaila

ble.

Pur

chas

e an

d fir

st in

term

ent (

plaq

ue a

nd 2

nd in

term

ent n

ot in

clud

ed)

5,78

0.00

E

Mem

oria

l Shr

ub –

25

year

Ren

ewab

le T

enur

eT

wo

Inte

rmen

tsP

linth

at b

ase

of fl

ower

ing

shru

b. P

rovi

sion

for

two

inte

rmen

ts.

Pur

chas

e an

d fir

st in

term

ent (

plaq

ue n

ot in

clud

ed)

5,78

0.00

ES

econ

d in

term

ent f

ee (

plaq

ue n

ot in

clud

ed)

777.

00

EF

our

Inte

rmen

tsP

linth

at b

ase

of fl

ower

ing

shru

b. P

rovi

sion

for

four

inte

rmen

ts.

Pur

chas

e an

d fir

st in

term

ent (

plaq

ue n

ot in

clud

ed)

6,09

8.00

ES

econ

d an

d su

bseq

uent

inte

rmen

ts (

plaq

ue n

ot in

clud

ed)

634.

00

E

Fam

ily M

emor

ial S

hrub

– 2

5 ye

ar R

enew

able

Ten

ure

Six

Inte

rmen

tsP

linth

at b

ase

of fl

ower

ing

shru

b. P

rovi

sion

for

six

inte

rmen

ts.

Pur

chas

e an

d fir

st in

term

ent (

plaq

ue n

ot in

clud

ed)

9,75

4.00

ES

econ

d an

d su

bseq

uent

inte

rmen

ts (

plaq

ue n

ot in

clud

ed)

806.

00

E

Rem

embr

ance

Nic

he W

all –

Sou

th H

ead

Gen

eral

Cem

eter

y –

25 y

ear

Ren

ewab

le T

enur

eS

ingl

e In

term

ents

Nic

he fo

r re

posi

tory

of a

shes

(pl

aque

not

incl

uded

)pe

r si

ngle

nic

he2,

385.

00

�E

Nic

he W

alls

– W

aver

ley

Cem

eter

y –

25 y

ear

Ren

ewab

le T

enur

eS

ingl

e In

term

ents

Nic

he fo

r re

posi

tory

of a

shes

(pl

aque

not

incl

uded

)pe

r si

ngle

nic

he2,

168.

00

�E

‘Mem

oria

l Onl

y’ –

Mem

oria

l Pla

ques

– 2

5 ye

ar R

enew

abl

e T

enur

e

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es8

Page 10: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

Pla

ques

fitte

d to

sto

ne w

all o

n ba

se p

laqu

e. N

o as

hes.

Com

mem

orat

ion

only

(w

here

fitte

d).

487.

00

E

Mem

oria

l Pla

ques

Law

n G

rave

Pla

que

– (C

hrom

e pl

ated

, eng

rave

d an

d bl

acke

ned)

714.

00

E

Oth

er P

laqu

es a

s ap

prov

edP

rice

on a

pplic

atio

nE

For

ged

Bro

nze

Pla

ques

Mem

oria

l Gar

den

– S

quar

e –

For

ged

and

polis

hed

325.

00

E

Nic

he W

alls

– O

val –

For

ged

and

polis

hed

(with

vas

e)50

1.00

EN

iche

Wal

ls –

Ova

l – F

orge

d an

d po

lishe

d –

extr

a lin

es, p

er li

ne34

.00

E

Nic

he W

alls

– S

quar

e –

For

ged

and

polis

hed

407.

00

E

Circ

ular

Mou

nd –

Ova

l – F

orge

d an

d po

lishe

d44

5.00

EC

ircul

ar M

ound

– O

val –

For

ged

and

polis

hed

– ex

tra

lines

, per

line

34.0

0

E

Flo

wer

Vas

es &

Mar

ker

Sto

nes

Bro

nze

units

for

Mem

oria

l Gar

dens

165.

00

E

PV

C fo

r tu

rf to

pped

gra

ss

each

9.00

E

Tem

pora

ry W

hite

cro

ss m

arke

rea

ch15

8.00

EM

emor

ial m

arke

r st

ones

– s

uit g

rave

site

s &

circ

ular

mou

nd (

inst

alle

d)26

9.00

E

Rig

ht o

f Bur

ial C

ertif

icat

e (R

elat

e to

site

cla

ssif

icat

ions

)0.

9m x

2.4

m (

3ft x

8 ft

) pl

ot (

25 y

ear

rene

wab

le te

nure

)18

,064

.00

�E

Dou

ble

size

, mau

sole

um/ v

ault,

spe

cial

loca

tions

or

at S

outh

Hea

d C

emet

ery

Pric

e on

app

licat

ion

(1)

�E

Inte

rmen

t of C

offin

/ Cas

ket i

n an

Allo

tmen

t(A

ll in

term

ents

exc

ludi

ng a

ny m

onum

enta

l wor

k)W

eekd

ays:

(in

clud

es 1

yea

r G

rave

Mai

nten

ance

Sch

eme)

2,56

0.00

ES

atur

days

: (in

clud

es 1

yea

r G

rave

Mai

nten

ance

Sch

eme)

2,85

0.00

E

Late

Fee

sW

eekd

ays

- pe

r ha

lf ho

ur o

r pa

rt th

ereo

f14

8.00

�E

Sat

urda

ys -

per

hal

f hou

r or

par

t the

reof

295.

00

E

Inte

rmen

t of A

shes

of D

ecea

sed

Per

son

in a

n A

llotm

ent

Wee

kday

s (in

clud

es 1

yea

r B

asic

mai

nten

ance

sch

eme)

1,08

7.00

ES

atur

days

(in

clud

es 1

yea

r B

asic

mai

nten

ance

sch

eme)

1,23

4.00

E

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es9

Page 11: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

Rec

eptio

n of

Cof

fin/ C

aske

t for

Ent

ombm

ent i

n V

ault

or

Mau

sole

um S

tyle

Allo

tmen

tW

eekd

ays

(All

inte

rmen

ts e

xclu

ding

any

mon

umen

tal w

ork)

1,64

4.00

ES

atur

days

(A

ll in

term

ents

exc

ludi

ng a

ny m

onum

enta

l wor

k)2,

300.

00

�E

Mon

umen

tal W

ork

App

licat

ion

Fee

s (a

s pe

r A

ustr

alia

n S

tand

ard

AS

4204

)P

erm

it to

con

stru

ct:

Vau

lt or

Mau

sole

um P

rice

on a

pplic

atio

n (2

) E

Hea

dsto

ne13

9.00

EF

oots

tone

70.0

0

ES

lab

over

gra

ve to

p18

1.00

EG

rave

Ker

bing

88.0

0

EP

erm

it to

pla

ce a

Mem

oria

l Pla

que

on:

An

exis

ting

Hea

dsto

ne, M

onum

ent o

r G

rave

Ker

bing

104.

50

E

A p

ropo

sed

Hea

dsto

ne, M

onum

ent o

r G

rave

Ker

bing

104.

50

E

Add

an

insc

riptio

n to

an

exis

ting

Hea

dsto

ne, M

onum

ent o

r G

rave

Ker

bing

71.0

0

EA

dd a

n in

scrip

tion

on a

pro

pose

d H

eads

tone

, Mon

umen

t or

Gra

ve K

erbi

ng71

.00

E

War

Gra

ve a

pplic

atio

n21

2.00

BO

ther

non

spe

cific

add

ition

s or

ren

ovat

ions

by

arra

ngem

ent

E

Allo

tmen

t Mai

nten

ance

Tur

fing

of A

llotm

ent:

0.9m

x 2

.4m

(3f

t x 8

ft)

212.

00

B0.

9m x

3.6

m (

3ft x

12f

t)21

2.00

�B

1.8m

x 3

.6m

(6f

t x 1

2ft)

351.

00

B3.

6m x

3.6

m (

12ft

x 12

ft)45

1.00

�B

7.2m

x 3

.6m

(24

ft x

12ft)

534.

00

BS

oilin

g an

d pl

antin

g al

lotm

ent.

Pric

e on

app

licat

ion

(4)

�B

Per

mis

sion

to p

lant

allo

tmen

t with

app

rove

d pl

ants

28.0

0

�B

Bas

ic M

aint

enan

ce P

lans

0.9m

x 2

.4m

(3f

t x 8

ft)

Allo

tmen

t:1

year

181.

00

B1

year

(sp

ecia

l Pen

sion

er p

rice)

98.0

0

�B

5 ye

ars

738.

00

BA

s re

ques

ted

Pric

e on

app

licat

ion

(5)

�B

Spe

cial

Mai

nten

ance

Pla

n P

rice

on a

pplic

atio

n (5

) �

B+

One

off

Cle

an u

p

9

8.00

B1.

8m x

3.6

m (

6ft x

12f

t) A

llotm

ent:

1 ye

ar

294

.00

�B

1 ye

ar (

spec

ial P

ensi

oner

pric

e)

153

.00

�B

5 ye

ars

8

34.0

0 �

BA

s re

ques

ted

Pric

e on

app

licat

ion

(5)

�B

Spe

cial

Mai

nten

ance

Pla

n R

efer

to C

emet

ery

Offi

ce (

5)

�B

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es10

Page 12: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

Mis

cella

neou

s S

ervi

ces

Arc

hive

Inte

rmen

t Inf

orm

atio

ntr

ansc

ript p

er d

ecea

sed

66.0

0

BB

uria

l Reg

iste

r S

earc

hpe

r al

lotm

ent p

er d

ecea

sed

9.00

B

Cop

y of

Sea

rch

and

Map

spe

r al

lotm

ent p

er d

ecea

sed

9.00

BE

xhum

atio

n F

eepe

r ex

hum

atio

n8,

833.

00

EE

xten

d or

ren

ew R

ight

of B

uria

l for

25

year

add

ition

al p

erio

ds (

whe

re C

ertif

icat

e is

sued

afte

r 1/

1/19

91)

50%

of c

urre

nt p

rice

�B

Film

ing

Fee

s (f

ilms/

com

mer

cial

s/ m

usic

vid

eos/

TV

, etc

– b

usin

ess

hour

s on

ly)

per

hour

587.

00

EF

ilmin

g F

ee (

still

pho

togr

aphy

/ wed

ding

/ adv

ertis

ing/

pro

mot

iona

l, et

c –

busi

ness

hou

rs o

nly)

per

hour

334.

00

EF

ilmin

g F

ee (

stud

ent/

AB

C/ S

BS

– b

usin

ess

hour

s on

ly)

Ref

er to

Cem

eter

y M

anan

ger

�B

Gen

ealo

gica

l and

mul

tiple

sea

rche

s O

n tim

e ba

sis

by a

rran

gem

ent (

6)

EO

ther

ser

vice

s or

goo

ds b

y re

ques

t but

not

list

edP

rice

on a

pplic

atio

n�

E

Ren

ewal

of a

Rig

ht o

f Bur

ial C

ertif

icat

e w

here

issu

ed b

efor

e 1/

1/19

91 (

one

cert

ifica

te p

er g

rave

)86

7.00

�B

Pho

togr

aphi

c im

ages

of a

n al

lotm

ent (

max

2 im

ages

)16

.00

E

Saf

e C

usto

dy o

f Ash

es (

per

mon

th o

r pa

rt th

ereo

f)43

.00

ES

catte

ring

Ash

es (

as d

irect

ed b

y C

emet

ery

Man

ager

)15

3.00

�E

Sec

ond

and/

or

subs

eque

nt a

sh in

term

ent i

n a

gard

en s

tyle

plo

t pur

chas

ed b

efor

e 19

9882

2.00

�E

Ack

now

ledg

ed c

ontr

ibut

ions

to r

esto

ratio

n w

orks

(m

emor

ials

, gra

ves,

gar

dens

, etc

) R

efer

to C

emet

ery

Man

ange

r T

rans

fer

of R

ight

of B

uria

l Cer

tific

ate

whe

re is

sued

bef

ore

Janu

ary

1991

1,6

04.0

0 �

BM

onum

ent R

esto

ratio

n/ E

mer

genc

y an

d or

Saf

ety

Ris

k R

epai

r/ M

odifi

catio

n: P

rice

on a

pplic

atio

n E

His

toric

al/ R

efer

ence

Info

rmat

ion

& S

ervi

ces

Edu

catio

nal/

Inst

ruct

iona

l/ In

terp

retiv

e us

e of

gro

unds

(sc

hool

s/ T

AF

E/ U

ni/ I

nter

est G

roup

s):

0 –

50 p

eopl

epe

r pe

rson

11.0

0

�B

51 –

100

peo

ple

per

pers

on7.

00

�B

101+

peo

ple

per

pers

on6.

00

�B

Tou

rs o

f the

Cem

eter

y by

app

oint

men

t (bu

sine

ss h

our

s)M

inim

um 1

0 pe

ople

/tour

- a

dults

per

pers

on22

.00

BC

hild

ren/

sch

ool s

tude

nts

per

pers

on10

.00

BT

ours

of t

he C

emet

ery

by a

ppoi

ntm

ent (

othe

r ho

urs)

Min

imum

10

peop

le/to

ur -

adu

ltspe

r pe

rson

35.0

0

�B

Ref

resh

men

ts, A

ncill

arie

sLi

st p

rice

�E

Boo

ks o

n W

aver

ley

Cem

eter

y (p

er b

ook)

List

pric

e�

E

(4)

Dep

ende

nt u

pon

type

of w

ork

and

flora

req

uest

ed.

(5)

Cal

cula

ted

on a

n an

nual

rat

e w

ith s

uffic

ient

add

ition

s to

cov

er th

e C

PI r

ate

for

the

desi

red

perio

d.

(1)

Pot

entia

l Mau

sole

um o

r V

ault

site

or

prim

e lo

catio

n de

term

ined

by

loca

tion

eval

uate

d on

siz

e/ ty

pe o

f plo

t allo

catio

n an

d th

e ty

pe o

f con

stru

ctio

n to

be

perm

itted

.(2

) A

per

cent

age

of th

e co

st o

f the

ent

ire p

roje

ct to

cov

er th

e le

vel o

f mon

itorin

g re

quire

d du

ring

cons

truc

tion

phas

e.

(3)

Any

pro

pose

d M

onum

enta

l wor

ks th

at a

re n

ot c

over

ed b

y an

y of

the

othe

r lis

ted

wor

ks.

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es11

Page 13: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

Cer

tific

ates

Bui

ldin

g C

ertif

icat

e [S

ectio

n 14

9A E

.P&

A A

ct 1

979]

(p

resc

ribed

) (C

laus

e 26

0)

App

licat

ion

fee:

Cla

sses

1 &

10

build

ings

(N

B: T

his

incl

udes

a C

lass

2 b

uild

ing

com

pris

ing

2 dw

ellin

gs o

nly)

.ap

plic

atio

n fe

e25

0 pe

r dw

ellin

gF

Cla

ss 2

to 9

bui

ldin

gsw

here

floo

r ar

ea o

r pa

rt d

oes

not e

xcee

d 20

0 m

2ap

plic

atio

n fe

e25

0.00

Fw

here

floo

r ar

ea b

etw

een

200

- 2,

000

m2

= $

210

+ $

0.50

per

m2

over

200

m2

appl

icat

ion

fee

250

plu

s 0.

5 pe

r m

2 ov

er 2

00m

2 F

whe

re fl

oor

area

ove

r 2,

000

m2

= $

1,16

5 +

$0.

075

per

m2

over

2,0

00 m

2ap

plic

atio

n fe

eT

able

FP

art o

f bui

ldin

g co

nsis

ting

of a

n ex

tern

al w

all o

nly

or n

ot o

ther

wis

e ha

ving

a fl

oor

area

appl

icat

ion

fee

250.

00

F

Add

ition

al In

spec

tion

Fee

per

insp

ectio

n90

.00

F

Cop

y of

Bui

ldin

g C

ertif

icat

epe

r ce

rtifi

cate

13.0

0

FA

dditi

onal

fees

may

app

ly a

s pe

r cl

ause

260

Issu

e of

Bui

ldin

g C

onst

ruct

ion

& C

ompl

ying

Dev

elop

men

t Cer

tific

ate

rela

ted

to b

uild

ing

cost

:A

dmin

istr

atio

n F

eepe

r ce

rtifi

cate

150.

00

B

Plu

s a

% o

f the

bui

ldin

g co

st

Up

to $

5,00

0bu

ildin

g co

st 0

.6%

of c

ost

B$5

,001

to $

100,

000

build

ing

cost

(i)

+ 0

.5%

for

next

$95

,000

B

$100

,001

to $

250,

000

build

ing

cost

(i)

+ (

ii) +

0.4

% fo

r ne

xt $

150,

000

B$2

50,0

01 to

$1,

000,

000

build

ing

cost

(i)

+(ii

)+(ii

i)+ 0

.2%

for

amou

nt o

ver

$750

,000

B

$1,0

00,0

01 +

build

ing

cost

(i)+

(ii)+

(iii)+

(iv)+

0.1

% fo

r am

ount

ov

er $

1,00

0,00

0

B

Urg

ency

Fee

(C

ertif

icat

e to

be

supp

lied

with

in 5

wor

king

day

s)pe

r ce

rtifi

cate

per

hou

r or

par

t the

reof

$11

0.00

B

Che

ck C

ompl

ianc

e w

ith B

AS

IX C

ertif

icat

eA

ltera

tions

and

Add

ition

spe

r ch

eck

233.

00

B

New

Dw

ellin

g H

ouse

per

chec

k58

3.00

BR

esid

entia

l Fla

t Bui

ldin

g (6

or

less

flat

s)pe

r ch

eck

873.

00

B

Res

iden

tial F

lat B

uild

ing

(gre

ater

than

6 fl

ats)

per

chec

k1,

164.

00

BM

ixed

Dev

elop

men

tpe

r ch

eck

1,16

4.00

B

Fee

rep

rese

nts

the

max

imum

cha

rge

and

may

be

varie

d at

the

disc

retio

n of

the

Cem

eter

y M

anag

er w

ith th

e ap

prov

al o

f Cou

ncil’

s G

ener

al M

anag

er.

(6)

Dep

ende

nt o

n th

e le

ngth

of r

esea

rch

requ

ired

and

the

type

of i

nfor

mat

ion

requ

este

d.

Fee

rep

rese

nts

the

max

imum

cha

rge

and

may

be

varie

d fo

r bo

na fi

de e

duca

tiona

l gro

ups

at th

e di

scre

tion

of th

e C

emet

ery

Man

ager

with

the

appr

oval

of C

ounc

il’s

Gen

eral

Man

ager

.

(7)

Bus

ines

s H

ours

: 9.

00am

– 5

.00p

m M

onda

y to

Frid

ay o

r as

at t

he d

iscr

etio

n of

the

Cem

eter

y M

anag

er.

Not

e: W

here

the

issu

e of

a C

onst

ruct

ion

Cer

tific

ate

invo

lves

a “

perf

orm

ance

bas

ed s

olut

ion”

to s

atis

fy th

e B

uild

ing

Cod

e of

Aus

tral

ia a

n ad

ditio

nal f

ee m

ay a

pply

.

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es12

Page 14: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

Sub

divi

sion

s C

ertif

icat

eLa

nd S

ubdi

visi

on

App

licat

ion

fee

appl

icat

ion

fee

600.

00

E

Add

ition

al a

pplic

atio

n fe

e fo

r ea

ch lo

tap

plic

atio

n fe

e60

0.00

EB

ound

ary

adju

stm

ent s

ubdi

visi

on a

pplic

atio

n fe

eap

plic

atio

n fe

e32

0.00

EIn

form

atio

n to

sup

port

sub

divi

sion

app

licat

ion

to th

e R

egis

trar

Gen

eral

appl

icat

ion

fee

320.

00

E

Str

ata

Sub

divi

sion

sA

pplic

atio

n fe

eap

plic

atio

n fe

e60

0.00

EA

dditi

onal

app

licat

ion

fee

for

each

lot

appl

icat

ion

fee

600.

00

E

“Cer

tific

ate

of C

ounc

il” r

equi

red

by L

and

Titl

es O

ffic

e fo

r la

nd s

ubdi

visi

on n

ot r

equi

ring

Cou

ncil

app

rova

lpe

r ce

rtifi

cate

B

Occ

upat

ion

Cer

tific

ates

App

licat

ion

fee

appl

icat

ion

fee

116.

00

B

Insp

ectio

n fe

e (if

not

incl

uded

in B

uild

ing

Insp

ectio

n F

ee)

pe

r ho

ur o

r pa

rt th

ereo

f90

.00

B

Pla

nnin

g C

ertif

icat

es S

ectio

n 14

9N

orm

al S

ervi

ce 4

- 7

day

sS

ectio

n 14

9 (2

)pe

r ce

rtifi

cate

53.0

0

FS

ectio

n 14

9 (2

) an

d S

ectio

n 14

9 (5

)pe

r ce

rtifi

cate

133.

