we are cre ati ng · 2020. 5. 4. · main projects main projects completed new university hospital...

40
WE ARE A better CRE ATI NG REALITY

Upload: others

Post on 02-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: WE ARE CRE ATI NG · 2020. 5. 4. · MAIN PROJECTS MAIN PROJECTS COMPLETED NEW UNIVERSITY HOSPITAL DENMARK _ 250.000 mq _ 2017 BROCCHI SCHOOL COMPLEX milan _ 6.400 mq _ 2016 “NORMALE”

W E A R E

A b e t t e rC R E A T I N G

R E A L I T Y

Page 2: WE ARE CRE ATI NG · 2020. 5. 4. · MAIN PROJECTS MAIN PROJECTS COMPLETED NEW UNIVERSITY HOSPITAL DENMARK _ 250.000 mq _ 2017 BROCCHI SCHOOL COMPLEX milan _ 6.400 mq _ 2016 “NORMALE”

Architecture & technology integratedin a unique design Who are we?Since 2011, ATIPROJECT works in the field of architecture and engineering, with passion and innovation, promoting environmentally friendly and zero-impact construction. ATIPROJECT today is an international company that operates in several countries with an innovative and constantly evolving approach. The driving force of our success lies in a team of cohesive and motivated, competent and visionary Architects and Engineers. Multidisciplinarity, the strength of integrated design, is the fuel of the creative process

which led the studio to stand out and emerge. Through the BIM platform, we guarantee a streamlined and effective management of the project with a total integration of all the disciplines obtaining a significant saving of resources, for the earth and for our clients. Today we can again imagine a sustainable future, in which the economic challenge never leaves behind the ecological one, in which our presence gives our children a healthier world. We strongly believe in this future and are determined to build it.

Page 3: WE ARE CRE ATI NG · 2020. 5. 4. · MAIN PROJECTS MAIN PROJECTS COMPLETED NEW UNIVERSITY HOSPITAL DENMARK _ 250.000 mq _ 2017 BROCCHI SCHOOL COMPLEX milan _ 6.400 mq _ 2016 “NORMALE”

our services

INTEGRATEDDESIGN

TENDERMANAGEMENT

PROJECT MANAGEMENT

ARCHITECTURE

STRUCTURE

MEP

ITALIAN TENDERS

AS - BUILT

COST CONTROL

TIME CONTROL

CONSTRUCTION ACTIVITIES CONTROL

PROCUREMENT MANAGEMENT

FOREIGN TENDERS

BIM

Architecture & technology integratedin a unique design

Page 4: WE ARE CRE ATI NG · 2020. 5. 4. · MAIN PROJECTS MAIN PROJECTS COMPLETED NEW UNIVERSITY HOSPITAL DENMARK _ 250.000 mq _ 2017 BROCCHI SCHOOL COMPLEX milan _ 6.400 mq _ 2016 “NORMALE”

Architecture & technology integratedin a unique design

our certifications

our numbers

Via G.B. Picotti, 12/14 56124 Pisa, ItaliaP.IVA: 02255140507Tel: +39 050 578460Fax: +39 0503869084

[email protected]

Certificate ISO 9001:2015

milan

Via C.Farini, 57/A 20159 Milano, ItaliaP.IVA: 02255140507Tel: +39 02 36572548Fax: +39 0503869084

ATIproject member of Green Building Council Italia

ATIproject member of dell’OICE

ODense

PARIs

Geneva

H.C. Andersens Boulevard 37,5.th 1553 CopenhagenCVR: 39302268

E-mail: [email protected]

H19 Boulevard Sebastopol,75001 Parigi, Francia

E-mail: [email protected]

Rue du Cendrier 12-141201 Geneve

P.IVA: n° CHE-450.862.112E-mail: [email protected]

ATIproject member of EFCA

Certificate ISO 14001:2015

our offices

belgrade

PISA

Majakovskog 10, 11080 Belgrade, SerbiaPIB: 109556064Tel: +381 11 3164045 /+381 11 7705907

PEC [email protected]

company revenue company staff

20112011 20122012 20132013 20142014 20152015 20162016 20172017 20182018 20192019

1 mln €

2 mln €

4 mln €

7 mln €

10 mln €

11 mln €

12 mln €

3 mln €

6 mln €

9 mln €

5 mln €

8 mln €

PISA110

MILAN30

Belgrade30PARIs

5

GeNEVA5

18512PERSONSSPRERADin 4 sedi

MLN €REVENUE2019

814 16

21

90

160

185

34

58

Page 5: WE ARE CRE ATI NG · 2020. 5. 4. · MAIN PROJECTS MAIN PROJECTS COMPLETED NEW UNIVERSITY HOSPITAL DENMARK _ 250.000 mq _ 2017 BROCCHI SCHOOL COMPLEX milan _ 6.400 mq _ 2016 “NORMALE”

tenders wontenders not won

% year success rate

2014

2015

20%

33%

16

4

1327

201330% 3

7

201636%

1832

201736%

37

67

66101

201840%

University hospitalOdense

specialist hospitalnigeria

onu officesGeNEVA

specialist hospitalangola

ha long hospital vietnam

ITALIAn EXPO pavilion 2020DUBAI

international hospitalcambogia

museum of writingsouth korea

250 WON TENDERS250 GARE VINTE

WE HAVE WON tenders for more than 1.5 BIL €

WE ARE currently working in 3 continents with 6 offices, spEAKING 8 DIFFERENT LANGUAGES

96

118201944%

Page 6: WE ARE CRE ATI NG · 2020. 5. 4. · MAIN PROJECTS MAIN PROJECTS COMPLETED NEW UNIVERSITY HOSPITAL DENMARK _ 250.000 mq _ 2017 BROCCHI SCHOOL COMPLEX milan _ 6.400 mq _ 2016 “NORMALE”

MAIN PROJECTS

MAIN PROJECTS COMPLETED

NEW UNIVERSITY HOSPITALDENMARK _ 250.000 mq _ 2017

BROCCHI SCHOOL COMPLEXmilan _ 6.400 mq _ 2016

“NORMALE” SCHOOL COMPLEXpisa _ 1.900 mq _ 2013

PRIMARY SCHOOL COMPLEXcalenzano (FI) _ 1.200 mq _ 2013

PRIMARY SCHOOL CALCINAIAcalcinaia (PI) _ 4.100 mq _ 2017

ex stallette RENOVATIONpisa _ 2.000 mq _ 2012

HIGH SCHOOL “A. vittoria”trento_ 9.600 mq _ 2017

vedalago sud SCHOOL COMPLEXvedelago (TV) _ 3.000 mq _ 2018

pisa stadiumpisa _ 20.000 spettatori _ 2010

ex caserma lupi BARRACKSfLORENCE _ 5.300MQ_ 2016

OFFICE sdkfellbach _ 24.000 MQ _ 2018

LENTATE SCHOOL COMPLEXlentate sul seveso _ 12.000_2017

ESSLINGEN CAMPUSesslingen _ 50.000_2016

palazzo diamanti ENLARGEMENTferrara _ 1.500_2017

cohousing zeropisa _ 1.200 mq _ 2014-2015

r. capranica SCHOOL COMPLEXamatrice _ 4.400 mq _ 2017

WRITING MUSEUMSOUTH KOREA _ 15.000 mq _ 2015

“umberto forti” HEADQUARTERpisa _ 4.750 mq _ 2013-2016

STROZZI SCHOOL COMPLEXmilan _ 6.800 mq _ 2016

dino compagni SCHOOL COMPLEXFLORENCE _ 8.000 mq _ 2017

scHOOLSHOSPITALSrestORATION-rENOVATIONhospitalityofficesresidencesurban riqualificationculturesportrenewable respurces

3817

44

1210

4762

Architecture & technology integratedin a unique design

Page 7: WE ARE CRE ATI NG · 2020. 5. 4. · MAIN PROJECTS MAIN PROJECTS COMPLETED NEW UNIVERSITY HOSPITAL DENMARK _ 250.000 mq _ 2017 BROCCHI SCHOOL COMPLEX milan _ 6.400 mq _ 2016 “NORMALE”

Architecture & technology integratedin a unique design

Nimis school complexLocation: Via Zilli 15, Nimis, Udine (UD)Clients: Comune di NimisServices: AR - ST - MEPPerformed services: Final and executive designYear: 2019Budget: 2.390.000,00 €Size: 1.400 mqWorks status: -Project Status: Final design completed

zibido school complexLocation: Via Matteotti 138, Zibido San Giacomo, (MI)Client: Comunde di Zibido San GiacomoServices: AR - ST - MEPPerformed services: Final and executive design Year: 2019Budget: 3.714.680,00 €Size: 11.700 mqWorks status: -Project Status: Executive design in progress

