wdt v100r005c00spc100 propaganda slides for indonesia 201501
DESCRIPTION
adgjmTRANSCRIPT
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 1HUAWEI Confidential
This document consists of two parts: the promotional slides of the wireless smart terminal deployment tool WDT and the operation guide slides.1. Promotional slides: describes tool functions, project delivery pain points, effect and value of the tool, comparison of delivery methods, and success stories.2. Operation guide slides: includes the detailed WDT operation guide that can be used for quick guide. These slides provides the technical details, operation
experience and implementation skills in the project deployment.Remarks: Pay attention to italics highlighted in yellow which marks the important roles that need to be focused and implemented in each part of the content, and the
usage of some pages. Thank you.
WDT promotional slides:Release path: Support > Special Resource > Service Area > Wireless > Five Kits Serviceability Measures Release period: The promotional slides will incorporate the WDT tool problems, requirements, and mature experience in global usage and be reviewed and updated
every two weeks. For the latest version, please contact the promotion contact person.
Software and matched documents:The software includes the WDT software installation package for mobile phones and the PC assistant tool installation package. The matched documents include the WDT specification and user guide.Release path: Support > Product Support > Wireless Network > Wireless Professional Service > Radio AccessService > GENEX > WDT Remarks: If the new login window on Support website is in Chinese, the matched documents downloaded by clicking the link is of Chinese version. If the login
window is in English, the matched documents downloaded by clicking the link is of English version. You can also contact the tool deployment contact person to obtain the latest version and documents.
The WDT tool deployment contact persons: Sang Yanqi (employee ID: 00189072) (tool promotion) Wang Haizhao (employee ID: 00150702) (tool promotion) Li Wuyang (employee ID: 00186135) (R&D)
Usage Guide for the Slides and Methods of Obtaining the Software and Documents
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Part I Wireless Deployment Tool WDT Promotional Slides(V100R005C00SPC100)
December 2014
Part I Wireless Deployment Tool WDT Promotional SlidesPart II Wireless Deployment Tool WDT Operation Guide Slides
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 3HUAWEI Confidential
2Tool Introduction and Function Introduction
3 Effect Analysis and Presentation
Contents
4 Appendixes and Example Sites
1 Deployment Pain Points
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 4HUAWEI Confidential
1. Pain Points of Traditional Deployment Modes
Transmission or the OSS is not ready.
PNP is not supported.
The progress is delayed.
Complex USB file making Files are easy to be placed in a wrong path.
Faults are invisible.
High skill requirements using laptop computers. The partner employee exchange is frequent.
The skill transfer costs are high.
An-tenna cross feeder con-nec-tion 18%
An-tenna faults 42%
Transmis-sion
prob-lems 15%
Optical fiber and
mod-ule
18%
GPS problems 2%Others 5%
Problem analysis of second visits in a projectComplex and long acceptance report output Incorrect
information collection, such as errors or missing
Rework
Case:Transmission and remote deployment conditions are not met at the earlier stage of a delivery project. To meet the deadline, 200 sites are installed. After sites go online later, only 50 sites are working properly and the other 150 sites have alarms, such as standing wave alarms, optical alarms related to no TX/RX optical modules, and low or high optical power alarms.Therefore, these 150 sites are handed over to the supervisor and subcontract to go online multiple times by using laptop computers and professional construction tools. This wastes costs and delays the progress.
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 5HUAWEI Confidential
2. Introduction to Wireless Deployment Toolkit WDT
Hardware requirements:1. Mainstream Android smartphones are supported:Configuration: Android 2.3+, CPU 1 GHz, 512 MB RAM, and 2 GB
SD card2. Common Wi-Fi APs are supported: Recommended: TP-LINK TL-MR12U
Software requirements:WDT.apk (the size of the software package is 3 MB)
WDT (Wireless Deployment Tool):Wireless deployment tool WDT is a Huawei-developed smart-phone application (WDT.apk) that focuses on deployment and acceptance scenarios. Integrated with expert systems, the WDT is easy to use and provides diverse functions to facilitate site deployment and maintenance.
ALL (USB flash drive, DT mobile phone, camera, GPS, barcode scanner, alarm board, paper, and pen among others) in ONE (smartphone)
Only a network cable, an AP, and a smartphone are required.All mainstream Android mobile phones are supported.All common APs are supported, which reduces costs and facilitates procurement.
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 6HUAWEI Confidential
WDT functions
Script
Software
One-click site deployment
One-click site deployment:
Allows engineers to automatically log in to a base station, and then load the required software, scripts, and license file in one-click mode. The load process is visible.
It takes 10 to 18 minutes to deploy a base station in one-click mode.
Note: Subcontractors do not need to load any functions. They can use the functions only by clicking the corresponding buttons.
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 7HUAWEI Confidential
WDT functionsAndroid Terminal
One-click self-check
Rectify faults onsite.
VSWR
PIM
Cross Feeder
CPRI
One-click self-check:
After the installation is completed, engineers can click a specific button to perform GUI-based detection on engineering quality, such as the CPRI optical power, transmit optical power, cell status, clock status, transmission status, voltage standing wave ratio (VSWR), intermodulation, and single cross feeder connection.
Engineers can click a specific button to transmit the detection results back to the OMC for review.
This ensures that engineering quality problems are solved onsite, and frees the product team from frequent site visits.