00

F

Urg

ent -

with

in 2

4 ho

urs

- F

ee is

in a

dditi

on to

app

licat

ion

fee

per

cert

ifica

te10

0.00

C

Reg

iste

r of

Cer

tific

ates

(by

Priv

ate

Cer

tifie

rs)

- C

onst

ruct

ion,

Com

plyi

ng d

evel

opm

ent a

nd O

ccup

atio

n C

ertif

icat

es &

Fee

cha

nged

by

Reg

ulat

ion

adm

inis

trat

ion

fee

36.0

0

F

Sec

tion

735A

LG

A &

121

ZP

EP

&A

Cer

tific

ates

– G

ivin

g In

form

atio

n –

Out

stan

ding

Not

ices

per

cert

ifica

teB

Chi

ld C

are

Ser

vice

s

Chi

ld C

are

Cen

tres

Max

imum

dai

ly fe

e –

child

ren

unde

r 2

year

s ol

dpe

r da

y84

.00

C

Max

imum

dai

ly fe

e –

child

ren

2 to

5 y

ears

old

pe

r da

y80

.00

C

Wai

ting

List

Fee

per

child

10.0

0

CE

nrol

men

t Fee

per

fam

ily80

.00

C

Late

Pic

k-up

Fee

- a

fter

clos

ing

time

per

min

ute

2.00

C

Not

e: T

he a

bove

sca

le o

f cha

rges

is s

ubje

ct to

adj

ustm

ents

in a

ccor

danc

e w

ith a

form

ula

dete

rmin

ed b

y th

e C

omm

onw

ealth

Dep

artm

ent o

f Fam

ilies

, Com

mun

ity S

ervi

ces

& In

dige

nous

Affa

irs.

Fiv

e pl

aces

, on

redu

ced

hour

s (8

.30a

m-4

.30p

m)

are

prov

ided

at B

ront

e C

hild

Car

e.

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es13

Page 15: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

Fam

ily D

ay C

are

– D

aily

rat

es:

Reg

istr

atio

n F

ee (

paya

ble

at in

terv

iew

)pe

r re

gist

ratio

n80

.00

B

Min

imum

Fee

(se

ven

hour

s or

less

)

per

day

70.0

0

BC

ore

hour

s (8

am-6

pm)

Mon

to F

ri

pe

r ho

ur8.

00

BE

xten

ded

Hou

rs C

are

(out

side

8am

to 6

pm)

Mon

to F

ri

pe

r ho

ur8.

00

BO

vern

ight

car

e by

spe

cial

neg

otia

tion

with

car

erpe

r ni

ght

62.0

0

BS

atur

days

per

hour

18.0

0

BS

unda

ys

pe

r ho

ur20

.00

B

Bef

ore

& A

fter

Sch

ool C

are

pe

r ho

ur7.

00

BM

eals

ea

ch3.

00

BS

nack

s

each

2.00

B

Abs

ent d

ays

due

to il

lnes

s or

oth

er r

easo

nsF

ull f

ee a

pplie

sF

ull f

ee a

pplie

sB

Adm

inis

trat

ion

Levy

per

day/

child

5.00

B

Car

er L

evy

% o

f Car

er's

dai

ly fe

e6.

00%

BW

aitin

g Li

st F

eepe

r ch

ild10

.00

B

Adm

inis

trat

ion

fee

for

late

/ inc

ompl

ete

time

shee

tsea

ch10

.00

B

Car

er R

egis

trat

ion

Pac

kage

(in

clud

es p

olic

y fo

lder

, Reg

ulat

ions

doc

umen

ts, r

ecei

pt b

ook

etc)

per

Car

er r

egis

trat

ion

200.

00

B

Ear

ly/ L

ate

Fee

: P

aren

ts w

ill b

e lia

ble

for

a fe

e fo

r ar

rivin

g be

fore

or

afte

r co

ntra

cted

hou

rspe

r ho

ur o

r pa

rt th

ereo

f18

.00

B

Re-

regi

stra

tion

Fee

per

care

r50

.00

B

Fitn

ess

Tra

inin

g U

se o

f Pub

lic O

pen

Spa

ces

Gen

eral

Adm

inis

trat

ion

Fee

(al

l app

licat

ions

are

non

ref

unda

ble)

per

appl

icat

ion

150.

00

B1-

2 pa

rtic

ipan

ts (

non-

stat

ic g

roup

, no

equi

pmen

t) A

dmin

istr

atio

n F

ee o

nly

per

year

150.

00

E

Bon

di P

ark,

Bro

nte

Par

k, H

unte

r P

ark,

Mar

ks P

ark,

Tam

aram

a P

ark,

Wav

erle

y P

ark

Org

anis

ed o

r co

mm

erci

al fi

tnes

s gr

oups

and

per

sona

l tr

aine

rs1-

6 pa

rtic

ipan

ts (

fixed

loca

tion,

equ

ipm

ent)

per

year

550.

00

E7-

12 p

artic

ipan

ts (

fixed

loca

tion,

equ

ipm

ent)

per

year

1,32

0.00

E13

-18

part

icip

ants

(fix

ed lo

catio

n, e

quip

men

t)pe

r ye

ar2,

040.

00

�E

Bar

racl

uff P

ark,

Dia

mon

d B

ay R

eser

ve, D

udle

y P

age

Res

erve

, Hug

h B

amfo

rd R

eser

ve, R

odne

y R

eser

ve,

Upp

er D

icks

on R

eser

ve, V

arna

Par

k

Org

anis

ed o

r co

mm

erci

al fi

tnes

s gr

oups

and

per

sona

l tr

aine

rs1-

6 pa

rtic

ipan

ts (

fixed

loca

tion,

equ

ipm

ent)

per

year

275.

00

E7-

12 p

artic

ipan

ts (

fixed

loca

tion,

equ

ipm

ent)

per

year

660.

00

E13

-18

part

icip

ants

(fix

ed lo

catio

n, e

quip

men

t)pe

r ye

ar1,

020.

00

�E

Chi

ld C

are

Ben

efit

may

be

avai

labl

e. T

his

prov

ides

ass

ista

nce

to e

ligib

le fa

mili

es fo

r ch

ild c

are

with

the

rate

of b

enef

it de

pend

ent o

n in

com

e. C

onta

ct th

e D

epar

tmen

t of E

duca

tion,

Em

ploy

men

t &

Wor

kpla

ce R

elat

ions

for

mor

e de

tails

(W

ebsi

te: w

ww

.dee

wr.

gov.

au)

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es14

Page 16: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

Com

mun

ity B

us(D

river

s ar

e re

quire

d to

hav

e a

curr

ent L

R D

river

s Li

cenc

e)R

ates

for

appr

oved

gro

ups

serv

icin

g fr

ail o

lder

peo

ple

and

peop

le w

ith a

dis

abili

ty13

Sea

ter

bus

D

aily

rat

epe

r da

y25

.00

B

20 S

eate

r, w

heel

chai

r ac

cess

ible

bus

D

aily

rat

epe

r da

y60

.00

B

Rat

es fo

r lo

cal o

rgan

isat

ions

pro

vidi

ng a

com

mun

ity s

ervi

ce13

Sea

ter

bus

Dai

ly r

ate

with

in th

e M

etro

polit

an a

rea

per

day

74.0

0

�B

Dai

ly r

ate

outs

ide

the

Met

ropo

litan

are

ape

r da

y96

.00

BW

eeke

nd r

ate

with

in th

e M

etro

polit

an a

rea

Sat

urda

y an

d S

unda

y14

4.00

�B

Wee

kend

rat

e ou

tsid

e th

e M

etro

polit

an a

rea

Sat

urda

y an

d S

unda

y16

9.00

�B

20 S

eate

r, w

heel

chai

r ac

cess

ible

bus

Dai

ly r

ate

with

in th

e M

etro

polit

an a

rea

per

day

109.

00

BD

aily

rat

e ou

tsid

e th

e M

etro

polit

an a

rea

per

day

144.

00

BW

eeke

nd r

ate

with

in th

e M

etro

polit

an a

rea

Sat

urda

y an

d S

unda

y24

0.00

�B

Wee

kend

rat

e ou

tsid

e th

e M

etro

polit

an a

rea

Sat

urda

y an

d S

unda

y27

7.00

�B

Rat

es fo

r ot

her

loca

l org

anis

atio

ns13

Sea

ter

bus

Dai

ly r

ate

per

day

169.

00

EW

eeke

nd r

ate

Sat

urda

y an

d S

unda

y33

8.00

�E

20 S

eate

r, w

heel

chai

r ac

cess

ible

bus

Dai

ly r

ate

per

day

217.

00

EW

eeke

nd r

ate

Sat

urda

y an

d S

unda

y43

3.00

�E

A r

efun

dabl

e cl

eani

ng d

epos

it of

$50

will

be

char

ged

(cas

h on

ly).

Trip

s ou

tsid

e th

e m

etro

polit

an a

rea

are

subj

ect t

o ap

prov

al b

y C

ounc

il's

Fle

et M

anag

er.

Com

mun

ity G

arde

nP

lot L

icen

ce F

eepe

r ye

ar60

.00

B

Cul

tura

l Act

iviti

esB

ondi

Pav

ilion

Com

mun

ity C

ultu

ral C

entr

eP

otte

ry C

lass

es -

Fee

s ba

sed

on a

typi

cal 1

0 w

eeks

te

rmA

dult

- st

anda

rd c

harg

e ex

clud

ing

clay

per

head

180.

00 -

200

.00

�B

,EA

dult

- co

nces

sion

exc

ludi

ng c

lay

per

head

120.

00 -

140

.00

�B

,E

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es15

Page 17: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

Adu

lt -

casu

al e

xclu

ding

cla

ype

r he

ad24

.00

B,E

Chi

ld -

sta

ndar

d ch

arge

incl

udin

g cl

aype

r he

ad12

0.00

- 1

40.0

0�

B,E

Chi

ld -

con

cess

ion

incl

udin

g cl

aype

r he

ad80

.00

- 10

0.00

�B

,EC

hild

- c

asua

l inc

ludi

ng c

lay

per

head

15.0

0

�B

,E

Sch

ool H

olid

ay A

ctiv

ities

Wor

ksho

ps a

nd p

erfo

rman

ces

pe

r he

ad0.

00 -

300

.00

�B

,EC

once

ssio

npe

r he

ad0.

00 -

250

.00

�B

,E

Con

cert

s/ F

estiv

als

Ent

rype

r he

ad0.

00 -

40.

00�

B,E

Wor

ksho

ppe

r he

ad0.

00 -

30.

00�

B,E

Pro

ject

Wor

ksho

pspe

r he

ad10

.00

- 50

0.00

�B

,E

Str

orag

e cu

pboa

rd h

ire fe

epe

r w

eek

10 -

50.

00�

E

Mus

ic S

tudi

o eq

uipm

ent h

ireD

rum

kit

(cy

mba

ls, s

nare

dru

m a

nd k

ick

peda

l not

incl

uded

)pe

r se

ssio

n20

.00

EG

uita

r A

mp

per

sess

ion

20.0

0

�E

AV

equ

ipem

nt h

ireS

eagu

ll ro

om in

clud

ing

proj

ecto

rpe

r hi

re15

0 -

250

�E

Sea

gull

room

exc

ludi

ng p

roje

ctor

per

hire

100

- 20

0�

EH

igh

Tid

e ro

om

per

hire

50

- 15

0�

E

Por

tabl

e st

agin

g 2m

x 1

m x

.4m

sta

ging

pie

ces

(max

imum

of 2

0 pi

eces

)pe

r st

agin

g pi

ece

20.0

0

�E

Wav

erle

y Li

brar

yE

xhib

ition

sA

rt a

nd o

ther

exh

ibiti

ons

Sta

ndar

d in

stal

latio

n fe

e pe

r ex

hibi

tion

150.

00

B(T

hese

fees

may

be

varie

d by

the

Div

isio

nal M

anag

er, L

ibra

ry &

Cus

tom

er S

ervi

ces

depe

ndin

g on

the

natu

re a

nd s

cope

of t

he e

xhib

ition

)

Dev

elop

men

t App

licat

ions

Dev

elop

men

t App

licat

ion

Fee

sF

or d

evel

opm

ents

up

to $

5,00

0pe

r de

velo

pmen

t11

0.00

FF

or d

evel

opm

ents

not

invo

lvin

g th

e er

ectio

n of

a b

uild

ing

or c

arry

ing

out w

ork,

a s

ubdi

visi

on o

r de

mol

ition

per

deve

lopm

ent

285.

00

F

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es16

Page 18: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

Dev

elop

men

t for

whi

ch e

stim

ated

cos

t is:

-M

ore

than

$5,

001

but n

ot e

xcee

ding

$50

,000

(pl

us $

3.00

for

each

$1,

000

(or

part

of $

1,00

0) o

f the

es

timat

ed c

ost)

per

deve

lopm

ent

170.

00

F

Mor

e th

an $

50,0

01 b

ut n

ot e

xcee

ding

$25

0,00

0 (p

lus

$3.6

4 fo

r ea

ch $

1,00

0 (o

r pa

rt o

f $1,

000)

of t

he

estim

ated

cos

t)pe

r de

velo

pmen

t35

2.00

F

Exc

eedi

ng $

250,

000

but n

ot e

xcee

ding

$50

0,00

0 (p

lus

$2.3

4 fo

r ea

ch $

1,00

0 (o

r pa

rt o

f $1,

000)

of t

he

estim

ated

cos

t)pe

r de

velo

pmen

t1,

160.

00

F

Exc

eedi

ng $

500,

000

but n

ot e

xcee

ding

$1,

000,

000

(plu

s $1

.64

for

each

$1,

000

(or

part

of $

1,00

0) o

f the

es

timat

ed c

ost)

per

deve

lopm

ent

1,74

5.00

F

Exc

eedi

ng $

1,00

0,00

0 bu

t not

exc

eedi

ng $

10,0

00,0

00 (

plus

$1.

44 fo

r ea

ch $

1,00

0 (o

r pa

rt o

f $1,

000)

of

the

estim

ated

cos

t)pe

r de

velo

pmen

t2,

615.

00

F

Exc

eedi

ng $

10,0

00,0

00 (

plus

$1.

19 fo

r ea

ch $

1,00

0 (o

r pa

rt o

f $1,

000)

of t

he e

stim

ated

cos

t)pe

r de

velo

pmen

t15

,875

.00

F

(Fee

s in

clud

e pl

anF

irst f

ee s

et b

y P

lann

ing

NS

W fr

om

1 N

ovem

ber

2002

)

Dig

itisi

ng d

evel

opm

ent a

pplic

atio

n an

d m

akin

g D

A in

form

atio

n av

aila

ble

in a

n el

ectr

onic

form

at to

the

publ

ic (

in a

dditi

on to

dev

elop

men

t app

licat

ion

fee)

For

dev

elop

men

t cos

t of w

orks

to $

250,

000

per

deve

lopm

ent

60.0

0

BF

or d

evel

opm

ent c

ost o

f wor

ks fr

om $

250,

001

to $

500,

000

per

deve

lopm

ent

80.0

0

BF

or d

evel

opm

ent c

ost o

f wor

ks fr

om $

500,

001

to $

1,00

0,00

0pe

r de

velo

pmen

t17

0.00

BF

or d

evel

opm

ent c

ost o

f wor

ks fr

om $

1,00

0,00

1 to

$5,

000,

000

per

deve

lopm

ent

300.

00

B

For

dev

elop

men

t cos

t of w

orks

ove

r $5

,000

,000

per

deve

lopm

ent

500.

00

B

Des

igna

ted

deve

lopm

ent (

in a

dditi

on to

any

oth

er fe

e pa

yabl

e)pe

r de

velo

pmen

t80

0.00

B

Add

ition

al D

evel

opm

ent A

pplic

atio

n C

harg

es(a

) A

dver

tisin

g fe

e fo

r de

velo

pmen

ts r

equi

ring

publ

ic a

dver

tisin

g un

der

eith

er th

e LE

Ps

or D

CP

s

1,10

5.00

B

Fee

whe

re r

efer

rals

req

uire

d to

be

conv

eyed

to a

n ap

prov

al b

ody

(unl

ess

conc

urre

nce

assu

med

) 1

40.0

0 pl

us 3

20.0

0 pe

r re

ferr

al

F

(b)

(1)

Dev

elop

men

t App

licat

ions

whi

ch r

equi

re w

ritte

n no

tific

atio

n on

ly u

nder

the

DC

P

$190

B(b

) (2

) -

Dev

elop

men

t App

licat

ions

whi

ch r

equi

re w

ritte

n no

tific

atio

n an

d si

te n

otic

e un

der

the

DC

PP

er s

ervi

ce

250

.00

B(c

) A

men

dmen

ts to

a D

evel

opm

ent A

pplic

atio

n pl

us r

eadv

ertis

ing

fees

(ap

plic

able

onl

y w

here

Cou

ncil

agre

es

to a

ccep

t the

am

endm

ent)

Min

or a

men

dmen

ts 5

0% o

f orig

inal

fe

e ch

arge

d. M

ajor

am

endm

ents

10

0% o

f the

orig

inal

fee.

B

(d)

Mod

ifica

tion

to a

Dev

elop

men

t Con

sent

I. F

or S

96(1

)57

.00

F

II. F

or S

96 (

1A)

$645

or

50%

of t

he o

rigin

al d

evel

opm

ent a

pplic

atio

n fe

e, w

hich

ever

is th

e le

sser

.64

5.00

or

50%

F

III. F

or S

96 (

2) (

a) If

the

fee

for

the

orig

inal

app

licat

ion

was

less

than

$10

0, 5

0% o

f tha

t fee

, or

(b)

the

fee

for

the

orig

inal

app

licat

ion

was

$10

0 or

mor

e:-

F

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es17

Page 19: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

(i) In

the

case

of a

n ap

plic

atio

n w

ith r

espe

ct to

a d

evel

opm

ent a

pplic

atio

n th

at d

oes

not i

nvol

ve th

e er

ectio

n of

a b

uild

ing,

the

carr

ying

out

of a

wor

k or

the

dem

oliti

on o

f a w

ork

or b

uild

ing,

50%

of t

he

fee

for

the

orig

inal

dev

elop

men

t app

licat

ion,

and

(ii)

In th

e ca

se o

f an

appl

icat

ion

with

res

pect

to a

dev

elop

men

t app

licat

ion

that

invo

lves

the

erec

tion

of a

dw

ellin

g ho

use

with

an

estim

ated

cos

t of c

onst

ruct

ion

of $

100,

000

or le

ss, $

190,

and

190.

00

(iii)

In th

e ca

se o

f an

appl

icat

ion

with

res

pect

to a

ny o

ther

dev

elop

men

t app

licat

ion,

as

set o

ut in

the

Tab

le to

this

cla

use,

Plu

s an

add

ition

al a

mou

nt o

f not

mor

e th

an $

665

if no

tice

of th

e ap

plic

atio

n is

req

uire

d to

be

give

n un

der

sect

ion

96(2

) or

96A

A(1

) of

the

Act

.

665.

00

Est

imat

es C

ost:

Up

to $

5,00

058

.00

F

$5,0

01 -

$25

0,00

0$8

5 +

an

addi

tiona

l $1.

50 fo

r ea

ch

$1,0

00 (

or p

art o

f $1,

000)

of t

he

estim

ated

cos

t.F

$250

,001

- $

500,

000

$500

+ a

n ad

ditio

nal $

0.85

for

each

$1

,000

(or

par

t of $

1,00

0) b

y w

hich

th

e es

timat

ed c

ost e

xcee

ds $

250,

000.

F

$500

,001

- $

1,00

0,00

0$7

12 +

an

addi

tiona

l $0.

50 fo

r ea

ch

$1,0

00 (

or p

art o

f $1,

000)

by

whi

ch

the

estim

ated

cos

t exc

eeds

$50

0,00

0F

$1,0

00,0

01 -

$10

,000

,000

$987

+ a

n ad

ditio

nal $

0.40

for

each

$1

,000

(or

par

t of $

1,00

0) b

y w

hich

th

e es

timat

ed c

ost e

xcee

ds

$1,0

00,0

00

F

Mor

e th

an $

10,0

00,0

00$4

,737

+ a

n ad

ditio

nal $

0.27

for

each

$1

,000

(or

par

t of $

1,00

0) b

y w

hich

th

e es

timat

ed c

ost e

xcee

ds

$10,

000,

000

F

(e)

Fro

m 1

Jul

y 20

02 fe

e fo

r in

tegr

ated

dev

elop

men

t (re

ferr

al to

an

auth

ority

for

advi

ce b

y ap

prov

al b

ody

$250

) th

e ad

ditio

nal f

ee o

f $11

0 is

pay

able

to e

ach

conc

urre

nce

auth

ority

. (T

hese

fees

are

not

pay

able

if

conc

urre

nce

can

be a

ssum

ed).