LEED

LEED

cam

cam

a4

a4

CasaClima

CasaClima

bim

bim

scHOOLsn .38

“margherita sarto sanson” primary schoolLocation: Comune di Riese Pio X, Treviso Client: Unione dei Comuni - Marca OccidentaleServices: AR - ST - MEPPerformed services: Final and executive design, CSOYear: 2019Budget: 3.100.000,00 €Size: 2.460 mqWorks status: -Project Status: Executive design in progress

pizzigoni school complexLocation: MilanClient: Comune di MilanoServices: AR - ST - MEPPerformed services: Preliminary projectYear: 2019Budget: 11.875.810,16 €Size: 43.800,00 mqWorks status: -Project Status: Design completed

scialoia school complexLocation: MilanClient: Comunde di MilanoServices: AR - ST - MEPPerformed services: Preliminary projectYear: 2019Budget: 36.600.000,00 €Size: 51.772,00 mqWorks status: -Project Status: Design completed

LEED

LEED

LEED

cam

cam

cam

a4

a4

a4

CasaClima

CasaClima

CasaClima

bim

bim

bim

Page 8: WE ARE CRE ATI NG · 2020. 5. 4. · MAIN PROJECTS MAIN PROJECTS COMPLETED NEW UNIVERSITY HOSPITAL DENMARK _ 250.000 mq _ 2017 BROCCHI SCHOOL COMPLEX milan _ 6.400 mq _ 2016 “NORMALE”

Classeenerg.

LEED

cam

CasaClima

bim

LEED

cam

CasaClima

bim

a4

a4

Architecture & technology integratedin a unique design

campus kid san lazzaro, bologna (BO)Location: Via Kennedy 47, San Lazzaro di Savena, Bologna (BO)Clients: Comune di San Lazzaro di SavenaServices: AR - ST - MEPPerformed services: Preliminary projectYear: 2018Budget: 8.250.000,00 €Size: 8.800 mqWorks status: -Project Status: Design completed

a4

LEED

cam

CasaClima

bim

schoolsn .38

lonate ceppino primary and middle school complex Location: Via V. Veneto, Lonate Ceppino (BO)Clients: Comune di Lonate CeppinoServices: AR - ST - MEPPerformed services: Preliminary projectYear: 2018Budget: 4.355.000,00 €Size: 3.510 mqWorks status: -Project Status: Design completed

LEED

cam

a4

CasaClima

bim

BORNATO school complexLocation: Bornato, Cazzago San Martino (BS)Clients: Comune di Cazzago San MartinoServices: AR - ST - MEP - IE - PIPerformed services: Executive designYear: 2019Budget: 4.105.000,00 €Size: 9500 mqWorks status: -Project Status: Executive design

LEED

cam

CasaClima

bim

“manara valgimigli” middle schoolLocation: via Nazario Sauro, San Piero in Bagno (FC)Clients: Comune di Bagno di Romagna (FC)Services: AR - ST Performed services: Preliminary projectYear: 2019Budget: 3.350.000,00 €Size: 2.000 mqWorks status: -Project Status: Project completed

carracci school campusLocation: Via Felice Battaglia, Bologna (BO)Clients: Comune di BolognaServices: AR - ST Performed services: Preliminary projectYear: 2019Budget: 4.827.439,00 €Size: 3.325 mqWorks status: -Project Status: Project completed

Page 9: WE ARE CRE ATI NG · 2020. 5. 4. · MAIN PROJECTS MAIN PROJECTS COMPLETED NEW UNIVERSITY HOSPITAL DENMARK _ 250.000 mq _ 2017 BROCCHI SCHOOL COMPLEX milan _ 6.400 mq _ 2016 “NORMALE”

Architecture & technology integratedin a unique design

“itis divini” san severino high schoolLocation: Viale Mazzini, San Severino Marche (MC)Clients: RTI (Marinelli Costruzioni S.r.l., Frimat S.p.a.)Services: AR - ST - MEPPerformed services: Executive designYear: 2018-2019Budget: 11.094.143,47 €Size: 9.063 mqWorks status: Under constructionProject Status: Design completed a4

LEED

cam

CasaClima

bim

schoolsn .38

“dante alighieri” school complex - mesticaLocation: Via Roma, Macerata (MC)Clients: Gualtieri Costruzioni s.a.s., Albertani Corporates s.p.a., Califel s.r.l.Services: AR - ST - MEPPerformed services: Executive designYear: 2018Budget: 6.800.852,00 €Size: 4665 mqWorks status: Work completedProject Status: Design completed a3

LEED

cam

CasaClima

bim

Empoli high schoolLocation: Via Raffaello Sanzio, Empoli (FI)Clients: Città Metropolitana di FirenzeServices: AR - ST - MEPPerformed services: Final and executive designYear: 2018Budget: 5.700.000,00 €Size: 8.002 mqWorks status: Awaiting completionProject Status: Final design completed, executive design in progress a4

LEED

cam

CasaClima

bim

pietro santini primary schoolLocation: Viale della Vittoria, Comune di Loro Piceno (MC)Clients: Strever spa, Salvati srlServices: AR - ST - MEPPerformed services: Executive designYear: 2018Budget: 1.394.574,76 €Size: 797 mqWorks status: Under constructionProject Status: Design completed a4

LEED

cam

CasaClima

bim

casale monferrato secondary schoolLocation: Cova-Adaglio historic building, Casale Monferrato (AL)Clients: Città di Casale MonferratoServices: AR - ST - MEPPerformed services: Final and executive designYear: 2018Budget: 1.500.000,00 €Size: 1.035,00 mqWorks status: Awaiting completionProject Status: Final design completed, executive design in progress a4

LEED

cam

CasaClima

bim

Page 10: WE ARE CRE ATI NG · 2020. 5. 4. · MAIN PROJECTS MAIN PROJECTS COMPLETED NEW UNIVERSITY HOSPITAL DENMARK _ 250.000 mq _ 2017 BROCCHI SCHOOL COMPLEX milan _ 6.400 mq _ 2016 “NORMALE”

Architecture & technology integratedin a unique design

AREA NORD school complex, PALERMOLocation: via Marinai Alliata, via Venere, Viale Regina Margherita, PalermoClients: Comune di PalermoServices: AR - ST - MEPPerformed services: Preliminary projectYear: 2017Budget: 10.517.400,00 €Size: 6.202 mqWorks status: -Project Status: Design completed a4

LEED

cam

CasaClima

bim

schoolsn .38

san benedetto dei marsi school complexLocation: San Benedetto dei Marsi (AQ)Clients: Comune di San Benedetto dei Marsi (AQ)Services: AR - ST Performed services: Preliminary projectYear: 2017Budget: 3.212.250,00 €Size: 2.500 mqWorks status: -Project Status: Design completed

LEED

cam

CasaClima

bim

Classeenerg.

vedelago sud school complexLocation: Via Corriva di Casacorba (SP n.5), Vedelago (TV)Clients: Comune di VedelagoServices: AR - ST - MEPPerformed services: Final and executive design, CSO, HSE, CMYear: 2017-2018Budget: 3.227.116,45 €Size: 3.155 mqWorks status: Under constructionProject Status: Design completed

LEED

cam

a4

CasaClima

bim

“b.malfatti” MIDDLE SCHOOLLocation: via Giovanni XXIII, Mori (TN)Clients: Provincia Autonoma di TrentoServices: AR - ST - MEPPerformed services: Preliminary projectYear: 2017Budget: 9.101.150,00 €Size: 6.000 mqWorks status: -Project Status: Design completed a4

LEED

cam

CasaClima

bim

lovadina primary schoolLocation: Spresiano, Treviso (TV)Clients: Provincia di TrevisoServices: AR - ST - MEPPerformed services: Executive designYear: 2018Budget: 1.366.902,15 €Size: 1.293,56 mqWorks status: Awaiting completionProject Status: Design completed a4

LEED

cam

CasaClima

bim

Page 11: WE ARE CRE ATI NG · 2020. 5. 4. · MAIN PROJECTS MAIN PROJECTS COMPLETED NEW UNIVERSITY HOSPITAL DENMARK _ 250.000 mq _ 2017 BROCCHI SCHOOL COMPLEX milan _ 6.400 mq _ 2016 “NORMALE”

Architecture & technology integratedin a unique design

“grazia deledda” school complexLocation: Via Tarragona 16, Alghero (SS)Clients: Comune di AlgheroServices: AR - STPerformed services: Preliminary projectYear: 2017Budget: 3.750.000,00 €Size: 3.050 mqWorks status: -Project Status: Design completed

Classeenerg.