Note: Subcontractors do not need to load any functions. They can use the functions only by clicking the corresponding buttons.
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 8HUAWEI Confidential
WDT functions
One-click transmission fault location
Trans-link
Auto Ping
Auto TRACERT
Trans error detect
Note: Subcontractors do not need to load any functions. They can use the functions only by clicking the corresponding buttons.
One-click transmission fault location:
Engineers can click a specific button to locate transmission faults, which is easy.
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 9HUAWEI Confidential
WDT functions
One-click report generation
Wizard-based photographing and one-click report generation:
Subcontractors can achieve wizard-based photographing based on a customized list, thereby preventing some photographs from being missed. The WDT automatically takes photographs and renames and sorts the photographs.
Site reports or customized acceptance reports are generated in one-click mode.
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 10HUAWEI Confidential
3. Detailed Functions of Wireless Deployment Toolkit WDT
Pain Point WDT Functions Effect
USB:1. Local faults are invisible and difficult to locate.2. The deployment based on the USB flash drive
depends a lot on the far end.3. Many devices are required for check and
there is a high risk of second visits. Laptop computer
1. Skills of software commissioning engineers are high and devices are expensive.
2. Commands are queried manually one by one and the fault locating skill requirements are high.
PNP:1. The ESN reporting is inefficient and error
prone.2. Transmission is out of position. The delivery
cannot start.3. Local faults are invisible and remote
communication is inefficient.4. OMC engineers are engaged in lots of affairs,
calls, and pressure. Acceptance:
1. Use multiple devices to collect information at random.
2. Check items are easy to miss and error prone. Report:
1. Later data filtering and reorganization costs a lot of time.
2. Labor costs are high and data accuracy is uncertain.
1. Software, configuration file, and license loading
1. Operation replay
2. Automatic generation of acceptance reports
1. Transmission link setup process and faults
visibility
2. Ping and Tracert
3. Antenna detection (VSWR, intermodulation, and
crossed pair connection)
4. Cell, board, optical power, and GPS check
5. Alarm query
6. Operation log
1. Radio parameters, service verification, and site
navigation
2. Acceptance photo-taking
3. Acquisition of GPS data
4. ESN scanning (sent by SMS)
5. Data uploading (sent by email)
Sit
e A
ccep
tan
ce
Bas
e S
tati
on
C
om
mis
sio
nin
g
Dat
a L
oad
ing
Rep
or
t To
ol
Reduce skill requirements
Reduce device quantities and
costs
Accelerate the project delivery
progress
Locate the cause of a fault and
solve the problem locally
Reduce the time of second visits
to a site significantly
Collect information correctly and
efficiently
Generate reports quickly and
correctly
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 11HUAWEI Confidential
4. WDT Benefits – C. Customized Photographing and Automatic Report Generation
1. Customize a list for wizard-based
photographing onsite by using the WDT.
Transmit photographs back through methods
such as email, SMS, or net disk.
Integrated solution based on wireless deployment toolkit WDT and documentation preparation tool SID
SID used for documentation
preparation2. Contents that need to be
entered: Record the contents on reused papers onsite (information
entries are optimized).
Base station
OMC
3. Customize information that is required for automatically obtaining site acceptance
information through the M2000.
5. All collected information is automatically filled in a
customized report.
Photographing list customization
The customization period is less than 30 minutes. Acceptance or survey
documentationThe customization period
is less than one week.
4.Enter other information according to specified rules.
Information is entered quickly.
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 12HUAWEI Confidential
5. Summary of Benefits Brought by Wireless Deployment Tool WDT
Free the project team from
frequent site visits
Generate acceptance reports
intelligently
Ensure the project progress
Reduce subcontractor skill
requirements
Transmission faults are avoided, software commissioning engineers are no longer required, and the project team does
not need to pay frequent site visits. This improves delivery efficiency, reduces the number of site visits, and ensures
delivery progress.
• Even if transmission is out of position, we dare to
install base stations. We can ensure no rework
after the installation.
• Generate neat deployment reports intelligently based on the photo collection guide, alarm query, and status query functions of smart terminals. This saves a lot of report making time.
• Ensure no site engineering installation faults before leaving sites
• No requirement for the remote OSS
• GUIs simplify the installation and operations.
• No user manual is required. Subcontractors can install base stations and user them immediately after the installation.
Four reasons to reduce costs
Replace multiple site visits by one visit.
Replace manual reports by automatically generated reports.
Replace laptop computers by smart terminals.
Replace high skill requirements by low skill requirements.
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 13HUAWEI Confidential
Appendix 5 - Required Smartphones and Selecting Policies1. The WDT software can be installed on all mobile phones of Android 2.3 to 4.4 produced by mainstream vendors. In areas where the Android phones are popular among subcontractors, subcontractors' Android phones can be used.
Note:To ensure that the functions are stable, smuggled cell phones and pirated cell phones cannot be used. You are advised to use the Android mobile phones produced by global mainstream vendors, such as: Samsung, HTC, and Huawei (If some Android mobile phones cannot be compatible, please send the phone models and Android versions back to the WDT deployment contact person. Thank you!).
1. The mobile phone functions in the delivery: site deployment and project quality self-check, service test, and reporting photo-taking.