-

F

(f)

The

max

imum

fee

for

requ

ests

for

reco

nsid

erat

ion

of d

ecis

ions

in r

espe

ct o

f dev

elop

men

t app

licat

ions

that

ha

ve b

een

dete

rmin

ed u

nder

Sec

tion

82A

(3)

-

F

(i) in

the

case

of a

req

uest

with

res

pect

to a

dev

elop

men

t app

licat

ion

that

doe

s no

t inv

olve

the

erec

tion

of a

bu

ildin

g, th

e ca

rryi

ng o

ut o

f a w

ork

or th

e de

mol

ition

of a

wor

k or

bui

ldin

g, 5

0 pe

r ce

nt o

f the

fee

for

the

orig

inal

de

velo

pmen

t app

licat

ion,

and

-

F

(ii)

in th

e ca

se o

f a r

eque

st w

ith r

espe

ct to

a d

evel

opm

ent a

pplic

atio

n th

at in

volv

es th

e er

ectio

n of

a d

wel

ling-

hous

e w

ith a

n es

timat

ed c

ost o

f con

stru

ctio

n of

$10

0,00

0 or

less

, $15

0, a

nd

190.

00

F

(iii)

in th

e ca

se o

f a r

eque

st w

ith r

espe

ct to

any

oth

er d

evel

opm

ent a

pplic

atio

n, a

s se

t out

in th

e T

able

to th

is

clau

se,

-

F

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es18

Page 20: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

plus

an

addi

tiona

l am

ount

of n

ot m

ore

than

$50

0 if

notic

e of

the

appl

icat

ion

is r

equi

red

to b

e gi

ven

unde

r se

ctio

n 82

A o

f the

Act

. 62

0.00

F

Est

imat

es C

ost:

-

U

p to

$5,

000

60.0

0

F$5

,001

- $

250,

000

$85,

plu

s an

add

ition

al $

1.50

for

each

$1

,000

(or

par

t of $

1,00

0) o

f the

es

timat

ed c

ost.

F

$250

,001

- $

500,

000

$500

, plu

s an

add

ition

al $

0.85

for

each

$1,

000

(or

part

of $

1,00

0) b

y w

hich

the

estim

ated

cos

t exc

eeds

$2

50,0

00.

F

$500

,001

- $

1,00

0,00

0$7

12, p

lus

an a

dditi

onal

$0.

50 fo

r ea

ch $

1,00

0 (o

r pa

rt o

f $1,

000)

by

whi

ch th

e es

timat

ed c

ost e

xcee

ds

$500

,000

.

F

$1,0

00,0

01 -

$10

,000

,000

$987

, plu

s an

add

ition

al $

0.40

for

each

$1,

000

(or

part

of $

1,00

0) b

y w

hich

the

estim

ated

cos

t exc

eeds

$1

,000

,000

.

F

Mor

e th

an $

10,0

00,0

00$4

,737

, plu

s an

add

ition

al $

0.27

for

each

$1,

000

(or

part

of $

1,00

0) b

y w

hich

the

estim

ated

cos

t exc

eeds

$1

0,00

0,00

0.

F

(g)

An

addi

tiona

l dev

elop

men

t app

licat

ion

fee

will

be

char

ged

for

appl

icat

ions

that

are

req

uire

d to

be

refe

rred

to

a J

oint

Reg

iona

l Pla

nnin

g P

anel

(JR

PP

). A

s de

term

ined

by

the

Min

iste

r fo

r P

lann

ing

F

Res

iden

tial f

lat d

evel

opm

ent

Add

ition

al fe

e pa

yabl

e fo

r de

velo

pmen

t whi

ch is

req

uire

d to

be

refe

rred

to a

des

ign

revi

ew p

anel

76

0.00

B

Dev

elop

men

t App

licat

ions

Lis

tings

:M

onth

ly56

.00

BA

nnua

lly56

0.00

�B

Pre

-Lod

gem

ent D

evel

opm

ent A

pplic

atio

n –

Ass

essm

ent/

Adv

ice

Fee

Sin

gle

dwel

ling

or d

ual o

ccup

ancy

(C

lass

1 &

10)

550.

00

BM

ultiu

nit/

mix

ed/ c

omm

erci

al u

p to

$50

0,00

055

0.00

�B

Mul

tiuni

t/ m

ixed

/ com

mer

cial

up

to $

500,

001

- $1

m75

0.00

�B

Mul

tiuni

t/ m

ixed

/ com

mer

cial

up

to $

1m -

$5m

1,00

0.00

BM

ultiu

nit/

mix

ed/ c

omm

erci

al u

p to

ove

r $5

m2,

000.

00

�B

Site

Spe

cific

Dev

elop

men

t Con

trol

s/ G

uide

lines

S

ite s

peci

fic c

ontr

ols

gene

rate

d by

ext

erna

l con

sulta

nts

whi

ch r

equi

re g

uide

danc

e, a

dvis

e an

d as

sess

men

t by

Cou

ncil

prio

r to

ado

ptio

n w

ithin

the

DC

P.

Min

or (

App

licat

ions

gen

eral

ly n

ot c

ompl

ex o

r co

nten

tious

)5,

408.

00

CP

repa

ratio

n of

site

spe

cific

con

trol

s/ g

uide

lines

10

,816

.00

C

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es19

Page 21: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

Dev

elop

men

t App

licat

ion

Fee

s fo

r S

ubdi

visi

ons

Land

Sub

divi

sion

App

licat

ion

(not

incl

udin

g a

new

roa

d)33

0.00

F�

Plu

s $5

3.00

per

add

ition

al r

egul

atio

n al

lotm

ent c

reat

ed53

.00

F

Bou

ndar

y ad

just

men

t (no

add

ition

al a

llotm

ents

)17

0.00

FS

trat

a S

ubdi

visi

on A

pplic

atio

n –

Dev

elop

men

t App

licat

ion

330.

00

F

� P

lus

$65.

00 p

er r

egul

atio

n al

lotm

ent

65.0

0

FD

evel

opm

ent A

pplic

atio

n R

epro

duct

ion

Cha

rges

A4

size

pho

toco

py (

per

page

)2.

00

BA

3 si

ze p

hoto

copy

(pe

r pa

ge)

3.00

B

A2

size

cop

y (p

er s

heet

)27

.00

B

A1

size

cop

y (p

er s

heet

)33

.00

B

Cer

tifie

d co

py o

f a d

ocum

ent,

map

or

plan

53.0

0

F

Film

ing

and

Pho

togr

aphy

in P

ublic

Ope

n S

pace

s

Film

ing

in P

ublic

Ope

n S

pace

s (in

acc

orda

nce

with

Loc

al G

over

nmen

t Film

ing

Pro

toco

l)*f

ees

may

be

wai

ved

or r

educ

ed in

acc

orda

nce

with

the

Loca

l Gov

ernm

ent F

ilmin

g P

roto

col 2

009

- to

be

dete

rmin

ed b

y th

e D

irect

or*m

ajor

rev

isio

ns to

a fi

lmin

g ap

plic

atio

n w

ill in

cur

a su

rcha

rge

of 7

5% o

f orig

inal

app

licat

ion

fee

App

licat

ion

Fee

(no

n re

fund

able

)U

ltra

Low

impa

ct (

Gen

eral

ly le

ss th

an 1

0 cr

ew, 1

cam

era,

1 s

ound

, 1 li

ght -

not

on

the

road

)pe

r ap

plic

atio

n-

�F

Low

Impa

ct (

11-2

5 cr

ew, m

inim

al v

ehic

les,

min

imal

equ

ipm

ent/

light

ing,

sm

all u

nit b

ase)

per

appl

icat

ion

150.

00

FM

ediu

m Im

pact

(26

-50

crew

, max

10

truc

ks, s

ome

equi

pmen

t, un

it ba

se)

per

appl

icat

ion

300.

00

FH

igh

Impa

ct (

Mor

e th

an 5

0 cr

ew, m

ore

than

10

truc

ks, s

igni

fican

t con

stru

ctio

n, e

xten

sive

equ

ipm

ent,

larg

e un

it ba

se)

per

appl

icat

ion

500.

00

F

App

licat

ion

fee

for

park

ing

plan

s an

d/ o

r ba

se p

lans

on

priv

ate

prop

erty

(in

add

ition

to a

bove

fees

)pe

r ap

plic

atio

n15

0.00

�F

Adm

inis

trat

ion

of p

roce

ssin

g tr

affic

man

agem

ent p

lans

(no

n re

fund

able

)Lo

w Im

pact

per

appl

icat

ion

100.

00

FM

ediu

m Im

pact

per

appl

icat

ion

300.

00

FH

igh

Impa

ct -

to b

e ne

gotia

ted

base

d up

on C

ounc

ils r

oad

clos

ure

fees

per

appl

icat

ion

Neg

otia

ted

�C

Add

ition

al F

ees

Com

pens

atio

n fe

e (f

ilmin

g >

3 d

ays

and/

or

sign

ifica

nt d

isru

ptio

n to

res

iden

ts/ p

ublic

)N

egot

iate

d�

CE

xclu

sive

use

of a

n ar

eaP

er h

our

300.

00 to

500

.00

�C

Veh

icle

Mile

age

per

kilo

met

re$0

.45

�C

Util

ities

acc

ess

incl

udin

g E

lect

ricity

and

Wat

erF

ee fo

r se

rvic

eC

ost

�C

Site

pre

para

tion

Fee

for

serv

ice

Cos

t�

CS

uper

visi

on d

urin

g no

rmal

wor

king

hou

rsP

er h

our

Cos

t�

CS

uper

visi

on a

fter

hour

sP

er h

our

Cos

t�

CS

ite v

isit/

insp

ectio

n/ r

esea

rch

(incl

udin

g be

fore

app

rova

l and

afte

r fil

m m

akin

g ta

kes

plac

e)P

er h

our

Cos

t�

C

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es20

Page 22: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

Rev

enue

fore

gone

for

park

ing

Neg

otia

ted

Neg

otia

ted

�C

Cle

anin

gF

ee fo

r se

rvic

eC

ost

�C

Was

te M

anag

emen

tF

ee fo

r se

rvic

eC

ost

�C

Site

rem

edia

tion

Neg

otia

ted

Neg

otia

ted

�C

Sta

ff S

uppo

rtP

er h

our

Cos

t�

CP

ublic

adv

ertis

ing/

con

sulta

tion

Fee

for

serv

ice

Cos

t�

CS

ecur

ityP

er h

our

Cos

t�

CA

cces

s F

ee fo

r se

rvic

eC

ost

�C

Wat

er s

afet

yF

ee fo

r se

rvic

eC

ost

�C

Tra

ffic

cont

rol

Fee

for

serv

ice

Cos

t�

CB

ond/

dam

age

depo

sit (

Ref

unda

ble)

- D

eter

min

ed o

n ca

se b

y ca

se b

asis

0.00

- 5

,000

.00

GO

ther

fees

in a

dditi

on to

thos

e ab

ove

may

be

char

ged

on a

cos

t rec

over

y ba

sis

depe

ndin

g up

on th

e ap

plic

atio

n re

ceiv

edF

ee fo

r se

rvic

eC

ost

�C

Pho

togr

aphy

/ Stil

ls (

Com

mer

cial

) in

Pub

lic O

pen

Spa

ces

App

licat

ion

Fee

Lo

w Im

pact

(Le

ss th

an 1

0 pe

ople

)pe

r ap

plic

atio

n15

6.00

�D

Med

ium

Impa

ct (

11-2

5 pe

ople

)pe

r ap

plic

atio

n20

7.00

�D

Hig

h Im

pact

and

/ or

excl

usiv

e us

e (2

5+pe

ople

)pe

r ap

plic

atio

n31

1.00

�D

Loca

tion

Fee

(ot

her

than

Bon

di, B

ront

e T

amar

ama

bea

ches

and

par

ks)

Low

Impa

ct (

Less

than

10

peop

le)

per

hour

78.0

0

�D

Med

ium

Impa

ct (

11-2

5 pe

ople

)pe

r ho

ur10

4.00

�D

Hig

h Im

pact

and

/ or

excl

usiv

e us

e (2

5+pe

ople

)pe

r ho

ur15

5.00

�D

Loca

tion

Fee

Bon

di, B

ront

e an

d T

amar

ama

beac

hes

and

par

ksLo

w Im

pact

(Le

ss th

an 1

0 cr

ew)

per

hour

104.

00

DM

ediu

m Im

pact

(11

-25

crew

)pe

r ho

ur20

7.00

�D

Hig

h Im

pact

and

/ or

excl

usiv

e us

e (2

5+cr

ew)

per

hour

310.

00

D

Add

ition

al F

ees

Com

pens

atio

n fe

e (p

hoto

grap

hy >

3 d

ays

and/

or

sign

ifica

nt d

isru

ptio

n to

res

iden

ts/ p

ublic

)N

egot

iate

dN

egot

iate

d�

DS

ite p

repa

ratio

n F

ee fo

r se

rvic

eC

ost

�C

Sup

ervi

sion

dur

ing

norm

al w

orki

ng h

ours

Per

hou

rC

ost

�C

Sup

ervi

sion

afte

r ho

urs

Per

hou

rC

ost

�C

Site

vis

it/ in

spec

tion/

res

earc

h (in

clud

ing

befo

re a

ppro

val a

nd a

fter

phot

ogra

phy

take

s pl

ace)

Per

hou

rC

ost

�C

Tra

ffic

cont

rol

Fee

for

serv

ice

Cos

t�

CO

ther

fees

in a

dditi

on to

thos

e ab

ove

may

be

char

ged

depe

ndin

g up

on th

e ap

plic

atio

n re

ceiv

edN

egot

iate

dN

egot

iate

d�

DS

tude

nts,

non

-pro

fit o

rgan

isat

ions

, gov

ernm

ent a

uth

oriti

es a

nd r

egis

tere

d ch

ariti

es a

pplic

atio

n fe

e on

ly (

docu

men

tatio

n re

quire

d)

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es21

Page 23: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

Libr

ary

Ser

vice

s

Libr

ary

Cha

rges

Boo

k re

serv

atio

ns -

item

s in

sto

ck2.

00

BB

ook

rese

rvat

ions

- it

ems

not i

n st

ock

4.00

B

Rep

lace

men

t Bor

row

er C

ards

- A

dults

4.00

B

Rep

lace

men

t Bor

row

er C

ards

- C

hild

ren

3.00

B

- U

SB

sto

rage

dev

ice

per

US

B 1

0.00

- 1

6.00

dep

endi

ng o

n ca

paci

ty

�B

- A

4 pa

per

per

shee

tpe

r pa

ge0.

20�

E -

Pen

spe

r pe

n2.

00 -

4.0

0�

B -

Hea

dset

spe

r he

adse

t4.

00 -

10.

00�

BLi

brar

y M

icro

film

/fich

e pr

intin

g B

lack

& W

hite

per

copy

0.60

�E

Libr

ary

Act

iviti

es –

boo

king

fee

per

book

ing

base

d on

act

ivity

6.00

- 5

0.00

BLi

brar

y C

arry

Bag

spe

r ba

g3.

00 -

10.

00�

BLo

st o

r D

amag

ed It

ems

- A

t the

dis

cret

ion

of th

e Li

brar

y M

anag

er, o

r se

nior

mem

ber

of s

taff

in c

harg

e, th

e co

st o

f rep

lace

men

t, or

mak

ing

good

dam

age

to a

ny A

dult

Libr

ary

item

sho

uld

be:-

(a)

In

the

even

t of r

epla

cem

ent i

tem

s, th

e ac

tual

cos

t of t

he it

em, p

lus

$8.0

0 pr

oces

sing

fee,

with

a

scal

e of

min

imum

cha

rges

, inc

lusi

ve o

f the

pro

cess

ing

fee,

bei

ng:

·

R

efer

ence

and

Loc

al H

isto

rype

r ite

m52

.00

C

·

R

efer

ence

Fol

iope

r ite

m73

.00

C

·

N

on-F

ictio

n (in

c Q

uart

o)pe

r ite

m31

.00

C

·

F

ictio

npe

r ite

m31

.00

C

·

L

arge

Prin

tpe

r ite

m31

.00

C

·

P

aper

back

s (P

B)

per

item

12.0

0

DV

D’s

per

item

20.0

0

Com

pact

Dis

cspe

r ite

m20

.00

C

·

J

ourn

als

per

item

12.0

0

CN

.B.

The

rep

lace

men

t cos

t for

Chi

ldre

n’s

Libr

ary

item

s –

cost

of i

tem

plu

s $8

.00

adm

inis

trat

ive

fee.

Inte

r Li

brar

y Lo

ans

& C

harg

es in

curr

ed fr

om o

ther

libr

arie

s ar

e pa

ssed

on

to b

orro

wer

As

char

ged

by o

ther

libr

arie

s C

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es22

Page 24: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

(b)

Ite

ms

that

hav

e no

pro

cess

ing

fee:

Dam

aged

boo

kspe

r ite

m5.

00

ILL

Jack

ets

per

item

5.00

C

Aud

io V

isua

l Mat

eria

l:-R

epla

cem

ent c

ase/

hang

up

bag

pe

r ite

m5.

00

CR

epla

cem

ent b

arco

de/R

FID

tag

pe

r ite

m3.

00

CR

epla

cem

ent c

ase

for

Kit

per

item

10.

00

C

(c)

In

the

even

t of p

artia

l dam

age

the

estim

ated

tota

l cos

ts o

f rep

air

or r

ebin

ding

.C

Ove

rdue

Item

s-

Firs

t not

ice

3.00

B

- S

econ

d no

tice

6.00

B

Ref

eren

ce/ L

ocal

Stu

dies

Ser

vice

sLo

cal S

tudi

es H

erita

ge L

eafle

ts

- P

er s

heet

0.20

B

- F

ull s

et10

.00

B

- C

emet

ery

Wal

k O

nly

1.00

B

Ref

eren

ce/ L

ocal

Stu

dies

Inqu

iries

-

Sea

rchi

ng o

f orig

inal

res

ourc

es o

wne

d or

con

trol

led

by W

aver

ley

Cou

ncil

(eg,

rat

e bo

oks,

min

utes

, ce

met

ery

book

s, m

aps)

. (In

clud

es p

hoto

copy

ing

of u

p to

10

page

s th

en 2

0 ce

nts

per

page

).

Ext

ende

d re

sear

ch fo

r co

mm

unity

pur

pose

sA

Ext

ende

d re

sear

ch fo

r co

mm

unity

pur

pose

s -

mor

e th

an 2

hou

rs30

.00

B

Ext

ende

d re

sear

ch fo

r co

mm

erci

al p

urpo

ses

- pe

r 2

hour

s or

par

t the

reof

30.0

0

C

(d)

Ref

eren

ce L

ibra

ry –

Fax

Ser

vice

Out

goin

g Lo

cal

per

page

1.00

C

Out

goin

g S

TD

pe

r pa

ge2.

00

CO

utgo

ing

Ove

rsea

spe

r pa

ge4.

00

CIn

com

ing

for

each

5 p

ages

or

part

1.

00

C

Ref

eren

ce L

ibra

ry –

Sca

nnin

g S

ervi

cepe

r pa

ge1.

00

C

Mai

nten

ance

and

Rep

air

of C

ounc

il P

rope

rty

Roa

d O

peni

ng P

erm

its &

Con

trib

utio

ns to

Cos

t of R

oad

Wor

kR

oads A

spha

ltic

conc

rete

on

road

bas

e pe

r m

2 or

par

t36

0.00

CA

spha

ltic

conc

rete

with

con

cret

e ba

se

per

m2

or p

art

800.

00

C

Con

cret

e (2

00m

m)

per

m2

or p

art

620.

00

C

Larg

e w

orks

As

per

nego

tiate

d pr

ice

with

Div

isio

nal

Man

ager

Mai

nten

ance

& C

onst

ruct

ion

C

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es23

Page 25: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

Foo

tpat

hsC

oncr

ete

per

m2

or p

art

245.

00

C

Asp

halt

per

m2

or p

art

195.

00

C

Asp

halt

& B

andi

ngpe

r m

2 or

par

t28

0.00

CB

lock

pav

ing

per

m2

or p

art

620.

00

C

Blo

ck p

avin

g on

con

cret

e ba

sepe

r m

2 or

par

t72

0.00

CC

oncr

ete

(exp

osed

agg

rega

te)

(min

imum

cha

rge

$3,2

40)

per

m2

or p

art

370.

00

C

Con

cret

e re

side

ntia

l driv

eway

s (1

00m

m)

per

m2

or p

art

330.

00

C

Con

cret

e in

dust

rial d

rivew

ays

(150

mm

)pe

r m

2 or

par

t44

5.00

CC

oncr

ete

indu

stria

l driv

eway

s (2

00m

m)

per

m2

or p

art

620.

00

C

Gra

ss a

rea

per

m2

or p

art

150.

00

C

Larg

e w

orks

per

m2

or p

art

As

per

nego

tiate

d pr

ice

with

D

ivis

iona

l Man

ager

Mai

nten

ance

&

Con

stru

ctio

n C

Ker

b &

Gut

ter

per

met

re (

or p

art t

here

of)

Con

cret

e ke

rb a

nd g

utte

rpe

r m

or

part

310.