LEED

cam

CasaClima

bim

schoolsn .38

ariano irpino high schoolLocation: Via R. D’Afflitto - Piazza San Francesco, Ariano Irpino (AV)Clients: Comune di Ariano IrpinoServices: AR - ST Performed services: Preliminary projectYear: 2017Budget: 8.000.000,00 €Size: 4.770 mqWorks status: -Project Status: Design completed

Classeenerg.

LEED

cam

CasaClima

bim

san giacomo school complexLocation: Laives (BZ), Alto Adige Clients: Comune di LaivesServices: AR - ST Performed services: Preliminary projectYear: 2017Budget: 9.201.600,00 €Size: 4.000 mqWorks status: -Project Status: Design completed

“salvatore farina” comprehensive instituteLocation: Via Antonio Diana, Ottava - Sassari (SS)Clients: Comune di SassariServices: AR - ST Performed services: Preliminary projectYear: 2017Budget: 1.888.957,25 €Size: 1.600 mqWorks status: -Project Status: Design completed

LEED

cam

CasaClima

bim

Classeenerg.

Classeenerg.

LEED

cam

CasaClima

bim

calci secondary schoolLocation: Via Vincente della Chiostra, Calci (PI)Clients: Comune di CalciServices: AR - ST - MEPPerformed services: Preliminary projectYear: 2017Budget: 3.045.000,00 €Size: 2.200 mqWorks status: -Project Status: Second place in the competition

Classeenerg.

LEED

cam

CasaClima

bim

Page 12: WE ARE CRE ATI NG · 2020. 5. 4. · MAIN PROJECTS MAIN PROJECTS COMPLETED NEW UNIVERSITY HOSPITAL DENMARK _ 250.000 mq _ 2017 BROCCHI SCHOOL COMPLEX milan _ 6.400 mq _ 2016 “NORMALE”

Architecture & technology integratedin a unique design

strozzi school complexLocation: Via Strozzi, zona decentramento 6, Milano (MI)Clients: RTI (Damiani Costruzioni srl, Diesse Electra Spa, Gianni Benvenuto Spa)Services: AR - ST - MEPPerformed services: Final and executive design, CSO, HSEYear: 2016 - 2017Budget: 9.148.400,00 €Size: 6.800 mqWorks status: Awaiting completionProject Status: Design completed

LEED

cam

a4

CasaClima

bim

schoolsn .38

“romolo capranica” school complexLocation: Via L. Campotosto, Amatrice (RI)Clients: RTI (CME Consorzio imprenditori Edili Soc. Coop., Euro impianti s.r.l.)Services: AR - ST - MEPPerformed services: Executive designYear: 2017Budget: 9.427.724,60 €Size: 4.600 mqWorks status: Work completedProject Status: Design completed

LEED

cam

a4

CasaClima

bim

“A. vittoria” high schoolLocation: Via Giusti, comune di Trento (TN)Clients: Provincia Autonoma di TrentoServices: AR Performed services: Preliminary projectYear: 2017Budget: 10.500.000,00 €Size: 9.600 mqWorks status: -Project Status: Project selected for the second phase

LEED

cam

CasaClima

bim

Classeenerg.

lentate sul seveso school complexLocation: Via Papa Giovanni XXIII, Lentate sul Seveso (MB)Clients: Comune di Lentate sul SevesoServices: AR - ST - MEPPerformed services: Preliminary projectYear: 2017Budget: 14.400.000,00 €Size: 12.000 mqWorks status: -Project Status: Design completed

LEED

cam

CasaClima

Classeenerg.

bim

calcinaia nursery and primary schoolLocation: Via Ubaldesca, Calcinaia (PI)Clients: Comune di CalcinaiaServices: AR - ST - MEPPerformed services: Final and executive design, CSOYear: 2017Budget: 4.415.000,00 €Size: 4.050 mqWorks status: Awaiting completionProject Status: Design completed

LEED

cam

a4

CasaClima

bim

Page 13: WE ARE CRE ATI NG · 2020. 5. 4. · MAIN PROJECTS MAIN PROJECTS COMPLETED NEW UNIVERSITY HOSPITAL DENMARK _ 250.000 mq _ 2017 BROCCHI SCHOOL COMPLEX milan _ 6.400 mq _ 2016 “NORMALE”

Architecture & technology integratedin a unique design

“l. da vinci” primary schoolLocation: Via Antonelli, Pistoia (PT)Clients: Russo Costruzioni s.a.sServices: AR - ST - MEPPerformed services: Executive designYear: 2015Budget: 1.660.000,00 €Size: 2.375 mqWorks status: Work completedProject Status: Design completed

LEED

cam

a4

CasaClima

bim

schoolsn .38

esslingen campusLocation: ex area di scalo merci, Esslingen, GermaniaClients: Landesbetrieb Vermögen und Bau Baden-WürttembergServices: AR - ST - MEPPerformed services: Preliminary projectYear: 2016Budget: 83.500.000,00 €Size: 50.220 mqWorks status: -Project Status: Design completed

LEED

cam

CasaClima

bim

Classeenerg.

barga high schoolLocation: Via dell’Acquedotto, Barga (LU)Clients: Provincia di LuccaServices: AR - ST - MEPPerformed services: Executive designYear: 2016Budget: 2.698.571,00 €Size: 2.800 mqWorks status: Work completedProject Status: Design completed

LEED

cam

CasaClima

bim

dino compagni school complexLocation: Via G. Sirtori, via Don Verità, Firenze (FI)Clients: Vincenzo Russo Costruzioni s.r.l.Services: AR - ST - MEPPerformed services: Final and executive design, CSO, HSEYear: 2016-2017Budget: 10.464.000,00 €Size: 8.000 mqWorks status: Work completedProject Status: Design completed

LEED

cam

a4

CasaClima

bim

brocchi primary school complexLocation: Via Brocchi 5, Milano (MI)Clients: RTI (ARCO Lavori S.c.c., R.D.F. Srl)Services: AR - ST - MEPPerformed services: Final and executive design, CSO, HSEYear: 2016 - 2017Budget: 11.689.000,00 €Size: 6.400 mqWorks status: Under constructionProject Status: Design completed

LEED

cam

a4

CasaClima

bim

a4

Page 14: WE ARE CRE ATI NG · 2020. 5. 4. · MAIN PROJECTS MAIN PROJECTS COMPLETED NEW UNIVERSITY HOSPITAL DENMARK _ 250.000 mq _ 2017 BROCCHI SCHOOL COMPLEX milan _ 6.400 mq _ 2016 “NORMALE”

Architecture & technology integratedin a unique design

LEED

cam

a+

CasaClima

bim

fornacette primary schoolLocation: Via Morandi, Fornacette - Calcinaia (PI)Clients: LL Costruzioni srlServices: AR - ST - MEPPerformed services: Final designYear: 2013Budget: 4.017.000,00 €Size: 3.600 mqWorks status: -Project Status: Design completed

calenzano nursery schoolLocation: Località Settimello, Calenzano (FI)Clients: Russo Costruzioni s.a.s.Services: AR - ST - MEPPerformed services: Final and executive design, CSO, HSE, CMYear: 2013 - 2015Budget: 1.092.551,00 €Size: 1.200 mqWorks status: Work completedProject Status: Design completed

LEED

cam

a+

CasaClima

bim

“capuana” kindergarden schoolLocation: Via Campania, Firenze (FI)Clients: Russo Costruzioni s.a.s.Services: AR - ST - MEPPerformed services: Executive designYear: 2012Budget: 2.506.287,00 €Size: 1.700 mqWorks status: Work completedProject Status: Design completed

LEED

cam

a

CasaClima

bim

schoolsn .38

Page 15: WE ARE CRE ATI NG · 2020. 5. 4. · MAIN PROJECTS MAIN PROJECTS COMPLETED NEW UNIVERSITY HOSPITAL DENMARK _ 250.000 mq _ 2017 BROCCHI SCHOOL COMPLEX milan _ 6.400 mq _ 2016 “NORMALE”

Architecture & technology integratedin a unique design

hospitalsn .17

new university hospital - dp03/dp04Location: Odense, DanimarcaClients: RTI (CMB Soc. Coop. Muratori e Braccianti di Carpi, Itinera s.p.a.)Services: AR - ST - MEPPerformed services: Final and executive designYear: 2018-2019Budget: 382.000.000,00 €Size: 160.000 mqWorks status: Under constructionProject Status: Final design completed, executive in progress

new university hospital - dp05/dp08Location: Odense, DanimarcaClients: RTI (CMB Soc. Coop. Muratori e Braccianti di Carpi, Itinera s.p.a.)Services: AR - ST - MEPPerformed services: Final and executive designYear: 2018-2019Budget: 203.000.000,00 €Size: 93.000 mqWorks status: Under constructionProject Status: Final design completed, executive in progress

CESENA new hospitalLocation: Cesena - Area di Villa ChiavicheClients: Azienda U.S.L della RomagnaServices: AR - ST - MEP - IE - PIPerformed services: Preliminary projectYear: 2019Budget: 14.690.000,00 €Size: 220.000 mqWorks status: -Project Status: Design completed

bucarest central hospitalLocation: Bucarest, RomaniaClients: Centrale militare di emergenza universitaria “DR. Carol Davila”Services: ARPerformed services: Preliminary project, Feasibility designYear: 2019Budget: 130.000.000,00 €Size: 75.000 mqWorks status: -Project Status: Design in progress

vaprio d’adda reconversion hospitalLocation: Vaprio d’Adda, MilanoClients: AR.CO Lavori Soc. Coop. Cons.Services: AR - ST - MEPPerformed services: Executive designYear: 2016-2017Budget: 2.433.000,00 €Size: 800 mqWorks status: Work completedProject Status: Design completed

LEED

LEED

LEED

LEED

cam

cam

cam

cam

CasaClima

CasaClima

CasaClima

CasaClima

bim

bim

bim

bim

Classeenerg.