The site deployment and project quality self-check functions basically have no requirements on mobile phone performance. Mobile phones of Android 2.3 to 4.4 can be used. Android mobile phones bought on the Taobao with 200 RMB (exemption from postage) also support the WDT.
2. Service test requirements: If there are service test onsite requirements on the wireless side (Not a drive test for network optimization. Drive test tools for network optimization are checked and prepared by the network optimization side.):
A. Preferred mobile phones support the modes and frequency bands required by the project, and mandatory feature tests, such as the CSFB and VoIP, which need to be checked by the wireless project owners.
B. If lock screen is tested, the PHU and a third-party lock frequency software must be installed on the mobile phone at a time. You are advised to choose preferred phone models that support the software (You need to confirm with the Huawei PHU team or the third-party software personnel).
3. Photo-taking requirements: If customers have high quality requirements on photos, the mobile phone resolution must be no lower than 8 million. In addition, the mobile phone must support the autofocus and SD card functions (mainstream mobile phones in the market basically support the functions).
Summary: If customers have dialing test requirements, mobile phones of specified models that support the dialing test function must be purchased. If there is no dialing test requirements, purchase Android mobile phones with a resolution no lower than 8 million that are easy to purchase at local area.
2. Delivery of smartphones will become the trend in the future. All fields of Huawei are developing mobile phone tools. Considering that mobile phones can be used for a long time, you are advised to purchase smartphones in batches based on the following selection policies:
Wireless responsible personnel must focus on this slide and
provide this slide to the project team or the representative
office for reference after selecting the modes.
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 14HUAWEI Confidential
Appendix 6 - Recommended APs with Self-supplied Power and Convenient for Local Procurement
ID Model Online Purchase Website
1 TP-LINK TL-MR12U
Jingdong Mall: http://www.jd.com
Taobao: Www.taobao.com
Amazon: www.amazon.com
ID Model Online Purchase Website
1 TP-Link WR702N
Jingdong Mall: http://www.jd.com Taobao: www.taobao.com
Amazon: www.amazon.com Ebay: www.ebay.com
eBay: www.eachnet.com Best Buy: www.bestbuy.com
Yahoo: shopping.yahoo.com Wal-Mart: www.walmart.com
2
POWERLINK AP2403 or
POWERLINK PT-AP2403
Amazon: www.amazon.com Ebay: www.ebay.com
eBay: www.eachnet.com Best Buy: www.bestbuy.com
3 B-Link BL-MP01Jingdong Mall: http://www.jd.com Taobao: www.taobao.com
Amazon: www.amazon.com
1. Recommended AP Lists (With self-supplied mobile power, it has no need for external power supply at the site.)
2. Other AP lists (The external power is used and the AP obtains power from the USB port on the control board.)Note: The UMPT board has no USB interface, and APs with external power supply cannot obtain power from the UMPT board.
Configuration Item
Configuration Requirements
Supported standards and protocols
IEEE 802.11 b, 802.11 g, 802.11 n
Work mode AP mode
AP mode settings
The default is AP, and the IP address is automatically configured. It can be manually switched to the AP by pressing the handover key.
RET type Built-in antenna
Transmission efficiency
11 b: 11 Mbit/s, 11 g: 54 Mbit/s, 11 n: 150 Mbit/s
Work voltage/Current
DC 5 V/500 mA
Charging cable USB cable
Port Ethernet port
Built-in battery Greater than 5200 mAh
3. AP Configuration Requirements
Note: Theoretically, all APs in the market support self-supplied power. However, some AP vendors set built-in firewall and password by default. If you find that the WDT cannot log in to the base station or cannot upgrade the software, disable the default settings and password of the AP firewall.
Wireless responsible personnel must focus on this slide
and provide this slide to the project team or the
representative office for reference after selecting the
modes.
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 15HUAWEI Confidential
• Base stations can be installed even when transmission links are unavailable. In addition, no faults will occur and rework will not be required after the base stations are installed.
Pain Points of Traditional Base Station Delivery
Transmission links or the OSS is
unavailable.
The acceptance report is complicated.
Information collection does not follow
specified norms and some information is
easy to be missed or incorrectly collected.
The turnover of external workforce is high,
which causes high skill transfer costs.
An-tenna
crossed pair con-nec-tions (18%)
An-tenna faults (42%)
Transmis-sion
faults (15%)
Optical fiber and
module faults (18%)
GPS faults (2%) Other faults (5%)
Analysis of faults causing frequent site visits in a project
The engineering quality cannot be ensured
due to a tight project schedule.F
au
lts
de
tec
ted
aft
er
ba
se
sta
tio
ns
go
liv
e
Benefits of Wireless Deployment Tool WDT
Function 1: Base station commissioning and hardware fault detection
Engineers can check the boards, optical power, GPS status, transmission status, and antenna VSWR and detect
intermodulation and crossed pair connections easily through GUIs.
Function 2: Site acceptance report
Engineers can generate standard site reports in one-click mode. The site reports include customized photographs and
information such as site detection information, equipment serial numbers (ESNs), latitudes, and longitudes.Function 3: OMC playback during self-check
Engineers can replay operation logs to locate faults. They can also view archived logs in the OMC to trace site deployment
processes.
Fa
ult
pre
ve
nti
on
• Site hardware installation errors and faults can be rectified onsite without using the remote OSS even when transmission links are unavailable.