00

C

Ker

b ou

tlet

per

hole

130.

00

C

Larg

e w

orks

pe

r m

or

part

A

s pe

r ne

gotia

ted

pric

e w

ith

Div

isio

nal M

anag

er M

aint

enan

ce &

C

onst

ruct

ion

C

Cam

pbel

l Par

ade

– w

este

rn s

ide/

Lam

rock

Ave

nue

to W

airo

a A

venu

eC

ircul

ar A

rt W

orks

Mar

ket R

epla

cem

ent C

ost :

sec

urity

dep

osit

in th

e fo

rm o

f an

unco

nditi

onal

Ban

k G

uara

ntee

per

item

1,03

0.00

G

Oxf

ord

Str

eet M

all

Blo

ck P

avin

g on

con

cret

e (m

inim

um c

harg

e $1

700)

per

m2

or p

art

870.

00

C

Ope

ning

in v

icin

ity o

f Art

wor

ks (

Insp

ectio

n re

quire

d)O

n ap

plic

atio

nC

Mea

ls o

n W

heel

s

All

stan

dard

mea

ls (

eg, c

hille

d, fr

ozen

)pe

r m

eal

6.00

- 7

.00

BS

peci

alis

ed m

eals

(in

clud

ing

gour

met

& m

ultic

ultu

ral m

eals

)pe

r m

eal

6.00

- 1

2.50

BS

hopp

ing

Ser

vice

- In

tern

et, L

ist o

r A

ssis

ted

Sho

ppin

g*pe

r de

liver

y4.

00 -

12.

00B

*Act

ual c

ost d

epen

ds o

n ty

pe o

f sho

ppin

g se

rvic

e pr

ovid

ed(M

eals

On

Whe

els

char

ges

may

incr

ease

due

to p

rices

from

sup

plie

rs).

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es24

Page 26: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

Par

king

Bea

ch P

arki

ng P

erm

itsC

once

ssio

n (P

ensi

oner

, You

th A

llow

ance

, Sen

ior

and

Gol

d V

eter

ans

Car

d H

olde

rs)

- 6

mon

th p

erm

itpe

r pe

rmit

56.0

0�

BC

once

ssio

n (P

ensi

oner

, You

th A

llow

ance

, Sen

ior

and

Gol

d V

eter

ans

Car

d H

olde

rs)

- 12

mon

th p

erm

itpe

r pe

rmit

80.0

0�

BW

aver

ley

Rat

epay

ers

or R

esid

ents

- 6

mon

th p

erm

itpe

r pe

rmit

74.0

0

�B

Wav

erle

y R

atep

ayer

s or

Res

iden

ts -

12

mon

th p

erm

itpe

r pe

rmit

107.

00

BN

on W

aver

ley

Res

iden

ts -

12

mon

th p

erm

itpe

r pe

rmit

1,37

5.00

EN

on W

aver

ley

Res

iden

ts -

3 m

onth

per

mit

per

perm

it34

5.00

�E

Rep

lace

men

t of l

ost p

erm

it/ a

cces

s ca

rdpe

r pe

rmit/

acc

ess

card

107.

00

D

Res

iden

tial P

arki

ng P

erm

its

Reg

istr

atio

n -

Val

id fo

r 6

mon

ths

1st p

erm

it (s

ingl

e re

gist

ratio

n) w

here

ther

e ar

e no

off-

stre

et s

pace

s*pe

r pe

rmit

22.0

0

B1st

per

mit

(sin

gle

regi

stra

tion)

whe

re th

ere

is o

ne o

ff-st

reet

spa

ce*

per

perm

it71

.50

B

1st p

erm

it (s

ingl

e re

gist

ratio

n) w

here

ther

e ar

e tw

o of

f-st

reet

spa

ces*

per

perm

it11

0.00

B2nd

perm

it (s

ingl

e re

gist

ratio

n) w

here

ther

e ar

e no

off-

stre

et s

pace

s*pe

r pe

rmit

71.5

0

B2nd

perm

it (s

ingl

e re

gist

ratio

n) w

here

ther

e ar

e no

off-

stre

et s

pace

s* (

hybr

id v

ehic

le)

per

perm

it22

.00

B

2nd pe

rmit

(sin

gle

regi

stra

tion)

whe

re th

ere

is o

ne o

ff-st

reet

spa

ce*

per

perm

it11

0.00

B2nd

perm

it (s

ingl

e re

gist

ratio

n) w

here

ther

e is

one

off-

stre

et s

pace

* (h

ybrid

veh

icle

)pe

r pe

rmit

71.5

0

B3rd

perm

it (s

ingl

e re

gist

ratio

n) w

here

ther

e ar

e no

off-

stre

et s

pace

s*pe

r pe

rmit

110.

00

B

3rd pe

rmit

(sin

gle

regi

stra

tion)

whe

re th

ere

are

no o

ff-st

reet

spa

ces*

(hy

brid

veh

icle

)pe

r pe

rmit

71.5

0

B

Reg

istr

atio

n -

Val

id fo

r 12

mon

ths

1st p

erm

it (s

ingl

e re

gist

ratio

n) w

here

ther

e ar

e no

off-

stre

et s

pace

s*pe

r pe

rmit

29.0

0

B1st

per

mit

(sin

gle

regi

stra

tion)

whe

re th

ere

is o

ne o

ff-st

reet

spa

ce*

per

perm

it11

5.50

B1st

per

mit

(sin

gle

regi

stra

tion)

whe

re th

ere

are

two

off-

stre

et s

pace

s*pe

r pe

rmit

173.

00

B

2nd pe

rmit

(sin

gle

regi

stra

tion)

whe

re th

ere

are

no o

ff-st

reet

spa

ces*

per

perm

it11

5.50

B2nd

perm

it (s

ingl

e re

gist

ratio

n) w

here

ther

e ar

e no

off-

stre

et s

pace

s* (

hybr

id v

ehic

le)

per

perm

it29

.00

B

2nd pe

rmit

(sin

gle

regi

stra

tion)

whe

re th

ere

is o

ne o

ff-st

reet

spa

ce*

per

perm

it17

3.00

B2nd

perm

it (s

ingl

e re

gist

ratio

n) w

here

ther

e is

one

off-

stre

et s

pace

* (h

ybrid

veh

icle

)pe

r pe

rmit

115.

50

B

3rd pe

rmit

(sin

gle

regi

stra

tion)

whe

re th

ere

are

no o

ff-st

reet

spa

ces*

per

perm

it17

3.00

B3rd

perm

it (s

ingl

e re

gist

ratio

n) w

here

ther

e ar

e no

off-

stre

et s

pace

s* (

hybr

id v

ehic

le)

per

perm

it11

5.50

B

Oth

er P

arki

ng P

erm

itsP

erm

it fo

r M

otor

cycl

e or

Mot

or S

coot

erpe

r pe

rmit

22.0

0

BD

ual r

egis

trat

ion

per

perm

it11

5.50

B

All

park

ing

fees

are

max

imum

s. F

rom

tim

e to

tim

e C

oun

cil m

ay c

harg

e le

ss th

an th

e m

axim

um to

max

imis

e or

opt

imis

e th

e us

e of

/ dem

and

for

the

asse

t/ fa

cil

ity. T

hese

fees

may

be

varie

d w

ith th

e ap

prov

al o

f the

Gen

eral

Man

ager

.

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es25

Page 27: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

Tem

pora

ry P

erm

it fo

r re

side

nt (

2 m

onth

s)pe

r pe

rmit

81.0

0

BV

isito

rs’ P

erm

its (

sing

le r

egis

trat

ion

for

up to

2 m

onth

s –

max

6 p

er y

ear)

per

perm

it81

.00

B

Vis

itors

’ Per

mits

(up

to 3

reg

istr

atio

ns p

er p

erm

it/ye

ar w

ith u

nlim

ited

upda

tes)

per

perm

it40

5.00

BO

rgan

isat

iona

l Car

er's

Per

mit

per

perm

it50

.00

B

* at

the

resi

dent

ial a

ddre

ss a

t whi

ch th

e ve

hicl

e is

reg

iste

red

Par

king

Met

ers

Bon

di J

unct

ion

max

imum

hou

rly fe

e4.

00

�E

Bon

di B

each

max

imum

hou

rly fe

e2.

40

�E

Res

iden

tial S

tree

tsm

axim

um h

ourly

fee

4.00

ELo

ng te

rm p

arki

ng o

n be

ach

perim

eter

max

imum

hou

rly fe

e5.

80

�E

Bro

nte

Bea

chm

axim

um h

ourly

fee

5.80

EC

ampb

ell P

arad

e B

us Z

one/

Coa

ches

max

imum

hou

rly fe

e7.

30

�E

To

occu

py a

ny m

eter

ed c

ar p

arki

ng s

pace

(pe

r da

y)pe

r sp

ace

100.

00

DT

o oc

cupy

any

met

ered

car

par

king

spa

ce (

per

wee

k)pe

r sp

ace

250.

00

D

Mis

cella

neou

sIn

frin

gem

ent Q

uery

Adm

inis

trat

ion

Fee

pe

r qu

ery

26.5

0

BS

ervi

ce Q

uery

Adm

inis

trat

ion

Fee

per

quer

y12

0.00

BC

hang

e or

upd

ate

of e

xist

ing

perm

itpe

r pe

rmit

40.0

0

BR

epla

cem

ent P

erm

its (

lost

, sto

len

or d

amag

ed)

per

perm

it60

.00

B

Cre

dit C

ard

Fee

: For

pay

men

ts m

ade

by c

redi

t car

d fo

r m

eter

car

par

king

an

adm

inis

trat

ion

fee

appl

ies

on

tota

l val

ue o

f the

cre

dit c

ard

paym

ent (

only

Vis

a, M

aste

rCar

d an

d A

mer

ican

Exp

ress

acc

epte

d)pe

r pa

ymen

t3.

00%

�C

Car

Par

ks•

Bon

di B

each

Car

Par

kB

US

ES

AN

D T

RU

CK

S -

Sm

all b

uses

per

hour

35.0

0

�E

- L

arge

bus

espe

r ho

ur70

.00

E -

Tru

cks

over

2 to

nnes

(pe

r ho

ur)

per

hour

40.0

0

�E

ALL

OT

HE

R V

EH

ICLE

S

Veh

icle

s w

ith b

each

par

king

per

mit

per

stay

-A

0-1

hour

per

stay

8.00

E1-

2 ho

urs

per

stay

16.0

0

�E

2-3

hour

spe

r st

ay22

.00

E3-

4 ho

urs

per

stay

27.0

0

�E

4-5

hour

s pe

r st

ay32

.00

E5+

hou

rspe

r st

ay37

.00

EO

vern

ight

per

nigh

t43

.00

ES

peci

al E

vent

Par

king

1 –

100

spac

espe

r sp

ace

per

day

65.0

0

�E

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es26

Page 28: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

101

– 50

0 sp

aces

per

spac

e pe

r da

y30

.00

E

B

ront

e B

each

Car

Par

kV

ehic

les

with

bea

ch p

arki

ng p

erm

itpe

r st

ayA

All

othe

r ve

hicl

esfla

t rat

e15

.00

ER

eser

ved

spac

espe

r sp

ace

per

even

tM

arke

t Rat

e�

ELo

st T

icke

t fee

Max

imum

Tim

ed P

arki

ng R

ate

�E

B

ondi

Jun

ctio

n E

astg

ate

Car

Par

k0-

1 ho

urpe

r st

ay-

F1-

2 ho

urs

per

stay

1.00

F2-

3 ho

urs

per

stay

11.0

0

�E

3-4

hour

spe

r st

ay22

.00

E4-

5 ho

urs

per

stay

32.0

0

�E

5-6

hour

spe

r st

ay43

.00

E6+

hou

rspe

r st

ay53

.00

EO

vern

ight

(pl

us p

arki

ng fe

e ex

clud

ing

Late

bird

)pe

r ni

ght

44.0

0

�E

Long

Ter

m S

hopp

ing

Rat

e pe

r m

onth

per

mon

th28

0.00

�E

Bon

d on

acc

ount

par

king

equ

ival

ent t

o m

onth

ly r

ate

(ref

unda

ble)

per

card

3 T

imes

Mon

thly

Rat

eG

Ope

ning

fee

outs

ide

norm

al o

pera

tiona

l hou

rspe

r ho

ur32

2.00

�E

Ear

lybi

rd, L

ateb

ird a

nd d

isco

unt p

arki

ngpe

r st

ayM

arke

t Rat

e�

ELo

st T

icke

t fee

Max

imum

Tim

ed P

arki

ng R

ate

�E

Fou

nd L

ost T

icke

t Ref

und

Adm

inis

trat

ion

Fee

per

inci

dent

15.0

0

�E

H

olly

woo

d A

venu

e C

ar P

ark

0-1

hour

per

stay

7.00

E1-

2 ho

urs

per

stay

11.0

0

�E

2-3

hour

spe

r st

ay17

.00

E3-

4 ho

urs

per

stay

22.0

0

�E

4+ h

ours

per

stay

27.0

0

�E

Ove

rnig

ht (

plus

par

king

fee

excl

udin

g La

tebi

rd)

per

nigh

t43

.00

EE

arly

bird

, Lat

ebird

and

dis

coun

t par

king

per

stay

Mar

ket R

ate

�E

Mon

thly

rat

e (a

ccou

nt p

arki

ng)

per

mon

th27

0.00

�E

Bon

d on

acc

ount

par

king

equ

ival

ent t

o m

onth

ly r

ate

(ref

unda

ble)

per

card

3 T

imes

Mon

thly

Rat

eG

Lost

Tic

ket f

eeM

axim

um T

imed

Par

king

Rat

e�

ER

eser

ved

spac

espe

r m

onth

295.

00

E

·

D

enis

on S

tree

t Lib

rary

Car

park

0-1.

5 ho

urs

per

stay

-A

1.5-

2 ho

urs

per

stay

17.0

0

�E

2-3

hour

spe

r st

ay22

.00

E3-

4 ho

urs

per

stay

27.0

0

�E

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es27

Page 29: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

4+ h

ours

pe

r st

ay32

.00

EO

vern

ight

(pl

us p

arki

ng fe

e ex

clud

ing

Late

bird

)pe

r ni

ght

43.0

0

�E

Mon

thly

rat

epe

r m

onth

270.

00

EB

ond

on a

ccou

nt p

arki

ng e

quiv

alen

t to

mon

thly

rat

e (r

efun

dabl

e)pe

r m

onth

3 T

imes

Mon

thly

Rat

eG

Ear

lybi

rd, L

ateb

ird a

nd d

isco

unt p

arki

ngpe

r st

ayM

arke

t Rat

e�

EM

isce

llane

ous

Off

Str

eet P

arki

ng in

oth

er a

reas

per

spac

eM

arke

t Rat

e�

ELo

st T

icke

t fee

Max

imum

Tim

ed P

arki

ng R

ate

�E

Rel

ocat

ion

of m

eter

ed p

arki

ng s

pace

(in

clud

es s

igna

ge, l

ine

mar

king

, bay

mar

king

, rep

rogr

amm

ing)

per

spac

e2,

500.

00

C

Loss

of m

eter

ed p

arki

ng s

pace

ass

ocia

ted

with

new

com

mer

cial

or

mul

ti-un

it de

velo

pmen

tpe

r sp

ace

35,0

00.0

0

D

Pay

men

t Tra

nsac

tions

C

redi

t Car

d F

ee: F

or p

aym

ents

mad

e by

cre

dit c

ard

thro

ugh

Cou

ncil’

s ca

shie

r an

d In

tern

et a

n ad

min

istr

atio

n fe

e ap

plie

s on

tota

l val

ue o

f cre

dit c

ard

paym

ent (

only

Vis

a/ M

aste

rcar

d an

d A

mer

ican

Exp

ress

acc

epte

d).

GS

T is

incl

uded

(or

is n

ot in

clud

ed)

to th

e sa

me

exte

nt th

at G

ST

app

lies

(or

does

not

app

ly)

to th

e un

derly

ing

supp

ly

per

tran

sact

ion

1.00

%C

Cre

dit C

ard

Fee

: For

pay

men

ts m

ade

by c

redi

t car

d fo

r m

eter

car

par

king

an

adm

inis

trat

ion

fee

appl

ies

on

tota

l val

ue o

f the

cre

dit c

ard

paym

ent (

only

Vis

a, M

aste

rCar

d an

d A

mer

ican

Exp

ress

acc

epte

d)pe

r tr

ansa

ctio

n3.

00%

C

Dis

hono

ured

Pay

men

t Fee

per

dish

onou

r30

.00

C

Unp

aid

Acc

ount

s -

All

acco

unts

unp

aid

afte

r 90

day

s m

ay b

e ch

arge

d an

acc

ount

adm

inis

trat

ion

fee

until

the

acco

unt i

s pa

idpe

r m

onth

20.0

0

C

Pho

toco

pyin

gP

hoto

copy

ing

of in

form

atio

n ow

ned

or c

ontr

olle

d by

W

aver

ley

Cou

ncil

(apa

rt fr

om a

pplic

atio

ns u

nder

G

IPA

Act

and

lega

l doc

umen

ts u

nder

sub

poen

a)M

aps,

dra

win

gs, c

ertif

icat

es, m

isce

llane

ous

per

page

(A

4 si

ze)

2.00

B

A 3

siz

e ph

otoc

opy

per

page

3.00

B

A2

size

cop

y pe

r sh

eet

27.0

0

BA

1 si

ze c

opy

per

shee

t33

.00

B

Libr

ary

Cha

rges

Pho

toco

pies

Bla

ck &

Whi

te -

A4

per

copy

0.20

EP

hoto

copi

es B

lack

& W

hite

- A

3pe

r co

py0.

40

�E

Mic

rofil

m c

opie

s of

info

rmat

ion

owne

d or

con

trol

led

by W

aver

ley

Cou

ncil

per

copy

1.00

E

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es28

Page 30: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

Pho

togr

aphy

of i

nfor

mat

ion

owne

d or

con

trol

led

by W

aver

ley

Cou

ncil

Pho

togr

aphi

c im

age

(10x

8)pe

r co

py35

.00

E

Pro

duct

ion

of a

pho

togr

aph

per

copy

50.0

0

EP

hoto

grap

h -

softc

opy

by e

mai

lpe

r im

age

35.0

0

E

Pho

togr

aph

- so

ftcop

y on

dis

kpe

r im

age

plus

cos

t of d

isk

35.0

0

E

Pho

togr

aph/

pla

n pr

int

Cos

t pric

e pl

us $

25.0

0 ad

min

fee

E

Rep

rodu

ctio

n rig

hts

On

App

licat

ion

EP

hoto

grap

hic

Imag

e or

neg

ativ

e fo

r co

mm

erci

al p

urpo

ses

On

App

licat

ion

ES

ectio

n 15

0 (E

P &

A A

ct)

evid

ence

(cl

ause

69(

2) r

egul

atio

ns)

55.0

0

B

Pub

licat

ions

Dev

elop

men

t Con

trol

Pla

ns -

Con

solid

atin

g D

CP

135.

00

B

Dig

ital D

ata:

CA

D P

lans

- f

ee d

epen

ds o

n ar

ea o

f pla

n et

c pe

r ho

ur10

0.00

�B

Map

pre

para

tion

and

supp

ly o

f dig

ital d

ata

– fe

e de

pend

s on

are

a of

pla

n et

c -

indi

vidu

als

and

busi

ness

espe

r ho

ur10

0.00

�B

Map

pre

para

tion

and

supp

ly o

f dig

ital d

ata

– fe

e de

pend

s on

are

a of

pla

n et

c -

loca

l com

mun

ity g

roup

s an

d go

vern

men

t dep

artm

ents

per

hour

50.0

0

�B

Map

pro

duct

ion

- so

ft co

py b

y em

ail

per

item

-B

Map

pro

duct

ion/

dig

ital c

opy

- so

ft co

py o

n di

skpe

r ite

m10

.00

BM

ap p

rodu

ctio

n -

A4

colo

ur m

aps

per

item

2.00

BM

ap p

rodu

ctio

n -

A3

colo

ur m

aps

per

item

3.00

BM

ap p

rodu

ctio

n -

A2

colo

ur m

aps

per

item

35.0

0

�B

Map

pro

duct

ion

- A

1 co

lour

map

spe

r ite

m45

.00

BM

ap p

rodu

ctio

n -

A0

colo

ur m

aps

per

item

55.0

0

�B

Env

ironm

enta

l Gui

delin

es fo

r R

etai

l Foo

d S

ecto

r (t

o n

on-W

aver

ley

prem

ises

)38

.00

B

Her

itage

Pol

icy

(for

mer

ly H

erita

ge S

tudy

)28

0.00

B

Loca

l Ord

ers

Pol

icy

27.0

0

B

LEP

199

6:

Inst

rum

ent

35.0

0

B

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es29

Page 31: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

Zon

ing

Map

55.0

0

�B

Tot

al90

.00

B

Wav

erle

y LE

P (

Bon

di J

unct

ion

Cen

tre)

201

0: In

stru

me

nt a

nd m

aps

42.0

0

�B

Dra

ft D

CP

201

165

.00

B

Dra

ft LE

P 2

011

200.