Classeenerg.

Classeenerg.

Classeenerg.

Classeenerg.

LEED

cam

CasaClima

bim

Page 16: WE ARE CRE ATI NG · 2020. 5. 4. · MAIN PROJECTS MAIN PROJECTS COMPLETED NEW UNIVERSITY HOSPITAL DENMARK _ 250.000 mq _ 2017 BROCCHI SCHOOL COMPLEX milan _ 6.400 mq _ 2016 “NORMALE”

Architecture & technology integratedin a unique design

compact hospital, bangkokLocation: Bangkok, ThailandiaClients: Rheinmental, International Engegneering GubttServices: AR Performed services: Preliminary projectYear: 2015 Budget: 85.000.000,00 €Size: 34.000 mqWorks status: -Project Status: Design completed

international hospital, cambogiaLocation: CambogiaClients: Rheinmental, International Engegneering GubttServices: AR Performed services: Preliminary projectYear: 2015Budget: 67.500.000,00 €Size: 27.000 mqWorks status: - Project Status: Design completed

green hospitalLocation: CambogiaClients: Rheinmental International Engegneering GubttServices: AR Performed services: Preliminary projectYear: 2015Budget: 75.000.000,00 €Size: 30.000 mqWorks status: - Project Status: Design completed

LEED

cam

CasaClima

bim

Classeenerg.

LEED

cam

CasaClima

bim

Classeenerg.

LEED

cam

CasaClima

bim

Classeenerg.

san matteo general hospitalLocation: Pavia (PV)Clients: RTI (Paolo Beltrami s.p.a., Sicrea Group)Services: AR - ST - MEPPerformed services: Final deisgnYear: 2016Budget: 23.123.500,91 €Size: 10.800 mqWorks status: -Project Status: Design completed

modular hospitalLocation: IndonesiaClients: Rheinmental International Engegneering GubttServices: AR Performed services: Preliminary projectYear: 2016Budget: 10.750.000,00 €Size: 4.300 mqWorks status: -Project Status: Design completed

a4

LEED

cam

CasaClima

bim

LEED

cam

CasaClima

bim

Classeenerg.

hospitalsn .17

Page 17: WE ARE CRE ATI NG · 2020. 5. 4. · MAIN PROJECTS MAIN PROJECTS COMPLETED NEW UNIVERSITY HOSPITAL DENMARK _ 250.000 mq _ 2017 BROCCHI SCHOOL COMPLEX milan _ 6.400 mq _ 2016 “NORMALE”

Architecture & technology integratedin a unique design

“andrea danielato” institution for the elderlyLocation: Cavarzere (VE)Clients: CEIF soc coop, Umanitaria edile soc coopServices: AR - ST - MEPPerformed services: Executive designYear: 2015Budget: 7.000.000,00 €Size: 5.870 mqWorks status: Work completedProject Status: Design completed

angola hospitalLocation: AngolaClients: -Services: AR Performed services: Preliminary projectYear: 2010Budget: 14.000.000,00 € Size: 7.000 mqWorks status: - Project Status: Design completed

ha long hospitalLocation: Ha Long, VietnamClients: -Services: AR Performed services: Preliminary projectYear: 2010Budget: 50.000.000 €Size: 25.000 mqWorks status: - Project Status: Design completed

LEED

LEED

LEED

cam

cam

cam

CasaClima

CasaClima

CasaClima

bim

bim

bim

Classeenerg.

A+

Classeenerg.

“stella maris” hospitalLocation: Pisa (PI)Clients: Fondazione Stella Maris - IRCCSServices: AR - ST - MEPPerformed services: Preliminary projectYear: 2015Budget: 11.500.000,00 €Size: 12.000 mqWorks status: -Project Status: Design completed

cisanello hospital entrance and waiting roomLocation: Pisa (PI)Clients: C.L.C. Soc. Coop.Cooperativa lavoratori delle costruzioniServices: AR - ST - MEPPerformed services: Preliminary, final and executive designYear: 2015Budget: 1.287.040,00 €Size: 1.030 mqWorks status: Work completedProject Status: Design completed

a+

LEED

cam

CasaClima

bim

cam

a+

LEED

CasaClima

bim

hospitalsn .17

Page 18: WE ARE CRE ATI NG · 2020. 5. 4. · MAIN PROJECTS MAIN PROJECTS COMPLETED NEW UNIVERSITY HOSPITAL DENMARK _ 250.000 mq _ 2017 BROCCHI SCHOOL COMPLEX milan _ 6.400 mq _ 2016 “NORMALE”

Architecture & technology integratedin a unique design

“plateau state” hospitalLocation: Jos, Plateau StateClients: -Services: ARPerformed services: Preliminary projectYear: 2009Budget: 36.000.000,00 €Size: 18.000 mqWorks status: - Project Status: Design completed

spla hospitalLocation: Juba, Sud SudanClients: - Services: AR Performed services: Preliminary projectYear: 2009Budget: 36.000.000,00 €Size: 18.000 mqWorks status: - Project Status: Design completed

LEED

LEED

cam

cam

CasaClima

CasaClima

bim

bim

Classeenerg.

Classeenerg.

hospitalsn .17

Page 19: WE ARE CRE ATI NG · 2020. 5. 4. · MAIN PROJECTS MAIN PROJECTS COMPLETED NEW UNIVERSITY HOSPITAL DENMARK _ 250.000 mq _ 2017 BROCCHI SCHOOL COMPLEX milan _ 6.400 mq _ 2016 “NORMALE”

Architecture & technology integratedin a unique design

restoration-renovation n .04

l. da vinci buildings renovationLocation: MilanoClients: ELI COSTRUZIONI SCARL Services: AR - ST - MEPPerformed services: Executive designYear: 2015Budget: 1.805.187,77 €Size: 4.400 mqWorks status: Work completedProject Status: Design completed

arinci primary schoolLocation: Monsummano Terme (PT)Clients: CMSA Società Coop. Muratori e Affini Soc. Coop.Services: AR - ST - MEPPerformed services: Executive designYear: 2015Budget: 964.576,73 €Size: 2.360 mqWorks status: Work completedProject Status: Design completed

palazzo di vetro renovation and energy efficiencyLocation: Aprilia (LT)Clients: CAR- Consorzio Artigiani Romagnolo Services: AR - MEPPerformed services: Executive designYear: 2014Budget: 1.360.000,00 €Size: 3.385 mqWorks status: Work completedProject Status: Design completed

“normale” school complexLocation: Piazza San Silvestro, Pisa (PI)Clients: Russo Costruzioni s.a.s.Services: AR - ST - MEPPerformed services: Executive design, CSOYear: 2013Budget: 4.125.114,87 €Size: 1.900 mqWorks status: Work completedProject Status: Design completed

LEED

LEED

cam

cam

CasaClima

CasaClima

bim

bim

Classeenerg.

Classeenerg.

LEED

cam

CasaClima

bim

Classeenerg.

LEED

cam

CasaClima

bim

Classeenerg.