1. Prevents frequent site visits due to engineering quality problems
4. Ensures project progress
• Photographs are collected and alarm status is queried based on specified sequences, and standard site deployment reports are generated in one-click mode to reduce report preparation time.
• GUIs make installation and operation easier.• Subcontractors can operate equipment upon installation without
reading related guides.
2. Generates site deployment reports automatically
3. Lowers skill requirements on subcontractors
1. Wireless deployment tool WDT is installed on an Android-based mobile phone.
2. An AP connects to the main control board of each base station by using a network cable and transmits Wi-Fi signals.
3. The mobile phone communicates with the AP and base stations through Wi-Fi to perform engineering self-check.
ALL (USB flash drive, DT mobile phone, camera, GPS, barcode scanner, paper, and pen among others) in ONE (smartphone)
Wireless Deployment Tool WDT
Tool contact of Wireless Product Rollout Dept: Sang Yanqi (employee ID: 00189072)
This page is used for WDT promotion, and is provided for each regional office and
product team if it is required.
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Part II Wireless Deployment Tool WDT Operation Guide Slides(V100R005C00SPC100)
December 2014
Wireless department leaders are advised to read the slides
carefully (because the slides include technical details and
experience related to project implementation).
Part I Wireless Deployment Tool WDT Promotional SlidesPart II Wireless Deployment Tool WDT Operation Guide Slides
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 17
Step 1. Obtain WDT and install
You can obtain the WDT installation package using either of the following two methods:
1. Log in to http://support.huawei.com and navigate to the following path:
Support > Product Support > Wireless Network > Wireless Professional Service > Radio Access Service >
GENEX > WDT (free application download)
Copy WDT.apk to the root directory of the smartphone and click to install.
2. Scan the following two-dimension code and download the installation package:(Print QR Code on paper)
Click to install after download successfully.
Step 2. Automatically create folders
WDT will create HuaweiSDTData and subfolders automatically.
Function 1: Install and Configure the WDT
QR Code
Folders
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 18
Step 3. License applying
1. Online applying(recommended way).Project administrator to authorize the privileges.
a. Project Administrator bulk import phone IMSI number,click "Register" button to apply. b. Install the tool and click on the "Register", the device will automatically be reported to
the information the user ID, the project administrator added.
Note: A project can have one or more interface person, please contact the administrator (Sang Yanqi 00189072, Wei Jie 00190129) to set new administrator privileges, after setting to manage the project and apply for License
Function 1: Install and Configure the WDT
2. Offline applying
a. Obtain Device ID from
b. Send to administrator Wei Jie 00190129, Li Wuyang 00186135
Note: Provide your project information while sending email.
c. Copy license file to smart phone.
d. Import file and start to use WDT.
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 19HUAWEI Confidential
4. Modify the WDT configuration file WDTConfig.txt.1. During the first running, the WDT automatically generates the script file WDTConfig.txt in the root directory of the internal storage area. Default values are used for parameters in the file. Change the values based on site requirements. The WDTConfig.txt file can be edited by following ways: 1) edit on STDRP, see section 2.4 in WDT V100R005C00 User Guide.docx. 2) edit on Phone. 3) edit by WordPad on PC.
2. The following values are changed:-- VSWR threshold-- Inbox and outbox addresses (the Gmail mailbox is used for mail sending by default, with the host and port IP addresses unchanged; the
inbox can use any mailbox.)-- Number of the mobile phone for receiving SMS messages-- Photograph list-- ESN names to be scanned
3. To ensure the script file consistency on all phones in the project, the administrator must modify the file on one phone and copy it to all the other phones.
(Install WDT.apk, delete the automatically generated WDTConfig.txt file, and copy the modified configuration file.)
4. For details about the related parameters, see section 1.5.5 in WDT V100R005C00 User Guide.docx.
Function 1: Install and Configure the WDT
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 20
1- Introduction of automatically generated folders.Folder Function FileName Description Location
BTS3900Stores software of SRAN8.0, 9.0, and 10.0 base stations, including BTS3900 WCDMA, BTS3900 LTE, and co-MPT BTS3900.
Software Folder Software \HuaweiBTSInfo\BTS3900\Software
HotPatch Folder HotPatch \HuaweiBTSInfo\BTS3900\HotPatch
*.xml/*.xml.ecf Site Script \HuaweiBTSInfo\BTS3900\SiteName
MICROStores software of SRAN8.0 and 9.0 Micro base stations, including BTS3202E, BTS3203E, BTS3902E, and BTS3803.
Software Folder Software \HuaweiBTSInfo\MICRO\Software
*.xml/*.xml.ecf Site Script \HuaweiBTSInfo\MICRO\SiteName
LAMPSITEStores software of SRAN8.0 and 9.0 base stations, and LampSite.
Software Folder Software \HuaweiBTSInfo\LAMPSITE\Software
*.xml/*.xml.ecf Site Script \HuaweiBTSInfo\LAMPSITE\SiteName
GSM Stores GBSS7.0, 8.0, 9.0, and 10.0 GBTS software.
*.csp Software \HuaweiBTSInfo\GSM\Software
Precfg.ini Preconfig \HuaweiBTSInfo\GSM\Software
TranCfg.INITransmition
Config\HuaweiBTSInfo\GSM\SiteName
UMTSStores UMTS 7.0 and BTS3900 WCDMA 8.0, 9.0, and 10.0 software.