00

B

Wav

erle

y LE

P 1

996

Am

endm

ent N

o.33

35.0

0

BP

olic

ies

and

inst

rum

ents

on

CD

20.0

0

BO

ther

pla

nnin

g po

licie

spe

r pa

ge1.

00

B

Ope

ratio

nal P

lan/

Ann

ual R

epor

t – C

opyi

ng C

ost

O

pera

tiona

l Pla

n21

.00

B

Ann

ual R

epor

t16

.00

B

Ope

ratio

nal P

lan

- on

CD

10.0

0

BA

nnua

l Rep

ort -

on

CD

10.0

0

BD

eliv

ery

Pro

gram

16.0

0

BD

eliv

ery

Pro

gram

- o

n C

D10

.00

B

Del

iver

y P

rogr

am a

nd o

pera

tiona

l Pla

n -

on C

D16

.00

B

Wav

erle

y T

oget

her

2 (C

omm

unity

Str

ateg

ic P

lan)

20.0

0

BC

opie

s of

thes

e do

cum

ents

can

be

dow

nloa

ded

for

free

from

Cou

ncil'

s w

ebsi

te

Par

k P

lann

ing

and

Man

agem

ent D

ocum

ents

Wav

erle

y P

ark

17.0

0

BB

ront

e P

ark

17.0

0

BB

ondi

Par

k an

d B

ondi

Pav

ilion

17.0

0

BT

hom

as H

ogan

Res

erve

17.0

0

BS

mal

l Par

ks17

.00

B

Pub

licat

ions

Ann

ual B

ell J

azz

Lect

ures

- 1

993-

1999

each

3.10

B

- 20

00 +

each

5.80

B

- F

ull s

et36

.20

B

Soc

ial P

lan

and

Wav

erle

y C

omm

unity

Pro

file

22.0

0

BC

hild

Car

e R

esou

rce

Man

uals

11.0

0-16

.00

BO

ther

Pub

licat

ions

6.00

-51.

00B

,C

Ter

mite

Con

trol

Cod

e11

.00

B

Rat

ing

& P

rope

rty

Info

rmat

ion

Cer

tific

ate

Fee

s

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es30

Page 32: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

Rat

e In

form

atio

n co

nfirm

atio

n C

ertif

icat

e (S

ectio

n 60

3 Lo

cal G

over

nmen

t Act

199

3)pe

r ce

rtifi

cate

65.0

0

FU

rgen

t (24

hou

r) r

ate

info

rmat

ion

conf

irmat

ion

Cer

tific

ate

(Sec

tion

603

Loca

l Gov

ernm

ent A

ct 1

993)

per

cert

ifica

te13

0.00

F,B

Add

ition

al in

form

atio

npe

r ce

rtifi

cate

50.0

0

BLa

ndlo

rd a

nd T

enan

t (A

men

dmen

t) A

ct C

ertif

icat

epe

r ce

rtifi

cate

15.0

0

FF

air

Ren

ts C

ertif

icat

espe

r ce

rtifi

cate

10.0

0

F

Cop

y of

Rat

e &

Inst

alm

ent N

otic

espe

r no

tice

10.0

0

B

Ext

ra C

harg

esE

xtra

cha

rges

on

over

due

rate

s (S

ectio

n 56

6 (3

) of

the

Loca

l Gov

ernm

ent A

ct 1

993)

per

year

11%

F

Dis

hono

ured

Che

que

Fee

per

dish

onou

r50

.00

C

Rat

ing

Info

rmat

ion

(sub

ject

to m

eetin

g th

e re

quire

men

ts o

f the

Priv

acy

and

Per

sonn

el In

form

atio

n A

ct)

Sal

e in

form

atio

n ov

er r

ates

cou

nter

(pe

r ho

ur)

per

hour

85.0

0

BM

inim

um c

harg

epe

r in

quiry

25.0

0

BP

rope

rty

inqu

iries

– p

er in

quiry

per

inqu

iry15

.00

B

Ann

ual f

ee fo

r su

pply

of t

elep

hone

info

rmat

ion

(exc

ludi

ng R

ate

bala

nces

)pe

r an

num

200.

00

B

Rec

onci

liatio

n of

rat

e ac

coun

t (5

year

s on

ly)

- fir

st y

ear

per

asse

ssm

ent

30.0

0

B-

subs

eque

nt y

ears

per

yea

rad

ditio

nal y

ears

15.0

0

B

Reg

istr

atio

n of

Pre

mis

esA

ir H

andl

ing

Sys

tem

sR

egis

trat

ion

fee

(ann

ual)

365.

00

B

Con

sulta

nt’s

ass

essm

ent f

ee79

2.00

BW

arm

-wat

er S

yste

ms

180.

00

B

Reg

iste

red

Pre

mis

esB

ackp

acke

r ac

com

mod

atio

n –

regi

stra

tion

and

insp

ectio

n (t

wo)

fee

per

annu

m42

0.00

BB

eaut

y sa

lons

– r

egis

trat

ion

and

insp

ectio

nfe

e pe

r an

num

210.

00

B

Bed

and

Bre

akfa

st e

stab

lishm

ents

– r

egis

trat

ion

and

insp

ectio

nfe

e pe

r an

num

210.

00

B

Boa

rdin

g ho

uses

– r

egis

trat

ion

and

insp

ectio

nfe

e pe

r an

num

210.

00

B

Foo

d sh

ops

– re

gist

ratio

n an

d in

spec

tion

fee

per

annu

m26

0.00

BH

aird

ress

ers

– re

gist

ratio

n an

d in

spec

tion

fee

per

annu

m21

0.00

BR

eins

pect

ion

of p

rem

ises

per

insp

ectio

n90

.00

B

Insp

ectio

n of

unr

egis

tere

d pr

emis

espe

r in

spec

tion

210.

00

B

Ski

n pe

netr

atio

n –

regi

stra

tion

and

insp

ectio

nfe

e pe

r an

num

120.

00

B

Tem

pora

ry F

ood

Sta

ll -

regi

stra

tion

and

insp

ectio

nfe

e pe

r an

num

115.

00

B

Fire

Saf

ety

Man

agem

ent

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es31

Page 33: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

Ann

ual F

ire S

afet

y S

tate

men

tpe

r an

num

110.

00

B

Aud

it of

pre

mis

es r

equi

ring

fire

safe

ty u

pgra

de

per

hour

135.

00

B

Sen

ding

Info

rmat

ion

Fac

sim

ileT

rans

mitt

al o

f doc

umen

ts p

er p

age

(A4

size

)pe

r pa

ge6.

50

�B

Tel

ecom

mun

icat

ions

Lev

y

LGA

Tel

ecom

mun

icat

ions

Str

ateg

y Le

vy

(T

hese

fees

are

in a

ccor

danc

e w

ith S

ectio

n 61

1 of

the

LGA

199

3)A

ll ca

ble

com

pone

ntpe

r ki

lom

etre

364.

00

F

Ove

rhea

d ca

ble

com

pone

ntpe

r ki

lom

etre

1,04

0.00

F

(All

mon

ies

rais

ed w

ill b

e di

rect

ed to

war

ds a

pro

gram

of u

nder

grou

ndin

g al

l cab

les

in th

e W

aver

ley

Cou

ncil

area

)

Ten

ders

Pro

visi

on o

f Ten

der

Info

rmat

ion

(dep

ends

on

com

plex

ity o

f doc

umen

tatio

n)pe

r te

nder

50 -

500

C, E

Tre

esA

pplic

atio

n to

lop/

rem

ove

priv

ate

tree

s (T

PO

s)1s

t tre

epe

r tr

ee60

.00

B

Add

ition

al tr

eepe

r tr

ee18

.00

B

Pen

sion

er/ c

once

ssio

npe

r ap

plic

atio

n 5

0% d

isco

unt a

gain

st r

espe

ctiv

e fe

e B

Rev

iew

of a

pplic

atio

npe

r re

view

60.0

0

B

Use

and

Hire

of C

ounc

il P

rope

rty

Kim

berle

y R

eser

ve C

omm

unity

Cen

tre

- H

ire c

harg

eB

ooki

ng F

ee (

Non

-ref

unda

ble)

57.0

0

�B

Hire

per

iod

8.00

am –

12

noon

161.

00

BH

ire p

erio

d 1.

00pm

– 5

.00p

m16

1.00

�B

Exc

lusi

ve u

se 8

.00a

m –

5.0

0pm

298.

00

BD

epos

it/ s

ecur

ity a

nd c

lean

ing

bond

300.

00

G

Not

e: H

ire o

f Kim

berle

y R

eser

ve C

omm

unity

Cen

tre

does

not

incl

ude

hire

of K

imbe

rley

Res

erve

gro

unds

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es32

Page 34: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

Wai

roa

Ave

nue

Com

mun

ity C

entr

e -

Hire

cha

rge

Boo

king

Fee

(N

on-r

efun

dabl

e)57

.00

BH

ire p

erio

d 8.

00am

– 1

2 no

on16

1.00

�B

Hire

per

iod

1.00

pm –

5.0

0pm

161.

00

BE

xclu

sive

use

8.0

0am

– 5

.00p

m29

8.00

�B

Dep

osit/

sec

urity

and

cle

anin

g bo

nd30

0.00

G

Tho

mas

Hog

an R

eser

ve C

omm

unity

Cen

tre

Long

-ter

m h

ireB

y lic

ence

agr

eem

ent

�B

Cas

ual h

ireC

omm

unity

/ Not

for

Pro

fit (

loca

l)pe

r ho

ur25

.00

BC

omm

unity

/ Not

for

Pro

fit (

non-

loca

l)pe

r ho

ur36

.00

BC

omm

erci

al/ G

over

nmen

tpe

r ho

ur56

.00

BC

orpo

rate

pe

r ho

ur70

.00

ED

epos

it/ S

ecur

ity a

nd c

lean

ing

bond

215.

00

A

Hug

h B

amfo

rd R

eser

ve C

omm

unity

Cen

tre

Long

-ter

m h

ireB

y lic

ence

agr

eem

ent

�B

Cau

sal h

ireC

omm

unity

/ Not

for

Pro

fit (

loca

l)pe

r ho

ur25

.00

BC

omm

unity

/ Not

for

Pro

fit (

non-

loca

l)pe

r ho

ur36

.00

BC

omm

erci

al/ G

over

nmen

tpe

r ho

ur56

.00

BC

orpo

rate

pe

r ho

ur70

.00

ED

epos

it/ S

ecur

ity a

nd c

lean

ing

bond

215.

00

A

Mill

Hill

Cen

tre,

31-

33 S

prin

g S

tree

t, B

ondi

Jun

cti

on –

Ven

ue H

ireR

efun

dabl

e bo

nds

may

be

requ

ired

at C

ounc

il’s

disc

ret

ion.

Day

time

(9am

– 5

pm o

r at

dis

cret

ion

of D

irect

or R

CC

S)

Hal

l (re

serv

ed fo

r se

nior

s on

ly)

Not

ava

ilabl

eN

ot a

vaila

ble

Roo

ms

A a

nd B

(re

serv

ed fo

r se

nior

s on

ly)

Not

ava

ilabl

eN

ot a

vaila

ble

Roo

ms

1 an

d 2

(non

-pro

fit o

rgan

isat

ions

onl

y)A

Com

mer

cial

, cor

pora

te o

r go

vern

men

t org

anis

atio

nsN

ot a

vaila

ble

Not

ava

ilabl

e�

Eve

ning

s (u

ntil

mid

nigh

t) a

nd W

eeke

nds

- H

all

Com

mun

ity/ N

ot fo

r P

rofit

(lo

cal)

per

hour

36.0

0

�B

Com

mun

ity/ N

ot fo

r P

rofit

(no

n-lo

cal)

per

hour

60.0

0

�B

Com

mer

cial

/ Gov

ernm

ent

per

hour

78.0

0

�B

Not

e: H

ire o

f Tho

mas

Hog

an R

eser

ve C

omm

unity

Cen

tre

does

not

incl

ude

hire

of g

roun

ds. A

vaila

bilit

y su

bjec

t to

licen

ce a

rran

gem

ents

.

Not

e: H

ire o

f Hug

h B

amfo

rd R

eser

ve R

eser

ve C

omm

unity

Cen

tre

does

not

incl

ude

hire

of g

roun

ds. A

vaila

bilit

y su

bjec

t to

licen

ce a

rran

gem

ents

.

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es33

Page 35: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

Cor

pora

te

per

hour

96.0

0

�E

Eve

ning

s (u

ntil

mid

nigh

t) a

nd W

eeke

nds

- H

alf o

f Ha

llC

omm

unity

/ Not

for

Pro

fit (

loca

l)pe

r ho

ur25

.00

BC

omm

unity

/ Not

for

Pro

fit (

non-

loca

l)pe

r ho

ur36

.00

BC

omm

erci

al/ G

over

nmen

tpe

r ho

ur49

.00

BC

orpo

rate

pe

r ho

ur60

.00

E

Eve

ning

s (u

ntil

mid

nigh

t) a

nd W

eeke

nds

- R

oom

s 1,

A &

BN

ote:

Roo

m A

or

B m

ay b

e hi

red

indi

vidu

ally

at h

alf f

eeC

omm

unity

/ Not

for

Pro

fit (

loca

l)pe

r ho

ur20

.00

BC

omm

unity

/ Not

for

Pro

fit (

non-

loca

l)pe

r ho

ur30

.00

BC

omm

erci

al/ G

over

nmen

tpe

r ho

ur35

.00

BC

orpo

rate

pe

r ho

ur44

.00

E

Eve

ning

s (u

ntil

mid

nigh

t) a

nd W

eeke

nds

- R

oom

2C

omm

unity

/ Not

for

Pro

fit (

loca

l)pe

r ho

ur25

.00

BC

omm

unity

/ Not

for

Pro

fit (

non-

loca

l)pe

r ho

ur36

.00

BC

omm

erci

al/ G

over

nmen

tpe

r ho

ur49

.00

BC

orpo

rate

pe

r ho

ur60

.00

E

Sur

char

ges

Cle

anin

g bo

nd (

as r

equi

red)

20.0

0

GC

lean

ing

fee

(as

requ

ired)

At c

ost

�C

Use

of t

able

s, c

hairs

, kitc

hen;

and

of w

hite

boar

ds in

Roo

ms

1 an

d 2

AS

ecur

ity fe

e (a

s re

quire

d)pe

r at

tend

ance

50.0

0

�G

Bon

di P

avili

on C

omm

unity

Cul

tura

l Cen

tre

Foy

er &

Bal

cony

(T

op F

loor

) (4

pm to

late

)C

omm

unity

/ Not

for

Pro

fit48

0.00

�B

,EC

omm

erci

al/ G

over

nmen

t68

0.00

�B

,EC

orpo

rate

1,45

0.00

C,E

Boo

king

Dep

osit/

Sec

urity

Bon

d/ C

lean

ing

Bon

d50

0.00

- 1

,000

.00

GN

B: A

vaila

bilit

y is

lim

ited

and

depe

nden

t on

The

atre

pro

duct

ions

sch

edul

ed

Sea

gull

Roo

mC

lass

es/ r

ehea

rsal

s/ m

eetin

gs e

tcC

omm

unity

/ Not

for

Pro

fitpe

r ho

ur22

.00

B,E

Com

mer

cial

/ Gov

ernm

ent

per

hour

28.0

0

�B

,E

Use

of f

acili

ties

is p

riorit

ised

acc

ordi

ng to

Wav

erle

y ar

ea n

eed

as d

escr

ibed

in th

e W

aver

ley

Cou

ncil

Soc

ial P

lan,

and

sub

ject

to th

e di

scre

tion

of th

e D

irect

or, R

ecre

atio

n, C

usto

mer

& C

omm

unity

S

ervi

ces.

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es34

Page 36: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

Cor

pora

tepe

r ho

ur13

0.00

�C

,E

Fun

ctio

n H

ire (

4pm

to 1

2am

) S

eagu

ll R

oom

, Oce

an R

oom

, Nor

ther

n F

oyer

, & B

alco

ny N

orth

Com

mun

ity/ N

ot fo

r P

rofit

480.

00

B,E

Com

mer

cial

/ Gov

ernm

ent

680.

00

B,E

Cor

pora

te1,

450.

00

�B

,EA

dditi

onal

$60

.00

per

hour

afte

r 12

am (

to la

test

3am

bui

ldin

g cl

ose)

per

hour

60.0

0

�B

,EB

ooki

ng D

epos

it/ S

ecur

ity B

ond/

Cle

anin

g B

ond

500.

00 -

1,0

00.0

0G

Mai

n F

oyer

Dis

play

s (G

roun

d F

loor

)C

omm

unity

/ Not

for

Pro

fitpe

r da

y50

.00

B,E

Com

mer

cial

/ Gov

ernm

ent

per

day

75.0

0

�B

,EC

orpo

rate

per

day

350.

00

C,E

Exh

ibiti

on G

alle

ryIn

stal

latio

n F

ee (

two

wee

ks)

470.

00

B,E

Com

mis

sion

on

sale

s20

%�

B,E

Boo

king

Dep

osit/

Sec

urity

Bon

d/ C

lean

ing

Bon

d30

0.00

- 1

000.

00G

Art

Wor

ksho

pN

ot fo

r P

rofit

per

wee

k70

.00

B,E

Com

mun

itype

r w

eek

110.

00

B,E

Boo

king

Dep

osit/

Sec

urity

Bon

d/ C

lean

ing

Bon

d20

0.00

- 1

000.

00G

Sou

ther

n C

ourt

yard

Mus

ic S

tudi

o 1

or S

tudi

o 2

Com

mun

ity/ N

ot fo

r P

rofit

per

hour

15.0

0

�B

,EC

omm

erci

al/ G

over

nmen

tpe

r ho

ur20

.00

B,E

Cor

pora

tepe

r ho

ur65

.00

C,E

Rec

ordi

ng C

ontr

ol R

oom

Onl

yC

omm

unity

/ Not

for

Pro

fitpe

r ho

ur25

.00

B,E

Com

mer

cial

/ Gov

ernm

ent

per

hour

40.0

0

�B

,EC

orpo

rate

per

hour

65.0

0

�B

,E

One

Mus

ic S

tudi

o pl

us th

e re

cord

ing

Con

trol

Roo

mC

omm

unity

/ Not

for

Pro

fitpe

r ho

ur30

.00

B,E

Com

mer

cial

/ Gov

ernm

ent

per

hour

50.0

0

�B

,EC

orpo

rate

per

hour

100.

00

C,E

Com

mun

ity/ N

ot fo

r P

rofit

per

day

240.

00

B,E

Com

mer

cial

/ Gov

ernm

ent

per

day

340.

00

B,E

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es35

Page 37: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

Cor

pora

tepe

r da

y80

0.00

�C

,E

Hire

of P

A E

quip

men

t (w

ith h

ire o

f one

stu

dios

)C

omm

unity

/ Not

for

Pro

fitpe

r ho

ur24

.00

B,E

Com

mer

cial

/ Gov

ernm

ent

per

hour

40.0

0

�B

,EC

orpo

rate

per

hour

75.0

0

�C

,ED

amag

e D

epos

it25

0.00

G

Sou

ther

n C

ourt

yard

Whe

n hi

red

in c

onju

nctio

n w

ith th

e H

igh

Tid

e R

oom

for

a fu

nctio

nC

omm

unity

/ Not

for

Pro

fit30

0.00

�B

,EC

omm

erci

al/ G

over

nmen

t50

0.00

�B

,EC

orpo

rate

900.

00

C

Oce

an R

oom

Sm

all m

eetin

gs/ r

ehea

rsal

sC

omm

unity

/ Not

for

Pro

fitpe

r ho

ur16

.00

B,E

Com

mer

cial

/ Gov

ernm

ent

per

hour

21.0

0

�B

,EC

orpo

rate

per

hour

65.0

0

�C

,E

Pro

duct

ion

Roo

m

Sm

all m

eetin

gs/ r

ehea

rsal

sC

omm

unity

/ Not

for

Pro

fitpe

r ho

ur15

.00

B,E

Com

mer

cial

/ Gov

ernm

ent

per

hour

19.0

0

�B

,EC

orpo

rate

per

hour

60.0

0

�C

,E

Hig

h T

ide

Roo

m (

Ful

l roo

m r

ate)

Cla

sses

/ reh

ears

als

Com

mun

ity/ N

ot fo

r P

rofit

per

hour

23.0

0

�B

,EC

omm

erci

al/ G

over

nmen

tpe

r ho

ur30

.00

B,E

Cor

pora

tepe

r ho

ur12

5.00

�C

Hig

h T

ide

Roo

m (

Hal

f roo

m r

ate)

Cla

sses

/ reh

ears

als

Com

mun

ity/ N

ot fo

r P

rofit

per

hour

16.0

0

�B

,EC

omm

erci

al/ G

over

nmen

tpe

r ho

ur21

.00

B,E

Cor

pora

tepe

r ho

ur65

.00

CC

hild

ren'

s P

artie

s in

Hig

h T

ide

Roo

m o

r S

eagu

ll R

oom

2.75

hou

rs11

0.00

�C

Boo

king

Dep

osit/

Sec

urity

Bon

d/ C

lean

ing

Bon

d10

0.00

G

Hig

h T

ide

Roo

m F

unct

ion

rate

4pm

to 1

2am

(in

clud

es

Hig

h T

ide

kitc

hen

and

foye

r)

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es36

Page 38: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

Com

mun

ity/ N

ot fo

r P

rofit

480.