Page 20: WE ARE CRE ATI NG · 2020. 5. 4. · MAIN PROJECTS MAIN PROJECTS COMPLETED NEW UNIVERSITY HOSPITAL DENMARK _ 250.000 mq _ 2017 BROCCHI SCHOOL COMPLEX milan _ 6.400 mq _ 2016 “NORMALE”

Architecture & technology integratedin a unique design

SALERNO resort complexLocation: Piazza della Libertà, SalernoClients: Luigi Soriente cantiere nauticiServices: AR - STPerformed services: Preliminary projectYear: 2014Budget: 3.966.070,00 €Size: 2100 mqWorks status: -Project Status: Design completed

Hospitalityn .04

3x3 / 3 hostels for 3 citiesLocation: Firenze / Berlino / PragaClients: Elite Club Vacanze GROUPServices: ARPerformed services: Preliminary projectYear: 2017Budget: 2.300.000,00 €Size: 40.000 mqWorks status: -Project Status: Project selected for the second phase

LEED

cam

CasaClima

bim

Classeenerg.

salza self serviceLocation: Montacchiello, PisaClients: Impresa lavori ing. U. Forti&FiglioServices: MEPPerformed services: Preliminary, final and executive design, CMYear: 2013Budget: 450.000,00 €Size: 700 mqWorks status: Work completedProject Status: Design completed

LEED

cam

CasaClima

bim

Classeenerg.

LEED

cam

CasaClima

bim

Classeenerg.

eu energy village - Pavilion masterplanLocation: Topola, SerbiaClients: SBI invest, T M nekretnineServices: AR - ST - MEPPerformed services: Preliminary projectYear: 2010Budget: 34.000 €Size: 2.580 mqWorks status: -Project Status: Design completed

LEED

cam

CasaClima

bim

Classeenerg.

Page 21: WE ARE CRE ATI NG · 2020. 5. 4. · MAIN PROJECTS MAIN PROJECTS COMPLETED NEW UNIVERSITY HOSPITAL DENMARK _ 250.000 mq _ 2017 BROCCHI SCHOOL COMPLEX milan _ 6.400 mq _ 2016 “NORMALE”

Architecture & technology integratedin a unique design

officesn .12

new r&d center of nice s.p.aLocation: Oderzo, ItaliaClients: Nice S.p.AServices: AR Performed services: Preliminary projectYear: 2019Budget: -Size: 6.250 mqWorks status: -Project Status: Design completed

central fire departmentLocation: Lecco, ItaliaClients: Direzione Regionale Vigili del Fuoco LombardiaServices: AR Performed services: Preliminary projectYear: 2019Budget: 8.650.000,00 €Size: 6.300 mqWorks status: -Project Status: Design completed

Classeenerg.

Classeenerg.

LEED

LEED

cam

cam

CasaClima

CasaClima

bim

bim

headquarter north design unionLocation: Tianjin, ChinaClients: North Design UnionServices: AR Performed services: Preliminary projectYear: 2019Budget: 25.000.000,00 €Size: 7.600 mqWorks status: -Project Status: Design completed

headquarter welcome italiaLocation: Massarosa, ItalyClients: Welcome ItaliaServices: AR - ST - MEPPerformed services: Preliminary projectYear: 2020Budget: --- €Size: 8750 mqWorks status: -Project Status: Design in progress

headquarter welcome italiaLocation: Milan, ItalyClients: Human TechnopoleServices: AR - ST - MEPPerformed services: Preliminary projectYear: 2019Budget: --- €Size: 57.150 mqWorks status: -Project Status: Design completed

Classeenerg.

Classeenerg.

LEED

LEED

cam

cam

CasaClima

CasaClima

bim

bim

Classeenerg.

LEED

cam

CasaClima

bim

Page 22: WE ARE CRE ATI NG · 2020. 5. 4. · MAIN PROJECTS MAIN PROJECTS COMPLETED NEW UNIVERSITY HOSPITAL DENMARK _ 250.000 mq _ 2017 BROCCHI SCHOOL COMPLEX milan _ 6.400 mq _ 2016 “NORMALE”

Architecture & technology integratedin a unique design

“umberto forti” headquarterLocation: Località Montacchiello, Pisa (PI)Clients: FORTI HOLDING S.p.a.Services: AR - ST - MEPPerformed services: Preliminary final and executive design, CMYear: 2012-2013Budget: 6.690.000,00 €Size: 4.750 mqWorks status: Work completedProject Status: Design completed

LEEDgold

cam

a4

CasaClima

bim

bim“ex stallette” renovationLocation: Cittadella Galileiana, Pisa (PI)Clients: Luigi Rota Costruzioni SncServices: MEPPerformed services: Executive designYear: 2012Budget: 1.875.060,00 €Size: 2000 mqWorks status: Work completedProject Status: Design completed

LEED

cam

CasaClima

Classeenerg.

officesn .12

“granulati zandobbio” headquartersLocation: Bolgare (BG)Clients: Granulati Zandobbio spaServices: AR - ST - MEPPerformed services: Preliminary projectYear: 2017Budget: 2.000.000,00 €Size: 1.056 mqWorks status: -Project Status: Design completed

atiproject officesLocation: Pisa (PI), Milano (MI)Clients: AtiprojectServices: AR - ST - MEPPerformed services: Preliminary final and executive design, CSO, HSE, CMYear: 2015-2018Budget: 1.200.000 €Size: 800 mqWorks status: Work completedProject Status: Design completed

cam

cam

a4

CasaClima

CasaClima

bim

bim

Classeenerg.

LEED

LEED

sdk officesLocation: Fellbach, GermaniaClients: SDK - collab.: Kühnl + Schmidt ArchitektenServices: AR - ST - MEPPerformed services: Preliminary projectYear: 2018Budget: 41.600.000,00 €Size: 24.000 mqWorks status: -Project Status: Design completed

Classeenerg.

LEED

cam

CasaClima

bim

Page 23: WE ARE CRE ATI NG · 2020. 5. 4. · MAIN PROJECTS MAIN PROJECTS COMPLETED NEW UNIVERSITY HOSPITAL DENMARK _ 250.000 mq _ 2017 BROCCHI SCHOOL COMPLEX milan _ 6.400 mq _ 2016 “NORMALE”

Architecture & technology integratedin a unique design

officesn .12

ETG headquarterLocation: Podgorica, MontenegroClients: ETG InzinjeringServices: AR - ST - MEPPerformed services: Preliminary projectYear: 2010Budget: 1.800.000 €Size: 900 mqWorks status: -Project Status: Design completed

cam

CasaClima

bim

LEED

Classeenerg.

jolly plastic officesLocation: Larciano, Pistoia (PT)Clients: Jolly Plastic srlServices: AR - ST - MEPPerformed services: Preliminary final and executive designYear: 2010Budget: 1.200.000,00 €Size: 750 mqWorks status: Work completedProject Status: Design completed

Classeenerg.

LEED

cam

CasaClima

bim

Page 24: WE ARE CRE ATI NG · 2020. 5. 4. · MAIN PROJECTS MAIN PROJECTS COMPLETED NEW UNIVERSITY HOSPITAL DENMARK _ 250.000 mq _ 2017 BROCCHI SCHOOL COMPLEX milan _ 6.400 mq _ 2016 “NORMALE”

Architecture & technology integratedin a unique design

GREEN HOUSE residenceLocation: Pisa, Pisa (PI)Clients: CMSAServices: AR Performed services: Preliminary projectYear: 2018Budget: 860.000 €Size: 745,80 mqWorks status: -Project Status: Design completed

cohousing zeroLocation: Via Cuppari 13, Pisa (PI)Clients: Classe A SrlServices: AR - ST - MEPPerformed services: Preliminary final and executive design, CMYear: 2012-2013Budget: 1.500.000,00 €Size: 1200 mqWorks status: Work completedProject Status: Design completed

LEED

cam

a4

CasaClima

bim

residencesn .10

CasaClima

cam

bim

LEED

a4

Nádraží Žižkov residencesLocation: Zizkov, PragaClients: Penta Real Estate, s.r.o.Services: AR Performed services: Preliminary projectYear: 2019Budget: -- €Size: 46.000 mqWorks status: -Project Status: Design completed

CasaClima

cam

bim

LEED

a4

interni appartamento pisaLocation: PisaClients: ATIProjectServices: AR Performed services: Final and executive designYear: 2020Budget: -- €Size: 90 mqWorks status: Work completedProject Status: Design completed

brunico residencesLocation: BrunicoClients: Provincia autonoma di Bolzano, IPES Ufficio Tecnico EstServices: AR - ST - MEPPerformed services: Preliminary projectYear: 2019Budget: 5.400.000,00 €Size: 3.400,00 mqWorks status: -Project Status: Design completed

CasaClima

CasaClima

cam

cam

bim

bim

LEED

LEED

a4

a4

Page 25: WE ARE CRE ATI NG · 2020. 5. 4. · MAIN PROJECTS MAIN PROJECTS COMPLETED NEW UNIVERSITY HOSPITAL DENMARK _ 250.000 mq _ 2017 BROCCHI SCHOOL COMPLEX milan _ 6.400 mq _ 2016 “NORMALE”