Software.csp Software \HuaweiBTSInfo\UMTS\Software
vercfg.xml Version config \HuaweiBTSInfo\UMTS\Software
HotPatch Folder HotPatch \HuaweiBTSInfo\ UMTS \ HotPatch
*.xml/*.xml.ecf Site Script \HuaweiBTSInfo\UMTS\SiteName
LTEStores LTE 7.0 and BTS3900 WCDMA 8.0, 9.0, and 10.0 software.
Software.csp Software \HuaweiBTSInfo\LTE\Software
vercfg.xml Version Config \HuaweiBTSInfo\LTE\Software
HotPatch Folder HotPatch \HuaweiBTSInfo\LTE \ HotPatch
*.xml/*.xml.ecf Site Script \HuaweiBTSInfo\LTE\SiteName
LICStores commissioning licenses for LTE base stations whose ESN is ANY.
*.dat/*.lic/*.xml License \HuaweiBTSInfo\LIC
CA Stores the CA root certificate (Certification Authority). *.pem/*.cer/*.per/*.p7b CA cert \HuaweiBTSInfo\CA
CRL Stores the CRL file (Certificate Revocation List). *.crl CRL \HuaweiBTSInfo\CRL
MML Stores the Customized MML script. *.txt MML Script \HuaweiBTSInfo\MML
RETCFG Stores the RET antenna configuration data. *.bin RET Config \HuaweiBTSInfo\RETCFG
Function 1: Prepare for the Deployment
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 21HUAWEI Confidential
Function 1: Prepare for the Deployment
HuaweiBTSInfo
BTS3900
LIC
Software
Base station name
1. If the WDT is used for the first time, Huawei engineers need to prepare the HuaweiBTSInfo folder (including the base station version software, license, and customized WDT data configuration file) and send the folder to subcontractors. The subcontractors only need to copy this folder to the root directory.
2. The subcontractors only need to periodically update base station configuration scripts before and even during onsite construction.
3. Base station configuration scripts can be periodically transmitted through the following methods: net disk, email, communications software, and remote server. The project team can select any method based on site conditions. (In countries outside China, it is recommended that the project team use a Google net disk to synchronize a number of scripts from the net disk to the specified directory on the mobile phone in one-click mode). The subcontractors can obtain the scripts easily in one-click mode.
4. If some scripts are incorrect or are changed during site deployment, script preparation engineers need to modify the scripts on the CME, re-export the scripts, and then remotely transmit the scripts to the subcontractors' mobile phone. For the subcontractors, base station configuration is similar to the black box of an airplane, and they can use the base station configuration to achieve channelization.
1. Deployment data preparation
Example: preparing deployment data for base stations in SRAN8.0 & 8.1 & 9.0
Note:To save storage space, engineers can delete unneeded software packages of the BTS3900 based on site requirements, such as BOOTROM, GBTS, and eGBTS.
Stores the license file (*.DAT)
Stores base station software
Stores the base station configuration file M2000.XML
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 22HUAWEI Confidential
Function 1: Prepare for the Deployment2. Device connection
Step 1 Verify that the AP works in AP mode.
If the AP has a physical button for setting the working mode, push the button to the position indicating the AP mode. If the AP does not have such a physical button, log in to the AP management page in advance to set the working mode to the AP mode.( 3G mode can also support WDT to do deployment and even more steady)
Step 2 Connect the AP to the commissioning port of the main control board using a network cable.
For a main control board such as GTMU, WMPT, or LMTP: − Connect the AP directly to the ETH commissioning port of the main control board using
a network cable.
For the main control board UMPT:− In countries outside China, each UMPT board is delivered with a USB-to-network port
cable by default. Connect the AP directly to the network port of the USB-to-network port cable.
− In China, each UMPT board is not delivered with a USB-to-network port cable by default, and auxiliary materials are centrally delivered. Obtain USB-to-network port cables from the warehouse before site visits.
Step 3 Power on the AP.
Push the physical button to the position indicating the AP mode. Set the working mode of the AP
on the AP management page.
Connect the AP to a main control board of an old type.
Connect the AP to a UMPT board.
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 23HUAWEI Confidential
3. WDT startFunction 1: GUI Phone does not require to pre-connect Wi-Fi, Please click "Deployment" icon and then to select Wi-Fi
signal, then can connect AP and login station.
Click the SDT icon, select the RAT of base stations you want to log in to, and select the site where the configuration file is saved. The navigation page is displayed. According to standard, software version and control board to select the corresponding "Select Mode" option, please refer to the following table.
Base Station Type
Recommended Logging RAT
RAT Selection
Path
GTMU GSM GSM HuaweiBTSInfo / GSM
WMPT UMTS UMTS HuaweiBTSInfo / UMTS
LMPT LTE LTE HuaweiBTSInfo / LTE
UMPT GSM/UMTS/LTE/GU/GL/UL/GUL
BTS3900 HuaweiBTSInfo / BTS3900
BTS3202E/BTS3203E/BTS3902E/BTS3803E
Micro UMTS, Micro LTE
Micro HuaweiBTSInfo / Micro
LAMPSITE Lampsite UMTS,
Lampsite LTE, Lampsite UL
Lampsite HuaweiBTSInfo / Lampsite
Choosing the destination version mode to login
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 24HUAWEI Confidential
Function 2: One-Click Deployment4. The base station software, scripts and license issued The macro site, micro site, and LampSite are supported. The progress of loading the software, configuration, or license is visible. You can select software RATs of co-MPT base stations.