00

B,E

Com

mer

cial

/ Gov

ernm

ent

680.

00

B,E

Cor

pora

te1,

400.

00

�B

,EA

dditi

onal

$60

.00

per

hour

afte

r 12

am (

to la

test

3am

bui

ldin

g cl

ose)

per

hour

60.0

0

�B

,EB

ooki

ng D

epos

it/ S

ecur

ity B

ond/

Cle

anin

g B

ond

500.

00 -

1,0

00.0

0G

Am

phith

eatr

e G

roun

d F

loor

wor

k sp

ace

Com

mun

ity/ N

ot fo

r P

rofit

per

hour

17.0

0

�B

,EC

omm

erci

al/ G

over

nmen

tpe

r ho

ur24

.00

B,E

Cor

pora

tepe

r ho

ur65

.00

CC

omm

unity

/ Not

for

Pro

fitpe

r da

y14

0.00

�B

,EC

omm

erci

al/ G

over

nmen

tpe

r da

y20

0.00

�B

,EC

orpo

rate

per

day

500.

00

CC

omm

unity

/ Not

for

Pro

fitpe

r w

eek

330.

00

B,E

Com

mer

cial

/ Gov

ernm

ent

per

wee

k50

0.00

�B

,EC

orpo

rate

per

wee

k1,

400.

00

�C

Boo

king

Dep

osit/

Sec

urity

Bon

d/ C

lean

ing

Bon

d50

0.00

- 1

000.

00G

Am

phith

eatr

e P

erfo

rman

ce p

lus

Gro

und

Flo

or w

ork

spa

ceC

omm

unity

/ Not

for

Pro

fitpe

r da

y25

0.00

�B

,EC

omm

erci

al/ G

over

nmen

tpe

r da

y40

0.00

�B

,EC

orpo

rate

per

day

650.

00

B,E

Com

mun

ity/ N

ot fo

r P

rofit

per

wee

k90

0.00

�B

,EC

omm

erci

al/ G

over

nmen

tpe

r w

eek

1,50

0.00

B,E

Cor

pora

tepe

r w

eek

2,60

0.00

B,E

Boo

king

Dep

osit/

Sec

urity

Bon

d/ C

lean

ing

Bon

d50

0.00

- 1

000.

00G

Cra

ft R

oom

Com

mun

ity/ N

ot fo

r P

rofit

per

hour

70.0

0

�B

,EC

omm

erci

al/ G

over

nmen

tpe

r ho

ur13

0.00

�B

,EB

ooki

ng D

epos

it/ S

ecur

ity B

ond/

Cle

anin

g B

ond

200.

00 -

1,0

00.0

0G

Cou

rtya

rd S

outh

ern

or N

orth

ern

Com

mun

ity/ N

ot fo

r P

rofit

per

day

500.

00

B,E

Com

mer

cial

/ Gov

ernm

ent

per

day

800.

00

B,E

Cor

pora

tepe

r da

y1,

550.

00

�B

,EC

omm

unity

/ Not

for

Pro

fitpe

r w

eek

1,25

0.00

B,E

Com

mer

cial

/ Gov

ernm

ent

per

wee

k2,

050.

00

�B

,EC

orpo

rate

per

wee

k4,

050.

00

�B

,EB

ooki

ng D

epos

it/ S

ecur

ity B

ond/

Cle

anin

g B

ond

500.

00 -

1,0

00.0

0G

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es37

Page 39: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

Larg

e, M

ultip

le S

pace

Eve

nts

Com

mun

ity/ N

ot fo

r P

rofit

per

day

1,60

0.00

B,E

Com

mer

cial

/ Gov

ernm

ent

per

day

6,20

0.00

B,E

Cor

pora

tepe

r da

y17

,100

.00

�C

,EB

ooki

ng D

epos

it/ S

ecur

ity B

ond/

Cle

anin

g B

ond

5,00

0.00

G

Chi

ld C

are

Cen

tre

Hire

Chi

ldre

n’s

part

ies,

gro

ups,

cla

sses

– M

orni

ng/ a

ftern

oon

sess

ions

on

Sat

urda

y or

Sun

day.

Wav

erle

y C

hild

Car

e C

entr

epe

r se

ssio

n31

5.00

�E

Bro

nte

& G

ardi

ner

Chi

ld C

are

Cen

tres

per

sess

ion

265.

00

E

Eve

ning

Ses

sion

sN

on-p

rofit

org

anis

atio

ns p

rovi

ding

a s

ervi

ce in

Wav

erle

ype

r ho

ur25

.00

BC

omm

erci

al h

irepe

r ho

ur60

.00

E

Cou

ncil

Cha

mbe

rs F

unct

ion

Roo

m H

ireQ

ueen

s P

ark

Roo

m (

OR

) T

amar

ama

Roo

m (

Min

imum

4 h

ours

hire

)M

onda

y to

Frid

ay 9

.00a

m-5

.00p

m (

excl

udin

g pu

blic

hol

iday

s)C

omm

unity

/ N

ot fo

r P

rofit

pe

r ro

om/h

our

45.0

0

�B

Cor

pora

tepe

r ro

om/h

our

68.0

0

�E

Day

Rat

e (9

.00a

m-5

.00p

m o

nly)

per

day

490.

00

E4

non

-con

secu

tive

days

(M

onda

y to

Frid

ay 9

am

- 5

pm

onl

y)1,

800.

00

�E

Mon

day

to F

riday

5pm

- m

idni

ght (

min

imum

4 h

ours

)C

omm

unity

/ N

ot fo

r P

rofit

pe

r ro

om/h

our

70.0

0

�B

Cor

pora

te

per

room

/hou

r11

0.00

�E

Wee

kend

s &

Pub

lic H

olid

ays

(Min

imum

4 h

ours

)

Com

mun

ity /

Not

for

Pro

fitpe

r ro

om/h

our

80.0

0

�B

Cor

pora

tepe

r ro

om/h

our

125.

00

ED

ay R

ate

(8 h

ours

onl

y)90

0.00

� E

4 n

on-c

onse

cutiv

e da

ys (

8 h

ours

per

day

)3,

200.

00

� E

Tw

o ro

oms

(Que

ens

Par

k &

Tam

aram

a R

oom

s) (

Min

imum

4 h

ours

) C

omm

unity

/ N

ot fo

r P

rofit

pe

r ho

ur65

.00

BC

orpo

rate

(M

onda

y to

Frid

ay 9

.00a

m-5

.00p

m)

per

hour

100.

00

E

Not

e:

(1)

Unl

ess

othe

rwis

e in

dica

ted

all B

ondi

Pav

ilion

Com

mun

ity C

ultu

ral C

entr

e fe

es a

re m

axim

um fe

es.

The

Div

isio

nal M

anag

er, C

ultu

ral &

Com

mun

ity S

ervi

ces,

with

app

rova

l of t

he

Gen

eral

Man

ager

, has

the

disc

retio

n to

cha

rge

less

than

thes

e fe

es.

(

2) B

onds

and

dam

age

depo

sits

will

be

reta

ined

, in

full

or in

par

t, w

here

con

trac

t con

ditio

ns a

re n

ot m

et, t

o m

eet t

he c

ost o

f rep

airs

or

repl

acem

ent o

f dam

aged

furn

iture

, equ

ipm

ent o

r bu

ildin

gs

Ref

unda

ble

book

ing

fee/

cle

anin

g de

posi

t app

lies.

All

pric

es m

ay b

e su

bjec

t to

an a

dditi

onal

ope

ning

/ clo

sing

sec

urity

fee.

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es38

Page 40: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

Day

Rat

e (9

.00a

m-5

.00p

m)

760.

00

E4

non

-con

secu

tive

days

(M

onda

y to

Frid

ay 9

am

- 5

pm

onl

y)2,

880.

00

� E

(Mon

day

to F

riday

5pm

– m

idni

ght)

Com

mun

ity /

Not

for

Pro

fit

per

hour

90.0

0

�B

Cor

pora

tepe

r ho

ur13

8.00

� E

(Wee

kend

s &

Pub

lic H

olid

ays)

Com

mun

ity /

Not

for

Pro

fit

per

hour

110.

00

BC

orpo

rate

per

hour

158.

00

EW

eeke

nds

Rat

e (8

hou

rs o

nly)

Per

day

1,25

0.00

E4

non

-con

secu

tive

days

( 8

hour

s pe

r da

y )

3,90

0.00

E

Bon

di (

OR

) R

ose

Bay

Roo

ms

(Min

imum

4 h

ours

) M

onda

y to

Frid

ay 9

.00a

m-5

.00p

m (

excl

udin

g pu

blic

hol

iday

s)C

omm

unity

/ N

ot fo

r P

rofit

pe

r ro

om/h

our

30.0

0

�B

Cor

pora

tepe

r ro

om/h

our

37.0

0

�E

Day

Rat

e (9

am -

5pm

onl

y)28

0.00

�E

4 n

on-c

onse

cutiv

e da

ys (

Mon

day

to F

riday

9 a

m -

5 p

m o

nly)

1,06

5.00

E

Mon

day

to F

riday

5pm

- m

idni

ght (

min

imum

4 h

ours

)C

omm

unity

/ N

ot fo

r P

rofit

pe

r ro

om/h

our

55.0

0

�B

Cor

pora

tepe

r ro

om/h

our

68.0

0

�E

Wee

kend

s &

Pub

lic H

olid

ays

(Min

imum

4 h

ours

) (9

am-5

pm o

nly)

Com

mun

ity /

Not

for

Pro

fitpe

r ro

om/h

our

65.0

0

�B

Cor

pora

tepe

r ro

om/h

our

76.0

0

�E

Day

Rat

e (9

am -

5pm

onl

y)54

6.00

�E

4 n

on-c

onse

cutiv

e da

ys (

8 h

ours

per

day

)2,

150.

00

�E

Use

of K

itche

n (M

inim

um 4

hou

rs)

Mon

day

to F

riday

9.0

0am

-5.0

0pm

(m

inim

um 4

hou

rs)

Com

mun

ity /

Not

for

Pro

fit

per

hour

30.0

0

�B

Cor

pora

tepe

r ho

ur40

.00

ED

ay R

ate

(9am

- 5

pm o

nly)

300.

00

E4

non

-con

secu

tive

days

(M

onda

y to

Frid

ay 9

am

- 5

pm

onl

y)1,

000.

00

Wee

kend

s an

d P

ublic

Hol

iday

s (M

inim

um 4

hou

rs)

(9am

- 5

pm o

nly)

Com

mun

ity /

Not

for

Pro

fit

per

hour

65.0

0

�B

Cor

pora

tepe

r ho

ur78

.00

ED

ay R

ate

(9am

- 5

pm o

nly)

560.

00

E

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es39

Page 41: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

Use

of L

unch

Roo

m (

an a

dditi

onal

roo

m)

As

an a

dditi

onal

roo

m p

er h

ire55

.00

E

Boo

king

Fee

(N

on r

efun

dabl

e ca

ncel

latio

n fe

e)11

7.00

B

Ron

Lan

der

Cen

tre

(Wav

erle

y Li

brar

y), 3

2-48

Den

ison

Str

eet,

Bon

di J

unct

ion

Com

mun

ity/ N

on P

rofit

/ Cul

tura

l Org

anis

atio

ns (

With

in L

ibra

ry o

peni

ng h

ours

)

Gro

und

Flo

or C

hild

ren’

s A

ctiv

ity R

oom

per

hour

20.0

0

�B

Frie

nds'

Mee

ting

Roo

m

per

day

60.0

0

�B

Frie

nds'

Mee

ting

Roo

m

per

half

day

40.0

0

�B

Ext

ras: W

hite

boar

d12

.00

EO

verh

ead

Pro

ject

or18

.00

EF

lip C

hart

12.0

0

�E

Sec

urity

(ou

tsid

e no

rmal

hou

rs)

per

hour

65.0

0

�C

Cle

anin

g65

.00

CT

V/ V

ideo

18.0

0

�E

The

atre

tte (

80 s

eats

– c

apac

ity fo

r fil

m/ v

ideo

pro

ject

ion)

pe

r da

y16

0.00

�B

The

atre

tte (

80 s

eats

– c

apac

ity fo

r fil

m/ v

ideo

pro

ject

ion)

pe

r ha

lf da

y90

.00

BE

xtra

s: Whi

tebo

ard

12.0

0

�E

Aud

io V

isua

l Acc

esso

ries

28

.00

EO

verh

ead

Pro

ject

or18

.00

EF

lip C

hart

12.0

0

�E

Pia

noas

is55

.00

EP

iano

tune

d fo

r oc

casi

on18

5.00

�E

Cle

anin

g65

.00

CS

ecur

ity (

outs

ide

norm

al h

ours

)pe

r ho

ur65

.00

C

Libr

ary

Com

pute

r T

rain

ing

Roo

mpe

r da

y44

0.00

�B

Libr

ary

Com

pute

r T

rain

ing

Roo

mpe

r ha

lf da

y28

0.00

�B

Ext

ras: O

verh

ead

proj

ecto

r18

.00

EW

hite

boar

d/ F

lip c

hart

12.0

0

�E

Sec

urity

(ou

tsid

e no

rmal

hou

rs)

per

hour

65.0

0

�C

The

se fe

es a

re m

axim

ums.

The

Div

isio

nal M

anag

er B

usin

ess

Ser

vice

s an

d P

rope

rty

has

the

disc

retio

n to

cha

rge

less

than

thes

e fe

es w

ith th

e ap

prov

al o

f the

Gen

eral

Man

ager

.N

B: A

dditi

onal

sec

urity

req

uire

men

ts d

eter

min

ed b

y C

ounc

il m

ay r

esul

t in

high

er c

harg

es fo

r al

l hiri

ngs.

Max

imum

rat

es a

re in

dica

ted.

Cha

rges

may

be

disc

ount

ed a

t the

dis

cret

ion

of L

ibra

ry M

anag

emen

t.

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es40

Page 42: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

Cle

anin

g65

.00

CK

itche

nette

18.0

0

�C

The

ory

Roo

m (

com

mun

ity)

per

day

90.0

0

�C

The

ory

Roo

m (

com

mun

ity)

per

half

day

60.0

0

�C

Com

mer

cial

Org

anis

atio

ns (

With

in L

ibra

ry O

peni

ng H

ours

)

Gro

und

Flo

or c

hild

ren’

s A

ctiv

ity R

oom

per

hour

40.0

0

�C

Firs

t Flo

orF

riend

s' M

eetin

g R

oom

pe

r da

y28

0.00

�C

Frie

nds'

Mee

ting

Roo

m

per

half

day

145.

00

CT

heor

y R

oom

(co

mm

erci

al)

per

day

290.

00

CT

heor

y R

oom

(co

mm

erci

al)

per

half

day

155.

00

CE

xtra

s Sec

urity

(ou

tsid

e no

rmal

hou

rs)

per

hour

65.0

0

�C

Cle

anin

g65

.00

C

The

atre

tte (

80 s

eats

– c

apac

ity fo

r fil

m/ v

ideo

pro

ject

ion)

per

day

600.

00

CT

heat

rette

(80

sea

ts –

cap

acity

for

film

/ vid

eo p

roje

ctio

n)pe

r ha

lf da

y30

0.00

�C

Ext

ras Sec

urity

(ou

tsid

e no

rmal

hou

rs)

per

hour

65.0

0

�C

Cle

anin

g65

.00

C

Libr

ary

Com

pute

r T

rain

ing

Roo

mpe

r da

y60

0.00

�C

Libr

ary

Com

pute

r T

rain

ing

Roo

mpe

r ha

lf da

y37

0.00

�C

Ext

ras Sec

urity

(ou

tsid

e no

rmal

hou

rs)

per

hour

65.0

0

�C

Cle

anin

g65

.00

C

Sch

ool o

f Art

sR

enta

l of u

psta

irs h

all f

or c

omm

unity

pur

pose

sR

egul

ar h

iring

per

hour

18.0

0

�B

Cas

ual h

iring

per

hour

20.0

0

�B

Gro

und

Flo

or M

eetin

g R

oom

sR

egul

ar h

iring

per

hour

15.0

0

�B

Cas

ual h

iring

per

hour

18.0

0

�B

Bon

di J

unct

ion

Cus

tom

er S

ervi

ce C

entr

e –

Mee

ting

Ro

omC

omm

erci

alpe

r ho

ur60

.00

EC

omm

unity

per

hour

30.0

0

�B

Ext

ras:

(Max

imum

rat

es a

re in

dica

ted.

Cha

rges

may

be

disc

ount

ed a

t the

dis

cret

ion

of L

ibra

ry M

anag

emen

t)

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es41

Page 43: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

Sec

urity

(ou

tsid

e no

rmal

hou

rs)

per

hour

65.0

0

�C

Cle

anin

gpe

r ho

ur65

.00

C

Wav

erle

y P

ark

Pav

ilion

Wav

erle

y P

ark

Pav

ilion

(C

ivic

& R

ecre

atio

nal U

se)

Com

mun

ity R

oom

Com

mun

ity/N

ot fo

r pr

ofit,

Clu

bsP

er h

our

30.0

0

�B

Per

hal

f-da

y90

.00

BP

er d

ay16

0.00

�B

Com

mer

cial

Per

hou

r45

.00

BE

Per

hal

f-da

y13

5.00

�B

EP

er d

ay25

0.00

�B

E

Cor

pora

teP

er h

our

65.0

0

�E

Per

hal

f-da

y19

5.00

�E

Per

day

370.

00

EP

er d

ay37

0.00

�E

Sec

urity

Fee

(ou

tsid

e no

rmal

hou

rs a

s re

quire

d)P

er a

ttend

ance

80.0

0

�E

Kitc

hen

Per

use

60.0

0

�B

Boo

king

dep

osit/

Sec

urity

Bon

d/ C

lean

ing

Bon

d$1

00-$

500

G

Spo

rts

Cou

rtC

omm

unity

/Not

for

prof

it, C

lubs

8.00

am-5

.00p

m w

eekd

ays

Per

hou

r40

.00

BO

ther

tim

esP

er h

our

50.0

0

�B

Com

mer

cial

8.00

am-5

.00p

m w

eekd

ays

Per

hou

r55

.00

BE

Oth

er ti

mes

Per

hou

r65

.00

BE

Cor

pora

te8.

00am

-5.0

0pm

wee

kday

sP

er h

our

70.0

0

�E

Oth

er ti

mes

Per

hou

r80

.00

ES

ecur

ity F

ee (

outs

ide

norm

al h

ours

as

requ

ired)

Per

atte

ndan

ce80

.00

EC

lub

room

(ca

sual

hire

)

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es42

Page 44: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

Com

mun

ity/N

ot fo

r pr

ofit

Per

Hou

r20

.00

BC

omm

erci

alP

er h

our

30.0

0

�B

EC

orpo

rate

Per

hou

r45

.00

ELi

cens

ed s

port

s cl

ubs

Per

hou

r15

.00

ES

ecur

ity F

ee (

outs

ide

norm

al h

ours

as

requ

ired)

Per

atte

ndan

ce80

.00

ER

ecre

atio

n pr

ogra

ms

Per

Ses

sion

$30

- $1

50�

EA

ll bo

okab

le s

pace

s m

ay a

ttrac

t a B

ooki

ng d

epos

it/S

ecur

ity B

ond/

Cle

anin

g B

ond

$100

-$50

0G

Wav

erle

y P

ark

Pav

ilion

(P

rivat

e F

unct

ions

& E

vent

s N

on R

ecre

atio

nal U

se)

Com

mun

ity R

oom

– M

onda

y to

Sun

day

9am

– 1

2noo

n

Per

hal

f-da

y30

0.00

�E

1pm

– 4

pmP

er h

alf-

day

300.

00

EF

ull d

ay c

harg

e 9a

m –

4pm

Per

day

560.

00

EE

veni

ngs

Per

Eve

ning

480.

00

EB

ooki

ng D

epos

it/ S

ecur

ity B

ond/

Cle

anin

g B

ond

As

per

adve

rtis

ed fe

es &

$1

00 -

$50

0�

GC

lean

ing

Fee

(as

req

uire

d)10

0.00

�E

Clu

b R

oom

– M

onda

y to

Frid

ay9a

m –

12n

oon

Per

hal

f-da

y24

0.00

�E

1pm

– 4

pmP

er h

alf-

day

240.

