we, the bridge maintenance engineerswe, the bridge maintenance … · 2012-11-01 · of new york...

47

Upload: others

Post on 26-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all
Page 2: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all

We, the bridge maintenance engineersWe, the bridge maintenance engineersWe, the bridge maintenance engineers We, the bridge maintenance engineers of New York hold these truths to be selfof New York hold these truths to be self--

evident: all joints leak, all concreteevident: all joints leak, all concreteevident: all joints leak, all concrete evident: all joints leak, all concrete cracks, and rust never sleeps. We will cracks, and rust never sleeps. We will

strive to capitalize our way out of strive to capitalize our way out of st e to cap ta e ou ay out ost e to cap ta e ou ay out omaintenance and maintain our way out maintenance and maintain our way out of capital. It is our endeavor to educate of capital. It is our endeavor to educate o cap ta t s ou e dea o to educateo cap ta t s ou e dea o to educateothers that a bridge is as important to a others that a bridge is as important to a

highway as a diamond is to a ring.highway as a diamond is to a ring.g y gg y g

Page 3: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all

OBJECTIVESOBJECTIVES

FOCUS AREASFOCUS AREASDeck TreatmentsGirder Ends

Spot PaintingSpot PaintingBearing Replacement

Small Movement Expansion JointsSmall Movement Expansion Joints

EVOLVING PRACTICESEVOLVING PRACTICES

Page 4: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all

DECK TREATMENTSDECK TREATMENTSSheet MembranesSheet Membranes

NCHRP Synthesis 425completedcompleted

PolymersNCHRP Synthesis 423NCHRP Synthesis 423

completed

Paver-Placed SurfacePaver Placed Surface TreatmentsNCHRP 20 7 Task 330NCHRP 20-7 Task 330

on-going

Page 5: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all

RESEARCH - SYNTHESISRESEARCH SYNTHESIS

Page 6: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all

SHEET MEMBRANESSHEET MEMBRANESNCHRP Synthesis 425y

Bond–Bond-BondHot appliedot app ed

Crack treatments – rubber mat or geo grid

Worksite- require protection boardNeed – specifications based on quantitative definition of performance requirementsperformance requirements, objective testing, & LCC.

Page 7: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all

Waterproofing Bridge Deck Hot Mix Asphalt Overlay

ITEM 402.97

Page 8: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all

HYDROMILLING with LATEX or POLYESTER

Page 9: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all
Page 10: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all

TREATMENT SELECTIONDecks are rated 5

Page 11: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all

GIRDER ENDSGIRDER ENDS

BANG for the BUCK• High 4 vs. Low 5g• First Preservation $

GSFLAGS• Section Loss• Cracks

Frozen BearingsOut of plane bending

Page 12: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all

80

Reporting Numbers

3040506070

01020

1999 2000 2001 2002 2003 2004 2005 2006 2007 2008

YearRed Yellow Safety

R ti Fl d C diti

150200250

Reporting Flagged Condition

050

100

TOTAL

Page 13: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all

BEARING REPLACEMENTBEARING REPLACEMENT

Elastomeric onElastomeric on Concrete

AASHTO D t ilAASHTO DetailAllows elimination of masonry platemasonry plateIncludes keepersMathCad Module

AccessMoog trailersMoog trailers

Page 14: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all

MAINTENANCE of COATINGSMAINTENANCE of COATINGSSurface Prep TrialsSurface Prep Trials

SP-3High pressure washHigh pressure wash

Materials TrialsFi ld & l b t i lField & lab trials1 component

Other States PracticesResearch

NCHRP 14-30

Page 15: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all

EXPANSION JOINTSEXPANSION JOINTS

Failure MechanismsFailure MechanismsElastomeric concrete

Unsound concreteImproper mixing Open too soon

Seal / Joint / GlandImproper sizingSloppy workmanshipSloppy workmanship

Page 16: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all

NYSDOT Joint Calculator

1. Why is the Calculator needed?y2. What does the Calculator do?3 C ?3. How does the Calculator work?

Page 17: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all

To address Joint Seal failures across the State.