One-click deploymentVisible progress and status
Automatically read the board and version
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 25HUAWEI Confidential
5. Base station commissioning - transmission link setup visibility
The visibility of IP transmission deployment process allows you to locate faults quickly. It reduces the time from 20-minute to 1.
Red, yellow, and green lights indicate task results, providing a simple and direct view. You can expand them to view details.
Note: Create site NE icons on the M2000 to ensure that the status of 1. OMCH/OML Information is in green, indicating connected.
Function 2: GUI-based Detection
Automatic detection of the expert system
Comprehensive transmission information and clear fault view
Useful tool of transmission fault locating and demarcation
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 26HUAWEI Confidential
6. Base station commissioning - Transmission fault check The input-free function automatically reads the next hop IP address of the base station and the IP addresses of the BSC and
M2000. The ping and Tracert tests can be executed multiple times.
You can manually change and type the IP address, and check service IP addresses.
Function 2: GUI-based Detection
Manual ping and Tracert tests
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 27HUAWEI Confidential
The WDT allows you to test the VSWR, intermodulation, and antenna cross feeder connection functions. Commands are automatically executed and results are displayed in red, yellow, and green, providing a direct and simple view.
7. Base station commissioning - Antenna checkFunction 2: GUI-based Detection
Automatic testsNo rework during the antenna construction
Note: After the software and configuration data is download, base stations are restarted. Wait for 12 minutes and then enable the antenna check function. Software of RRUs takes effect slowly. It takes 12 minutes for three 8-channel RRUs to take effect.
Meaning of signalgreen: not interferedred: interferedyellow: execution failed
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 28HUAWEI Confidential
Supported networking types: multi-core RET, SBT connected to the RET, and STMA connected to the
RET
Supported scenarios: built-in RCU, external single antenna, and external RCU cascading scenarios
Show details of each step, highlight the failure。
One-click detection encapsulates the detection process,.reduces skill requirements, and decreases the times of going sites for the second time
Note: External cascading scenarios need to scan ESN.
Function 2: GUI-based Detection8. Base station commissioning - RET Antenna check
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 29HUAWEI Confidential
Sector1 Sector1Sector1 Sector2 Sector3
external single antenna external RCU cascadingbuilt-in RCU
Scenario ① power on ② scan ald ③ add ret ④ download cfg ⑤ Calibration ⑥ Adjust operation experience
Internal cascadingWDT automatically turn on the power supply of RET and Antenna port
WDT automatically scan the ALD devices
WDT automatically add RCU to RRU through Color-Coding
of pre-configured file.No need No need
Automaticallyset
retsubunit tilt
One-click detection
External non-cascading Automatically add automatically loaded
down RET configure data file
Which Stored in SDCard
Automaticallycalibration
One-click detection
External cascadingManually scan the ESN of
RCU with camera
Scan with camera instead of writing on paper.
One-click detection.
Function 2: GUI-based Detection8. Base station commissioning - RET Antenna check
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 30HUAWEI Confidential
Scenario1: Internal cascading
The RCU is invisible inside the antenna, so you need to use the color coding to set the tilt, and then configure the RRU to which the current RCU needs to be added.
Therefore, the main settings include the RRU sector name, sector subrack No., RCU ESN tail No., and RET antenna tilt.
You can add multiple sets of RET antenna settings or delete the RET antenna settings.
Sector1
ESN explanation:
One-click to finish the detection
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 31HUAWEI Confidential
Scenario2: External_Regular
One-click to finish the detection
HuaweiBTSInfo
RETCFG
In the scenario, one RCU usually connects to one RRU, so you only need to designate the RRU, RET BIN file, and the tile.
Therefore, the main settings include the RRU sector name, sector subrack No., configuration data file name, and RET antenna tilt.
You can add multiple sets of RET antenna settings or delete the RET antenna settings.
Sector1 Sector2 Sector3
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 32HUAWEI Confidential
Scenario3: External_Chain
HuaweiBTSInfo
RETCFG
扇区 1
Camera scanning instead of writing on paper,One-click to finish the detection.
In the scenario, one RRU usually connects to multiple RCUs. The RCUs need to be identified through the frequency band or other methods. So you need to designate the frequency bank, RET BIN file, and the tile.
Therefore, the main settings include the RRU sector name, sector subrack No., identification flag, configuration data file name, and RET antenna tilt. You can add multiple sets of RET antenna settings or delete the RET antenna settings.
You can set all the three configuration scenarios or choose any of them. Only the configured scenario can be used as the activation scenario.
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 33HUAWEI Confidential
Ensure that no engineering alarms exist before you leave sites to avoid possible future rework.
This function can replace the external alarm detection board.
Implementation Skills:
Considering that the skills of subcontractors are poor in many areas, the following policies can be defined in the delivery procedure: Subcontractors are obligated to transmit site deployment logs back to a mailbox specified by OMC personnel after they complete the self-check. The OMC personnel use the WDT PC assistant to view the logs and verify that no errors occur and no engineering-related alarms are reported, and then notify the subcontractors of leaving the sites.
9. Base station commissioning - Alarm queryThe list in the current page can be refreshed so that the deleting status is confirmed in a timely manner.