Architecture & technology integratedin a unique design

marina di pisa passive houseLocation: Marina di Pisa, Pisa (PI)Clients: Luigi Rota Costruzioni SncServices: MEPPerformed services: Executive design, CMYear: 2010Budget: 120.000,00 €Size: 350 mqWorks status: Work completedProject Status: Design completed

montenero residenceLocation: Montenero, Livorno (LI)Clients: CO.GE.MAR Service S.r.l.Services: ARPerformed services: Preliminary projectYear: 2010Budget: 400.000,00 €Size: 194 mqWorks status: -Project Status: Design completed

CasaClima

cam

a+

bim

LEED

cam

a+

CasaClima

bim

LEED

cam

CasaClima

bim

LEED

Classeenerg.

residence in budvaLocation: Budva, MontenegroClients: ETG GrupaServices: AR - ST - MEPPerformed services: Preliminary projectYear: 2010Budget: 9.500.000 €Size: 4.850 mqWorks status: Awaiting completationProject Status: Design completed

residencesn .10

VInci Residential complexLocation: Vinci, Firenze (FI)Clients: S.R. Costruzioni S.r.l.Services: AR + MEPPerformed services: Executive designYear: 2011Budget: 6.200.000,00 €Size: 6.500 mqWorks status: Work in progressProject Status: Design completed

cam

a+

CasaClima

bim

LEED

erp massaLocation: ex Mattatoio comunale, Massa (MS)Clients: Macchia SrlServices: AR - ST - MEPPerformed services: Final and executive designYear: 2012Budget: 4.021.264,00 €Size: 2100 mqWorks status: Work in progressProject Status: Design completed

cam

a+

CasaClima

bim

LEED

Page 26: WE ARE CRE ATI NG · 2020. 5. 4. · MAIN PROJECTS MAIN PROJECTS COMPLETED NEW UNIVERSITY HOSPITAL DENMARK _ 250.000 mq _ 2017 BROCCHI SCHOOL COMPLEX milan _ 6.400 mq _ 2016 “NORMALE”

Architecture & technology integratedin a unique design

urban redevelopmentn .04

ex lupi barracks redevelopmentLocation: Firenze (FI)Clients: Comune di FirenzeServices: ARPerformed services: Preliminary projectYear: 2016Budget: 16.000.000 €Size: 5300 mqWorks status: -Project Status: Design completed a4

cam

CasaClima

bim

LEED

pIAcentiniano center in bergamo redevelopmentLocation: Centro Piacentiniano, BergamoClients: Comune di BergamoServices: AR Performed services: Preliminary projectYear: 2017Budget: 1.450.000,00 €Size: 700 mqWorks status: -Project Status: Design completed

LEED

cam

CasaClima

bim

Classeenerg.

maratea harbourLocation: Maratea (PZ)Clients: Comune di MarateaServices: ARPerformed services: Preliminary projectYear: 2017Budget: 2.200.000,00 €Size: 7.640 mqWorks status: -Project Status: Design completed

LEED

cam

CasaClima

bim

Classeenerg.

chinese University of Hong Kong campusLocation: ShenzenClients: Shenzhen Municipal GovernmentServices: AR Performed services: Preliminary projectYear: 2019Budget: 320.000.000,00 €Size: 79.000 mqWorks status: -Project Status: Design completed

LEED

cam

CasaClima

bim

Classeenerg.

Page 27: WE ARE CRE ATI NG · 2020. 5. 4. · MAIN PROJECTS MAIN PROJECTS COMPLETED NEW UNIVERSITY HOSPITAL DENMARK _ 250.000 mq _ 2017 BROCCHI SCHOOL COMPLEX milan _ 6.400 mq _ 2016 “NORMALE”

Architecture & technology integratedin a unique design

culturen .07

italian pavilion expo 2020Location: Expo 2020, DubaiClients: Invitalia S.p.A.Services: AR Performed services: Preliminary projectYear: 2019Budget: 13.061.450,00 €Size: 5.150 mqWorks status: -Project Status: Design completed

national Writing museumLocation: Songdo, Corea del SudClients: Ministero della Cultura, Sport, TurismoServices: ARPerformed services: Preliminary projectYear: 2017Budget: 34.000.000 €Size: 15.000 mqWorks status: -Project Status: Design completed

LEED

cam

a4

CasaClima

bim

cam

CasaClima

bim

LEED

Classeenerg.

“TAUTOS NAMAI” national auditoriumLocation: Vilnius, LithuaniaClients: --Services: AR Performed services: Preliminary projectYear: 2019Budget: ---Size: 17.000 mqWorks status: -Project Status: Design completed

san donato cultural center Location: Firenze, ItaliaClients: Immobiliare Novoli S.p.aServices: AR - ST - MEPPerformed services: Final and executive designYear: 2019Budget: 1.966.000,00 €Size: 2.185 mqWorks status: -Project Status: Executive design in progress

cam

cam

CasaClima

CasaClima

bim

bim

LEED

LEED

Classeenerg.

Classeenerg.

science centerLocation: Area di Trnovo, LubianaClients: Repubblica di Slovenia, Ministero dell’educazione, scienze e sport Services: AR Performed services: Preliminary projectYear: 2018Budget: 19.764.000,00 €Size: 11.900 mqWorks status: -Project Status: Design completed

cam

CasaClima

bim

LEED

Classeenerg.

Page 28: WE ARE CRE ATI NG · 2020. 5. 4. · MAIN PROJECTS MAIN PROJECTS COMPLETED NEW UNIVERSITY HOSPITAL DENMARK _ 250.000 mq _ 2017 BROCCHI SCHOOL COMPLEX milan _ 6.400 mq _ 2016 “NORMALE”

Architecture & technology integratedin a unique design

culturen .07

LEED

cam

a4

CasaClima

bim

parma cultural centerLocation: Area di Via Trento, ParmaClients: Comune di ParmaServices: AR Performed services: Preliminary projectYear: 2016Budget: 3.148.503,83 €Size: 4.300 mqWorks status: -Project Status: Design completed

PALAZZO DEI DIAMANTI extensionLocation: FerraraClients: Comune di FerraraServices: AR Performed services: Preliminary projectYear: 2017Budget: 2.615.000,00 €Size: 1.500 mqWorks status: -Project Status: Design completed

LEED

cam

a4

CasaClima

bim

Page 29: WE ARE CRE ATI NG · 2020. 5. 4. · MAIN PROJECTS MAIN PROJECTS COMPLETED NEW UNIVERSITY HOSPITAL DENMARK _ 250.000 mq _ 2017 BROCCHI SCHOOL COMPLEX milan _ 6.400 mq _ 2016 “NORMALE”

Architecture & technology integratedin a unique design

campo di rugby cus, pisaLocation: PisaClients: C.U.S. PISA a.s.d.Services: AR - MEPPerformed services: Executive design, CSO, HSE, CMYear: 2013Budget: 565.000,00 €Size: 7700 mq Works status: Work completedProject Status: Design completed

l. mannetti school gymLocation: Antrodoco, Rieti (Italia)Clients: Ufficio Speciale Ricostruzione LazioServices: AR - MEPPerformed services: Executive design, CSO,HSE, CMYear: 2019Budget: 1.078.000,00 €Size: 550 mq Works status: ---Project Status: Final design in progress

nembro sports arenaLocation: Nembro, Bergamo (Italia)Clients: Comune di Nembro, (BG)Services: AR - MEPPerformed services: Final and executive designYear: 2019Budget: 2.256.000,00 €Size: 2400 mq Works status: ----Project Status: Executive design in progress

marzabotto gymLocation: Marzabotto, BolognaClients: Comune di Marzabotto (BO)Services: AR - ST - MEPPerformed services: Preliminary projectYear: 2019Budget: 1.340.000,00 €Size: 1.274 mq Works status: -Project Status: Design completed

Matteotti instituteLocation: Pisa, ItaliaClients: Provincia di PisaServices: AR - ST - MEPPerformed services: Final and executive design, CSOYear: 2020Budget: 3.155.000,00 €Size: 2.290 mq Works status: -Project Status: Final design in progress

sportn .06

LEED

LEED

LEED

LEED

LEED

cam

cam

cam

cam

cam

CasaClima

CasaClima

CasaClima

CasaClima

CasaClima

bim

bim

bim

bim

Classeenerg.

Classeenerg.

Classeenerg.

Classeenerg.