Possible reasons for failure include:1. Not choosing the correct width of the joint seal g j

during installation.2. Bad workmanship during installation of the p g

joint seal.

Page 18: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all
Page 19: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all
Page 20: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all
Page 21: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all
Page 22: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all

We basically use one of two methods:1 Research Record Plans in the office prior to1. Research Record Plans in the office prior to

going on-site, find the Design Opening with Design Temperature in the plans then refer toDesign Temperature in the plans, then refer to Manufacturer specifications and sizes (correct approach).

2. Measure the existing joint opening and refer to Manufacturer specifications and sizes (incorrect approach).

Page 23: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all

1 R d Pl R h1. Record Plan Research

Record Plans often have a detail and a table which indicate the design joint opening at 68oF.With this information, you can use the Manufacturer tables. The Manufacturer tables h i t f d i j i t i lshow a variety of design joint openings along

with wider recommended joint seal widths (sometimes with a different design temp i e(sometimes with a different design temp i.e. 60oF).

Page 24: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all

From Record Plans

Page 25: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all

Manufacturer Specificationsp

Page 26: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all
Page 27: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all

Closed-cell Foam JointsClosed cell Foam Joints

Closed-cell foam joint seals have become aClosed cell foam joint seals have become a popular choice of material to use when replacing armorless joint seals. This material behaves well i i b t t ll i t i Thi iin compression but not as well in tension. This is reflected in the Manufacturer’s Specifications which typically state Max Compression is 60%,which typically state Max Compression is 60%, Max Tension is 30%.

Page 28: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all

2. Manufacturer Specifications

Just go out to the bridge, measure the joint opening to work on and refer to the Manufacturer’s table.

– Not a good idea –The temperature of the bridge that day probably isn’t 68oF.

Page 29: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all
Page 30: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all
Page 31: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all

1 Why is the Joint Calculator Needed?1. Why is the Joint Calculator Needed?

ProblemsThe tables included in the Manufacturer Specifications indicate recommended seal widths based on a Design Temperature (i.e. 60oF)

You need to know the Design Joint Opening at the Design Temperature from Record Plans to use the Manufacturer t bl Thi i f ti i t l i th R d Pltables. This information is not always in the Record Plans, and when it is, it can be time consuming to find it. We sometimes don’t do it.

Also, if the joint opening was somehow modified after the original construction, the record plans are of no use.

Page 32: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all

1. Why is the Joint Calculator Needed?

ProblemsThe tables included in the Manufacturer Specifications indicate recommended seal widths to use for a variety of ybridge joint openings that allow the seal material to experience both compression and tension.

We don’t want the joint material to experience tension, we want zero tension.

Page 33: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all

Bridge Maintenance Charge:

Develop a calculator for Bridge Maintenance staff th t d t i th i j i t l tthat determines the proper size joint seal to install at any given temperature while on-site. The seal installed should not be subjected toThe seal installed should not be subjected to tension throughout its useful life.

Page 34: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all

2 Wh t d th J i t C l l t D ?2. What does the Joint Calculator Do?1. Calculates the Total joint movement in inches for the full range of1. Calculates the Total joint movement in inches for the full range of

temperatures established for each Region by AASHTO. In other words: it calculates the distance the girder expands from the lowest to the highest temperatures within a DOT Region.

2. Calculates “expected” joint widths or openings at three different temperatures (coldest temp, 68oF, warmest temp.)

3. Calculates the proper width and depth of the closed-cell foam3. Calculates the proper width and depth of the closed cell foam material to install on repair day while the crews are on-site. Sizing the joint material to equal the gap at the coldest temperature would not put the material into tension.

4. Calculates the Max. compression of the closed-cell foam material at the warmest temperature to see if it exceeds Manufacturer Max. Compression limit (typically 60%).