00

EF

ull d

ay c

harg

e 9a

m –

4pm

Per

day

400.

00

EB

ooki

ng D

epos

it/ S

ecur

ity B

ond/

Cle

anin

g B

ond

As

per

adve

rtis

ed fe

es &

$1

00 -

$50

0�

GC

lean

ing

Fee

(as

req

uire

d)10

0.00

�E

Wav

erle

y P

ark

Pav

ilion

Hou

rs o

f ope

ratio

n ar

e lim

ited

to:

7am

-10p

m S

unda

y -

Wed

nesd

ay7a

m -

11pm

Thu

rsda

y -

Sat

urda

y

Use

and

Hire

of P

ublic

Ope

n S

pace

sR

efun

dabl

e bo

nds

may

be

requ

ired

at C

ounc

il’s

disc

retio

n.B

ondi

Bea

ch &

Par

k, B

ondi

Ska

tepa

rk, B

iddi

gal R

eser

ve, B

ront

e B

each

, Sam

Fis

zman

Par

k, R

ay O

'Kee

fe

Res

erve

, Tam

aram

a B

each

(w

here

per

mitt

ed)

Gen

eral

Adm

inis

trat

ion

Fee

(al

l app

licat

ions

are

non

ref

unda

ble)

per

appl

icat

ion

155.

00

BS

hort

Not

ice

Adm

inis

trat

ion

Fee

(al

l app

licat

ions

whe

n le

ss th

an 5

wor

king

day

s no

tice

give

n ar

e no

n re

fund

able

)pe

r ap

plic

atio

n20

0.00

�B

Pro

duct

sam

plin

g an

d pr

omot

ions

(no

t per

mitt

ed o

n s

and

area

s)pe

ak s

easo

n N

ovem

ber

- F

ebru

ary

per

hour

or

part

ther

eof

430.

00

C,E

off p

eak

seas

on M

arch

- O

ctob

erpe

r ho

ur o

r pa

rt th

ereo

f28

0.00

�C

,EC

orpo

rate

func

tions

and

act

iviti

espe

r ho

ur o

r pa

rt th

ereo

f28

0.00

�B

,E

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es43

Page 45: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

Soc

ial g

athe

rings

(pi

cnic

s, p

artie

s, w

eddi

ngs

and

rel

igio

us g

athe

rings

etc

)0

– 50

peo

ple

per

even

tB

,E50

– 1

00 p

eopl

epe

r ev

ent

280.

00

B,E

100

– 25

0 pe

ople

per

even

t39

0.00

�B

,EO

rgan

ised

and

spe

cial

eve

nts

(mor

e th

an 3

00 p

eopl

e, e

rect

ion

of e

quip

men

t)B

ump-

in, b

ump-

out d

aype

r da

y1,

500.

00

�B

,Elo

w/ m

ediu

m im

pact

and

/ or

low

/ med

ium

ris

kpe

r ev

ent

6,25

0.00

- 1

6,00

0.00

�B

,Ehi

gh im

pact

and

/ or

high

ris

kpe

r ev

ent

�B

,E

Mar

quee

(w

here

per

mitt

ed)

Fre

esta

ndin

g sh

ade

stru

ctur

e/s,

tota

l are

a 10

m2

or u

nder

BF

rees

tand

ing

shad

e st

ruct

ure/

s, to

tal a

rea

betw

een

10m

2 an

d 25

m2

207.

00

BF

rees

tand

ing

shad

e st

ruct

ure/

s, to

tal a

rea

grea

ter

than

25m

236

2.00

�B

Sur

f life

savi

ng e

vent

s an

d ac

tiviti

esJe

t ski

hire

(in

c Li

fe G

uard

)0-

4 hr

s30

0.00

�B

Oth

er C

ounc

il co

sts

incu

rred

by

even

t (eg

was

te, s

ite in

spec

tions

, hea

lth o

ffice

rs, t

raffi

c m

anag

emen

t)B

y ne

gotia

tion

�B

City

to S

urf

beac

h/ p

ark

hire

fee

B

y ne

gotia

tion

�C

Non

ref

unda

ble

book

ing

fee

(con

ditio

ns a

pply

)51

5.00

�C

mar

quee

hire

(C

orpo

rate

/ com

mer

cial

)pe

r m

arqu

ee6,

210.

00

�B

,Em

arqu

ee h

ire (

Com

mun

ity r

unni

ng c

lubs

& g

roup

s -

docu

men

tatio

n re

quire

d)pe

r ch

alet

�C

Dam

ages

Dep

osit

per

mar

quee

500.

00

G

(Oth

er b

each

es a

nd c

oast

al r

eser

ve h

ire fe

es a

re s

et b

y th

e re

leva

nt D

irect

or)

Life

guar

dsB

each

eve

nt s

uper

visi

on fe

epe

r lif

egua

rd p

er h

our

By

nego

tiatio

n�

C

Sur

f Aw

aren

ess

Edu

catio

nco

mm

unity

gro

ups

per

sess

ion

By

nego

tiatio

n�

Bco

rpor

atio

npe

r lif

egua

rd p

er h

our

By

nego

tiatio

n�

B

Bro

nte

and

Tam

aram

a P

arks

Soc

ial g

athe

rings

0

– 50

peo

ple

B50

– 1

00 p

eopl

e17

9.00

�B

100

– 25

0 pe

ople

(no

t ava

ilabl

e D

ec-F

eb)

300.

00

B

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es44

Page 46: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

Loca

l prim

ary/

sec

onda

ry s

choo

ls (

up to

250

peo

ple)

-

A

Non

-loca

l prim

ary/

sec

onda

ry s

choo

ls60

.00

BM

arqu

ee (

whe

re p

erm

itted

)F

rees

tand

ing

shad

e st

ruct

ure/

s, to

tal a

rea

10m

2 or

und

er�

BF

rees

tand

ing

shad

e st

ruct

ure/

s, to

tal a

rea

betw

een

10m

2 an

d 25

m2

80.0

0

�B

Fre

esta

ndin

g sh

ade

stru

ctur

e/s,

tota

l are

a gr

eate

r th

an 2

5m2

152.

00

BJu

mpi

ng c

astle

, am

usem

ent r

ides

, pet

ting

zoos

, etc

(w

here

per

mitt

ed)

Sm

all (

unde

r 25

m2)

79.0

0

�B

Larg

e (o

ver

25 m

2)13

7.00

�B

Sum

mer

wee

kend

use

Add

50%

�B

Bea

ch s

uper

visi

onB

y ne

gotia

tion

�B

Larg

e C

orpo

rate

func

tions

By

nego

tiatio

n�

B

Wav

erle

y O

val

Clu

b us

eLo

ng te

rmB

y le

ase/

lice

nce

�B

Gen

eral

use

Wee

kday

per

day

528.

00

BW

eeke

ndpe

r da

y77

0.00

�B

Wee

kday

per

hour

88.0

0

�B

Wee

kend

per

hour

104.

00

B

Sch

ool a

thle

tics

carn

ival

s Lo

cal p

rimar

y sc

hool

spe

r da

y96

.00

BN

on-lo

cal p

rimar

y sc

hool

spe

r da

y16

9.00

�B

Wav

erle

y P

ark

No

2 A

rea

Soc

ial g

athe

rings

50

– 1

00 p

eopl

epe

r ev

ent

157.

00

B,E

100

– 30

0 pe

ople

per

even

t29

4.00

�B

,ES

port

Hou

rlype

r ho

ur49

.00

B,E

Wee

kday

full

day

(6 h

rs o

r m

ore)

per

day

292.

00

B,E

Wee

kend

full

day

(6 h

rs o

r m

ore)

per

day

344.

00

B,E

Wav

erle

y P

ark

No

3 A

rea

Soc

ial g

athe

rings

50

– 1

00 p

eopl

epe

r ev

ent

157.

00

B,E

100

– 20

0 pe

ople

per

even

t22

1.00

�B

,ES

port

Hou

rlype

r ho

ur25

.00

B,E

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es45

Page 47: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

Wee

kday

full

day

(6 h

rs o

r m

ore)

per

day

146.

00

B,E

Wee

kend

full

day

(6 h

rs o

r m

ore)

per

day

172.

00

B,E

Wav

erle

y P

ark

No

2 an

d 3

Are

as C

ombi

ned

Soc

ial g

athe

rings

50

– 1

00 p

eopl

epe

r ev

ent

157.

00

B,E

100

– 30

0 pe

ople

per

even

t29

4.00

�B

,E30

0 –

500

peop

lepe

r ev

ent

444.

00

B,E

Spo

rtH

ourly

per

hour

60.0

0

�B

,EW

eekd

ay fu

ll da

y (6

hrs

or

mor

e)pe

r da

y35

1.00

�B

,EW

eeke

nd fu

ll da

y (6

hrs

or

mor

e)pe

r da

y41

2.00

�B

,E

Hug

h B

amfo

rd R

eser

veS

ocia

l gat

herin

gs

50 –

100

peo

ple

per

even

t15

7.00

�B

,Eov

er 1

00 p

eopl

eN

ot a

vaila

ble

Not

ava

ilabl

eS

port

per

hour

30.0

0

�B

,E

Bar

racl

uff P

ark,

Rod

ney

Res

erve

Soc

ial g

athe

rings

50

– 1

00 p

eopl

epe

r ev

ent

157.

00

B,E

100

– 30

0 pe

ople

per

even

t21

7.00

�B

,ES

port

per

hour

30.0

0

�B

,E

Dud

ley

Pag

e R

eser

veS

ocia

l gat

herin

gs

50 –

100

peo

ple

per

even

t15

7.00

�B

,E10

0 –

300

peop

lepe

r ev

ent

217.

00

B,E

Cric

ket

per

day

90.0

0

�B

,EO

ther

Spo

rt (

whe

re p

erm

itted

)pe

r ho

ur30

.00

B,E

Kim

berle

y R

eser

veS

ocia

l gat

herin

gs

0 –

50 p

eopl

epe

r ev

ent

0O

ver

50 p

eopl

eN

ot a

vaila

ble

Spo

rtN

ot a

vaila

ble

Ref

unda

ble

Gat

e K

ey S

ecur

ity D

epos

it (w

here

per

mitt

ed)

Per

Hire

52.0

0

G

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es46

Page 48: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

Mar

ks P

ark,

Tho

mas

Hog

an R

eser

ve, V

arna

Par

kS

ocia

l gat

herin

gs

0 –

50 p

eopl

epe

r ev

ent

-

B

,E50

-100

peo

ple

per

even

t15

7.00

�B

,ES

port

Not

ava

ilabl

eN

ot a

vaila

ble

Oth

er P

arks

Soc

ial g

athe

rings

0

– 50

peo

ple

No

char

geN

o ch

arge

Ove

r 50

peo

ple

Not

ava

ilabl

e-

Spo

rtN

ot a

vaila

ble

Not

ava

ilabl

eN

etba

ll C

ourt

sD

icks

on P

ark

Com

mun

itype

r ho

ur-

�B

,EC

omm

erci

alpe

r ho

ur-

�B

,EW

aver

ley

Par

k C

omm

unity

per

hour

per

cou

rt7.

00

�B

,EC

omm

erci

alpe

r ho

ur p

er c

ourt

21.0

0

�B

,E

Oth

er F

ees

App

ly to

all

park

s an

d re

serv

es (

othe

r th

an B

ondi

Par

k, S

am F

iszm

an P

ark,

Ray

'O'K

eefe

Res

erve

, B

iddi

gal R

eser

ve)

Wed

ding

cer

emon

ies

(max

imum

150

peo

ple/

2hrs

)12

0.00

�B

,EJu

mpi

ng c

astle

, am

usem

ent r

ides

, ani

mal

farm

s, p

ett

ing

zoos

etc

(w

here

per

mitt

ed)

Sm

all

50.0

0

�B

Larg

e85

.00

BM

arqu

ee (

whe

re p

erm

itted

) ex

cept

Bro

nte/

Tam

aram

aF

rees

tand

ing

shad

e st

ruct

ure/

s, to

tal a

rea

10m

2 or

und

erF

rees

tand

ing

shad

e st

ruct

ure/

s, to

tal a

rea

betw

een

10m

2 an

d 25

m2

49.0

0

�B

Fre

esta

ndin

g sh

ade

stru

ctur

e/s,

tota

l are

a gr

eate

r th

an 2

5m2

91.0

0

�B

Veh

icle

Ent

ryV

ehic

le e

ntry

(w

here

per

mitt

ed -

incl

udes

one

dro

p of

f and

one

pic

k up

)V

ehic

le e

ntry

(w

here

per

mitt

ed)

frai

l/ ag

ed/ d

isab

ility

tran

spor

tV

ehic

le e

ntry

(w

here

per

mitt

ed)

othe

r23

.00

BR

efun

dabl

e G

ate

Key

Sec

urity

Dep

osit

(whe

re p

erm

itted

)P

er H

ire52

.00

G

Ligh

ts, p

er a

djus

tmen

t of t

imer

78.0

0

�C

Line

-mar

king

(ex

cept

Wav

erle

y O

val)

Initi

al m

arki

ng/ s

etup

221.

00

BR

e-m

arki

ng83

.00

BU

se fo

r ov

er 4

hou

rs (

whe

re p

erm

itted

)A

dd 5

0%�

BU

se b

y ov

er 2

50 p

eopl

e (w

here

per

mitt

ed)

Spe

cial

fees

app

ly�

B

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es47

Page 49: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

Sho

rt N

otic

e/ R

epea

ted

Am

endm

ent F

ee (

park

hire

app

licat

ions

rec

eive

d le

ss th

an 5

wor

king

day

s be

fore

dat

e of

eve

nt o

r re

petit

ive

amen

dmen

t of b

ooki

ng )

58.0

0

�B

Fee

for

book

ing

canc

elle

d le

ss th

an 8

wee

ks in

adv

ance

50%

B

Use

of R

oads

, Foo

tpat

hs a

nd P

edes

tria

n M

alls

Cha

ring

Cro

ss, C

ampb

ell P

arad

e, O

xfor

d S

tree

t Mal

l, R

osco

e S

tree

t Mal

l, W

aver

ley

Str

eet M

all

Adm

inis

trat

ion

fee

(all

appl

icat

ions

)15

5.00

CP

rodu

ct s

ampl

ing,

pro

mot

ions

and

sta

tic d

ispl

ays

per

hour

or

part

217.

00

C

,E

Dis

trib

utio

n of

leaf

lets

/ pro

mot

iona

l mat

eria

l (ex

clud

ing

Bon

di B

each

)P

art d

ay (

min

imum

of 2

hou

rs)

per

hour

155.

00

B

Reg

iste

red

char

ities

/ not

for

prof

it or

gani

satio

ns (

docu

men

tatio

n re

quire

d)15

5.00

AS

peci

al E

vent

s pe

r da

y or

par

t 15

5.00

Oxf

ord

Str

eet M

all M

arke

ts, O

xfor

d S

tree

t Mal

lpe

r da

yB

y ne

gotia

tion

BR

osco

e S

tree

t Mal

l Mar

kets

, Ros

coe

Str

eet M

all

per

day

746.

90

B

All

othe

r no

n-co

mm

erci

al a

reas

for

prom

otio

nal o

r o

ther

sim

ilar

activ

ities

App

licat

ion

Fee

(A

ll ap

plic

atio

ns n

on r

efun

dabl

e)90

.00

B

Ful

l day

(9.

00 a

m –

5.0

0 pm

)pe

r da

y39

5.00

BP

art d

aype

r ho

ur85

.00

B

Reg

iste

red

char

ities

/ not

for

prof

it or

gani

satio

ns (

docu

men

tatio

n re

quire

d)-

A

Foo

tway

Res

taur

ants

(S

ectio

n 12

5 R

oads

Act

199

3)A

pplic

atio

n fe

e25

0.00

BN

otifi

catio

n fe

e19

0.00

BR

enta

l fee

Bas

ed o

n co

mm

erci

al v

alua

tion

of p

rope

rty

D

Foo

tpat

h S

eatin

g Lo

catio

n A

: Oxf

ord

Str

eet M

all,

Bon

di J

unct

ion

per

m2

629.

00

D

Loca

tion

B: W

aver

ley

Str

eet M

all,

Bon

di J

unct

ion

per

m2

546.

00

D

Loca

tion

C: C

ampb

ell P

arad

e &

Ros

coe

Str

eet,

Bon

di B

each

(D

CP

)pe

r m

282

7.00

DLo

catio

n D

: Bro

nte

Roa

d, B

ront

e B

each

per

m2

582.

00

D

Loca

tion

E: H

all S

tree

t and

Cam

pbel

l Par

ade

extr

emiti

es B

ondi

Bea

ch (

outs

ide

DC

P)

per

m2

494.

00

D

Loca

tion

F: O

ther

are

aspe

r m

241

6.00

D

Not

e: 1

. Bon

ds m

ay b

e re

quire

d at

Cou

ncil'

s di

scre

tion.

2. F

ees

and

cond

ition

s fo

r an

y pe

rmitt

ed e

vent

s no

t spe

cifie

d ab

ove

are

set b

y th

e D

irect

or R

ecre

atio

n, C

usto

mer

and

Com

mun

ity S

ervi

ces

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es48

Page 50: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

Foo

tway

Use

Per

mits

Goo

ds d

ispl

ay -

app

licat

ion

fee

per

appl

icat

ion

175.

00

D

- pe

rmit

fee

per

year

per

m2

320.

00

D

Sig

n di

spla

y -

app

licat

ion

fee

per

appl

icat

ion

175.

00

D

- pe

rmit

fee

per

year

440.

00

D

Clo

thin

g B

ins

Cha

ritie

s an

d no

t for

pro

fitpe

r bi

n pe

r an

num

108.

00

B

Com

mer

cial

ope

rato

rspe

r bi

n pe

r an

num

350.

00

D

Roa

dway

Use

Per

mits

Pla

cem

ent o

f bui

lder

’s w

aste

bin

per

year

583.

00

D

Pla

cem

ent o

f bui

ldin

g w

aste

bin

in m

eter

ed s

pace

(m

axim

um fe

e $2

00.0

0 fo

r 1-

7 da

ys)

per

day

90.0

0

DP

lace

men

t of b

uild

ing

was

te b

in in

res

iden

tial p

arki

ng a

rea

spac

e

1st w

eek

56.0

0

DP

lace

men

t of b

uild

ing

was

te b

in in

res

iden

tial p

arki

ng a

rea

spac

e

2nd

and

sub

sequ

ent w

eeks

– p

er

wee

k11

2.00

D

Ban

ner

Pol

es –

Com

mer

cial

Are

as -

Oxf

ord

Str

eet M

all (

18 p

oles

, 36

bann

ers

& C

ampb

ell P

arad

e (1

8 po

les,

36

bann

ers)

Com

mer

cial

use

per

bann

er p

ole

per

wee

k54

.00

D

App

rove

d ch

ariti

es a

nd n

ot fo

r pr

ofit

per

bann

er p

ole

per

wee

k27

.00

C

Ban

ner

Inst

alla

tion

by n

egot

iatio

nby

neg

otia

tion

C

Way

findi

ng s

igna

ge -

Oxf

ord

Str

eet M

all

Incl

usio

n of

Bus

ines

s na

me

on T

enan

cy D

irect

ory

per

entr

y pe

r an

num

170.

00

D

AO

Pro

mot

iona

l Pos

ters

- O

xfor

d S

tree

t Mal

lpe

r po

ster

per

wee

kby

neg

otia

tion

D

Way

findi

ng s

igna

ge -

Bon

di B

each

Tow

n C

entr

eIn

clus

ion

of B

usin

ess

nam

e on

Ten

ancy

Dire

ctor

ype

r an

num

342.

00

D

AO

Pro

mot

iona

l Pos

ters

- B

ondi

Bea

ch T

own

Cen

tre

per

post

er p

er w

eek

By

nego

tiatio

nE

Roa

ds Spe

cific

atio

n &

Insp

ectio

n of

Driv

eway

Cro

ssin

gs (

incl

udin

g 2

insp

ectio

ns –

form

wor

k an

d at

com

plet

ion)

375.

00

C

,E

Add

ition

al in

spec

tions

(if

dete

rmin

ed n

eces

sary

by

Div

isio

nal M

anag

er –

Tec

hnic

al S

ervi

ces)

per

insp

ectio

n12

5.00

C,E

Mar

king

of l

ines

on

road

way

nex

t to

driv

eway

s to

pre

vent

acc

ess

bein

g bl

ocke

d11

0.00

CIn

stal

latio

n of

tim

ber

post

s on

foot

path

per

post

110.

00

C

(The

se fe

es a

re th

e m

axim

um fo

r fo

otpa

th r

enta

l for

res

taur

ant s

eatin

g in

the

area

s id

entif

ied.

A le

sser

fee

can

be c

harg

ed w

ith th

e ap

prov

al o

f Cou

ncil’

s G

ener

al M

anag

er).

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es49

Page 51: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

Con

stru

ctio

n Z

one

Fee

App

licat

ion

fee

(non

ref

unda

ble)

375.