Classeenerg.

bim

Page 30: WE ARE CRE ATI NG · 2020. 5. 4. · MAIN PROJECTS MAIN PROJECTS COMPLETED NEW UNIVERSITY HOSPITAL DENMARK _ 250.000 mq _ 2017 BROCCHI SCHOOL COMPLEX milan _ 6.400 mq _ 2016 “NORMALE”

Architecture & technology integratedin a unique design

sportn .06

pisa stadiumLocation: Ospedaletto, PisaClients: -Services: AR - ST - MEPPerformed services: Preliminary projectYear: 2010Budget: 60.000.000 €Size: capacità di 20.000 spettatoriWorks status: -Project Status: Design completed

LEED

cam

CasaClima

bim

Classeenerg.

Page 31: WE ARE CRE ATI NG · 2020. 5. 4. · MAIN PROJECTS MAIN PROJECTS COMPLETED NEW UNIVERSITY HOSPITAL DENMARK _ 250.000 mq _ 2017 BROCCHI SCHOOL COMPLEX milan _ 6.400 mq _ 2016 “NORMALE”

Architecture & technology integratedin a unique design

renewable resourcesn .02

GROSSETO PV 82,5 kwpLocation: GrossetoClients: -Services: MEPPerformed services: Final and executive design, CMYear: 2008Budget: 400.000 €Installed power: 82,5 KwPWorks status: Work completedProject Status: Design completed

LEED

cam

CasaClima

bim

Classeenerg.

photovoltaic systemLocation: Montalto, Fauglia (PI)Clients: Agenzia energetica provinciale di Pisa s.r.l.Services: AR - ST - MEPPerformed services: Final and executive design, CMYear: 2010Budget: 497.696,00 €Installed power: 147,20 KwPWorks status: Work completedProject Status: Design completed

LEED

cam

CasaClima

bim

Classeenerg.

Page 32: WE ARE CRE ATI NG · 2020. 5. 4. · MAIN PROJECTS MAIN PROJECTS COMPLETED NEW UNIVERSITY HOSPITAL DENMARK _ 250.000 mq _ 2017 BROCCHI SCHOOL COMPLEX milan _ 6.400 mq _ 2016 “NORMALE”

Architecture & technology integratedin a unique design

Project Management n .06

NEW University hospital, odense / 2019BUDGET: 600.000.000,00 €

spark one, milan / 2019BUDGET: 80.000.000,00 €

data center, bologna / 2019BUDGET: 36.000.000,00 €

shopping mall gran reno, bologna / 2019BUDGET: 80.000.000,00 €

onu offices, geneva / 2019BUDGET: 240.000.000,00 €

vp22 headquarters, milan / 2019BUDGET: 30.000.000,00€

1

4

2

5

3

6

2

1

78

935

4

6

7 8 9

THE ST.REGIS, BELGRADO / 2019BUDGET: 110.000.000,00 €

STUDENT HOUSE,Giovenale st., MILAN / 2020BUDGET: CIRCA 35.000.000,00 €

SEGREEN, SEGRATE / 2020BUDGET: circa 32.000.000,00 €

Page 33: WE ARE CRE ATI NG · 2020. 5. 4. · MAIN PROJECTS MAIN PROJECTS COMPLETED NEW UNIVERSITY HOSPITAL DENMARK _ 250.000 mq _ 2017 BROCCHI SCHOOL COMPLEX milan _ 6.400 mq _ 2016 “NORMALE”

Architecture & technology integratedin a unique design

ONU OfficesLocation: Ginvera, SvizzeraClients: CMB Services: Tender Management, Project ManagementYear: 2019Budget: 240.000.000,00€Credits: Architectural design: JV SOM and B+PStructural design: IngeniPlants design: RAPPLandscape: OxalisIT & Audiovisual: Shen Milson & WilkeSecurity: SBIS Securitas

VP22 headquartersLocation: Milano, ItaliaClients: Ediltecnorestauri Services: As - Built, Project ManagementYear: 2019Budget: 30.000.000,00 €

Credits: Architectural concept: Tectoo s.r.lArchitectural and Structural design:Tectoo s.r.l e Milan Ingegneria s.r.lMechanical plants design: Ariatta Ingegneria dei Sistemi S.p.AElectrical and special plants design: Ariatta Ingegneria dei Sistemi S.p.ALandscape: Erika Skabar

new university hospitalLocation: Odense, DanimarcaClients: Joint Venture (CMB + Itinera)Services: As - Built, Supporto Project ManagementYear: 2019Budget: 600.000.000,00€

Credits: Architectural concept: C.F. MollerAR + ST + MEP Design: ATIProject

Project Management n .09

shopping mall gran renoLocation: Bologna, ItaliaClients: CMBServices: As Built, Project ManagementYear: 2019Budget: 80.000.000,00 €

Credits: Architectural concept: Design InternationalArchitectural and Structural design: PlanningMechanical plants design: Studio NoceraElectrical and special plants design: SyTecLandscape: Studio Silva

Page 34: WE ARE CRE ATI NG · 2020. 5. 4. · MAIN PROJECTS MAIN PROJECTS COMPLETED NEW UNIVERSITY HOSPITAL DENMARK _ 250.000 mq _ 2017 BROCCHI SCHOOL COMPLEX milan _ 6.400 mq _ 2016 “NORMALE”

Architecture & technology integratedin a unique design

Project Management n .09

STUDENT HOUSE GIOVENALE STREETLocation: Milan, ItalyClients: Colombo Costruzioni S.p.AServices: As Built, Project ManagementYear: 2020Budget: about 35.000.000,00 €Credits: Architectural Design: Carmody Groarke, Calzoni ArchitettiStructural design: B.Cube S.r.l.Plants design: ESA EngineeringFire Safety: Jensen HughesSafety and Environment: REEAS - Real Estate Asset & Assurance ServiceLandscape: Arch. Giovanna Longhi

ECMWF DATA CENTERLocation: Bologna, ItalyClients: RTP Frimat - Site - Giani BenvenutoServices: As Built, Project ManagementYear: 2019Budget: 37.000.000,00 €

Credits: Architectural design and coordination: gmp Architekten von Gerkan Marg and PartnerStructural design: Werner Sobek StuttgartPlants design: Studio TLandscape: LAND Italia

ST. REGIS BELGRADELocation: Belgrade, SerbiaClients: Impresa Pizzarotti & C.Services: As Built, Quantity Check, ARYear: 2018 - 2021Budget: 110.000.000,00 €

Credits: Architectural Concept: Skidmore, Owings & Merrill LLP LEADINGDesign / Consultant: AECOM Middle East limitedInterior Design: HOK interior design

SPARK ONELocation: Milano, ItaliaClients: CMBServices: Tender ManagementYear: 2019Budget: 80.000.000,00 €

Credits: Architectural design: Progetto CMRStructural design: Milan Ingegneria s.r.lPlants design: DeernsFire Safety: GAE Engineering

Page 35: WE ARE CRE ATI NG · 2020. 5. 4. · MAIN PROJECTS MAIN PROJECTS COMPLETED NEW UNIVERSITY HOSPITAL DENMARK _ 250.000 mq _ 2017 BROCCHI SCHOOL COMPLEX milan _ 6.400 mq _ 2016 “NORMALE”

Architecture & technology integratedin a unique design

Project Management n .09

SEGREEN OFFICESLocation: Segrate, ItalyClients: EdiltecnorestauriServices: As Built, Project ManagementYear: 2020Budget: 32.000.000,00 €Credits: Local and Design Architect: Studio ElementareDevelopment and Executive Architect: Tekne S.p.AStructural Design: Tekne S.p.AConstructive Structures Design: IdeasMEP: Tekne S.p.AFire Prevention: Tekne S.p.ARemedation: Tekne S.p.ALandscape Design: Studio Elementare

Page 36: WE ARE CRE ATI NG · 2020. 5. 4. · MAIN PROJECTS MAIN PROJECTS COMPLETED NEW UNIVERSITY HOSPITAL DENMARK _ 250.000 mq _ 2017 BROCCHI SCHOOL COMPLEX milan _ 6.400 mq _ 2016 “NORMALE”

BIM & DIGITAL AWARDIn 2018 ATIproject srl was awarded the BIM & DIGITAL AWARD award in thePublic Buildings category for the Nyt OUH project, New Odense University Hospital (Denmark)

THE PLAN AWARD In 2019 ATIproject srl was awarded the THE PLAN AWARD award in the Health Future category for the Nyt OUH project, New Odense University Hospital (Denmark)

HONORABLE MENTION SCHÜCOIn 2015 ATIproject received the Schüco honorable mention for the constructionof the Umberto Forti Business Center, one of the TOP 20 2015 buildings builtwith Schüco systems

AWARDED PROJECT at the “Redevelopment Competition First Level Secondary School Complex No. 1” Grace Deledda “- Extraordinary School Building Plan Iscol @ Program Axis the” Schools of the New Millennium “, 2017