Function 2: GUI-based Detection
Please contact OMC to get further help
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 34HUAWEI ConfidentialIf the optical power meter is used onsite, lead the customer into replacing the optical power meter with the WDT.
Allows you to query various kinds of information.
The GBTS does not support the board, optical power, cell, and GPS check at the local end.
10. Base station commissioning - Board, optical power, cell, and GPS checkFunction 2: GUI-based Detection
Places where problems probably occur are clearly displayed.
Board status
RRU serial number,Can be used as an reference of CPRI crossfeed
Optical power
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 35HUAWEI Confidential
Export the base station equipment archives, and check whether the material record
information is consistent with the actual situation.
You can perform dialing tests of simple services by blocking or unblocking a cell.
11. Common - Base station management
Function 2: GUI-based Detection Ensure that the record information is consistent with the actual situation.
By blocking cells to ensure the phone stay at the target cell, In order to do service tests.
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 36HUAWEI Confidential
Parameters of the IPRT/OMCH/VLANMAP/VLANCLASS are automatically queried and manually modified.
Modification of transmission parameters of non-GSM macro sites and micro sites is supported.
11. Common - Base station managementFunction 2: GUI-based Detection
The parameters offer the optional items, which helps reduce
manual input.
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 37HUAWEI Confidential
User-defined query commands (LST and DSP) are supported.
Error commands are identified and you know the execution progress and return packet at a glance.
12. Common - User-defined MML query
Function 2: GUI-based Detection Error commands are identified at a glance and the execution progress can be stopped at any time.
Format the command,highlight the wrong ones.
Procedure
1. Edit MML,save file to /HuaweiBTSInfo/MML.2. WDT preparse the command and filter the wrong one.3. Send commands to site and display the results.
Pause at any time
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 38HUAWEI Confidential
Applies to only the LampSite base station. The check item is presented only when you log in from the LampSite entrance. Presents the topology relationship of the BBU baseband boards, the RHUB, and the pRRU, and the cabinet, subrack, slot, and cell information. Filters existing cell IDs, indexes directly to the pRRU where the current cell locates, and checks the verification relationship.
13. Hardware installation check - Presented in the LampSite topologyFunction 2: GUI-based Detection
Check to exclude the pRRU installation and connection errors.1. Comparing the ESN of querying results and Installation drawings to find out the connection errors.2. Comparing the cell by the same way to find out the installation errors.
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 39HUAWEI Confidential
Use the maintenance Wi-Fi of the small-cell base station to log in to the DOCK to query and
manage the transmission parameters.
14. Small-cell base station - DOCK (BTS3203E and BTS3803E)
Function 2: GUI-based Detection
Note: Do not change the default maintenance IP address (192.168.0.49) of the small cell base station to avoid effecting the time synchronization of the small-cell base station and the DOCK.
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 40HUAWEI Confidential
Attachment 1: Base station commissioning - Site deployment logs
Site deployment logs display operation processes and records related to base stations.
All operations related to base stations are traceable.
Function 2: GUI-based Detection
Each operation is recorded precisely, allowing you to trace and locate operations easily.
You can manually check WDT logon phone, the path is\HuaweiWDTData\SiteName\LOG\
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 41HUAWEI Confidential
Attachment 2: Site acceptance - Data uploading
After site deployment is complete, data is automatically uploaded to the OMC engineer email.
Sender and recipient emails are configurable. The sender email box must be Gmail.
Function 2: GUI-based Detection
One-click uploading and OMC synchronization locating
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 42HUAWEI Confidential
Base station commissioning - Operation replay
You can replay deployment data on the mobile phone.
Deployment results are displayed on GUIs,
facilitating later problem locating and communication.
Function 2: Data Replay for Easy Troubleshooting
Location of Replay files on phone
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 43HUAWEI Confidential
Function 3: Site Acceptance - Site Photo-Taking Fixed entry photo-taking: The mobile phone displays pre-configured entries on the screen. Workers take phones one by one based on these entries.
Random fault photo-taking. Take photos of all faults. Fault photos can be uploaded in real time, facilitating fault locating in time. Photos can be
selected and descriptions can be added to photos.
These entries can be customized. Photos are taken based on these entries. No photo is missing or improperly taken. Photos can be compressed or edited.
Compression will reduce the picture quality of 45%,With 13 million pixel mobile phone for reference,Uncompressed photo size is 1.2M,Compression, the picture 66k.
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 44HUAWEI Confidential
Function 4: Site Acceptance - ESN Bar Scanning
Workers scan bar codes based on pre-configured ESN entries. The function supports one-dimension
and two-dimension code scanning. The site name, RAT, and ESN name are automatically added before the ESN and then sent to OMC engineers by SMS or email. For example,
Site78_GSM_BBU:210305394710CB001076. The BBU ESN can be used in ESN binding during the M2000 PNP deployment in real time. This avoids the inefficiency and errors of manual ESN reading.
Avoid ESN copying and reading errors.Real-time uploading accelerates the PNP deployment.
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 45HUAWEI Confidential
Enable the function manually to automatically obtain GPS information.
GPS information is automatically saved in deployment reports.
GPS information is sent in real time, helping real-time position management.