00

D

Fee

(re

side

ntia

l are

a) p

lus

park

ing

met

er fe

e in

met

ered

are

aspe

r m

etre

per

wee

k40

.00

D

Fee

(no

n-re

side

ntia

l are

a) p

lus

park

ing

met

er fe

e in

met

ered

are

aspe

r m

etre

per

wee

k65

.00

D

Foo

tpat

h H

oard

ing

Fee

sA

pplic

atio

n fe

e (n

on-r

efun

dabl

e)27

5.00

DF

ees

to b

e pa

id 3

mon

thly

, in

adva

nce:

Fee

(S

tand

ard

A C

lass

less

than

1 m

etre

from

bou

ndar

y)pe

r lin

eal m

etre

per

wee

k30

.00

D

Fee

(S

tand

ard

A o

r B

Cla

ss g

reat

er th

an 1

met

re fr

om b

ound

ary)

per

m2/

wee

k30

.00

D

Occ

upat

ion

of F

ootp

ath

App

licat

ion

fee

(non

ref

unda

ble)

275.

00

D

A fe

e pe

r w

eek

per

m2

or p

art t

here

of a

nd s

uch

fee

paid

3 m

onth

ly in

adv

ance

.F

ee (

per

m2/

wee

k)30

.00

D

Occ

upat

ion

of fo

otpa

th –

clo

thin

g bi

n (p

er y

ear)

375.

00

D

Mob

ile C

rane

/Con

cret

e B

oom

Pum

p/S

ciss

or li

ft/C

herr

y P

icke

r or

Oth

er S

imila

r E

quip

men

tpe

r da

y27

5.00

DIn

add

ition

to o

ccup

y an

y m

eter

ed p

arki

ng s

pace

per

spac

e pe

r da

y10

0.00

DIn

add

ition

- p

artia

l roa

d cl

osur

e/ e

xtra

lane

in a

dditi

on to

par

king

lane

per

day

275.

00

D

In a

dditi

on -

full

road

clo

sure

per

day

550.

00

D

Site

Tow

er C

rane

per

wee

k1,

000.

00

DLi

ne P

ump

per

day

150.

00

D

Roc

k/ S

and

Anc

hors

Ben

eath

roa

dway

s an

d ot

her

Cou

ncil

prop

erty

per

anch

or65

0.00

D

Sal

e/ L

ease

of C

ounc

il P

rope

rty

App

licat

ions

for

Pur

chas

e/ L

ease

of M

isce

llane

ous

Cou

ncil

Pro

pert

y/ L

anew

ays/

Roa

ds e

tc.

Initi

al a

pplic

atio

n fo

r co

nsid

erat

ion

(non

-ref

unda

ble)

830.

00

C

Sec

urity

Dep

osits

Sec

urity

Dep

osits

– B

uild

ing

App

licat

ions

Rel

ated

to b

uild

ing

cost

Less

than

$5,

000

250.

00

G

$5,0

00 to

$10

,000

500.

00

G

$10,

000

to $

25,0

0075

0.00

G

A fe

e ap

plie

s pe

r w

eek

per

met

re o

r pa

rt th

ereo

f, an

d su

ch fe

e to

be

paid

3 m

onth

ly, i

n ad

vanc

e. T

he h

ours

of r

estr

ictio

n to

be

indi

cate

d by

Cou

ncil,

but

gen

eral

ly 7

.00a

m to

5.0

0pm

, Mon

days

to

Sat

urda

ys.

Lic

ense

s to

be

gran

ted

by C

ounc

il on

aut

horis

atio

n an

d un

der

such

con

ditio

ns a

s m

ay b

e im

pose

d by

the

Tra

ffic

Com

mitt

ee.

Fur

ther

, one

wee

k's

notic

e to

be

give

n on

the

com

plet

ion

of th

e w

ork

to e

nabl

e au

thor

isat

ion

of th

e re

mov

al o

f the

sig

ns to

be

unde

rtak

en.

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es50

Page 52: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

$25,

000

to $

50,0

001,

000.

00

G$5

0,00

0 to

$10

0,00

02,

000.

00

G$1

00,0

00 to

$15

0,00

03,

000.

00

G$1

50,0

00 to

$20

0,00

04,

000.

00

G$2

00,0

00 to

$30

0,00

05,

000.

00

G$3

00,0

00 to

$40

0,00

06,

000.

00

G$4

00,0

00 to

$50

0,00

07,

000.

00

G$5

00,0

00 to

$75

0,00

08,

000.

00

G$7

50,0

00 to

$1,

000,

000

10,0

00.0

0

G

Ove

r $1

,000

,000

D

eter

min

ed b

y D

ivis

iona

l Man

ager

T

echn

ical

Ser

vice

s G

Inte

rest

pay

able

on

depo

sit (

sim

ple

inte

rest

, who

le m

onth

s on

ly)

base

d on

the

RB

A C

ash

Rat

e, w

hen

appl

ied

for

by th

e de

posi

tor.

Effe

ctiv

e fo

r de

posi

ts a

ppro

ved

to b

e re

fund

ed a

fter

1 Ju

ly 2

011.

N

/AG

(No

inte

rest

pay

able

if in

tere

st a

mou

nt is

less

than

$32

. Whe

re a

full

or p

artia

l ded

uctio

n ha

s be

en m

ade

for

rest

orat

ion

cost

s, in

tere

st w

ill b

e ca

lcul

ated

bas

ed o

n th

e ba

lanc

e to

be

refu

nded

if a

pplie

d fo

r by

the

depo

sito

r). N

ote

that

the

depo

sit i

s re

fund

ed to

the

indi

vidu

al/c

ompa

ny w

ho p

ay C

ounc

il th

e de

posi

t as

indi

cate

d on

the

rece

ipt.

Adm

inis

trat

ion

char

ge s

ubje

ct to

no

dedu

ctio

n be

ing

mad

e fr

om th

e de

posi

t prin

cipa

l32

.00

C

Was

te S

ervi

ces

Res

iden

tial P

rope

rtie

s –

Dom

estic

Was

te a

nd R

ecyc

ling

Col

lect

ion

for

sing

le d

wel

ling

and

mul

ti un

it pr

oper

ties

Cha

rges

incl

ude:

420.

00

C

Wee

kly

empt

ying

of 1

40L

or s

hare

d 24

0L b

ins

for

garb

age

For

tnig

htly

em

ptyi

ng o

f 140

L or

sha

red

240L

bin

(s)

for

recy

clin

gF

ortn

ight

ly b

undl

ed/ t

ied

gree

n w

aste

rem

oval

Tw

ice

wee

kly

rem

oval

of 5

5L b

ins

for

garb

age

and

wee

kly

empt

ying

of r

ecyc

ling

crat

e an

d tw

o at

cal

l cle

an-u

p se

rvic

e

Col

lect

ion

of A

dditi

onal

Dom

estic

Gar

bage

and

Rec

yclin

g B

ins

for

sing

le d

wel

ling

and

mul

ti un

it pr

oper

ties

Cha

rges

incl

ude:

420.

00

C

Wee

kly

empt

ying

of 1

40L

or s

hare

d 24

0L b

ins

for

garb

age

For

tnig

htly

em

ptyi

ng o

f 140

L or

sha

red

240L

bin

(s)

for

recy

clin

g

Add

ition

al R

ubbi

sh R

emov

al S

ervi

ce fo

r R

esid

entia

l P

rope

rtie

sA

dditi

onal

pic

k up

140

/ 240

litr

e m

obile

gar

bage

bin

(R

ed L

id)

21.7

5

�C

Add

ition

al p

ick

up 8

0/ 1

40/ 2

40 li

tre

mob

ile g

arde

nwas

te b

in (

Gre

en L

id)

21.7

5

�C

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es51

Page 53: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

Add

ition

al a

t cal

l cle

an u

p se

rvic

e (

up to

2 c

ubic

met

res

volu

me

of d

ry w

aste

)52

.80

CT

hese

pay

men

ts a

re n

on-r

efun

dabl

e

Pre

Pai

d G

arba

ge B

ag C

olle

ctio

nP

ack

of 1

0 pr

e pa

id b

ags

48.0

0

�C

,E

Cha

rges

for

supp

ly/ r

epla

cem

ent o

f was

te a

nd r

ecyc

lin

g co

ntai

ners

(W

here

a fe

e is

cha

rged

it w

ill b

e n

o m

ore

than

the

follo

win

g)

80/ 1

40/ 2

40 li

tre

mob

ile g

arba

ge b

in (

red

lid)

59.0

0

�C

140/

240

litr

e m

obile

rec

yclin

g bi

n (b

lue

or y

ello

w li

d)32

.00

C80

/ 140

/ 240

litr

e m

obile

gar

denw

aste

bin

(gr

een

lid)

59.0

0

�C

660

litre

mob

ile g

arba

ge b

in71

5.00

�C

Rec

yclin

g cr

ates

21.7

5

�C

Cha

rges

for

supp

ly o

f com

post

bin

s an

d w

orm

farm

sC

ompo

st B

in80

.00

CC

ompo

st M

ate

13.5

0

�C

Wor

m F

arm

72.5

0

�C

Non

Rat

eabl

e P

rope

rtie

s –

Res

iden

tial

Ser

vice

cha

rges

140

litre

bin

– o

nce

wee

kly

serv

ice

per

year

420.

00

C

240

litre

bin

– o

nce

wee

kly

serv

ice

per

year

420.

00

C

Com

mer

cial

Was

te a

nd R

ecyc

ling

Col

lect

ion

Ple

ase

call

Cou

ncil

on 9

369

8000

for

info

rmat

ion

Ser

vice

s fo

r S

peci

al E

vent

sW

aste

Ser

vice

s fo

r S

peci

al E

vent

sB

in d

eliv

ery

fees

0-25

58.0

0

�C

,E26

-50

232.

00

C,E

51-1

0031

9.00

�C

,ES

ervi

ce c

harg

es14

0 lit

re b

in p

er s

ervi

cepe

r se

rvic

e17

.60

C,E

240

litre

bin

per

ser

vice

per

serv

ice

29.0

0

�C

,EB

ulk

cont

aine

rpe

r m

3 pe

r se

rvic

e58

.00

C,E

Rep

lace

men

t fee

for

lost

bin

s11

6.00

C,E

Rec

yclin

g S

ervi

ces

for

Spe

cial

Eve

nts

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es52

Page 54: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Dra

ft F

ees

and

Cha

rges

for

2012

-13

Cat

egor

yU

nit

2012

/13

Fee

or

Cha

rge

$G

ST

� ���

Pric

ing

Pol

icy

201

2/13

Spe

cial

Eve

nts

cust

omer

s ar

e of

fere

d th

e fo

llow

ing

subs

idis

ed r

ecyc

ling

char

ges

for

non-

cont

amin

ated

re

cycl

ing

mat

eria

ls

Pap

er/ c

ardb

oard

col

lect

ion

- 24

0 lit

re m

obile

bin

per

colle

ctio

n7.

80

�C

,EB

ulk

Col

lect

ions

per

serv

ice

15.5

0

�C

,EC

o-m

ingl

ed c

olle

ctio

nspe

r se

rvic

e7.

80

�C

,E

Gen

eral

Was

te S

ervi

ceM

anag

erpe

r ho

ur12

8.00

�C

,ES

uper

viso

rpe

r ho

ur83

.00

C,E

Driv

er/ l

oade

r/ o

pera

tor/

edu

catio

n of

ficer

spe

r ho

ur57

.00

C,E

Was

te v

ehic

lepe

r ho

ur60

.00

C,E

Cle

ansi

ngM

anag

erpe

r ho

ur12

8.00

�C

Sup

ervi

sor

per

hour

83.0

0

�C

Driv

er/ l

oade

r/ o

pera

tor

per

hour

57.0

0

�C

Str

eet a

nd g

utte

r ve

hicl

epe

r ho

ur49

.00

CLi

tter

bin

truc

kpe

r ho

ur55

.00

CM

ini r

oad

swee

per

per

hour

66.0

0

�C

Roa

d sw

eepe

rpe

r ho

ur77

.00

CIll

egal

Dum

ping

-

Fee

s an

d fin

es w

ill b

e le

vied

acc

ordi

ng to

the

Pro

tect

ion

of th

e E

nviro

nmen

t Ope

ratio

ns

Act

.

Wav

erle

y C

ounc

il O

pera

tiona

l Pla

n 20

12-1

3 -

Pric

ing

Pol

icy,

Fee

s an

d C

harg

es53

Page 55: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Index Page

Abandoned Cars, Trolleys & Other ItemsAbandoned Vehicles 6Impounding Fee 6

Access to Information/RecordsAccess to Council Records 6Supply of Council Business Papers 6Building & Development Plans 6Photocopying Legal Documents Under Subpoena 6

AnimalsCompanion Animals Act 6Impounding Fees 7

ApplicationsRezoning Applications 7Temporary Street Closure Application (non-refundable) 7Application to alter Street Number 7

Building MattersBuilding Inspection Fees 7Additional Inspection Fees 7Administration Fees 7Additional Warning Signs for Building Sites Relating to Soil & Water Management 8

Cemetery ServicesMemorial Garden Plots 8Memorial Shrub 8Family Memorial Shrub 8Remembrance Niche Wall – South Head General Cemetery 8Niche Walls – Waverley Cemetery 8‘Memorial Only’ – Memorial Plaques 8Memorial Plaques 9Forged Bronze Plaques 9Flower Vases & Marker Stones 9Right of Burial Certificate 9Interment of Coffin/Casket in an Allotment 9Late Fees 9Interment of Ashes of Deceased Person in an Allotment 9Reception of Coffin/Casket for Entombment in Vault or Mausoleum Style Allotment 10Monumental Work Application Fees 10Allotment Maintenance 10Basic Maintenance Plans 10Miscellaneous Services 11Historical/Reference Information & Services 11

CertificatesApplication fees for approval to erect: 12Issue of Building Construction & Complying Development Certificate 12Check Compliance with BASIX Certificate 12Land Subdivision Certificate 13Occupation Certificates 13Planning Certificates Section 149 13Strata Subdivision Certificate 13

Child Care ServicesChild Care Centres 13Family Day Care 14

Commercial Fitness Personal and Group Training use of Public Open SpacesAdministration Fee 14Bondi Park 14

Waverley Council Operational Plan 2012-13 - Pricing Policy, Fees and Charges 54

Page 56: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Index Page

Bronte Park 14Hunter Park 14Marks Park 14Tamarama Park 14Waverley Park 14Barracluff Park 14Diamond Bay Reserve 14Dudley Page Reserve 14Hugh Bamford Reserve 14Rodney Reserve 14Upper Diskson Reserve 14Varna Park 14

Community BusRates for approved groups servicing frail older people and people with a disability 15Rates for local organisations providing a community service 15Rates for other local organisations 15

Community Garden Plot Licence Fee 15

Cultural ActivitiesBondi Pavilion Community Cultural Centre 15Pottery Classes 15School Holiday Activities 16Concerts/Festivals 16Project Workshops 16Storage cupboard hire fee 16Music Studio equipment hire 16AV equipment hire 16Portable Staging 16Waverley Library - Art and other exhibitions 16

Development ApplicationsDevelopment Application Fees 16Additional Development Application Charges 17Residential flat development 19Development Application Fees for Subdivisions 20

Filming and Photography in Public Open Spaces Filming in Public Open Spaces

Application Fee (non refundable) 20Administration of processing traffic management plans (non refundable) 20Additional Fees 20

Photography/Stills (Commercial) in Public Open SpacesApplication Fee (non refundable) 21Location Fee 21Additional Fees 21

Library ServicesLibrary Charges 22Overdue Items 23Reference/Local Studies Services 23Reference/Local Studies Inquiries 23Reference Library – Fax Service 23

Maintenance and Repair of Council PropertyRoad Opening Permits & Contributions to Cost of Road Work 23Campbell Parade – western side/Lamrock Avenue to Wairoa Avenue 24Oxford Street Mall 24

Waverley Council Operational Plan 2012-13 - Pricing Policy, Fees and Charges 55

Page 57: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Index Page

Meals on WheelsStandard Meals 24Specialised meals 24Shopping Service 24

ParkingBeach Parking Permits 25Residential Parking Permits 25Registration - Valid for 6 months 25Registration - Valid for 12 months 25Other Parking Permits 25Parking Meters 26Miscellaneous 26Bondi Beach Car Park 26Bronte Beach Car Park 27Bondi Junction Eastgate Car Park 27Hollywood Avenue Car Park 27Denison Street Library Carpark 27

Payment TransactionsCredit Card Fee 28Dishonoured Payment Fee 28Unpaid Account Fee 28

PhotocopyingPhotocopying of information owned or controlled by Waverley Coucil (apart from applications under GIPA Act and legal documents under subpoena) 28Library Charges 28Photography of information owned or controlled by Waverley Council 29

PublicationsDevelopment Control Plans 29Digital Data 29Environmental Guidelines for Retail Food Sector (to non-Waverley premises) 29Heritage Policy (formerley Heritage Study) 29Local Orders Policy 29LEP 1996: Instrument 29Waverley LEP (Bondi Junction Centre) 2010: Instrument and maps 30Draft DCP 2011 30Draft LEP 2011 30Waverley LEP 1996 Ammendment No.33 30Policies and intruments on CD 30Other Planning Policies 30Operational Plan/Annual Report – Copying Cost 30Park Planning and Management Documents 30Publications 30Termite Control Code 30

Rating & Property InformationCertificate Fees 30Copy of Rate & Instalment Notices 31Extra Charges 31Rating Information 31Reconciliation of rate account 31

Registration of PremisesAir Handling Systems 31Registered Premises 31Fire Safety Management 31

Sending InformationFacsimile 32

Waverley Council Operational Plan 2012-13 - Pricing Policy, Fees and Charges 56

Page 58: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Index Page

Telecommunications Levy LGA Telecommunications Strategy Levy 32

Tenders 32

TreesApplication to lop/remove private trees (TPOs) 32

Use and hire of Council PropertyKimberley Reserve Community Centre 32Wairoa Avenue Community Centre 32Thomas Hogan Reserve Community Centre 33Hugh Bamford Reserve Community Centre 33Mill Hill Centre, 31-33 Spring Street, Bondi Junction – Venue Hire 33Bondi Pavilion Community Cultural Centre 34Child Care Centre Hire 38Council Chambers Function Room Hire 38Ron Lander Centre (Waverley Library) 40School of Arts 41Bondi Junction Customer Service Centre – Meeting Room 41

Waverley Park PavilionWaverley Park Pavilion (Civic & Recreational Use) 42Waverley Park Pavilion (Private Functions & Events Non Recreational Use) 43

Use and Hire of Public Open SpacesBondi Beach 43Bondi Park 43Bondi Skatepark 43Biddigal Reserve 43Bronte Beach 43Sam Fiszman Park 43Ray O'Keefe Reserve 43Tamarama Beach 43Bronte Park 44Tamarama Park 44Waverley Oval 45Hugh Bamford Reserve 46Barracluff Park 46Rodney Reserve 46Dudley Page Reserve 46Kimberley Reserve 46Marks Park 46Thomas Hogan Reserve 46Varna Park 46Other Parks 47Netball Courts 47Other Fees 47

Use Of Roads, Footpaths and Pedestrian MallsCharing Cross 48Campbell Parade 48Oxford Street Mall 48Roscoe Street Mall 48Waverley Street Mall 48Oxford Street Mall Markets, Oxford Street Mall 48Roscoe Street Mall Markets, Roscoe Street Mall 48All other non-commercial areas for promotional or other similar activities 48Footway Restaurants (Section 125 Roads Act 1993) 48Footpath Seating 48Footway Use Permits 48Roadway Use Permits 49

Waverley Council Operational Plan 2012-13 - Pricing Policy, Fees and Charges 57

Page 59: WAVERLEY COUNCIL Operational Plan...Waverley Council’s Mission and values Through its detailed Integrated Engagement Strategy, Waverley Council has taken note of the breadth and

Index Page

Banner Poles – Commercial Areas - Oxford Street Mall 49Campbell Parade 49

Wayfinding signage -Oxford Street Mall 49Bondi Beach Town Centre 49

Roads 49Construction Zone Fee 49Footpath Hoarding Fees 50Occupation of Footpath 50Site 50Rock/Sand Anchors 50

Sale/Lease Of Council PropertyApplication fee 50

Security DepositsSecurity Deposits – Building Applications 50

Waste ServicesResidential Properties 51

Collection of Additional Domestic Garbage and Recycling Collection for single dwelling and multi unit properties 51Additional Rubbish Removal Service for Residential Properties 51Pre Paid Garbage Bag collection 51Charges for supply/replacement of waste and recycling containers 52Charges for supply of compost bins and worm farms 52Non Rateable Properties - Residential 52Commercial Waste and Recycling Collection 52Services for Special Events 52General Waste Service 53Cleansing 53

Waverley Council Operational Plan 2012-13 - Pricing Policy, Fees and Charges 58