5. It does all this based on inputs from field observations.

Page 35: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all

3 How does the Joint Calculator Work?3. How does the Joint Calculator Work?

Basically comes down to calculating movement ofBasically comes down to calculating movement of the bridge as temperature changes.

N d 3 i bl t l l t “T t l M t”Need 3 variables to calculate “Total Movement”1. Coefficient of Thermal Expansion. “Φ”

2. Temperature Range (Max & Min) for your2. Temperature Range (Max & Min) for your particular Region. “∆T”

3. Length of bridge beams “contributing” to the total movement in the joint “L”total movement in the joint. L

Total Movement = Φ x ∆T x L

Page 36: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all

NYSDOT E i J i t C l l tNYSDOT Expansion Joint Calculator

M k l i f h f ll i iMake selections for the following categories:

NYSDOT Region R7

Primary Member Type SteelPrimary Member Type Steel

Input values for the following categories:Input values for the following categories:

Exist Temperature of Primary Member 55oF

*Length of Member(s) contributing to total movement @ joint 124Feet

*Exist Joint Opening (perpendicular to header) ⊥ 2inches

*Skew Angle (0o≤ θ <90o) 18Degree Skew

Max. Compression limit % of joint material (from Manufacturer) 60%

Page 37: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all

Results: (Perpendicular to header)

Joint Opening at 68oF (⊥) 1.88inches

Joint Opening at Coldest oF (⊥) 2.69inches

Joint Opening at Warmest oF (⊥) 1.54inches

Total movement of Joint within full Temp range (⊥) 1.15inchesTotal movement of Joint within full Temp range (⊥) 1.15inches

Width of New Closed Cell Foam (use Coldest Temp width (⊥)) 2.69inches

Depth of New Closed Cell Foam (if Manuf. info. not available) 2.50inches

Acceptablility based on Manufacturer's Compression limit OK

Compression @ Warmest Temp 42.75%

Compression @ Exist Temp 25.65%

Results: (Parallel to primary member)

Joint Opening at 68oF (//) 1.98inches

Joint Opening at Coldest oF (//) 2.83inches

J i O i W F (//) 1 62i hJoint Opening at Warmest oF (//) 1.62inches

Total movement of Joint within full Temp range (//) 1.21inches

Procedure B Temperature Ranges ‐ AASHTO

Coldest Temp for Primary Member used in your Region ‐20oF

Warmest Temp for Primary Member used in your Region +105oF

Page 38: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all
Page 39: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all
Page 40: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all

Show Calculator

Page 41: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all

Summary of ExamplesJt Size, Temp, Span L NYSDOT

Calculator(0% tension)

Manufacturer Recommendation

Conclusion

y p

2 ½”, 60oF, L=130 ft 3.31” (same) 3.25” Manufacturer recommendation same as NYSDOT calculator.

2 ½”, 10oF, L=130 ft 2.80” (-1/2”) 3.25” Manufacturer recommendation is oversized. May fail at high temps.

2 ½”, 100oF, L=130 ft 3.72” (+1/2”) 3.25” (t i 14 5%)

Manufacturer recommendation is d i d f 0% t i(tension=14.5%) undersized for 0% tension.

2 ½”, 60oF, L=230 ft 3.94” (+3/4”) 3.25” (tension=21.2%)

Manufacturer recommendation is undersized for 0% tension.

2 ½”, 60oF, L=250 ft FAILS (overcompressed)

3.25” Manufacturer Specs indicate Max Compression Limit to avoid in Spec Notes.

Page 42: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all

Overall Conclusion:

When contributing span lengths increase and/or temperatures increase, there is a a d/o te pe atu es c ease, t e e s aneed for wider seals to ensure 0% tension.

The NYSDOT calculator puts these design capabilities into the hands of our Bridge Repair Crews On the Go TechnologyRepair Crews. - On the Go Technology

Page 43: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all
Page 44: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all
Page 45: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all
Page 46: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all
Page 47: We, the bridge maintenance engineersWe, the bridge maintenance … · 2012-11-01 · of New York hold these truths to be selfof New York hold these truths to be self--evident: all