Function 5: Site Acceptance - Acquisition of GPS dataAutomatic GPS picture savingCorrect site positionsCorrect time information
Add GPS info on photo
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 46HUAWEI Confidential
Function 6: Site Acceptance - Simple Service Verification Allows you to view brief information about radio parameters,such as radio parameters of GSM,UMTS,LTE,and Wi-Fi. You need to log in to the base station to obtain PCI parameters of the LTE. The short message sending and receiving, MMS message sending, calling test, the HTTP test, and the FTP uplink and
downlink tests are supported.
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 47HUAWEI Confidential
Set preferred network mode
Block other cells
Log in to the site to obtain
PCI (Optional)
Set parameters of SMS,calling
test,FTP,HTTP Result table
Main Activities of Simple Service Verification
Function 6: Site Acceptance - Simple Service Verification
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 48HUAWEI Confidential
The short message sending and receiving, MMS message sending, calling test, the HTTP test, and the FTP uplink and downlink tests are supported.
HTTP testSMS,MMS message sendingAnd receiving
Calling testFTPuplink and downlink
Result
Function 6: Site Acceptance - Simple Service Verification
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 49HUAWEI Confidential
Downloads the configuration file, software package, and license.
Supports retransmission of data, such as deployment logs, photos, and ESN.
Supports online test of version upgrade and online downloading.
Supports the license authentication.
Download software package and so on,Re-download them when changes on server
Upload logs to server
Show License validity date, seven days before the expiry prompts the user to postpone the operation
Functions 7: Common - Data serviceOnline upgrading
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 50HUAWEI Confidential
Contact Sang Yanqi 00189072, Wei Jie 00190129 to get Administrator privileges.
http://support-trial.huawei.com/onlinetools/sdtrp/project.action
It provides the APP uniform access, site deployment data transmission, site deployment result send-back, terminal APP automatic updating, and terminal APP license
management for the site deployment through smartphones.
Functions 7: Common - SDTRP
ID Type Function Description Special Requirements
1
Site deployment
management
Management of site deployment files
Provide the function to upload and delete site deployment files (such as site configuration files, software packages, and license files).
None
2Terminal configuration
Provide the function to configure the terminal APP parameters (such as the AP connection, base station settings, photographing items, ESN items, SWR thresholds, RET antenna, GSM self-defined alarms, undercurrent/overcurrent alarm settings, business validation, Email and SMS, and staff information) and transmit the data to the terminals based on actual project conditions.
None
Obtaining of the site deployment results
Provide the function to query site deployment result files (such as the ESNs, GPS, site deployment logs, fault photos, acceptance photos) and download the site deployment result files through terminals.
The terminal must be able to access the network.
3
4Assignment of the site deployment terminals
Provide the function to assign the sites to designated terminals for site deployment (for example, assign multiple sites in a batch to one terminal for sites deployment).
5
Terminal management
Terminal online registration
Provide the function that the terminals register to the SDTRP server and then be added after being audited by the user.
The terminal must be able to access the network.
Manual adding of site deployment terminals
Provide the function to manually add the terminals one by one based on the terminal IMEIs or import multiple terminals in a batch using an Excel file.
6
7Extension of terminal validity term
Provide the function to manually extend the terminal validity term and to extend the terminal validity term after auditing its application for extending its validity term on the SDTRP server.
The terminal must be able to access the network.
8Exporting of offline license
Provide the function to export the offline license file that is controlled by the terminal validity term. None
9Terminal APP management
Provide the function to upload the terminal APP installation packages and update the APP version. None
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 51HUAWEI Confidential
Create a project
Site list
Filter function
View site logs
Create a site
SDTRP - Site deployment management
Provide the function to create projects, create sites, upload and delete site deployment files
(such as site configuration files, software packages, and license files).
Provide the function to query site deployment result files, or to filter by sitename , status and time.
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 52HUAWEI Confidential
upload files
Starting Device number
Activated scenario
Undercurrent/Overcurrent threshold
Save as
Edit WDTConfig.txt
Visual editor, simple and flexible Set WDTConfig.txt on the WEB window of the SDTRP server.
Provide the function to set the starting device number, reduce configuration difficulty.
SDTRP - Site deployment management
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 53HUAWEI Confidential
SDTRP - Terminal management
Add Terminal
Supported bulk upload
Online license applying
Update WDT version
Administrator online add and audit and transfer terminal, provide the function to bulk upload terminal list.
Upload the WDT installation package, prompts terminal to download and update.
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 54HUAWEI Confidential
Function 9: Windows Background Tool - Operation Replay The mobile phone uploads deployment data in real time. The server displays deployment GUIs
synchronously, facilitating fault locating and communication.
Copies the deployment data folder HuaweiSDTData in the root directory to the PC. Replays deployment data on the PC and stimulates mobile phone GUIs to reproduce previous onsite GUIs.
Synchronous display of site faultsWhole replay of deployment processEveryone is a GTAC expert
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 55HUAWEI Confidential
Function 10: Windows Background Tool - Site Acceptance Report Generation The tool reads data generated during the deployment, such as deployment logs, site photos, ESNs, GPS
information, and service test data, automatically generates professional, neat, systemic, and comprehensive
reports, and submits them to telecom operators.
The 18-page report is automatically generated in 3 minutes.Site information is correct, complete, and neat.
96.174_DBS3900 WCDMA.xlsx
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 56HUAWEI Confidential
Thank you!