MENTION for the “Toscana Ecoefficiente” award for the project “C.A.S.A.Marina di Pisa, Building and living for environmental sustainability ”, 2012

AWARDED PROJECT at the “2014 Design Competition. Design and qualitytechnique as an economic opportunity”, Viessmann, for the project “New construction CHZERO”, 2014

2018

2019

2014

2012

2015

HONORABLE MENTION - ERAORAThe ATIproject itself is dedicated in 2011 to the honorable mention of the “Efficiency and Innovation Project” ideas contest, presenting the ERAORA project

MENTION for the “Toscana Ecoefficiente” award for “Casa Costantino”,2009-10

2011

2010

2017

Architecture & technology integratedin a unique design awarded projects

MENtions and qualifications

“umberto forti” new headquarterscompetition by invitation: first place

calci secondary schoolcompetition: 2nd place

“b. Malfatti” mori middle schoolselected for the second competition phase

campus kid san lazzaro, bolognacompetition: 3rd place

“a.vittoria” artistic high schoolselected for the second competition phase

3X3 / 3 hostels for 3 citiescompetition: 4th place

Page 37: WE ARE CRE ATI NG · 2020. 5. 4. · MAIN PROJECTS MAIN PROJECTS COMPLETED NEW UNIVERSITY HOSPITAL DENMARK _ 250.000 mq _ 2017 BROCCHI SCHOOL COMPLEX milan _ 6.400 mq _ 2016 “NORMALE”

EQUIPMENTHARDWARE TOOLS

185 computer 3 Plotter inkjet type 6 Laser printers / scanners 1 Audi A5 series, 1 BMW 3 series, 1 Electric Tesla

1 gopro camera1 nikon coolpix S2500 photocamera

1 Thermal imager

1 drone1 total station 2 laser distance meter1 oculus rift

MAIN SOFTWARE

EDILCLIMAx 14 licenses

PRIMUSx 14 licenses

SYNCHRO SOFTWAREx 1 license

PROGETTO INTEGRAx 2 licenses

CERTUSx 1 license

ACROBAT PRO DCx 12 licenses

MOLD SIMULATORx 1 license

DESIGN BUILDERx 1 license

LUMIONx 1 license

PRIMAVERAx 1 license

DIALUXfreewase

MANTUSx 1 license

SGM ARCHITECTUREx 1 license

AUTODESK BIM 360x 47 licenses

AMPEREx 1 license

EDILUSx 1 license

PROJECTx 10 licenses

MAGICADx 10 licenses

WINDOWSx 153 licenses

STRAUSx 1 license

REVIT/ REVIT LIVEx 59 licenses

3ds MAX x 7 licenses

REALITY CAPTUREx 7 licenses

AUTOCAD/LTx 111 licenses

OFFICE x 170 licenses

NAVISWORKx 7 licenses

ESCAPEx 3 licenses

PHOTOSHOPx 34 licenses

ILLUSTRATORx 20 licenses

INDESIGNx 20 licenses

Page 38: WE ARE CRE ATI NG · 2020. 5. 4. · MAIN PROJECTS MAIN PROJECTS COMPLETED NEW UNIVERSITY HOSPITAL DENMARK _ 250.000 mq _ 2017 BROCCHI SCHOOL COMPLEX milan _ 6.400 mq _ 2016 “NORMALE”

organization chart

Ing. Arch.Branko Zrnic

AR/ST

NewConstruction

Facility Management

Infrastructure

RenovationRestorations

Energy Management

ArchitectureAR

MEP BIM

StructureST

ArchitecturalCompetitions

ArchitecturalContests

EuropeanTenders

BIM managerLegenda

BIM specialistBIM coordinator

Ing.Luca Serri

MEP

technical directors

tenders

Project Manager project leader Project Manager / project leader Project Manager / project leader

design research and development

1 1 12 2 23 3 34 4 45 5 56 6 67 7 78 89 910 1011 1112 1213 13

141516

141516171819

17181920212223

Ing. Carmine SpinaArch. Annachiara LamorgeseArch. Erica Agnese CorvinoIng. dott. arch.Giuseppe VersaceIng. dott. arch. Paolo PanesiIng. dott. arch. Luciano MongelliIng. Carlo Sebastiano BalataIng. dott. arch. Dario LorenzettiIng. dott. arch. Chiara PicchiIng. dott. arch. Cristina BracciniIng. dott. arch. David MaimoneArch. Chiara Fugazzottodott. Ing. Marco TurniArch. Giulia BuffolinoIng. Arch. Marco Di RussoIng. dott. arch. Carlo A.Bertolinidott. Arch. Marianna SgarbantiIng. dott. arch. Natale Scarpittadott. Arch. Jacopo Bellomo

Ing. dott. arch. Rachele CiacchiniIng. Marco AlessandriniArch. Jelena VukčevićIng. dott. arch. Gaia BelliniArch. Enrica Ida CampobassoArch. Cristina MottaIng. dott. arch. Angela Pisciotta

Arch. Ing. Filippo ValleriniIng. Gian Luca GrassiniIng. dott. arch. Luca LanatàArch. Fabio CamberiniIng. dott. arch. Fabio BonciIng. Valerio BagagliArch. Stanimir PavlovićArch. Mila SplendianiIng. dott. arch. Chiara PorroniIng. dott. arch. Flavia SeniseIng. Michele VersaceIng. Arch. Tiziano SeriIng. dott. arch. Giulio de Nonnodott. Ing. Giacomo MaraniIng. dott. arch. Lucia MeucciIng. Mattia GiannettiIng. Chiara CiattoArch. Lorenzo BoatiArch. Annalisa RotaArch. Pietro PalombellaIng. Arch. Enrica PirronelloIng. Giorgia CavatortaIng. Lucrezia Dosmi

1 8 5 PERSONE

+ 63

+ 62

+ 17

110 PISA30 MILAN30 BELGRADe5 ODENSE5 PARIs5 GeNEVA

Page 39: WE ARE CRE ATI NG · 2020. 5. 4. · MAIN PROJECTS MAIN PROJECTS COMPLETED NEW UNIVERSITY HOSPITAL DENMARK _ 250.000 mq _ 2017 BROCCHI SCHOOL COMPLEX milan _ 6.400 mq _ 2016 “NORMALE”

5 BIM MANAGER

(L. Serri, F. Vallerini, L. Lanatà, S. Pavlovic, F.Bonci)

8 BIM COORDINATOR

(D. Lorenzetti, L. Boati, F. Senise, L. Dosmi, C.Porroni, M. Giannetti, M. Di Russo, G. Biscarini)

8 BIM SPECIALIST

(L. Romboli, G. De Nonno, M. Puccini, C. Ciatto, L. Passarello, M. Versace, M. Splendiani, G. Asaro, )

4 LEED GA

(B. Zrnic, L. Serri, M. Splendiani, M.Sgarbanti)

4 COMPETENT TECHNICIAN IN ACOUSTICS

(B. Zrnic,E. Pirronello, R. Di Lorenzo, P. Panesi)

5 QUALIFIED FOR SAFETY COORDINATION

(B. Zrnic, F. Camberini, L. Meucci, R. Ciacchini, F. Bonci)

3 FIRE PREVENTION TECHNICIANS

(L. Serri, C. Porroni, V. Bagagli)

1 COMMISSIONING AUTHORITY

(L. Serri)

2 CASACLIMA AUDITORS

(B. Zrnic, L. Serri)

QUALIFICations - CERTIF ICAtIONs

BIM

LEED

GA

Page 40: WE ARE CRE ATI NG · 2020. 5. 4. · MAIN PROJECTS MAIN PROJECTS COMPLETED NEW UNIVERSITY HOSPITAL DENMARK _ 250.000 mq _ 2017 BROCCHI SCHOOL COMPLEX milan _ 6.400 mq _ 2016 “NORMALE”

visita il nostro website:

www.atiproject.com

PISA OFFICEvia G.B. Picotti 12/1456124 Pisa (PI) ItalIA

+39 050 578460Piva: 02255140507

MILAN OFFICE via c. farini, 57/ a

20159 Milano (MI) ItalIA+39 02 36572548Piva: 02255140507

BELGRADE OFFICE Ugrinovacka 40

11080 BelgradO, Serbia+381 11 3164045+381 11 7705907

PIB: 109556064

ODENSE OFFICEH.C. Andersens Boulevard 37,5.th

1553 CopenhagenCVR: 39302268

PARIS OFFICEH19 Boulevard Sebastopol

75001 Parigi, Francia

GENEVA OFFICERue du Cendrier 12-14

1201 GeneveP.IVA: n° CHE-450.862.112

mail: [email protected]: [email protected]

cONTACTS